HomeMy WebLinkAbout1999 Capital Budget
1999
CAPITAL BUDGET
)
I
¡
I
\
¡
I
I
I
¡
Ii
(
I
THE CORPORATION
OF THE
TOWN OF PICKERING
~~ OF PiC
~O ~
~..~
~œ:ø
~
J
I
}
AS SUBMITTED TO COUNCIL - MAY 1O, 1999
,¡\\'I OF "Ie
.:.0 +~
ï!l'O'" ~
;- !Ii G')
~.
1999 CAPITAL FUND SUMMARY
1999 CAPITAL BUDGET
&
FOUR YEAR FORECAST.
The following pages contain summary budget information for the
1999 Capital Budget & Four Year Forecast.
Further details concerning these requests can be found in the
Business Case Summaries and/ or Departmental budgets.
1
As submitted to Council May 10, 1999
,¡.II'I OF "Ie
t..%
;- ~;~
.,
TOWN OF PICKERING
1999 CAPITAL BUDGET
AND FOUR YEAR FORECAST
EXDenditure
:'.:...~~'§i~~... ............... .'...'.....~¿..'..'.'~... '" ..
8,117 CAO 5,863 2,000 1,750 1.750 1,750 7,250
57,000 Clerks 38,000 222,600 47,000 20,000 20,000 309,600
423,060 Finance 503,575 546,000 516,000 516,000 516,000 2,094,000
535 Human Resources 0 0 0 0 0 0
411,600 Fire Services 586,100 712,000 1,740,000 1,206,000 26,000 3,684,000
2.458,250 Public Works 2,767,330 2,520,000 2,530,000 2,740,000 2.710,000 10,500,000
1,743,582 Transit 218.770 200,500 577,500 1,130,500 447,500 2,356,000
0 Planning 34,300 6,000 0 0 0 6,000
1.470,170 . Parks & Facilities 4.726,150 3,010,000 3,175,000 6,150,000 7,000,000 21,335,000
Recreation & Facilities 201,250 140,500 265,500 95,000 1,155,000 1,656,000
45,426 . Culture & Recreation 120,579 60,000 60,000 60,000 0 300,579
672,700 Libranes 370,073 661,776 598,171 484,899 546,612 2,661,531
0 Y2K 179,000 0 0 0 0 0
1,696.498 General Fund 1,609,533
1,236,949 Provincial Grants
Federal Grants 51,350
¡ 459,952 Res. Fund. Comm, Fac, 758,353
1,337,698 Res. Fund. Dev. Charges 1.808,021
128,250 Res, Fund. Parkland 1.777,250
Millennium Trail Contributions 1,400,000
0 Debt (5 Years) 348,000
2,628,893 Debt (Greater than 5 Years) 1,955,483
0 Lease 0
0 Donations 45,000
2
As submitted to Council May 1O, 1999
l"-"~ II.
s
375
50,000
103,575
353
101.000
5.135
400,000
7,000
179.000
22,000
587.600
500
57,230
9,000
61,050
1,568.125
281,175
76.000
571,300
209,770
9,000
CIAUlficAlion
General Government
2121 Chief Admin. Officer
2124 Municipal Building
2127 Finance
2129 Customer Care Centre
2132 Town Property Main!.
2192 Economic Dev,
2196 Infonnalion Services
2199 Print/Mailroom
2950 Y2K
Protection to Pera. & Prop.
2220 By-Law
2240 Fire
2241 Emergency Operations
2290 Public Works
2293 Animal Control
Transportation Services
2315 Municipal Garage
2320 Roads
2321 External Sub. WorKs
2323 Sidewalks
2325 Street Lights
2350 Public Transit
2360 Transit - Spec. Services
TOWN OF PICKERING
1999 BUDGET
13264 CAPITAL fUND SUMMARY
[~~ij~3~:~Gëri.~(i:ù~~ I ¡ '16~3 'II
To RopIAC. Prov. Millennium
Levy Reserve GrAnts Trail
Contributions
I
L- ---1
375
50,000
88,575
353
26,000
5.135
7.000 0
0
22.000
102.468
500
57,230
9,000
61,050
200,125
76,000
159,770
9,000
¡
, ,
114225
Comm.
Facilities
I
15,000
400,000
179.000
84,353
3
SOURCES OF FUNDING
Reserve Funds
, .
114221 114230
Develop. PArklAnd
Charges
L ¡
0
75,000
120,949
196.822
50,000
114232
Public
Works
I
Debt
5 Years
¡ .
348,000
External Funding
Debt Over
5 YeArs
I
364,183
1,020,000
571,300
lease
0
Donations
Misc.
1/3292
Other
I
0
0
0
0
As submilled 10 Council May 10. 1999
TOWN OF PICKERING
1999 BUDGET
'3264 CAPITAL FUND SUMMARY
I Ii I SOURCES OF FUNDING
I i' [ i282i~~~~':~Ij:und . ¡ 11
l-~II '1623 Reserve Funds ,; External Funding Misc. :
. ,
CI....lfk:AtIon TAX RepiAc. Prov. Millennium 114225 114227 114230 114232 113292
Levy Re.erve GrAnta TrAil Comm. Develop. PuldAnd Public Debt Debt Over lease Donations Other
Contribution. fAcilities Charge. Works 5 Years 5 Years
$ $ $ $ $ $ $ $ $ $ $ $ $ ---.!
Environmental Services
213,500 2410 Stonn Water Management 93,500 120,000
Social Services
0 2572 Senior Citizens Centre
Planning & Development
34.300 2610 Planning 8,550 25,750
Recreation Services
6,085 2711 C&R -Admin 6,085
3,735 2712 C&R - Programs 3,735
21,550 2713 R&F - Dunbarton Pool 21,550
95,500 2715 P&F - Don Beer Arena 95,500
4,395,900 2718 P&F - Parks 174,150 1,400,000 1,164,500 1,657,250 0
11,700 2719 P&F - Comm. Centres 11,700
134,875 2731 R&F Rec.Com. - Cen. CorE 54,875 80,000 0
44,825 2733 R&F - Rec. Com, - Pool 44,825
11,000 2735 P&F - Rec. Com. - Arenas 11,000
Cultural Services
110.759 2744 Museum 20,759 45,000 45,000
370,073 2745 Libraries 188,723 130,000 51,350
'.76~,~ 1,609,633 0 1,400,000 758,353 1,808,021 !J'l1..l~L ____~4M()() 1,955,483 0 45,000 51,350
4
As submilled 10 CouncIl May 10. 1999
o~~ OF PIC
" 1:
~!I~ ~
t- ~ Z
GJ
~
TOWN OF PICKERING
1999 CAPITAL BUDGET
AND FOUR YEAR FORECAST
BREAKDOWN
Vehicles 0 0 0 0 0 0
Furniture & Fixtures 375 1,000 750 750 750 3,625
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
Customer Care Centre IVehicles 0 0 0 0 0 0
Furniture & Fixtures 353 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
Economic Development IVehicles 0 0 0 0 0 0
Furniture & Fixtures 5,135 1,000 1.000 1,000 1,000 4,000
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
5
As submitted to Council May 10, 1999
Clerks
Print Shop/Mail Room Vehicles 0 0 0 0 0 0
Furniture & Fixtures 7,000 157,000 47,000 20,000 20,000 244,000
Office Machines $. Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
By-law ¡vehiCles 22,000 22,000 0 0 0 22,000
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 34,800 0 0 0 34,800
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
Animal Control Vehicles 0 0 0 0 0 o
Furniture & Fixtures 0 o ° ° ° o
Office Machines & Equipment 0 0 ° ° ° o
Miscellaneous Equipment 0 0 0 0 ° 0
Other Fixed Assets 9,000 9,000 0 0 o 9,000
F 1!!.!ßg
Finance Department Vehicles ° 0 0 ° ° 0
Furniture & Fixtures 12,525 15,000 5,000 5,000 5,000 30,000
Office Machines & Equipment 1,050 1,000 1,000 1,000 1,000 4,000
Miscellaneous Equipment 0 0 0 0 0 o
Other Fixed Assets 90,000 30,000 10,000 10,000 10,000 60,000
6
As submitted to Council May 10,1999
Finance Department - Cont'd
Finance
Information Systems
Vehicles
Furniture & Fixtures
Office Machines & Equipment
Computer Equipment for:
Information Systems
Human Resources
Public Works
Culture & Recreation
Parks & Facilities
Legal
Transportation
Finance
Planning
Mayor
Council
Economic Development
Customer Care
Chief Administrator's Office
Fire Services
Clerks
Miscellaneous Equipment
Other Fixed Assets
Reduction as per Council Budget
Meeting of April 6, 1999.
0
11,817
348,429
1,332
14,347
932
999
0
1,443
17 ,674
4,482
0
3,619
1,104
0
7,965
4,356
34,800
7,713
0
500,000
500,000
500,000
500,000
2,000,000
7
As submitted to Council May 10,1999
Fire Services
Fire Protection tVehicles 317,500 712,000 1,740,000 1,206,000 26,000 3,684,000
Furniture & Fixtures 11,600 0 0 0 0 0
Office Machines & Equipment 2,500 0 0 0 0 0
Miscellaneous Equipment 36,000 0 0 0 0 0
Other Fixed Assets 220,000 0 0 0 0 0
0
Emergency Operations Control I Vehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 500 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
Public Works
Public Works IVehicles 34,725 60,000 60,000 60,000 60,000 240,000
Furniture & Fixtures 4,005 0 0 0 0 0
Office Machines & Equipment 1,500 0 0 0 0 0
Miscellaneous Equipment 17,000 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
Roads IVehicles 230,000 340,000 180,000 200,000 0 720,000
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 300 0 0 0 0 0
Miscellaneous Equipment 247,825 0 0 0 0 0
Other Fixed Assets 1,090,000 1,730,000 1,900,000 2,090,000 2,300,000 8,020,000
8
As submitted to Council May 10,1999
Vehicles 0 0 0 0 0 0
Furniture.& Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscell~neous Equipment 0 0 0 0 0 0
Other Fixed Assets 281,175 0 0 0 0 0
Sidewalks I New Construction 76,000 100,000 100,000 100,000 100,000 400,000
Vehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 0
Street Lights IVehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 571,300 290,000 290,000 290,000 250,000 1,120,000
Storm Water Management IVehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 213,500 0 0 0 0 0
9
As submitted to Council May 10,1999
Transit
Public Transit IVehicles 201,250 90,000 340,000 930,000 340,000 1,700,000
Furniture & Fixtures 4,520 5,000 25,000 5,000 5,000 40,000
Office Machines & Equipment 1,500 0 0 5,000 0 5,000
Miscellaneous Equipment 2,500 2,500 2,500 2,500 2,500 10,000
Other Fixed Assets 0 0 0 0 0 0
Specialized Services I Vehicles 9,000 100,000 210,000 185,000 100,000 595,000
Furniture & Fixtures 0 3,000 0 3,000 0 6,000
Office Machines & Equipment 0 0 0 0 ° 0
Miscellaneous Equipment o 0 0 0 0 0
Other Fixed Assets 0 0 0 0 0 °
Planning I Vehicles 0 0 0 0 0 o
Furniture & Fixtures 8,550 6,000 0 0 0 6,000
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 25,750 0 0 0 0 0
Parks & Facilities
Administration IVehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 300,000 5,000,000 4,000,000 9,300,000
10
As submitted to Council May 10, 1999
Parks & Facilities - Cont'd
Civic Complex Vehicles ° ° ° ° ° o
Furniture & Fixtures 5,000 o o ° ° o
Office Machines & Equipment o o ° ° ° o
Miscellaneous Equipment 17,500 20,000 30,000 20,000 20,000 90,000
Other Fixed Assets 27,500 15,000 30,000 o o 45,000
Town Property Maintenance IVehiCles ° ' ° o 40,000 o 40,000
Furniture & Fixtures o o ° ° ° o
Office Machines & Equipment o o ° ° ° o
Miscellaneous Equipment 76,000 75,000 30,000 20,000 20,000 145,000
Other Fixed Assets 25,000 25,000 20,000 0 0 45,000
Municipal Garage IVehicles 0 ° ° ° 0 o
Furniture & Fixtures 0 o ° ° 0 0
Office Machines & Equipment 0 o ° 0 0 o
Miscellaneous Equipment 54,550 20,000 20,000 30,000 20,000 90,000
Other Fixed Assets 6,500 20,000 10,000 120,000 10,000 160,000
Don Beer Arena IVehicles ° 0 ° ° ° 0
Furniture & Fixtures 3,000 0 o 0 0 o
Office Machines & Equipment o 0 ° ° ° o
Miscellaneous Equipment 10,000 20,000 20,000 5,000 5,000 50,000
Other Fixed Assets 82,500 400,000 o 0 o 400,000
Parks I Parks 3,733,250 2,200,000 2,500,000 2,600,000 2,600,000 9,900,000
Vehicles 70,000 80,000 80,000 80,000 80,000 320,000
Furniture & Fixtures o o ° ° ° o
Office Machines & Equipment o o 0 ° ° o
Miscellaneous Equipment 221,650 50,000 50,000 50,000 50,000 200,000
Other Fixed Assets 71,000 50,000 50,000 150,000 150,000 400,000
11
As submitted to Council May 10, 1999
Parks & Facilities - Cont'd
Community Centres ¡Vehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Mijchines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 1,200 10,000 10,000 10,000 10,000 40,000
Other Fixed Assets 10,500 15,000 15,000 15,000 25,000 70,000
Recreation Complex - Arenas Ivehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 3,500 5,000 5,000 5,000 5,000 20,000
Other Fixed Assets 7,500 5,000 5,000 5,000 5,000 20,000
Recreations & Facilities
Senior Citizens Centre I Vehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 0 0 0 0 1,000,000 1,000,000
Dunbarton Pool Vehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0 0 0 0 0
Miscellaneous Equipment 2,450 10,000 10,000 10,000 o 30,000
Other Fixed Assets 19,100 10,000 5,000 5,000 15,000 35,000
12
As submitted to Council May 10, 1999
Rec. & Facilities - Cont'd
Rec. Complex - Central Core IVehicles 0 0 0 0 0 0
Furniture & Fixtures 5,000 0 0 0 0 0
Office Machines & Equipment 125 500 500 0 0 1,000
Miscellaneous Equipment 30,000 40,000 50,000 50,000 50,000 190,000
Other Fixed Assets 99,750 60,000 180,000 10,000 50,000 300,000
Rec. Complex - Pool IVehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 125 0 0 0 0 0
Miscellaneous Equipment 12,200 10,000 10,000 20,000 40,000 80,000
Other Fixed Assets 32,500 10,000 10,000 0 0 20,000
Culture & Recreation
Administration
Programs
Vehicles 0 0
Furniture & Fixtures 940 0
Office Machines & Equipment 0 5,OOO,~ 5,000 5,000 15,000
Miscellaneous Equipment 5,145 0
Other Fixed Assets 0 0
Vehicles 0 0
Furniture & Fixtures 0 0
Office Machines & Equipment 1,200 5,000 5,000 5,000 15,000
Miscellaneous Equipment 2,535 0
Other Fixed Assets 0 0
Restoration - Museum Buildings 103,650 50,000 50,000 50,000 150,000
Vehicles 0 0
Furniture & Fixtures 1,896 0
Office Machines & Equipment 0 0
Miscellaneous Equipment 2,088 0
Other Fixed Assets 3,125 0
Museum
13
As submitted to Council May 10,1999
Vehicles 0 0 0 0 0 0
Furniture & Fixtures 18,843 198,690 * 20,650 28,305 28,305 275,950
Office Machines & Equipment 87,690 36,630 214,230 49,950 49,950 350,760
Miscellaneous Equipment 180,000 409,140 346,641 404,444 466,157 1,626,382
Other Fixed Assets 83,540 17,316 16,650 2,200 2,200 38,366
Y2K Vehicles 0 0 0 0 0 0
Furniture & Fixtures 0 0 0 0 0 0
Office Machines & Equipment 0 0"'- 0 0 0 0
Miscellaneous Equipment 0 0 0 0 0 0
Other Fixed Assets 179,000 0 0 0 0 0
* Increase in 2000 furniture expenditures is due to the Western Branch.
14
As submitted to Council May 10, 1999
'u_"--- -_...___m_'...,_~_._--
TOWN OF PICKERING
1999
ÇAPITA~ß..YQgET un_' '-un nn_"'- n
2121 . CHIEF ADMINISTRATIVE OFFICER
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
1,000
6176 Office Machines & Equipment
600
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$1,600
FINANCING
1998
2823 General Fund
$1,600
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
Debt
$1,600
15
a
1999
BUDGET
$0
375
0
0
a
$375
a
a
1999
$375
0
0
o.
a
$375
Q
a
a
.. Page 1
1999 CAPITAL BUDGET
2121- CHIEF ADMINISTRATIVE OFFICER
BACKGROUND INFORMATION
6157 Vehicles $0
§ill Furniture and Fixtures $375
1 - Task Chair (Executive Assistant)
(replacement)
6176 Office Machines and EauiDment $0
6178 Miscellaneous EauiDment $0
6181 Other Fixed Assets $0
16
As submitted to Council May 10, 1999
,.--. --- .
TOWN OF PICKERING
1999
CA?JJ"AI..~l.Jl~Q_çJ
2129 - CUSTOMER CARE CENTRE
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
217
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$217
FINANCING
1998
2823 General Fund
$217
I
2823 General Fund - Reserve
0
Reserve Fund
0
Reserve Fund
0
Debt
0
$217
17
0
1999
BUDGET
$0
353
0
0
0
$353
0
0
1999
$353
0
0
) 0
0
$353
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2129 - CUSTOMER CARE CENTRE
Page 1
BACKGROUND INFORMATION
Vehicles
$0
Furniture & Fixtures
353
1 St:andar(j Work Station
fGr C~8tOrRer Care Staff
$ã,J17 Deleted TJQ
Steno Chair
Jê& Deleted T JQ
ExtensioR for Existing 'Nork Station
2,OJ1 Deleted T JQ
2 Drawer Lateral File Cabinet
353
Office Machines & Eauioment
$0
Miscellaneous Eauioment
$0
Other Fixed Assets
$0
18
As submitted to Council May 1O, 1999
n_- - -'",
"--.._- '-..-,..-.-.-, "
TOWN OF PICKERING
1999
--- __u__CAPITA~JnJQG_ET -- nnn______--------..-
2192 - ECONOMIC DEVELOPMENT
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6,300
6176 Office Machines & Equipment
¡
¡ .
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$6,300
FINANCING
1998
2823 General Fund
$6,300
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
Debt
$6,300
19
0
1999
BUDGET
$0
5,135
0
0
0
$5,135
0
0
0
1999
$5,135
0
0
0
0
$5,135
0
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2192 - ECONOMIC DEVELOPMENT
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
L-shaped workstation
Secretarial Chair for above 'A'orkstation
Office Machines & EauiDment
Miscellaneous EauiDment
Other Fixed Assets
20
$0
$5,135
$5,135
3ðO
Deleted T JQ
$0
$0
$0
Page 1
As submitted to Council May 10. 1999
TOWN OF PICKERING
1999
_ÇAPJI AL.el)R~J;J.- ---- -, ---.-- ---- ---~~---
2199 - PRINT SHOP/MAIL ROOM
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
15,000
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$15,000
FINANCING
1998
2823 General Fund
$15,000
¡
I
I
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
0
Débt
0
$15,000
21
0
1999
BUDGET
$0
7,000
0
0
0
$7,000
0
0
0
1999
$7,000
0
0
0
$7,000
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2199 - PRINT SHOP/MAIL ROOM
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
To provide for additional free-standing
shelving in the archives.
Office Machines and Eauipment
High Speeg/High Voh"Ime Photocopier
Miscellaneous Eauipment
Other Fixed Assets
22
Page 1
$0
$7,000
$1 &0.000 Deleted T JQ
$0
$0
As submitted to Council May 10. 1999
,--...-..
-, ------ _._-~ -
-.. ---u_---
TOWN OF PICKERING
1999
,~Af»lT~~ ~YPGe..T
2220 PROTECTION SERVICES - BY-LAW
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$22,000
6173 Furniture & Fixtures
11 ,000
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$33,000
FINANCING
1998
2823 General Fund
$33,000
2823 General Fund - Reserve
0
4227 Reserve Fund - Development Charges
0
Reserve Fund
0
Debt
0
Lease
0
I
I'
I
$33,000
23
0
1999
BUDGET
$22,000
0
0
0
0
$22,000
0
0
1999
$22,000
0
0
0
0
$22,000
Page 1
1999 CAPITAL BUDGET
2220 PROTECTION SERVICES - BY-LAW
BACKGROUND INFORMATION
6157 Vehicles $22,000
An allocation of $22,000 has been provided for
the lease of a vehicle for the Municipal
Law Enforcement Division to replace the
present 1989 vehicle,
6173 Furniture & Fixtures $0
6176 Office Machines & Eauioment $0
6178 Miscellaneous Eauioment $0
ill.1 Other Fixed Assets $0
24
As submitted to Council May 10, 1999
I
,I
; "BUSINESS CASE"
I
I ¡ The Criteria!
ThiS form deals with how work is
¡rganized to support your Department's
strategiC approach to this year's Capital
lemands. Each request is analysed to
~flect the value to the Town and its
rïnanCial Review of this Request.
1
¡
¡
TOWN OF PICKERING
~\'I OF "Ie
(pØ)
-
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
DeDartment: Clerk's
Division: By-law Enforcement Services Account 2220
Project: New Vehicle Project #:
Capital Budget Year: Previously Included In:
1999
Corporate Project Title: New Vehicle
Project Title & Location:
Expected Starting Date: I Expected Completion Date:
!
r Iro¡eci Descriellon:
¡ Material required: New Vehicle
I
Location of Project:
I j
I Detailed information as to project description:
I
This new vehicle is intended to replace the oldest
By-law vehicle which is a 1989 and which is
incurring large expenditures in repairs.
rroiect Justification:
¡
$
Legislated Requirement
! Health and Safety
Maintenance of Existing Infrastructure
Extension of Life of Asset
¡Improve Customer Service
Other (Council, Public, Staff)
¡
¡
¡
22,000.00
%5
Page 2
1998 New/ 1999
Budaet ExDenditure ReDlacement UDarade Quantitv Budaet
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad ministratio n/Ov erhead
Vehicles R 22,000 1 22,000
Other
Total 22,000 1 22,000
1998
Budaet Financina N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) R 22.000 22,000
User Revenue
Reserve/Reserve Fund
Development Charges
Lease
Total 22.000 22.000
Growth Related
Net Expenditure to be Financed by/from:
26
. ,
!
, !
J
¡
.I
!
(inanCinQ ADDroval
financing for this project has previously been approved by Council and is available in Capital Account No:
¡
IpaDital PrOQram Four Year Forecast
1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
22,000
i
II
IOoeratina Costs
. Costs to be included in Current Budget
for: 1999
'IJoeratina Savinas
. Cost Reduction
due to: reduced repair & maintenance bills 1,000
II
I
raYbaCk Period: N/A
I
I Month: Quarter: Beyond
taSh Flow January April July October 1st 3rd 1999
. rojection February May August Nov.
,n/(Out) Flow March June Sept. Dec. 2nd 4th
!
oj
Icost/Benefit Analysis The purchase of a new vehicle will provide a saving of at least $1,000 per year in repair and
I maintenance bills and reduce the number of hours that the vehicle is in the garage
being repaired.
It" of Asset
A new vehicle should last about five years before starting to require large expenditures on
revision for
Future Repair/Replacement repair and maintenance.
'I
I
It.,ovals
bepartment Approval
Finance Approval
Chief Administrative Officer
27
Page 4
FINANCE DEPARTMENT
REQU~STFO~PROJ~ROVAb
IFinance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financina Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
28
~~~-~ u, ..
-- - ,-~, ~ "'Un -,.. ,~---, ~~-_u -, ,- '-..--- - ~
TOWN OF PICKERING
1999
_~ÇAPJTAL BUpG_E'L, - --- -----,
2293 PROTECTION SERVICES - ANIMAL CONTROL
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
9,000
$9,000
FINANCING
1998
2823 General Fund
$9,000
2823 General Fund. Reserve
Reserve Fund
0
Reserve Fund
0
Debt
0
$9,000
29
°
1999
BUDGET
$0
o
o
0
9,000
$9,000
°
°
°
1999
$9,000
o
0
0
0
$9,000
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2293 PROTECTION SERVICES - ANIMAL CONTROL
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & Eauioment
Miscellaneous Eauioment
Other Fixed Assets
Pickering's 33.3% share of the 1999 approved
PAW Joint Animal Control Committee's Budget.
(The capital expense is for the replacement of
the outside dog kennels.)
30
Page 1
$0
$0
$0
$0
$9,000
As submitted to Council May 10,1999
~---~ ,---,
TOWN OF PICKERING
1999
Ç~PJIPtkJil.LQ~~T~ ----- -------- ---.--.--
2127 - FINANCE
CLASSIFICATION
1998
BUDGET
6157 Vehicles
6173 Furniture & Fixtures
12,376
6176 Office Machines & Equipment
3,050
6178 Miscellaneous Equipment
8,200
6181 Other Fixed Assets
50,000
$73,626
FINANCING
1998
2823 General Fund
$23.626
2823 General Fund - Reserve
4227 Reserve Fund - Develop. Charges (1.2)
50,000
R:eserve Fund - Community Facilities
Debt
$73,626
31
$0
1999
BUDGET
$0
12.525
1,050
0
90,000
$103,575
a
1999
$88,575
0
0
15.000
0
$103,575
0
0
ill!
6173
6176
6178
ill!
1999 CAPITAL BUDGET
2127 . FINANCE
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
1 5-Drawer File Cabinets - (Replacements)
1 2 Drawer File Cabinets - (Replacements)
2 Bookcases (4 feet height) $200 ea.
1 ~ Workstations
6 Work Partitions/Dividers
6 Replacement Ergonomic Chairs (3 year replacement progran
1 Portable/ Tub File (Replacement)
7,200
Office Machines & EauiDment
4 Calculators @ $200 each (replacements)
Counterfeit Currency Identifier
to check $50, $100 and $1000 bills used to pay taxes
Miscellaneous EauiDment
Other Fixed Assets
ContinuiRg DevelepFFlent Charges Re':iew
Bill 35 - Deloitte & Touche
legal AEI'Jiee
Study for review of Information Systems
15,000
32
$700
425
400
44;400
1,200
2,300
300
$800
250
Page 1
$0
$12,525
Reduced T JQ
$1,050
$0
$90,000
$20,QOO OG Deleted T JQ
75,000
~ Deleted T JQ
20,250 CF Reduced T JQ
As submitted to Council May 10, 1999
-- -,---,-,._-, '-
TOWN OF PICKERING
1999
-------- CAPITAL.~.uPGJ;T- ~.. ---- --,
2196 -INFORMATION SYSTEMS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
341,721
6178 Miscellaneous Equipment
7,713
6181 Other Fixed Assets
Reduction as per Council budget
meeting of April 6, 1999
$349,434
FINANCING
1998
2823 General Fund
$229.434
2823 General Fund - Reserve
4225 Reserve Fund - Comm. Facilities
120,000
Reserve Fund
Debt
Lease
I,
!
$349,434
33
0
1999
BUDGET
$0
11,817
441 ,482
7,713
0
(61,013)
$400,000
0
0
1999
$0
0
400,000
0,
0
0
$400,000 '
a
a
a
1999 CAPITAL BUDGET
2196 . INFORMATION SYSTEMS
BACKGROUND INFORMATION
§1ll
Vehicles
6173
Furniture & Fixtures
(2) Chairs -- Replacements
1 t21 Chairs -- New Staff
1 t21 Desks & 2.Drawer Filing Cabinets -- New Staff
(2) 36x24 20-ga Shelving -- Computer Room
Network Server Rack Extension -- Computer Room
432
6,555
6176
Office Machines & EauiDment
Information Systems.
(5) Network Server Replacements
Network Tape Backup Unit -- Hardware & Software
MS Windows 2000 - Server Software Upgrade
HP 0250 -- Tape Backup Unit Replacement
HP 0250 -- 250mb Memory Upgrade
HP 0250 .- (2) 4.3gb Disk Upgrade
Network Cabling at Works Centre
Drive Image 2.0 Software
Omega Jazz Backup Drive and three Disks
ReadlWrite CD Drive
Web Site Monitoring Software
(2) 24-port Network Hubs and Patch Panels - Clerks & IS
(4) Maplnfo Licenses
(2) APC Smart UPS 1000 NET with Powerchute
(55) Replacement PCs
(20) Replacement Monitors
MS-Exchange 5.5 Upgrade
(130) MS-Office 2000 Standard Version - New
(70) MS-Office 2000 Standard Version - Upgrade
Contingency for unexpected expenditures
Human Resources
ViewSonic Monitor
HP 6L Printer
34
$863
8êð
~
1.783
2,185
$62.104
16,039
8,325
4.329
4.995
4.162
3,108
111
1,054
721
3.330
1,277
7,104
1.665
162.393
13,320
14.319
82.973
21.368
22,200
$666
666
Page 1
$0
$11,817
Reduced T JQ
Reduced T JQ
$348,429
$1,332
As submitted to Council May 10. 1999
1999 CAPITAL BUDGET
2196 . INFORMATION SYSTEMS
BACKGROUND INFORMATION
¡ .
I
Public Works
(3) Pentium AutoCAD Workstations
HP 6250 Scanner
HP1120Cxi Printer - Roads
(2) ViewSonic Monitors (New Staff--Roads & Traffic Tech)
Culture & Recreation
PReAe ¡A/Fax iA RegistFatien SysteA'l
WinFax Software - East Shore Community Centre
HP 1120Cxi Colour Printer
Parks & Facilities
MS-Publisher 98
MS-Project 98
Leaal
No Requirements
TransDortation
HP1120Cxi Colour Printer
New Monitor - General PC
Finance
(8) Replacement Monitors
(2) Bar-Code Scanning Wands - Tax
Final Installment of Vailtech Accounts Receivable
Fixes ^ssets MaAageA'leAt IA\'eAtary SafW.'are
Pt.lr6RasiRg Se#tv:are
IA':estR'leAt Sefti'are
Cheque Signing Device - Printer Attachment
Staff CaleAsár S6ÀeElwler 1 Q User LieeAse
Plannlna
(2) AutoCAD Lite
HP6L Printer
Maplnfo - Front Counter
(1) HP 1100 Ptinter
35
Page 2
$14,347
$11,489
749
777
1,332
$932
$26.299 Deleted T JQ
155
777
$999
$222
777
$0
$1,443
$777
666
$17,674
$5,328
1,443
8.103
~ Deleted T JQ
4Q;OOO Deleted T JQ
4;-700 Deleted T JQ
2.800
2;400 Deleted T JQ
$4,482
$1,285
666
1.776
755
As submitted to Council May 10, 1999
~
6181
1999 CAPITAL BUDGET
2196 . INFORMATION SYSTEMS
BACKGROUND INFORMATION
Mayor
No Requirements
Council
(1) Replacement PC and Monitor -- Secretary
Economic Development
HP 6250 Scanner
Adobe Acrobat
Customer Care
New PC ~Aa MeAiter (New Staff Public RelatieAs Rep.)
HPêL Printer
Chief Administrator's Office
HP 6L Printer
Corporate Laptop, Case and MS-Office
Corel Draw
HP 1120Cxi Colour Printer
Fire DeDartment
Iomega Backup Drive -- 250mb
64mb Laptop Memory Upgrade
Kodak Digital Camera
(3) HP 1100 Printers
Clerks .
McDTag Parking Tag System
Miscellaneous Eauipment
1 st of 5 annual transfers to Community Facilities
Reserve Fund for purchase of Teranet Land Information
Services (4225)
Other Fixed Assets
Page 3
$0
$3,619
$3,619
$1,104
$749
355
$0
~ Deleted T JQ
êOO Deleted TJQ
$7,965
$666
5,689
833
777
$4,356
$444
305
1,332
2,275
$34,800
$7,713
$0
Reduction as per Council Budget meeting of April 6, 1999.
Changes to be detennined by Treasurer and senior management
staff.
36
($61,013)
As submitted to Council May 10,1999
"BUSINESS CASE"
The Criteria!
'ThiS form deals with how work is
þrganized to support your Department's
¡Strategic approach to this year's Capital
pemands. Each request is analysed to
reflect the value to the Town and its
,FinanCial Review of this Request.
!
Þroiect Description:
I
Material required:
TOWN OF PICKERING
,¡.I'" OF "Ie
.,",0 ~%
~ z
;- <:)
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Clerk's
Division: By-law Account #: 2196
Project: Parking Tag System Software Project #:
Capital Budget Year: Previously Included In:
1999
Corporate Project Title: Parking Tag System Software
Project Title & Location:
Expected Starting Date: Expected Completi~n Date:
July, 1999
McDTag For Windows
,
I
(
Location of Project:
Detailed information as to project description:
I.
