HomeMy WebLinkAboutPD 01-11
Ciw Report To
Planning & Development Committee
PICKERING Report Number: PD 01-11
52 Date: January 4, 2011
From: Neil Carroll
Director, Planning & Development
Subject: Proposed Wireless Cell Tower Installation
Rogers Wireless
5025 Sideline 8
(Part of Lot 7 & 8, Concession 9)
City of Pickering
Recommendation:
1. That Report 01-11 of the Director, Planning & Development be received;
2. That Rogers Wireless be advised that City Council has no objection to the
proposed 60 metre high cell tower installation at 5025 Sideline 8; and
3. Further, that the City Clerk advise Rogers Wireless accordingly.
Executive Summary: On February 25, 2010 Rogers Wireless submitted a proposal
to the City Clerk proposing to construct a 60 metre high self supported free standing cell
tower at 5025 Sideline 8. By Resolution #42/10, the council correspondence
(CORR 19-10) was referred to the Director, Planning & Development for a report.
Since the submission of the initial proposal, Rogers Wireless completed their public
consultation process, in accordance with Industry Canada's requirements. Rogers has
advised that no public comments were received and are requesting that City Council
provide a statement of concurrence in support of the installation.
City staff are supportive of the proposed installation.. There do not appear to be other
opportunities to co-locate this installation in the immediate area. The proposed siting of
the tower and equipment compound appears to minimize any disturbance to existing
vegetation while utilizing the existing vegetation to screen the equipment compound. It
is recommended that Rogers Wireless be advised that City Council has no objection to
the proposed cell tower at 5025 Sideline 8.
Financial Implications: No direct costs to the City are anticipated as a result of the
proposed development.
Report PD 01-11 January 4, 2011
Subject: Proposed Wireless Cell Tower Installation Page 2
53
Sustainability Implications: Enhancement to the wireless coverage at this location
will improve business and community communication capability.
The proposed tower and associated equipment compound has been sited to minimize
disturbance of existing vegetation.
1.0 Background:
On February 25, 2010, Rogers Wireless submitted a proposal to the City Clerk
outlining its intent to construct a free standing cell tower on the lands municipally
known as 5025 Sideline 8 (see Applicant's Proposal and Sample Notification
Package - Attachment #1 and Location Map - Attachment #2).
1.1 The Proposal
Rogers Wireless proposes to install a 60 metre high self supporting
communication tower and related ground cabinets. The base of the proposed
tower is approximately 7.0 metres wide. The two ground cabinets, which house
the radio equipment, occupy an area of 2.2 metres by 5.0 metres and are located
at the base of the tower. The tower and ground cabinets will be located in a
fenced compound measuring approximately 16.5 metres by 18.0 metres. The
compound is proposed to be set back approximately 50 metres from Regional
Road 5 which will provide the principal access (see Applicant's Submitted Plan -
Attachments #3 & #4).
1.2 Property Description
The lands known as 5025 Sideline 8 are currently zoned W- Rural Agriculture
and `ORM-EP' - Oak Ridges Moraine Environmental Protection in By-law 3037
as amended by By-laws 6577/05 and 6640/06. The area of the property where
the cell tower facility is proposed is entirely within the W- Rural Agriculture
Zone. The subject property currently supports a residential dwelling with a
number of accessory buildings.
The subject lands are surrounded by agriculturalVesidential uses in all directions
from the proposed cell tower with the closest residential dwelling located
approximately 280 metres to the south of the site.
2.0 Discussion:
2.1 Required Public Notification has been completed
Planning & Development staff are currently in the process of developing a
protocol respecting the installation of cell towers for City Council's consideration.
In the absence of a City protocol, applicants must follow Industry Canada's
requirements as outlined in Spectrum Management and Telecommunications
CPC (Client Procedures Circular) 2-0-03 Issue 4.
Report PD 01-11 January 4, 2011
Subject: Proposed Wireless Cell Tower Installation Page 3
The Industry Canada requirements for public consultation require the proponent
to consult with the land use authority, and the public within a radius of three times
the tower height, measured from the tower base or the outside perimeter of the
supporting structure. For structures greater than 30 metres in height, proponents
are required to place a notice in the local community newspaper.
Based on the proposed 60 metre tower height, the proposed installation required
notification to three adjoining property owners. Rogers has indicated that they
have provided written notification to the three adjoining property owners and
placed a notice of the proposed installation in the April 9, 2010 edition of the
News Advertiser (see Applicant's Proposal and Sample Notification Package -
Attachment #1 and Newspaper Notice - Attachment #5).
