HomeMy WebLinkAboutCS 53-06
~ {'"
1;"'1-
REPORT TO
EXECUTIVE COMMITTEE
Report Number: CS 53-06
Date: September 25, 2006
From:
Gillis A. Paterson
Director, Corporate Services & Treasurer
Subject:
Municipal Performance Measurement Program - Provincially Mandated
Public Reporting of Performance Measures
Recommendation:
It is recommended that Report CS 53-06 from the Director, Corporate Services &
Treasurer be received and forwarded to Council for information.
Executive Summary: The City is mandated by the Province of Ontario to report on
Performance Measures for specific key service areas. The collection and reporting of
these measures is not in any way associated with the City's annual audit but are
derived from the Financial Information Return filed by the City with the Ministry of
Municipal Affairs and Housing. These measurements are being submitted and reported
by the Treasurer under the direction of Provincial authority.
Attached are the Municipal Performance Measurement Program (MPMP) results for
2005 together with a supplemental information package which will be provided on the
City's website, a comparison to the 2004 Measures and a copy of the Public Notice that
will appear in the News Advertiser at the end of September.
Financial Implications: None
Background: Attachment 1 is the information mandated by the Province to be
reported to the public by September 30, 2006. Comments pertaining to the compilation
and interpretation of the data have been included to aid in the explanation and
understanding of what is being reported. The Province has made provision for these
comments and encourages their inclusion, as many municipalities do.
Report CS 53-06
Date: September 25, 2006
.. r:, ..~,
It...d
Subject: Municipal Performance Measurement Program - Provincially
Mandated Public Reporting of Performance Measures
Page 2
With this being the sixth year of Performance Measurement reporting, these measures
continue to evolve as feedback from municipalities are received and are taken into
consideration by the Province in the development of the Performance Measures to be
reported upon. In addition there are continual refinements to the way measures are
defined and calculated as well as municipalities continuing to improve on their methods
for collection of data in attempts to ensure consistency with reporting. This leads to
improving the measures to better serve the interests of the public and municipal needs
for evaluating the efficiency and effectiveness of the services we provide in the
municipality. However I must still caution against municipality-to-municipality
comparisons due to the fact no two municipalities are identical in their geography, rural
vs. urban mix or the level of service.
It will only be through continuing efforts, ongoing experience, further clarifications from
the Province and consistent reporting formulas that year-to-year comparisons within the
municipality and across municipalities will become meaningful.
Attachment 2 is a table highlighting the comparability, or lack of it, of the 2005 and 2004
results of this program. Attachment 3 provides a comparison of the results for the two
years.
The information will be posted on the City's website, as was the case in past years, and
a notice to this effect will be included in the "Community Page" of the local newspaper,
Attachment 4. The information will also be available to anyone wishing to pick it up at
City Hall.
Attachments:
1. 2005 Provincial Performance Measurement Program - Public Reporting
2. Comparability Table - 2005/2004
3. Comparison of 2005 and 2004 Performance Measures
4. Public Notice to be included in the Community Page of the News Advertiser
.. n'.
1 :., 'i
Report CS 53-06
Date: September 25, 2006
Subject: Municipal Performance Measurement Program - Provincially
Mandated Public Reporting of Performance Measures
Page 3
Prepared By:
Approved I Endorsed By:
! ('-
'., ~ .
, " \ L ,', .' t( \,..\ (. (( f(
Kristme Senior
Manager, Accounting Services
..---r~ 2' ~_ ~
Gillis A. Paterson
Director, Corporate Services & Treasurer
GAP:vw
Attachments
Copy: Chief Administrative Officer
Recommended for the consideration of
Pickering CitYfi Council "
-
<III n .'..
1 t.:, ~)
ATTACHMENT#.L.. TO REPORT#C~ 5,'3 'Db
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
OVERVIEW
As required by the Ontario Government's Municipal Performance Measures Program
(MPMP), the Treasurer of the City of Pickering, as part of its 2005 Financial Information
Return (FIR) package, has submitted financial and related service performance
measurements to the Province.
