HomeMy WebLinkAboutCS 38-10 I
eitq Report To
Executive Committee
PICKERING Report Number: CS 38-10
Date: September 7, 2010
312
From: Gillis A. Paterson
Director, Corporate Services & Treasurer
Subject: Municipal Performance Measurement Program - Provincially Mandated
Public Reporting of Performance Measures
Recommendation:
It is recommended that Report CS 38-10 from the Director, Corporate Services &
Treasurer be received and forwarded to Council for information.
Executive Summary: The City is mandated by the Province of Ontario to report on
Performance Measures for specific key service areas. The collection and reporting of
these efficiency and effectiveness measures is derived from the Financial Information
Return filed by the City with the Ministry of Municipal Affairs and Housing. These
measurements are being submitted and reported by the Treasurer under the direction of
Provincial authority.
Each year measures are refined, altered and increased making prior year comparisons
difficult. For example, in 2008 we had to report on 28 measures. In 2009 it is 49.
Attached are the Municipal Performance Measurement Program (MPMP) results for
2009 together with a supplemental information package which will be provided on the
City's website, a comparison to the 2008 measures if applicable and a copy of the
Public Notice that will appear in the News Advertiser at the end of September.
Financial Implications: None
Sustainability Implications: This report contains no information pertaining to
sustainability.
Background: Attachment 1 is the information mandated by the Province to be
reported to the public by September 30, 2010. The set of information required for
reporting changes every year as identified by the Minister of Municipal Affairs and
Housing. Comments pertaining to the compilation and interpretation of the data have
been included to aid in the explanation and understanding of what is being reported.
Report CS 38-10 September 7, 2010
Subject: 2009 Municipal Performance Measurement Program Page 2
313
The Province has made provision for these comments and encourages their inclusion,
as many municipalities do.
Every year, these measures continue to evolve as existing ones are being revised and
new ones being added as feedback from municipalities are received and taken into
consideration by the Province. In addition there are continual refinements to the way
measures are defined and calculated especially in the Roadways, Parks and Recreation
areas, where new and modified measures are being reported in the last few years.
Municipalities also continue to improve on their methods of data collection in an attempt
to ensure consistency in reporting. This leads to improving the measures to better
serve the interests of the public and municipal needs for evaluating the efficiency and
effectiveness of the services we provide in the municipality. However, caution must still
be taken against municipality-to-municipality comparisons due to the fact that no two
municipalities are identical in their geography, rural vs. urban mix, the level of service
provided and treatment of information for data collection.
It will only be through continuing efforts, ongoing experience, further clarifications from
the Province and consistent reporting formulas that year-to-year comparisons within the
municipality and across municipalities will become meaningful.
The information will be posted on the City's website, as was the case in past years, and
a notice to this effect, per Attachment 3, will be included in the "Community Page" of the
local newspaper. The information will also be available to anyone wishing to pick up a
copy at City Hall.
Attachments:
1. 2009 Provincial Performance Measurement Program - Public Reporting
2. Comparison of 2009 and 2008 Performance Measures,
3. Public Notice to be included in the Community Page of the News Advertiser
Prepared By: Approved/Endorsed By:
Dennis P. Arboleda Gillis a erson
Supervisor, Accounting Services Director, Corporate Services & Treasurer
Report CS 38-10 September 7, 2010
Subject: 2009 Municipal Performance Measurement Program Page 3
4
DA:gp
Copy: Chief Administrative Officer
Recommended for the consideration
of Pickerin Cou c'
Tony Prevedel, P.Eng.
Chief Administrative Officer
City of Pickering ATTACHMENT # I TO REPORT # CS 38 - 1 v
315 Year 2009 Performance Measurement Report
Overview
As required by the Ontario Government's Municipal Performance Measurement
Program (MPMP), the Treasurer of the City of Pickering, as part of its 2009 Financial
Information Return (FIR) package, has submitted financial and related service
performance measurements to the Province.
This program was announced in 2000 by the Ontario Government, which requires
municipalities to collect data on measures of effectiveness and efficiency in key service
areas and report these measures to the Province and the Public.
The objective of the Province is: to enhance accountability by reporting to taxpayers; to
increase taxpayer awareness on service plans, standards and costs; and to improve
local service delivery by sharing best practices with comparable municipalities. As
municipalities change and grow, its citizens expect to receive quality, cost effective
services. Performance measurements are a means of benchmarking these services that
will allow the City to review and improve their delivery. Existing measures are
continuously refined and new measures are introduced depending on the value and
importance for public information.
In reporting the results to the public, each measure is accompanied by comments
regarding aspects of the measurements. The comments are an integral part in the
interpretation of the performance measure results. These results should not be
compared across municipalities without consideration of the comments that impact on
interpreting and understanding the results. In addition, influencing factors in the
collection of data or refinements while the measures are still evolving could affect the
results and year over year comparability,.
New for 2009, each service measured have two efficiency measures: Operating Costs
per Unit and Total Costs per Unit. The Operating Costs per Unit measure uses the
same formula as the 2005 to 2008 reporting years but with minor modifications in the
formula on some of the measures. However, most operating costs calculations on
individual efficiency measure are comparable from 2005 through to 2009.
Starting with the 2009 reporting year, efficiency measures based on Total Costs per
Unit are to be reported to the public. Total costs are calculated as the sum of Operating
Costs, Interest on Long Term Debt and Amortization of related capital assets. The Total
Costs per Unit measures add an important dimension to efficiency measures by
including capital costs and interest on long term debt.
In addition to changing the reporting criteria for many of the 28 measures reported in
2008, the number has increased to 49 for 2009.
City of Pickering. 3 6
Year 2009 Performance Measurement Report
General Government
1.1a Operating Costs for Governance and Corporate Management
2009
7.00%
Efficiency Measure
Revised Measure - Operating costs for governance and corporate management as a
percentage of total municipal operating costs.
Objective
To determine the efficiency of municipal management.
General Comments
The following factors can influence the above results:
• The extent that cost centers within municipalities directly relate to the functions
included under the governance and corporate management categories.
• The level of service provided to the corporation and the public.
Detailed Comments
Calculation of this measure includes operating costs for governance, corporate
management and related allocation from program support expenditures net of tax
write-offs over total municipal operating costs. No netting occurred in 2008 hence not
comparable to this year's result.