Rogers Wireless confirmed that no public comments were received as a result of
the public notification process (see Applicant's Notice of Completion of Public
Consultation - Attachment #6).
2.2 Co-location opportunities have been examined
The installation and creation of separate, stand alone, radio communication
towers and broadcasting facilities is discouraged unless all other co-location
options have been explored and are considered unfeasible. Rogers Wireless
and City staff have reviewed the options of co-locating on existing towers,
locating on hydro transmission towers, using alternative tower structures and
buildings and clustering of the facilities with existing installations, and have
concluded that there are no existing structures in the immediate area that could
be utilized to provide adequate wireless coverage.
2.3 Proposed Tower Location is acceptable
Staff support the proposed location of this cell tower facility. The portion of the
site where the tower and compound are to be located is entirely within the Rural
Agriculture zone and does not impact the portion of the lands within the Oak
Ridges Moraine.
The applicant has proposed to access the site from Regional Road 5. The
proposed tower and equipment compound are to be located in a clearing behind
existing vegetation. The proposed location minimizes disturbance to existing
vegetation and provides adequate screening for the compound from Regional
Road 5. No additional screening is recommended for this installation.
Staff recommend that City Council approve the recommendations in this report
as the proposed installation minimizes disruption to natural features, is not
located in proximity to incompatible and\or sensitive land uses and is located with
appropriate setbacks and screening from Regional Road 5.
Report PD 01-11 January 4, 2011
Subject: Proposed Wireless Cell Tower Installation Page 4
55
Attachments:
1 Applicant's Proposal and Sample Notification Package
2. Location Map
3. Applicant's Submitted Plan - Site Layout
4. Applicant's Submitted Plan - Tower Elevation
5. Applicant's Newspaper Notice
6. Applicant's Notice of Completion of Public Consultation
Prep Y: Approved/Endorsed By:
yler Barne Neil Carro`1A G , RPP
Se nner - Site Planning Director, Planning & Development
Marg Wouters, MCIP, RPP
Manager, Development Review
& Urban Design
TB:Id
Copy: Chief Administrative Officer
Recommended for the consideration
of Pickering 'ty Council
, . ZOr Zo/0
Tony Prevedel, P.Eng.
Chief Administrative Officer
ATTACHMENT ~ TO
REPORT # P0~
56 ` :5
T0:
E 2?ti
-a 8200 Dixie Road
Brampton, Ontario L6T OC 1
February 25, 2010
i
Debbie Shields
Clerk
City of Pickering
One The Esplanade
Pickering, Ontario
CLEF S aIN
L1V 6K7
Dear Ms Shields:
Re: Rogers Site "9th Concession & 6th Sideline", C3673
Proposed Telecommunications Tower - 9th Concession and 6th Sideline
Part of Lot 7, Concession 9
On behalf of Rogers Wireless ("Rogers"), I would like to submit a site information
package concerning a proposed wireless site located at the above noted location as
required by Industry Canada Directive CPC 2-0-03. This directive requires the applicant
to make our submission to Council, but going forward we will address this issue with
planning staff.
Project Description & Proposed Location
Rogers is constantly improving and expanding its infrastructure to meet the ever-growing
demand for high-quality reliable wireless and data services. The proposed site is needed
to improve our wireless and data services in and around the vicinity of Athens.
The following is a brief overview of the site:
1. Tower type: Self Supported/Free standing, 60 metres in height.
2. Equipment Cabinets: 2 mechanical. equipment cabinets are to be located at the
base of the tower. These cabinets will house the radio equipment used to operate
the site.
3. Notification forms: A copy of the standard public notification form and
newspaper notice is attached.
Municipal Consultation Process
Rogers Wireless is regulated and licensed by Industry Canada to provide inter-provincial
wireless and data services. As a federal undertaking, Rogers is required by Industry
Canada to consult with land-use authorities in siting tower locations. The consultation
process established under Industry Canada's authority is intended to allow the local land-
use authorities the opportunity to address land-use concerns while respecting the federal
I
- r -
IS
S
ATTACHMENT # i TO
REPORT # PD D/^~ c 7
government's exclusive jurisdiction in the siting and operation of wireless and data J
systems.
