HomeMy WebLinkAboutENG 06-24Report to
Executive Committee
Report Number: ENG 06-24
Date: May 6, 2024
From: Richard Holborn
Director, Engineering Services
Subject: Rouge Stormwater Management Pond Sediment Cleanout
- Request for Tender No. T2024-1
- File: A-1440
Recommendation:
1. That Request for Tender No. T2024-1 for Rouge Stormwater Management Pond
Sediment Cleanout as submitted by Cardan Demolition & Excavation Inc. in the total
tendered amount of $521,898.13 (HST included) be accepted;
2. That Council approve the hiring of T.Y.Lin International Canada Inc. as a consultant, in
the amount of $75,650.00 (HST excluded) to undertake contract administration and
construction supervision of Request for Tender No. T2024-1 for Rouge Stormwater
Management Pond Sediment Cleanout in accordance with Purchasing Policy 10.03 (c),
as the assignment is above $50,000.00;
3. That the total gross project cost of $670,011.00 (HST included), including the tendered
amount, consulting cost, a contingency and other associated costs, and the total net
project cost of $603,366.00 (net of HST rebate) be approved;
4. That Council authorize the Director, Finance & Treasurer to finance the total net project
cost of $603,366.00 as approved in the 2023 Capital Budget to be funded by a transfer
from the SWM Reserve Fund; and,
5. That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this report.
Executive Summary: The purpose of this report is to obtain authority to award Request
for Tender No. T2024-1 for Rouge Stormwater Management (SWM) Pond Sediment Cleanout
to Cardan Demolition & Excavation Inc.
In 2023, T.Y.Lin International Canada Inc. (TYLin) was retained to undertake the detailed
design and approvals for the Rouge SWM Pond Sediment Cleanout project. Staff recommend
continuing with TYLin to undertake the contract administration, construction supervision and
certification of works associated with Request for Tender No. T2024-1 Rouge SWM Pond
Sediment Cleanout project as set out in fee proposal dated January 9, 2024 in the amount of
$75,650.00 (HST excluded).
Request for Tender No. T2024-1 was advertised on Bids & Tenders on Tuesday, February 6,
2024 and closed on Friday, March 8, 2024 with 18 bidders responding. The lowest compliant
ENG 06-24 May 6, 2024
Subject: Rouge Stormwater Management Pond Sediment Cleanout
Request for Tender No. T2024-1 Page 2
bid of $521,898.13 (HST included) submitted by Cardan Demolition & Excavation Inc. is
recommended for approval. The total gross project cost which includes the tendered amount, a
construction contingency, and other associated costs is estimated at $670,011.00 (HST
included) with an estimated total net project cost of $603,366.00 (net of HST rebate).
Financial Implications:
1. Tender Amount
Request for Tender No. T2024-1 $461,856.75
HST (13%) 60,041.38
Total $521,898.13
2. Estimated Project Costing Summary
Request for Tender No. T2024-1 – Tender for Rouge SWM Pond
Sediment Cleanout $461,857.00
Associated Costs
Contract Administration and Construction Supervision 75,650.00
Construction Contingency (12%) 55,423.00
Sub Total – Costs $592,930.00
HST (13%) 77,081.00
Total Gross Project Cost $670,011.00
HST Rebate (11.24%) (66,645.00)
Total Net Project Cost $603,366.00
3. Approved Source of Funds
Expense Code Source of Funds Approved Budget Required
C10525.2301.01 –
504550 SWM Reserve Fund $1,250,000.00 $603,366.00
Total $1,250,000.00 $603,366.00
Net project cost (over) under approved funds $646,634.00
Relationship to the Pickering Strategic Plan: The recommendations in this report
respond to the Pickering Strategic Plan Priority of Lead & Advocate for Environmental
Stewardship, Innovation & Resiliency.
ENG 06-24 May 6, 2024
Subject: Rouge Stormwater Management Pond Sediment Cleanout
Request for Tender No. T2024-1 Page 3
Discussion: The purpose of this report is to obtain authority to award Request for Tender
No. T2024-1 for Rouge Stormwater Management (SWM) Pond Sediment Cleanout to Cardan
Demolition & Excavation Inc.