I
3 17 City of Pickering
Year 2009 Performance Measurement Report
General Government
1.1 b Total Costs for Governance and Corporate Management
2009
6.00%
Efficiency Measure
New measure - Total costs for governance and corporate management as a
percentage of total municipal costs.
Objective
To determine the efficiency of municipal management.
General Comments
The following factors can influence the above results:
• The extent that cost centers within municipalities directly relate to the functions
included under the governance and corporate management categories.
• The level of service provided to the corporation and the public.
Detailed Comments
Calculation of this new measure includes the total costs for governance, corporate
management, related allocation from program support expenditures, interest on long
term debt and amortization net of tax write-offs over total municipal costs.
I
t
City of Pickering
Year 2009 Performance Measurement Report 3 g
Fire Services
2.1a Operating Costs for Fire Services
2009 2008
$1.43 $1.27
Efficiency Measure
Operating costs for fire services per $1,000 of assessment.
Objective
Provide efficient municipal fire services.
General Comments
The following factors can influence the above results across municipalities:
• Emergency response times
• Number-and location of fire halls
• Urban/rural mix of properties as well as density of buildings
• Geographic size of municipality
Detailed Comments
Assessment value does not necessarily correlate to operating cost for fire services.
The higher the assessment value, the lower the cost per $1,000 assessment.
Conversely the urban/rural mix of the community affects the results as the size and
type of commercial/industrial establishments.
Number of households, response time and urban/rural mix of the municipality are
factors, that determine the need for fire services and not necessarily the property
value.
For 2009, the operating costs per $1,000 of property assessment increased by 12.6%
from 2008. The increase is mainly due to negotiated collective agreement and the
additional four staff hired in 2009. Increase in property assessment also contributed
to the resulting measure in 2009.
I
31 9 City of Pickering
Year 2009 Performance Measurement Report
Fire Services
2.1 b Total Costs for Fire Services
2009
$1.50
Efficiency Measure
New measure - Total costs for fire services per $1,000 of assessment.
Objective
Provide efficient municipal fire services.
General Comments
The following factors can influence the above results across municipalities:
Emergency response times
• Number and location of fire halls
• Urban/rural mix of properties as well as density of buildings
• Geographic size of municipality
• Capital costs and interest on long term debt
Detailed Comments
The numerator in the calculation of this new measure adds interest on long term debt
and amortization to the total operating costs for Fire Services. However, like in the
previous measure, the assessment value as denominator does not necessarily
correlate to the total cost for fire services. The higher the assessment value, the
lower the cost per $1,000 assessment. Conversely the urban/rural mix of the
community affects the results as with the size and type of commercial/industrial
establishments.
Number of households, response time and urban/rural mix of the municipality are
factors that determine the need for fire services and not necessarily the property
value.
City of Pickering
Year 2009 Performance Measurement Report 320
Fire Services
2.2 Residential Fire Related Civilian Injuries
2009
0.00
Effectiveness Measure
New measure - Number of residential fire related civilian injuries per 1,000 persons.
Objective
Minimize the number of civilian injuries in residential fires.
General Comments
The following factors can influence the above results across municipalities:
• Number of residential fires
Emergency response times
• Number and location of fire halls
• Geographic size of municipality
Detailed Comments
This new measure presents the total number of residential fire related civilian injuries
as reported by the fire department to the Office of the Fire Marshal (OFM) in the OFM
Standard Incident Report.
In 2009, no fire related civilian injury was reported to the OFM.
3 2 1 City of Pickering
Year 2009 Performance Measurement Report
Fire Services
2.3 Residential Fire Related Civilian Injuries - 5 Year Average
2009
0.065
Effectiveness Measure
New measure - Total number of residential fire related civilian injuries from 2005 to
2009, per 1,000 persons.
Objective
Minimize the number of civilian injuries in residential fires.
General Comments
The following factors can influence the above results across municipalities:
I
• Number of residential fires
• Emergency response times
• Number and location of fire halls
• Geographic size of municipality
Detailed Comments
This new measure presents the number of residential fire related civilian injuries as
reported by the fire department to the Office of the Fire Marshal (OFM) in the OFM
Standard Incident Report from 2005 to 2009 averaged over 5 years per 1,000
persons.
From 2005 to 2009, there were a total of 29 residential fire related civilian injuries
reported to the OFM. This averages to about 6.0 injuries per year in the past five
years. Total City population in 2009 was 92,950.
City of Pickering j
Year 2009 Performance Measurement Report 322
Fire Services
2.4 Residential Fire Related Civilian Fatalities
2009
0.011
Effectiveness Measure
New measure - Number of residential fire related civilian fatalities per 1,000 persons.
Objective
Minimize the number of civilian fatalities in residential fires.
General Comments
The following factors can influence the above results across municipalities:
Number of residential fires
• Emergency response times
• Number and location of fire halls
• Geographic size of municipality
Detailed Comments
This new measure presents the number of residential fire related civilian fatalities as
determined by the Office of the Fire Marshal (OFM) per 1,000 persons.
In 2009, there was a single civilian fatality reported by the OFM.
' I
1
City of Pickering
3 2 3 Year 2009 Performance Measurement Report
Fire Services
2.5 Residential Fire Related Civilian Fatalities - 5 Year Average
2009
0.011
Effectiveness Measure
New measure - Number of residential fire related civilian fatalities per 1,000 persons.
Objective
Minimize the number of civilian fatalities in residential fires.
General Comments
The following factors can influence the above results across municipalities:
• Number of residential fires
• Emergency response times
• Number and location of fire halls
• Geographic size of municipality
Detailed Comments
This new measure presents the total number of residential fire related civilian
fatalities as determined by the Office of the Fire Marshal (0 FM) from 2005 to 2009
averaged over 5 years per 1,000 persons.
The average residential fire related civilian fatality per year for 5 years is one in 2009,
as reported by the OFM.
City of Pickering 302 4
Year 2009 Performance Measurement Report
Fire Services
2.6 Number of Residential Structural Fires
2009
0.875
Effectiveness Measure
New measure - Number of residential structural fires per 1,000 households.
Objective
Minimize the number of residential structural fires.
General Comments
The following factors can influence the above results across municipalities:
• Number of residential fires
Emergency response times
• Number and location of fire halls
• Geographic size of municipality
Detailed Comments
This new measure presents the total number of residential structural fires and
explosions reported by the fire department to the Office of the Fire Marshal (OFM) in
the OFM Standard Incident Report per 1,000 households (29,704 households).
In 2009, there were 26 residential structural fires and explosions reported to the
OFM.
I
i
City of Pickering
3 2 5 Year 2009 Performance Measurement Report
Road Services
4.1a Operating Costs for Paved Roads
2009
$1,958.98
Efficiency Measure
Revised Measure - Operating costs for paved (hard top) roads per lane kilometre.
Objective
Provide efficient maintenance of paved roads.
General Comments
The following factors can influence the above results across municipalities:
• Use of roads by heavy equipment.
• The municipality's standard for road conditions in comparison with comparable
municipalities.
• Kilometres of paved roads in the municipality.
• The method of allocating overhead costs (such as office supplies, telephone,
advertising, subscriptions, insurance, general repairs and maintenance, other
indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
Detailed Comments
Paved (hard top) roads include roads with asphalt, concrete and composite surfaces.
The identified costs attributable to this function include employee wages & benefits,
road materials, program support, rental of heavy equipment and shoulder
maintenance.
The City of Pickering maintains separate accounts to track material costs related to
roads. In 2009, aggregated capital amounts that did not meet reporting thresholds
for capital assets were added on to the materials costs thereby increasing the
resulting measure and making it not comparable with the result in prior year.
However, as in the previous reporting years, the costs for administration and other
indirect costs have been allocated to the cost for paved roads based on
management's best estimate of the proportion of responsibility dedicated to the road
functions such as maintenance of paved and unpaved roads and. winter control.
The City maintained a total of 703 kilometres of paved lanes in 2009.
City of Pickering 326
Year 2009 Performance Measurement Report
Road Services
4.1,b Total Costs for Paved Roads
2009
$6,321.41
Efficiency Measure
New Measure - Total costs for paved (hard top) roads per lane kilometre.
Objective
Provide efficient maintenance of paved roads.
General Comments
The following factors can influence the above results across municipalities:
• Use of the roads by heavy equipment.
• The municipality's standard for road conditions in comparison with comparable
municipalities.
• Kilometres of paved roads in the municipality.
• The method of allocating overhead costs (such as office supplies, telephone,
advertising, subscriptions, insurance, general repairs and maintenance, other
indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
• Interest on long term debt and amortization on capital costs.
Detailed Comments
Paved (hard top) roads include roads with asphalt, concrete and composite surfaces.
The City of Pickering maintains separate accounts to track material costs related to
roads. However, the costs for administration and other indirect costs have been
allocated to the cost for paved roads based on management's best estimate of the
proportion of responsibility dedicated to the road functions such as maintenance of
paved and unpaved roads and winter control.
The total costs are calculated by adding operating costs, interest on long term debt
and amortization over 703 kilometres of paved lane maintained in 2009.
3 2 7 City of Pickering
Year 2009 Performance Measurement Report
Road Services
4.2a Operating Costs for Unpaved Roads
2009 2008
$5,237.12 $5,991.63
Efficiency Measure
Operating costs for unpaved (loose top) roads per lane kilometre.
Objective
Provide efficient maintenance of unpaved roads.
General Comments
The following factors can influence the above results across municipalities:
• Use of the roads by heavy equipment.
• The kilometres of unpaved roads in the municipality in comparison with
comparable municipalities.
• Locations of the unpaved roads.
• The method of allocating overhead costs (that includes office supplies, telephone,
advertising, subscriptions, insurance, general repairs and maintenance, other
indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
Detailed Comments
Unpaved (loose top) roads include roads with gravel, stone or other loose surface.
The City of Pickering maintains separate accounts to track material costs related to .
roads. However, the cost for administration and other indirect costs have been
allocated to the cost for unpaved roads based on management's best estimate of the
proportion or responsibility dedicated to the road functions such as maintenance of
paved and unpaved roads and winter control.
The operating costs of maintaining the City's unpaved roads include employee wages
& benefits, granular materials, administering calcium programs, program support,
rental of heavy equipment, grading, wash out repair and shoulder maintenance.
In 2009, the City used less granular materials in many unpaved roads due to lesser
than usual washouts in the spring. This resulted in less rentals of heavy equipment
and less labor used. The City maintains 216 kilometres of unpaved lanes.
City of Pickering
Year 2009 Performance Measurement Report 328
Road Services
4.2b Total. Costs for Unpaved Roads
2009
$5,295.11
Efficiency Measure
New Measure - Total costs for unpaved (loose top) roads per lane kilometre.
Objective
Provide efficient maintenance of unpaved roads.
General Comments
The following factors can influence the above results across municipalities:
• Use of the roads by heavy equipment.
• The kilometres of unpaved roads in the municipality in comparison with
comparable municipalities.
• Locations of the unpaved lanes.
• The method of allocating overhead costs (that includes office supplies, telephone,
advertising, subscriptions, insurance, general repairs and maintenance, other
indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
• Interest on long term debt and amortization on capital costs.
Detailed Comments
Unpaved (loose top) roads include roads with gravel, stone or other loose surface.
The City of Pickering maintains separate accounts to track material costs related to
roads. However, the cost for administration and other indirect costs have been
allocated to the cost for unpaved roads based on management's best estimate of the
proportion or responsibility dedicated to the road functions such as maintenance of
paved and unpaved roads and winter control.
Calculation of total costs include the sum of the operating costs, interest on long term
debt and amortization on capital costs over 216 kilometres of unpaved lanes
maintained in 2009.
City of Pickering
3 2 9 Year 2009 Performance Measurement Report
Road Services
4.3a Operating Costs for Bridges and Culverts
2009
$0.00
Efficiency Measure
New Measure - Operating costs for bridges and culverts per square metre of surface
area.
Objective
Provide efficient maintenance of bridges and culverts.
General Comments
The following factors can influence the above results across municipalities:
• Use of bridges and causeways.
• Location of bridges and culverts.
• The method of allocating overhead costs (that includes office supplies, telephone,
advertising, subscriptions, insurance, general repairs and maintenance, other
indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
Detailed Comments
The operating costs of maintaining the City's bridges and culverts include employees'
wages and benefits, materials, contracted services, rental of equipment, program
support less revenue from other municipalities.
