Loading...
HomeMy WebLinkAboutENG 04-25Report to Executive Committee Report Number: ENG 04-25 Date: March 3, 2025 From: Richard Holborn Director, Engineering Services Subject: Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive Consulting and Professional Services for the Detailed Design - File: A-1440 Recommendation: 1.That Council approve retaining Aquafor Beech Limited for consulting and professional services for the preparation of the detailed design of the Pine Creek Restoration Site #22 –Culvert Replacement at Lynn Heights Drive, in accordance with Purchasing Policy Item 10.03 (c), as the assignment is above $50,000.00; 2.That the proposal submitted by Aquafor Beech Limited for consulting and professional services for the preparation of the detailed design of the Pine Creek Restoration Site #22 –Culvert Replacement at Lynn Heights Drive, in the amount of $176,267.65 (net HST) or $195,737.47 (HST included) be accepted; 3.That the total gross project cost of $232,713.00 (HST included), including the fee amount and other associated costs, and the total net project cost of $209,565.00 (net HST) be approved; 4.That Council authorize the Director, Finance & Treasurer to finance the total net project cost of $209,565.00 as follows: a)The sum of $183,239.00 to be funded by a transfer from the Development Charges – City’s Share Reserve as approved in the 2025 Capital Budget; b)The sum of $26,326.00 to be funded by a transfer from Development Charges – Stormwater Management Reserve Fund as approved in the 2025 Capital Budget; and, 5.That the appropriate officials of the City of Pickering be authorized to take the necessary actions as indicated in this report. Executive Summary: The purpose of this report is to obtain Council approval to retain Aquafor Beech Limited for consulting and professional services for the preparation of the detailed design for the Pine Creek Restoration Site #22 –Culvert Replacement at Lynn Heights Drive. The City of Pickering hired Aquafor Beech Limited in June 2022 to undertake the Pine Creek Erosion Assessment Municipal Class Environmental Assessment to assess the erosion ENG 04-25 March 3, 2025 Subject: Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive Page 2 hazards at identified risk sites and to develop erosion protection strategies for the Pine Creek corridor. The study was completed in accordance with the requirements for Schedule B projects, as per the Municipal Class Environmental Assessment (Municipal Class EA) process. The implementation plan provided in the study specified eleven restoration projects within the Pine Creek corridor. Council endorsed the Pine Creek Erosion Assessment Municipal Class Environmental Assessment in September 2024 through Resolution #574/24. The Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive project was identified as a first priority project in the Pine Creek Erosion Assessment Municipal Class Environmental Assessment. Engineering Services Department staff requested a proposal from Aquafor Beech Limited for the preparation of the detailed design of the Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive due to their project history with the Pine Creek Erosion Assessment Class Environmental Assessment Study, their specialized knowledge and expertise in the subject matter, and on the basis that good value would be achieved since they have all of the background information and have prepared the conceptual design from the previous assignment. In accordance with Purchasing Policy 10.03 (c), where the project or annual cost of a consulting or professional service assignment is expected to be more than $50,000.00 and the initiating Director intends to acquire the services without obtaining written proposals, the Director shall submit a Report to Council to obtain approval to engage the services of a particular consultant. Staff are recommending that Council approve the proposal submitted by Aquafor Beech Limited for Consulting and Professional Services for the preparation of the detail design of the Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive, in the amount $195,737.47 (HST included). Relationship to the Pickering Strategic Plan: The recommendations in this report respond to the Pickering Strategic Plan Priorities of Lead & Advocate for Environmental Stewardship, Innovation & Resiliency; and Advocate for an Inclusive, Welcoming, Safe & Healthy Community. Financial Implications: 1.Proposal Amount Aquafor Beech Limited Fee Proposal $173,219.00 HST (13%) 22,518.47 Total Gross Proposal Amount $195,737.47 ENG 04-25 March 3, 2025 Subject: Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive Page 3 2.Estimated Project Cost Summary Aquafor Beech Limited Fee Proposal $173,219.00 Associated Costs TRCA fees and Miscellaneous Costs 15,400.00 Contingency (10%) 17,322.00 Sub Total – Costs $205,941.00 HST (13%) 26,772.00 Total Gross Project Cost $232,713.00 HST Rebate (11.24%) (23,148.00) Total Net Project Costs $209,565.00 