This program was announced in 2000 by the Ontario Government, which requires
municipalities to collect and report data to the Province and the Public in the form of
performance measurements on key service areas.
The objective of the Province is: to enhance accountability by reporting to taxpayers; to
increase taxpayer awareness; and, to improve service delivery by sharing best
practices with comparable municipalities. As municipalities change and grow, its
citizens expect to receive quality, cost effective services. Performance measurements
are a means of benchmarking these services. The City is committed to refining and
developing new methods of collecting data so as to have more efficient and effective
benchmarking tools.
The benefits of this program will improve as municipalities in conjunction with personnel
of the Ontario Government's Municipal Performance Measurement Program work
towards standardizing information collected in calculating the related measures which
will ultimately allow for fairer comparisons from year to year and across municipalities.
A comparability table has been provided that highlights which results are comparable
within the municipality's own measures and includes comments explaining why any are
not comparable.
Each measure is also accompanied by comments regarding aspects of the
measurements. The comments are an integral part in the interpretation of the
performance measure results. These results should not be compared across
municipalities without consideration of the comments that impact on interpreting and
understanding the results. In addition, influencing factors in the collection of data or
refinements while the measures are still evolving could affect the results and
comparability of same year over year.
4f)("
1(.,0
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
GENERAL GOVERNMENT
1.1 OPERATING COSTS FOR GOVERNANCE AND CORPORATE
MANAGEMENT
2005 2004
6.50% 7.40%
Efficiency Measure
Operating costs for governance and corporate management as a percentage of total
municipal operating costs.
Objective
To determine the efficiency of municipal management
General Comments
The following factors can influence the above results:
. The extent that cost centers within municipalities directly relate to the functions
included under the governance and corporate management categories
. The level of service provided to the corporation and the public.
Detailed Comments
2005 is comparable with 2004 result as the same methodology was used in the
calculation of these results.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
.. ().,
1/~ f
FIRE SERVICES
2.1 OPERATING COSTS FOR FIRE SERVICES
2005 2004
$1.16 $1.18
Efficiency Measure
Operating costs for fire services per $1,000 of assessment.
Objective
Efficient municipal fire services
General Comments
The following factors can influence the above results across municipalities:
. Emergency response times
. Number and location of fire halls
. Urban/rural mix of properties as well as density of buildings
. Geographic size of municipality
Detailed Comments
Assessment value does not necessarily correlate to operating cost for fire services.
The higher the assessment value, the lower the cost per $1,000 assessment.
Conversely the urban/rural mix of the community will affect the results as will the size
and type of commercial/industrial establishments.
Number of households, response time and urban/rural mix of the municipality are
factors that determine the need for fire services not the property value.
.. n ",
1 ~ t) CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
ROAD SERVICES
4.1 OPERATING COSTS FOR PAVED ROADS
2005 2004
$914.79 $787.39
Efficiency Measure
Operating costs for paved (hard top) roads per lane kilometre
Objective
Efficient maintenance of paved roads
General Comments
The following factors can influence the above results across municipalities:
. Use of the roads by heavy equipment.
. The municipality's standard for road conditions in comparison with comparable
municipalities.
. Kilometres of paved roads in the municipality.
. The allocation of operating costs used in the determination of the numerator
when there is not a separate cost centre.
Detailed Comments
The City of Pickering maintains separate account to track material costs related to
roads. However, the costs for administration and other indirect costs have been
allocated to the cost for paved roads based on management's best estimate of the
proportion of responsibility dedicated to the road functions such as maintenance of
paved and unpaved roads and winter control
The identified costs attributable to this function include employee wages & benefits,
asphalt, program support, rental of heavy equipment and shoulder maintenance.
The City maintained 751 paved lane kilometers in 2005
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
.. r) i'
ll:. ,.j
ROAD SERVICES
4.2 OPERATING COSTS FOR UNPAVED ROADS
2005 2004
$3,728.03 $3,580.81
Efficiency Measure
Operating costs for unpaved (loose top) roads per lane kilometre.
Objective
Efficient maintenance of unpaved roads
General Comments
The following factors can influence the above results across municipalities:
. Use of the roads by heavy equipment.
. The kilometres of unpaved roads in the municipality in comparison with
comparable municipalities.
. Locations of the unpaved lanes.
. The allocation of operating costs used in the determination of the numerator
when there is not a separate cost centre.
Detailed Comments
The City of Pickering maintains separate accounts to track material costs related to
roads. However, the cost for administration and other indirect costs have been
allocated to the cost for unpaved roads based on management's best estimate of the
proportion of responsibility dedicated to the road functions such as maintenance of
paved and unpaved roads and winter control.
The operating cost of maintaining the City's unpaved roads includes employee
wages & benefits, granular materials, administering calcium programs, program
support, rental of heavy equipment, grading, culvert and shoulder maintenance.
The City maintained 236 unpaved lane kilometers in 2005
A significant factor affecting rural road maintenance costs is traffic exiting the eastern
terminus of Highway 407.
.. "', "
1.)\.1
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
ROAD SERVICES
4.3 OPERATING COSTS FOR WINTER MAINTENANCE OF ROADS
2005 2004
$1,270.39 $1,144.21
Efficiency Measure
Operating costs for winter maintenance of roadways per lane kilometre maintained in
winter.
Objective
Efficient winter control operation
General Comments
The following factors can influence the above results:
. The municipality's standard seNice levels for road conditions.
. The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
. The allocation of operating costs used in the determination of the numerator when
there is not a separate cost centre.
Detailed Comments
In 2004 the City of Pickering established a separate account to track material costs
that were directly related to winter control. The costs for administration and other
indirect costs have been allocated to the cost for winter control based on
management's best estimate of the proportion of responsibility dedicated to the road
functions such as maintenance of paved and unpaved roads and winter control.
The operating cost of the City's winter control maintenance includes employee wages
& benefits, salt, sand, program support, equipment rental, culvert thawing.
The City maintained a total of 987 lane kilometers in 2005.
A significant factor affecting winter maintenance costs is traffic exiting the eastern
terminus of Highway 407.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
4 f) A
lJ_l
ROAD SERVICES
4.4 CONDITION OF PAVED ROADS
2005 2004
85.40% 75.10%
Effectiveness Measure
Percentage of paved lane kilometres where the condition is rated as good to very good.
Objective
Provide a paved lane system that has a pavement condition that meets municipal
standards
General Comments
The following factors can influence the above results:
. The municipality's standard service levels for road conditions.
. The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
. Amount of traffic.
Detailed Comments
The City's staff uses their best estimates to establish the % of roads that are rated as
good. The City's road patrols, the public and employees are other sources providing
feedback on road conditions. As existing roads are reconstructed the rating will move
up to a higher level.
4 3 ,-
1'..;".
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
ROAD SERVICES
4.5 WINTER EVENT RESPONSE
2005 2004
100% 100%
Effectiveness Measure
Percentage of winter events where the response met or exceeded locally determined
road maintenance standards.
Objective
Provide an appropriate response to winter events
General Comments
The following factors can influence the above results:
. The municipality's standard service levels for road conditions.
. The frequency and severity of the winter weather.
. The kilometres of paved and unpaved roads in the municipality in comparison with
comparable municipalities.
Detailed Comments
Roads are cleaned and cleared within 24 hours of a snowfall. The City did not
experience a winter event which staff was not able to meet or exceed road maintenance
standards.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
l~ I).,
\),.J
TRANSIT
5.1 OPERATING COSTS FOR CONVENTIONAL TRANSIT
2005 2004
$4.71 $4.24
Efficiency Measure
Operating costs for conventional transit per regular service passenger trip.