In 2009, the City did not incur any operating costs related to the maintenance of
bridges and culverts. Total surface area maintained on bridges and culverts in 2009
was 8,599 square metres. This included deck areas, sidewalks and railings.
City of Pickering
Year 2009 Performance Measurement Report .330
Road Services
4.3b Total Costs for Bridges and Culverts
2009
$24.70
Efficiency Measure
New Measure - Total costs for bridges and culverts per square metre of surface
area.
Objective
Provide efficient maintenance of bridges and culverts.
General Comments
The following factors can influence the above results across municipalities:
• Use of bridges and causeways.
• Locations of bridges and culverts.
• The method of allocating overhead costs (that includes office supplies, telephone,
advertising, subscriptions, insurance, general repairs _ and maintenance, other
indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
Detailed Comments
The total costs of maintaining the City's bridges and culverts is the sum of the
operating costs, interest on long term debt and depreciation.
In 2009, a depreciation expense of $212,403 on assets related to bridges and
culverts was calculated against 8,599 square metres of surface area.
I
City of Pickering
3 31 Year 2009 Performance Measurement Report
Road Services
4.4a Operating Costs for Winter Maintenance of Roads
2009 2008
$1,328.15 $2,121.71
Efficiency Measure
Operating costs for winter maintenance of roadways per lane kilometre maintained in
winter.
Objective
Provide efficient winter maintenance of roadways.
General Comments
The following factors can influence the above results:
• The municipality's standard service levels for road conditions.
• The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
• The method of allocating overhead costs (that includes office supplies, travel,
telephone, advertising, subscriptions, insurance, general repairs and maintenance,
other indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
Detailed Comments
Since 2004 the City of Pickering has maintained a separate account to track material
costs that are directly related to winter control. The costs for administration and other
indirect costs have been allocated to the cost for winter control based on
management's best estimate of the proportion of responsibility dedicated to the road
function of winter control.
The operating cost of the City's winter control maintenance includes employee wages
& benefits, salt, sand, program support, equipment rental and culvert thawing.
The decrease in costs of winter maintenance on roads from 2008 was due to the mild
winter conditions experienced in 2009. This resulted in less use of salt materials,
overtime and contracted services for snow removal. The City maintained 919
kilometres of lanes in the winter.
City of Pickering
Year 2009 Performance Measurement Report 332
Road Services
4.4b Total Costs for Winter Maintenance of Roads
2009
$1,328.15
Efficiency Measure
New Measure - Total costs for winter maintenance of roadways per lane kilometre
maintained in winter.
Objective
Provide efficient winter control operation.
General Comments
The following factors can influence the above results:
• The municipality's standard service levels for road conditions.
• The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
• The method of allocating overhead costs (that includes office supplies, travel,
telephone, advertising, subscriptions, insurance, general repairs and maintenance,
other indirect costs) used in the determination of the numerator when there is not a
separate cost centre.
Detailed Comments
The total costs for winter maintenance of roads is calculated as the sum of operating
costs, interest on long term debt and amortization on related assets. In 2009, there
was no interest and amortization related to winter maintenance of roadways therefore,
the resulting measure is the same as the operating costs for winter maintenance of
road per lane kilometre.
City of Pickering
333 Year 2009 Performance Measurement Report
Road Services
4.5 Adequacy of Roads
2009 2008
84.9% 84.9%
Effectiveness Measure
Percentage of paved lane.kilometres where the condition is rated as good to very good.
Objective
Provide a paved lane system that has a pavement condition that meets municipal
standards.
General Comments
The following factors can influence the above results:
• The municipality's standard service levels for road conditions.
• The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
• Amount of traffic.
Detailed Comments
The City's staff uses their best estimates to establish the percentage of roads that are
rated as good. The City's road patrols, the public, employees and the Roads Needs
Study (2005 Update) are other sources providing feedback on road conditions. As
existing roads are reconstructed and rehabilitated the rating will move up to a higher
level.
In 2009, 597 out of 703 kilometres of paved lane was rated to be in good to very good
condition as compared.to 591 out of 696 kilometres in 2008.
City of Pickering
Year 2009 Performance Measurement Report 334
Road Services
4.6 Adequacy of Bridges and Culverts
2009
.64.8%
Effectiveness Measure
New Measure - Percentage of bridges and culverts where the condition is rated as good
to very good.
Objective
Provide safe bridges and culverts.
General Comments
The following factors can influence the above results across municipalities:
• , Use of bridges and causeways.
• Maintenance of bridges.and causeways as required to meet standards.
• Locations of bridges and culverts.
Detailed Comments
The condition of a bridge or culvert in this measure means the condition of only the
primary components which are the main load carrying components of the structure and
includes: decks, beams, girders, abutments, foundations., etc. The City rates all of its
bridges and culverts through regular inspection of these primary components.
In 2009, the number of bridges and culverts with primary components rated as good to
very good was 35. The total number of bridges and culverts in the City is 54.
City of Pickering
3 3 5 Year 2009 Performance. Measurement Report
Road Services
4.7 Winter Event Response
2009 2008
100% 100%
Effectiveness Measure
Percentage of winter events where the response met or exceeded locally determined
road municipal service levels for road maintenance.
I
Objective
Provide an appropriate response to winter storm events.
General Comments
The following factors can influence the above results:
• The municipality's standard service levels for road conditions.
• The frequency and severity of the winter weather.
• The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
• Hours of Service regulations under the Highway Traffic Act.
Detailed Comments
Roads are cleaned and cleared usually within 24 hours of a snowfall when adequate
resources are available in accordance with hours of service regulations. The City did
not experience a winter event where staff was not able to meet or exceed road
maintenance standards.
The mild winter afforded the City to respond to only 19 winter storm events in 2009
compared to 47 in 2008.
City of Pickering
Year 2009 Performance Measurement Report 336
Storm Water Management
7.1a Operating Costs for Urban Storm Water Management
2009
$1,502.89
Efficiency Measure
Revised Measure - Operating costs for urban storm water management (collection,
treatment, and disposal) per kilometre of drainage system.
Objective
Provide efficient storm water management.
General Comments
The following factors. can influence the efficiency rate of urban storm water
management:
• The geography of the City
• The extent and age of the drainage system
• The inventory of pipes in the Municipality
Detailed Comments
Storm water management is increasingly important as the City continues to develop
and intensify resulting in pressures on watercourses and Frenchman's Bay.