Project Justification:
¡
¡
I
I
'1
,I
Legislated Requirement
Health and Safety
Maintenance of Ð<isting Infrastructure
Extension of Life of Asset
Improve Customer Selìlice
Other (Council, Public, Staff)
$
$34,800
37
Page 2
1998 New/ 1999
. '
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
34,800 Admi n istratio n/Overhead N 34,800 34,800
Vehicles
Other
34,800 Total 34,800 34,800
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Community Facilities N 34,800 34,800
Development Charges
Other
Total 34,800 34,800
;rowth Related
Jet Expenditure to be Financed by/from: .'
38
P 01"
. .i:inancinQ Approval
I . .
rinanCing for this project has previously been approved by Council and is available in Capital Account No:
I
f¡:aPital ProQram
ì
Four Year Forecast
1999
$
2000
$
2001
$
2002
$
2003
$
Beyond
I.
I
i
IOoeratina Costs
¡costs to be included in Current Budget
I >for:
. pperatinQ SavinQs
! Cost Reduction
I, due to: less manual handling of tickets
I
:í .
ì'
r
I
~ayback Period:
I)
34,800
10,000
3 Years
I, Month: Quarter: Beyond
raSh Flow January April July October 1st 3rd 1999
. roiection February May August Nov.
Iin/(Out) Flow March June Sept. Dec. 2nd 4th
.
r
I Cost/Benefit Analysis See attached memo to Manager of IS dated January 11, 1999
I
Ire of Asset
rovision for Once the software is installed, there will be no changes to it until changes are made to
I ulure Repair/Replacement legislation or Court administration.
."
r
IlDDrav'I'
bepartment Approval
Finance Approval
Chief Administrative Officer
39
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
¡Finance Reference #: ..
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DA TE APPROVED
40
¡
r
4.
INTERDEPARTMENTAL MEMORANDUM
CLERK'S DEPART~IENT
January [1, 1999
TO:
Jon Storms
Manager of Information Systems
FROM:
Bruce Taylor
Town Clerk
SUBJECT:
Parking Tag System Software
I am herewith requesting that you allocate funds in the Information Systems budget to
implement the McDTag for Windows proposal dated December 14, 1998 which will
provide for a Parking Tag System software. More particularly, I would ask that allocate
$34,800,00 which will provide for the software to process a maximum of 35,000 tickets per
year.
The issuance of a parking ticket currently involves the following procedures:
1.
A parking ticket is issued by a Parking Control Officer and the information on the
ticket is issued into the computer system within a day.
2.
An offender is given fifteen days to either pay the ticket or attend our First
Appearance Parking Facility to discuss the ticket. At this First Appearance Parking
Facility, one of three process will occur; one, the offender's ticket will be canc'elled,
two, the offender will pay the ticket or three, the offender will request a Court
appearance.
3.
If the offender does not pay the ticket within fifteen days or request an appearance
at a First Appearance Parking Facility, we request information trom the Ministry of
Transport (MOT)on ownership details of the plate.
From the information received trom the MOT, a Notice of Impending Conviction is
sent to the owner of the vehicle.
..../2
/f 1
'-1
4,
--2-.
5
If there is no response to the Notice of Impeding Conviction within 21 days, all
infonnation is sent to the Court.
6,
The Court will either dismiss the ticket or enter a plea of guilt.
7.
If there is a plea of guilty, the Court will send out a Notice of Fine and Due Date If
the defendant does not respond to this Notice, the Court will request that the MOT
enter the Notice on the plate and the plate will not be renewed until this fine is paid,
All of the above processes are tracked on our current software up to and including Item #5,
The Town has no idea what happens once the ticket is in the Court system.
If the McDTag system is implemented, it will allow for the following:
l.
The Town can opt into Bill 25 which will allow the Town to receive plate
infonnation through electronic data transfer, which is immediate. This has two
advantages; one, the tickets can be processed more quickly and two, we can use our
own system when towing a vehicle as opposed to waiting to get infonnation on a .
plate iTom the Police.
2.
The By-law Division will be able to keep electronic records of decisions made at the
First Appearance Parking Facility.
3,
Under Bill 108 which involves the downloading of the Provincial Court system to
local government, the Town will be responsible for sending out the Notice of Fine
and Due Date and registering unpaid tickets with the MOT.
The McDTag system will allow for the implementation of electronically generated
parking tickets' as opposed to handwritten tickets. We hope to implement this
feature in the year 2000.
I believe the features noted above more than justify the purchase of the McDTag system. If
there are any further questions, please call me.
Bruce Taylor, AMCT, CMM
Town Clerk
cc:
Manager of By-law Enforcement Services
:. I)
'-j ¡.
/
I
II
McDonald Systems Group
Towu ofPidœrinl
December 14. 1998
Mc.DTu for Window! DI"ODO:nÙ
T eta! this proposal
MS SQL Servu 7 Database licence: (OptiOD)
MS SQL Server 7,0 with 5 client access lic:eDCeS
InstaJlation and configuration afMS SQL Server 7 on network
A)
B)
C)
D)
r
I
¡
Mcl>Tag for Window! Software Licences:
McDTag for Wmdows base system user ~ce includes:
- Five Il.~. Parting ticket de¡!~ fOi a ç~~it;y
Licence to process a maximum 20.000 ticJcets
Electronic data tramfer' with MTO for Owner rntàrmatiol1
. Notice of Impending Coavicnon proce5iing
- Certificate Requesting Conviction processing
Notice of Fine and Due Date processing
Electronic data transfer for Certificates Requesting P1ate Denial
Trial Scheduling module
First Atteudance module
ODBC connection (ORACLE or MS SQL Server7 databøe Dot included)
S 22,000.00
InsuBation and OJnfiguration services:
Iœtal.Iation and configuration ofMcDTII@ fur Windows
011 clients m=twork server and five workstations
$ 3,000,00
MeDTq for Windom Training:
Operatartraining course (5 people @ S 800.00)
AdmiDistratar 1laining course (1 IT person @ $800.00)
S 4,000.00
S 800.00
AlmunJ 5Ofnnre maidtenallce, support and 1imited W&rnUIty-.
The first year of software maintenance, 3UppCrt and limited wurmty
is included in the above pric:ing. The renewal amount will be 25% at
the CUITent software price (ea $22,000.00 x 25% = $ 5,500.00), renewed
00 tM amùversary of your installation date.
$19,800.00
S 3,500.00
Tues and ~ expenses extta
Deposit wÏth order $ 15,000.00
BaJance with instatlation
8COMPt,,"'T9$ 8SOl'T'WAa£ 8TV.:.NtNG .1'ŒT'NC1L~G 8!eMCIE 8CONStJl.TtNG
sa :'>l1A.GARA STJInT. ST. c.ATH.~RtNES, ~N'IAIUOL4n +KSI (ccm 641..,)m, £ø (9'J51 6<tl.0i5'. .. ~1IIC.aI=
.8 3
':'J.
II
McDonald Systems Group
Town of Ptckerin~
December 14~ 1998
B)
C)
D)
Mcl>Tag for Windows proposal
A)
l\IclYI'ag for Window. Software Lieences:
McDT as for Windows base system user licence includes:
Five user, Parkin tLcket d artmcnt B
Licence to process a maximum 5,000 tick
Eloctronic data transfer with MTa tor Owner
- Notice of Impending Cœviction processing
- Certificate Req\Jesting CotIViction process:ing
- Notice of Fine and Due Date processing
. Electronic data tJ'ansfer for Certifi.ca1ès Requesting Plate Denial
- Trial Scheduling module
First Attendance module
- ODBC connection (ORACLE or MS SQL Servc:r7 dAtabase net included)
$ 27,000.00
IDstaßation md Con1iguradon serviœl:
Installation and cori:ñguration ofMclY!'a.¡ fcT WmdoWl
on clients network .server and five worlcstations
:5 3,000.00
MenTal for Windows Training:
Operator training OOlme (5 people @ S 800.00)
Administrator tr:únúlg course (1 r:1' person @ $800.00)
S 4,000.00
S 800.00
Annual software maintenance, support and UmiUå warrmty:
The first year of software main~.IIt'ce, support and limited warranty
Î3 included in the above priCÌDg. The renewal smount will be 25% of
the CUILcnt software price (eg. $27,000.00 x 25% "" S 6,750.00), renewed
on the anniversary of your installation date.
T eta! this proposal
MS SQL Server 7 Database IJcence: (Option)
MS SQL Server 7.0 with 5 client access licences
Installation and canfigurarion of MS SQL Server 7 on network
$ 34;800.00
S 3,500,00
Taxes and travel expenses extra
Deposit with order S 15,000.00
Balmce with insta11at:ìon
.COM~ .~,\,AR5 .ruINING 8NEIWOlUCING 8Satl.V1CE 8CO!ooíSUUING
50 ~1t^(õAV. :;n21'. ~1', c.\I'H."iU1'IES, ;)~"'t.I,IUo ~ 'fIG (905) õ":~15. Iiix (9(m õ..l.œ5', iIIIiI W'l"tmds)"Socam
44
11
-c:~
McDonald Systems Group
!\-lcDT 31: Parking Ticket ~fanagement Software
Year 2000 Statement
McDT3g fur Windows:
MCDTAG98 for WmdcMs is wri1:tca In YB~ 4SÍIIg Acc::ss97 or MS SQL Server 7,0 database,
Date fields within the software are an stared in ftùl8 cbancia's (4 for the yœr) so tbc MCDTAG
tbr Wimdaws scftwa:e is mmalIy Year 2000 Compliant. u~ íUC cauâoDcd. bowew~ that }'tar
2000 issues may arise as a result afDOl1.N'C'q)1~~ hardware. opcratiag sysæm software. software
~ or other hardwarelscrftware impticatiOl1l beyond tbc cœtro1 of McDooaId S}'!tcms
Group .
Md)T~ fur DOS "AREV" ediÞoo.:
McDœa1d Sysúms will !JfJt abendoo user! who wish to O;)IttÍmIe using om MCDTAG for DOS
(~) edùiaa. However, ~ cmmct maJœ any furtbcr ("~ges to tbat oodc., iii it 111JIÏng all
mcmary &VaiJabIe wi:dÙI1 the limim aeDeS. Th~'Cfull~, iftbcrc are düñcWtíes with it, waX.
a.muods most be tinmd, without major changes ro tbc code. While we b~ it wùl wark ok tIuu '
the year 2000, as our year Scki, in ticket ev= proccssinQ date data., is samd as 4 ~:s. We
have lUX bec:a able to test every possible scenario, 90 we cannot guar3IlœC that tbere will not be
SOllIe minor issue&
I!COM~ !lSOPT\V^~ 8nAl'N1NG ."'lnWORKING I!SERVlœ 8ICONSUt.7tNG
50 I-rIAGAR.J. sn.m. ST. c.U'HA~N1!S, ONTA410 U'R "'K9 (90') 6+1~S~, !u (00') ó41-ù~S, f!IiíI-.:w:diys.com
.-
<.J;)
II
ì\lcDonald Systems Group
liPARKING TICKET MA.NAGL~ SPECIALISTS"
McDTAG 9~are ReooiremeJID
Standard WorksUtion Hardware Requirement!:
These are some st.'indard requiremems for the worKstations runIÙng McDTa.g for W"mdowø.,
however this may vary with the datJlbase engjne of cboJœ and ather applications rumring.
1. 1000/Ó IBM compatible microcompuœr based on an Intel Pentium 133 or higher
processor. (J 66 Mhz, or higher, processor ~mmeaded)
2. 32 MB of RAM minimum (recommeDded 64 MB of RAM)
3. SVGA colour video adapter and monitor capable of a screen resolutionof800xó0Q
w/255 colours or better under Microsoft WlI100WS
4. 100% l\fiaosot1: mouse compatible poÍJ:ltÍ%1g device
5, Microsoft W mdows 9 SINT Workstation operating syStem
6. Hard disk space available of 100 MB. (depend! upon database type and stora@e location)
7, A W'uuiows 9SINT Workstation compatible printer, prefeJ-ably It Wer or inkjet primt::'.
8. A Hayes compllC"ble modem is required for electronic filing with MOT, COMCOURT
and MAG. It is recommended to oomml1nicæe by MAG (CRPD) and COMCOURT
(CRC) using ProComm. fur WUldows ami MTOWIN for MOT (IDformarion Request!).
Yau may want to conñzm currem versions ~omm.ended, wit!1 the vvious provincial
agclcies, prior 'to pu:rcl1ase.
9. The same modem 1JSec1 for efectlO11Ìc filing can be used for remOte support with
McDonald SyStemS and the software required is PC Anywhere 32-
10, An UPS is recommended to recb:e the chance of any data corrupâon due to power
fluctuations.
Standard Server Hardware Requinment3:
'1'œse are some standard rcqužrements fur tlJe N~rt Serwr running McDTag tòr
Windows, however this may vary with database ensme rec¡Wmnems, database growth al1d
other applications runllin¡.
1. 100% m:M compatible atiaocomputer based on an Intel Pentium Pro 200 or
b.igher pÍ'OCCS&or
64 MB ofRAM minimUD1 (recommended 128 MB ofRMr1)
Microsoft W'mdows NT Server 4.0 OPeratin8 system, CUlTent service packs
A tape backup system i s required
A UPS is required to reduce the ~ of any data oomJptiou due to power
fluctuations. It is recomm.ended that the UPS on the server 'that includes power
l12aJ24gerDem 9otnvaTe such as Powerchuns
Hard. drive space available fur 2()Q MB of program files and lOOt MB for
database files, you will need room far future growth oftb.e database files
2.
3.
4,
S.
6.
8CCMPt1t!RS IlSOP'IWARE IlTlWNt.'iG I!NI!'t\...OUINV !lSER'l1a¡ I!CONSt:~û
'0 NIAGAIA SLUET, ST. CATHARINES, ON't~!O UR. ot1(9 (90S) 6o"l~l', ~'1X (905) 6oI-l~8S'. iIiII '1fWW.mcd.s}.~,(om.
~16
TOWN OF PICKERING
1999
CAPITAL BUDGET
2240 PROTECTION SERVICES - FIRE
u -.-. ~ .
CLASSIFICATION
6157 Vehicles
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
FINANCING
2823 General Fund
2823 General Fund - Reserve
I
!
4227 Reserve Fund - Develop. Charges (2.2)
4225 Reserve Fund - Community Facilities
Debt (Greater Than 5 Years)
Lease
47
1998
BUDGET
$338,000
3,100
1,500
33,000
36,000
$411,600
1998
$411,600
a
a
0
a
a
$411,600
. .._,.. u-. .
- .. .---- m._._. '-...-
1999
BUDGET
$317,500
11,600
2,500
36,000
220,000
$587,600
1999
$102,468
0
120,949
0
364,183
0
$587,600
Page 1
1999 CAPITAL BUDGET
2240 FIRE PROTECTION
6157 Vehicles $317,500
Aerial Based on acquisition of a demo $750,000 $900,000 (D) Reduced T JQ
and sale of Telesquirt* $êOO,OOO (D) Reduced T JQ
Deleted as per Council Budget meeting of April 6, 1999.
PuA1~er J20,000 (D) Deleted T JQ
Tanker JOO,OOO (D) Deleted T JQ
Added as per Council Budget meeting of April 6,1999 (D) 300,000
Deputy Chiefs Vehicle (New Fire Pr9tection Act) Jã;.OOQ (L) Deleted T JQ
Fire Prevention Car 17,500 Jã;.OOQ Reduced T JQ
Financina Summary - Vehicles
Develop Charges - Fire Veh. & Equip, $120,949
Debt 189,183
Current Budget 7,368
Total $317,500
Development Charaes - Fire Vehicles & Eauip Explanation
Vehicles To be Funded
Aerial Deleted as per Council April 6 $000,000
Tanker Added as per Council April 6 $300,000
Fire Prevention Car 17,500
Sub Total $317,500
Development Charges Funding based on
1991 Study (54,42%) 172,784
Less: Non Residential Growth (30%) (51.835)
Amount to be funded from Develop. Charges $120,949
6173 Furniture & Fixtures $11,600
Work Stations - replacements $6,000 $12,000 Reduced T JQ
Furniture for Fire Halls - replacements 1,900
Dispatch Office .chair -replacements 1,500
Chairs -replacements 2,200
48
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
2240 FIRE PROTECTION
6176 Office Machines and EauiDment
Lateral Filing Cabinets for Fire Prevention - replacements
6178 Miscellaneous EauiDment
Bunker Gear Washing Machine (Health & Safety)
Opticom Equipment
Hose and High Volume Hose -replacements
Thermal Imagin§ Camera
Weather Monitoring Equipment (Emergency Situations)
5,500
6181 Other Fixed Assets
Camm~nicatien& 6t~gy Aja~Piskerifl§/VVhittly
Flashover Simulator for Training (1/3 share with Ajax & Whitby
Defibrillatiofl Program .
Dispatch Center Equipment & Study
Reduced as per Council Budget meeting of
April 6, 1999.
Financina Summarv - Disoatch Centre Eauio. & StudY
Debt - Equipment
Current - Study
Total
$175,000
45,000
$220,000
* The aerial is deferred to 2000 budget.
49
Page 2
$2,500
$36,000
$10,000
8,500
~
4G;OOO
12,000
Reduced T JQ
Deleted T JQ
$220,000
$25,000 Deleted T JQ
20.000
100,000 Deleted TJQ
JOg,OOO (D)
200,000 (D)
As submitted to Council May 10, 1999
PICKERING FIRE DEPARTMENT
AERIAL REPLACEMENT
Introduction: ,
To assist in th~ d~cision making process 0 f th~ proposed purchase 0 fane',',,; el¡;vating device. I
out!ind th¡; impact following the criteria: Risk :vbnJgemcnt. Fire Operations. Applic:1bk
StJ.l1t.1:1rds. This vehicl~ has been i<.kntified on every budget request since 1993 and is in need of
rep bœmer1t.
Present Apparatus:
19 -5 100 fool aerial on a single a.'de Ford chassis wich exposed sealing for five-
fìrefzghcers.
Pro posed Ap paratus Profile:
j 999 100 foot quint aerial apparatus on a dual a.'de custom chassis with enclosed seating
jòr four firefighters.
F or discussion purposes we have focused on an "E-One" supplied vehicle.
Risk ¡yI anagement:
At the present time the existing apparatus has several deficiencies that cannot be addressed by
refurbishment or maintenance. Thev are as follows:
.
.
This apparatus cannot carry water in its tank because with the combined weight of the water
and the apparatus, the rear a."de of the truck is insufficient to carry both of these loads. This
situation has occurred as a result of the change in the laws governing load carrying capacity
of truck chassis. \Vhen the apparatus goes to a call and arrives first on the scene, as it did to a
structure fire on April 11, 1998 the crew must connect to a hydrant to secure a water supply.
The truck was never designed to connect to hydrants as a pumper, The time to perform this
function will allow the fire to grow exponentially and/or delay rescue of trapped persons. On
April 21, 1995"Dateline" did an expose on the Houston Fire Department concerning this
very topic and literally crucified them on International television for not having apparatus
that could meet the challenges of firefightin'g operations during several fire deaths. We
certainly wish to avoid this type of controversial liability issue.
~ .
.
As each repair is experienced the confidence level of firefighters in the equipment is
diminished, '
FE8RUAR Y 1999
PAGE 1 OF 4
5ù
PICKERING FiRE DEPARTMENT
AERIAL REPLACEMENT
.
Catastrophi<.; failurc. As ~4uipml:nt ages crJcks. streSSl:S and oxidation bl:come incn::.lsingly
prcv:.:llenr. In spitc of the b~st ~fforts of maint~n:lI1Cl: divisions, som~ fire dl:p.:mmcnts havc
experienced an aerial device that has collapsed. Depending upon th~ circumstances these
collapses have resulted in firefighter dcaths and prolonged loss of tire[¡ghting equipment.
C nfortunatcly these episod~s are not predictable.
.
In 1996 the present aerial had to undergo extensive repairs. Due to the age of the equipment
and the difficulty in obtaining replacement pD.11S the aerial was out of service for a period of
nine months. To compensate for this absence \ve would have had to call in an aerial from
\Vhitb,y or Scarborough for assistance. Fortunately we did not have to do this. However, as
the apparJtus ages these types of service interruptions will become more frequent and
probably of longer duration. Just because something did not happen when the appar.:ltus was
out of service, assuming this will be the case for subsequent service interruptions, is
foolhardy. We arc a service to our customers, our work load is generated by the needs ofthé'
community. \Ve ultimately hope that this equipment will never be required but we all realize
that the tools to perfonn the job must be provided to the firefighters to save lives and
property.
Fire Operations:
In support of our request for a new aerial device it is essential that the facts concerning the
importance of this device to an integrated fire attack be illustrated. An elevated device functions
on the fireground in the following capacities:
.
Elevated vantage point for the application of water. Large facilities such as the Metro East
Trade Centre and The Pickering Town Centre have substantial size. In the event that a
defensive fire attack is used it would be impossible to apply water onto or into the structure
with hand lines due to their limited reach and volwne. It is essential to have an apparatus that
can be raised above the roofline and flow water (1250 gpm) onto the fire in order to provide
suppreSSIon.
.
Vantage point for monitoring hazardous materials operations. To be able to monitor a spill it
is necessary to obtain a height advantage to be able to look down and see adjacent impact.
Environmental monitoring equipment can De raised to monitor the plume of any discharge.
This assists in the mitigation of the hazard by providing data on dispersal and concentrations.
.
High angle rescue operations. In some circumstances the use of an aerial device can reduce
the amount of time. it takes to perfonn rescue because of its ability to be deployed quickly.
.
Stable ladder for rescue of persons in high rise applications. An aerial device will access and
provide safety for persons located up to the tenth floor. Without the aerial device ground
ladders will only reach to the second floor. It has been our experience that persons being
rescued by ground ladders are reluctant to go onto the ladder and in some cases. due to fear,
they .will fight with the rescuing firefighter.
FEBRUARY 1999
PAGE 2 OF 4
51
f .
I.
PICKERING FiRE DEPARTMENT
AERIAL REPLACEMENT
.
,~èriJI devic~'provides a stJbk [JdJer to perform roof oper:.uions such ::lS vertic::!! vcnti1J.tion.
in J safe mJMCr, when the roof is too steep or unstJbk for firelighters to \vork on, Without
the use of this type of apparatus less efficient means of venti1J.tion will h;,¡vc to be used \vith
the result of more property d;'llnage,
.
Vinual1y ::J.!! incident command courses. semin:lrs. books ::J.nd tr::1Îning soft\v::J.re reference the
::J.pplication of aerial devices in ::J.!! structur::J.I tire situations.
Applicable Standards:
NFP A 1201 "Developing Fire Protection Services for the Public" specifically addresses the issue
of ::J.eri::J.l apparatus \-vith regard to a capital equipment replacement program (see Appendix "B"),
"
Fire Undenvriters Surv'ey (FUS) idt:ntifies the need of elevated devices 1f1 Appendix I
"Determination of Required Fire Companies and PersonneL" page A2 "Table of Effective
Response" (see Appendix "A"). This document identified the type of buildings for the response
(scattered wood frame) and the time for the apparatus to be on scene, In all circumstances the
FUS identifies an elevating device to be on scene from 9 to 2,5 minutes.
FCS rates fire departmenTs according to a scale of 1 through 10. The rating is determined by the
accrual of demerit poims in areas of \-vater supply, apparatus, personnel, etc. The points are then
used to determine the rating of the department. If a department does not have an aerial then the '
department accrues demerits, The scale has direct impact on the rates customers pay for
insurance (see Appendix "A"), This benefit is not apparent to insurance customers for hvo
reasons: their biDs do not reflect this impact because it is done at the underwriting level and
comparative analysis of rates paid by residents of one community to another is virtually non-
existent.
The "Ontario Firetìghter Standard" has a complete section on "Aerial Devices". In order to
qualify and ce.rtify as a firefighter in the Province of Ontario it is necessary to accrue knowledge,
practice techniques, demonstrate skill (see Appendix "C") and finally demonstrate job
competency using the apparatus on the fireground.
FEBRUARY 1999
PAGE 3 OF 4
5¿
PICKERING FIRE DEPARTMENT
AERIAL REPLACEMENT
C osls:
All pricin:; is based upon estimates from '"E-onc", Thc actual cost \vil! vary accordin:; to
equipment :md options ordered. I have Jtt.:lchd J price list (see Appendix "0") on stock units
for considerJ.tion.
Purchase of a Show Demonstrator with Tradc.in
$750,000
less trade in 1990 65' T elesqurt S 150,000 *
/
plus taxes (7%)
Total S600,ùOO
þ
Delivery June 99'
* Esrimared value provided by "Superior" ea!er in 1996
Impact:
Ifrhis aerial is nor replaced the negative impact upon our department is as follows:
.
Increased maintenance costs for 1999.
Apparatus unavailable for fire operations due to accelerated and expanding repair periods
directly related to age and obsolescence.
Health and Safety issue apparatus responding to fire alanns with no water due to axle weight
restrictions.
Increased risk of catastrophic failure due to age and deterioration.
Negative impact on FUS rating and increased insurance rates for the property OVvTIers in
Pickering.
Risk management exposure on the issue of no water carrying capacity.
.
.
.
.
.
When this aerial is replaced the positive impact upon our department is as follows:
.
Reduced operating budget due to decreased maintenance costs.
Apparatus available for fire operations due to decre:lSed do\vn time for repairs.
Capacity of new apparatus will have properly rated a:des for carrying water on board, this
will allow for independent fire attack.
FUS ratings will remain the same or may lower with a new survey.
We will not need to rely on outside communities for an aerial response if and when they are
available.
Risk management issues will have been addressed.
.
.
.
.
.
FEBRUARY 1999
PAGE 4 OF 4
~ 'J
,.JJ
\
I i
"BUSINESS CASE"
The Criteria!
I
ìhis form deals with how work is
Irganized to support your Department's
'StrategiC approach to this year's Capital
\emands. Each request is analysed to
þflect the value to the Town and its
IFinancial Review of this Request.
I
I
\
\
: .Jroiect DescriDtion:
¡ Material required:
!
I
! Location of Project:
I'
¡
If
TOWN OF PICKERING
,¡.I'" OF "Ie
::°51+%
J: %
;- G')
..
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
DeDartment: Fire
Division: Account #:
Fire Protection 2240-6157
Project: Short Title Project #:
Aerial Vehicle
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & location: (attach map)
Expected Starting Date: I Expected Completion Date:
One hundred foot aerial ladder vehicle
1616 Bayly St. (Fire Station #5)
Detailed information as to project description:
A 100 ft. aerial apparatus.
¡rOiect Justification:
I Legislated Requirement
I Health and Safety
,I Maintenance of Existing Infrastructure
I Extension of Life of Asset
¡Improve Customer Service
¡ Other (Council, Public, Staff)
I
¡
\
,(
$
Lost ULC Listing
Does not meet government load limitation
Out of service for extended periods - parts
Present Aerial 23 years old
Reliability as both advantage point for f/fighting & rescue activities
Firefighters have lost confidence in vehicle
5-1
Page 2
1998 New! )9.99
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad m i n istrati 0 n/ Ov e rh e ad
Vehicles R 600,000. 600,000
Other
Total 600,000 600,000
. Price includes trade-in value for the telesquirt vehicle.
1998
Budget Financing N!R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) R 7,158 7,158
User Revenue
Reserve/Reserve Fund
Development Charges - Fire Vehicle & Equipment R 228,551 228,551
Debt R 364,291 364,291
Total 600,000 600,000
3rowth Related
~et Expenditure to be Financed by/from: .'
55
¡
, ¡
\
,
¡
)
"
j
¡
J
Page 3
Financina Aooroval
'financing for this project has previously been approved by Council and is availab!e in Capital Account No
\
,
lçaoital Proaram
i
i
1999
$
2000
$
Four Year Forecast
2001 2002
$ $
2003
$
Beyond
I
'I
¡
fOoeratina Costs
¡ Costs to be included in Operating Budget
lfor:
I.ooeratina Savinas
ICost Reduction/Increased Revenue
i due to:
!Net
I
r
raYbaCk Period:
,
600,000
N/A
I Month: Quarter: Beyond
I eSh Flow January April July October 1st 3rd 1999
rojection February May AuQust Nov.
Iin/(Out) Flow March June Sept. Dec. 2nd 4th
\
¡¿ost/Benefit Analysis
'frovide on separate page if necessary)
, ¡-
ILife of Asset
tovision for
I' uture Repair/Replacement ,
I
, ~oorovals
I
I pepartment APpro~al
Finance Approval
Chief Administrative Officer
56
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
"Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is ejected. the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
5 ~¡
f I
}
I
~his form deals with how work is
Jganized to support your Department's
StrategiC approach to this year's Capital
lemands. Each request is analysed to
.sflect the value to the Town and its
Financial Review of this Request.
"BUSINESS CASE"
The Criteria!
i
} ,
I
¡
I~roiect DescriDtion:
{ Material required:
One car
Location of Project:
Municipal Building
TOWN OF PICKERING
,¡.II'I OF ,ole
,;;. ora+%
r '" z
>- ø
..
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
DeDartment: FIRE
Division: Account #:
FIRE PREVENTION 2240-6157
Project: Short Title Project #:
Fire Prevention Vehicle
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date:
Detailed information as to project description:
These two cars required by Fire Prevention Inspectors in order to travel throughout Pickering
to complete inspections and conduct investigations.
\
,roject Justification:
Legislated Requirement
Health and Safety
Maintenance of Existing Infrastructure
Extension of Life of Asset
Improve Customer Service
¡
r
¡
Other (Council, Public, Staff)
$
None
Inspectors presently using own vehicles
Presently we have no vehicles for two inspectors
12 - 15 years
Investigation instruments: cameras, etc., would be in a
Town vehicles - ready to respond
We pay mileage to inspectors now -
question insurance & liability concerns
5:j
Page 2
1998 . ° New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Admi n istratio n/Overhead
Vehicles N 17,500 17,500
Other
Total 17,500 17,500
o.
. Price includes trade-in value for the telesquirt vehicle.
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) 210 210
User Revenue
Reserve/Reserve Fund
Development Charges - Fire Vehicle & Equipment N 6,680 6,680
Debt 10,610 10,610
Total 17,500 17,500
ìrowth Related
let Expenditure to be Financed by/from: o'
\
j
¡
5~
Page 3
r1inanCina Accroval
¡inancing for this project has previously been approved by Council and is available in Capital Account No:
¡
r'lacital ProQram
Four Year Forecast
1999
$
2000
$
2001
$
2002
$
2003
$
Beyond
17,500
I
I :
19ceratinQ Costs
'costs to be included in Operating Budget
ì
for:
)ceratinQ Savings
;Cost Reduction/Increased Revenue
due to:
¡\Jet
!aybaCk Period:
N/A
Month: Quarter: Beyond
¡ash Flow January April July October 1 st 3rd 1999
roiection February Mav Auqust Nov.
!n/(Out) Flow March June Sept. Dec. 2nd 4th
\
j
¡
Cost/Benefit Analysis
'?rovide on separate page if necessary)
I
I ife of Asset
rOViSiOn for
ruture Repair/Replacement .'
¡
I
Iccrovals
i
¡epartment Approval
Finance Approval
Chief Administrative Officer
60
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
IFinance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financina Sources
1999 Preliminary Proposed
Budget Allocation
(Total Proje?t)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
j
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elect~d, the Treasurer has updated the Town's finanCial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal ~tatute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
1
J
TREASURER'S APPROVAL
DATE APPROVED
01
--,---- 'n_..,
TOWN OF PICKERING
1999
CAPITAL BUDGET
u_---~-_... -------'---___"n_"--_--'-nu-- U
_.,- -----'--'-_m
_u- ,--u_--..-
2241 - EMERGENCY OPERATIONS CONTROL CENTRE
(CLAREMONT)
CLASSIFICATION
1998
BUDGET
6173 Furniture & Fixtures
$0
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$0
FINANCING
1998
2823 General Fund
$0
2823 General Fund - Reserve
4227 Reserve Fund - Development Charges
4225 Reserve Fund - Community Facifities
0
Debt
0
I.
!
$0
62
0
1999
BUDGET
$0
500
0
0
$500
0
a
0
1999
$500
0
0
0
0
$500
0
6173
6176
6178
6181
1999 CAPITAL BUDGET
Page 1
2241. EMERGENCY OPERATIONS CONTROL CENTRE
(CLAREMONT)
Furniture & Fixtures
Office Machines and EauiDment
O','erhe3s Pro1ector
Filing c3sinet
Fax Machine
Miscellaneous EauiDment
Other Fixed Assets
Viseo Camera
Ontario Hydro provided the above items at no cost.
