HomeMy WebLinkAboutBy-law 7999/23The Corporation of the City Of Pickering
By-law No. 7999/23
Being a by-law to limit the gross vehicle
weight of any vehicle or any class thereof
passing over a bridge under the jurisdiction
of the Corporation of the City of Pickering
pursuant to the Highway Traffic Act, R.S.O.
1990, c.H.8, as amended.
Whereas, pursuant to Section 123 (2) of the Highway Traffic Act R.S.O. 1990 C.H.8,
as amended, the municipal corporation or other authority having jurisdiction over a
bridge may by by-law, limit the gross vehicle weight of any vehicle or any class thereof
passing over the bridge.
Now therefore the Council of The Corporation of the City of Pickering hereby enacts as
follows:
1.In this by-law “gross vehicle weight” means the total weight in tonnes transmitted to
the highway by a vehicle or combination of vehicles and load.
2.No vehicle or combination of vehicles or any class thereof, whether empty or loaded,
shall be operated over those bridges as set out in Column 1 and Column 2 of
Schedule A to this by-law where the gross weight exceeds that set out in Column 3
of Schedule A to this by-law.
3.This by-law shall not become effective until a notice of the maximum limit of gross
vehicle weight permitted, legibly printed, has been posted in a conspicuous place at
each end of the bridge.
4.Any person violating the provisions of this by-law is guilty of an offence and on
conviction is liable to a fine as provided in the Highway Traffic Act, R.S.O. 1990, c.
H.8, as amended from time to time.
5.That the engineers statement verifying the gross vehicle weight limit specified in
Section 2 of this by-law are set out in Schedule B, attached and forms part of this by-
law.
6.By-law Number 7807/21 is repealed.
By-law passed this 27th day of March 2023.
Original Signed By
________________________________
Kevin Ashe, Mayor
Original Signed By________________________________
Susan Cassel, City Clerk
Schedule A
Bridge Load Limits
Column 1 Column 2 Column 3
Bridge No. Bridge Location Maximum Gross
Vehicle Weight
6003 North Road
0.4km south of Seventh Concession Road
15 tonnes
6004 Sideline 32
0.7km South of Seventh Concession Road
20 tonnes
7002 Seventh Concession Road
2.1km east of Markham-Pickering Townline Road
15 tonnes
7004 Sideline 34
0.2km South of Eighth Concession Road
10 tonnes
8001 Eighth Concession Road
0.3km east of Markham-Pickering Townline Road
15 tonnes
8003 Eighth Concession Road
0.9km west of Regional Road #23
20 tonnes
8004 Sideline 20
0.3km south of Regional Road #5
20 tonnes
8007 Sideline 12
0.1km south of Regional Road #5
20 tonnes
9003 Sideline 28
0.3km north of Regional Road #5
20 tonnes
9006 Sideline 4
1.4km north of Regional Road #5
10 tonnes
Schedule B
By-law 7999/23
Professional Engineers representing the consulting firm Keystone Bridge Management
Corporation, have reviewed the restriction of the gross vehicle weight passing over the
bridges as identified in the above noted by-law.
Effective as of the date of approval of the bylaw, I agree with the recommended gross
vehicle weight limit as set out in By-law 7999/23 for a period of twenty four (24) months.
Signed Signed
Dated
Keystone Bridge Management Corp.
Your Bridge Asset Management Specialist
May 10, 2023
Mr. Richard Holborn , P.Eng.
Director, Engineering Services
City of Pickering
One the Esplanade
Pickering , ON L 1V 6K7
Re : Schedule "B" By-law 7999/23
Dear Richard ,
Keystone Bridge Management Corp . is pleased to furnish herewith the signed above captioned By-law.
The bridges were examined by Mr. Boris Mihov, P.Eng. and myself on May 06, 2023 . Our
endorsement signatures and seals on the By-law are predicated on the following understandings and
undertakings :
The gravel fill between the curbs on this bridge shall be maintained to not more than 15 cm thickness,
and in addition to the 15-tonne load limit signing, the signage stating, "Loaded Trucks Must Occupy
Centre of Bridge " shall continue to be maintained in place .
6004
The deck soffit at the north end between the girders is delaminated and spalled and becoming
vulnerable to a punching type of failure . See Figure 1 appended to this letter. This should be repaired
with a full depth patch not later than the end of construction season 2023.