As the provisions of the Ontario Planning Act and other municipal by-laws and
regulations do not apply to federal undertakings, Rogers is however required to follow
established and documented wireless protocols or processes set forth by land-use
authorities. In instances where those established and documented processes do not exist,
Rogers must follow Industry Canada's Default Consultation Process,, a copy of Industry
Canada's CPC-2-0-03 (Issue 4) is attached describing such default consultation
processes.
In accordance with Industry Canada's CPC, please provide us with a list of property
owners within 180 metres from the tower location as illustrated in the site information
package. For your reference a map showing the properties that fall within the 180 metre
radius is contained in the top left corner of the site plan. Rogers will in turn issue
notification letters (see standard notification letter) for circulation. Rogers will also post
a notice (see standard newspaper notice) in the local newspaper.
Once circulation efforts and notice periods end, Rogers will prepare a summary report for
the municipality's review.
Collocation
Co-location is not possible in this particular situation as there are no other suitable
existing or proposed tower structures in the vicinity that would provide adequate wireless
coverage.
Conclusion
Rogers feels that the proposed site is well located to provide and improve wireless and
data services in the targeted area. The proposed site is also situated and designed so as to
have minimal impact on surrounding land uses.
Rogers looks forward to working with City in providing better service. Kindly review
the site information package; please contact me at 416-402-1169 or
matthew.milligan~rci.rogers.com if there are questions.
Yours truly,
Rogers Communications Inc.
Matthew Milligan, MCIP, RPP
Site AcquisAlon Specialist.
C: Tyler Barnett, City of Pickering
Rene Guerrette, Industry Canada
5 8 ATTACHMENT # TO
REPORT # PO
February 25, 2010
Tyler Barnett
Planner
City of Pickering
One The Esplanade
Pickering, Ontario
L1V 6K7
Dear Mr. Barnett:
Re: Tower Application
Rogers Site "9th Concession & 6th Sideline", C3673
Proposed Telecommunications Tower - 9th Concession and 6th Sideline
Part of Lot 7, Concession 9
Please find our enclosed application which we have made to the Clerk as required by
industry Canada's directive. Enclosed are multiple copies of the site plan for your
review, along with a draft of the newspaper notice and public notification document.
These documents were drafted in order to comply with Industry Canada's requirements.
In our initial discussion there were some questions about tower height and co-location.
Please consider the following with respect to these issues:
Collocation
There are no co-location options to provide service in the targeted area. The closest
tower is owned by Telus and is located on the Uxbridge/Pickering Townline just west of
Lakeridge Road. Its location, height and existing loading prevent this location from
providing service in the targeted area near to the 9th concession and 6th sideline. Rogers
is looking to co-locate on this tower, but to provide coverage on the local ski resorts.
This location on the Townline will not provide coverage in the targeted area of 9th
concession and 6th sideline.
The next closest tower is on Brock Road just north of Webb Road. This is an existing
Rogers tower which does not provide coverage in the targeted area at 9th concession and
6th sideline.
Tower Heiaht.
I
The proposed tower height is 60 metres. This height is required to ensure, adequate
wireless coverage will be provided in the targeted area and to ensure seamless coverage
with our existing network infrastructure. The tower height is similar to other tower that
ATTACHNfENT # J
REPORT # PD o - 59
have been built in recent years in rural areas of Pickering and other areas around the
GTA.
I trust that we have addressed your initial concerns. If further questions arise prior to the
public notification or if YOU vv'is h io address our application in person, please let rile
know. Rogers looks forward to working with City on this matter.
Yours truly,
Rogers Communications Inc.
Matthew Milligan, MCIP, RPP
Site Acquisition Specialist.
C: Industry Canada
ATTACHMENT # / TO
6 0 REPORT! PD_ /5
TM
.ROG RS
Your World Right Now
Public Consultation - Wireless Telecommunications Tower Site
Part of Lot 7, Concession 9
City of Pickering
Rogers Wireless Inc.
8200 Dixie Road
Brampton, ON
L6T OC 1
Phone: (647) 747-4684
ATTACHMENT # To 61
REPORI # PD--IT
Purpose
Background & Coverage Requirement
The selection of a wireless telecommunications site works similarly to fitting a piece into
a puzzle. In this case, the puzzle is a complex radio network, situated in a rural setting.
Client demand, radio frequency engineering principles, local topography and land use
opportunities working in concert with one another direct the geography of our sites. In
order to achieve a reliable wireless network, carriers must provide a seamless
transmission signal to alleviate any gaps in coverage. Gaps in coverage are responsible
for dropped calls, and unavailable service to clients. Rogers would utilize the following
proposed site locations in order to provide high quality network signal for its 3G high
speed wireless voice and data network.