63
$0
500
$500
$3ãO Deleted T JQ
200 Deleted T JQ
900 Reduced T JQ
$0
$0
$iOO Deleted T JQ
As submitted to Council May 10.1999
TOWN OF PICKERING
1999
CAPIIA~ I3t..1[¿GI;T
2290 - PUBLIC WORKS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
6173 Furniture & Fixtures
$60,450
6176 Office Machines & Equipment
13,850
6181 Other Fixed Assets
6178 Miscellaneous Equipment
2,950
FINANCING
$77,250
1998
2823 General Fund
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
Debt
Lease
I '
$77,250
0
Q
0
Q
$77,250
64
0
1999
BUDGET
$34.725
4,005
1,500
17,000
0
$57,230
0
1999
$57,230
0
0
0
0
0
$57,230
6157
1999 CAPITAL BUDGET
2290 - PUBLIC WORKS
BACKGROUND INFORMATION
Vehicles
Public Works Vehicles - Two door
utility vehicles ( replace unit 618 (1989)
3na unit 1320 (1 QQ1» ~(1)
Refurbish vehicles - body work and paint
(units 621 (1991) and 622 (1991) (2)
6173 Furniture & Fixtures
Work station components to complete
office relocation - 1998
Privacy Panel - Administration (1)
Corner Panel - Administration (1)
Work top - Development Control (1)
Privacy panels - Development Control (3)
Planhold Cabinet - Municipal Works (1) (replacement)
Overhead Storage Cabinet - Municipal Works (1)
(replacement)
6176 Office Machines & EauiDment
Fax machine for Public Works
Department ( Replacement) (1)
6178 Miscellaneous EauiDment
Confined Space Equipment
a) Portable Gas Detector (replacement)
including Confined Space Kit
(to repláce CoG.S. 80 unit #2
serial #4313 - Purchased - 1989) (1)
b) S,Co8.A Scott Air Pack (replacement)
including mask/harness/case
(to replace original Scott Pac received
from Fire Dept. with steel tank, 15+ years old) (1)
65
$30,225 $139,459
4,500
$2,305
1,000
700
$5,500
4,600
Page 1
$34,725
Reduced T JQ
$4,005
$1,500
$17,000
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
2290 . PUBLIC WORKS
BACKGROUND INFORMATION
6178 Miscellaneous Eauioment Con't
Cellular Phones
(Traffic and Waste Management Coordinator/
Municipal Works Supervisor) (2)
Vehicle Adapter - hands free
(Required for new vehicle - Municipal Works) (1)
Vertical Benchmark Maintenance
Purchase chance anchors for Benchmarks
and quote for removed/infilling Vertical Control.
Continuation of program from 1996 .
various locations throughout municipality.
6181 Other Fixed Assets
66
Page 2
350
550
6,000
$0
As submitted to Council May 1O, 1999
TOWN OF PICKERING
,¡.I~ OF "Ie
;;°51"'" +%
- "'" Z
f- CJ
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
I
i
I
this form deals with how work is
I OrganiZed to support your Department's
i ?trategic approach to this year's Capital
lemands, Each request is analysed to
reflect the value to the Town and its
Financial Review of this Request.
! ,
"BUSINESS CASE"
The Criterial
Department: PUBLIC WORKS
Division: Account #:
ENGINEERING SERVICES 2290-6157
Project: Project #:
UTILITY VEHICLE
Capital Budget Year: Previously Included In:
1999
Corporate Project Title:
Project Title & Location: (attach map)
N/A
Expected Starting Date: Expected Completion Date:
Project Description:
1 Material required:
ONE UTILITY VEHICLE
¡ Location of Project:
\ Detailed information as to project description:
, Purchase of one utility vehicles for the Municipal Works Section,
¡
Project Justification:
~
~t
These vehicles are proposed for the following reasons:
$
This vehicle is required to be used on construction projects where it is not practical for an employee
to use their personal vehicle. Identification of Town staff is desirable.
This vehicle will be shared amongst staff and will cut down on mileage claims to the Town.
This vehicle is around 10 years old and is beyond it's life expectancy of 7 years and will require
more extensive maintenance, as it's getting even older.
y This vehicle requires body repairs and new paint.
¡
66A
Page 2
1998 New/ 1999
Budaet EXDenditure ReDlacement UDarade Quantitv Budaet
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad min i stra tio n/Overh ea d
Vehicles One Utility Vehicle R 30,225 1 30,225
Other
Total 30,225 1 30,225
1998
Budaet Financina N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) R 30,225 30,225
User Revenue
Reserve/Reserve Fund
Development Charges
Lease
Total 30,225 30,225
Growth Related
Net Expenditure to be Financed by/from:
f
Page 3
linancinq Approval
¡Financing for this project has previously been approved by Council and is available in Capital Account No
I
i
\
Capital Proqram
Four Year Forecast
1999
$
2000
$
2001
$
2002
$
2003
$
Beyond
30,225
ODeratinq Costs
(Costs to be included in Operating Budget
for: gas, oil, tires, maintenance
1,000
1,000
1,250
1,500
1,750
3,000
2,000
3,000
2,000
3,500
2,250
4,000
2,500
4,500
2,750
~YbaCk Period:
Months/Y ears
!ash Flow
Projection
T(out) Flow
Month: Quarter:
January April July October 1 st 3rd
February May August Nov,
March June Sept. Dec. 2nd 4th
30,225 30,225
Beyond
1999
~ostlBenefit Anal sis
sts for gas, oil and tires will exceed off-setted personal mileage claims, but a Town vehicle is required for day to day
perations. Maintenance of the vehicle being replaced will be expensive in 1999 and beyond,
'fe of Asset
Jrovision for
=uture Repair/Replacement
This vehicle has a life expectancy of 7 years, depending on total mileage accumulated.
~DProvals
I
I
)epartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
One Utility Vehicle
Public Works
ORGINATING DEPARTMENT
Jun-99
ESTIMATED STARTING DATE
N/A
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
¡
I
UPDATED ANNUAL LIMIT
,
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992, The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
I
1
¡
'- --., -- ,
TOWN OF PICKERING
1999
. ._u_-,_Ç1\PJIA,",~~RGçT_- m__-
2320 TRANSPORTATION SERVICES - ROADS
CLASSIFICATION
1998
BUDGET
, \
i
¡
6157 Vehicles
$153,000
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
8,500
6181 Other Fixed Assets
1,502,000
$1,663,500
FINANCING
1998
2823 General Fund
$1,243,000
2823 General Fund - Reserve
4227 Reserve Fund - Development Charges
420,500
4232 Reserve Fund - Public Works
Reserve Fund
Lease
I
!.
,
,
Debt (5 Year)
Debt (Greater Than 5 Years)
$1,663,500
67
.uu_--,---
0
1999
BUDGET
$230,000
0
300
247,825
1,090,000
$1,568,125
0
0
1999
$200,125
0
0,
0
0
348,000
1,020,000 .
$1,568,125
0
0
0
0
0
6157
§lli ,
6176
6178
1999 CAPITAL BUDGET
2320 ROADS DIVISION
BACKGROUND INFORMATION
Vehicles
4 ton Single Axle Dump Truck
with one way plow and wing
Replaces unit # 078 - 1987 (Trade in)
and ~nit 11' OiG 1 gig (Trade in) (2) (1)
Hon Crew Cab Stake Truck
with dump body
Replaces unit # 087 - 1993 (Trade in) (1)
3/4 Ton Pick up 4X4
with front mounted plow
Replaces unit # 085 - 1992 (Trade in) (1)
Utility Vehicle
Replaces unit # 022 - 1992 (Trade in) (1)
Furniture & Fixtures
Office Machines & Eauioment
Adding Machine (1) (replacement)
35mm Camera - replacement
Miscellaneous Eauioment
Road Grader with snow wing and
scarifier
Replaces unit # 105 -1983 (Trade in) (1)
Set Lifting Clamps
for lifting catchbasins (1)
Concrete Finishing Bull Float (1)
( replacel1)ent)
Gas Powered Jack Hammer (1 )
(replacement)
Snowblower and Bucket attachments for
John Deere Tractor
68
$210,000 (D5)
40,000
40,000
30,000
$150
150
$228,000 (D5)
450
175
4,200
15,000
Page 1
$230,000
$120,000 Reduced TJQ
$0
$300
$247,825
As submitted to Council May 10, 1999
6181
I
¡ ,
1999 CAPITAL BUDGET
2320 ROADS DIVISION
BACKGROUND INFORMATION
Other Fixed Assets
Installation of IPS pedistrian crosswalk at the intersection
of Finch Avenue and Rosefield Road
Added as per Council Budget Meeting
of April 28, 1999
. Page 2
$1,090,000
$40,000
Streets to receive base asphalt repairs, top asphalt and final boulevard
works to complete 1998 Road Projects.
1 Dunbarton Road
final layer of asphalt
(incfudes culvert relining)
2 Radom Street
final layer of asphalt
3 Rosebank Road
final layer of asphalt
4 Sheppard Avenue
final layer of asphalt
5 Wixon Street
final layer of asphalt
Sub Total
Pre Engineering Surveys for
future years budgets
Road Projects
( Listed by Priority)
1 Fairport Road
Finch Avenue to Pine Creek.
Storm sewer installation and road
reconstruction including new granular
base, concrete curb and asphalt pavement
2 Dunchurch Street
Concrete curbs and minor drJinage
works, in conjunction with Region works
placing top course asphalt.
69
(D)
$70,000
(D) 10,000
(D) 80,000
(D) 25,000
(D) 55,000
240,000
30,000
(D)
180,000 Deleted TJQ
Deferred to Year 2000 Budget
Priority #1
(D)
25,000
As submitted to Council May 10,1999
Page 3
1999 CAPITAL BUDGET
2320 ROADS DIVISION
BACKGROUND INFORMATION
3 William Street
Central Street to north of David Street
Storm sewer improvements and road
widening, including new granular base,
concrete curbs and asphalt pavement.
4 Westshore Boulevard
Vistula Drive to Oklahoma Drive
Storm sewer improvements and road
widening, including new granular base,
concrete curbs and asphalt pavement.
(D)
70,000
(D)
340,000
*
5 *Pickering/Uxbridge Townline Road
Gravel, surface treat and slurry seal
section of road from Markham T ownline
easterly to Conc. #3 of Uxbridge.
6 *Concession 5 Road
Greenburn Place to east of Salem Road
gravel reconstruction and asphalt paving
Either Project 5 or 6 will be completed for 1999.
The remaining project is deferred to Year 2000 Budget - Priority #3
As per Council Budget Meeting April 6, 1999
(D)
160,000
(D)
160,000
7 Rougemount Drive
Toynevale Road to Oakwood Drive
Pavement resurfacing
8 Balaton Avenue
Colmar Avenue to South limit.
Storm sewer improvements and new
granular base, concrete curbs and
asphalt pavement.
9 Liverpool Road
Old Orchard Road to Commerce Street.
Storm Sewer Improvements and road
widening, including new granular base,
concrete curbs and asphalt pavement
(D)
115,000
(D)
70,000
(D)
22Q,ggg Deleted T JQ
Deferred to Year 2000 Budget
Priority #2
Sub Total
1,090,000
10 Sheppard Avenue
Rosebank Road to Altona Road.
C.S.P Culvert Replacement with
concrete box culvert. Storm sewer
installation and Road Reconstruction
includes new granular base, concrete
curbs and asphalt pavement
1,200,000
70
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
2320 ROADS DIVISION
BACKGROUND INFORMATION
11 Vicki Drive
Westshore Blvd. to Hillcrest Rd.
Storm Sewer Improvements and
Road Reconstruction, including new
granular base, concrete curbs and asphalt
pavement.
12 Seventh Concession Road
Salem Road to Durham Rd. # 23
New granular base and Hard Top Surfacing
13 Ferncliffe Circle
Road Construction including
new granular base, concrete curbs
and asphalt pavement.
14 Pickering Parkway
Glenanna Road to Hydro Corridor
Resurfacing of asphalt pavement
15 Brands Court
Storm Sewer Improvements
and Road Reconstruction, including
new granular base, concrete curbs
and asphalt pavement.
16 Strouds Lane and Fairport Road
Traffic Control Signal Installation
17 Helen Crescent
Storm Sewer Improvements and
Road Reconstruction, including
new granular base, concrete curbs and
asphalt pavement.
71
Page 4
235,000
160,000
30,000
90,000
130,000
75,000
85,000
As submitted to Council May 10, 1999
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Dunchurch Street
-
~
",
/' '..
" '~ ..,~
-, -
:~~~'
'::' ---------
-
..
~
'--
-
r-
- L '-
- --
, :::
- -',
- - -'::'
.... --:
-
-=
- ,
~ /
- ,
~ -
..
> '-
.>
'>
'>
-- -- -
- -
-
~ -
- - - '
//
"
, ------' ,'~~ /' - :".. ,"- /;:/
,>-- '~// //' <--,//
/'
",
-
s
--- --
.. - - ..
..
-
"
=
""-,
-
-
-'- :::
-~
'" '
-- ~
Â
'"
- ~--
, / -------=.~ - / ~
-, - \', ~ --------~~ ~ c
--~~~:;~.~ , ,
,,--
LOCA IrON MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$25,000
LOCATION:
Dunchurch Street - from Dunbarton Road, to south limit.
PROPOSED CONSTRUCTION INCLUDES:
Road Reconstruction (add concrete curb/gutter)
. Dunchurch Street - from Dunbarton Road, to south limit.
Minor Drainage Works
. Dunchurch Street - from Dunbarton Road, to south limit.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
Note: Region of Durham to pay for top asphalt - commitment from 1997
u TENCellS\BUDGiEij'" 199912320.02,DOC
)
72
PUBLIC WORKS DÊPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
William Street
-. - ------
-----' --.=- =- -=-=-
/_-
/ . ~
-
-
-
-
.?
"
SUBJECT
AREA
-
"
-~
~
---~- --,
~ -~, - -=--: = - z
- - -- --
---- --
-, ,-,
-
- .
-
- ,~~~; ~
.': :;' ~ =-:; -
~ ~ L~ ~ . ~ -
- - -=--=-= ---./
-
- '--
~ -=- . ---
--=- ~/
-
..
--
-
-,
-
-, -
::; ,-
--
" "
-
,', ::_- "':;-::'.
3-, -
-
'/ ---
~ C F ~
"- - ~ z
-
~ -
- /
Z
.. /
/-
~
-
<
(:-'
?
'v'
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$70,000
LOCA TION:
William Street - from Central Street, to 45m north of David Street.
PROPOSED CONSTRUCTION INCLUDES:
Storm Sewer Improvements
. William Street - from Central Street, to 45m north of David Street.
Road Reconstruction (granular base, asphalt and curb/gutter)
. William Street - from Central Street, to 45m north of David Street.
Sidewalk Replacement
. William Street - from Central Street, to 45m north of David Street.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
/
/ \ íE".CêRS\BUOGéij~' 19991232033,OOC
I 7j
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL. '
Account #2320 - ROADS
West Shore Boulevard
/.,
,~ ~~
,,-' ,~/~- ,--------- ::::/" .~ ~ //
/'~ ,- . -'-----
'.' ,,:" ,<:;:¿;;;/:f{Þ~~~,~, ~ ~~ -- :z, ~
< -" ././;~. ..//>~
/ /~ /&/ ~ :; -""""~ :;.Z:~'...."
/ /. ""V' '?:- - cz- ~ ~- - ~
/ // ' , ':;// ../ s':"~"':q~ ~
// ,/'." \'../.// .,<,--~:.:. ----- --"'-
/ , .. , / C;;:;:--- :.,:~ ~?:~:~:,
- '//:~>;';z-- - s,;.vs-:"::
--.
~
, .
./
~
-- --
0;
--
- - ~ :=' ~ ,- -",
:: s,<~:;", .:.,::, ;; ,.
~ :: ~ ~ ~'"
. - -
v:=:: ~ ':"J::,
v -
- - -"::-~,
, . ,
.~ -
.
,,/'
--
0/,'
'-
~
, ,
,/:-<,
:;'<"/::
SUBJECT -::.~< ~
AREA -:: - -....'" '.
-
,
-
~,;.,,:;.<
.
----
-':".'Z-: ",
',-- -
,;'
/
0;
-
.><,':'-:;":':' ~ -, ::::
----
. -, ,)
,-:;; ::-', ";,-,:'/¡:':¡ '5
C-<>, --
~,~~ -=- - -- ~¿,
-- '"',-< c;-=::::- --
-
"':'~,'.'~:;~~' ~ ;,~ ~,,'
..
õ-:;'.::".o ::;::;:: ::: - ;;,
0:= - -- = :;,:,:; " -
"'- ..----.
. "
LOCA lION MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$340,000
LOCATION:
I
West Shore Boulevard - from Oklahoma Drive, north to Vistula Drive.
PROPOSED CONSTRUCTION IN'CLUDES:
Storm S ewer Improvements
. West Shore Boulevard - from Oklahoma Drive, north to Vistula Drive.
Road Reconstruction (granular base, asphalt and curb/gutter)
. West Shore Boulevard - from Oklahoma Drive, north to Vistula Drive.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
II TENCé.=ISIBUDGETj>\ 1 99912320_04 DOC
,J
74
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
PickeringlUxbridge Townline
"
,-, , - -
,
. !
~ .'1',_- "
-
-
.~.,
;r
."." ::.:;-
....
, --", ._,
-
-
~ ,--=" - - -~,
-
-, -
-
~
"
,
SUBJECT"
AREA
'-.
7V'
....
'-----'
/
~
"-
J
-Î
) /"
'...---
-I
,
.,
;;
-
-
,
-
/
-
- ,
-
"
-
/
~
-
;
z .'
:1:
~¡.,
J
)
,,; r-~'
'" ~',/ '
-cz.~ / ~
.-'
//
c
-
',-
7
-
-
~,.:
~
/
---
"----
v
--
/'
-
/
-
~-~
/
/
., ;=O~""c 'CAC!'
"""'\ \,
-
-
i:
,
~
\..,
I 'ò
-
/
-
- ,
-
/
.-
-
I'
'.-
...",,>.--,.
..
/
-
-
r
-/
-- ,
"-
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$160,000
LOCATION:
PickeringfUxbridge Townline - from MarkhamJPickering Tov.-1Ùine, east to Concession 3
(Uxbridge).
PROPOSED CONSTRUCTION INCLUDES:
Road Resurfacing (granular base, Surface Treatment and Slurry Seal)
. PickeringlUxbridge Townline - from MarkhamJPickering Townline, east to
Concession 3 (Uxbridge).
,i
1\ TENCéRS\BUDGET_Pl1999\2320_0S.DOC
I 75
PUBLIC WORKS DEPARTMENT °. 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Fifth Concession Road
/'
)
.
r
,-J
I
\
~
~ì
!
J
\
)
\
"'\
¡
z.
,-"
~ .
,,'
.. , ~
I I
I I
Cr-\~\
"..-----, I
. ~ \ I
~j 1\ ~ \
~ / ) ^ ;: Id
!~ ~I ,3115
I ' I W I I il
~. :.. '. Î.. . ...J"-.../;J' G i
=; ¡: ~~
ì I \ I
/r1:!l )
. '. I I
~ 'i) )
,./° :~ ': '
. I ~
"-- ! ",=-,..
I
\
~
(
I SUBJECT
\ AREA
(
\
i
C::J"CESS,ON
-C'!i,\;
"'
C;F
AJAX
LOCA IION MAP
PROPOSED BUDGET ACCOUNT:
Roads (Account #2320)
$160,000
LOCATION:
-
5'
::¡' :
<:
~, , :
~
\..
,:::A:::
Fifth Concession Road - from Greenbum Place, east to Salem Road.
PROPOSED CONSTRUCTION INCLUDES:
I
r
Road Reconstruction (granular base and asphalt)
. Fifth Concession Road - from Greenbum Place, east to Salem Road.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
.1
IITEN:;:RSISUDGéTj'\ 19991232°_°6 DOC
76.
PUBLIC \VORKS DEPARTiYIENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Rougemount Drive
", ,'.
. .',
".,;--, ,,'-.
. ~ ~ :::'. .:.. - "
">".~~
.. -
- '7
----
---
..
- '
.
-
-
',' , - '. '~ "
-.
-. - '3
'.
; ~ ",
-
;- ..
..;.':~'~~
-
-
-
--
'- ~-
"';:;.:>':
..
, .~
-
-
- ------
- - , .-
--'
/'
. ~~----
',"'" - J..,:;
: '< .,;:
"
::~-
SUBJECT
AREA
-
- ~ -
~~ ': - ~--------- -~;;=~~.
:::::;,0'.
- -n
~
: n'.'.:::3~
.,.
'J
",:{
.,.
"
~
.,
- -
~ :;'-:
-
y
z
-
-< '.'-:::', "
- ::
:~::.- - :'
::,<",;:
- ~
?
...
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$115,000
LOCATION:
Rougemount Drive- from Oakwood Drive, north to T oynevale Road.
PROPOSED CONSTRUCTION IN'CLUDES:
Road Resurfacing (as'phalt)
. Rougemount Drive- from Oakwood Drive, north to Toynevale Road.
.-'
I 'TENCEF<S1BUDGETj~.19991232(J_(J7DOC
77
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Balaton Avenue
, ,
-~ ,~
" '-
~:.' -<=<::- <;
!"'--
- - ~
=
----
~
-
::
-
=:" -<
-
-,../
::: =-:"-'_:---
- - -- ~
'/
,~~-
--
---;::,:.,?:::?
-
'/
s: = -"';,E ::
z
-~ -- ::
.'
-
-
-
-
- "-
-
/
~
-
"',
'-
.
'-
-
~ " - =
. -
-
-
-
-
-
"
" -
=
-
-
=
-
.-
-
-
-
-- ----
-- -~-
..
<'
'v
-
-
-
-
--
.
-
-
:;:: '/"'::
-
- ./
,-"'='"
-
.=-":'/. "- If= ~ ;.
"- "/:: '/
. :;; - \' -./-
- -- ~ ~
.> '~. ::_co. -. -co / /
j' ~ - '-. r /' ,-
5 --- , :~ '--II---'~ "' ,'::'/::."
/ ) "--------- ------ ...
...-------- ----. =: '" - .(
. SUBJECT - // --- - -
:: "'::'::' AREA" <,' -
-
-
~
-
,
-
~
--
/
- ------- ,-
" -'-', '- -- ~
-
.
-:
-
-
-
-
-
'-
----- --------
"-~-= ~
'--
\
..
-
-
-
-
,..
-
"
-
-
- -
LOCATION rv1AP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$70,000
LOCATION:
Balaton Avenue - nom Colmar A venue, to south limit.
PROPOSED CONSTRUCTION INCLUDES:
Storm Sewer Improvements
. Balaton A venue - nom Colmar A venue, to south limit.
Road Reconstruction (asphalt and curb/gutter)
. Balaton A venue - from Calmar Avenue, to south limit.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
I, ITENCERS\SUDGET j"\199912320_08DOC
7d
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Sheppard Avenue
-
-
.~ " --
-
,~
'-'
-/
>
--",---
- - ,', "- ~~
--.--
~--" .
" :::>c:, :: :; :::
;;:
</--='~.c,::::' - ::
- -
" -
---
~ -
-~ ~
- --, - -
- ::0 - - , :.
, -
'-
----/
-
~ ~
---.,
- .
, -
- - '
--,~
-
--- .,.
:::.c ',;;' :; ,:,',
---./ ',;;'- :::'",':'-
- - -
-' - -
s-.;:=:::.:.=:;
SUBJECT
AREA "
-.-
- :", ~:.
---
"
-'~
-
z
",
'-'
" -
I -/0
... <';'~~
--..
,
\
-
-
"
-
:; " 'v';:
-
<
:: - 'c ::;c',':'
-
~\
"
().
~ '
- ,
,C
:::
z
-""='=
"C_:::;';:'.'C- ,-
þ<
-
~
.
-
'.
"
"'"'"
"
-
- '- -
.' ,
-=
- --
-
- - co.:o,
- - - -
- - - -
-"
, ~
LOCATION ìv1AP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$1,200,000
LOCATION:
Sheppard A venue - from Rosebank Road, west to Altona Road.
PROPOSED CONSTRUCTION INCLUDES:
C.S.P. Culvert Replacement (with Concrete Box Culvert)
. Sheppard Avenue - on Petticoat Creek.
Storm Sewer Installation
. Sheppard A venue:. from Rosebank Road, west to Altona Road.
Road Improvements (granular base, asphalt and curb/gutter)
. Sheppard A venue - from Rosebank Road. west to Altona Road.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
1:\TENCERS\8UDGETj:~\199912320_10,DOC
7'J
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 .. ROADS
Vicki Drive
/;'~"
/ , :' /<:;;;.~~-- /"~ ~
-' /.;.//> -// ------~"-"', ~ --
:;.~ ?--?~",./-/-,--, ',c
-- -- //" :-"~/',,, -- //
/./ - / v //
/,/ ,/' ,,:;-/'/
/~/ -::;~,-y ~~7~ -~-
/-/ ,.~/ / "".,' ,--
./ ./ \ // -- -',
.// '- \/' ,,-.?-~,
--./ - /' ,-,//-
/ ~ / -;: Â <¿.:;\ \//
'// ~:;-- ~-'--:.. ,', ~~, "0--
-- ---"';---:
-"
----------
-
- '.-
'-"
1//
:::
-
, "-
0:----
--/
,-
~~ ~ ~::-x,,-::~--
- _/'",'(-:: ---.-'::-
- -- :::-- -..,' - -
-: - ------- -- -", '-.
:.'"
,f/
/
,',~
- >
::~~-:-=~=:
-
,----- --..,
'-'
\'::"'::--~ ;.,.,::,
-
. , -----
:: ~- -'
/;
:: =:-:--, ,
-
~ :: "':::"- ;"'v::
L
-,
:..~~::.
./ -"' ", ::
"/
.
"
-
- --
~ - - --:.----~---
- ----./ --.,: - --
3-'-',::-< SUBJECT ----"~----
I-'" -"",,",/ AREA
~ ~--
::::: -~-
'::-<--"-::v,:, :=:: ~ . -
------,,:,,> -=
------------- - - - - ~",'",-",-"
-'-A',:;:::;', "',",- --
~
"--'-
'.. ---,
-~ ,- --'
.
..
-
Â
LOCATION tv1AP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$235,000
LOCATION:
Vicki Drive - from Hillcrest Road, east to West Shore Blvd.
PROPOSED CONSTRUCTION INCLUDES:
Storm Sewer Improv~ments
. Vicki Drive .. from Hillcrest Road, east to West Shore Blvd.
Road Reconstruction (granular base, asphalt and curb/gutter)
. Vicki Drive - from Hillcrest Road, east to West Shore Blvd., including
intersections with Hillview Cres., Victory Drive, and Marksbury Road.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
II TENC:RS\BUDGET.Pi 199912320_11.DOC
80
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Seventh Concession Road
.
~
~
~
.,
:
"
-
.,
"
-
-
-
~~
-
-
-------' ;:
-----
-
:::::: ,':: '¡--
--, ---- ."
'-'~ ,~=-:::::: -,
- - , 5:
'7
/"
SUB.JECT
AREA
-
-
-
-' ; ::::
= ,
-,
,-
-
/1
/'
//'
/ //!
//
// /
/ /
// //
//'
/
/
'7
-
;;>
---
-
-
-
:,::
~ '!
v
..
LOCATION NJAP
PROPOSED BUDGET ACCOUNT:
Roads (Account #2320)
$160,000
LOCATION:
Seventh Concession Road - from Salem Road, east to Lakeridge Road (Regional Road #23).
PROPOSED CONSTRUCTION INCLUDES:
Road Resurfacing (granular base, Surface Treatment and Slurry Seal)
. on the Seventh Concession Road from Salem Road, east to Lakeridge Road
(Regional Road #23).
.J
1.1 TENCERS\SUOGëT_PlI999\2320_'2.00C
81
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Ferncliff Circle Extension
" -
--
------
-
" :;: '" '/" -== ,', ~::;:. ~
-~:::- !::
=
,', ,- ::,:" -:; - :: c. =-
- ------- "
, ,/
',,'
'<
_.:. '":: -
~,
" .. ./
::: "'-"
~ - - . --
-
'--,
- - ~ -
. "
, - -
- -, """:;:'.,'.:.::
- --
-
--
"
---',~
c: ",:-
-, -
- '/~--
~ ,
-
z
- - --
-,
-
-
"
-
~
=--:::~.,':-::?: ~ s~ --~--;:/::::~'~:::::---
'~ ~~ <~:;~ ~ :
~:;:::;_::: ~ /_- -:; =-:;:/:"--== s-
,. . -
/ ---../.... '""' \;' =- " - =-
/
-,-
- '
-...,
SUBJECT / "", -c"
AREA
- ,
::: ,
- -
--
"
_~--:;::;:NO:;¿-,...,
:: .:""~ Z
'-C:' -:;:"-"::-:::
,-,,-
-
.. ---
'. ::;:
.,
-
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
LOCATION:
~
.,
~ ==~:::::-=',
------
=::......~
~
.'
v
.,
::.2:
-'"
~-
;:;
-
~-,
--
-
LOCATION MAP
$30,000
F emc1iff C irc1e - from the north leg to the south leg.
PROPOSED CONSTRUCTION INCLUDES:
Stonn Sewer Installé:\tion
. FemcliffCircle. from the north leg to the south leg.
Road Construction (granular base, asphalt and curb/gutter)
. F emc1iff Circle - from the north leg to the south leg.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected
II TENCfERS1BUDGêìj~'I1 9991232o_13 DOC
82
/
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Pickering Parkway
\. Ii $
\ ,....::.. ì !:j
~~\, ~ I¡,J::
-----:::~\\~,"'O<:-i
IV ,7\--' , ~?"':"', ,'\2
,~'-" ;:,<:, -. ~.... \ \ v
If-\' , ~ ~ -:,...<:. - "-IC. 'i, ...\ \":i ~c:"--, -Ai(-~
~\, ':~\ ':--"_-::'<0 =-,
~("~~ :- C:~'-=<-:- V
-;,. """,0,"\ :
7A <,'5?':::-:- \!
'1.- \ "...'é. SCU"" \:
7 \ i i I ~
: : ! I'::
, I
, ,;¡:
I SUBJECT i >
AREA"
\.
"V
~
>-
~~::V5E::;: J
í
V C~uRT i
~\
0,
~_""NG '
~..<:.'O-'
\ ?\'-'
\
"')R- ..AI'-: ,"-", :
~ -R-,~~
:; ~, ",
<
Z
1'- -../
" '\J ,"" I
H\G'¡-I~
Il- C ^,
,.-
a \ I
<::: I
0 I Ac.L.:ANC;::
<Y ~^'
~ ~"'
\ C
, \
~ I i
<:
~^ I
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$90,000
LOCATION:
Pickering Parkway - from Glenanna Road, east to the Hydro Corridor.
PROPOSED CONSTRUCTION INCLUDES:
Road Resurfacing (asphalt)
. Pickering Parkway - from Glenanna Road, east to the Hydro Corridor.
1\ TIfEND¿ASiBUDGIfET- PlI999\2320_14 DOC
)
83
. PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Brands Court
iL
. ' i
I L-.,
------ ,
- - ,
~;~~; =:_~ j I~
-." --
,
;:¡i
v'
-¿
L..
-
-,
-~ ~-
LOCATION rv1AP
PROPOSED BUDGET ACCOUNT:
Roads (Account #2320)
$130,000
LOCATION:
I.
i
Brands Court - from Fieldlight Blvd. east to Tenninus.
PROPOSED CONSTRUCTION INCLUDES:
Stonn Sewer Improvements .
. Brands Court - from Fieldlight Blvd. east to Terminus.
Road Reconstruction (granular base, asphalt, and curb/gutter)
. Brands Court - from Fieldlight Blvd. east to Tenninus.
Complete Landscape Restoration (grading and sodding \I,,-here required)
. to all areas affected
I. lTENDERS\BUDGET.PlI99912320.15.DOC
/
84
PUBLIC WO,R)(S DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Strouds Lane and Fairport Road
~
- - v
j
-
;::
v
--
~ ~', ./
:':7 :=
=;:
3::: ", - - .:.,::
,
-,--- --
"~~-'---
-
.
r
'-...
-
-
-
.-/> '
-
-
- -
----,', ^ . -~
'- ./ /':ô';- ---~ -'- '>"-
00-___00 -,::..
:. ./-~~~ /'
/
SUBJECT
AREA
-
- "
- '-. -'"
" '---.
----.
'-
-
-
-
::
- ------
/ ~'
- -:::-:::"':,>,'-
-
- --~::. '
-
- -
~----=-, :
, -,
-
/,~
/ -
..
-
=
,,'
-
v
v
<:
'3:
:; ,,~
-/ -
.' -
- ;; '::--
- ~~:;
-
I \<~;,
- '
v
-
v
::
>
-
::
<'-, - </ -~
-,::' ,-::.
'-"::"--,--
/ "
/._',", :::::_"_5 S-
-
,-;-'
--- "---
, '0,
-,:.::;::-::.- ',::
---- ---
,:.,,'::
-
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Roads (Account #2320)
$75,000
LOCATION:
At the intersection of Strouds Lane and Fairport Road.
PROPOSED CONSTRUCTION INCLUDES:
Traffic Control Signal Installation
. At the intersection of Strouds Lane and Fairport Road.
¡-¡ TëNDéRS\BUDGE7"j'\1999\2320_16.DDC
)
85
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2320 - ROADS
Helen Crescent
..
-
-
~~
=:'-VC""õ:
-
-
-~ "
~,
-c:.
--'"'-E: ~::.
