HomeMy WebLinkAboutCS 29-25Report to Council Report Number: CS 29-25 Date: October 27, 2025 From: Laura Gibbs Director, Community Services Subject: Emergency Plumbing Repairs at Chestnut Hill Developments Recreation Complex File: A-1440-001 Recommendation: 1. That Report CS 29-25 regarding Emergency Plumbing Repairs at Chestnut Hill Developments Recreation Complex be received for information. Executive Summary: The purpose of this report is to notify Council of the emergency repairs required at the Chestnut Hill Developments Recreation Complex (CHDRC). A maintenance project undertaken during the annual pool shutdown revealed that the sanitary plumbing line from the banquet hall kitchen, passing below the public change room, was not properly connected to downstream plumbing. What was originally believed to be a broken pipe requiring repair required much more extensive work, and the scheduled pool shutdown had to be extended as a result. A new connection solution was quickly developed and implemented, introducing a new sump pit between the two sections of pipe to re-establish the required connection. Temporary works have restored full service to the banquet hall kitchen and universal change room pending delivery of required parts and equipment for completion of the permanent repair . Smith & Long Ltd. has submitted a quote totaling $130,843.40 (HST included) for the emergency repairs. This quote has been accepted in accordance with Section 12.01 of the City’s Purchasing Policy (PUR 010) and Section 15 of the Purchasing Procedure (PUR 010 001). The total gross cost for the emergency repair is estimated at $146,545.00 (HST included), with a net project cost of $131,968.00 (net HST). Relationship to the Pickering Strategic Plan: The recommendations in this report respond to the Pickering Strategic Plan Priority of Advocate for an Inclusive, Welcoming, Safe & Healthy Community. Financial Implications: 1. Quotation Amount Emergency Plumbing Repairs $115,790.62 HST (13%) 15,052.78 Total Gross Quotation Cost $130,843.40 CS 29-25 October 27, 2025 Page 2 2. Estimated Project Costing Summary Emergency Plumbing Repairs $115,791.00 Contingency (12%) 13,895.00 Total Project Cost $129,686.00 HST (13%) 16,859.00 Gross Project Costs $146,545.00 HST Rebate (11.24%) (14,577.00) Total Net Project Costs $131,968.00 3. Approved Source of Funds Description Source of Funds Account Code Funds Required Emergency Plumbing Repairs - CHDRC Emergency Operational Needs - Capital 11100.50351 $131,968.00 Total Funds $131,968.00 In accordance with Purchasing Policy PUR 010, Section 12.01, in an emergency situation, staff are permitted to obtain such goods and services as are necessary to respond to the emergency . If the purchase amount exceeds $50,000.00, the Director must notify the Treasurer and CAO and the Director shall submit a report of the incident to the appropriate Committee and Council at the earliest possible time. Discussion: The purpose of this report is to notify Council of the emergency repairs required at the CHDRC. Planned maintenance repairs to a broken sanitary sewer line revealed that the line was disconnected and the required repair work is much more extensive than originally anticipated. 1. Emergency Repair Staff scheduled repairs for the sanitary lines from the banquet hall kitchen during the annual pool shutdown at CHDRC in early September 2025 due to a consistent blockage in the banquet hall kitchen sinks. A camera survey of the affected drains confirmed the approximate location of the blockage below the public change room, which appeared to be a break in the pipe. Once excavation began, it was revealed that the sanitary pipe in question was not connected to the downstream line and that a much more extensive repair was required. A solution was immediately devised, required engineering services engaged, and a building permit obtained. The impacted sanitary line is approximately 2.4 meters below the floor in the public change room . CS 29-25 October 27, 2025 Page 3 The regularly planned annual pool shutdown at CHDRC was extended by two weeks to implement a temporary solution and restore service to the banquet hall kitchen and public change room, as both remained unusable until the pipe was repaired. A new sump pit had to be provided as the incoming line was lower than the drain line to which it had to connect. An adjacent washroom has been converted into a mechanical room to contain the sump pit and eliminate any related risks or hazards to public enjoyment of the space. Four fully enclosed public washrooms remain available in the public changerooms. 2. Procurement In the event of an emergency, the Purchasing Policy permits the Manager, Procurement to develop new supply arrangements. Staff followed the procedures outlined in Section 12 of the Purchasing Policy , with the Director notifying the Treasurer and CAO of the emergency purchase at the earliest possible time. Since this purchase exceeds $50,000.00 Council is being notified. Restoring service to the banquet hall and public change rooms were of the utmost importance to minimize impacts to pending rentals, programming and service delivery. As per Purchasing Policy, Section 12.01, the Community Services Department is notifying Council of the emergency repair work being completed by Smith & Long Ltd. in the amount of $130,843.40 (HST included). The total net project cost inclusive of contingency is estimated at $131,968.00 (net HST). Attachment: None Prepared By: Approved/Endorsed By: Original Signed By Original Signed By Vince Plouffe, OAA, MRAIC Laura Gibbs, MBA, MSc. Division Head, Facilities Management Director, Community Services & Construction Original Signed By Stan Karwowski, MBA, CPA, CMA Director, Finance & Treasurer Original Signed By Cathy Bazinet, CPPB, NIGP-CPP Manager, Procurement CS 29-25 October 27, 2025 Page 4 LG :vp Recommended for the consideration of Pickering City Council Original Signed By Marisa Carpino, M.A. Chief Administrative Officer