Objective
Efficient conventional transit services
General Comments
The following factors can influence the above results:
. The service hours of the transit operations, for example the level of weekend or
holiday service provided.
. The population distribution and the geography of the service area.
. Service levels required to accommodate passenger trips transferred from outside of
the City's boundaries.
. Unexpected events that may be included in operating cost that has no correlation to
service levels.
. The urban/rural mix of the service area.
Detailed Comments
The 2005 results reflect 100% of APT A's operations even though the Transit Authority
is jointly owned by the City of Pickering and Town of Ajax.
In 2001 Ajax and Pickering operated separate transit departments. These two
departments were amalgamated for 2002 resulting in some one-time transitional costs.
In 2003 under the provincial reporting program, the allocation of program support costs
incurred by each municipality changed substantially. This resulted in a formula driven
increase in the amount allocated to APT A, for reporting purposes, not an actual
increase in operating costs.
Trips deemed as transfers are excluded from the denominator of passenger trips.
However, the costs would be impacted to ensure that appropriate service levels are
provided to accommodate these additional passengers.
For 2004, the number of passenger trips excluding transfers was 2,338,680 and in 2005
it was 2,413,854 an increase in ridership of approximately 3.2%.
13t.~
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
TRANSIT
5.2 REGULAR SERVICE PASSENGER TRIPS
2005 2004
13.68 13.26
Effectiveness Measure
Number of conventional transit passenger trips per person in the service area in a year.
Objective
Maximum utilization of municipal transit services
General Comments
The following factors can influence the above results:
. The service hours of the transit operations, for example the level of weekend or
holiday service provided.
. The population distribution and geography of the service area.
. The percentage of the service area to the total municipal area.
Detailed Comments
The 2005 measure is based on a combination of the population of the service areas in
the City of Pickering and the Town of Ajax.
For 2005 and 2004 the population of the service area was 176,398.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
135
STORM WATER MANAGEMENT
7.1 OPERATING COSTS FOR URBAN STORM WATER MANAGEMENT
2005 2004
$428.40 $678.71
Efficiency Measure
Operating costs for urban storm water management (collection, treatment, and
disposal) per kilometre of drainage system.
Objective
Efficient storm water management
General Comments
The following factors can influence the efficiency rate of urban storm water
management:
. The geography of the City
. The extent and age of the drainage system
. The inventory of pipes in the Municipality
Detailed Comments
This measure identifies direct costs such as contracted services and materials, storm
pipe cleaning, flushing, video inspection, catch basin/manhole repairs storm pipe
repairs, cleaning of specialized oil and grit separators.
Storms water management is increasingly important as the City continues to develop
and intensify and pressures are put on watercourses and Frenchman's Bay.
13 G CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
STORM WATER
7.2 OPERATING COSTS FOR RURAL STORM WATER MANAGEMENT
2005
$1 ,565.32
Efficiency Measure
Operating costs for rural storm water management
disposal) per kilometre of drainage system.
2004
$1 ,340.06
(collection, treatment, and
Objective
Efficient storm water management
General Comments
The following factors can influence the efficiency rate of urban storm water
management:
. The geography of the City, size and nature of the rural area.
. Land erosion control.
The frequency and time devoted to the maintenance of the rural drainage system.
Detailed Comments
This measure includes Storm Water Management and the accounts were structured to
more accurately identify direct costs such as contracted services and materials, storm
canal dredging, culvert repairs and maintenance, ditching and other day to day
maintenance measures.
Storms water management is increasingly important as the City continues to develop
and intensify and pressures are put on watercourses and Frenchman's Bay.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
.. 3' ':
1 - i
PARKS AND RECREATION
10.1 OPERATING COST FOR PARKS PER PERSON
2005 2004
$26.42 $26.46
Efficiency Measure
Operating costs for parks per parks person.