- .. ~
.',
- -
-
~
" -' '---
. ~ ~ - .~
'~
";
~
-
~
~
-
- -,
l::~=-'
~ ~',
.----' -
----'
~è'
~'r- 9~:' v ~
::: :;:., - 7~,
-
'--
,::. '
-
----
---
---
. -
.:., =- '.~ 'õ:
':'_V5.3 - ',I
-
"
'"'"
/"<'" ~,'
'<,',~,::;,
"', <,/:J
".. '-,
- - ',.."- ",'-
~" ",,----
- -' -
--
- --'
--- --
- - -
'- '--
:: '" '::::, ". ',:::
=-':",5-':', -,
- ---- .:,. '" 'õ:", - 'õ:
-:; '.A
-,.-/ --::::<::;_:::.'õ: ;;;A_"'-:;'-
-
.-/ -'" ,'õ: .,.' - . c----' ,
- ~:: S-'õ:AR=="
:: ,;;: _""-E ::
- ~ - Z
-'-
"-
-:.
. -, -
"'.:."'-<
þ '. -
-
'. .
0,'
"
-
",:::.:.::;
;ç
=='!';'=-""===
5-~=-'õ:-. Z
z
-
:::::: VA"
"
LOCATION MAP
¡
¡
¡
PROPOSED BUDGET A1\10UNT:
Roads (Account #2320)
$85,000
LOCATION:
Helen Crescent - from Modlin Road, west to Terminus.
PROPOSED CONSTRUCTION INCLUDES:
t
! .
Storm Sewer Improvements
. H~len Crescent - from Modlin Road, west to Terminus.
Road Reconstruction (granular base, asphalt and curb/gutter)
. Helen Crescent - from Modlin Road, west to Terminus.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
)
'\TENDERS\BUDGéTJ~\199912320_18,DOC
86
::; -
-
~
"/
-
-
-
-
~ .
-
'-
~
j---,
"-
'-'
-
/-,
'-
TOWN OF PICKERING
,:'.. OF "/~
;; ora- r",~
- .. Z
~ "
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
¡
, i
ì
!
j
¡
I
¡his form deals with how work is
I brganized to support your Department's
'Strategic approach to this year's Capital
femands. Each request is analysed to
¡eflect the value to the Town and its
'Financial Review of this Request.
í
I
i
"BUSINESS CASE"
The Criteria!
Department: PUBLIC WORKS
Division: Account #:
ROADS 2320-6157
Project: Project #:
ONE-4 TON DUMP TRUCK
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date:
Dec-99 N/A
l.l.oiOOI DescriPtion:
r Material required:
I
I I Location of Project
One 4 Ton Dump Truck
! r
Detailed information as to project description:
Purchase of one 4 ton dump truck for the Roads Division. (Replacements)
'roject Justification:
,
$
This vehicle is required for winter control operations, including salting, sanding, plowing and road
maintenance involving gravel replacement, asphalt, ditching, shouldering, culvert repairs and
installations.
Replacing Vehicle #078, which is beyond it's life cycle and experiencing extensive repairs.
Truck #078 is a 1987 model year. This truck is no longer reliable.
86A
Page 2
1998 . . Newl 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad mi nistratio n/Overh ead
Vehicles One Ton Dump Truck R 120,000 1 120,000
Other
Total 120,000 1 120,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
Other Debt - 5-Year R 120,000 120,000
Total 120,000 120,000
.
3rowth Related
Iet Expenditure to be Financed by/from: "
tinanCinQ ~pproval
¡=inanCing for this project has previously been approved by Council and is available in Capital Account No:
If"°ital Program Four Year Forecast
1999 2000 2001 2002 2003 Beyond
$ $ $ $ $
I 120.000
J
.1
IOperatinQ Costs
. Costs to be included in Operating Budget
for: Maintenance/Repairs o 1,000 2,000 3,000 4,000
l'j)peratinQ SavinQs
I Cost Reduction/Increased Revenue 16,000 10,000 1 O,OOO ? ?
I due to: Maintenance/Repairs
¡Net 104,000 9,000 8,000
I
I
. taYbaCk Period: MonthsNears
.,. ,
L~ash Flow Month: Quarter: Beyond
January April July October 1 st 3rd 1999
¡roiection February May August Nov
Iin/(Out) Flow March June Sept. Dec. 2nd 4th
\ 120,000 120,000
¡JOStlBenefit Anal!!>i>
¡he vehicle is used everyday and must be reliable, especially during winter control, to provide emergency operations.
I
Life of Asset
¡rovision for The vehicle will have a 7 year life expectancy.
uture Repair/Replacement
tDDrovals
tepartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
IFinance Reference #:
Project Description and Location
One 4 - Ton Dump Trucks (Plows)
Public Works
ORGINATING DEPARTMENT
Dec-99
ESTIMATED STARTING DATE
N/A
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$120,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
I
¡
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
I
1
1
TREASURER'S APPROVAL
DATE APPROVED
TOWN OF PICKERING
,¡.I" OF "Ie
;;°5°,," 1-%
- " z
~ Ç)
..
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
I
, ì "BUSINESS CASE"
The Criteria!
'ThiS form deals with how work is
/,rganized to support your Department's
'Strategic approach to this year's Capital
rl¡,emands. Each request is analysed to
eflect the value to the Town and its
,tinancial Review of this Request.
¡
Department: PUBLIC WORKS
Division: Account #:
Roads 2320-6157
Project: Project #:
Crew Cab Stake Truck
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & location: (attach map)
Expected Starting Date: I Expected Completion Date:
Jun-99 Aug-99 ,
I
¡
¡roject Description:
I J Material required:
¡
I' Location of Project:
I
I ¡
i
,I
'lroiect Justification:
! !
One Crew Cab Stake Truck
Detailed information as to project description:
Purchase of one crew cab stake truck for the Roads Division of Public Works,
$
This Truck is required for debris and litter pick up, pothole repairs, sign installations and
maintenance, brush and tree removal, guide posts and rails, etc" shoulder maintenance,
Replacing vehicle #087, which is at the end of it's life cycle and experiencing expensive repairs.
The existing vehicle is a 1993 model and will be traded in.
40,000
86B
Page 2
1998 New/ 1999
Budaet ExDenditure Reclacement UDarade Quantitv Budaet
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad mi nistrati on/Overhead
Vehicles Crew Cab Stake Truck R 40,000 1 40,000
Other
Total 40,000 1 40,000
1998
Budaet Financina N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) R 40,000 40,000
User Revenue
Reserve/Reserve Fund
Development Charges
lease
Total 40,000 40,000
Growth Related
\jet Expenditure to be Financed bylfrom:
Page 3
pnanCinQ Approval
Financing for this project has previously been approved by Council and is available in Capital Account No:
¡
¡
1
¡Capital ProQram
¡
I
Ii
I
,:Jperatinq Costs
Costs to be included in Operating Budget
¡for: Maintenance/ Repairs
I
OperatinQ SavinQs
¡Cost Reduction/Increased Revenue
due to: Maintenance/Repairs
Four Year Forecast
1999
$
2000
$
2001
$
2002
$
2003
$
Beyond
40,000
0
2,000
2,000
5,000
8,000
6,000
6,000
6,000
Net
¡
I
6,000
4,000
4,000
Payback Period:
Months/Y ears
Month: Quarter: Beyond
Cash Flow January April July October 1 st 3rd 1999
--r°jection February May Auqust Nov. 40,000
/(Out) Flow March June Sept. Dec. 2nd 4th
40,000
lost/Benefit Analysis
I he vehicle is used every day and due to the type of work it is used for, it is constantly idling. It is versatile and operations
:ênnot be accomplished without it.
Jfe of Asset
Provision for
tJture Repair/Replacement This vehicle has a life expectancy of 7 years.
I.,
ìPprova,s
¡apartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
IF;n"nce Reference #:
Project Description and Location
One Crew Cab Stake Truck
Public Works
ORGINATING DEPARTMENT
Jun-99
ESTIMATED STARTING DATE
Aug-99
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$40,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is el~cted, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
TOWN OF PICKERING
,¡<\'I OF "Ie
,;; o5l'O~ +%
r '" z
;- Ç)
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
¡
I
¡~hiS form deals with how work is
'organized to support your Department's
îtrategic approach to this year's Capital
remands, Each request is analysed to
'reflect the value to the Town and its
¡;;inancial Review of this Request.
¡
"BUSINESS CASE"
The Criteria!
Department: PUBLIC WORKS
Division: Account #:
ROADS 2320-6157
Project: Project #:
PICK-UP TRUCK WITH PLOW
Capital Budget Year: Previously Included In:
1999
Corporate Project Title:
Project Title & Location: (attach map)
Expected Starting Date: I ~xpected Completion Date:
Jul-99 N/A
'Project Descriotion:
¡
i
¡
, Material required:
I Location of Project
!
One 3/4 Ton Pick-Up Truck with Plow.
Detailed information as to project description:
Purchase of one 3/4 Ton Pick-Up complete with plow, for the Roads foreperson. (replacement)
I
j
Project Justification:
I
I
$
This vehicle is used by the Roads foreperson on road patrols, site inspections, material pickup, plowing
of snow as required, complaint investigations, etc.
To replace unit #085, which is 7 years old and 198,000 km.
I
¡
86C
Page 2
1998 New/ 1999
Budaet ExDenditure ReDlacement UDarade Quantity Budaet
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad mini strati 0 n/Overhe ad
Vehicles One 3/4 Ton Pick-Up Truck with Plow R 40,000 1 40,000
Other
Total 40,000 1 40,000
1998
Budaet Financina N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) R 40,000 40,000
User Revenue
Reserve/Reserve Fund
Development Charges
Lease
Total 40,000 40,000
:Jrowth Related
>Jet Expenditure to be Financed by/from:
Page 3
,tinanCinQ Approval
¡inanCing for this project has previously been approved by Council and is available in Capital Account No:
I
;aPital ProQram
I
¡
,
Four Year Forecast
1999
$
2000
$
2001
$
2002
$
2003
$
Beyond
40,000
~peratinQ Costs
I Costs to be Included In Operating Budget
for: Repairs/Maintenance
,
I
I
J)peratinQ SavinQs
I Cost Reduction/Increased Revenue
¡due to: Repairs/Maintenance
I Net
I
1,000
2,000
2,500
3,000
3,500
2,000
3,000
4,000
5,000
6,000
1,000
1,000
1,500
2,000
2,500
Payback Period:
I
I
Months/Y ears
¡
¡ Month: Quarter: Beyond
Cash Flow January April July October 1 st 3rd 1999
-¡roiection February May August Nov. 40,000
/(Out) Flow March June Sept. Dec. 2nd 4th
40,000
lost/Benefit Analysis
Vehicle Maintenance/Repairs will be expensive in 1999 and beyond. Body badly rusted.
'¡ddition of plow allows shorter response time to rectify snow removal complaints/deficiencies.
I .'
Life of Asset
lrovision for The vehicle has a life expectancy of 5 - 7 years, depending on total mileage accumulated.
!,uture Repair/Replacement
pprovals
/epartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Pick-up Truck with Plow
Public Works
ORGINATING DEPARTMENT
Jul-99
ESTIMATED STARTING DATE
N/A
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$40,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
.'
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
TOWN OF PICKERING
,¡.II'I OF "Ie...
;-o~%
>=œ;ð
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Ii
, j
this form deals with how work is
organiZed to support your Department's
rtrategic approach to this year's Capital
~emands. Each request is analysed to
¡reflect the value to the Town and its
'¡inancial Review of this Request
I '
I .
"BUSINESS CASE"
The Criteria!
Department: PUBLIC WORKS
Division: Account #:
ROADS 2320-6157
Project: Project #:
UTILITY VEHICLE
Capital Budget Year: Previously Included In:
1999
Corporate Project Title:
Project Title & Location: (attach map)
Expected Starting Date: I ~xpected Completion Date:
Jun-99 N/A
¡roiect Description:
I
Material required:
One Utility Vehicle
Location of Project
Detailed information as to project description:
Purchase of one Utility Vehicle for the Roads Supervisor. (Replacement)
Project Justification:
1
I
This Vehicle is used by the Roads Supervisor daily for road patrols, job inspections, works at Civic Complex,
winter control and emergencies, if required,
I To replace unit #022, which is 7 years old and.185,00O km.
$
86D
Page 2
1998 New/ 1999
Budaet Excenditure ReDlacement Ucarade Quantitv Budaet
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad mi n istratio n/Overh e ad
Vehicles One Utility Vehicle R 30,000 1 30,000
Other
Total 30,000 1 30,000
1998
Budaet Financ;na N/R $ $ NJA $
(To be completed by the Finance Department)
Property Tax (current) R 30,000 30,000
User Revenue
Reserve/Reserve Fund
Development Charges
Lease
.
Total 30,000 30,000
:;rowth Related
~et Expenditure to be Financed bylfrom:
"
Page 3
I
!
j
IFinancinQ Approval
I
¡inancing for this project has previously been approved by Council and IS available in Capital Account No:
fapital ProQram Four Year Forecast
1999 2000 2001 2002 2003 Beyond
$ $ $ $ $
¡ 30,000
iDeratinQ Costs
tosts to be included in Operating Budget
for: Repairs, Maintenance, Servicing 500 1,500 2,000 3,000 3,500
!
jperatinQ SavinQs
Cost Reduction/Increased Revenue
rue to: Repairs/Maintenance 2,000 2,500 3,000 4,000 5,000
Net 1,500 1,000 1,000 1,000 1,500
¡
Payback Period: Months/Y ears
¡
I
I Month: Quarter: Beyond
:ash Flow January April July October 1 st 3rd 1999
!rojection February May August Nov.
hOut) Flow March June Sept. Dec. 2nd 4th
30,000 30,000
ÞstJBenefit Analysis
Vlaintenance of the vehicle being replaced will be expensive in 1999 and beyond.
I
.'
_ife of Asset
lovision for The vehicle has a life expectancy of 7 years depending on the mileage accumulated.
uture Repair/ReplacemÊmt
¡
!pprovalS
epartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINA ~CE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Utility Vehicle
Public Works
ORGINA TING DEPARTMENT
Jun-99
ESTIMATED STARTING DATE
N/A
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$30,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDA TED ANNUAL LIMIT
1
"
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992, The
Treasurer has determined that the limit has not been exceeded, Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board,
TREASURER'S APPROVAL
DA TE APPROVED
TOWN OF PICKERING
,¡.II'I OF "Ie
.;,,;,°m+%
::: '" z
;- Q
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
I
I
rhiS form deals with how work is
OrganiZed to support your Department's
cptrategic approach to this year's Capital
lemands. Each request is analysed to
I
I reflect the value to the Town and its
J:¡inancial Review of this Request.
I
"BUSINESS CASE"
The Criterial
Department: PUBLIC WORKS
Division: Account #:
ROADS 2320-6178
Project: Project #:
ROAD GRADER
Capital Budget Year: Previously Included In:
1999
Corporate Project Title:
Project Title & Location: (attach map)
Expected Starting Date: I ~xpected Completion Date:
Dec-99 N/A
Ilroiect Description:
Material required:
One Road Grader
\ Location of Project:
Detailed information as to project description:
Purchase of one Road Grader for the Road Division of Public Works (Replacement)
Project Justification:
I This equipment is required for the maintenance of Gravel Roads, for grading, placement of material, and
winter control operations.
$
Replaces Unit #105, which is beyond it's life cycle and experiencing expensive repairs, The existing
equipment is a 1983 model. The"normallife expectancy is 10 - 12 years.
86E
Page 2
1998 New/ . . 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
EngineeringlOesign
Administration/Overhead
Vehicles - Road Grader R 240,000 1 240,000
Other
Total 240,000 1 240,000
1998
Budget Financing . N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
5-Year Debt R 240,000 240,000
Total 240,000 240,000
Growth Related
'Jet Expenditure to be Financed by/from: .'
I
¡
j
Page 3
J
fFinanCinq Approval
¡
I
Financing for this project has previously been approved by Council and is available in Capital Account No:
I Four Year Forecast
þaPital ProQram 1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
I
240,000
,I
pperatinQ Costs
I ¡ Costs to be included in Operating Budget
> for: Maintenance/Repairs 0 4,000 8,000 12,000 16,000
hperatinQ Savinqs
I Cost Reduction/Increased Revenue
¡due to: Maintenance/Repairs 40,000 30,000 30,000 ? ?
I 'Net 40,000 26,000 22,000
j
I
I
'paYbaCk Period: Months/Y ears
Month: Quarter: Beyond
Cash Flow January April July October 1 st 3rd 1999
trajection February May' August Nov.
I /(Out) Flow March June Sept. Dec. 2nd 4th
240,000 240,000
lost/Benefit Analysis
This equipment is essential for gravel road maintenance and must be reliable. The machine is equally important
juring winter control to provide emergency operations, (scraping of ice and plowing).
.1
Life of Asset .'
rovision for The vehicle will have a life expectancy of 10-12 years.
. uture Repair/Replacement
~pprovals
~epartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
One Road Grader
Public Works
ORGINATING DEPARTMENT
Dec-99
ESTIMATED STARTING DATE
N/A
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$240,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
¡
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected. the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
)
j
TOWN OF PICKERING
,¡.II'I OF "Ie
;; oPfl+~
== !Ii Z
>- Q
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
¡
¡
I
I
~hiS form deals with how work is
10rganiZed to support your Department's
ptrategic approach to this year's Capital
~emands. Each request is analysed to
Ireflect the value to the Town,and its
rnanCial Review of this Request.
"BUSINESS CASE"
The Criteria!
Department: PUBLIC WORKS
Division: Account #:
MUNICIPAL WORKS 2320-6181 - 2323-6108
Project: Project #:
WILLIAM STREET RECONSTRUCTION
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location:
See attached map
Expected Starting Date: I Expected Completion Date:
Jul-99 Aug-99
"?roiect Descriotion:
II Material required:
!
!
¡
Location of Project:
William Street from Central Street to north of David Street
Detailed information as to project description:
Reconstruction of William Street from Central Street to north of David Street, including storm sewer improvements
(repairs), new granular base, concrete curbs, asphalt pavement and sidewalk installation.
!
Project Justification:
1
This project is proposed for 1999 for the following reasons:
1) The existing pavement is nearing it's life expectancy and has deteriorated to
a point where it is very difficult to maintain,
2) Streets in Claremont are being reconstructed as part of a major project.
3) Recent development north of this area connects to this street.
$
86F
Page 2
1998 .' New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Road Reconstruction 66,000 66,000
- Buildings
Engineering/Design Survey 4,000 4,000
Administration/Overhead
Vehicles
Other Sidewalks 15,000 15,000
Total 85,000 85,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) 15,000 15,000
User Revenue
Reserve/Reserve Fund
Development Charges
Other - Debt 70,000 70,000
Total 85,000 85,000
3rowth Related
\jet Expenditure to be Financed by/from:"
Page 3
I
í
J
finanCinq Approval
¡
financing for this project has previously been approved by Council and is available in Capital Account No:
I
II Four Year Forecast
faPita, Proqram 1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
85,000 6,000
I
l
DDeratina Costs
r Costs to be included in Operating Budget
for:
\
I
i)peratina Savinas
I Cost Reduction/Increased Revenue
!due to:
j
¡
I Net
¡
j
¡
paYbaCk Period: Months/Y ears
I
¡
Month: Quarter: Beyond
Icash Flow January April July October 1 st 3rd 1999 6,000
11roiection February May. August Nov. 85,000
P/(Out) Flow March June Sept. Dec. 2nd 4th
I 85,000
~OStlBenefit Analysis
¡The provision of adequate maintenance is difficult due to the surface conditions. The structural adequacy of the base is
'-LJbstandard.
~ife of Asset
rovision for The newly constructed road wilt have a 20 to 25 year life expectancy,
. uture Repair/Replacement
tpprovals
fepartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Reconstruction of William Street from Central Street to north of David Sreet.
Public Works
ORGINATING DEPARTMENT
jul-99
ESTIMATED STARTING DATE
Aug-99
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
1999-2000
YEAR
AMOUNT
$85,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financmq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
..
Since approval of this provisional debenturing may require rang term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
J
J
i
j "BUSINESS CASE"
I The Criteria!
~hiS form deals with how work is
10rganiZed to support your Department's
ftrategic approach to this year's Capital
¡emands. Each request is analysed to
¡reflect the value to the Town and its
Tnancial Review of this Request.
TOWN OF PICKERING
,¡.II'I OF "Ie
~o_~
~œ;ô
..
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: PUBLIC WORKS
Division: Account #:
MUNICIPAL WORKS 2320-6181
Project: Project #:
WESTSHORE BOULEVARD RECONSTRUCTION
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location:
See attached Map
Expected Starting Date: I Expected Completion Date:
Jun-99 Aug-99
roject DescriDtion:
. Material required:
¡
Location of Project:
Westshore Boulevard from Vistula Drive to Oklahoma Drive
Detailed information as to project description:
, Reconstruction of Westshore Boulevard from Vistula Drive to Oklahoma Drive, including storm sewer improvements
I (repairs), new granular base, concrete curbs and asphalt pavement.
Project Justification: The project is proposed for 1999 for the following reasons:
f . The Region of Durham is planning to replace the old existing watermain and is in the process of
budget approval.
2) The existing pavement which is 30 years old has exceeded it's life expectancy and has deteriorated to a
I point where it is very difficult to maintain, and drainage is inadequate.
It is one of the few streets in the 'ijestshore area that has not been redone as part of a major project of
upgrading the streets in this area.
$
86G
Page 2
1998 . ' New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Road Reconstruction 332,000 332,000
- Buildings
Engineering/Design Survey 8,000 8,000
Administration/Overhead
Vehicles
Other
Total 340,000 340,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
Other - Debt 340,000 340,000
Total 340,000 340,000
3rowth Related
'\jet Expenditure to be Financed by/from: ;,
P,age 3 .
L . A I
I r' rnancrnQ pprova
finanCing for this project has previously been approved by Council and is available in Capital Account No:
I j Four Year Forecast
faPita, ProQram 1999 2000 2001 2002 2003 Beyond
$ $ $ $ $
I 340,000 50,000
¡
~peratinQ Costs
Costs to be included in Operating Budget
for:
I
~peratinQ SavinQs
Cost Reductionllncreased Revenue
rue to:
Net
I
Payback Period: Months/Y ears
I
t
J Month: Quarter: Beyond
Cash Flow January April July October 1 st 3rd 1999 50,000
E:!roiection February May August Nov. 300,000
~/(Out) Flow March June Sept. Dec. 2nd 4th
300,000 40,000 40,000
lost/Benefit Analysis
I he provisin of adequate maintenance is difficult due to surface conditions. The structural adequacy of the
'"1,ase is substandard.
Jife of Asset .'
Provision for The newly constructed road will have a 20 to 25 year life expectancy,
t~ture Repair/Replacement
tpprovals
repartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
IFinance Reference #:
Project Description and Location
Reconstruction of Westshore Boulevard from Vistula Avenue to Oklahoma Drive.
Public Works
ORGINATING DEPARTMENT
Jun-99
ESTIMATED STARTING DATE
Aug-99
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financino Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
i
J
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is el~cted, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this p(oject from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
TOWN OF PICKERING
~\'I OF PIC
;)°Sli! +%
- " Z
>- Q
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
I
I
I
\
this form deals with how work is
'Organized to support your Department's
1trategic approach to this year's Capital
¡emands, Each request is analysed to
reflect the value to the Town and its
jinancial Review of this Request.
j
¡
¡
"BUSINESS CASE"
The Criteria!
Department: PUBLIC WORKS
Division: Account #:
MUNICIPAL WORKS 2320-6181
Project: Project #:
PICKERING/UXBRIDGE TOWNLINE RESURFACING
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location:
See Attached Map
Expected Starting Date: I Expected Completion Date:
Aug-99 Sep-99
l'1roiect Description:
!
I
I. Material required:
I
I Location of Project:
I
¡
Pickering/Uxbridge Townline from Markham Townline easterly to Concession #3 of Uxbridge.
Detailed information as to project description:
Resurfacing Pickering /Uxbridge Townline from Markham Townline easterly to Concession #3 of Uxbridge, including
f gravel, surface treatment and slurry .seal.
Project Justification:
I The existing pavement is nearing its life expectancy and has
deteriorated to a point where it is very difficult to maintain. A section of this road is gravel surface.
The Township of Uxbridge has recently resurfaced their portion of the Townline and by resurfacing our
I portion it will be a completed resurfaced road from Brock Road to the Pickering/Markham Townline.
¡
$
86H
Page 2
1998 New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Road Resurfacing 160,000 160,000
- Buildings
Engineering/Design
Administration/Overhead
Vehicles
Other
Total 160,000 160,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
Other - Debt 160,000 160,000
Total 160,000 160,000
Growth Related
'let Expenditure to be Financed by/from: "
!
Page 3
¡
1.-. . A I
r-mancmQ pprova
j
Financing for this project has previously been approved by Council and IS available in Capital Account No:
I
FaPita, PrOQram
I
¡
,I
pperatinQ Costs
, Costs to be Included In Operating Budget
, for:
j
ip . S .
. peratinq avlnQS
I Cost Reduction/Increased Revenue
¡ due to:
¡
I Net
I
¡
'~aYbaCk Period:
Four Year Forecast
1999
$
160,000
2000
$
2001
$
2002
$
2003
$
Beyond
Months/Y ears
I
¡ Month: Quarter: Beyond
,cash Flow January April July October 1 st 3rd 1999
19roiection February May August Nov. 140,000
~/(Out) Flow March June Sept. Dec. 2nd 4th
I 140,000 20,000 20,000
I
þoStlBenefit Analysis
'The provision of adeq uate maintenance is difficult due to the surface conditions.
I
ILle 01 Asset .'
Provision for The newly resurfaced road will have a life expectancy of 5 to 10 years.
Future Repair/Replacement
I
~pprovalS
I '
pepartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Resurfacing of Pickering/Uxbridge Townline.
Public Works
ORGINATING DEPARTMENT
Aug-99
ESTIMATED STARTING DATE
Sep-99
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$160,000
.'
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
i
.i
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
"
I
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992, The
Treasurer has determined that the limit has not been exceeded, Therefore. Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
I
.1
¡
¡ "BUSINESS CASE"
I The Criteria!
this form deals with how work is
organiZed to support your Department's
,...,r. trategic approach to this year's caPit.al
emands. Each request is analysed to
reflect the value to the Town and its
C¡inancial Review of this Request.
¡
!
TOWN OF PICKERING
,¡.II'I OF I>/e
.,ow",
;; œ;ð
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: PUBLIC WORKS
Division: Account #:
MUNICIPAL WORKS 2320-6181
Project: Project #:
CONCESSION ROAD 5 RECONSTRUCTION
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location:
See attached map
Expected Starting Date: I Expected Completion Date: .
Jul-99 Aug-99
rOject Description:
Material required:
Location of Project:
Concession Road 5 from Greenburn Place to Salem Road
Detailed information as to project description:
. Reconstruction of Concession Road 5 from Greenburn Place to Salem Road, including new granular base,
asphalt pavement & ditching, .
¡
Project Justification: .
¡The existing gravel road has deteriorated to a point where it is very difficult to maintain.
Drainage is poor.
This section of road when completed, will tie into the portion of road east of Salem
I Road which will be completed by Development.
$
861
Page 2
1998 Newt 1999 '
Budget Expenditure Replacement Upgrade Quantity. Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings
Improvements - Parks
- Road Reconstruction 160,000 160,000
- Buildings
Engineering/Design
Ad m i n istratio n/ Overhead
Vehicles
Other
Total 160,000 160,000
..
1998
Budget Financing NtR $ $ NtA $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
Other - Debt 160,000 160,000
Total 160,000 160,000
3rowth Related
-Jet Expenditure to be Financed by/from: .'
.' !
j
¡
¡
¡
Page 3
¡
FinanCinQ Approval
!=inancing for this project has previously been approved by Council and is available in Capital Account No:
I Four Year Forecast
paPital ProQram 1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
160,000
I
RPeratin~ Costs
I Costs to be included in Operating Budget
for:
6 . 5 .
peratln~ avlnQS
I Cost Reduction/Increased Revenue
I due to:
¡
I Net
¡
paYbaCk Period: Months/Y ears
¡
¡
\
I Month: Quarter: Beyond
ICash Flow January April July October 1 st 3rd 1999
'-Proiection February May August Nov. 160,000
r/(Out) Flow March June Sept. Dec. 2nd 4th
I 160,000
~OStiBenefit Analysis
IThe provision of adequate maintenance is difficult due to surface conditions. The structural adequacy of the
þase is substandard. Poor drainage is creating maintenance difficulties.
1
ILife of Asset .'
rOViSiOn for The newly constructed road will have a 15 to 20 year life expectancy.
-uture Repair/Replacement
I
~pprovals
I
pepartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Reconstruction of Concession Road 5 from Greenburn Place to Salem Road
Public Works
ORGINA TING DEPARTMENT
Jul-99
ESTIMATED STARTING DATE
Aug-99
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
'¡
í
I
¡
i
I certify that the financing sources proposed for this project are valid and accurate,
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
i
¡
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
,"
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992, The
Treasurer has determined that the limit has not been exceeded, Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board,
TREASURER'S APPROVAL
DA TE APPROVED
!
I
fhiS form deals with how work is
'organized to support your Department's
!Strategic approach to this year's Capital
)Iemands. Each request is analysed to
I eflect the value to the Town and its
~inancial Review of this Request.
¡
j
"BUSINESS CASE"
The Criteria!
TOWN OF PICKERING
~\'I OF "Ie
:; o!l+~
J: '" ž
;- ø
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: PUBLIC WORKS
Division: Account #:
MUNICIPAL WORKS 2320-6181
Project: Project #:
ROUGEMOUNT DRIVE RESURFACING
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location:
See Attached Map
Expected Starting Date: I Expected Completion Date:
Aug-99 Sep-99
'Project Description:
I
I' Material required:
I
I Location of Project:
II
I
¡
¡Project Justification:
II
I
I
'i..
Rougemount Drive from Toynevale Road to Oakwood Drive
Detailed information as to project description:
Resurfacing of Rougemount Drive from Toynevale Road to Oakwood Drive, including 50mm of Asphalt Pavement.
$
The existing pavement is nearing it's life expectancy and has deteriorated to a point where it is very
difficult to maintain.
86J
Page 2
1998 . . New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Road Resurfacing 115,000 115,000
- Buildings
Engineering/Design
Administratio n/Overh ead
Vehicles
Other
Total 115,000 115,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
Other - Debt 115,000 115,000
Total 115,000 115,000
3rowth Related
>.Jet Expenditure to be Financed by/from: "
Page 3
I
I
¡
(inanCinQ Approval
¡:inancing for this project has previously been approved by Council and is available in Capital Account No:
,
,
I Four Year Forecast
Capital ProQram 1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
I 115,000
II
~perating Costs
,Costs to be included in Operating Budget
for:
~peratin,g Savings
Cost Reduction/Increased Revenue
¡due to:
I
Net
!
Payback Period: Months/Y ears
í
I
J
dash Flow Month: Quarter: Beyond
January April July October 1 st 3rd 1999
~roiection February May August Nov. 115,000
t/(out) Flow March June Sept. Dec. 2nd 4th
115,000
lost/Benefit Analysis
I he provision of adequate maintenance is difficult due to the surface conditions.
,
Jife of Asset .'
Provision for' The newly resurfaced road will have a life expectancy of 15 to 20 years,
I utu reRepair/Replacement
~pprovals
¡epartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Resurfacing of Rougemount Drive from Toynevale Road to Oakwood Drive
Public Works
ORGINATING DEPARTMENT
Aug-99
ESTIMATED STARTING DATE
Sep-99
ESTIMA TED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$115,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinq Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
.'
I
¡
j
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DA TE APPROVED
TOWN OF PICKERING
,¡.I'" OF "Ie
,;;°51+%
:r z
;- "
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
,
i
I
I
I
this form deals with how work is
OrganiZed to support your Department's
rortrategiC approach to this year's Capital
emands. Each request is analysed to
refiect the value to the Town and its
jinancial Review of this Request.
i
I
"BUSINESS CASE"
The Criteria!
Department: PUBLIC WORKS
Division: Account #:
MUNICIPAL WORKS 2320-6181
Project: Project #:
BALATON AVENUE RECONSTRUCTION
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location:
See Attached Map
Expected Starting Date: I Expected Completion Date:
Jul-99 Aug-99
Ijroiect Description:
I
Material required:
Location of Project:
Balaton Avenue from Colmar Avenue to South Limit.
Detailed information as to project description:
Reconstruction of Balaton Avenue from Colmar to South Limit, including storm sewer improvements (repairs), new
granular base, concrete curbs and asphalt pavement.
I
Project Justification:
I
$
The existing pavement which is 30 years old has exceeded it's life expectancy and has deteriorated
to a point where it is very difficult to maintain. It is one of the few streets in Bay Ridges
area that has not been redone. as part of a major project of upgrading the streets in this area.
86K
Page 2
1998 .' New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Road Reconstruction 70,000 70,000
- Buildings
EngineeringlOesign
Administration/Overhead
Vehicles
Other
Total 70,000 70,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund
Development Charges
Other - Debt 70,000 70,000
Total 70,000 70,000
3rowth Related
~et Expenditure to be Financed by/from: ;.
