Loading...
HomeMy WebLinkAboutINF 01-25Report to Council Report Number: INF 01-25 Date: April 29, 2025 From: Brian Duffield Director, City Infrastructure Subject: Wilson Bridge Replacement (Bridge 7002) Request for Tender No. T2025-2 File: A-1440 Recommendation: 1. That the bid submitted by Esposito Bros. Construction Ltd. in response to Request for Tender No. T2025-2 for Wilson Bridge Replacement, in the amount of $1,990,291.00 (net HST) or $2,210,129.43 (HST included), be accepted; 2. That Council award the contract administration and construction inspection for Request for Tender No. T2025-2 Wilson Bridge Replacement to Greer Galloway Group Inc. in the amount of $102,538.35 (HST included); in accordance with the Purchasing Policy Section 10.03 (c) as the assignment is above $50,000.00; 3. That the total gross project cost of $2,661,318.00 (HST included), including the tendered amount, contract administration and inspection services, a contingency, and other associated costs, and the total net project cost of $2,396,600.00 (net HST) be approved; 4. That Council authorize the Director, Finance & Treasurer to finance the total net project cost of $2,396,600.00 as follows: a. The sum of $2,000,000.00 as approved in the 2025 Capital Budget be increased to $2,396,600 and be funded from the Building Faster Fund Reserve Fund; and, 5. That the appropriate officials of the City of Pickering be authorized to take the necessary actions as indicated in this report. Executive Summary: The purpose of this report is to obtain Council approval to award Request for Tender (RFT) No. T2025-2 for Wilson Bridge Replacement to Esposito Bros. Construction Ltd. and to award contract administration and inspection services to Greer Galloway Group Inc.. As part of the 2025 Roads Capital Budget, Wilson Bridge Replacement (Bridge 7002) was approved as construction project. Request for Tender No. T2025-2 was advertised on the City’s bids&tenders portal on Friday, March 7, 2025 and closed on Monday, April 7, 2025 with seven bidders responding. The lowest compliant bid of $1,990,291.00 (net HST) or $2,210,129.43 (HST included) submitted by Esposito Bros. Construction Ltd. is recommended for approval. INF 01-25 April 29, 2025 Subject: Wilson Bridge Replacement (Bridge 7002) Page 2 Greer Galloway Group Inc. have provided a fee proposal dated January 13, 2025 in the amount of $90,742.00 for all construction related services and are recommended for approval in accordance with the Purchasing Policy Section 10.03 (c). The total gross project cost which includes the tendered amount, a construction contingency, and other associated costs is estimated at $2,661,318.00 (HST included) with an estimated total net project cost of $2,396,600.00 (net HST). Relationship to the Pickering Strategic Plan: The recommendations in this report respond to the Pickering Strategic Plan Priority of Advance Innovation & Responsible Planning to Support a Connected, Well-Serviced Community. Financial Implications: 1. Tender Amount Request for Tender No. T2025-2 $1,955,866.75 HST (13%) Total Gross Tender Amount 254,262.68 $2,210,129.43 2. Estimated Project Cost Summary Request for Tender No. T2025-2 – Tender for Wilson Bridge Replacement $1,955,867.00 Associated Costs Contract Administration and Construction Inspection Services 90,742.00 Materials Testing Provincial Building Faster Fund (BFF) Sponsor Signage 12,660.00 2,500.00 Construction Contingency (15%) 293,380.00 Sub Total - Costs $2,355,149.00 HST (13%) 306,170.00 Total Gross Project Cost $2,661,319.00 HST Rebate (11.24%) (264,719.00) Total Net Project Cost $2,396,600.00 3. Approved Expense Accounts Expenditure Account Source of Funds Budget Required C10570.1505.01-504420 Total Funds BFF Reserve Fund $2,000,000.00 $2,000,000.00 $2,396,600.00 $2,396,600.00 Net project cost (over) under approved funds ($396,600.00) INF 01-25 April 29, 2025 Subject: Wilson Bridge Replacement (Bridge 7002) Page 3 A higher construction contingency of 15 percent has been included as an associated cost as bridge replacement projects have a high degree of complexity due to in-water work and the potential for unforeseen site conditions. The Wilson Bridge project was approved by the Province to be funded by the Building Faster Fund. There are sufficient dollars available to cover the over expenditure from the funding received for reaching 2023 housing targets ($5.2 million). The construction of this project must be