Wireless carriers constantly strive to improve coverage and network quality for the sake
of their clients. In the recent past, due to subscriber feedback, our Network Planning
and Engineering departments have become aware of coverage deficiencies new to
Athens
The proposed site is situated in a topographically challenging rural area and the wireless
coverage deficiencies are recognized by the Rogers network. Unfortunately, there were
no existing structures which could have been utilized in the area.
Proposed Site Location
Rogers proposed to build a new telecommunications site approximately 125 metres west
of the intersection of the 9th Concession and Sideline No. 6.
The property's legal description is: Part of Lot 7, Concession No. 9
The geographic coordinates for the site are as follows;
Latitude (NAD 83) 43-59-10N Longitude (NAD 83) 079-04-23
Health Canada's Safety Code 6 Compliance
Rogers attests that the radio antenna system described in this notification package will
comply with Health Canada's Safety Code 6 limits, as may be amended from time to
time, for the protection of the general public including any combined effects of additional
carrier collocations and nearby installations within the local radio environment.
Control of Public Access
The site facility would include a locked, alarmed and electronically monitored mechanical
equipment shelter. Fencing would be installed around the base of the tower and
equipment shelter and would include one locked gate access point.
Canadian Environmental Assessment Act
Rogers attests that the radio antenna system described in this notification package will
comply with the Canadian Environmental Assessment Act as this facility is exempt from
assessment.
2
0 E -
WIRELESS
ATTACHMENT #
6 2 REPORT # PD ITO
Description of Proposed System
The proposed site is a self supporting type. The tower and associated equipment will
take up on area of 290 square metres.
The tower would initially provide wireless voice and data services for subscribers to the
Rogers network.
A copy of Rogers' surveyed site plan has been attached for your reference and
information.
Transport Canada's Aeronautical Obstruction Marking Requirements
Rogers attests that the radio antenna system described in this notification package will
comply with Transport Canada / NAV Canada aeronautical safety requirements. Rogers
will make all necessary applications to Transport Canada and NAV Canada.
Engineering Practices
Rogers attests that the radio antenna system described in this notification package will
be constructed in compliance with the National Building Code of Canada and comply
with good engineering practices including structural adequacy.
Local Land Use Requirements
Wireless Facilities are exclusively regulated by the Federal Government and as a result
are not required to obtain municipal permits of any kind. City of Pickering does not have
any Council adopted policies or protocols relevant to Rogers' proposal.
Industry Canada's Spectrum Management
Please be advised that the approval of this site and its design is under the exclusive
jurisdiction of the Government of Canada through Industry. Canada.
Rogers Wireless Inc. is participating in this circulation in accordance with Industry
Canada's guidelines CPC-2-0-03.
For more information on Industry Canada's public consultation guidelines including CPC-
2-0-03 contact (http://www.ic.gc.ca/epic/site%smt-gst.nsf/en/sf08777e.htmi)
or the local Industry Canada office at spectrum.ottawa@ic.gc.ca
Radio Frequency Spectrum Management
Bell Canada Building
Suite C-100
160 Elgin St.
Ottawa, Ontario
K2P 2P7
Tel: 613-998-3693
3
ROGERS
WIRELESS
ATTACHMENT TQ 6 3
REPORT # PQ_ D I - 1
General information relating to antenna systems is available on Industry Canada's
Spectrum Management and Telecommunications website
(http://www.ic.gc.ca/epir,/site/smt-gst.nsf/en/home)
Contact Information
Rogers Wireless is committed to effective public consultation. The public is invited to
provide comments to Rogers Wireless about this proposal by mail, electronic mail, phone
or fax. Please send your comments to the address below by the close of business on TO
BE DETERMINED
Rogers Wireless
8200 Dixie Road,
Brampton, Ontario, L6T OC1
Attn: Matthew Milligan
matthew.milligan@rci.rogers.com
Fax: (647) 747-4600
Phone: (647) 747-4684
Closing Date for Submission of Written Public Comments
Industry Canada's rules contain requirements for timely response to your questions,
comments or concerns. We will acknowledge receipt of your communication within 14
days and will provide a formal response to the Municipality and those members of the
public who communicated to Rogers, within 60 days. The members of the public who
communicated with Rogers will then have 21days to review and reply to Rogers a final
response.
Contact Information - Land Use Authority
MUNICIPAL CONTACT:
TO BE DETERMINED
4
ROGERS-
WIRELESS
ATTACHIMENT. # I TO
6 4 REPORT # PQ ~-I
Public Comment Record
Proposed Telecommunications Installation
Rogers Wireless
Site Address: Part of Lot 7, Concession 9
Name:
Address:
Telephone: E-mail:
Comments
To be considered part of this consultation, comments must be received by close
of business To Be Determined. Please forward your comments to: TO BE
DETERMINED
Rogers Wireless
c/o Matthew Milligan
8200 Dixie Road, Brampton, Ontario LIST OC1
Fax: 647-747-4600 Phone: 647-747-4684
E-mail: matthew.milligan@rci.rogers.com
Continue on reverse if required...
Comments received shall form part of Industry Canada's Public Consultation Process under the Spectrum
Management and Telecommunications Client Procedures Circular CPC-2-0-03, Issue 4, and will be made
public as part of a report issued to the City of Pickering and Industry Canada.
5
0 ROGERS`
WIRELESS
ATTACHMENT #-':g TO
REPORT # PD 65
cp4
G p.
APPROXIMATE
Co LOCATION
F PROPOSED
CELL TWER
w
Z
J -
(n
REGI AL ROAD 5
TIE WITHIN
180m OF P OPOSED
CELL T WER
City of Pickering Planning & Development Department
PROPERTY DESCRIPTION CON 8 N PT LOT 7 NOW, 40R-23061 PART 4
OWNER J. ManOlakOS DATE Oct. 22, 2010 DRAWN BY JB
FILE No. PROPOSED ROGERS WIRELESS CELL TOWER SCALE 1:10,000 CHECKED BY TB N
ca TeranatrcEn[arprises Ine. and its suppliers. All rights Reserved. Not o plan of 5...y. PN-RUR
c 2005 MPAC and its suppliers. All rig M1t.
Reserved. Not o plan of Survey.
ATTACHMENT TO
REPORT # PD_
6 INFORMATION COMPILED FROM APPLICANT'S
SUBMITTED PLAN
ROGERS WIRELESS CELLULAR TOWER INSTALLATION
(SIDELINE 8 & REGIONAL ROAD 5)
HP 4
! 4
'too e %'P
f 3
fir;, ^ ~Ij . f ~
wits
!r
• Ydr:--::::tr:rt
TOM AssEmy
1~Y--
oFnsEC ~o
F~ 6Qm t f N8B0230111
APPROX LU~IH.
98(1006) ssm
)167.64
Pty , aF}
~7* :QId:T FENCE 0.4 N
28
A IY r g (.I~ f ~N_~08'00 E (Pt, P2. CALC do SET) 87.02
ESTAausn D FED 02 N sm POST do WIRE FENCE --+c-
AS A t js- ~5 PUBItC F9GNWAY y i• IV
q 9 MaDEl411i ~ _ 11T
CU----_----- -
CBAVEI -
REGIONAL ROAD #5
p i.
THIS MAP WAS PRODUCED BY THE CITY OF PICKERING PLANNING 8
DEVELOPMENT DEPARTMENT, PLANNING INFORMATION SERVICES
DIVISION MAPPING AND DESIGN, NOV 9, 2010.
RTTACHMEkIT TO
REPORT # RD INFORMATION COMPILED FROM APPLICANT'S 67
SUBMITTED PLAN
ROGERS WIRELESS CELLULAR TOWER INSTALLATION
(SIDELINE 8 & REGIONAL ROAD 5)
El"ATION PLAN
NOT TO SCALE
PROPOSED GALVANIZED STEEL.
SELF SUPPORTING TOWER
PAIN COLOUR SUBJECT TO
TRANSPORT CANADA REQUIREMENTS.
ANTENNA NUUSM AND LOCATIONS
TO BE DETERMINED.
E
0
m
i
i
Al
THIS MAP WAS PRODUCED BY THE CITY OF PICKERING PLANNING &
DEVELOPMENT DEPARTMENT, PLANNING INFORMATION SERVICES
DIVISION MAPPING AND DESIGN, NOV 9, 2010.
Excerpts from Pickering News Advertiser
of
68 Friday, April 9, 2010 ATTACHMENT # ` _TO
REPORT PD_ n ! -1
PUBLIC NOTICE
PROPOSED ROGERS WIRELESS 60 METRE TELECOMMUNICATION SELF-SUPPORTED TOWER
ANY PERSON may make a written submission to the individual listed below by May, 10, 2010 with respect to this matter.`
Approval of this site and its design, is under the exclusive jurisdiction of the Government of Canada through Industry
Canada. The City of Pickering has no jurisdiction in this matter other than as a commenting body to Industry Canada and
the applicant: For more information contact the local Industry Canada office at 613-998-3693.
SITE DETAILS
Self-Supported Telecommunication p
0
Tower 60 metres in height
E I
Tower Location: North side of SITE
Concession No. 9 approximately
130 metres west of Sideline No. 6 c o"
• Part of Lot 7, Concession No. 9 a
Geographic Township of Pickering, crnREMOW 'DO
Now the City of Pickering _
' Site Coordinates (NAD 83):
N43-59-10.0 e
W079-04-23.5
• The facility will include mechanical
equipment cabinets and fencing
around the base of the tower. The Municipal Contact. Please forward all comments and
tower will provide wireless voice and requests for additional information to the
data services. Tyler Barnett _ following individual.
City of Pickering
One The Esplanade Matthew Milligan, MCIP, RPP -
Road
Rogers ROGERS Pickering, Ontario 8200 Dixie Road
L1V 6K7 8200 Dixie
Tel (905),420 4660 ext 2042 - - Brampton, Ontario
Fax (906j420 7648 LU Oct
tbarriett@cityofpickering com Tel (647) 747684
Fax (647} 747-4600
Email: matthew.milligan@rci.rogers.com
ATTACHMENT # (O TO 6 9
ROG ERS REPORT # PD_- Rogers Wireless Partnership
8200 Dixie Road
Brampton, Ontario L6T OC1
August 6, 2010
Tyler Barnett I
Planner AUG 1 0 2010
City of Pickering
One The Esplanade CITY OF PICKERIN
Pickering, Ontario RLANN DEPARTMEN VELOPMEXT
L1V 6K7
Dear Mr. Barnett:
Re: Rogers Site "9th Concession & 6th Sideline", C3673
Proposed Telecommunications Tower - 9th Concession and 6th Sideline
Part of Lot 7, Concession 9
(North Side of the 9th Concession west of the 6th sideline.)
I am writing to follow-up on the public consultation that has taken place for our proposed
telecommunications site at the above reference location and to request a statement of
concurrence from Council. This statement of concurrence will be provided to Industry
Canada to conclude the consultation.
Rogers Wireless is regulated and licensed by Industry Canada to provide inter-provincial
wireless and data services. As a federal undertaking, Rogers is required by Industry
Canada to consult with land-use authorities in siting tower locations. The consultation
process established under Industry Canada's authority is intended to allow the local land-
use authorities and the public the opportunity to address land-use concerns while
respecting the federal government's exclusive jurisdiction in the siting and operation of
wireless and data systems.
The provisions of the Ontario Planning Act and other municipal by-laws and regulations
do not apply to federal undertakings, Rogers is however required to follow established
and documented wireless protocols or processes set forth by land-use authorities. In
instances where those established and documented processes do not exist, Rogers must
follow Industry Canada's Default Consultation Process; CPC-2-0-03 (Issue 4) which was
previously supplied to the Township.
Public Notification
In accordance with Industry Canada's CPC a circulation was undertaken with owners
within three times the height of the tower ((60m x 3) = 180 metres) from the site as
illustrated in the site information package supplied in our package dated February 25,
W;REI..ESS m CABLE TV ~ INTERNET HOME PHONE RETAIL. a PUBLISHING m BROADCASTING
ATTACHMENT TO
REPORT # PD (7
70
2010. In addition a public notice was placed in the Pickering News Advertiser on April
9, 2010. As a result of the public notification there were no responses.
Conclusion and Request For Concurrence
Rogers feels that the proposed site is properly located on the subject lands to provide
improved wireless voice and data services in the targeted area. In order to conclude this
landuse consultation and meet Industry Canada's requirements, Rogers Wireless is
requesting that that Town Council issue a Statement of Concurrence that Rogers will
provide to Industry Canada. If you require further information about this matter, please
feel free to contact me at anytime. We look forward to providing enhanced wireless
services in the City of Pickering.
Yours truly,
Ro ers Cications Inc.
Matthe MCIP, RPP
Site Acquisition Specialist.
C: Industry Canada
Debbie Shields, Clerk - City of Pickering