The measure identifies direct costs such as related salaries, contracted services and
materials, storm pipe cleaning, flushing, video inspection, catch basin/manhole repairs,
storm pipe repairs, cleaning of specialized oil and grit separators.
The City maintained 295 km of urban drainage system in 2009, 4 km more compared
to 2008. In 2009, the City intensified its program of cleaning and flushing existing storm
sewers and catch basins to meet its service responsibilities. Also in this reporting year,
minor capital costs were included in the cost calculation making the resulting measure
not comparable to 2008.
I
City of Pickering
3 3 7 Year 2009 Performance Measurement Report
Storm Water Management
7.1 b Total Costs for Urban Storm Water Management
2009
$8,460.40
Efficiency Measure
New Measure - Total costs for urban storm water management (collection, treatment,
and disposal) per kilometre of drainage system.
Objective
Provide efficient storm water management.
General Comments
The following factors can influence the efficiency rate of urban storm water
management:
• The geography of the City
• The extent and age of the drainage system
• The inventory of pipes in the Municipality
Detailed Comments
This new measure reflects the total operating costs for urban storm water
management, including interest on long term debt and amortization on urban storm
capital assets over total kilometres of urban drainage system plus 0.005 kilometres
times the number of catchbasins.
The City maintained 295 km of urban drainage system in 2009.
I
City of Pickering
Year 2009 Performance Measurement Report
. 338
Storm Water Management
7.2a Operating Costs for Rural Storm Water Management
2009
$2,308.05
Efficiency Measure
Revised Measure - Operating costs for rural storm water management (collection,
treatment, and disposal) per kilometre of drainage system.
Objective
Provide efficient storm water management.
General Comments
The following factors can influence the efficiency rate of rural storm water
management:
• The geography of the City, size and nature of the rural area.
• Land erosion control.
• The frequency and time devoted to the maintenance of the rural drainage system.
Detailed Comments
Rural stormwater system is one where stormwater is conveyed primarily along side of
the roadways with a rural cross section (open ditches) located in areas defined as rural
in municipal official plans. A rural system may include covered drains.
The operating costs calculation include related salaries, contracted services,
materials, other direct costs such as storm canal dredging, culvert repairs and
maintenance, ditching, bank repair and other day-to-day maintenance measures, rents,
interfunctional adjustments and program support over the total kilometres of drainage
system. Also, included under the materials component of the operating costs are minor
capital expenses which were not reported in prior years.
The City maintained a total of 351 km of rural drainage system in 2009.
I
i
City of Pickering
3 3 9 Year 2009 Performance Measurement Report
Storm Water Management
7.2b Total Costs for Rural Storm Water Management
2009
.$2,369.96
Efficiency Measure
New Measure - Total costs for rural storm water management (collection, treatment,
and disposal) per kilometre of drainage system.
Objective
Provide efficient storm water management.
General Comments
The following factors can influence the efficiency rate of rural storm water
management:
• The geography of the City, size and nature of the rural area.
• Land erosion control.
• The frequency and time devoted to the maintenance of the rural drainage system.
• Interest on long term debt and amortization.
Detailed Comments
This new measure calculates the sum of operating costs, interest on long term debt
and related amortization for rural storm water management over total kilometres of
rural drainage system plus 0.005 kilometres times the number of catch basins.
City of Pickering
Year 2009 Performance Measurement Report
340
Parks and Recreation
10.1a Operating Cost for Parks per Person
2009 2008
$43.94 $36.33
Efficiency Measure
Operating costs for parks per person.
Objective
Provide efficient operations of parks.
General Comments
Outdoor open spaces including parks, parkettes, playgrounds, public squares, skateboard
parks, skating rinks, sports fields, splash pads, trails and similar spaces are included in the
determination of this measure.
Detailed Comments
The City efficiently maintains the parks on a'daily basis in the summer. The scheduled
grass cutting cycle of 5 to 10 days is maintained to control growth and keep the park
available and safe for public use at all times during the summer months. However, the
amount of precipitation received during this time directly affects the grass cutting cycle.
With the extended summer and fall weather conditions experienced in 2009, total materials
and contracted services costs were relatively higher compared to 2008. This contributed
largely to the increase in the total operating cost for parks per person.
i
City of Pickering
3 4 1 Year 2009 Performance Measurement Report
Parks and Recreation
10.1 b Total Cost for Parks per Person
2009
$52.92
Efficiency Measure
New Measure - Total costs for parks per person.
Objective
Provide efficient operations of parks.
.Detailed Comments
Calculation of this new measure totals the operating costs, interest on long term debt and
amortization on capital assets related to parks.
. I
City of Pickering
Year 2009 Performance Measurement Report
342
Parks and Recreation
10.2a Operating Costs for Recreation Programs per Person
2009 2008
$45.12 $41.24
Efficiency Measure
Operating costs for recreation programs per person.
Objective
Provide efficient operation of recreation programs.
Detailed Comments
Included in this measure is the cost of wages; benefits and operating costs for the operation of
a broad range of recreational programs and activities offered by the City to the public.
The recreation complex expansion was completed in September 2009. The new expansion
resulted in more programs being offered translating into higher operating costs.
This financial measure does not include the revenue generated by these additional programs.
I
City of Pickering
343 Year 2009 Performance Measurement Report
Parks and Recreation
10.2b Total Costs for Recreation Programs per Person
2009
$45.12
Efficiency Measure
New Measure - Total costs for recreation programs per person.
Objective
Provide efficient'operation of recreation programs.
Detailed Comments
The total costs are calculated as the sum of operating costs, interest on long term debt and
amortization related to recreation programs. In 2009, no interest and amortization were
included under recreation programs hence the total costs per person is the same as the
operating cost per person reported in 10.2a.
City of Pickering
Year 2009 Performance Measurement Report
344
Parks and Recreation
10.3a Operating Costs for Recreation Facilities per Person
2009 2008
$80.81 $73.78
Efficiency Measure
Operating costs for recreation facilities per person.
Objective
Provide efficient operation of the City's recreation facilities.
Detailed Comments
Included in this measure is the cost of wages, benefits and operating costs for community
recreation facilities. Aging facilities and the expansion at the recreation complex contributed to
the increase in materials and other maintenance costs of the facilities in 2009.