completed by March 31, 2026, in accordance with BFF funding requirements. Discussion: The purpose of this report is to obtain Council approval to award RFT No. T2025-2 for Wilson Bridge Replacement (Bridge 7002) to Esposito Bros. Construction Ltd. and to award contract administration and inspection services to Greer Galloway Group Inc. As part of the past several Biennial Municipal Bridge and Culvert Inspection Reports, Wilson Bridge (Asset ID 7002) located on Seventh Concession Road, 2.1 km east of York/Durham Road 30, has been identified as a priority for replacement. Originally constructed in 1930, the bridge has reached the end of its infrastructure lifecycle. The Wilson Bridge spans a tributary of Duffins Creek and, as such, falls under the jurisdiction of the Toronto and Region Conservation Authority (TRCA). The necessary TRCA permit for the project has been secured. In accordance with TRCA environmental protection guidelines, there are strict timing windows for in-water and near-water activities to protect local fish populations during critical periods such as spawning, nursery development, and migration. As a result, in- water and near-water construction activities are only permitted between June 15 and September 15. Work of this nature shall not take place outside of this window. Report ENG 05-16 was approved by Council (Resolution #153/16) to retain Greer Galloway Group Inc. to undertake the engineering design of the Wilson Bridge. It is good engineering practice to have the same consultant provide further support with contract administration and inspection services. This ensures good technical continuity for the project by using the same company and allows for certification upon completion. Greer Galloway Group Inc. have provided a fee proposal dated January 13, 2025 in the amount of $90,742.00 for all construction related services and are recommended for approval in accordance with the Purchasing Policy Section 10.03 (c). In accordance with Purchasing Policy Item 10.03, the Manager may obtain the services of a particular consultant selected by the initiating Director without going through a competitive process. Where the funds are available in the approved budget and the project or annual cost of a consulting or professional service assignment is expected to be; (c) above $50,000 is subject to the additional approval by Council. The initiating Director shall submit the Report to Council to obtain approval. Request for Tender No. T2025-2 was advertised on the City’s bids&tenders portal on Friday, March 7, 2025 and closed on Monday, April 7, 2025 with seven bidders responding. The lowest compliant bid of $1,990,291.00 (net HST) or $2,210,129.43 (HST included) submitted by Esposito Bros. Construction Ltd. is recommended for approval. The total gross project cost which includes the tendered amount, a construction contingency, and other associated costs is INF 01-25 April 29, 2025 Subject: Wilson Bridge Replacement (Bridge 7002) Page 4 estimated at $2,661,318.00 (HST included) with an estimated total net project cost of $2,396,600.00 (net HST). Through RFSQ2023-1 Roster Category of Geotechnical Investigation and Inspection Services Master Framework Agreement, the geotechnical investigation and material testing services under associated costs have been awarded to Engtec Consulting Inc.. Upon careful examination of all bids and relevant documents received, staff from the Engineering Services and City Infrastructure Departments recommend acceptance of the lowest compliant bid submitted by Esposito Bros. Construction Ltd. for Request for Tender No. T2025-2 in the amount of $1,990,291.00 (net HST) or $2,210,129.43 (HST included), and that the total net project cost of $2,396,600.00 (net HST) be approved. Attachment: 1.Location Map Prepared By: Approved/Endorsed By: David Lo, CPT, C.E.T. Richard Holborn, P.Eng. Senior Coordinator, Infrastructure Design Director, Engineering Services Kevin Heathcote, P.Eng. Brian Duffield Division Head, Capital Projects & Infrastructure Director, City Infrastructure Cathy Bazinet, CPPB, NIGP-CPP Stan Karwowski, MBA, CPA, CMA Manager, Procurement Director, Finance & Treasurer DL:mjh Recommended for the consideration of Pickering City Council Marisa Carpino, M.A. Chief Administrative Officer Original signed by:Original signed by: Original signed by:Original signed by: Original signed by:Original signed by: Original signed by: Attachment 1 to Report INF 01-25