Objective
Efficient operations of Parks
Detailed Comments
This was a new measure for the year 2004 reporting. The City efficiently maintains the
parks on a daily basis in the summer. Grass is scheduled for cutting on a 7 to 10 day
cycle so as to control growth and keep the park available and safe for public use at all
times during the summer months.
~ '" ."
. -.' '.<
.L. .J t.'
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
PARKS AND RECREATION
10.2 OPERATING COSTS FOR RECREATION PROGRAM PER PERSON
2005 2004
$36.32 $34.21
Efficiency Measure
Operating costs for recreation programs.
Objective
Efficient operation of recreation programs
Detailed Comments
This was a new measure for the year 2004 reporting. Included in this measure is the cost of
wages, benefits and operating costs for the operating of a broad range of recreation programs
and activities.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
... 0,'"
10d
PARKS AND RECREATION
10.3 OPERATING COSTS FOR RECREATION FACILITIES PER PERSON
2005 2004
$61.02 $58.14
Efficiency Measure
Operating costs for recreation facilities per person.
Objective
Efficient operation of the City's recreation facilities
Detailed Comments
This was a new measure for the year 2004 reporting. Included in this measure is the cost of
wages, benefits and operating costs for community recreational facilities.
~ "
14 'U CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
PARKS AND RECREATION
10.4 OPERATING COSTS FOR PARKS, RECREATION PROGRAMS AND RECREATION
FACILITIES PER PERSON
2005 2004
$123.76 $118.91
Efficiency Measure
Operating costs for parks, recreation programs and recreation facilities per person.
Objective
Efficient operation of the City's parks, programs and recreation facilities
Detailed Comments
This was a new measure for the year 2004 reporting. Included in this measure is the cost of
wages, benefits and operating costs for the operation of parks, recreation programs and
facilities.
The total cost is the total of the three preceding measures.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
14i
PARKS AND RECREATION
10.5 TOTAL PARTICPANT HOURS FOR RECREATION PROGRAMS PER 1,000 PERSONS
2005 2004
14,487 HRS 14,026 HRS
Effectiveness Measure
Total participant hours for recreation programs per 1,000 persons.
Objective
The effectiveness of programs provided by the City
Detailed Comments
This was a new measure for the year 2004 reporting. Total participant hours for every 1,000
person in the City, registered, drop in and permitted recreation programs and activities was
used in this calculation.
.t 4 .,
1. '-
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
PARKS AND RECREATION
10.6 HECTARES OF OPENS SPACE AND HECTARES OF OPEN SPACE PER 1,000
PERSONS
2005 2004
7.521 HA 7.527 HA
Effectiveness Measure
Hectares of open space per 1,000 person.
Objective
Effectiveness of open space
Detailed Comments
This was a new measure for the year 2004 reporting. Hectares of open space per 1,000
person in the City was used in this calculation.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
... 4~'
i .-
..... ...>>
PARKS AND RECREATION
10.7 TOTAL KILOMETRES OF TRAILS AND TOTAL KILOMETRES OF
TRAILS PER 1,000 PERSON
2005 2004
0.371 K 0.372 K
Effectiveness Measure
Kilometres of trails per 1,000 person
Objective
Effectiveness of trails in the City
Detailed Comments
This was a new measure for the year 2004 reporting. Total kilometres of trails per every 1,000
resident was used in the calculation of this measure.
14:,i
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
PARKS AND RECREATION
10.8 SQUARE METRES OF RECREATION FACILITY SPACE AND SQUARE METRES OF
RECREATION FACILITY SPACE PER 1,000 PERSON
2005 2004
442.797 SQ M 430.786 SQ M
Effectiveness Measure
Square metres of recreation facility space per 1,000 person
Objective
Square metres of recreation space in the City
Detailed Comments
This was a new measure for the year 2004 reporting. Total square meters of community
recreation facility space for every 1,000 person in the City was used in this calculation.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
.. 4."'-'
. ' .
.4. d
LIBRARY SERVICES
11.1 OPERATING COSTS FOR LIBRARY SERVICES PER PERSON
2005 2004
$47.70 $46.20
Efficiency Measure
Operating costs for library per person.