3.Approved Source of Funds – 2025 Capital Budget Expense Code Source of Funds Budget Required C10525.2503 C10525.2503 DC– City’s Share – Reserve DC – Stormwater Management Reserve Fund $264,500.00 38,000.00 $183,239.00 26,326.00 Total $302,500.00 $209,565.00 Net Project Cost under (over) Approved Funds $92,935.00 As part of the 2025 Capital Budget for Stormwater Management projects, the Pine Creek Restoration Site #22 – Culvert Replacement Detailed Design project was approved in the amount of $302,500.00 (net HST). Discussion: The purpose of this report is to obtain Council approval to retain Aquafor Beech Limited for consulting and professional services for the preparation of the detailed design for the Pine Creek Restoration Site #22 –Culvert Replacement at Lynn Heights Drive. On September 25, 2024, Council endorsed the Pine Creek Erosion Assessment Municipal Class Environmental Assessment (Resolution #574/24) and authorized City staff to implement the recommendations subject to budget and further Council approval for individual projects. The overall goal of the Pine Creek Erosion Assessment Municipal Class Environmental Assessment is as follows: “To assess the erosion hazards at identified risk sites and to develop erosion protection strategies, which will result in the long-term stability of the Pine Creek channel corridors, the reduction of suspended sediments in the channel, and ultimately the improvement of water quality in Frenchman’s Bay.” All of the restoration projects identified in the Pine Creek Erosion Assessment Municipal Class Environmental Assessment are categorized as Schedule A undertakings under the Municipal ENG 04-25 March 3, 2025 Subject: Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive Page 4 Class EA and can proceed directly to the detailed design and construction stages in accordance with the priority plan specified in the study. The Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive project was identified as a first priority project in the Pine Creek Erosion Assessment implementation plan. Aquafor Beech Limited is recommended to complete the Detailed Design of the Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive. Engineering Services Department staff requested a proposal from Aquafor Beech Limited for the preparation of the detail design for Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive due to their project history with the Pine Creek Erosion Assessment Municipal Class Environmental Assessment, their specialized knowledge and expertise in the subject matter, and on the basis that good value would be achieved since they have all of the background information and have prepared the conceptual design from the previous assignment. Their previous work demonstrates a deep understanding of the technical requirements and challenges, making them highly effective in providing solutions and understanding the City’s requirements, including tender specifications, post-construction inspections and monitoring. Keeping the same consultant allows for continuity in the project, as they are already familiar with the project's scope, objectives, and challenges. This helps reduce delays and the need to revisit previously completed tasks when a new consultant is brought on. Retaining Aquafor Beech Limited will provide long-term value and reduce the risk of delays, cost overruns, or complications. In accordance with Purchasing Policy Item 10.03 (c), the Manager may obtain the services of a particular consultant selected by the initiating Director without going through a competitive process. Where the funds are available in the approved budget and the project or annual cost of a consulting or professional service assignment is expected to be: (c)above $50,000 is subject to the additional approval of Council. The initiating Director shall submit the Report to Council to obtain approval. Staff are recommending approval of the proposal submitted by Aquafor Beech Ltd. for Consulting and Professional Services for the preparation of the detailed design of the Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive in the amount of $195,737.47 (HST included). It is also recommended that the total gross project cost of $232,713.00 (HST included) which includes the consulting fees and other associated costs, and a net project cost of $209,565.00 (net HST) be approved. Attachment: 1. Location Map ENG 04-25 March 3, 2025 Subject: Pine Creek Restoration Site #22 – Culvert Replacement at Lynn Heights Drive Page 5 Prepared By: Approved/Endorsed By: Irina Marouchko, P.Eng. Richard Holborn, P.Eng. Manager, Water Resources Director, Engineering Services Cathy Bazinet Stan Karwowski, MBA, CPA, CMA Manager, Procurement Director, Finance & Treasurer IM:mjh Recommended for the consideration of Pickering City Council Marisa Carpino, M.A. Chief Administrative Officer Original signed by:Original signed by: Original signed by:Original signed by: Original signed by: Attachment 1 to Report ENG 04-25