HomeMy WebLinkAboutOPS 16-23Report to Council
Report Number: OPS 16-23
Date: May 23, 2023
From: Brian Duffield
Director, Operations
Subject: Greenwood Library and Oddfellows Hall Window Replacement
-RFQ No. Q2023-6
-File: A-1440
Recommendation:
1.That Request for Quotation No. Q2023-6 for Greenwood Library and Oddfellows Hall
Window Replacement as submitted by Roof Tile Management Inc. in the amount of
$182,500.00 (HST included) be received;
2.That the Capital Budget for the Greenwood Library Windows Replacement (account
C10220.2204) be cancelled and that these funds be applied to fund the Oddfellows Hall
Window Replacement Capital Budget;
3.That only the Oddfellows Hall Window Replacement, as submitted by Roof Tile
Management Inc. as part of W2023-6, in the amount of $110,570.50 (HST included) be
awarded;
4.That the total gross project cost of $121,871.00 (HST included), including the amount of
the tender, contingency, consulting and other associated costs, and the total net project
cost of $109,749.00 (net of HST rebate) be approved;
5.That the Director, Finance & Treasurer be authorized to finance the net project cost of
$109,749.00 as approved in the 2022 Capital Budget and funded from the Rate
Stabilization Reserve; and,
6.That the appropriate City of Pickering officials be authorized to take the necessary
action to give effect hereto.
Executive Summary: Greenwood Library, located next to Greenwood Public School on
Westney Road, and Oddfellows Hall located on the lower site of the Pickering Museum Village
are both historic buildings over a hundred years old. Both have wood frame windows that have
deteriorated with age and have been identified for replacement. Custom reproduction with
single pane float glass is required in both cases.
Request for Quotation No. Q2023-6 was issued, including both scopes of work and has
resulted in bids exceeding the available budgets for each of the projects, individually. Given
that Greenwood Library has been closed since approximately 2015, and that its windows have
been shuttered and protected with plywood, and that Oddfellows Hall will serve as the main
staff hub for the museum during the pending construction of the Pickering Heritage &
OPS 16-23 May 23, 2023
Subject: Greenwood Library and Oddfellows Hall Window Replacement Page 2
Community Centre (PHCC), it is recommended that the available budgets be pooled and
dedicated towards replacing the existing windows only at Oddfellows Hall.
Request for Quotation No. Q2023-6 was advertised on the City’s bids & tenders portal on
March 28, 2023 and closed on April 20, 2023. One bid was received. All required pre-
conditions of award have been received and approved; therefore, the lowest compliant bid
submitted by Roof Tile Management Inc. in the amount of $110,570.50 (HST included), limited
to the replacement of windows at Oddfellows Hall, is recommended for approval. The total
gross project cost is estimated to be $121,871.00 and the total net project cost is estimated at
$109,749.00 (net of HST rebate).
Financial Implications:
1.Quotation Amount
RFQ No. Q2023-6 (Oddfellows Hall windows only) $97,850.00
HST (13%) 12,720.50
Total Gross Tender Cost $110,570.50
2.Estimated Project Costing Summary
RFQ Q2023-6 (Oddfellows Hall windows only) $97,850.00
Contingency 10,000.00
Total Project Cost $107,850.00
HST (13%) 14,021.00
Total Gross Project Costs $121,871.00
HST Rebate (11.24%) (12,122.00)
Total Net Project Cost $109,749.00
3. Approved Source of Funds – Parks’ Capital Budget
Approved Code Source of Funds Funds Available Funds Required
C10250.2213 Rate Stabilization $65,000.00 $65,000.00
C10250.2213 Rate Stabilization 0.00 44,749.00
C10220.2204 Rate Stabilization 45,000.00 0.00
$110,000.00 $109,749.00
Project Cost under (over) approved funds by $251.00
The Greenwood Library Window Replacement capital project (C10220.2204) will be cancelled
and the $45,000.00 funding for this project will be applied to the Oddfellows Hall Window
Replacement capital project (C10250.2213).
OPS 16-23 May 23, 2023
Subject: Greenwood Library and Oddfellows Hall Window Replacement Page 3
Costs shown above include previously committed and separately awarded consulting and
related project costs. They are funded from the same accounts and have been included for
clarity regarding the total cost of the project.
Discussion: Oddfellows Hall was constructed in 1869 and moved to the museum’s current
site in 1972 along with the whole site relocation from Brougham. The building was again
relocated a short distance within the lower site in 2015 and substantially restored. Its windows
were not replaced as part of that project due to budget constraints, but have since deteriorated
to a point where they risk becoming a hazard if they are not replaced. Due to the age of the
building and historic construction of the wood frame windows and glass, custom replacement
windows are required to maintain the building’s appearance and to maintain the character of
the City’s living history museum.
Greenwood Library was built in 1860 and most recently served as a branch library until its
closure in 2015. The building remains vacant and is currently only used for storage.
Deterioration of its historic wood windows is primarily focused on the storm windows on the
exterior face of the building, with the main windows behind remaining in fair condition. The
scope of work carried in Q2023-6 was limited to replacement of the exterior storm windows,
which have since been shuttered and protected by plywood to help protect against further
deterioration and to better secure this remote facility. The City is currently undergoing a
Facilities Renewal Study which is expected to be completed by the end of 2023. The study will
include recommendations regarding future investments on the Greenwood Library and other
aging buildings.
The museum has spent the past year adjusting its operations and relocating staff in order to
accommodate the closure of the upper site for the construction of PHCC, expected to
commence late this summer, and closing the upper site until early 2026. Oddfellows Hall has
been converted into staff offices and will serve as the primary staff hub on site until PHCC is
ready for occupancy. Given the condition of its windows and essential function at the museum
for the next few years, it is recommended that available budget be pooled and that work at
this location be given priority.
As bid prices have exceeded available budgets for each individual budget by more than ten
percent, per section 11.02 of the Financial Control Policy (FIN 030), and as funding is
proposed to be repurposed and reallocated to prioritized needs, Council approval is required
in order to proceed.
Request for Quotation No. Q2023-6 was advertised on the City’s bids & tenders portal on
March 28, 2023 and closed on April 20, 2023. One bid was received. All required pre-
conditions of award have been received and approved; therefore, the lowest compliant bid
submitted by Roof Tile Management Inc. in the amount of $110,570.50 (HST included), limited
to the replacement of windows at Oddfellows Hall, is recommended for approval. The total
gross project cost is estimated to be $121,871.00 and the total net project cost is estimated at
$109,749.00 (net of HST rebate).
OPS 16-23 May 23, 2023
Subject: Greenwood Library and Oddfellows Hall Window Replacement Page 4
Attachment: None.
Prepared By: Approved/Endorsed By:
Original Signed By: Original Signed By:
Vince Plouffe, OAA, MRAIC Stan Karwowski, MBA, CPA, CMA
(Acting Director, Operations) Director, Finance & Treasurer
Original Signed By:
Sarah Douglas-Murray
Director, Community Services
Original Signed By:
Cathy Bazinet, CPPB, NIGP-CPP
Manager, Procurement
VP:nm
Recommended for the consideration
of Pickering City Council
Original Signed By:
Marisa Carpino, M.A.
Chief Administrative Officer