Objective
Efficient operations of Libraries in the City
Detailed Comments
This was a new measure for the year 2004 reporting. The City has five locations servicing its
residents. The cost of all five locations is included in the calculation of this measure. It
includes wages, benefits and all other operating costs.
Rural libraries, of which the City has three, are more costly to operate on a per person basis.
14G
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
LIBRARY SERVICES
11.2 OPERATING COSTS FOR LIBRARY SERVICES PER USE
2005 2004
$1.66 $1.67
Efficiency Measure
Operating costs for Library services per use.
Objective
Efficient use of Library services
Detailed Comments
This was a new measure for the year 2004 reporting. The City has five locations servicing its
residents. Total usage of the five locations was included in the calculation of this measure.
Rural libraries, of which the City has three, are more costly to operate on a per person basis.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
... 4'
J. (
LIBRARY SERVICES
11.3 LIBRARY USES PER PERSON
2005 2004
28.785 27.712
Effectiveness Measure
Library uses per person.
Objective
Effectiveness of Library uses
Detailed Comments
This was a new measure for the year 2004 reporting. Total usage of all five locations together
with the total population of the City is used in the calculation of this measure.
14 ,';~
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
LIBRARY SERVICES
11.4 ELECTRONIC LIBRARY USES AS A PERCENTAGE OF TOTAL LIBRARY USES
2005 2004
30.2% 25%
Effectiveness Measure
Electronic Library uses as a percentage of total library uses.
Objective
Effectiveness of total library uses
Detailed Comments
This was a new measure for the year 2004 reporting. The percentage of electronic use
represents the five locations.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
14,]
LIBRARY SERVICES
11.5 NON ELECTRONIC LIBRARY USES AS A PERCENTAGE OF TOTAL LIBRARY USES
2005 2004
69.8% 75%
Effectiveness Measure
Non-electronic Library uses as a percentage of total library uses.
Objective
Effective percentage of non-electronic Library uses
Detailed Comments
This was a new measure for the year 2004 reporting. The percentage of non-electronic use
represents the five locations
4 1"''''- ,."
l~) U
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
LAND PLANNING USE
12.1 PERCENTAGE OF NEW DEVELOPMENT
2005 2004
99.60% 100%
Effectiveness Measure
Percentage of new lots, blocks and/or units with final approval which are located within
the settlement areas.
Objective
New lot creation is occurring in the settlement area
Detailed Comments
The City of Pickering is responsible for approving all plans. All approved new lots were
located within the settlement areas.
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
.. e:: ,"
101
LAND PLANNING USE
12.2 PRESERVATION OF ARGICULTURAL LANDS
2005 2004
100% 100%
Effectiveness Measure
Percentage of land designated for agricultural purposes which was not re-designated for
other uses during 2005.
Objective
PreseNation of agricultural lands
Detailed Comments
The City of Pickering did not re-designate any agricultural lands in the reporting year 2005.
15,~
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
LAND PLANNING USE
12.3 PRESERVATION OF AGRICULTURAL LAND RELATIVE TO 2000
2005 2004
99.80% 99.80%
Effectiveness Measure
Percentage of land designated for agricultural purposes which was not re-designated for other
uses relative to the base year of 2000.
Objective
Preserve agricultural land
Detailed Comments
This represents land that was re-designated during the year 2000.
CITY OF PICKERING 15;;
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
LAND PLANNING USE
12.4 HECTARES AGRICULTURAL LAND (DURING REPORTING YEAR)
2005 2004
0 0
Effectiveness Measure
Number of hectares of land originally designated for agricultural purposes which was re-
designated for other uses during 2004.
Objective
Preserve agricultural land
Detailed Comments
No agricultural lands were re-designated in the reporting year.