The gravel fill between the curbs on this bridge shall be mainta ined to not more than 15 cm thickness ,
and in addition to the 20-tonne load limit signing , the signage stating , "Loaded Trucks Must Occupy
Centre of Bridge " shall be maintained in place .
7002
The gravel fill between the curbs on this bridge shall be maintained to not more than 5 cm thickness ,
and in addition to the 15-tonne load limit signing, the signage stating, "Loaded Trucks Must Occupy
Centre of Bridge " shall continue to be maintained in place . Furthermore, TC54 type barrels shall be
placed against the railings to discourage wheel loading on the exterior T-beam girders .
We alert you to the following serious deficiencies that require remedy :
• There is severe erosion at the SW corner of the bridge that has encroached on the traveled
part of the roadway . (Figure 2)
• There is a damaged rail post in the NE corner. (Figure 3)
7 14 -Unit B, Front Rd Kin gsto n, ON Ca nada K7M 4L5 Ph : (6 13) 384-3272 Ce ll : (6 13) 449-3272
e-mai l: haro ld @keystoneb ridge.ca web: www .keystoneb ridge.ca
• Page2 May 10, 2023
• Guiderail on the approaches is required.
• Ongoing girder end deterioration of the interior T-beams, particularly at the east end is slowly
compromising the shear capacity of the girders. (Figure 4)
This structure should be prioritized for replacement. Before the bylaw is renewed again this bridge will
require a load test to confirm its capacity.
7004 (Hoover)
The load posting on this bridge has been increased to 10-tonnes predicated on a load test completed in
December 2022.
The railings on this bridge are partially failed and completely inadequate. This structure should be
prioritized for replacement.
There is a very severe spall in the deck surface of the NE quadrant. (Figure 5). This is a very
significant vulnerability that will lead to a deck punching failure. This must be repaired ASAP and not
later than the end of the 2023 construction season.
The stream channel has migrated and is attacking the south side upstream of the bridge. (Figure 6).
8001
The gravel fill between the curbs on this bridge shall be reduced to not more than 15 cm thickness, and
in addition to the 15-tonne load limit signing, the signage stating, "Loaded Trucks Must Occupy Centre
of Bridge" shall continue to be maintained in place.
This structure should be prioritized for replacement.
8003
Load posting signs for 20 tonnes shall be maintained. The present TC-54 traffic barrels should be
maintained so that they are one metre from the outside edge of the curbs.
8004,8007, 9003
Load posting signs for 20 tonnes shall be installed. The fill on the deck shall not exceed the height of
the curbs.
Load posting signs for 10 tonnes are required for the By-law to have force. The consultant that
designed the most recent bridge rehabilitation should review the load posting as well, as it may be
possible to increase the capacity of the bridge after the rehabilitation.
All Structures
Road surfaces at all structures were generally potholed and rough. A rough surface on a structure can
increase the dynamic loading. Grading of the surfaces is strongly encouraged.
'' • Page 3 May 10, 2023
General
Our signatures on the By-law are not an endorsement of the overall safety or functional adequacy of
the bridges . The missing and inadequate barriers on some of the structures is a very pressing concern
that must be addressed separately by the City of Pickering.
Keystone Bridge Management strives to help you get the most out of your bridge infrastructure
investment.
Sincerely,
Harold Kleywegt, P.Eng.
Managing Director
Boris Mihov , P.Eng.
Associate Sr. Structural Engineer
• Page4
Figure 1 Site 6004 North end soffit delamination
-.·
.,
........ ";-~ ::,:·
·. ·-· ... -
·~. ~--,4,{ . ..:"~ .
··: .....
i.: ... ;,:. .\., .......
,!,,., .,,
-~ -~ ·. ':
-·_;:·:--:
Figure 2 Site 7002 Gullying & erosion encroaching driving lane in SW approach
May 10, 2023
• Page 5 May 10, 2023
Figure 3 Site 7002 Broken railing post NE corner
Figure 4 Site 7002 ongoing deterioration of interior girder east end
• Page6 May 10, 2023
.~'
Figure 5 Site 7004 Hoover Bridge severe spall in NE deck quadrant requires urgent repair
Figure 6 Site 7004 scour erosion of south bank upstream of bridge.