3 4 5 City of Pickering
Year 2009 Performance Measurement Report
Parks and Recreation
10.3b Total Costs for Recreation Facilities per Person
2009
$93.20
Efficiency Measure
New Measure - Total costs for recreation facilities per person.
Objective
Provide efficient operation of the City's recreation facilities.
Detailed Comments
Total costs are calculated to include operating costs, interest on long term debt and
amortization related to recreation facilities.
City of Pickering
Year 2009 Performance Measurement Report 346
Parks and Recreation
10.4a Operating Costs for Recreation Programs and Recreation Facilities per Person
Subtotal
2009 2008
$125.93 $115.03
Efficiency Measure
Operating costs for recreation programs and recreation facilities per person.
Objective
Provide efficient operation of the City's programs and recreation facilities,
Detailed Comments
Included in this measure is the cost of wages, benefits and operating costs for the operation of
recreational programs and facilities.
The facility expansion at the recreation complex afforded the introduction of more programs
that directly contributed to the increase in operating costs for both programs and facilities in
2009. Repairs and maintenance related expenses including labour, contracted services and
materials also contributed to the increase in the calculation of the subtotal.
3 4 7 City of Pickering
Year 2009 Performance Measurement Report
Parks and Recreation
10.4b Total Costs for Recreation Programs and Recreation Facilities per Person
(Subtotal)
2009
$138.32
Efficiency Measure.
New Measure - Total costs for recreation programs and recreation facilities per person.
Objective
Provide efficient operation of the City's programs and recreation facilities
Detailed Comments
Total costs are calculated to include operating costs, interest on long term debt and
amortization related to programs and'recreation facilities.
City of Pickering
Year 2009 Performance Measurement Report 348
Parks and Recreation
10.5 Total Kilometres of Trails per 1,000 Persons
2009 2008
0.161 km 0.162 km
Effectiveness Measure
Kilometres of trails per 1,000 persons
Objective
Measure the effectiveness of trails in the City that provide recreation opportunities.
Detailed Comments
Total kilometres of trails owned by the City plus trails owned by third parties where the City has
a formal lease contract, joint use agreement or reciprocal use agreement for every 1,000
resident were used in the calculation of this measure.
The 15 kilometres of trail maintained by the City in 2009 was the same as in 2008. The
decrease in the calculation of this measure in 2009 was a result of the slight increase in the
population (denominator). In other words, if the population increases and the trail kilometres
remains the same, this ratio will decrease every year.
City of Pickering
3 4 9 Year 2009 Performance Measurement Report
Parks and Recreation
10.6 Hectares of Open Space and Hectares of Open Space per 1,000 Persons
2009 2008
7.639 ha 7.651 ha
Effectiveness Measure
Hectares of open space (City owned) per 1,000 persona
Objective
Measure the adequacy of open space for the population.
Detailed Comments
Total hectares of city owned open space was used in this calculation. Open space includes all
outdoor open spaces that provide opportunities and benefits for active, passive and
programmed community recreation and leisure that are accessible to the public. This includes
but not limited to allotments, horticultural areas, natural areas, parks and parkettes,
playgrounds, public squares, skateboard parks, sports fields and trails.
The 710 hectares of open space reported in 2009 was the same as in 2008. The decrease in
the calculation of this measure was a result of the slight increase in population (denominator).
City of Pickering 3 0
Year 2009 Performance Measurement Report Parks and Recreation
10.7 Total Participant Hours for Recreation Programs
2008 2008
20,099 hrs 17,385 hrs
Effectiveness Measure
Total participant hours for recreation programs per 1,000 persons.
Objective
Measure the effectiveness of programs provided by the City.
Detailed Comments
Total participant hours for every 1,000 person in the City including registered, drop-in and
permitted recreation programs and activities was used in this calculation. Participant hours are
based only on the number of active registrants or participants in a program. Hours for special
events are not included in the calculation.
The increase in the number of programs offered and variations on existing programs in 2009
contributed to the increased 'participation in drop-in and permitted recreation program
registrations. This translated to a 15.6% increase in total participant hours in 2009 from 2008.
City of Pickering
3 51 Year 2009 Performance Measurement Report
Parks and Recreation
10.8 Square Metres of Indoor Recreation Facilities and Square Metres of Indoor
Recreation Facilities per 1,000 Persons (Municipal) Owned
2009 2008
439.279 s m 436.860 s m
Effectiveness Measure
Square metres of indoor recreation facilities per 1,000 persons.
Objective
Determine the adequacy of indoor recreation facility space available to the public.
Detailed Comments
Indoor recreation facilities include built or enclosed structures used for the purposes of
community recreation and leisure.
Total square metres of City owned indoor recreation facilities increased by 290 square metres
(sqm) from 40,541 sqm in 2008 to 40,831 sqm in 2009 with the expansion of the recreation
complex.
j
City of Pickering
Year 2009 Performance Measurement Report 352
Parks and Recreation
10.9 Square Metres of Outdoor Recreation Facility Space and Square Metres of Outdoor
Recreation Facility Space per 1,000 Persons (Municipally Owned)
2009 2008
286.057 sqm 286.516 sqm
Effectiveness Measure
Square metres of outdoor recreation facility space per 1,000 persons.
Objective
Determine the adequacy of outdoor recreation facility space available to the public.
Detailed Comments
Total area in square metres of municipally owned outdoor recreation facility space with
controlled access and electrical or mechanical functions was used in this calculation.
The 26,589 square metres of City owned outdoor space reported in 2009 is the same as in
2008. The slight decrease in the 2009 calculation was a result of the increase in general
population from 2008 (denominator).
3 5 3 City of Pickering
Year 2009 Performance Measurement Report
Library Services
11.1a Operating Costs for Libra Services per Person
2009 2008
$54.89 $54.72
Efficiency Measure
Operating costs for library services per person.
Objective
Provide efficient library services to the public.
Detailed Comments
The City has five locations servicing its residents. The cost for all five locations is included in
the calculation of this measure, which includes wages benefits and all other operating costs.
The increase in library operating costs is largely due to an increase in salaries and an increase
in repair and maintenance related to aging facilities. With the increase in both operating cost
components and the population (denominator), the resulting measure increased slightly in
2009 from 2008.
With a low growth rate in Pickering, this indicates that the Library's costs are being reasonably
contained.
I
City of Pickering 3 5 4
Year 2009 Performance Measurement Report
Library Services
11.1 b Total Costs for Libra Services per Person
2009
$67.45
Efficiency Measure
New Measure - Total costs for library services per person.
Objective
Provide. efficient library services to the public.
Detailed Comments
Total cost for this new measure is the sum of the operating costs, interest on long term debt
and amortization of related capital assets.
City of Pickering
3 5 5 Year 2009 Performance Measurement Report
Library Services
11.2a Operating Costs for Libra Services per Use
2009 2008
$1.75 $1.77
Efficiency Measure
Operating costs for library services per use.
Objective
Provide efficient library services to the public.
Detailed Comments
The City has five locations servicing its residents. The total operating costs for all five locations
and the total library uses was included in the calculation of this measure.
Although the operating costs in 2009 slightly went up from prior year mostly from salaries and
wages, the resulting measure slightly decreased due to the higher number of total library uses
in 2009 compared to 2008.
City of Pickering
Year 2009 Performance Measurement Report 356
Library Services
11.2b Total Costs for Libra Services per Use
2009
$2.15
Efficiency Measure
New Measure - Total costs for library services per use.
Objective
Provide efficient library services to the public.
Detailed Comments
The total costs for all five locations was used in the calculation of this measure against total
library uses. The total costs include the sum of the operating costs, interest on long term debt
and amortization of library assets.
City of Pickering
3 5 7 Year 2009 Performance Measurement Report
Library Services
11.3 Libra Uses per Person
2009 2008
31.425 30.879
Effectiveness Measure
Library uses per person.
Objective
Increased use of library services.
General Comment
Although population. changes impact the resulting measure, it does not necessarily affect the
level of service provided. Just a change in usage alone is a satisfactory indicator of service
levels.
Detailed Comments
Total library uses from all five locations together with the total population of the City were used
in the calculation of this measure.
Total usage per person slightly increased by 1.7% in 2009 from 2008.. This was due to the
increased visits to Library branches and access to the Library web site through the library
wireless connections (new this year). There was also an increase in the use of electronic
collections such as ebooks and audiobooks in 2009. The slight increase in population
denominator also affected the calculation of the resulting measure.
City of Pickering
Year 2009 Performance Measurement Report 358
Library Services
11.4 Electronic Libra Uses as a Percentage of Total Libra Uses
2009
30.0%
Effectiveness Measure
Revised Measure - Electronic library uses as a percentage of total library uses.
Objective
Effectiveness of information on library usage.
Detailed Comments
The percentage of electronic uses includes data from the five library locations. Uses include
as in previous years the number of people using on-site library computers, number of times
electronic collections (e-books, etc.) are accessed, number of electronic reference transactions
and number of electronic visits to the library.
In 2009, the definition of electronic uses was revised to include the use of library wireless
connections making this ear's measure not comparable to prior ears.
City of Pickering
3 5 9 Year 2009 Performance Measurement Report
Library Services
11.5 Non Electronic Libra Uses as a Percentage of Total Libra Uses
2008 2008
70.0% 66.3%
Effectiveness Measure
Non-electronic Library uses as a percentage of total library uses.
Objective
Effectiveness of information on library usage.
4 Detailed Comments
The percentage of non-electronic uses includes data from the five library locations. Uses
include borrowing books, program attendance, in-library materials, number of standard
reference transactions and number of in-person visits to the library.
Overall there was an increase in the use of all non-electronic categories mentioned above in
2009 compared to 2008 especially on in-library materials used and in-person visits to the
library. Total increases from all categories translated to a 5.6% total increase in non electronic
library uses in 2009.
k
i
c
City of Pickering
Year 2009 Performance Measurement Report 360
Land Use Planning
12.1 Percentage of New Residential Units Located Within Settlement Areas
2009 2008
98.2% 99.2%
Effectiveness Measure
Percentage of new residential units located within settlement areas.
Objective
New residential development is occurring within settlement areas.
Detailed Comments
The number of new residential units in detached houses, semi-detached houses, row
houses/town houses and apartments/condo apartments within the settlement areas are
used for the calculation of this measure as a percentage of the total number of new
residential units created within the entire City. Settlement areas include areas within the
City which have been designated for development in an approved municipal official plan.
In 2009, there were a total of 57 new dwelling units created within the City as compared
to the 244 created in 2008. This represents a 76.6% drop on new units created from
2008. Of the 57 new units in 2009, 56 were located within the settlement areas as
compared to the 242 units in 2008.
City of Pickering
3 6 1 Year 2009 Performance Measurement Report
Land Use Planning
12.2 Preservation of Agricultural Lands
2009 2008
99.7% 100.0%
Effectiveness Measure
Percentage of land designated for agricultural purposes which was not re-designated for
other uses in 2009.
Objective
Preservation of agricultural land.
Detailed Comments
The City of Pickering re-designated 27 hectares of agricultural lands to other uses in the
reporting year 2009. The total area designated for agricultural purposes at the end of 2009
is now 8,823 hectares from 8,850 hectares at the end of 2008.
City of Pickering
Year 2009 Performance Measurement Report 362
Land Use Planning
12.3 Preservation of A ricultural Lands Relative to 2000
2009 2008
99.5% 99.8%
Effectiveness Measure
Percentage of land designated for agricultural purposes which was not re-designated for other
uses relative to the base year of 2000.
Objective
Preservation of agricultural land.
Detailed Comments
Of the 8,865 hectares of land originally designated for agricultural purposes in the official plan
of 2000, 42 hectares was re-designated to other classifications as of 2009. Out of this 42
hectares, 27 hectares was re-designated in 2009.
i
City of Pickering
3 6 3 Year 2009 Performance Measurement Report
Land Use Planning
12.4 Hectares of Agricultural Land which was Re-designated for Other Uses During
the Reporting Year
2009 2008
27 0
Effectiveness Measure
Number of hectares of land originally designated for agricultural purposes which was re-
designated for other uses during 2009.
Objective
Preservation of agricultural land.
Detailed Comments
A total of 27 hectares of land originally designated for agricultural purposes in 2008 was re-
designated.to other uses in 2009. The re-designated land is now classified as "Open Space
- Active Recreational Area".
City of Pickering
Year 2009 Performance Measurement Report 364
Land Use Planning
12.5 Hectares of Agricultural Lands which was Re-designated for Other Uses Since
2000
2009 2008
42 15
Effectiveness Measure
Number of hectares of land originally designated for agricultural purposes which was re-
designated.for other uses since January 1, 2000.