J
J
Page 3
I
FinanCinQ Approval
financing for this project has previously been approved by Council and is available in Capital Account No:
I; Four Year Forecast
faPita, ProQram 1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
70,000 10, 000
I
I
I
I
~peratinQ Costs
Costs to be Included in Operating Budget
for:
lperatinQ SavinQs
Cost Reduction/Increased Revenue
rue to:
Net
¡
Payback Period: Months/Y ears
¡
I
Month: Quarter: Beyond
Cash Flow January April July October 1 st 3rd 1999
-roiection February May. August Nov. 60,000
¡/(Out) Flow March June' Sept. Dec. 2nd 4th
60,000 10,000 10, 000 10, 000
lost/Benefit Analysis
The provision of adequate maintenance is difficult due to the surface conditions. The structural adequacy
~f the base is substandard.
I
Life of Asset .'
lrovision for The newly constructed road wilt have a 20 to 25 year life expectancy.
uture Repair/Replacement
pprovals
epartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
Reconstruction of Balaton Avenue from Colmar Avenue to south limit.
Public Works
ORGINATING DEPARTMENT
Jul-99
ESTIMATED STARTING DATE
Aug-99
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
$70,000
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate,
A summary of the financing for this project follows:
-
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Financinq Sources
Notes:
DEBENTURE FINANCING
TREASURER'S APPROVAL
DA TE APPROVED
i
J
I
I
I
UPDATED ANNUAL LIMIT
.'
Since approval of this provisional debenturing may require tong term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TOWN OF PICKERING
1999
Ç~E,ITAL ßlJPG~J -----~--~----,--
2321 TRANSPORTATION. EXTERNAL SUBDIVISION WORKS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
325,000
$325,000
FINANCING
1998
2823 General Fund
$0
I.
J
2823 General Fund - Reserve
4225 Reserve Fund - Comm. Facilities
97,500
4227 Reserve Fund - Develop. Charges (4.1)
227,500
Debt
$325,000
87
0
1999
BUDGET
$0
0
0
0
281,175
$281,175
0
0
0
1999
$0
0
84,353
196,822
0
$281,175
0
6157 Vehicles
6173 Furniture & Fixtures
6176 Office Machines & Eauioment
6178
6181
Page 1
1999 CAPITAL BUDGET
2321 TRANSPORTATION. EXTERNAL SUBDIVISION WORKS
BACKGROUND INFORMATION
$0
$0
$0
Miscellaneous Eauioment
$0
Other Fixed Assets
$281,175
Listed bv Priority
+
$75,000
OC.'CF
Valley Farm Rea'"
from Pickering Parkway to Diefenbaker Court.
Sidew31k1iobllev3rd.' Tree Planting
T ã C3rn:)itelli A:i.'Q4
Deferred to Year 2000. As per Council Budget Meeting April 6, 1999
2
Finch Avenue and Whites Road
adjacent to Draft Plan 18T .97006 (18T -89094)
sidewalk, street lighting.
Finch Avenue - 410m @ $178.00/m
Whites Road - 350m @ $178.00/m
72,980
62,300
DC/CF
DC/CF
3
Altona Road
adjacent to Draft Plan 18T -89117 (A) and
18T-88100 (40M-1689) (B)
Sidewalk and Street lighting
(A) Altona Road - 120m @ $178.00/m
(B) Altona Road - 90m @ $178.00/m
21,360
16,020
DC/CF
DC/CF
5
50,800
DC/CF
Kingston Road Street Lights
and Sidewalks
W2
(Now 52/94)
from Altona Road east to limit of development
88
As submitted to Council May 10,1999
¡
1999 CAPITAL BUDGET
2321 TRANSPORTATION - EXTERNAL SUBDIVISION WORKS
BACKGROUND INFORMATION
6
Altona Road Street Lights
and Sidewalks
from Kingston Road north to limit of development
North East quadrant Kingston Road
sidewalk and street lighting
7
Financina Summary
Community Facilities
Develop. Charges - Roads
30%
70%
Total
89
31,700
26,015
DC/CF
DC/CF
$84,353
196,822
$281,175
Page 2
As submitted to Council May 10, 1999
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
2321 - EXTERt"JAL SUBOrvISION WORKS
Valley Farm Road
.. / / /'
// //./
/~/<:'::: /,/
,/¿:~/~
" /'
/
,/
~ '-. //
,
-/
-
- ---
'-~~=~:;/'~\".."", --~~ l
".;/ ""-,"-------~ '. -:~:-:>,=.:.,,::'"
/" ' " :" \--:"--' ~ ---
-/-:.' '\ ~ -- - ~ ~.-
/-;-:~ \~i~~~:'-
':"'~/::::"
, -
- ----
~
'/
,,~"'- -~"':: /~
=,,- '~
-
...
,..
~
~
SUBJECT
AREA '7,,;..= ,', :' ;.. - -----------" ----
/~-----~/
/// ,1-::- ~
//- - ::'-"~~~7
----~/--;:. ;.. --
~~ ',~
---
~- -
" ,
~,~
, -_/~:--
- - , - ' ------
":',-:..c::-- - -----
LOCATION ìvlAP
PROPOSED BUDGET AMOUNT:
External Subdivision Works (Account #2321)
575,000
LOCA TION:
Valley Farm Road - from Pickering Parkway to Diefenbaker Court.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk
. Vall~y Fann Road - from Pickering Parkway, north to Diefenbaker Court.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
\1
flTENOr::RSIBUDGETJ'\199912321_01 DOC
90
PUBLIC \VORKS DEPARTMENT - 1999 BUDGET PROPOSAL
2321 - EXTERNAL SUBDIVISION WORKS
Finch Avenue/Whites Road
,~
-;::..~'
/
"'"
-
----
</,
.
!-
- ,/ ',' .---
~==-,,=----,=- ,-,:,-,~,/.~
--'-." '- , .'
" :::::_:;-~<~~.."
~', ,,~,::/~~
":;;.?:;~ ............/'~<'.' '-./ '/ -
...--",,::---""~ . ..: ',..-'
// ,......-- ..~- ::: :: :: " '" ::: ..--- ,:::::
" ' /"""--/""""""" '" ----
.. ...--/
........
~
~ .-.. " ':::::
-~--
- ------,~-:--
SUBJECT
AREAS
~.
- ~
-,~.
- '
------ ",'
~> :: :::.;-~-
-'.:...'.:~
~
=-,--
-
~
,.-----.
-
'.....¿- :::
J
-/
, .
z -- ~
,,? S S '.,::
~L:;"'::::::
. '
~ -::-----
- ~.
-.
: '/
._;:- :.
- ",:; - ",
'. -
....~-..........,
..< , ~
, A --,----
-----., COo'::'.",
-....... ~,"<~
'~ .-
.:: -, '" ..:;::: :: ::...: ". ~
'-"""',::::;;- '
-"<.., '
~~, ::;>-
::;=¡"':::::,"", :::-- ~~~ . ~'J
-- '-'
'!
. .../""
\ ....-
/ ;'
..:::--
"
::::: -:;- .::
,..-
z
"'-""~
"
.
-
, ~
~
-
.
-
-'~~ ':::;"';:'=5":'
-
5
-
-
.
-
,::'.' ""
,y'
LOCATION MAP
PROPOSED BUDGET AMOUNT:
External Subdivision Works (Account #2321)
$72,980
$62,300
LOCA nON:
Finch Avenue - from Whites Road northerly for 41 Om.
\Vhites Road - from Finch Avenue easterly for 350m.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk & Street Lighting
. Finch Avenue - from Whites Road northerly for 41 Om.
. Whites Road - from Finch Avenue easterly for 350m.
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
1\ TiENDéRS\BUDGéi.",", 199912321. 02,DOC
9~
PUBLIC WORKS DEPARTMENT - 1999 BUDGIiT PROPOSAL
2321 - EXTERL'\IAL SUBOrvISION WORKS
AItona Road
- ';"',
- ---
~ -~-
- ',-
- ---,--
----'-~-<
- - -
-'-'. =:::'" ~:::
>
'-
" ,--------
-
"
- ::: ,', ::: - - :: - !:..- -
_./ ,""
-:
'";"~: -.:.:;; :'3:" = :~
- - :. ::0 ------- ,-'
------- - - /
- SUBJECT
i . AREAS
'.
~':'; ~
-
"-
..----'/ '
-- =-=--::;:-
-- - ,-
-
18T-89117
.~ .
1/ .
.r
" ,
'. "
'--/- -
""
-
..
-
,',
-
S-:'/:::::;e ,
01
-
-<--
- :::::-=-'"',:::'
-" - ,
/ ~'
-:::',:0::;; ::::;: 'I:::
-
---<
- '7
L-
'~; ::;::::- -" ,A ,-
'..,I
-
,
/
/
~,
~~
L.:::: -
-::"~-';S::'"
~
j
--- ~
-
<,
"
',,-
:=
s-=<=:::=:::-
=
-=:
~
¿'
~,
=_:::,.<
- - - '
'j
-,C
\v(
~,' ,~,
-
'. '-':-:::,
\ ' .J,
..
, -/'
LOCATION rvIAP
PROPOSED BUDGET AMOUNT:
External Subdivision Works (Account #2321)
$21,360
$16,020
LOCATION:
Altona Road - fronting Draft Plan 18T-89117 for 120m.
Altona Road - fronting Draft Plan 18T-88100 for 90m.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk and Street Lighting
. Altona Road - fronting Draft Plan 18T-89117.
. Altona Road - fronting Draft Plan 18T-88100.
Complete Landscape Restoration (grading and sodding \vhere required)
. to all areas affected.
/,\ TENDERSIBUDGETj>' 199912321. 03,DOC
92
PUBLIC WORKS DEPARTMENT - l.999 BUDGET PROPOSAL' .
2321 - EXTERNAL SlJBDIVISION WORKS
I(jngston Road / Altona Road
-:-
- - -
..
/~\
~ -j' C \
-
-
c..
~
~ \'~--F
- - --
, - --
--------' /'
---"",:,è..
-' -- ..
:::
.-,
-:;',
-
.
-
/
'~,-
,,~-,~.
'- /'
S -----~ ,/'/,
" ::: =: ~::; .-(::: :::.=; =: - -------- ~'/~--
':~ ~j=- §. .0,-'- :. . ~/ ..---., //~
). ~' ,:~~~r/ .
.' /> ~lJ3JEC,:r------------~,L=\ \' " ' ' ..-----/ . :-~
-./ ;.~BEAS . / '/
- //
~ / "
/ ~/'
, ./ '" .' --
" ;.- '-' . -
/. , ~,,~
/ ,"- ',"
,/-::,/"=:.,,,,-~
,//
=:c;o.:::
/ ~.
///
-
7
-
-
z - ~
- -,
- -
L.-, :::
-
'/
- - ~'.
~ ..:::...... "'-", .~>~"
~
-
- .~
~
~ - --
LOCATION MAP
PROPOSED BUDGET AMOUNT:
External Subdivision Works (Account #2321)
$50,800
$31,700
LOCATION:
Kingston Road / Altona Road - North east comer Site Plan S2/94.
Kingston Road / Altona Road - North west comer Site Plan S12/98.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk and Street Lighting
. Kingston Road / Altona Road - North east comer Site Plan S2/94.
. Kingston Road / Altona Road - North west comer Site Plan S 12/98.
Complete Landscape Restoration (grading and sodding \vhere required)
. to all areas affected.
,)
1\ rENCERS\SUDGET_PI 199912321_04 DOC
93
I
,
.r
I
I
I,
}
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
2321 - EXTERNAL SUBDIVISION WORKS
North East Quadrant (Kingston Road / Whites Road)
~ ~-
---- ,--,---,-----------~
--,'----~- '" ,--'-
lnt~.
-
---n---~---------,- ~----
~. -u ~-~u,--,----- .,--
n.,__,_n--------
-
- ---,-
_n__- --
--
-
,._-, .-. u ....,- _,__,n__- -----.
------- _.,---
-- --
-.'.---
,----------- -.-
....
.-..-. ~~~
~
m__.- .
~
----- -----
/-- ----
,--.-----. '
--
- - -- --.,---
S 5/93
~- "
.
..
~
-
'-'-~---
- .. S
SUBJECT
AREAS
..
-----'--:.-' ,-
~_.
-- ~~--
::::
u- -
,-
/--~
,~
-
I ~::
/---- ~--
-..
LOCA IrON MAP
PROPOSED BUDGET AMOUNT:
External Subdivision Works (Account #2321)
$26,015
LOCA nON:
Kingston Road - Fronting Site Plans S 5/93 and S 1/92.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk and Street Lighting
. Kingston Road - Fronting Site Plans S 5/93 and S 1/92 (north side).
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
f, \ TENDERSIBUDGET_PI 1999\2321- 06,DOC
9,}
/'-
'--,---
'----.- ,
--
TOWN OF PICKERING
1999
-- _ÇAPITA~__BVQGçT -,---- ..-------
23231RANSPORTATION SERVICES - SIDEWALKS
CLASSIFICATION
1998
BUDGET
6108 New Construction
$68,000
6157 Vehicles
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$68,000
FINANCING
1998
2823 General Fund
$68,000
I
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
Debt
$68,000
95
0
1999
BUDGET
$76,000
0
0
0
0
0
$76,000
0
0
0
0
a
1999
$76,000
0
0
0
0
$76,000
0
0
0
1999 CAPITAL BUDGET
2323 - SIDEWALKS
Page 1
BACKGROUND INFORMATION
6108
New Construction
(Listed by Priority)
1 Fairport Road
From Finch Avenue to Duncannon
Drive both sides, in conjunction with
road reconstruction.
$76,000
$JO,OOO Deleted T JQ
Deferred to Year 2000 Budget
Priority #1
2 William Street
From Central Street north of
David Street west side, in conjunction with
the road reconstruction.
15,000
3 Liverpool Road
From Ilona Park Road to Commerce
Street west side, in conjunction with
the road reconstruction.
4;000 Deleted T JQ
Deferred to Year 2000 Budget
Priority #2
4 Granite CourtiRosebank Road
From Rosebank Road to Whites Road
( asphalt) and Rosebank Road from
Toynvale Road to Granite Court ( asphalt)
25,000
5(a) Bayly Street
Fronting Go Train Station ( asphalt)
10,000
5(b) Bayly Street
From Sandy Beach Road to Alliance Road,
south side (asphalt)
Added per Council Budget Meeting April 6, 1999
6 Finch Avenue
Darwin Drive to Fairport Road
Added back per Council Budget
Committee Meeting of April 6, 1999
7 Highway #7 Green River
On bridge structure to be rehabilitated by MTC ~ Reduced TJQ
8;QQO Sidewalk on one side of the bridge
Project deferred to Year 2000 by MTO - Priority #3
10,000
~
16,000
Deleted T JQ
8 Finch Avenue
South side between Rosefield and Liverpool
Road ~
Deleted as per Council Budget Meeting of April 28, 1999
Sub total 76,000
96
As submitted to Council May 10,1999
1999 CAPITAL BUDGET. .
2323 - SIDEWALKS
BACKGROUND INFORMATION
6157
6173
6176
6178
6181
9 Sheppard Avenue
Rosebank Road to Altona Road
south side in conjunction with the
road reconstruction.
$45,000
Vehicles
Furniture & Fixtures
Office Machines & Eauioment
Miscellaneous Eauioment
Other Fixed Assets
97
$0
$0
$0
$0
$0
Page 2
As submitted to Council May 10,1999
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2323 - srDEW ALKS
William Street
----------- _..:. " ë: - - -
I/"/~~
/ .
-
-
~
-
-
'-
-/
-
-/
SUBJECT -;;, -,6. _u- --
AREA -~;O:.-- ::> ,
" = ::;..:.\/':; ë:- _-_-I
,): -- Z :::~'-
- >-- - -
~- z ::;..~ ~
x :;, z' ~ - ~' -
~ -L=--;' ~ .
,6. - ------
-=---=-=---' "~--/
~
- =-', :; I
-
--- ---
>
~ =:0:',-=":'-
---
--
-
-/
-
"
"-
v -
;:; -
" ,.;--
þ
-
:. ë:_,-"G-=~
~
/
-
z
~ ---
CF ~
.- -;:; Z
-/ ~
~ J~
v
Z
--- -
, '
~
-'-'
s
..
"
LOCATION N1AP
PROPOSED BUDGET ACCOUNT:
Sidewalks (Account #2323)
$15,000
LOCA TrON:
William Street - from Central Street, to 45m north of David Street.
PROPOSED CONSTRUCTION INCLUDES:
r
!
}
Sidewalk Installation (concrete)
. William Street - from Central Street, to 45m north of David Street (west side).
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
/
1\ TENOêRSISUDGt:T_PI 1999\2323- 02,DOC
93
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2323 - SIDEWALK
Granite Court / Rosebank Road
-
C //~. // ./'.~
/ ---./ /--
, -//' !Þ ~',-, ,~
/ ,~- . ,///
-- ,/ - /'
- /' --------/ ~
------------,.//~ r:, / >-- ~ --
J"/ '\,' \~. /--~..--/
/
./,/"
,(/
~
--. I
~
,"
"
,- -
"'/¡
Ç//
-
"
-//'
- _.
~
-- - .
-,~v'"è._::
~
'/
v', ~/¡ .\ s,-<:"
"-I SUBJECT \ \.:::/./ c;.,.
// AREAS'~ '::<~;;2:-;,
--/-7« ~, ~~' /~'
// '" '~ \
, ----- .-; ~ ' ---../
(:----
,/
- ' .. - ,
,'---- ,
" ,~-------
-:: :; - .-'\ =
.:.3 ',:::::::::
/~
.' -
'~:::::,,=-
~>~~ ---+-
'-' -
þo
'"
- _':"'-:-~"-
~.
s-'
~:::_,,- -
~-'
-
~ ~ '!:
,.: Z
- ::: .,. . :;.
- - -
-" ~ /:: /~~~~ -== \~
_/ ::. '-./ - ~,'
. \.,
~.
..... . ---...
.\ "
------
::::,"_':"':
.¡
;:
......
-~
- -
- ,
, ,
-'
---
LaC A TrON MAP
PROPOSED BUDGET ACCOUNT:
Sidewalk (Account #2323)
$25,OÒO
LOCA TrON:
Granite Court - from Rosebank Road, east to Whites Road (south side).
Rosebank Road - from Granite Court, south to Toynevale Road (east side).
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk Installation (asphalt)
. Granite Court - from Rosebank Road, east to Whites Road (south side).
. Rosebank Road - from Granite Court, south to Toynevale Road (east side).
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
,J
1\ TENCa:¡S\BUDGCT_PI 1999\2323- 03.DOC
9'9
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2323 - SIDEWALKS
Bayly Street
. , -
~~,r\\ ~-~.'. ~.
;./ ,;-.>~~/ ~ ~.;.-
~(" - ~ .- ::",- ~
. /~' . ~ :...". ',- -
------'-~- . -:.,>:",-, :::
. .~~. ;_~5~~:;T ~. ~
~ ., - / ;:
------------ ' ~ I' =.2 v ,/ .-
/-~
- :: ,~ =::=:;:¡.::: AV'::'<_'::
I ;:; '---
Å I ':::;: SA"-'C:;:C "
- - -,,-:;¡t. -"",'-J¿ ~
::::;:'/':: -' .~
------ ~ .:.
L C ':=
-
, :..'-=
::;::'" - '
.;. -- ":",:::::
--- ---
- - - -
,-
"
-
"
-/
:.":'" ::-:.. :;¡ ':: ='
~-
,....'
/
" ::::;¡':',:"
~
", <,. ,
'," -.
-,
'-
.-,
- -=-:_sc_>~ -C"C~- ;~~' ",-
-/-",:::.. '/
-
-
-/
-
------
'"
"
LOCATION MAP
PROPOSED BUDGET ACCOUNT:
Sidewalks (Account #2323)
$10,000
LOCATION:
Bayly Street - fronting the GO Station, for 100m.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk Installation (temporary asphalt)
. Bayly Street - fronting the GO Station, for 100m (north side).
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
.J
1.1 TENCEERSIBUDGEET -PI 1999\2323.04, DOC
llJ u
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2323 - SIDEWALKS
Bayly Street
--
,.------.. --~'-~ '//'~
-- -_.~~~- 4-:,.':'\ ..........--'---=-- .,,----.
~----/ .. , i ( . .- _..-/-~~~-'~/~~'L ~
If ,\\1"'1 /-""~-,-,.,"/'~- 'IÎ"
..-/
l / /----:,'~~,ì
.-/,./. (, r,~~I'C~
..--"
"
"
()
it
¡
i____... _~"J('i~
(----- -..--- .
I
I
I
I
\,
\ EJ/\YI_.Y
'--- -- . --- ----'
.1)
(,
I
I
il.Fj
.-----, ..." "
1- .,
I I ..8'1' ,e!
,¡I!!!!!I '! ,
- ._~L .~
--- '--------1\ (--1(-------~~~~~1 '~~ ÀI ~)/in-----11--" ---..
\\ \\ \ \('---)\1 I(~"-.. /~Ii!', I I
\, ,\:--',1\ III'II'SUBJECT-,ii,y I I
!).!',!~U j --, \, '\x~\ \ \ /J L_J I' AREAS 1 ill ¡
~--.._-..._-- \ \')' ': \ \.- '--- I (", () !
.r\ \f\ \ \.'[)f?Ad\ll;:: "j! I cr: I
IOf~,' ",'c.) "'.'. t.'!.'?, \J \., . \ 5T I. ':!, 0 I
~=':'~'II--=- ~--í, \\9.\9.~\\'~ II~ )- I
'- - \. - i -\--\\ -,;\\~\ \I'¿I 1 I m I I
II -\\ \\\~ 11(\
,~I \ \. I, I, \1~L("(\:.r I /:
! \, \ \ \\ '\. I!;)
LOCATION MAP
PROPOSED BUDGET ACCOUNT:
Sidewalks (Account #2323)
$ I 0,000
LOCATION:
i ':.' 1.';1 f/I[f'.,
; !
- -----,---
,
,
I
III
___n_" --\
I
( \ I
(I) I
rr-I
S ï f< r:.:: ET j
,- "1:¿2¡--n_--_-
---1.__J--,"", '
I i
\ ...
\ "
, ¡
)
//-
( ------')
, ( :( I
j UI
II) I ()
() I 'r- I
iY I [f I I
Bayly Street - on the south side, from the Sandy Beach Plaza east to the Legion.
PROPOSED CONSTRUCTION INCLUDES:
.'
Sidewalk Installation (concrete)
. Bayly Street - on the south side, fronting Sandy Beach Plaza to Sandy Beach
Road.
Temporary Sidewalk Installation (asphalt)
. Bayly Street - on the south side, from Sandy Beach Road, east to the Legion.
I:\TENDERS\BUDGET_P\ 1999\2323- 10 DOC
101
PuBLIC \VORKS DEPARTìvlENT - 1999 BUDGET PROPOSAL
Account #2323 - SIDEWALKS
Finch Avenue
---
~~..,.. -- ~ '"
=~ ~
"'õ:"::;" , ,SUBJECT
, ::-----=- ' AREA
~ ::"'?:::-- \
~',
~, :;:~~ ~~ "'"
- '(,,"~~ ,,-
. -- - -" =---=-
',,- " /'/-....::. =: - ---- -'
"'---. ::" " :: ,'~,
- - -', '-, /,
, ~ -..:: ----
: ~~~~~ f:--:-
--., ---
" - .',
----
/~
/'./"-.
///
-
----
--.
-
'., ~
., --, '.,,= ;:. ,-
..-'--- ,
~----------
,.-<:;~=;":'::: '::~ '~, - "
~
':::. '- ',,-
... '. ~ --"":", - ----..'--....
... I-V ~ :----.. ""'..' -- , --
-':'='- '-J ::::::"/:: :;::' ' '... ~
-';;'/~"-. , -. ------~
/. " .-:::.:: :: ~ --
, ----- -....:..: ::'.
- -- ---..., -.....:..-
~ - -- "'.-. ----------',
- ~ ;::: ~ ~::::? -"-
~ i ~ -:::~->--
---::: .::- :.: ~ -
- - - ' --- ..::.'
,"",
----
.---:.:
::-"- :::
-
-
, ..
-
.
-
~,
-""
LOCATION MAP
PROPOSED BUDGET ACCOUNT:
Sidewalks (Account #2323)
$16,000
LOCATION:
Finch Avenue - from Darwin Drive, east to Fairport Road.
¡
j'
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk Installation (temporary asphalt)
. Finch Avenue - from Darwin Drive, east to Fairport Road (north side).
Complete Landscape Restoration (grading and sodding \vhere required)
. to all areas affected.
/;\ TENCêRSIBUCGëT'_PI 1999\2323- OS,DOC
102
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2323 - SIDEWALK
Sheppard Avenue
-
-
-
~,
~
,/
=-:,:,:=:
'- -- - /'
-: ~ -- --- - ------'"
:: ~--",
-::"::.::::= ""'< "
;. - :;
"/ ~~;=:,' 7 S , -
",----.::. - --
0>
~
-
r-
- --
- -
-
- -- - -
~ ~~,::..,
'--
-
- ----.- '
"
-, :=,,-
,
- '
"'---',", ::"
-
-
"-~J :::
, -
- , ,- .,
-- ..- - - ,
~'./ ","'-:'-"'-
-- - - ::"'"'
"'" - :.- v 5
- ---,--
'::;-::.----:~
SUBJECT
AREA
'~
, =- , =-
-, - ,--
.">
"
-
".
, ,-.
.. -~
, ---.. è" +-
'.,
- ,
-
-
-
::..., '-, =:
-
-
-
'-..,
'\, "
-~, '
(è
C
'~-
5_'.::::::,'
=::_:::;~',o:::~,--
-\
" '--
þo
.
-
....
'-.....,
,
z.
-
---, --
". .. - '"
-:
- --~ ,-
-
-
- --
-- ---
- - - '-
j
?,
LOCA IrON MAP
PROPOSED BUDGET ACCOUNT:
Sidewalk (Account #2323)
$45,000
LOCATION:
Sheppard A venue - from Rosebank Road, west to Altona Road.
PROPOSED CONSTRUCTION INCLUDES:
Sidewalk Installation.( concrete)
. Sheppard Avenue - from Rosebank Road, west to Altona Road (south side).
Complete Landscape Restoration (grading and sodding where required)
. to all areas affected.
I I TENOE."!S\BUOGêTJ'\ 1999\2323_06 DOC
103
TOWN OF PICKERING
1999
CAPITAL BUDGET
___-__nn~n- -, --- u_--
2325 TRANSPORTATION SERVICES - STREET LIGHTS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
249,500
$249,500
FINANCING
1998
2823 General Fund
$249,500
2823 General Fund - Reserve
t
Reserve Fund
Reserve Fund
Debt (Greater than 5 Years)
0
$249,500
104
0
1999
BUDGET
$0
0
0
0
571,300
$571,300
0
0
0
1999
$0
0
0
0
571,300
$571,300
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2325 - STREETLIGHTS
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & Eauioment
Miscellaneous Eauioment
Other Fixed Assets
Street Liaht Reolacement - Town Initiated Projects
1
Glendale Area
2
Squires Beach Road
from Bayly Street to north of Clements Road
As per Pickering Hydro Program
3
$80,000 D
18,100 D
Kingston Road ~ D
from Valley Farm to Brock Road 41,200
As cer Pickerina Hydro Program
Reduced by S35,OOO As per Council Budget Meeting April 6, 1999
4
Kingston Road
from Brock Road to Notion Road
As per Pickering Hydro Program
Sub Total
105
53,600 D
192,900
Page 1
$0
$0
$0
so
$571,300
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
Page 2
2325 - STREETLIGHTS
BACKGROUND INFORMATION
Street Liaht ReDlacement -Pickerina Hvdro Underaroundina Projects
Kingston Road
from Liverpool Road to Valley Farm Road 270,000 D
( deferred to 1999, from 1998 budget)
2 Radom Street
from Liverpool Road to Douglas Avenue 30,800 D
3 Franklin Street 9,000 D
from Central Street to Joseph Street
4 Twyn Rivers Drive 18,600 D
from Woodview Avenue to Rouge Valley
5 Brock Road Overpass 11,900 D
from Old Taunton Road to CN Crossing
6 Valley Farm Road 38,100 D
from Kingston Road to Finch Avenue
. Pickering Hydro is replacing overhead hydro with
underground hydro, which requires a stand alone
street light.
Sub Total 378.400
106
As submitted to Council May 10,1999
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Glendale Area
=-¡.~"':" .-:: ....
==-, :; -----
- 3~"",...-'- --
---
-
;~='.:"_:
~ .-. ~- ~"';~"T ~"::W~~;~¿/ 'C' - ,¿,:;?'
-', ' ,.,:/"u<:,/;, "",/"w"~,,,'Z;(;~~/,X/'/é ---
;;;'/(" ;' ',/ -, ';' /:-/;~V/.~v/~;:/.>x/~/"/'/'; = -
'\ ','///,,'/,..:..::z::-,'" --0-;-;///,/..4/" //"/X/", ,-
", : '///h:'~/ ",.'/Í<--"',"'~-' 7f,:/:/ /;'"'///,/FZ//;¿"~~",/;/./'" ~-
-', /, >:;;<'i/"Ý.///-://'_._:;~/~/7-//</;~~/~ -/-/:~: ::: :-
-,//' , ;:,'/,//~//,-/, /,',",.,'::',//¡;,""'",-, <:.V.,%' ~/;/.,V-~:/-4</ Y;,/,/4;"/~,'.x/'//' ._,=' .,
'--// \ :/.;;/~ ,/>'///<.:.-r:-,~.:; Ø~//"/fi////X--/' - ~ :: - ':
' , /~,-'.?'./ //.!/////' <%' ,~//x/Æ ////--'-V ' '-
-- /// ~ "':¿////,/,z,;J // / /,~ ' " --=-
, '/;,-/~,W;::;-'-,'///"",:/o'/:/,~M /; /,~////// ',/ .=~5 ',,' ';.--
'- \ :/../;:<;2?'//,;:.,}'t//,,< ,," ~;../,'l.</;~~ ~ /1
"', \"-";~/Y'-"'" ' "'" ,'/,/,/','/.':;:;:,/',,' ,':'/,' ;7'.;if'~""" Y./~/~-;/~ /,' //',,/ ~"-',,-/ <
.. //,y,~.;;7;,/"J7;T",x//, X///////«///~/::::-' /'i/x/Y,' '- I,
- ,- 5::~ ,/~/,x'/////" -"/,'x,",/'" "'u'//t.f.n- ///..(. ~'i" ~//, '/,/,2'-',; - ,/,' I~ '-
4--===-~ ~:/..z'/,~:;/;:;&><,,; :;;/~/, //~/;::;;':;"7 = I/:f
= /,"///,'//'/ "j;/x~:////,-x/ ;/.6,////x,/",: /'-~-
" "",',//,/J x/,'/ ,1/"/ ..;',
- ,'*,,',' "~""""",/"-/",,,,;;/,,,,<-::,;r:,'/,/,'~'//;~~,//7"//'/,//, -,",/V ..
- /""//<£/"" / """'///-;Y"i/'~'/x/ x"///,I"'-'-- "'("."
- /""?-XX"" "F',,'/,' ',"'//Y/I///.// ...//ž////:;~ , ,//" -
þ ~_-.:=: -:-;:%~ø:<,;;::~;:;< ( :~~:;//;;;.. /~;?/~;;>///;'7 -== -
. , ~ //J///:"/",/",,:,,/., ",.j/'/~I /x//,~'-'"'/,, ," '/ -- -- -~- ,.r,
-'_u - " ".,,- -.;,////:¡.~'i'//.z/ "n°,-- -~~,,~o- /'<
= " ~ ~ r--~o, ~;;~~,'/,'~<"'"i/,;;~/:'>'/fft(4,::,x~~ý;~~%,.~<;;¿/',:~:~,~",/,~. - ' -'
-?= ~ ~ - -: /_'/i/.>~"///x'i7 :-;.<,/yØ;j'-/.////,~
: ~ ..:;; - ~ '~"'//~:"""/" ", :,/<:/// /y///,/ //,//;/:/;// 0>:
:~, " -: ~ ;:i/;</,X' '~:ž;;~./-,,/:::,,~,:';~~;"/ ;:)~;~;) - ~>
----- '/~"""'/~/W/'~////Y /.:% //'//< \
'-//,/,/x/""/.""""",,, /x',/-/'/'ly~Y / ~~~~/%/ )/ \. , ...-
,'-, >/X////'I.;'///,/; .;>/;, ////7/, ,///.;.// ,/~,- \" ,/
---, , -, .x,' //~, , ' / /; ," ,x,/ // ~,' /// /. //, x \ ""/ ,
--- 0'/""-"" I"~ /
- '-: ::,//,[~':-,"",',',,//,X~ x//ø,//~~~~ /, /;/,// , ,,/ /
-, '- ,//y////" ""/~""['-;-%/V/:%/;r):/;'/'-y'-, //// "
'" =::,.. ~ ~ ;/,;:?'-, /;::::-:::;,; ',',> :,,'" ' )/,' ?;,"//~.i';>:/.W/;/" / ~~;/,// ..,,- ,/'
:: - :';./F/' :'-~ :;:: :,~:.r;;ij'Z~:~;//-~/~::":;:-%>;/:j, , -'" / .
""'..:./'~'%/'/'.;';~,',' ","/,;: ",'"/X,:////,,X7"X////~% ',/...';//'/' /,//Z-, ", ,I'~ /' ...
=/,'¡ II ""","'//////7-//// IÙ///'/,/ ~ /
, "-<'/,'I/./'/"',~ U/X/F////,,/',/;///,/;'//////,/- -,-:- '
,,; .:-=-:- ~,'/v//",' ,,- ,','//xx/ / 1,//, ',~/// ...' -..'-'
- --~~, -"/-"y"",,,'-' "',,'/,X////""/v.TX, ",,/x//.,/"
.:: -- -d"""", '- ,'///,"/~-/ 'X.,-",-,.., , - '
-":-'~/N/----,', ',' - IY'>:¿';>',/~~?/77/u /////1
~,,-:::= ~;'~:.:,:' ,:,~,/ ::}~~//Y~7{i~2~:~~::;:
-.' - - ~ '/""'~"~~ ',' '/',' /', ..,/, "",'/,//Ÿ, I e/ø:,,/>;;;:/
"'~,n~-~_/ ,- '//" //')/~%,//://-/",
- ~ /;~>, ',' :,', '///,/'::'-</;,//,- ,,'->'/ ;,/,;;¿:.- -,
--.x" -"',,,' ,,/:.?,7,x.'/'//XI'N -
:~:S ,~ /,/;~~"o/-".r'/',/,/',,',', ",,>. ',",', /'",/.)9;"-;:' //:,:;Z-rfp/'//¿,// ;:::
- "',S'..: '//,;;-'/~:'.I" , ,,-,-/ /-"-' /~'~-/./;>;?;:y' -;,r ~
' -//"'/ /~ ~~,~,',%/x // ~' =-
. ~,'" ,,~,--, ',';~, X/ ",'/,'/;,'/"",-, ,','/~~,:/'-;"" "é' =-,'.
. - ':-:-.--" /X/'/////"X/'),,//;/,~
" :.. --=-=,~ '~/-.i;/;'/'//..";~. /-:/7/ '::: ~'-
:: :: ~ ~/ / '/./':;,;..j;;,;.-::;,/;p - - -",
'/ = '.,. Ž :: II " "~~///;//,/,:/~,'///, ,~W - j¿'" ,
' - ~:: ~ ,¡- :/Æ'/. '/Y/h~/ -'
, .:: '-- -=---. ,,¡; <2.3"'£</'::::':."/;:> ' -~,-::,
.. -, --,~~",~'/",// , "'1--,',//:'/ """'"
~ ~ . ,,/// :-<~ --..... pI-
"- ;..-:/,.v/ . -.,
,'" '\.,---::::::: /' ',~"~ / ~,'" ~,
'/' / ///" /' ,~, ~ t--
/ - '///' ., ' ~"'/
/'/ ,,----- '/"\' , ,/, ,/ ,\'~'
/ / ,/, ----- A;,- ,- , / /' .i/ - - ,
'/ I //~-".=""--. ' // /. -,'J
" .... : -',/?-' I -- ='::=: -' /~, '
,/// ~:~~
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Streetlights (Accoun¡ #2325)
$80,000
LOCA nON:
Glendale Area -
various locations within the limits of Dixie Road, Finch A venue, Liverpool
Road and Kingston Road.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Glendale Area - various locations within the limits of Dixie Road, Finch Avenue,
Liverpool Road and Kingston Road.
n TEfNDERS\SUDGET_PI 19991232S_01,DOC
107
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Squires Beach Road
0 C'<" ,:
--:"0
:: - -' - v
------
'/
/"
<-
-
"
/'
'-',
SUBJECT
AREA
~
-
v
()~','-ç~=~::()-<
:::~,,-
::",,¡~
-
r-
-
-
-
,~
=
-
=
~ 5'~::ÇNE =" ,~
f '
v
"
-"
-
7
~
" -
, ->
-:>
::_~v~,-;
~ç",=
,-,
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$18,100
LOCATION:
Squires Beach Road - from Bayly Street, south to 225m north of Clements Road.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Squires Beach Road - ,from Bayly Street, south to 225m north of Clements Road.
~
I: \ TENDERSISUDGET_PI 199912325_02, DOC
10,3
PUBLIC WORKS DEPARTlYIENT - 1999 BlJDGET PROPOSAL
Account #2325 - STREETLIGHTS
Kings,ton Road
-
-
~
- '::.
~
'/
-
-
= ',:-- !-
~
~
~ '
~ .:.. / ::: "-,- :::
'/
~
'/
P / "'-
"
/
// /
" ,
./ ,
/'
- "
'"
-/
-
,~
...---/ ~
.-
~ ~~
~ -
. \ ,......-
\ \ -/
'\ \ ~ /,' ~ -
'...... , ,-' ~ ).....-
.-/' /' Ä-
SUBJECT /.-.-'---
AREA ~~~;:; ~
,/-' : ~/,"-- ;;
,/;"'--.::. '~~ ,';::
, /,' ~
~ /' '~,<:;~ ~, ::/~ '.
; // , ,~ <: r ;¡C.:-':----
, // // / ~...' -----
. ,/' ./ Z ' ---- ,...-/'/ . ,~'
" "/// '- ; / .---.,
,/' ::;:::-c. /.<
::
/
-
-
>-
..-
,////
/'
-
- <~
-
-
~
-/
~
v
~~
. . i ::-,
'-.:...
..--"
LOCATION MAP
PROPOSED BUDGET AL\¡fOl)NT:
Streetlights (Account #2325)
$76,200
LOCATION:
Kingston Road - from Valley Farm Road, east to Brock Road (on the north side).
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement and Installation
. Kingston Road - from Valley Farm Road, east to Brock Road (on the north side).
.J
1:\ TENe::."! S\BUOGëT- PI 199912325_03,001;
109
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Kingston Road
-
-~
~
"
-
-
-
~
~.
-,/
---- ..
----- ~
/' .---
~'/
/' ~ -------'
--- ,/ "
,- --~_.2-', ~ - ;., :::-" '-':::
~
SUBJECT
AREA "-----
=: =,.:::.::::.
,
-
-
-
-,
"
,/
./'-
.-
v
-
-
'/
,-,-<
.-,~\,--,'
-- --....'--'
;;
-
"
~ ::
=
,--.
-
~ ::
-, .':
:: Z
;:: ::;: '-'
<~ :'" .~- i
-- -- -
"
-
, --
- ,-'-'./ -',
.
.'
-,/
- -
z
z
~
=-",3'~;;;~
-
-
- - .'. ---
:: ~ ----
---
::;,,- ,'-
,~
--:
-
-
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$53,600
LOCATION:
Kingston Road - from Brock Road, east to Notion Road (on the north side).
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement and Installation
. Kingston Road - from Brock Road, east to Notion Road (on the north side),
)
1\ TCfo;DERSIBUDGëTj'1\19991232'_O4. DOC
l1u
PUBLIC WORKS DEPART?vlENT - 1999 BCTDGET P.ROPOSAL
Account #2325 - STREETLIGHTS
Kings,ton Road
-
-
: ~ .. - - : ~v~ ~ --;::::::::- - ~ - ,/
- - -- '-<, ~ ='-',,=, \" _/ ~/ ///
:,~~ - ' "::;:,0 - ¡ , ~ ;;,~~ ,
: !! "~ "",',= (~" j -~. .~ i
~ " ' /" - - >-, ' - ",.:.:;'--
~ /¿ ~~ ,~/-<,
- -1 ~ - '~>,~' ,I ~' ,:~::~, l
~, ,~'. ~ ", ~~-_:::~ '~~,~ ~s~~~,=~~,""l:;~:~,="<~" § ':;~~,"'::;~~"" ,,'-',
,~ ' ,47 :::-¡, \ ~' -;::' ::;-"- ..; ,- :'i-~:- I
------- - .,;t-'" :.\\~, ' ' 2
~- .'_//~, -", " 7.,,;, ¡~¿. ~f-~- ',~ .. !' j:
~;-::;'.;. /' ;, SUBJECT : - , --.: / ,/ /'/
//--;/~~ - AREA , ' ~ ~:~;;;;ø
~' ~,~:,~~-~~--~ .:.=.~
-,' ~ .. _//~ _:: -' c...-'--;,~
-
LOCATION Mt\P
PROPOSED BUDGET At\10UNT:
Streetlights (Account #2325)
$270,000
LOCATION:
Kingston Road - from Liverpool Road, east to the Hydro Corridor.
PROPOSED CONSTRUCTION INCLUDES:
I
\
\
Street Light Replac~ment
. Kingston Road - from Liverpool Road, east to the Hydro Corridor (both sides).
/
I. \ TëNC:.=- S\SUDGEfT -PI 1 999\2325- Oil DOC
111
. .
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Radom Street
~~
::. --------
= ~~. .-' ~~--
:., ./ ,/~" -
~//..~~~
::_~~~. ~
. ~~/ ~/ '~---- ~ =--- ~;c,:',:~è.~::::¿
,. /.../ - ~ 7 --"..--- = ::;
.. /': <:,
. - . .. -' .. - , '
-----
~
.
------~ --
>~~
- - ~..
, /
- '
------
- _....
---- ..
-~--.-..
, -. -
À
" .. ..
-c,-:O:è.
- - '" =:
- '" ; =-
~
'-'\;~~-/ § - . ~
~'>Z~~~
- SU8JECT~~ s-::¿::::-
 AREA,' ,-
.....----/ "'-" i", /~~-/ ;
............- ""-......---- / ~ ~/ ~, '..~
~ ; / _'J/ /', -
.--- -'7" '", ", -.
------.à... '// ,,~"/, -
~/./ c;::-/ / -
/ / ,: / .~-
'T/ ,'-
~./ '
LC
=- ::: :0: : :: "
>-
--
-
..
.-
<,
'/
=- ~,:::- ~=
'/ -
~~.
~ ~ ,
=
'/
-
-
..
..
::: ' -, ,~ :0: =-
.. " ~ -
..
-
-~
'\
-
,/
:::
-
------
--
-
,-
~...
'---
-
--
.; .j
.-'-- ,/ i ~}I
.-'~'
-'
..
",'
;.>
LOCATION NIAP
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$30,800
LOCATION:
Radom Street - from Liverpool Road, west to Douglas Avenue.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Radom Street - from Liverpool Road, west to Douglas Avenue.
I lTENDERSIBUDGET_PI 1999\2325_O7 DOC
1 ¡ )
.l.t:..
PUBLIC WORKS DEPARTMENT - 1999 B'lJDGET PROPOSAL
Account #2325 - STREETLIGHTS
Franklin Street
------
/~~
/ /' -
'..' " ~
"
,~
-
-
-/
.~
-/
~
"-,
.Â.
- SUBJECT
AREA
:' :::~.::: :-. ----
--
---- --
-----
---- -
--
~ - - ;.~, L =_/
-;::' ='/ - - -'-
.{ - '-
- - - u- ? ~ L ~ :~
~ ::::~,-::;:;'-
---
'/ ~
-
~
-/ -/" '/
, ~
-.Â. - --- u-
--_/ ',._~.'
~
,.--
-
'/
-
Z
-/ -
;:; .~
"
-
..
-
:,~--',:::;-::',
- '
-
'-
--
'/
.~ C F j
- -
-
~
-
'/
::
---- -
-
,"-.
/
-
-'-
..
" '"
!
!
I
¡
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$9,000
LOCATION:
Franklin Street - from Central Street, north to Joseph Street.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Franklin Street - from Central Street, north to Joseph Street.
f \ TENDEl'lS1BUDGEJ_P\ 19991232S_08,DOC
113
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Twyn Rivers Drive
=-
-'- ' :::-=<=-=--
~ "<~~~~~-' ::_-~
~ ~--:"'-- s:
.:.. ---, '-:""- =
, ~ -,:,~ ~ -
- ---./
,-,,- ::.
" --
~
------, -
- - - -.
- . - - '. - '
.
_':"~
~c::-<¡,':::':::::
/
)-
z
- - --
. ., - -
'-, ~
"~,-. ' >
"-~
-~
;;¡""~ s-~:::::-
_?-.~ '
~7/...- ---- - .-
.--' ~ ::0 ;; :.:. = '"' .. ""
,~.--.,
--../ - ,
-/
v-'
-
~
-
_:",ù3:::',
s-:;>::::::-
:::::~~-
=
,>
- ,';V'~
;;:¿ "::::;:3
~
s
~, -
------
SUBJECT//'
AREA
~
'~""/N~'::
'~::::::
. 5:-
,,----~ = ;,3
'- -, ./ /1
.... ~
>
/
-/
- - " =-
~"---
-
;:.
/- "
:::;::::3, --
------
----
::: ~ ::-:"':;:::5:::-...,
'::,~ ~:;;::-~ /
"<'" ":--..
'<',~~:~~ ~)
.~
::0
-- - -- - -
-- - ,~
-
---
-
..
--- --
- ,-
,-
- '--'
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$18,600
LOCATION:
Twyn Rivers Drive - fromWoodview Avenue, west to the Rouge Valley.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Twyn Rivers Drive - fromWoodview Avenue, west to the Rouge Valley.
,.I
" \ TENDéRS1BUDGêTj='t 1999\232Sß9,DOC
114
PUBLIC WORKS DEPARTMENT - 1999'BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Brock Road Overpass
~ ,-
-
r
'-~,
-
/'-/~
/'
'-~'
-~
~
~-~
----- '
_:~ _?"
, ~,/ /--::>-/
, _è;Z:i'~/
"~/.// .' ..- ~----
/ -----------
.--.-/ .../~
,/, .. .. ----- ~
..',--::-/
"
-
- -
---------
//;-::-(/~/
./..c, /'//
'----
- ~'-3"'~-
- -------::------, - -
~~-,
"'-. '" ,',
~ - , ' ,,~<~~
-~-
'--
/,,-------
'---,
./
, -
SUBJECT
AREA---
---- "
-:::."'.:,'::'--/
;:;;'" -'
/
-
.--7 --------/
, ,: -,:';...-'------~'
-~//"~ ;;; -----
_/'//~::=--/;::: ~ -
,//
.. .-'
- -----'
---'
LOCA II ON MAP
\
!
I
I'
I
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$11,900
LOCATION:
Brock Road - from Old Taunton Road, north to the CN Railway Crossing.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Brock Road - from Old Taunton Road, nol1h to the CN Railway Crossing.
" \ TE\iCERSISUDGET -PI 19991232S_10,QOC
115
PUBLIC WORKS DEPARTMENT - 1999 BUDGET PROPOSAL
Account #2325 - STREETLIGHTS
Valley Farm Road
:: .:. ::: -< -.:. 0'
3-"'::=:-
',:---.....
~
"
---- ---- . / / //
~- ---'-::::::::::'---
-
"
'. r"-
~
--- ---
-. ~ -. -
v
...,
;:;.
? /::"/=-',~-
~ ¡
---,...-----
-
~
- =:.:: c;: - ,::"
-
-
"
:c
I
I
I
- I
~ ¡
-/
- ,
:::
-,
~-
-
-
-
.::: Z
~,
¡l
-
"
..,~"'-./' -::::==:
" ..-
-
-
-
y
-
"
.-/
-----
SUBJECT
AREA
'-.'
--' -
-
-------
- ----'
~-- ---
- ,~
.
. ~ >.,'-
/
:';:--
/-::-
,,' -
I-C' ..
- -,-,..."
"'../-'-"
)-
~,- :~ ~~~~~:j ~\
~ .:...' ",- .,""
-' .'-..,/ , ::,;::~
----, '
~
,,--.~
,,;...., ------
",:::;,.0.:
þ
~ 3 d":~-:'
. : //-1-;::
/'</ /,/ /
/ ,/" ,// //
,~' /
3::;,':"',::'::: ,-,~'"
~'
/
"
"
-
~. :'; ~:!::::
-
~
~
-::
,~'
LOCATION MAP
PROPOSED BUDGET AMOUNT:
Streetlights (Account #2325)
$38,100
LOCATION:
Valley Farm Road - from Kingston Road, north to Finch Avenue.
PROPOSED CONSTRUCTION INCLUDES:
Street Light Replacement
. Valley Farm Road - from Kingston Road, north to Finch Avenue.
I lTëNDERS\BUDGETj"\1999\2325_11 DOC
I1G
_. .....--. -
TOWN OF PICKERING
1999
____n_- CA-F'IT A_~I3UDGET_- n ---~----------'-
2410 ENVIRONMENTAL SERVo - STORM WATER MANAGEMENT
CLASSIFICA TION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
75,000
$75,000
FINANCING
1998
2823 General Fund
$75.000
2823 .General Fund - Reserve
4227 Reserve Fund - Develop. Charges (1.2)
I
\
I
I
Reserve Fund
Oebt
$75,000
117
0
1999
BUDGET
$0
0
0
0
213,500
$213,500
0
0
0
1999
$93,500
0
120,000
0
0
$213,500
0
0
0
1999 CAPITAL BUDGET
2410 ENVIRONMENTAL SERVICES - STORM WATER MANAGEMENT
BACKGROUND INFORMATION
6157 Vehicles
6173 Furniture & Fixtures
6176 Office Machines & EauiDment
6178 Miscellaneous EauiDment
6181 Other Fixed Assets
1
Rain Gauge & Technical Support
Council Resolution # 173/98
2
Flood Plain Management and
Storm Water Management Analysis
Krosno Watercourse
Council Resolution # 173/98
3
Frenchmans Bay Watershed
Management Strategy
Implementation
( Phase 2 )
4
Sheppard Avenue
Storm Water Management Study and
Preliminary Design for culvert replacement
Petticoat Creek Crossing
5
Brock Industrial (Neighborhood 4)
Storm Water Management
and Servicing Plan
Defer to Year 2000 As per Council Budget
Meeting April 6, 1999
Financina Summarv
Frenchmans Bay Watershed
Development Charges - Growth Study
based on 1991 Study (80%)
Amount to be funded from General Fund
118
3,500
50,000
150,000
10,000
~
$150,000
120,000
$30,000
Page 1
$0
$0
$0
$0
213,500
As submitted to Council May 10, 1999
--._------
TOWN OF PICKERING
1999
-- - -- Çt\PJIAj,.ßJJ O_GEL- '---,---
2350 TRANSPORTATION SERVICES - PUBLIC TRANSIT
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$1,707,932
6173 Furniture & Fixtures
7,450
6176 Office Machines & Equipment
1,600
6178 Miscellaneous Equipment
9,500
6181 Other Fixed Assets
$1,726,482
FINANCING
1998
2823 General Fund
$499,533
2823 General Fund - Reserve
4227 Reserve Fund - Dev. Charges (4.3)
3292 Third Party
I
\
I
J
J
1623 Provincial Subsidy
1,226.949
Debt
$1,726,482
119
0
1999
BUDGET
$201,250
4,520
1,500
2,500
0
$209,770
0
1999
$159,770
a
50,000
0
0
0
$209,770
0
a
0
Page 1
1999 CAPITAL BUDGET
2350 TRANSPORTATION SERVICES - PUBLIC TRANSIT
BACKGROUND INFORMATION
6157 Vehicles
$201,250
Note: A total of $817,966 has been
carried forward form 1998 and placed
in reserve to cover the Town portion of
costs associated with the purchase of
four (8) 40' Low Floor Orion VI Buses
to replace vehicles that retired in 1998.
(#906, #907, #908,#909,#910, #911,
#914 and #915)
Purchase (1) refurbished bus
(This purchase will result in reduced leasing costs
for the year 2000 budget).
125,000
(2) Mid-life Bus Refurbishing
$50,000
DC
Mid-life refurbishing as per Bus Fleet
Management Strategy Report prepared
by C.H. Prentice Consulting
(The mid-life refurbishing cost will have to be increased
to $90,000 if the purchase of the refurbished bus
is deleted).
Radio Base Unit
(20) Portable Communication Units
Licencing
500
10,000
7,500
(15) Rebuilt Fare Boxes
8,250
6173 Furniture and Fixtures
$4,520
(3) Four Drawer Lateral File Cabinets (replacement)
(2) Visitor Chairs - !nspector (replacement)
(2) Ergonomic Chairs - Reception
Window Blinds (replacement)
$1,000
320
700
2,500
120
As submitted to Council May 10. 1999
Page 2
1999 CAPITAL BUDGET
2350 TRANSPORTATION SERVICES. PUBLIC TRANSIT
BACKGROUND INFORMATION
6176 Office Machines & Eauioment
Cash Register - GO Station office
$1,500
6178 Miscellaneous Eauioment
Street Signage - Replacement
(Bus Stops, Mapping)
$2,500
6181 Other Fixed Assets
$0
121
As submitted to Council May 10,1999
----- - ---
TOWN OF PICKERING
1999
CAPITAL eUp~J:T ------,-_u_--
2360 TRANSPORTATION - SPECIALIZED SERVICES
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$14,600
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
2,500
6181 Other Fixed Assets
$17,100
FINANCING
1998
¡
2823 General Fund
$17.100
2823 General Fund - Reserve
4227 Reserve Fund - Dev. Charges
0
Reserve Fund
0
Debt
0
$17,100
122
0
1999
BUDGET
$9,000
0
0
0
0
$9,000
0
0
0
1999
$9,000
0
0
0
0
$9,000
1999 CAPITAL BUDGET
2360 TRANSPORTATION - SPECIALIZED SERVICES
BACKGROUND INFORMATION
6157
Vehicles
Radio Base Unit
(10) Portable Communication Units
licencing
6173 Furniture and Fixtures
6176 Office Machines & Eauioment
6178 Miscellaneous Eauioment
6181 Other Fixed Assets
123
500
5,000
3.500
Page 1
$9,000
$0
$0
$0
$0
As submitted to Council May 10, 1999
-..-. -----------------m-
----------,
TOWN OF PICKERING
1999
CAPITAL BUDGET
.._---------.,-,- ------ ,------- --------._,- '---'-------O------u_------
2610 PLANNING & DEVELOPMENT - PLANNING
CLASSIFICATION
1998
BUDGET
6157 Vehicles
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$0
FINANCING
1998
2823 General Fund
$0
2823 General Fund - Reserve
4227 Reserve Fund - Develop. Charges (1.2)
Reserve Fund
Debt
I
I
$0
124
$0
1999
BUDGET
$0
8,550
0
0
25,750
$34,300
0
0
0
0
0
1999
$8,550
0
25,750
0
0
$34,300 -
0
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2610 PLANNING & DEVELOPMENT - PLANNING
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Replacement Chair for Director
Replacement Filing Cabinets - Lateral
Office Machines & EauiDment
Miscellaneous EauiDment
Other Fixed Assets
Preparation of Neighbourhood Plan for Rouge
Park Neighbourhood (Town's contribution to study)
125
Page 1 ' .
$0
$8,550
$550
8,000
$0
$0
DC $25,750
As submitted to Council May 10,1999
TOWN OF PICKERING
1999
- -~_u_--_CAPIIAke~DGET_,__- --- ------__H - ---
2710 PARKS & FACILITIES - ADMINISTRATION
CLASSIFICATION
1998
BUDGET
6157 Vehicles
6173 Furniture & Fixtures
10,000
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$10,000
FINANCING
1998
2823 General Fund
$10,000
I
¡
¡
2823 General Fund - Reserve
4230 Reserve Fund - Parkland
Reserve Fund
Debt
$10,000
126
$0
1999
BUDGET
$0
0
0
0
0
$0
0
0
0
0
1999
$0
0
0
0
0
$0
0
0
0
6157
6173
6176
6178
6181
Vehicles
I
1999 CAPITAL BUDGET
2710 PARKS & FACILITIES - ADMINISTRATION
Furniture & Fixtures
BACKGROUND INFORMATION
Office Machines & EauiDment
Miscellaneous EauiDment
Other Fixed Assets
127
Page 1
$0
$0
$0
$0
$0
As submitted to Council May 10,1999
TOWN OF PICKERING
1999
CAPtT AL. BUDGeT
2124 GENERAL GOVERNMENT - CIVIC COMPLEX
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
250
6178 Miscellaneous Equipment
103,000
6181 Other Fixed Assets
24,000
$127,250
FINANCING
1998
2823 General Fund
$27,250
I
I
I
¡
l
I
2823 General Fund - Reserve
4225 Reserve Fund - Comm. Facilities
100,000
Reserve Fund
Cìebt
$127,250
128
.-.. ..,. . .. .,
0
1999
BUDGET
$0
5,000
0
17,500
27,500
$50,000
0
1999
$50,000
0
0
0
0
$50,000
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2124 . CIVIC COMPLEX
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Supply & install new signage for Mayor, Council and
CAO,'s area and general improvements throughout
the building.
Office Machines & EauiDment
Miscellaneous Eauioment
3 Recycle Stations for Coffee stations
1 Tractor & Snow Blower Blade
Security Cameras & Systems
Other Fixed Assets
Perform Roof repairs & water proofing of Tower
and 5th flo,or mechanical room
Paint line markings as per new Handicap Parking
Regulations (10 spots)
Alterations and office construction
(Finance and Planning)
Beautification project as approved by Council
Added ås per Council Budget meeting of
April 6,1999.
129
5,000
Page 1
$0
$5,000
$0
$17,500
$1,500
8,000
8,000
$27,500
10,000
2,500
15,000 Reduced T JQ
10,000
As submitted to Council May 10, 1999
TOWN OF PICKERING
1999
GAPrrA~,Bl.JDGJ:I_~_.__--- -- ---'------
2132 - TOWN PROPERTY MAINTENANCE
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$38,000
6173 Furniture & Fixtures
6176 Office Machines & Equipment
í
I
6178 Miscellaneous Equipment
3,000
6181 Other Fixed Assets
12,500
$53,500
FINANCING
1998
2823 General Fund
$41,000
2823 General Fund - Reserve
4227 Reserve Fund - Dev. Charges
4225 Reserve Fund - Community Facilities
12,500
4230 Reserve Fund - Parkland
Debt
$53,500
130
0
1999
BUDGET
$0
0
0
76,000
25,000
$101,000
0
0
1999
$26,000
0
0
O'
75,000
0
$101,000
0
0
a
-
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
Page 1
2132 - TOWN PROPERTY MAINTENANCE
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & EauiDment
Miscellaneous EauiDment
2 Stihl F.S. 80 Grass trimmers (replacement)
1 Trackless MTS Tractor (replacement) .
. Winter use of equtpment study pending to the CAO.
Other Fixed Assets
Tree Planting various street trees
(replacements)
Walkway lights & poles public areas
(Safe Community Report) (replacement)
(50/50 split)
131
$0
$0
$0
$76,000
$1,000
I
I
,I
75,000 PL
$25,000
$10,000
15,000
As submitted to Council May 10, 1999
! "BUSINESS CASE"
I The Criteria!
I-hiS form deals with how work is
10rganized to support your Department's
ptrategic approach to this year's Capital
~emands. Each request is analysed to
Ireflect the value to the Town and its
r¡inancial Review of this Request.
I
I
;
TOWN OF PICKERING
"", OF P/C'
tllt)
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Property Maintenance Account #: 2132
Project: Short Title Project #:
Trackless
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Trackless MTS Tractor
Project Title & Location: (attach map)
Expected Starting Date: [Expected Completion Date:
.¡roject Description:
I ¡ Material required:
¡
¡
I Location of Project:
\
I Detailed information as to project description:
. ¡
IPrQject Justification:
I! Legislated Requirement
Health and Safety
I Maintenance of Existing Infrastructure
I Extension of Life of Asset
Improve Customer Service
I Other (Council, Public, Staff)
. Replacement
N/A
N/A
$
75,000
1,32
Page 2
1998 , ' New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Administration/Overhead
Vehicles R 75,000 75,000
Other
Total 75,000 75,000
. Price includes trade-in value for the telesquirt vehicle.
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland R 75,000 75,000
Development Charges
Other
Total 75,000 75,000
;rowth Related
~et Expenditure to be Financed bylfrom: .'
133
, ¡
Page 3
¡
L . A I
rmanctng pprova
financing for this project has previously been approved by Council and is available in Capital Account No:
I
~aPital Program
I
)
I'
Four Year Forecast
~
$
.2QQ.Q
$
2021
$
2.Q.Q2
$
2.00.3.
$
Beyond
75.000
Ca~t~
¡'Costs to be included in Operating Budget
for:
Jperating Savings
I Cost Reduction/Increased Revenue
~ue to:
I Net
¡
0
0
¡
Payback Period:
!
N/A
M..Q.o.th;, Quarter' Beyond
Cash Flow January April July October 1 st 3rd 1999
l~~beu~~i~~w February May August Nov. $75,000 0
March June Sept. Dec. 2nd 4th
lost/Benefit Analysis
Replace existing equipment which has reached/exceeded life expectancy
I
I .'
Life of Asset
rOViSiOn for 10 year replacement
uture Repair/Replacement
!pprovals
¡epartment Approval
Finance Approval
r '
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financint¡¡ Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
J
¡
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
" -
J~
TOWN OF PICKERING
1999
--- ----- CAP1IALßI4P~I;T. -. ,. -------,------ ,
2315 TRANSPORTATION SERVICES - MUNICIPAL GARAGE
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
12,450
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
76,170
6181 Other Fixed Assets
6,000
$94,620
FINANCING
1998
2823 General Fund
$94,620
2823 General Fund - Reserve
4227 Reserve Fund - Dey. Charges
Reserve Fund
Debt
$94,620
136
0
1999
BUDGET
$0
0
0
54,550
6,500
$61,050
0
1999
$61,050
0
0
0
0
$61,050
0
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
Page 1
2315 TRANSPORTATION SERVICES - MUNICIPAL GARAGE
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & Eauioment
Miscellaneous Eauioment
Remove ans extens existing ~YSF3ulit ~gist ror Flew ÞIoIS86
Wheel Dolly for Large Tires & Wheels (replacement)
Electric Motor - Overhead Crane (safety) (replacement)
Shop Wrenches 1 1/2 - 2 1/2" drives (replacement)
Emission Testing equipment (re: new M.O.E. Regulations)
Pneumatic lines and seals for floor hoists (replacement)
Cordless Phone (shop use)
Metal brake (replacement)
Remove electric water heater and replace with natural gas
Inspection of shop hoist & testing (M.T.O. Requirement)
Other Fixed Assets
Construct new storage tire bay for storage of
tires. spare engines & transmissions
(approx. size 1600 - 1800 sq, ft.)
irest ¡¡¡er:maA8F1t wall (81016 8ay)
(im,'iFQnmental CeA"8m lo1ealtn & Safety)
137
$0
$0
$0
$54,550
$2ã,OOg Deleted T JQ
2.500
1,500
2,350
28,000
8,000
700
4.500
5,000
2,000
$6,500
$6,500
~ Deleted T JQ
As submitted to Council May 10, 1999
~ -.- - -~.~_._-,.
TOWN OF PICKERING
1999
CAPITAL BUDGET
,- -,..... -~.._....,.., .-., - .... ~~n__-~ ----- ----~_..__.____n
2715 PARKS & FACILITIES - DON BEER ARENA
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
3,000
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
14,600
6181 Other Fixed Assets
16,200
$33,800
FINANCING
1998
2823 General Fund
$33,800
2823 General Fund - Reserve
0
4230 Reserve Fund - Parkland
0
Reserve Fund
0
De..bt
0
$33,800
138
0
1999
BUDGET
$0
3.000
0
10,000
82,500
$95,500
1999
$95,500
0
0
0
0
$95,500
Page 1
1999 CAPITAL BUDGET
2715 PARKS & FACILITIES. DON BEER ARENA
BACKGROUND INFORMATION
6157 Vehicles
$0
6173 Furniture & Fixtures
$3,000
Supply 20 Banquet Hall tables (replacement)
6176 Office Machines & EaulDment
$0
6178 Miscellaneous EauiDment
$10,000
Netting for goal nets (replacement)
2 New Ice Machine blades (replacement)
$1,500
1,000
Overhaul Olympia Ice Machine and re-build
Natural Gas Platform (replacement)
6,000
Supply & install new Time Clock (replacement)
1,500
6181 Other Fixed Assets
$82,500
Supply concrete rink floor (pad #2)
complete with new sub-floor heating system and new
rink boards (re~laQeR'1eRt) (design phase only)
$25,000 $-12ã,Qgg ~ Reduced T JQ
* Supply materials only to rebuild players benches
(replacement)
* Supply various sizes of puck board (replacement)
* Only required if floor and boards not approved
3,000
2,000
2 Electrical Panels (replacement)
7,500
Supply & install Fire Alarm Panel to replace
existing obsolete panel (Health & Safety)
5,000
3,000
Replace various doors and panic hardware
139
As submitted to Council May 10, 1999
.
1999 CAPITAL BUDGET
Page 2
2715 PARKS & FACILITIES. DON BEER ARENA
.
BACKGROUND INFORMATION
6181 Other Fixed Assets
( continued)
Remove, supply and install floor tile in snack
bar and staff room (replacement)
Supply & install high pressure piping and oil
separator in Compressor Room (replacement)
Supply various sizes of arena glass (replacement)
Scrape, prime and paint roof supports on rink #2
and Siding of partition wall of rink #1
(as per 1998 Inspection and Recommendation)
Supply Condenser Pump and Motor
Paint line markings as per handicap parking
regulations (4 spots)
140
2,000
16,500
1,500
10,000
6,000
1,000
As submitted to Council May 10, 1999
TOWN OF PICKERING
1999
CAPITAL BUDGeT
2718 PARKS & FACILITIES - PARKS
CLASSIFICATION
1998
BUDGET
6129 Parks
$826,000
6157 Vehicles
32,000
6173 Furniture & Fixtures
6176 Office Machines & Equipment
450
6178 Miscellaneous Equipment
38,800
6181 Other Fixed Assets
30,000
$927,250
FINANCING
1998
2823 General Fund
$252,250
2823 General Fund - Reserve
0
4227 Reserve Fund - Devlop. Charges (5.2}
546,750
4230 Reserve Fund - Parkland
128,250
Debt
0
Lease
0
Millennium Trail Contributions
$927,250
141
0
1999
BUDGET
$4,033,250
70,000
0
0
221,650
71,000
$4,395,900
1999
$174,150
0
1,164,500
1,657,250
0
$1.400,000
$4,395,900
1999 CAPITAL BUDGET
2718 PARKS FACILITIES - PARKS
BACKGROUND INFORMATION
6129 Parks
Bulk supply of topsoil for topdressing sports
fields (safety)
Regrade and resod, install sprinkler system
at Dunmoore Park Soccer Field (safety)
Tree planting various parks
Ball Diamond - infield material (safety)
Improve ball lighting Centennial Park (safety)
(per Council 1998 Approval)
(Pickering baseball association donated the lights and
the budgeted cost reflects installation)
Supply and install security lighting various parks (safety)
Tennis court repair (Rosebank Park, Maple Ridge)
Fencing and baseball backstop renovations
and repairs various parks
Resurface basketball court (Commerce St. Park)
Regrade and resod football field (Kinsmen Park)
Purchase of 1083 Beachpoint Promenade - As per Council
Resolution #67/99
Construction of Woodsmere Park - (New Park)
ResefinsR Parkette (Design &. C9Astr~et) ("Jew Park)
Deleted As per Council Budget Meeting of April 6, 1999
Parking Lot alterations (Rosebank)
(depends on School Board Partnership)
Millennium Trail. Approved at the May 3, 1999 Council Meeting
(Breakdown of funding provided on page 3).
Waterfront Trail - Western Section
Council Added an additional $300,000 at the May 3, 1999 Meeting
Petticoat Creek design - Priority 1 A for 2000 budget
142
$10,000
20,000
10,000
5,000
15,000
12,000
30,000
15,000
2,500
20,000
123,750 (PL)
450,000 (DC) (PL)
&MOO (DC) (Pl)
20,000
2,600,000
300,000
300,000
~
(PL)
(PL)
(PL)
Page 1
$4,033,250
Deleted T JQ
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
2718 PARKS FACILITIES. PARKS
BACKGROUND INFORMATION
Bonita Park Design - Priority 1 B for 2000 budget
Front St. Park (Design & Construction Phase I)
First Phase - Joint Co-operative with Men's Progress Club
Amount to be determined at a later date.
Financina Summarv
Woodsmere Park
Total
Development Charges - Parkland Developments (81%)
Parkland Reserve Fund (19%)
Total
6157 Vehicles
3 ton Dump (replace 1984 Chev 3 ton dump, 728)
6173 Furniture & Fixtures
6176 Office Machines & EauiDment
6178 Miscellaneous EauiDment
I
[
f
Case 580K Backhoe Super L (replacement)
2 Heavy duty wheel barrows (replacement)
4 Stihl FS 80 Grass Trimmers (replacement)
2 Complete Water Tank pumps, hoses and reels (replacement)
1 Stihl TS400 Cut off Saw with Diamond Blade
1 Tractor Mount 3 point hitch flail mower (replacement)
143
(DC) (PL)
100,000
~
JOO,OOO
(PL)
Page 2
Deleted T JQ
Reduced T JQ
$70,000
$0
$0
$221,650
As submitted to Council May 10, 1999
$450,000
$450,000
$364,500
85,500
$450,000
$95.000 (PL)
400
1,500
2,200
1,500
4,500
1999 CAPITAL BUDGET
2718 PARKS FACILITIES. PARKS
BACKGROUND INFORMATION
2 Toro CCR2400 GTS Snow Blower (replacement)
Keyed Alike Padlocks (replacement)
1 Lawn vacuum for glass, debris, leaves, 5 HP (replacement)
1 10" Sliding Compound Mitre Saw - Mikita LS 1013
(replacement for radial arm saw)
1 26" Radial arm drill press - Mastercraft 55.5913.8
1 Stihl 026 Chain Saw and Chains (replacement)
1 Ex-mark 60" 22 HP Riding Mower (replacement)
1 Taro Gang Mower Rotary Mower (replace 1983 Toro)*
.Winter use of equipment study pending to the CAO
Gang Mowers - reels and tires (replacement)
6181 Other Fixed Assets
Soccer Posts
Timber & Pea Gravel
Play Unit (replacement) Phase One (Kinsmen Park safety)*
Repair play unit (Claremont Park safety)
4 Complete Basketball uprights and nets
Picnic Tables and Park Benches
. Any additional equipment will be depended upon the design
and will be funded through the 2000 budget.
Breakdown of Millennium Trail Fundina
Community Services Groups
Ontario Power Corporation
Toronto Region Conservation Authority
Federal Government - Millennium Partnership Program
Province of Ontario
Town of Pickering -
Development Charges
- Parkland Reserve Fund
Total Project Cost
144
Page 3
2,000
2,000
2,250
1,000
300
1,000
12,000
91,000 (PL)
5,000
$71,000 !
!
!
$6,000 (PL)
3,000 (PL)
40,000 3O;QOO (PL) Reduced T JQ ¡
\
8,000 (PL) I
4,000 (PL)
10,000 (PL)
$100,000
500,000
200,000
400,000
200,000
800,000
400,000
$2,600,000
As submitted to Council May 10, 1999
I "BUSINESS CASE"
I The Criteria!
~hiS form deals with how work is
'OrganiZed to support your Department's
ptrategic approach to this year's Capital
!Jemands. Each request is analysed to
'reflect the value to the Town and its
rnancial Review of this Request.
TOWN OF PICKERING
..,." OF ,o'c
;O"'-%
-~:5
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Account #: 2718
Parks
Project: Short Title Project #:
Woodsmere Park
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Construction of Woodsmere Park
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date: .
30-May-99 15-Sep-99
I¡roiect Description:
I
, Material required:
I ¡
Location of Project:
II
11
[rOiect Justification:
I Legislated Requirement
Health and Safety
¡Maintenance of Existing Infrastructure
I Extension of Life of Asset
Improve Customer Service
! Other (Council, Public, Staff)
I
¡
I
Woodsmere Avenue west of Rosebank Road, North of Strouds Lane
Detailed information as to project description: Grade, seed/sod and install park amenities as park plan
$
x
XXX
450,000
145
Page 2
1998 . ' New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks X 450,000 450,000
- Roads
- Buildings
Engineering/Design
Administration/Overhead
Vehicles
Other
Total 450,000 450,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund. Parkland - 19% 85,500 85,500
Development Charges - Parkland Development - 81 % 364,500 364,500
Other
Total 450,000 450,000
3rowth Related
\jet Expenditure to be Financed by/from: .'
146
Page 3
J
I
Financing Approval
í
Financing for this project has previously been approved by Council and is available in Capital Account No:
I
I Four Year Forecast
þaPital Program ~ 2OjlQ 2021 2QQ2 2QQ3 Beyond
$ $ $ $ $
,I 450,000
!
pperating Costs
I Costs to be included in Operating Budget
for:
bperating Savings 0
I Cost Reduction/Increased Revenue
¡due to:
Net
!
ì
paYback Period: N/A
r
I
r ~ Quarter' Beyond
Icash Flow January April July October 1 st 3rd 1999
It7~.u~;i~~w February May August Nov. 260,000 0
March June Sept. Dec. 2nd 4th
100,000 90,000
[ .- .
SUbdivision is reaching completion and adjacent school site will be developed in 1999
r
ILife of Asset .'
þrOViSion for N/A
I -uture Repair/Replacement
~pprovals
I
¡)epartment Approval
Finance Approval
:1
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate,
A summary of the financing for this project follows:
FinancinQ Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
.J
!
,
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
[
1 <:1 ,~
I
I
i
rE
..----.--
j
--~-T-- -=ìfe:::sL
AVE
~I
~~
~g
'iZ\O
O~"\p..
~
0
«
0
a:
~
«
z
0
...
..J
«
Town of Pickering
CONSTRUCTION OF WOODSMERE PARK
l'
I DATE FEB. 9/99
11'9.
- ....~
I
!
¡ "BUSINESS CASE"
, The Criteria!
Irhis form deals with how work is
OrganiZed to support your Department's
ptrategic approach to this year's Capital
~emands. Each request is analysed to
Ireflect the value to the Town and its
financial Review of this Request.
I
I
TOWN OF PICKERING
,..'"' OF .o'C'
;O"%
~ ,~: ~
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Account #: 2718
Parks
Project: Short Title Project #:
Rosefinch Parkette
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Rosefinch Parkette
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date:
Jul-99 Aug-99
'reiect Description:
I Material required:
I : Location of Project:
I
.1
TOI'C! Jus!iflciljon:
" Legislated Requirement
Health and Safety
I Maintenance of Existing Infrastructure
I Extension of Life of Asset
Improve Customer Service'
! Other (Council, Public, Staff)
,i
South/East corner Rosebank and Finch
Detailed information as to project description: Design and construction of aesthetic
enhancement for parkette. Seating, possible play area.
$
50,000
150
1998
Budget
Expenditure
(To be completed by the appropriate Department)
Page 2
New/ 1999
Replacement Upgrade Quantity Budget
$ $ $
$
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks X
- Roads
. Buildings
50,000
50,000
Engineering/Design
Administration/Overhead
Vehicles
Other
Total
50,000
50,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland - 19% 9,500 9,500
Development Charges - Parkland Development - 81 % 40,500 40,500
Other
Total 50,000 50,000
3rowth Related
'Jet Expenditure to be Financed by/from: .'
151
Page 3
I
I
I
IÞinanCing Approval
Þinancing for this project has previously been approved by Council and is available in Capital Account No:
¡
f,
faPital Program
I
!
I
I'
Four Year Forecast
1m
$
2OOQ
$
zojtl
$
2QQ2
$
ZQQ3
$
Beyond
50,000
Cn~h::
I,' Costs to be included in Operating Budget
for:
bperating Savings
I Cost Reduction/Increased Revenue
I due to:
,. Net
paYbaCk Period:
!
I
0
N/A
I
J Month' Quarter' Beyond
Icash Flow January April July October 1 st 3rd 1999
broiection February May August Nov. 45,000 0
In/(out) Flow March June Sept. Dec. 2nd 4th
5,000
.bost/Benefit Analysis
provide aesthetically improved public area and entrance from Finch Avenue
I
.r
ILife of Asset "
rOViSiOn for
(uture Repair/Replacement
~pprovals
I
þepartment Approval
Finance Ap,proval
1::12
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate,
A summary of the financing for this project follows:
Financinc;¡ Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
DEBENTURE FINANCING
.
UPDATED ANNUAL LIMIT .'
J
\
I
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
lJJ
)
-----r------------' -- ---,------ ---,---
I
'-------------
1 ~r
I
I
¡
j .
:J..Q'?-O
y.,
l
'<:
Z
-(
iD
w
V>
0
œ
FIN H
,?-\O
O~'\ Þ-
ROSEFINCH PARKETIE
l'
I ,
DATE FEB. 9/99
15,4
I
I
I "BUSINESS CASE"
I The Criteria!
~hiS form deals with how work is
'OrganiZed to support your Department's
ptrategic approach to this year's Capital
~emands. Each request is analysed to
'reflect the value to the Town and its
T'inancial Review of this Request.
J
TOWN OF PICKERING
,,-" OF' ""c
,,° +",
ð'lJI1
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Account #: 2718
Parks
Project: Short Title Project #:
Trail
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Waterfront Trail
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date:
Jul-99 N/A
lroiect Description:
I Material required:
I
I Location of Project:
I
I
.1
'j'oi'l!:l Justifiç~llgn:
I Legislated Requirement
Health and Safety
I Maintenance of Existing Infrastructure
I Extension of Life of Asset
Improve Customer Service X
I Other (Council, Public, Staff) XXX
¡
Detailed information as to project description: Design and construct additional Waterfront Trail sections.
Includes Western Gateway to Trail
$
300,000
155
Page 2
1998 , . New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings
Improvements - Parks X 300,000 300,000
- Roads
- Buildings
Engineering/Design
Adm inistratio n/Overhead
Vehicles
Other
Total 300,000 300,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland 300,000 300,000
Development Charges
Other
Total 300,000 300,000
3rowth Related
\Jet Expenditure to be Financed by/from: ;.
156
"I
I
¡
I
I
J
Page 3
l~inanCing Approval
financing for this project has previously been approved by Council and is available in Capital Account No:
I, Four Year Forecast
raPital Program 1ä9 2OOQ 2QO1 2QO2 2OQ3 Beyond
I $ $ $ $ $
300 , 000
I
I
I
Costs
I Costs to be included in Operating Budget
for:
¡
bperatinQ Savings 0
I Cost Reduction/Increased Revenue
I due to:
¡
I
I Net
I
J
l~aYbaCk Period: N/A
J
Month: Quarter' Beyond
ICash Flow January April July October 1 st 3rd 1999
I ~~~u~;i~~w February May. August Nov. 150,000
March June Sept. Dec, 2nd 4th
30,000 120,000 Unknown
tost/Benefit Analysis
ComPletes section of trail to connect to the east and provide Western Gateway
ILife of Asset '
rOViSiOn for
-uture Repair/Replacement
¡'
~pprovals
I
þepartment Approval
Finance Approval
1 "'I
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financing Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
d
...
Z
::J
0
~
'"
<J
::J
0
a:
z
~
Z
::J
0
~
""
"',
...
ï
it.
v
LAKE ONTARIO
Town of Pickering
Planning Department
WATERFRONT TRAIL - WEST
l'
11
I DATE FEB, 9/99
t5~
~
~
FRENCHMAN'S
BAY
~~
~~
"
"
'...
"'...
-...
---.....
~
)-------------
I ,
I .
I ,
I #
I ,
~#
LAKE ONTARIO
Town of Pickering
Planning Department:
i
i
I
I ,
i
I
WATERFRONT TRAIL - EAST
l'
Ii
I DATE FEB. 9/99
160
"BUSINESS CASE"
The Criteria!
1
!
I
irhis form deals with how work is
OrganiZed to support your Department's
i3trategic approach to this year's Capital
!:iemands. Each request is analysed to
reflect the value to the Town and its
Financial Review of this Request.
I
TOWN OF PICKERING
...'" OF PIC
,.:-O-':-%
~ £à: ði
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Parks Account #: 2718
Project: Short Title Project #:
Front Street Park
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
McKeen Property Development
Project Title & Location: (attach map)
Expected Starting Date: !Expected Completion Date:
Jun-99 N/A
¡'roject Description:
\
!
Material required:
i
i
i
I
¡
¡
¡
¡'
Location of Project:
Front Street eastern shore of Frenchman's Bay
Detailed information as to project description: Complete design and approval. Commence Phase I Construction
I j
'?roiect Justification:
I
I'
J
I
i
!
¡
,i
!
¡
Legislated Requirement
Health and Safety
Maintenance of Existing Infrastructure
Extension of Life of Asset
Improve Customer Service
Other (Council, Public, Staff)
$
x
XXX
100,000
IGl
Page 2
,19,98 New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks X 100,000 100,000
- Roads
- Buildings
Engineering/Design
Ad mi nistration/Overhead
Vehicles
Other
Total 100,000 100,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland 100,000 100,000
Development Charges
Other
Total 100,000 100,000
rowth Related
et Expenditure to be Financed by/from: .'
I
I
t f,?
î'-
Page 3
i
¡
IFinancing Approval
I
financing for this project has previously been approved by Council and is available in Capital Account No:
" Four Year Forecast
I
~apital Program 19S.9 2O2Q 2001 ZQ.O2 2QO.3 Beyond
J
I $ $ $ $ $
1
II 100,000
¡
pperating Costs
I' Costs to be included in Operating Budget
(or:
operating Savings
Cost Reduction/Increased Revenue o
¡due to:
I Net
paYbaCk Period: N/A
1
!
j Month: Quarter' Beyond
Icash Flow January April July October 1 st 3rd 1999
It~~:'t;i~~w February May August Nov. 100,000
March June Sept. Dec. 2nd 4th To be budgeted
lost/Benefit Analysis
IA Service Club partner has expressed an interest in this project if start is now. Details will be forthcoming.
I
.J
ILife of Asset .'
trovision for
I' uture Repair/Replacement
lpprova,s
I '
¡
,
Pepartment Approval
Finance Approval
r"
.)
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
FinancinQ Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
.'
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected. the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
¡
1
TREASU RER'S APPROVAL
DATE APPROVED
.1
l~) 4
FRENCHMAN'S
BAY
¡
I
j
,
,
.
.
I
I
,
SUBJECT -Þ-',
AREA ,
,
~
~
~~
411..'-'
~~~~~1:..--------------~-,::.------....- ---J
LAKE ONTARIO
: Town of Pickering
¡
Planning Department
McKEEN PROPERTY DEVELOPMENT
l'
'"
I DATE FEB, 9/99
If35
¡
I
J
j.hiS form deals with how work is
IOrganiZed to support your Department's
'rJ"trategiC approach to this year's Capital
emands. Each request is analysed to
reflect the value to the Town and its
7inancial Review of this Request.
I .
"BUSINESS CASE"
The Criteria!
TOWN OF PICKERING
,..." OF Pf,.,
tlfì1
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Parks Account #: 2718
Project: Short Title Project #:
Vehicle Replacement - 3 ton Dump Truck
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Vehicle Replacement - 3 ton Dump Truck
Project Title & Location: (attach map)
Expected Starting Date: Expected Completion Date:
Aug-99 N/A
Iloject Description:
,I Material required:
II LocaJion of Project:
¡
I Detailed information as to project description:
.\
¡
I
I I
!?rOject Justification:
If Legislated Requirement
Health and Safety
I Maintenance of Existing Infrastructure
I' Extension of Life of Asset
Improve Customer Service
\. Other (Council, Public, Staff)
. '
Replace Vehicle
$
x
70,000
166
Page 2
'1998 New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Administration/Overhead
Vehicles R 70,000 70,000
Other
Total 70,000 70,000
1998 -
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) R 70,000 70,000
User Revenue
Reserve/Reserve Fund
Development Charges
Other
Total 70,000 70,000
Growth Related
Net Expenditure to be Financed by/from: "
167
Page 3
,
I
¡
I
,~inancing Approval
I:¡nancing for this project has previously been approved by Council and is available in Capital Account No:
I
: Four Year Forecast
I
t:apital Program 1m 2OO.Q 2OQ1 2QQZ 2OQ3 Beyond
1,1 $ $ $ $ $
70,000
¡
'.
,I
I,
þperating Costs
I ¡Costs to be included in Operating Budget
for:
I
.!>peratinQ Savings
I Cost Reduction/Increased Revenue
jdue to:
,
I Net
!
!
paybaCk Period: N/A
\
¡ MQa1h: Quarter' Beyond
Icash Flow January April July October 1st 3rd 1999
rojection February May. August Nov.
~/(Out) Flow March June Sept. Dec. 2nd 4th
I 70,000 0
lost/Benefit Analysis
¡Vehicle has far exceeded life expectancy (1984 replacement)
~
~
ILife of Asset .'
ìrovision for 10 year replacement
¡ uture Repair/Replacement
l
~
I.
I
fepartment Approval
Finance Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMO,UNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
FinancinQ Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1) ,
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT .'
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
1h~
,
I
I
I
!
f
'\
~'his form deals with how work is
lorganized to support your Department's
.
ptrategic approach to this year's Capital
pemands. Each request is analysed to
reflect the value to the Town and its
rnancial Review of this Request.
',: :
"BUSINESS CASE"
The Criteria!
TOWN OF PICKERING
,.."" OF "'C'
tJ5Ì1
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Parks Account #: 2718
Project: Short Title Project #:
Backhoe Replacement
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Equipment Replacement
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date:
Jun-99 N/A
"Project Description:
I
I Material required:
(
I
¡
.1
I, Detailed information as to project description:
,I
Location of Project:
Replace equipment as existing equipment is inoperable
Iyroiect Justification:
II Legislated Requirement
. Health and Safety
1 Maintenance of Existing Infrastructure
I Extension of Life of Asset
Improve Customèr Service
I Other (Council, Public, Staff)
I
J
I
$
x
X
95,000
1170
Page 2
1998 Newf 1999,
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Admin istratio n/Overhead
Vehicles R 95,000 95,000
Other
Total 95,000 95,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland R 95,000 95,000
Development Charges
Other
Total 95,000 95,000
irowth Related
et Expenditure to be Financed by/from: ;,
171
Page 3
,}inanCinQ Approval
'¡
financing for this project has previously been approved by Council and is available in Capital Account No:
I
I,
þaPital Program
I
Four Year Forecast
~
$
2.QQQ
$
2.QQ1
$
2QO2
$
2OQ3
$
Beyond
I
I
I
I
I
95,000
Cn!l::h:
II Costs to be included in Operating Budget
for:
¡
!
.. '
.Operating Savings
I Cost Reduction/Increased Revenue
¡\ due to:
rNet
, j
I
¡
'paYbaCk Period:
¡
I
0
"'
N/A
. J ~ Quarter' Beyond
ICash Flow January April July October 1 st 3rd 1999
~roiection February May August Nov.
' /(Out) Flow March June Sept. Dec. 2nd 4th
95,000 0
.,
lost/Benefit Analysis
(Provide on separate page if necessary)
r
f
!Life of Asset ."
þrOViSion for 10 year replaces 1989 Backhoe
-uture Repair/Replacement
l
ï
kpprovals
/J ,
~epartment Approval
Finance Approval
I)
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
1999-2000
AMOUNT
YEAR
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financing Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
.'
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
l'lJ
- 1
¡
.1
¡
\
"
,
I
"BUSINESS CASE"
The Criteria!
This form deals with how work is
organized to support your Department's
Strategic approach to this year's Capital
demands. Each request is analysed to
reflect the value to the Town and its
Financial Review of this Request.
TOWN OF PICKERING
,¡.II'I OF "Ie
...° +",
~-~
~~;(;)
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Parks Account #: 2718
Project: Toro Gang Mower Project #:
Capital Budget Year: Previously Included In:
1999
Corporate Project Title:
Project Title & Location: (attach map)
Vehicle Replacement - Toro Gang Rotary Mower
Expected Starting Date: I ~xpected Completion Date:
Aug-99 N/A
Project Description:
Material required:
Location of Project:
Detailed information as to project description: Replace 1983 Gang Rotary Mower
Project Justification: $
Legislated Requirement
Health and Safety
Maintenance of Existing Infrastructure X 91,000
Extension of Life of Asset
Improve Customer Service
Improve Efficiency/Effectiveness
Other (Council, Public, Staff)
174
Page 2
1998 . ' New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad min istration/Overhead
Vehicles R 91,000 91,000
Other
Total 91,000 91,000
. Price includes trade-in value for the telesquirt vehicle.
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland R 91,000 91,000
Development Charges
Other
Total 91,000 91,000
¡rowth Related
et Expenditure to be Financed by/from: .'
175
Page 3
.. )inancing Approval
I
I ¡inancing for this project has previously been approved by Council and is available in Capital Account No:
,
j
, I Four Year Forecast
!CaPital Program 1999 2000 2001 2002 2003 Beyond
I $ $ $ $ $
I
,
91,000
¡
Operating Costs
rosts to be included in Operating Budget
or:
Software Maintenance Agreement
Operating Savings
¡here are two major benefits with this software
I
I: This software will ensure that there will be no
over expenditure without Department Head
approval.
t Software will generate operational efficiency which
¡ will reduce the need for additional buyer involvement
by having electronic catalogues.
t
layback Period: N/A
lash Flow Month: Quarter: Beyond
January April July October 1st 3rd 1999
I . f February May August Nov.
.-'rojec Ion
In/(Out) Flow March June Sept. Dec. 2nd 4th
¡ 91,000 0
r
Cost/Benefit Analysis
'rovide on separate page if necessary)
Life of Asset Approximately seven years.
íoviSion for
. . ture Repair/Replacement .'
j.
pprovals
repartment Approval
Finance Approval
Chief Administrative Officer
176
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
J'
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financing Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
,¡
¡
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the" Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore. Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
17'"
- (
I
I
I
J
I
rhis form deals with how work is
'organiZed to support your Department's
rtrategic approach to this year's Capital
'emands, Each request is analysed to
reflect the value to the Town and its
'financial Review of this Request.
1
"BUSINESS CASE"
The Criteria!
i
,I
ii,
TOWN OF PICKERING
""" OF' "'Ie
:o-.:~
iE¡::j¡¡; ð
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Parks & Facilities
Division: Parks Account #: 2718
Project:Play Equipment Project #:
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title: Kinsmen Park - Play Equipment Upgrade
Project Title & Location: (attach map)
Expected Starting Date: I Expected Completion Date: .
Aug-99 Aug-99
1o7rQject Description:
I
, I Material required:
I
I
I
t
'
Location of Project:
Detailed information as to project description: Existing play equipment does not meet CSA standards for Safety
¡
j
\
,\
'Project Justification:
!
I Legislated Requirement
, Health and Safety
r Maintenance of Existing Infrastructure
I Extension of Life of Asset
. Improve Customer Service
¡ Other (Council, Public, Staff)
.'
I
¡
$
x
X
X
X Safety
40,000
178
Page 2
1998 New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
Land
Buildings
Improvements - Parks X 40,000 40,000
- Roads
- Buildings
Engineering/Design
Adm i n istration/Overhead
Vehicles
Other
Total 40,000 40,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Parkland 40,000 40,000
Development Charges
Other
Total 40,000 40,000
3rowth Related
~et Expenditure to be Financed bylfrom: .'
;
,
ì
,
179
Page 3
I
'FinanCing Approval
~inanCing for this project has previously been approved by Council and is available in Capital Account No:
I
þaPital Program
'
!
j ¡
Four Year Forecast
1ll9
$
2O.QQ
$
~
$
2002
$
2M3
$
Beyond
40,000
Costs
I' Costs to be included in Operating Budget
¡for:
\
b . s .
I' peratlrn;¡ avmgs
Cost Reduction/Increased Revenue
\due to:
'î
"
I' Net
!
r
paYbaCk Period:
,\
I
N/A
I
.I Month' Quarter' Beyond
Cash Flow January April July October 1 st 3rd 1999
!
~roiection February May August Nov,
,\ /(Out) Flow March June Sept. Dec, 2nd 4th
40,000 0
10StlBenefit Analysis
This should ensure safe play equipment for park users
r
I
.'
J,..ife of Asset
brovision for 10 - 15 years
,.uture Repair/Replacement .
I
¡
I
lpprovalS
þepartment Approval
Chief Administrative Officer
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
1999-2000
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financinç¡ Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
~
i
I
i
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
¡
!
¡
,
Since approval of this provisional debenturing may require'long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASU RER'S APPROVAL
DATE APPROVED
lSjl
i'
r------------
I
i I
i Town of Pickering
!
0
~
II:
SUBJECT
PROPERTY
0
0::
0
>-
I
1:
U
~
CD
>-
0
~
en
0
0::
~
1-
Z
0
I
::;
0(
I
'-'
Z
::;
....
õ
FELDSPAR
COURT
~ONTGO~ERY
0
0(
0
II:
>:
u
0
a:
II]
-----"--,-
0
0(
0
II:
'"
u
0
II:
CD
CLEMENTS ROAD
MCPHERSON
COURT
C.N.R.
PARK RD.
l'
Planning Department
KINSMEN PARK - PLAY EQUIPMENT UPGRADE
192
I DATE FEB, 9/99
TOWN OF PICKERING
1999
~__Ct\eII ~J~~ue_llDJ~_I;L-
2719 PARKS & FACILITIES - COMMUNITY CENTRES
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
2,500
6176 Office Machines & Equipment
0
6178 Miscellaneous Equipment
1,200
6181 Other Fixed Assets
10,000
$13,700
FINANCING
1998
2823 General Fund
$13,700
I
í
2823 General Fund - Reserve
4230 Reserve Fund - Parkland
r
}
4225 Reserve Fund - Community Facilities
Débt
ì
¡ ,
$13,700
183
1999
BUDGET
$0
0
0
1,200
10,500
$11,700
0
1999
$11,700
0
0
0
0
$11,700
0
0
0
Page 1
1999 CAPITAL BUDGET
2719 PARKS & FACILITIES. COMMUNITY CENTRES
BACKGROUND INFORMATION
6157 Vehicles
6173 Furniture & Fixtures
6176 Office Machines & Eauicment
6178 Miscellaneous Eauicment
$0
$0
$0
$1,200
Supply 2 Indoor Basketball Backboards in
Gymnasium of East Shore Community Centre (replacement)
6181
Other Fixed Assets
$10,500
Supply & install Vertical Blinds at West Shore
Community Centre (replacement)
3,000
Paint line markings as per Handicap Parking
Regulations (10 spots)
2,500
Sliding Glass Patio Doors for Claremont
Community Centre - Multi Purpose Room
5,000
The following is included for information purposes only.
The Eastshore Community Centre is being funded debt. Breakdown of the costs
is presented below:
Initial Project Cost
Springier System
Total Project Cost
$700,000
49,000
$749,000
184
As submitted to Council May 10,1999
TOWN OF PICKERING
1999
CAPITAL BUDGET
__'_""H__mH_"- --,---" "-,--
2735 PARKS & FACILITIES. REC. COMPLEX - ARENAS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
0
6176 Office Machines & Equipment
0
6178 Miscellaneous Equipment
4,000
\
¡
:>
1"
6181 Other Fixed Assets
2,500
$6,500
FINANCING
1998
2823 General Fund
$6,500
2823 General Fund - Reserve
0
4230 Reserve Fund - Parkland
0
r
,
Reserve Fund
0
D~.bt
0
$6,500
185
1999
BUDGET
$0
0
0
3,500
7,500
$11,000
1999
$11,000
0
0
0
0
$11,000
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
Page 1
2735 PARKS & FACiliTIES - REC. COMPLEX - ARENAS
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & Eauipment
Miscellaneous Eauipment
1 double door cooler fridge
for O'Brien meeting room (replacement)
Other Fixed Assets
Paint line markings for Handicap Parking Spots
as per new regulation (6 spots)
Re-design Overhead Door controls
to Machine Room (health & safety) (Fire Code)
186
$0
$0
$0
$3,500
$7,500
$1,500
6,000
As submitted to Council May 10, 1999
TOWN OF PICKERING
1999
CAPITAL BUDGET
2572 SOCIAL SERVICES - SENIOR CITIZENS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
900
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
4,000
6181 Other Fixed Assets
$4,900
FINANCING
1998
2823 General Fund
$4,900
I
r
2823 General Fund - Reserve
4230 Reserve Fund - Parkland
Reserve Fund
Débt
$4,900
187
0
1999
BUDGET
$0
o
0
0
0
$0
0
0
1999
$0
0
0
0
0
. $0
0
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
2572 - SENIOR CITIZENS CENTRE
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & Eauipment
Miscellaneous Eauipment
Other Fixed Assets
Paint line markings as per Handicap Parking
Regl:Jlations ( 6 spots)
This amount is reflected in the capital
construction cost.
188
$0
$0
$0
$0
$-1,iOO Deleted T JQ
As submitted to Council May 10, 1999
,- ~--
TOWN OF PICKERING
1999
-,-- -____,ÇAPJIAL f31JDÇ;_~T
2713 RECREATION & FACILITIES. DUNBARTON POOL
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
350
6181 Other Fixed Assets
13.600
$13,950
FINANCING
1998
2823 General Fund
$13,950
2823 General Fund - Reserve
Reserve Fund
r
Reserve Fund
Debt
$13,950
189
0
1999
BUDGET
$0
0
0
2,450
19. 1 00
$21,550
0
0
1999
$21,550
0
0
0
0
$21,550
0
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
Page 1
2713 RECREATION & FACILITIES. DUNBARTON POOL
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
Office Machines & EQuipment
Miscellaneous EQuipment
1 only Lane Reel Holder (replacement)
1 "Water Beetle" (replacement)
Other Fixed Assets
Supply & install Fisher Water Operated Butterfly
Valve on Filter Tank (replacement)
Supply & install 4 Ball Valves on heating boilers
( replacement)
Re-grout pool and repair areas due to rebar
rusting at surface of walls and floor (replacement)
190
$0
$0
$0
$2,450
$1,500
950
$19,100
$9,600
1,500
8,000
As submitted to Council May 10, 1999
-'-'-- - --
TOWN OF PICKERING
1999
ÇAPITA~ BVR<3,ET .--- ,---,--------- - ,
2731 RECREATION & FACILITIES - REC, COMPLEX - CENTRAL CORE
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
16,650
,
ì
j
6176 Office Machines & Equipment
0
6178 Miscellaneous Equipment
60,000
6181 Other Fixed Assets
49,000
$125,650
FINANCING
1998
2823 General Fund
$125,650
2823 General Fund - Reserve
0
4230 Reserve Fund - Parkland
0
4225 Reserve Fund - Community Facilities
0
.' - Debt (Greater than 5 Years)
0
$125,650
191
1999
BUDGET
$0
5,000
125
30,000
99,750
$134,875
1999
$54,875
o
o
80,000
$134,875
Page 1
1999 CAPITAL BUDGET
2731 RECREATION & FACILITIES - RECREATION COMPLEX - CENTRAL CORE
BACKGROUND INFORMATION
6157 Vehicles $0
$5,000
6173 Furniture & Fixtures Reduced T JQ ~
20 New Drafting Tables for Art Room (replacement) $4,500
1 Two Drawer Filing Cabinet (replacement) 350
2 Value Task Chairs (replacement) 468
6176 Office Machines & EauiDment $125
1 Calculator (replacement)
$30,000
6178 Miscellaneous EauiDment Reduced T JQ $1&,&80
1 Climb & Slide Castle (replacement) $170
1 "Little Tykes" Cosy Cottage (replacement) 245
1 Photo Identification System (replacement) 4,000
4 Tennis Nets (replacement) 1,600
1 only Gym Mat (replacement) 800
Treadmill Belts (replacement) 10,590
Shoulder Press & Inclined Chest Press 4,220
Strength TraiJ:ling Machine (replacement)
192
As submitted to Council May 10, 1999
I
\
,
I
ì'
1999 CAPITAL BUDGET
2731 RECREATION & FACILITIES. RECREATION COMPLEX. CENTRAL CORE
BACKGROUND INFORMATION
Bicep Curl & Tricep Extension
Strength Training Machine (replacement)
Seated Leg Extension & Leg Curl Combination
Strength Training Machine (replacement)
Pectoral Contractor & Rear Deltoid Combination
Strength Training Machine (replacement)
Blood Pressure Cuff, Bulb, Valve & Stethoscope
Chrome Plated Dumbbells (replacement)
6181
Other Fixed Assets
Perform Roof replacement and repair (Phase I)
Supply & install Armstrong In-line recirculating
pump (replacement)
Supply & install counters and sinks in upstairs
men's & women's public washrooms (replacement)
Supply & Install VAT. floor in banquet hall
washrooms & creative centre (replacement)
Supply & install carpet in entrance of
Combatants Room (replacement)
Paint line markings as per handicap parking
regulations (6 spots)
Perform cleaning & maintenance of Duct Work in Central
Core Area (Health & Safety)
193
4,840
5,235
4,065
135
680
Reduced T JQ
80,000
7,000
5,000
6,500
1,000
1,500
6,500
Page 2
$99,750
$107,600
CF
As submitted to Council May 10, 1999
¡
i
I
"BUSINESS CASE"
The Criteria!
i
I'his form deals with how work is
organized to support your Department's
"'¡¡¡trateg¡c approach to this year's Capital
¡emands. Each request is analysed to
reflect the value to the Town and its
Tnancia' Review of this Request.
TOWN OF PICKERING
..." O" "/C'
tst'
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
Department: Recreation & Facilities
Division: Account 2731
Facilities
Project: Short Title Project #:
Roof Replacement Recreation Complex (Phase I)
Capital Budget Year: Previously Included In:
1999 1998
Corporate Project Title:
Project Title & Location: (attach map)
Roof Replacement - Recreation Complex
Expected Starting Date: Expected Completion Date:
Jul-99 Aug-99
I~roject Description:
,
I
I
I
I Location of Project:
;
I
¡
¡
Material required:
Detailed information as to project description:
Supply and install new roofing system to Recreation Complex
Central Core Area as per drawing (attached).
Pickering Recreation Complex - Central Core area
See attached
loiect Justification:
, Legislated Requirement
Health and Safety
Maintenance of Existing Infrastructure
Extension of Life of Asset
Improve Customer Service
¡ Other (Council, Public, Staff)
j
$
Replacement of Roof to extend life of facility
80,000
194
Page 2
1998 , . New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets
land
Buildings R 80,000 80,000
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Ad ministratio n/Overhead
Vehicles
Other
Total 80,000 80,000
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current)
User Revenue
Reserve/Reserve Fund - Community Facilities R 80,000 80,000
Development Charges
Provincial Subsidy
Other
Total 80,000 80,000
..
Growth Related
'Jet Expenditure to be Financed by/from:
195
Page ~ .
l~inanCing Approval-
financing for this project has previously been approved by Council and is available in Capital Account No:
}
I Four Year Forecast
faPita, ProQram 1m 2QQQ 2QO1 2O.Q2 2.0.0.3 Beyond
I $ $ $ $ $
Expenditure: anticipated
f financing - Community 80,000 80,000 80,000
I Facilities Reserve Fund
bperating Costs
I ¡Costs to be included in Operating Budget
for:
\
,..Þperating SavinQs
I Cost Reduction/Increased Revenue
}dUe to:
Net
\
.I
Payback Period: N/A
I
I
I
¡ MQo1b.; Quarter' Beyond
Cash Flow January April July October 1 st 3rd 1999
rO¡ection February May' August Nov. 80,000 Other Phases Approx.
/(Out) Flow March June Sept. Dec. 2nd 4th $160,000
Jost/Benefit Analysis
(Provide on separate page if necessary)
¡
I
Life of Asset Pháse II and III to be budgeted in 2000 and 2001 in order to complete replacement
rOViSiOn for of entire roof (Central Core Area).
'uture Repair/Replacement
~pprovals
~epartment Approval
Finance Aþproval
1 ('
Chief Administrative Officer
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Project Description and Location
ORIGINATING DEPARTMENT
Page 4
Finance Reference #:
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
YEAR
Treasurer's Report
1999-2000
AMOUNT
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
FinancinQ Sources
~
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
.'
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
I
II
I
1
)
I
1
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASU RER'S APPROVAL
DATE APPROVED
l~é
..
MNI
896 Brock Road South, Unit 1O, Plcki?llflCl Ontain L 1 ''OJ' =9
Roofing Limited
Tel. (905) 831-6664
Fê!X (90518J~,;-¡;-O
November 11, 1998,
THE TOWN OF PICKERING,
Parks & Facilities Dept"
Pickering Recreation Complex,
1867 Valley Farm Road South,
Pickering, Ontario,
LIV 3Y7.
Copies - 5 pages
Fax.
- 905-831-4181
- 905-831-1711
Bus,
Attn:
Mr. Chris Siddle
Hr. Tim Hunter
Re:
reroofing of - Recreation Complex (partial) - as per attached maps
Dear Sir:
We are pleased to submit for your perual, prices and specifications to assist
you in preparing a budget price for reroofing of the 3 main roof areas at your
complex here in Pickering, Ontario.
You will find attached, 3 drawing which I have prepared to help you orient
yourself to these areas,
1)
The specifications that are proposed, are as follows -
2)
3)
4)
5)
6)
7)
8)
A complete removal and disposal of the existing roofing (EPD~), ballast,
insulation, metal work, down to the steel deckin~.
Supply and install a new vapour barrier, adhered in a fire-retardant
adhesive,
Supply and install a new base layer of insulation - 2,5", R.18,5, ISO
insulation,
Supply and install a new cap layer of insulation - !.z" Fibreboard, R,I,4,
fully adhred in hot asphalt,
Supply and install a new Soprema 2 ply modified-bitumen roofing system,
base layer to be mopped, cap layer to be torch-applied.
Supply and,install the Soprema 2 ply modified-bitumen flashing system, all,
to be installed as per Soprema's specifications and instructions,
*The above system carries the 10 year Labour and Material Guarantee as
issued to the owners by Soprema upon their inspection and approval of our
installation,
Supply and install new drains fitted with the u-flow mechanical seal to
prevent water backup.
Supply and install new stack jacks around all plumbing pipes.
~.~
\ ~ I\:,," i
\~. "...;:;/
~~ NAllU\1AL
~ noorll\G
(.;u.¡rnN.;~
. ' 'AS,<;I'lOATK Nt 9 :3
-m: Itln()rJln
I':' r:(I.N:~":tor. r I' 'N
L;,I N;'~()I ",\1 II '¡'I
OIRCA
().MNI
Page 2
9)
All of the skylights are to be flashed, raised, and caulked as per Soprema's
specifications,
10)
New expansion and control joints are to be installed as required.
11)
New cant strip, fastening bars, caulking, and EPDM repairs to the duct
work are included,
12)
Supply and install new 26 gauge, prepainted, metal to match the existing
metal flashings are to be supplied and installed as per proper sheet metal
practices and methods,
13)
All safety procedures are to be strictly followed as per the Governments
guidelines and codes.
14)
Any damage to the grounds, walls, etc" are to be repaired to your satisfaction.
All of the above work to be carried out to the 3 buflding~ as outlined on the
accompanying maps, for the sum of - $245,155,00) - TWO HUNDRED AND FORTY-FIVE THOUSAND,
ONE HUNDRED AND FIFTY-FIVE DOLLARS,
The P,S.T, taxes are included in the above price,
The G,S.T, taxes are not included in the above price.
We trust that the above price. specifications. and information meets with your approval,
and we look forward to working with you once again in the near future.
If you require any further information or clarification of any of the prececding, please
do not hesitate to call me.
Yours truly,
OMNI ROOFING LIMITED,
(¿¿;
Senior Estimator,
(J ,?"S ..
¡.,{~ ; s
ð~ )d
cd.
6A.~K~tooJ ..J
~ ¿, fIoo< / ¡C ¡ (.C. ,
,4' ~ <# / (S«. -r' ) - I' (;.s; dl M., ""
II #~ (" I') - ør 9.3/ ¡.ro, of)
,'#'J. (f/Þ II) ~ 8"', Koo.-:J
~
#< il ~5: /5:>'
'1- iJ .. "/-fllJ. ... ¡( - t? ¡1. IJ .,., . ~
(~'I'c.,)
£~"~5
.,./., .
tÞ-
¡,19J
¡ .
,
--......
\~
~ ~
~"<i ;.,
?,\ '{
\, ('
'J, IJ G¡
, '<
r-..
()..
J
~ ~ ~
\'/-.'.1 ~
I
\:
'"
~
~
.J
c~
.Do ~;"""Q" K
(~'I')) ,-1/ .)
( AtI'4¡i()
~
.)" 'í'
. "8" ø
. ~/'J' ,"
\7
'"
13'8' ,
7'3 "
I
"
~ f' ~
)t ~ .:
.,¡1. ~
49'
..
~
[ilJJ " oJ '
ŒlI]
. IJ'
.!) '" L r:: w .", / f (e, ¡Ø. ,/), /71 '
c,
,r/
v
1
, '
~
'j' "G. 1'1'
:;
...
a
~
.. 4'
1.3/' 9'1 tffijs . .7",[f). ~ ~ '3
I~ I
S .s
'". . C¿2)
;;",t-Æ.,-,us
tV .I.G,
200
, G '
ŒJ []] Œ @ ŒJ [1] 0 [i] IT] [] m 0 [}] 0~'
/t 90"" "
1/
J~ I L. :)
(~~f~)
i
. .;}I' ,I '
~_...- -.t-~-, - - .
¡;:.f. ~
.4'
041
(.J.11/ --- -,¡
(,... f,,~ :: ~
S ,.I. '", J ) -s
, ...
..... £"...
r- ~
<1'
[1].'1/
I
. /JI,)", (9
. .
. '"
~VH~' ~ f',f
'I"" /'
'. ..
. . 9' 3' .
($
II. I, C,
Œ),
~
(,
"
<¿j~
"", ~
ro '1' ~
---.......
ç;
"
'" ,
a., .
(~
I
\,
~
ø
"1
;, ')
u., J
G:(
G)
~
'-1
()
"
1'./
\.
J^ ~"
~, "
~o
I!," ..
1"1'
"". ~ -"
....-,
""~.
~ )(.'
"~ ,.
'c,, ;'
";:":"" :. ".,
, ". / l.,'
". /,
. .
~
, J.
G.~'
GJ
m
?
~
,,/
,.
,,¡ I
~
V5J
0
1.1)
'.<. '
tffijs ql .' t., :'\.
(" ,.. o~ .t
.;) .:> ~,. V
:J I.;
99'G"
., ~tij :,
@
. 'I'.
.!)n Iw. 0( /( (~.~.A ,I,)
~
..
~
"
// ~
I J / /911 [J ~
)
," ".....
,," ~7 .' \
v' ~ <)
~
201
/. j.
,
. ,"
r::n I 8'
(ilJ
I, I
"II
11'~1/
;'
I
,'7/ .1
~l!
, Ii
, ,)", /
'\ .' 1/
"
"
^~
',i
. ..
. I ~ r
1..I/Œ0'
~
----'-'_.._-,-,-,---- 9/'(, '1'--
121'3 'I -------
0 80 ŒJ ". ~
~
ŒJ~'
<l'
@
I
I
I
~
I
oJ J I (, 'I
!
}
!
3S'
! .
J
'I
7ol~
¡)I ~;
i
\
/11~¡;"~
C:j ---. :r..I.",)
. '1' .
(.1 '
ŒJ
3<"
1/1
17'
1.'J14'1
IT}!. I
-,
~
~
1:\
~
I
~
(
~ I
87'
fIffiq ~ .
/.1.1
S .s
.~
;'
'J>f
\° \}~.' , ~/'
~I. It}
9~
'J:. ~ .
i'
'O~
~;>
v
~/
.1ß\
41/
. ..
QOt')
..., '-
,
,',
/"
¡'t'
, .
(",/>," ,
/
<;0 ,.
?, -.:'
.; ...,-"
"
"
, .
(g)
,.r:
'/
~.
9" ~
(!)
..
1
'{,
J
::!
CQ
IO$'1
'1 T 'c,. " -.
LJ...a<woriK -(E'P.[)/1')
/3/'1'/ -
'1,)lý"
---'-- --- .. -"
. ----..-
;; //
/ .. ,.¡-//Í . " ....(
N' I. C.
........... J
r".
Q-
f:: '
q I '
",\.)
\~" \)
" "-
I
\:
'"
,
-(
l
)
(::)
))u ~"«..JQo1 ¡f'
(-::"</..0 "I .)
( ~,#,;.()
"""'
.
~l
~ ~ ~
~': "
~~ @
. '18" ø
, I
I.'; '2 '
I
I
"""01
ß".,f,...,
"",~~~I
~,,'I ~
~4"t ~
ot..'"
.,¿
r :::.'""
rl
7'.3 "
\
\
9~'c;. //
í:
I
)
I
v
?,
;>
"
4,) "
~
,.
<.?
1).. '- f w 0 -f /(" ¿, ~ j), ,flf)
,,4'
!
,~' f' ~
"t (i' ,; ,
'.I. ~
[I[I] ".J ¡
ŒJJ
41'
. ,J'
ŒJŒJQJŒJŒJŒJ00
/} 90'"1- '¡
/
II
¡)1 I '\
( ,;.f" - f~') )
( S'
Il rJ rA~ ,-"J~ s
N. /. C,
r(/of \
( ~. .,) I{ to /4 .Jt..'
\.: ",f' .. v' Þ
); S'."'S¡"J.
;11'
{" £.'.0
Q ¡(I'"
.,>11 611-
" ¡tI foÃ
, ".4
",II"
¡.AfJ. .,)
~ .'
4~
~t.'" ,."",r
é- II"t.
,203
13/'9'1
tffiJ' .7G ~
S.s ' ,,¡ .
1 ~ '
S S
I~ '
~
(9
, ~ I
ŒJ ŒJ [£] [I] ŒJ 0~1
eA q 1'"
.)1 "
------
.. J '
- 4',
0."
w.dl---- u;¡
(.NTJlt... ~ ~
s,j""j) ~
,
,.,., C'.
'" ~
<:1
ŒJ.11
I ~
13'3"
. ~1
pI H~; ,~
I
e.,1"
¡;.i,. .ref &:I1Ie. -f- AIUA-
(/?¡1.,D.,4t')
( IJI ( J II. - ¡J .." : C$)
, , 9']' .
ø
;/, ¡. c:'
-- U_--¡
\
Q
<:
0
Q:
'"
u
0
Ir
iD
;0
0
»
0
Q
ð
Ir
ALLIANCE
J:
~
iD
STR
BAYLY
j II/II I ^ I 1\1 \
i Town of Pickering
I
>-
a
Z
<:
VI
;0
0
»
0
0
a:::
0
>-
I
'"
..J
00(
VI
'"
u
0
a:
iD
STREET
I IIIIII I
BAYLY
\ r--íl
\ (
STREET
¡ I " ,.---¡--
Planning Department.
ROOF REPLACEMENT - RECREATION COMPLEX
l'
I DATE FEB. 9/99
') , i
....U'"t
TOWN OF PICKERING
1999
---- --- '-------- ----~_Ç~P'-TAhß_~DG_çL_u__u_----,---
2733 RECREATION & FACILITIES - REC. COMPLEX - POOL
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
7,850
6181 Other Fixed Assets
51,200
$59,050
FINANCING
1998
2823 General Fund
$59,050
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
Debt
$59,050
205
0
1999
BUDGET
$0
0
125
12,200
32,500
$44,825
0
0
1999
$44,825
0
0
0
0
$44,825
0
0
0
6157
6173
6176
6178
6181
1999 CAPITAL BUDGET
Page 1
2733 RECREATION & FACILITIES. RECREATION COMPLEX - POOL
BACKGROUND INFORMATION
Vehicles
$0
Furniture & Fixtures
$0
Office Machines & EQuiDment
$125
1 Calculator (replacement)
Miscellaneous EQuiDment
$12,200
$1,500
7,250
2,500
950
$32,500
Supply lane reel holder (replacement)
Supply BIF feeder for constant supply of Soda
Ash to filter tank (replacement)
Supply Filter Element Covers (replacement)
1 "Water Beetle" (replacement)
Other Fixed Assets
Remove 2 existing diving platforms and supply
1 Durafirm Stand and repair tile on pool
deck (replacement)
$12,000
Perform repairs to concrete Filter Tank due to
deterioration of walls and floor (replacement)
5,500
Supply & apply sealer and paint to
Acoustical Insulation on walls around perimeter of
swimming pool (replacement)
15,000
206
As submitted to Council May 10, 1999
TOWN OF PICKERING
1999
Ct\PITAI,.. ßUQGI;I
2711 CULTURE & RECREATION - ADMINISTRATION
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
600
6178 Miscellaneous Equipment
4.175
6181 Other Fixed Assets
$4,775
FINANCING
1998
2823 General Fund
$4.775
2823 General Fund - Reserve
Reserve Fund
Reserve Fund
0
Debt
0
$4,775
207
0
1999
BUDGET
$0
940
0
5.145
0
$6,085
0
0
1999
$6.085
0
0
0
0
$6,085
0
6157
6173
1999 CAPITAL BUDGET
2711 CULTURE & RECREATION -ADMINISTRATION
BACKGROUND INFORMATION
Vehicles
Furniture & Fixtures
1 pedestal filing cabinet (Director's Office) (replacement)
1 two drawer filing cabinet - Administrative Assistant
(replacement) !
I
I
6176 Office Machines & EauiDment
6178 Miscellaneous EauiDment
Portable Tents (replacement)
6181 Other Fixed Assets
208
$0
$940
$610
330
$0
$5,145
'Page
$0
As submitted to Council May 1O, 1999
TOWN OF PICKERING
1999
CAPITAL BUDGET --- '-"-------
2712 CULTURE & RECREATION - PROGRAMS
CLASSIFICATION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
¡
I
.
i
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
. 7,735
6181 Other Fixed Assets
$7,735
FINANCING
1998
2823 General Fund
$7,735
2823 General Fund - Reserve
0
Reserve Fund
0
Reserve Fund
0
Debt
0
$7,735
209
0
1999
BUDGET
$0
0
1,200
2,535
0
$3,735
0
0
1999
$3,735
0
0
0
0
$3,735
Page
1999 CAPITAL BUDGET
2712 CULTURE & RECREATION - PROGRAMS
BACKGROUND INFORMATION
6157 Vehicles $0
6173 Furniture & Fixtures $0
6176 Office Machines & EauiDment ~
$1,200 Reduced T JQ
Fax Machine (for Program Registration Area)
6178 Miscellaneous EauiDment $2,535
Electric Ball Inflator (replacement) $425
Portable Stereo for Claremont Fitness Classes 1,191
1 Set Headworn Microphone & Transmitter 919
ill! Other Fixed Assets $0
210
As submitted to Council May 10. 1999
TOWN OF PICKERING
1999
CAPITAL BUDGET
-,-, ---- ._, - --------....---.-
2744 CULTURAL SERVICES. MUSEUM
CLASSIFICATION
1998
BUDGET
6149 Restoration - Museum Buildings
$8,500
6157 Vehicles
6173 Furniture & Fixtures
1,836
6176 Office Machines & Equipment
817
6178 Miscellaneous Equipment
1,763
6181 Other Fixed Assets
20,000
$32,916
FINANCING
1998
2823 General Fund
$32,916
I.
f
2823 General Fund - Reserve
0
4230 Reserve Fund - Parkland
°
Reserve Fund
0
Donations - (For School House Project)
°
¡
I'
Debt (Greater than 5 Years)
0
$32,916
211
°
1999
BUDGET
$103,650
0
1,896
0
2,088
3,125
$110,759
1999
$20,759
o
45,000
o
45,000
$110,759
1999 CAPITAL BUDGET
Page 1
2744 CULTURAL SERVICES. MUSEUM
BACKGROUND INFORMATION
6149 Restoration Museum BuildinQS $103,650
Restoration of School House - (matching funds
contribution with Museum Fund Raising initiatives) $90,000 PL
(Project total cost is $90,000 partially offset by
donation of $45,000).
Gazebo Foundation to eliminate lifting causing stress 4,900
Ties - Drive Shed. to secure roof 1,250
Restoration of Entrance Doors on Chapel - install
ramp for accessibility 5,000
Restoration of Gas & Steam Barn Collection 2,500
6157 Vehicles $0
§ill Furniture & Fixtures $1,896 ~ Reduced T JQ
Work station accessories
6176 Office Machines & EQuiDment $0
6178 Miscellaneous EQuiDment $2,088
6 Picnic Tables (replacement) $1,688
1 Metal Detector (Gas & Steam Barn) 400
6181 Other Fixed Assets $3,125
Lighting - Front Entrance sign & driveway - (safety)
212
As submitted to Council May 10, 1999
TOWN OF PICKERING
1999
CAPITAL BUDGET
2745 LIBRARIES
CLASSIFICA TION
1998
BUDGET
6157 Vehicles
$0
6173 Furniture & Fixtures
80,659
6176 Office Machines & Equipment
169,492
6178 Miscellaneous Equipment
223.100
6181 Other Fixed Assets
399,449
$872,700
FINANCING
1998
2823 General Fund
$639,600
2823 General Fund - Reserve for Replacement
0
4227 Reserve Fund - Dev. Charges (7.2)
93,148
4225 ReseNe Fund - Comm. Facilities
129,952
1623 Provincial Subsidy
10,000
Debt
Federal Government Grant
$872,700
213
1999
BUDGET
$0
18,843
87,690
180,000
83,540
$370,073
1999
$188,723
o
130,000
o
o
0
51,350
$370,073
1999 CAPITAL BUDGET
2745 PICKERING PUBLIC LIBRARY
BACKGROUND INFORMATION
§1g Vehicles
2.lli Furniture & Fixtures (includes aoolicable taxes)
Additional book return box for Central
Provision for ergonomic furniture (replacement)
Furniture for new systems staff work area
Staff area re-organization (Reference & Tech. Services)
Rouge Hill desk re-design & chair
Provision for Signage
Furniture for Family Search workstation
Shelving components
Furniture for children (public area) Central
Slat wall display units
Spinners for Claremont (2)
CD Spinner rack for children's dept (Central)
Sub Total
6176 Office Machines & Eauioment (includes aoolicable taxes)
Web Pac hardware & software (to put library catalogue
on the Web)
Improve telecommunications for Greenwood & Claremont
Data projector for group instruction
Wireless microphone for presentations, training etc.
Increase RAM on Dynix server to meet contract standard
Enriched Bisac software for on-line collection ordering
Provision for replacement wkstns, monitors & keyboards
Provision for Software (e.g. scheduling, presentation)
Installation of equipment + cabling
Upgrade Public word processing units to Win 98 with
appropriate software (includes "crash less component")
214
Page 1
$0
$18,843
$894
2,775
2,775
2,775
2,220
333
1,665
1,110
444
2.498
1,021
333
18,843
$87,690
$22,200
4,329
11,100
1,665
5,017
3,108
3,330
2,220
2,220
4,523
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
2745 PICKERING PUBLIC LIBRARY
BACKGROUND INFORMATION
6176 Office Machines & EQuipment Cont'd.
Upgrade public Dynix dumb terminals to PCs (multi-year
project) (6 wkstns - incl. 3 large screen monitors)
(includes"crashless component")
21" monitor for use by sight impaired patrons with new
PC to allow access to GUI interface
Sound cards for some public workstations
Staff PC for Children's Information Desk
Printer for Technical Services (replacement)
Television for Rouge Hill Branch
Uninterrupted Power Supply (UPS) .
Retrofit public workstations with "crashless component"
(10 workstations)
Sub Total
6178 Miscellaneous EQuipment (includes applicable taxes)
General Collection Materials (Books, etc.)
1999 Funding request
New and collection items (books, etc.) to meet
population growth.
Collection Building for Western Branch
Part of multi-year collection development program to
provide satisfactory resources at the opening of planned
new branch.
Transfer to contigency reserve as per Council budget
meeting of April 6,1999.
6181 Other Fixed Assets (includes a,PPlicable taxes)
Central Library
Redesign drpp box area
Interior paint
Permanent wall for Reference office
215
13,448
3,527
500
1,862
287
834
305
7,215
87,690
$50,000
130,000 (DC)
ðO;OOO
$9,435
2,775
7,215
Page 2
$180,000 .
$83,540
As submitted to Council May 10, 1999
1999 CAPITAL BUDGET
Page 3
2745 PICKERING PUBLIC LIBRARY
BACKGROUND INFORMATION
6181 Other Fixed Assets (includes aDDUcable taxes) Contd.
Rouqe Hill
Interior paint
1,665
Greenwood
Roof replacement
11 ,100
Internet Training Lab
(Funded 100% by Human Resources Development
Canada)
51,350
Equipment and services required for the lab includes
the following:
8 Computers
8 Tables & chairs
1 Overhead Projector
Website Design Consultant
Total
$
31,280
5,520
9,200
5,350
51,350
Western Branch Project
The following is included for information purposes only.
The Western Branch has been funded from the
following sources:
Community Facilities Reserve Fund
Development Charges Reserve Fund
General Fund
SubTotal
Add:
1999 Budget - Book Collection (Contingency
Reserve)
Less: Consulting Fees
Current Project Balance
$399.420
276,097
639,983
$1,315,500
50,000
(22,790)
$1.342,710
Actual construction start date yet to be established.
216
As submitted to Council May 10,1999
TOWN OF PICKERING
,¡.II'I OF "Ie
~o_%
~œ:~
~
1999 CAPITAL BUDGET
BUSINESS CASE SUMMARY
I
I
I
,
fhis form deals with how work is
brganized to support your Department's
'StrategiC approach to this year's Capital
~emands, Each request is analysed to
leflect the value to the Town and its
'FinanCial Review of this Request.
I
¡
"BUSINESS CASE"
The Criteria!
Department:
Division: LIBRARY Account #:
3264-2745-6176
Project: Short Title Project #: N/A
INTERNET ACCESS TO LIBRARY SERVICES
Capital Budget Year: Previously Included In:
1999
Corporate Project Title: N/A
Project Title & Location: (attach map)
CENTRAL LIBRARY & BRANCHES
Expected Starting Date: I Expected Completion Date:
May-99 Oct-99
Detailed information as to project description: Will allow Pickering Public Library to
make its library catalogue and other information resources, plus various bor-
rowing functions, available to card-holders over the Internet, and will allow gate-
way and interface access to other libraries' catalogues on the World Wide Web.
I Project Justification:
f Extension of Life of Asset
I Improve Customer Service
I Other (Public, Staff)
I
!
¡
'Project Description:
.
,
¡ Material required:
I .
¡ Location of Project:
I
I
II
WEBPAC GATEWAY SOFTWARE
Ameritech (Dynix) Inc.proprietary software,
related hardware and licences
To be operated from the Central Library
$
Maintains Library's accessibility and relevance in an age of digital
and paper information resources.
Makes Library collection-based services more broadly accessible
and at times when the Library buildings are closed
Reduces staff intervention needed in borrowing transactions
Software & Licences
Installation & training
Server
10,200
3,000
9,000
£)1"
.:... I
Page 2
1998 . . New/ 1999
Budget Expenditure Replacement Upgrade Quantity Budget
(To be completed by the appropriate Department)
$ $ $ $
Furniture & Fixtures
Office Machines & Equipment
Other Fixed Assets Software & Licences 10,200 All sites
Training, install & h/w 12,000 1 22,200
Land
Buildings
Improvements - Parks
- Roads
- Buildings
Engineering/Design
Administration/Overhead
Vehicles
Other
Total 22,200 22,200
1998
Budget Financing N/R $ $ N/A $
(To be completed by the Finance Department)
Property Tax (current) 22,200 22,200
User Revenue
Reserve/Reserve Fund
Development Charges
Other
Total 22,200 22,200
3rowth Related
~et Expenditure to be Financed by/from: '
218
i
I
i
i
,
- \
¡
J
Page 3
1. . A I
financing pprova
'linancing for this project has previously been approved by Council and is available in Capital Account No:
¡ Four Year Forecast
CaPital Program 1999 2000 2001 2002 2003 Beyond
¡ $ $ $ $ $
I
I 22,000
II. perating Costs
Costs to be included in Operating Budget
for: Annual Maintenance 0 1,500 1,500 1,500 1,500 annual rate
¡Operating Savings
lost Reduction/lncreased Revenue Not estimatable
¡ue to: Reduced need for added staff
!
,Jet
¡
aybaCk Period: N/A N/A
Month: Quarter: Beyond
~Sh Flow January April July October 1st 3rd 1999
. rojection February May August Nov.
In/tOut) Flow March June Sept. Dec. 2nd 4th
ì
J
Cost/Benefit Analysis Will alleviate walk-in business volumes at all sites by increasing user ability to perform own
I searches, holds, renewals, etc. for library materials, from home, office, other location with
Internet accessibility, at any time of the day.
Life of Asset
1
ovision for N/A
Jture Repair/Replacement
.'
pprovalS
¡epartment Approval
Finance Approval
Chief Administrative Officer
91 .
J",. J
Page 4
FINANCE DEPARTMENT
REQUEST FOR PROJECT APPROVAL
Finance Reference #:
Project Description and Location
ORGINATING DEPARTMENT
ESTIMATED STARTING DATE
ESTIMATED COMPLETION DATE
BUDGET REFERENCES:
1999-2000
YEAR
AMOUNT
Treasurer's Report
I certify that the financing sources proposed for this project are valid and accurate.
A summary of the financing for this project follows:
Financing Sources
1999 Preliminary Proposed
Budget Allocation
(Total Project)
Proposed Financing
(Phase 1)
Notes:
DEBENTURE FINANCING
UPDATED ANNUAL LIMIT
Since approval of this provisional debenturing may require long term debt for which payment will be required beyond
the term for which Council is elected, the Treasurer has updated the Town's financial debt and obligation limit in
accordance with Section 4 of the Regulation respecting the Municipal Statute Law Amendment Act, 1992. The
Treasurer has determined that the limit has not been exceeded. Therefore, Council is not required to obtain approval
for this project from the Ontario Municipal Board.
TREASURER'S APPROVAL
DATE APPROVED
t') : ) O. .
i:" '-
I
I
!
.j
TOWN OF PICKERING
1999
. CAPITAL Bl.JDGJ;T-
2950 - Y2K
CLASSIFICATION
1998
BUDGET
2196 Vehicles
$0
6173 Furniture & Fixtures
6176 Office Machines & Equipment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
$0
Approved by Town Council on February 15, 1999
FINANCING
1998
2823 General Fund
$0
¡
I
.
2823 General Fund - Reserve
0
4225 Reserve Fund - Community Facilities
0
Reserve Fund
0
Débt (Greater than 5 years)
0
$0
221
0
1999
BUDGET
$0
0
0
0
179,000
$179,000
0
0
0
1999
$0
0
179,000
0
0
$179,000
6157
6173
6176
6178
6181
Vehicles
Furniture and Fixtures
1999 CAPITAL BUDGET
2950 - Y2K
BACKGROUND INFORMATION
Office Machines and EauiDment
Miscellaneous EauiDment
Other Fixed Assets
~
Parks & Facilities
Culture & Recreation
Public Works
Clerks
Customer Care
Transportation
Library
Fire
$82,340
0
574
5,610
14,000
1,840
72,916
1,720
Total cost to be funded through community facility reserve fund.
222
Page 1
$0
$0
$0
$0
$179,000
As submitted to Council May 10, 1999