15 if CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
LAND PLANNING USE
12.5 CHANGE IN AGRICULTURAL LAND (SINCE 2000)
2005 2004
15 15
Effectiveness Measure
Number of hectares of land originally designated for agricultural purposes which was re-
designated for other uses since January 1, 2000.
Objective
Preserve agricultural land
Detailed Comments
These lands were redesignated during 2000.
... 5"
1 .J
!"",TTACHMENT#~ TO REPORT#~ -;~
Comparability Table - Reporting Year 2005
Operating cost for fire services per 1,000 of
assessment
Significant increases in
material costs of approx
23% were the major
contributing factor to an
overall increase in the cost
per lane kilometre. In
addition refinement of
collection of data continues,
to improve year to year
com arisons.
Significant increases in
material costs of approx
23% were the major
contributing factor to an
overall increase in the cost
per lane kilometre. In
addition refinement of the
collection of data continues,
to improve year to year
com arisons.
Refinement of the data
collected for this
measurement continues to
be refined to obtain
consistenc .
The percentage of paved
lanes was consistently rated
as ood.
Operating costs for paved (hard top) roads per lane
kilometre
Operating costs for unpaved (loose top) roads per Not Comparable to 2004
lane kilometre
Operating costs for winter maintenance of roadways Not Comparable to 2004
per lane kilometre maintained in winter
Percentage of paved lane kilometres where the Comparable to 2004
condition is rated as good to very good
Operating costs for urban storm water management
The proportion of costs
related to urban versus rural
reversed compared to 2004
results, causing the swing in
the results. In addition
further refinement of the
collection of data continues
to improve year to year
com arisons.
The proportion of costs
related to urban versus rural
reversed compared to 2004
results,causing the swing in
the results. In addition
further refinement of the
collection of data continues
to improve year to year
com arisons.
Operating cost for rural storm water management Not Comparable to 2004
'" r.:: ""
l~U
Comparability Table - Reporting Year 2005
Cost of operating parks per person
Comparable to 2004
New measure in 2004
Cost of recreation programs per person
Comparable to 2004
New measure in 2004
Cost of operating recreation facilities per person
Comparable to 2004
New measure in 2004
Total cost per person of operating parks, recreation
ro rams and recreation facilities er erson
Total participant hours for recreation programs
Comparable to 2004
New measure in 2004
Comparable to 2004
New measure in 2004
Hectares of open space in the City
Comparable to 2004
New measure in 2004
Kilometres of trails in the Municipality
Comparable to 2004
New measure in 2004
Square metres of space available for recreation
Comparable to 2004
New measure in 2004
Cost of library services per person
Comparable to 2004
New measure in 2004
Cost per use of library service
Comparable to 2004
New measure in 2004
Percentage of electronic use
Comparable to 2004
New measure in 2004
Percentage of non-electronic uses
Comparable to 2004
New measure in 2004
Comparable to 2004
The 2005 results represent
the operating costs and
service area for the
amalgamation of both
Pickering and Ajax transit
divisions.
Number of conventional transit passenger trips per Comparable to 2004
person in the service are in a year
The 2005 results represent
the operating costs and
service area for the
amalgamation of both
Pickering and Ajax transit
divisions.
Percentage of new lots, blocks and/or units with final Comparable to 2004
approval which are located within the settlement
areas
Percentage of land designated for agricultural Comparable to 2004
purposes which was not re-designated for other uses
durin 2005
Percentage of land designated for agricultural Comparable to 2004
purposes, which was not re-designated for other
uses relative to the base ear of 2000.
Number of hectares of land originally designated for Comparable to 2004
agricultural purposes which was re-designated for
other uses durin the re ortin ear 2005
Number of hectares land originally designated for Comparable to 2004
agricultural purposes which was re-designated for
other uses since Janua 1 , 2000
No agricultural lands were
re-designated during 2005
No agricultural lands were
re-designated during 2005
1, 5~"j
_I, .f
ATTACHMENT #3~~._. 'tC REPORT # CS.5:-; -J~
General Government. Efficiency
Operating costs for governance and corporate management 6.50% 7.40%
as % of total municipal operating costs
Protection Services - Fire Services Efficiency
Operating cost for fire services per $1 ,000 of assessment $ 1.16 $ 1.18
Transportation Services - Roadways Efficiency
Operating cost for paved roads per lane kilometer $ 914.79 $ 787.39
Operating cost for unpaved roads per lane kilometer $ 3,728.03 $ 3,580.81
Operating cost for winter control maintenance per lane kilometer $ 1,270.39 $ 1,144.21
Tranportation Services - Roadways Effectiveness
Percentage of paved lane kilometer rated good to very good 85.40% 75.10%
Percentage of winter event response that met or exceeded 100% 100%
municipal road maintenance standards
Transit Services - Transit Efficiency
Operating costs for conventional transit per regular service $ 4.71 $ 4.24
passenger trip
Tranist Services - Transit Effectiveness
Number of conventional transit passenger trips per person in the 13.68 13.26
service area in a year
Environmental Services - Sewer System Efficiency
Operating costs for urban storm water management (collection, treatment $ 428.40 $ 678.71
and disposal) per kilometer of drainage system (URBAN)
Operating costs for rural storm water management (collection, treatment $ 1,565.32 $ 1,340.06
and disposal) per kilometer of drainage system (RURAL)
Plannig and Development - Land Use Planning. Effectiveness
Percentage of new lots approved which are located in settlement areas 99.60% 100%
Percentage of lands designated for agricultural purposes which was not 100% 100%
re-designated for other uses during the reporting year
Percentage of land designated for argicultural purposes which was not 99.80% 99.80%
re-designated for other uses relative to the base year of 2000.
Number of hectares of land originally designated for agricultural purposes
which was re-designated for other uses during the reporting year 0 0
Number of hectares of land originally designated for agricultural purposes 15 15
which wasre-designated for other uses since January 1, 2000.
Parks & Recreation - Operation of Parks Efficiency
Operating cost for parks per person $ 26.42 $ 26.46
Recreation Programs - Operation of Recreation Programs Efficiency
Operating cost for recreation progams per person $ 36.32 $ 34.21
Recreation Facilities - Operation of Recreation Facilities Efficiency
Operaing cost for recreation facility per person $ 61.02 $ 58.14
Parks, Recreation Programs & Recreation Facilities - Operations of Parks,
Recreation Programs and Recreation Facilities Efficiency
Operating cost for parks, recreation programs and recreation $ 123.76 $ 118.91
facilities per person
Parks & Recreation - Open Space is adequate for population
Hectres of Open Space per 1,000 person 7.521 ha 7.527 ha
Trails - To provide recreational opportunities
Total kilometers of trails per 1,000 person 0.371 k 0.372 k
15:j
Participant Hours for Recreation Programs - How Effective the City
is in servicing the needs of residents for Recreation Programs
Total hours for registered programs
Recreation Facility Space - Recreation facility space is adequate for
population
Square metres of recreation facility space per 1,000 person
Library - Library Services Efficiency
Operating cost for library service per person
Library Services - Library Services Efficiency
Operating cost for library service per use
Library Services - Library Services Effectiveness
Library uses per person
Percentage of Electronic Library uses
Percentage of Non - Electronic Library uses
14,487 hrs
14,026 hrs
442.797 sq m. 430.786 sq m.
$ 47.70 $ 46.20
$ 1.66 $ 1.67
28.785 27.712
30.2% 25.0%
69.8% 75.0%
f\CHMENT# L TO REPORT#~}~~J
CITY OF PICKERING
YEAR 2005 PERFORMANCE MEASUREMENT REPORT
The Performance Measures required to be reported publicly under the Provincially
mandated Performance Measurement Program will be available on the City of
Pickering's website citvofpickerinq.com as of September 30, 2006 or available at the
Corporate Services Department, 2nd Floor, Pickering Civic Complex.