Objective
Preservation of agricultural land.
Detailed Comments
A total of 42 hectares of agricultural land was re-designated to other uses from year 2000
to 2009. Of this 42 hectares, 27 hectares was re-designated to other uses in 2009.
i
ATTACHMENT #--2-TO REPORT # AS 30NO
City of Pickering Performance Measurement
365 Comparison of 2009 and 2008 Measures
FPerformance Measurements 2009 2008
General Government - Efficiency
- Operating costs for governance and corporate management 7.00% * 7.30%
as % of total municipal operating costs
- Total Costs for governance and corporate management
as % of total municipal costs 6.00% * N/A
Protection Services - Fire Services Efficiency
Operating cost for fire services per $1,000 of assessment $ 1.43 $ 1.27
Total cost for fire services per $1,000 of assessment $ 1.50 * N/A
- Number of residential fire related civilian injuries per 1,000 persons 0.00 * N/A
- Residential fire related civilian injuries - 5 year average per 1,000 persons 0.065 * N/A
- Residential fire related civilian fatalities per 1,000 persons in 2009 0.011 * N/A
- Residential fire related civilian fatalities - 5 year average per 1,000 persons 0.011 * N/A
Number of residential structural fires per 1,000 households 0.875 * N/A
Transportation Services - Roadways Efficiency
- Operating cost for paved roads per lane kilometer $ 1,958.98 * $ 706.57
- Total cost for paved roads per lane kilometer $ 6,321.41 *
- Operating cost for unpaved roads per lane kilometer $ 5,237.12 $ _ 5,991.63
- Total cost for unpaved roads per lane kilometer $ 5,295.11 * N/A
- Operating cost for bridges & culverts per sq m of surface area $ - * N/A
- Total cost for bridges & culverts per sq m of surface area $ 24.70 * N/A
- Operating cost for winter control maintenance of roads per lane kilometer $ 1,328.15 $ 2,121.71
- Total cost for winter control maintenance of roads per lane kilometer $ 1,328.15 * N/A
Tranportation Services - Roadways Effectiveness
- Percentage of paved lane kilometer rated as good to very good 84.90% 84.90%
- Percentage of bridges & culverts rated as good to very good 64.81% * N/A
- Percentage of winter event response that met or exceeded set standards 100.00% 100%
Environmental Services - Storm Water System Efficiency
Operating costs for urban storm water management (collection, treatment
and disposal) per kilometer of drainage system (URBAN) $ 1,502.89 * $ 817.18
Total costs for urban storm water management (collection, treatment
and disposal) per kilometer of drainage system (URBAN) $ 8,460.40 * N/A
Operating costs for rural storm water management (collection, treatment
and disposal) per kilometer of drainage system (RURAL) $ 2,308.05 * $ 1,592.50
- Total costs for rural storm water management (collection, treatment
and disposal) per kilometer of drainage system (RURAL) $ 2,369.96 * N/A
Parks & Recreation - Operation of Parks Efficiency
- Operating cost for parks per person $ 43.94 $ 36.33
- Total cost for parks per person $ 52.92 * N/A
Recreation Programs - Operation of Recreation Programs Efficiency
- Operating cost for recreation progams per person $ 45.12 $ 41.24
- Total cost for recreation progams per person $ 45.12 * N/A
Recreation Facilities - Operation of Recreation Facilities Efficiency
- Operating cost for recreation facility per person $ 80.81 $ 73.78
- Total cost for recreation facility per person $ 93.20 * N/A .
City of Pickering Performance Measurement
Comparison of 2009 and 2008 Measures 366
Performance Measurements 2009 2008
Parks, Recreation Programs & Recreation Facilities - Operations of Parks,
Recreation Programs and Recreation Facilities Efficiency
Operating cost for recreation programs and recreation facilities per person
per person (subtotal) $ 125.93 $ 115.03
- Total cost for recreation programs and recreation facilities
per person (subtotal) $ 138.32 N/A
Trails - To provide recreational opportunities
Total kilometers of trails and total kilometers of trails per 1,000 person 0.161 km 0.162 km
Parks & Recreation - Open Space is adequate for population
- Hectres of Open Space per 1,000 person 7.639 ha 7.651 ha
Participant Hours for Recreation Programs - How Effective the City
is in servicing the needs of residents for Recreation Programs
- Total participant hours for recreation programs per 1,000 person 20,099 hrs 17,385 hrs
Recreation Facility Space - Recreation facility space is adequate for
j population (municipally owned)
f1 - Square metres of indoor recreation facility space per 1,000 person 439.279 sq.m. 436.860 sq.m.
- Square metres of outdoor recreation facility space per 1,000 person 286.057 sq.m. 286.516 sq.m.
Library Services - Library Services Efficiency
- Operating cost for library service per person $ 54.89 $ 54.72
f - Total cost for library service per person $ 67.45 * N/A
- Operating cost for library service per use $ 1.75 $ 1.77
- Total cost for library service per use $ 2.15 * N/A
Library Services - Library Services Effectiveness
- Library uses per person 31.425 30.879
- Percentage of Electronic Library uses 30.00% * 33.70%
- Percentage of Non - Electronic Library uses 70.00% 66.30%
Planning and Development - Land Use Planning - Effectiveness
Percentage of new residential units located in settlement areas 98.20% 99.20%
- Percentage of lands designated for agricultural purposes which was not
re-designated for other uses during the reporting year 99.69% 100.00%
- Percentage of land designated for argicUltural purposes which was not
re-designated for other uses relative to the base year of 2000. 99.53% 99.83%
Number of hectares of land originally designated for agricultural purposes
which was re-designated for other uses during the reporting year 27 ha 0
- Number of hectares of land originally designated for agricultural purposes
which was re-designated for other uses since January 1, 2000. 42 ha 15 ha
Not comparable to prior year due to modification in calculations or new measure
ATTACHMENT #,-j-TO REF®RT#-a! 3F d
367
City of Pickering
Year 2009. Performance Measurement Report
The Performance Measures required to be reported publicly under the Provincially
mandated Performance Measurement Program will be available on the City of
Pickering's website cityofpickering.com as of September 30, 2010 or available at the
Corporate Services Department, 2nd Floor, Pickering Civic Complex.