The City of Pickering hired T.Y.Lin International Canada Inc. (TYLin), formerly known as The
Municipal Infrastructure Group Ltd., in June 2019 to undertake the Stormwater Management
Facilities Asset Management Plan (AMP). The project was awarded through RFP-3-2019.
The AMP has identified the Rouge SWM Pond as the first priority for the City’s maintenance
works plan and, based on the pond’s deteriorated state and a cost analysis, the AMP has
recommended a maintenance and cleanout option for the Rouge SWM Pond restoration. Staff
recommended the Rouge SWM Pond Sediment Cleanout project in the 2023 Capital Budget,
with the intent of proceeding with design and approvals in 2023, followed by construction in
2024.
The Rouge SWM Pond was constructed in 1993 to provide water quality and quantity control
for a 27 hectare drainage area, according to the applicable criteria at the time. The Rouge
SWM Pond services the Bramalea Subdivision which is located northwest of the intersection of
Twyn Rivers Drive and Woodview Avenue, as shown on the Location Map (Attachment 1).
Currently, the southern wet cell portion of the Rouge SWM Pond is full of accumulated
sediment and requires cleanout. Additionally, the hickenbottom outlet control structure is
clogged resulting in an elevated permanent pool and reduced overall performance. The Rouge
SWM Pond no longer meets the minimum water quality objectives according to the Ministry of
the Environment, Conservation and Parks guidelines, and the City of Pickering’s Stormwater
Management Design Guidelines.
Request for Tender No. T2024-1 was advertised on Bids & Tenders on Tuesday, February 6,
2024 and closed on Friday, March 8, 2024 with 18 companies responding. The lowest
compliant bid of $521,898.13 (HST included) submitted by Cardan Demolition & Excavation
Inc. is recommended for approval. The total gross project cost which includes the tendered
amount, a construction contingency, and other associated costs is estimated at $670,011.00
(HST included) with an estimated total net project cost of $603,366.00 (net of HST rebate).
In 2023, TYLin completed the detailed design and approvals for the Rouge SWM Pond
Sediment Cleanout project. Staff recommend continuing with TYLin to undertake the contract
administration, construction supervision and certification of works associated with Request for
Tender No. T2024-1 Rouge SWM Pond Sediment Cleanout project as set out in fee proposal
dated January 9, 2024 in the amount of $75,650.00 (HST excluded). The hiring of TYLin and
its team of sub-consultants, represents good value as they have the necessary project history,
specifically the technical and existing conditions information of the Rouge SWM Pond
Sediment Cleanout project, knowledge and expertise.
Further, in accordance with Purchasing Policy Item 10.03, the Manager may obtain the
services of a particular consultant selected by the initiating Director without going through a
competitive process. Where the funds are available in the approved budget and the project or
annual cost of a consulting or professional service assignment is expected to be:
ENG 06-24 May 6, 2024
Subject: Rouge Stormwater Management Pond Sediment Cleanout
Request for Tender No. T2024-1 Page 4
(c)above $50,000 is subject to the additional approval of Council. The initiating Director
shall submit the Report to Council to obtain approval.
All required pre-conditions of award have been received and approved.
Upon careful examination of all tenders received, the Engineering Services Department
recommends acceptance of the lowest compliant bid submitted by Cardan Demolition &
Excavation Inc. for Request for Tender No. T2024-1 in the amount of $521,898.13 (HST
included), and that the total net project cost of $603,366.00 (net of HST rebate) be approved.
Attachment:
1.Location Maps
Prepared By: Approved/Endorsed By:
David Lo, CPT, C.E.T. Richard Holborn, P. Eng.
Senior Coordinator, Infrastructure Design Director, Engineering Services
Bob Trajceski, M.Eng., P.Eng., PMP Stan Karwowski, MBA, CPA, CMA
Senior Water Resources Engineer Director, Finance & Treasurer
Cathy Bazinet, CPPB, NIGP-CPP
Manager, Procurement
DL:mjh
Recommended for the consideration
of Pickering City Council
Marisa Carpino, M.A.
Chief Administrative Officer
Original signed by:Original signed by:
Original signed by:Original signed by:
Original signed by:
Original signed by: