Loading...
HomeMy WebLinkAboutPLN 01-23Report to Planning & Development Committee Report Number: PLN 01-23 Date: January 9, 2023 From: Kyle Bentley Director, City Development & CBO Subject: Draft Plan of Subdivision Application SP-2021-02 Zoning By-law Amendment Application A 15/21 OPB Realty Inc. Eastern Portion of the Pickering Town Centre Lands, West of Glenanna Road and South of Kingston Road Recommendation: 1. That Draft Plan of Subdivision Application SP-2021-02, submitted by OPB Realty Inc., to establish a plan of subdivision on the easterly portion of the Pickering Town Centre lands, consisting of 9 development blocks for a mix of high-density residential, office and commercial uses, 1 parkland block and 2 public roads, as shown on Attachment #5 to Report PLN 01-23, and the implementing conditions of approval, as set out in Appendix I, be endorsed; 2. That Zoning By-law Amendment Application A 15/21, submitted by OPB Realty Inc., to permit a high-density, mixed-use development on the easterly portion of the Pickering Town Centre lands, be approved, and that the draft Zoning By-law Amendment, as set out in Appendix II to Report PLN 01-23, be finalized and forwarded to Council for enactment; and 3. That no further notice is to be given in respect of the proposed by-law, where a change is made in a proposed by-law after the holding of the public meeting. Executive Summary: On September 1, 2022, OPB Realty Inc., owner of the Pickering Town Centre, requested that the consideration of Draft Plan of Subdivision Application SP-2021-02 and Zoning By-law Amendment Application A 15/21 be deferred from the September 6, 2022 Planning & Development Committee meeting to the January 9, 2023 Planning & Development Committee meeting. The lands subject to the applications are on the easterly portion of the Pickering Town Centre lands (“PTC lands”) along Glenanna Road, between Kingston Road and Pickering Parkway (see Location Map, Attachment #1). In December 2021, OPB Realty Inc. (“PTC Ownership”) submitted applications for Draft Plan of Subdivision and Zoning By-law Amendment for the PTC lands, and the rezoning application also applied to the City lands located on the south side of the Esplanade South between Glenanna Road and Valley Farm Road. In partnership with the City, the first phase of their development included: a new expanded Central Library facility; a new Performing Arts Centre; PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 2 a new Seniors & Youth Centre; various mixed-use, high-density buildings ranging in height between 9 and 50 storeys; 3 parks; and internal public and private roads connecting all of the buildings and uses and providing access to Glenanna Road (see Original Phase 1 Master Plan, Attachment #4). At the Special In-Camera Council meeting of March 11, 2022, Council received a significant update related to the long-term fiscal and economic impacts of the City Centre project. Council decided to defer all work related to the City facilities on the project, pending further Council direction. No decision related to the City facilities and the City lands are being considered through the approval these applications. In June of 2022, PTC Ownership submitted revised applications for the PTC lands only, for a high-density mixed-use development, with buildings heights ranging between 9 and 55 storeys (see Revised Phase 1 Master Plan, Attachment #6). Key changes made to the proposal include: doubling the size of the parkland; increasing the total number of residential units; reducing the total amount of commercial/retail space; and refining building heights. The revised Draft Plan of Subdivision for the PTC lands proposes to create 9 development blocks, 1 parkland block and a network of new internal public and private roads (see Revised Draft Plan of Subdivision, Attachment #5). The rezoning application is to transfer the allowable Floor Space Index attributed to the proposed public roads and public parks to the development blocks. The applicant is also requesting site-specific amendments to reduce the minimum residential parking ratio, increase building height for certain development blocks, and other minor technical amendments. The revised draft plan of subdivision and the implementing zoning by-law would allow for the flexibility should the City decide to pursue the City Centre project. To ensure the City Centre is developed with a mix of uses to create a dynamic and vibrant downtown, PTC Ownership has agreed to provide a total minimum of 12,000 square metres of net floor area for office and other complementary uses within the first phase of the development. In addition, they have agreed to provide an aggregate minimum of 2,000 square metres for commercial/retail uses in the first phase of development with a minimum of 150 square metres of commercial/retail space to be provided on the ground floor of each building. City Development staff are in support of the revisions to the draft plan of subdivision and zoning by-law amendment. The proposal is in keeping with the City's vision of the City Centre as a distinct urban place; a place that inspires, a place to live, work and play, all in a compact and walkable environment. The proposal is consistent with the Provincial Policy Statement and conforms with the Provincial Growth Plan, and the Durham Regional and Pickering Official Plans. The proposed zoning amendment does not change the amount of development that can occur but allows taller buildings in appropriate locations to minimize shadow impacts. Staff will continue to work with PTC Ownership to ensure the design of buildings and the quality of the public realm spaces create a human-scale development. Any outstanding technical requirements that need to be addressed will be dealt with through the Site Plan Approval process. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 3 Staff recommend that Council endorse Draft Plan of Subdivision SP-2021-02, as shown on Attachment #5 to this Report, and the conditions of approval set out in Appendix I to this Report. Staff recommend that the site-specific implementing by-law, as set out in Appendix II to this Report, be finalized and forwarded to Council for enactment. Additionally, Section 34(17) of the Planning Act states that where a change is made in a proposed by-law after the holding of the public meeting, Council shall determine whether any further notice is to be given in respect of the proposed by-law. Considering that a total of 1,571 notices were mailed out to area residents regarding these applications and the City received limited comments from the public and the improvements to the proposal are consistent with the City’s vision for the City Centre, staff recommend that further public notice is not required. The nine development blocks will be subject to site plan approval, in which detailed design issues will be dealt with. Financial Implications: No direct costs to the City are anticipated as a result of the recommendations of this report. 1. Background In July 2014, City Council approved Official Plan Amendment 26 (“OPA 26”), which introduced new designations and policies and changed existing policies to create a framework for the redevelopment and intensification of the City Centre. OPA 26 was approved with modifications on March 4, 2015, by the Ontario Land Tribunal (“OLT”), previously known at that time as the Ontario Municipal Board (“OMB”) and has been in full force and effect since then. On April 11, 2017, Council approved a new comprehensive City-initiated City Centre Zoning By-law 7553/17, and City Centre Urban Design Guidelines. Following the approval of these documents, on June 12, 2017, Council approved Official Plan Amendment 29 (“OPA 29”) to remove the density cap for the City Centre. The removal of the cap provides further opportunities for intensification, allowing for a greater number of units to be achieved within the same building envelope. During the preparation of these documents, City Development staff had extensive discussions with representatives for OPB Realty Inc. (“PTC Ownership”), regarding their long-term redevelopment plans of the Pickering Town Centre lands (“PTC lands”). At that time, PTC Ownership representatives advised that due to department store restrictions, the PTC lands would continue to be used as a commercial centre. For this reason, the implementing planning documents only identified a network of private roads internal to the site and did not address further intensification of the property and integration of the mall site into the surrounding urban fabric, which would be necessary steps to ensure the creation of a complete community. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 4 Since Council's approval of these documents, the vision for the PTC lands has changed significantly to reflect evolving market conditions and consumer demands, which was triggered largely by the closure of Sears Canada on this site. As a result, in September 2019, Council approved a City-initiated Zoning By-law Amendment (By-law 7713/19), which applied to the easterly portion of the PTC lands located on the west side of Glenanna Road between Kingston Road and Pickering Parkway, and City-owned lands on the south side of The Esplanade South (“City lands”) (see Location Map and Air Photo Map, Attachments #1 and #2). This amendment increased the maximum building heights on certain portions of the PTC lands and City lands; added residential uses to the City’s lands; revised the definition of floor space index for the entire City Centre; and introduced a new definition of net floor space for the entire City Centre. This City initiated rezoning was intended to prepare the City lands to form a part of a new City Centre project. This by-law was appealed to the OLT by Canadian Apartment Properties Real Estate Investment Trust (“CAPREIT”), owners of Pickering Place. However, the appeal was formally withdrawn in March 2021, after the City approved Minutes of Settlement. By-law 7713/19 is now in effect. 2. Applicant’s Original Proposal Following the closure of the Sears retail store at the PTC, and the relocation of the movie theatres to the west side of the mall, the City and PTC Ownership identified an opportunity to accelerate the redevelopment of the City Centre, and explore new and innovative ways to repurpose underutilized lands at the mall site for both City facilities and new residential/retail development. The City began working in conjunction with PTC Ownership to develop the City Centre Project for a high-density mixed-use development. As part of these discussions, representatives for PTC Ownership initiated a Master Plan review of the PTC lands in August of 2021. The purpose of the Master Plan review was to demonstrate how the balance of the PTC lands can be redeveloped in an integrated and coordinated manner over time. This review also assisted in determining the future development blocks; identifying the alignment and configuration of public and private streets; resolving key issues concerning site servicing, stormwater management, and on-site flood storage; and determining the location and size of public parks, and privately-owned publicly accessible spaces. In December of 2021, PTC Ownership submitted applications for Draft Plan of Subdivision and Zoning By-law Amendment for the PTC lands and City lands, to implement the first phase of the Master Plan (see Original Draft Plan of Subdivision, Attachment #3 and Original Phase 1 Master Plan, Attachment #4). The original proposal included: • a new expanded Central Library facility, which would replace the existing central library; • a new Performing Arts Centre, anticipated to feature a theatre, visual arts gallery and rehearsal/program spaces; PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 5 • a new Seniors & Youth Centre, anticipated to feature a full-sized gymnasium, meeting/program rooms, and youth and seniors spaces; • a 50-storey signature landmark residential rental building to be constructed on top of the Seniors & Youth facility; • various mixed-use, high-density buildings ranging in height between 9 and 50 storeys, containing a total of 3,871 new residential units, and approximately 6,046 square metres of new commercial/office/retail space; • on the City lands, 3 mixed-use buildings having heights of 38 storeys, 6 storeys, and 30 storeys, containing a total of 932 residential dwelling units, and 229 square metres of retail/commercial space at grade; • 3 park blocks totalling an area of 0.28 of a hectare, which would meet the parkland dedication requirements for the PTC lands and City lands; and • internal public and private roads connecting all of the buildings and uses, and providing access to Glenanna Road. An electronic Statutory Public Meeting was held for the original proposal on February 7, 2022. 3. Council’s Decision at the Special In-Camera Council Meeting of March 11, 2022 At a Special In-Camera Council meeting on March 11, 2022, Council received a significant update related to the long-term fiscal and economic impacts of the City Centre project. Council decided to defer all work related to the City facilities on the project, pending further Council direction. Following Council’s decision, PTC Ownership continued to work with City staff to amend their proposal to remove the City facilities and the City lands, and further refine their draft plan of subdivision and accompanying zoning by-law amendment. 4. Applicant’s Revised Proposal In June of 2022, PTC Ownership submitted revised applications for Draft Plan of Subdivision and Zoning By-law Amendment for the PTC lands only, for a high-density, mixed-use development, with buildings heights ranging between 9 and 55 storeys. Key changes made to the proposal include: • doubling the size of the parkland from a total of 0.28 of a hectare (5 percent of the total land area) to 0.58 of a hectare (10 percent of the total land area); • increasing the total number of residential units to 5,099 units; • reducing the total amount of commercial/retail space to 3,418 square metres; and • further increasing building heights on Blocks 1, 6, 7, 9 and 10 in order to accommodate the transfer of the Floor Space Index (FSI) attributed to the additional parklands to be conveyed to the City. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 6 4.1 Revised Draft Plan of Subdivision The revised Draft Plan of Subdivision for the PTC lands proposes to create nine development blocks for a mix of high-density residential and commercial uses; one parkland block; and a network of new internal public and private roads that will provide access to Glenanna Road (see Revised Draft Plan of Subdivision, Attachment #5). The table below provides a summary of the proposed land uses and land area associated with each proposed development block (see Revised Phase 1 Master Plan, Attachment #6). Development Block Number Land Area Proposed Use Blocks 1, 3, 4, 5, 6, 7, 8, 9 and 10 approx. 4.33 hectares • various mixed-use, high-density buildings ranging in height between 9 and 55 storeys; • a total of 5,099 new residential dwelling units; • a total of 3,418 square metres (36,791 square feet) of new retail/commercial space at grade. Park Block 2 approx. 0.58 of a hectare • the parkland has increased in size from 0.28 of a hectare to 0.58 of a hectare; • the parkland now represents 10 percent of the total land area to be developed; • the parkland will be conveyed to the City for parkland dedication. Public Roads B and D approx. 0.84 of a hectare • proposed public roads providing frontage along each development block. 4.2 Revised Zoning By-law Amendment The applicant has requested the following site-specific amendments to support the revised proposal: • transfer the allowable Floor Space Index (FSI) attributed to the proposed public roads and public parks to the future development blocks; • reduce the minimum residential parking ratio for apartment dwellings from 0.8 spaces per unit to 0.65 spaces per unit; • increase maximum building heights as follows: • Block 1: 50 storeys to 55 storeys; • Blocks 3, 4 and 8: 40 storeys to 50 storeys; • Block 5: 40 storeys to 42 storeys; • Block 6 and 7: 40 storeys to 48 storeys; • Block 9: 40 storeys to 53 storeys; • allow certain development blocks to locate the required outdoor and indoor amenity areas on another abutting lot; and • remove the requirement for a minimum main wall stepback, between the podium and tower, for select residential towers. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 7 As noted above, the City lands have been removed from this proposal, and as such, the proposed amendments apply to the PTC lands only. PTC Ownership will be responsible for submitting a Site Plan Application for each development block, where the City will have additional opportunities to review detailed technical matters concerning, but not limited to, architecture, urban design, landscaping, and engineering. As part of the site plan applications, PTC Ownership will be required to develop and submit a phasing plan for the entire Phase 1 Master Plan. 5. Comments Received 5.1 February 7, 2022, Electronic Statutory Public Meeting and Written Comments An electronic Statutory Public Meeting was held on February 7, 2022. Notice of the public meeting regarding these applications was provided through a mailing to all properties within 150 metres of the subject lands (in total, notice was mailed to 1,571 property owners). In addition, development signs were posted along Kingston Road, Pickering Parkway, Glenanna Road and The Esplanade South. A copy of the notice of the electronic statutory public meeting was included in the January 20 and February 3, 2022, News Advertiser. The City received two written comments from the public, and one resident spoke at the meeting. The following is a list of key comments and concerns expressed by area residents at the meeting and in written submissions: • questioned if and when road improvements, (including traffic light coordination), will be made to accommodate the increased traffic as a result of the proposed development; • concerned about potential shadow impacts as a result of the high-density buildings proposed on the City of Pickering lands; • questioned whether the proposed parkland dedication is sufficient to serve future residents; • requested clarification as to what commercial uses are proposed for the development; and • questioned what the future use of the existing library building will be and whether The Esplanade Park, located east of City Hall, will remain. Key questions/comments raised by members of the Planning & Development Committee at the electronic Statutory Public Meeting include: • questioned whether the proposed development is consistent with Provincial Plans and policies related to major transit areas; • questioned if the proposed development will be constructed in phases; • questioned the scope of the City-initiated traffic study and timeline for completion of the study; and • questioned if the proposed buildings will be high-performance buildings that are energy efficient and green. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 8 5.1.1 No further public notice is required Section 34(17) of the Planning Act states that where a change is made in a proposed by-law after the holding of the public meeting, Council shall determine whether any further notice is to be given in respect of the proposed by-law. The determination of the council as to the giving of a further notice is final and not subject to review in any court, irrespective of the extent of the change made in the proposed by-law. Following the Statutory Public Meeting on February 7, 2022, PTC Ownership revised their proposal to increase building heights on Blocks 1, 6, 7, 9 and 10, and increase the size of the parkland. When an applicant requests for an increase in building heights after the public meeting, the City typically holds another public open house or statutory public meeting. A total of 1,571 notices were sent to property owners regarding these applications resulting in the City receiving two written comments from the public and one resident who spoke at the meeting. Considering that PTC Ownership has doubled the size of the parkland and the minimal comments received by the public, staff recommend that additional public notice is not necessary to give further notice to the changes to the applicant’s proposal. 5.2 Comments from Agencies 5.2.1 Region of Durham • the proposal incorporates a wide variety of residential and non-residential uses, consistent with the directives of the Provincial Plan and Policies, the Region of Durham Official Plan, the Pickering Official Plan and Zoning By-law; and • the Region has no concerns with the draft plan of subdivision and the zoning by-law amendment, subject to the applicant satisfying the Region’s comments related to various matters including servicing, transportation, and noise and vibration. 5.2.2 Durham Regional Police, Radio Systems – Communications • proposed buildings on Blocks 6, 7 and 8 will be an obstruction to the Region’s Public Safety Microwave paths and affect the system's operation for Police and Fire communications; • to address this issue, the applicant has three options: 1. reduce the height of the proposed buildings that are directly in the path; 2. move the buildings out of the path; or 3. route the microwave path either over or around the obstructions (the costs associated with this option are the responsibility of the applicant). 5.2.3 Metrolinx • the proposal falls within 300 metres of Metrolinx’s Pickering GO Station and Kingston Subdivision, which carries Lakeshore East Go Train services; • Metrolinx does not have any further concerns regarding the revised proposal; PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 9 • requested that a noise report be prepared and submitted for review; • requested that a warning clause be provided advising purchasers of the railway right-of-way; • requested the Owner grant Metrolinx an environmental easement over the subject lands for operational emissions; and • requested the applicant work with Metrolinx to ensure pedestrian connections are provided between the subject lands and the Pickering GO Station. 5.2.4 Ministry of Transportation (MTO) • no objections; • the applicant’s submitted Traffic Impact Study identifies road improvements that may be required as a result of further growth within the City Centre; and • future development in the City Centre may not be permitted until appropriate road improvements are completed. 5.2.5 Canadian National Railway • requested that a noise report be prepared and submitted for review; and • requested that warning clauses, restrictive covenants, and environmental easements are provided advising purchasers of the railway right-of-way, and that noise and vibration measures are not to be altered. 5.2.6 Durham Catholic District School Board • no objections; and • students from this development will attend Father Fenelon Catholic Elementary School located at 795 Eyer Drive, and St. Mary Catholic Secondary School located at 1918 Whites Road. 5.3 Comments from City Departments 5.3.1 Engineering Services • no objections to the proposed zoning by-law amendment application; and • technical matters related to grading, drainage, site-servicing, stormwater management and landscaping can be addressed through the site plan approval process. 5.3.2 Fire Services • No comments at this time. 6. Planning Analysis 6.1 The proposal meets the directives of the Provincial Policy Statement The Provincial Policy Statement, 2020 (“PPS”) states that healthy, livable and safe communities are to be sustained, including among other matters: promoting efficient development and land-use patterns; accommodating an appropriate range and mix of PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 10 residential, employment, institutional, recreation, park and open space and other uses, to meet long-term needs; and promoting cost-effective development patterns, optimization of transit investments, and standards to minimize land consumption and servicing costs. The PPS states that settlement areas are to be the focus of growth and development and that land-use patterns within settlement areas are to be based on densities and a mix of land uses which: • efficiently use land and resources; • are appropriate for, and efficiently use, the infrastructure and public service facilities which are planned or available; • support active transportation; • are transit-supportive, where transit is planned, exists or may be developed; and avoid the need for their unjustified and/or uneconomical expansion; • minimize negative impacts to air quality and climate change, and promote energy efficiency; and • prepare for the impacts of a changing climate. The subject lands are located within the City Centre. The land use policies for the City Centre call for a greater density of development and a more urban mix of built forms and uses. The Revised Phase 1 Master Plan, as shown on Attachment #6 to this report, will transform Pickering’s City Centre into a pedestrian-friendly, and transit-supportive centre, that will include a diverse mix of housing options, a large public park for the enjoyment of all residents, and a broad mix of commercial/retail uses and employment opportunities. The proposal is consistent with the Provincial Policy Statement. 6.2 The proposal conforms to the Provincial Growth Plan The Growth Plan for the Greater Golden Horseshoe (2020) ("Growth Plan") seeks to optimize provincial investments in higher-order transit, by directing growth to strategic growth areas, and locations with existing or planned transit, with a priority on higher-order transit where it exists or is planned. Schedule 4 of the Growth Plan identifies Pickering City Centre as an Urban Growth Centre and on Schedule 5 as a priority transit corridor, having the capacity to accommodate significant mixed-use, residential and employment intensification. Policy 2.2.4.8 b) states “All major transit station areas will be planned and designed to be transit-supportive, and to achieve multimodal access to stations and connections to nearby major trip generators by providing, where appropriate infrastructure to support active transportation, including sidewalks, bicycle lanes, and secure bicycle parking”. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 11 Policy 2.2.4.9 states “Within all major transit station areas, development will be supported, where appropriate, by planning for a diverse mix of uses, including additional residential units and affordable housing, to support existing and planned transit service levels; fostering collaboration between public and private sectors, such as joint development projects; and providing alternative development standards such as reduced parking standards”. Policy 2.2.5.3 states “Retail and office uses will be directed to locations that support active transportation, and have existing or planned transit.” The proposal conforms with the Growth Plan as it facilitates new development in a compact and efficient form that is designed to support and promote active transportation adjacent to a major transit hub. The proposal will also contribute to a complete community, with a variety of housing options and new office/commercial spaces, while efficiently using underutilized lands, and existing and planned infrastructure. 6.3 The proposal conforms to the Durham Regional Official Plan The Durham Regional Official Plan (“DROP”) designates Pickering’s City Centre as an Urban Growth Centre and a Regional Centre. Lands that are designated as Centres shall be developed as the main concentration of commercial, residential, cultural and government functions, in a well-designed and intensive land use form. Furthermore, Centres shall be developed in accordance with the following principles: • focal point of culture, art, entertainment and assembly, through provision of public squares, in addition to cultural facilities, parks and other public facilities; • mixed uses, and a grid of roads and walkways; • urban design that favours pedestrian traffic and public transit with direct pedestrian access to buildings, provision of transit, and parking areas sited at the rear, or within buildings, wherever possible; and • balance of employment and residential growth, and a variety of compact, higher-density housing types to service all housing needs, including affordable housing and assisted housing. In addition, the DROP identifies the subject lands as being within a Major Transit Station Area (“MTSA”) for the Pickering GO Station. MTSAs are primary locations for mixed-use and transit-oriented development, providing a variety of housing opportunities, office uses, street-oriented commercial uses, institutional uses, recreational uses, and public amenities. In support of existing and future transit services, development adjacent to transportation hubs shall provide for: • complementary higher order density and mixed uses at an appropriate scale and context; • buildings oriented toward the street, to reduce walking distances to transit facilities; • facilities which support non-auto modes including: drop off facilities, bus bays, bus loops, bus shelters, walkways, trails and other pedestrian and cycling facilities; and • limited surface parking and the potential redevelopment of existing surface parking. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 12 The proposal will facilitate a mix of office, commercial and residential land uses at densities and heights within an Urban Growth Centre and Major Transit Station Area, where high-density, mixed-uses and taller buildings are encouraged. The DROP encourages the reuse, revitalization, redevelopment and rehabilitation of Urban Areas. The proposal conforms to the policies of the Durham Regional Official Plan. 6.4 The proposal conforms to the policies of the Pickering Official Plan The subject lands are designated “Mixed Use Areas – City Centre” within the Pickering Official Plan. This designation permits high-density residential uses, retailing of goods and services, offices and restaurants, hotels, convention centres, community, cultural and recreational uses, community gardens, and farmers’ market. The designation permits a minimum net residential density of 80 units per hectare and no maximum density; a maximum gross leasable floor space for the retailing of goods and services of up to and including 300,000 square metres; and a maximum Floor Space Index (FSI) of over 0.75 and up to and including 5.75. The City Centre Neighbourhood also includes specific policies concerning enhancements to the public realm; active uses at grade; performance criteria for tall buildings to minimize adverse impacts concerning shadowing, sky view, privacy and transition to established low-density development; and pedestrian network and mobility. The proposed development contributes to the transformation of the City Centre into a more liveable, walkable and human-scaled neighbourhood by providing features such as: • providing a high mix and intensity of uses, and locating tall buildings in proximity to Highway 401 and a higher order transit station; • creating social gathering places, and a vibrant street life, by integrating commercial uses into the development adjacent to the public realm; • providing publicly accessible outdoor and indoor spaces where people can gather, and providing streetscapes and pedestrian routes that are safe and comfortable; • locating new buildings along Glenanna Road and Pickering Parkway to address these street edges, and prohibiting back lotting and surface parking between the buildings and the street; • providing adequate podium heights for the high-density buildings, to help create a human scale at street level and reduce shadow impacts; • providing sufficient spacing between adjacent buildings, to ensure views and privacy for residents are maintained, and to minimize any shadowing and wind tunnel impacts on adjacent buildings, streets and public spaces; • minimizing shadowing impacts on surrounding development, publicly accessible open spaces and sidewalks; • requiring the applicant to cooperate with Durham Region Transit and Metrolinx to ensure the alignment and location of future transit routes consider access to the greatest concentration of people and jobs; • providing parking through underground parking structures; • requiring the provision of secure bicycle parking facilities in suitable locations; and • reducing the number of required car parking spaces, where bicycle parking facilities and transportation demand management measurements, are provided. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 13 The proposal conforms to the goals and objectives of the City’s Official Plan, which is to promote the City Centre as the main focus for business, employment, entertainment, shopping, and higher-density residential accommodations. The proposal will facilitate land uses and built forms that are transit-oriented, environmentally friendly, and supportive of mixed-use development and walkability. The proposal conforms to the policies within the Pickering Official Plan. 6.5 A larger parkland block will be conveyed to the City to serve future residents The City’s current practice for fulfilling parkland dedication requirements under the Planning Act is to collect 5 percent of the developable land, or the payment of money equal to the value of 5 percent of the developable land, or such combination of land and money. However, through further discussions between staff and PTC Ownership, it was determined that there is a strong need for greater open space to accommodate the increased population within the City Centre. As such, PTC Ownership has doubled the size of the parkland from a total of 0.28 of a hectare (5 percent of the total land area) to 0.58 of a hectare (10 percent of the total land area), which substantially exceeds the City current parkland dedication requirements. The park is identified as Block 2 on the Revised Draft Plan of Subdivision (see Attachment #5). No conceptual design for the park block has been completed at this time. The size and configuration of the larger park block will provide the City greater flexibility to incorporate a variety of elements such as hard and soft landscaping, outdoor seating area, public art, water features, seasonal outdoor activities, and gathering spaces for special events. The park block will be conveyed to the City to satisfy the parkland dedication requirements for this development. Upon the registration of the subdivision and conveyance of the park block, the City will commence a public engagement strategy to collect feedback from City Centre residents regarding the design and programming of the park block. In addition, each residential building is required to provide indoor and outdoor amenity spaces for its residents, as required in the City Centre Zoning By-law 7553/17. The details of the indoor and outdoor amenity spaces will be determined through the site plan approval process for each building. The proposed larger park block is consistent with the City’s urban design objective for creating an enhanced public realm and a distinct visual identity for the City Centre. 6.6 Implementing Zoning By-law Amendment requires minimum non-residential gross floor area Pickering’s City Centre is designated as an Urban Growth Centre in the Growth Plan. The minimum growth target of 200 people and jobs per hectare will result in an additional population of approximately 8,300 people and 8,700 jobs by 2031. Council supports a balance of opportunities to live, work and play in the City Centre by adopting a resident-to-job ratio of 1:1. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 14 The revised proposal submitted by the applicant provides for approximately 5,099 residential units (approximate population: 9,178 people), 3,418 square metres of new commercial/retail space and no minimum gross floor area for office or other employment uses. Staff identified a concern that the current proposal primarily proposes residential uses with some at-grade commercial/retail uses. Based on further discussions and negotiations with CentreCourt Developments (“CentreCourt”), potential partners/purchasers of Pickering Town Centre, and Investment Management Corporation of Ontario (“IMCO”), Investment Manager for the Ontario Pension Board and Cushman and Wakefield Asset Services, both CentreCourt and IMCO have advised that it’s their objective is to transform the Pickering Town Centre into a true mixed-use node with a successful retail offering, a major employment node, an economic centre and a community hub. They noted that there is still upwards of approximately 3,700 square metres (approximately 40,000 square feet) of retail vacancy leftover from the former Target store and approximately 1,672 square metres (approximately 18,000 square feet) in the existing MPAC Office Building. IMCO has advised that they continue to explore opportunities to fill these vacancies with limited success. In addition, they have expressed reservation with including a minimum gross floor area given the limited demand for suburban office space and the financial viability of constructing an office building the current economic climate. Notwithstanding their current position regarding the viability of office space within the City Centre, they have agreed to provide a total minimum of 12,000 square metres of net floor area for office use to be protected within the first phase of the PTC development, which is the size of the existing 10-storey MPAC Office building. This total could be accommodated within a single building or distributed within the podium of the proposed nine mixed-use buildings. To provide flexibility to lease the required 12,000 square metres of office spaces, IMCO has requested that other complementary uses be included in this minimum requirement including Financial Institution, Medical Office, Post-Secondary School, Private School, Commercial School and Veterinary Clinic. In addition to requiring a minimum GFA for office use, a total minimum of 2,000 square metres for commercial/retail uses will be required for the first phase of development with a minimum of 150 square metres of commercial/retail space to be provided on the ground floor of each building. The type of commercial uses that could be accommodated within the ground floor of each building could be daycare centres, medical and dental offices, restaurants, and personal services. In addition, the implementing zoning by-law will require Active At Grade Frontages along Glenanna Road, the future park block and portions of the internal public roads. Buildings requiring active at-grade frontages must be comprised of a primary entrance door with openings and transparent glazing along the street frontage. The above-noted zoning provisions are intended to ensure that the continuous buildout of the City Centre includes a significant amount of non-residential and employment uses that will facilitate a dynamic downtown. Furthermore, as new residents move into the City Centre sufficient commercial/retail uses will be provided in convenient locations to serve the growing population. The inclusion of at-grade commercial/retail uses will help to animate the streetscape, promote pedestrian and bicycle travel, and enhance the overall vibrancy of the City Centre. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 15 6.7 Proposed building heights will have acceptable shadow impacts During the statutory public meeting, an area resident expressed concerns related to shadow impact as a result of the increase in building heights. In support of the proposed buildings on the PTC lands, PTC Ownership submitted a Shadow Study, prepared by Architects Alliance. The shadow study includes March, June, September and December hourly between 9:18 am and 7:18 pm. Shadow impacts on the parkland block are expected to vary throughout the year. In March, between 9:18 am and 1:18 pm, the buildings are expected to cast shadows. In June, shadow impacts on the park block are expected to be minimal, except in the evening hours between 6:18 and 7:18 pm, wherein shadow impacts are slightly greater. Shadow impacts on the park in September are greatest at mid-day (11:18 am to 1:18 pm) and in the evening (6:18 pm). Impacts in December are the greatest, with the park experiencing shadowing during all hours. Throughout the year, shadowing impacts on Esplanade Park are minimal. In March and September, Esplanade Park is expected to experience minimal shadowing between 2:18 and 5:18 pm, whereas all other hours of the day are expected to experience no shadowing. In the month of June, it is expected that Esplanade Park will experience no shadow impacts during any hours of the day. In December, Esplanade Park will experience shadowing impacts in the afternoon and evening. For the existing, low-density townhomes to the east (located on the east side of Valley Farm Road, south of the Chestnut Hill Developments Recreation Complex), shadow impacts throughout the year are expected to be minimal. During March and September, the townhomes will experience minor shadowing in the evening hours only (after 5:18 pm). In the month of June, the townhomes will experience no shadow impacts. In December, the townhomes will experience minor shadowing in the afternoon and evening (after 2:18 pm). Staff have reviewed the submitted shadow study and concur with the findings of the study. Staff are satisfied that the proposed building heights will result in minimal shadow impacts on existing and proposed parks, and the existing residential dwellings to the east. Through the site plan review process, staff will continue to work with the applicant to review the location of the tower further minimize the shadow impacts. 6.8 The City is undertaking a Transportation Master Plan Study for the City Centre The Pickering City Centre is anticipated to experience significant long-term redevelopment for residential, commercial, office and recreational uses. To manage future growth in the City Centre, the City is undertaking a City Centre Transportation Master Plan. The Master Plan will look at all proposed or potential development or redevelopment within the City Centre (between Brock Road and Whites Road), at the 10-year and 20-year development horizons. The study will consider multi-model travel needs; road network operations (including Highway 401 interchanges); transit, bicycle and pedestrian networks; and identify future transportation infrastructure needs. The PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 16 study will include a comprehensive transportation impact study; a transportation network review; and preparation of road functional design plans. The Region of Durham will also take an active role in the Master Plan, as redevelopment opportunities will affect Regional roads. The study is expected to take approximately a year to complete. PTC Ownership will be responsible for submitting a Site Plan Application for each development block. The applicant must address conformity to the City Centre Transportation Master Plan through the site plan applications. The road network in the City Centre has been designed to accommodate a considerable volume of traffic, whether it is from retail, office or residential uses. Design modifications for Glenanna Road are under review and will consider all users (pedestrians, cyclists, transit and vehicles). Other traffic management systems, such as traffic signals, are also being reviewed. Any required modifications will be implemented with the reconstruction of Glenanna Road. As further phases of development occur, the need for additional modifications will be assessed at that time. The City is also working with the Ministry of Transportation (MTO) to assess the impact of residential and mixed-use developments within the City Centre on the Liverpool Road intersection. A study assessing these impacts has been prepared and circulated to MTO for their review and comment. 6.9 Staff support reduced residential parking ratio The City Centre Zoning By-law requires a minimum of 0.8 resident parking spaces per dwelling unit and an additional 0.15 spaces per dwelling unit for visitors. The applicant is requesting to amend the residential parking rate from 0.8 spaces to 0.65 spaces per dwelling unit. Each building will also provide indoor and outdoor bicycle parking spaces at a minimum ratio of 0.5 spaces per dwelling unit, and 2 spaces for each 1,000 square metres of gross leasable floor area. In addition, the subject lands have direct pedestrian access to the Pickering GO Station through the Pickering GO Pedestrian Bridge located along Pickering Parkway. The lands are also within 600 metres of at least 15 Durham Region Transit bus stops. To support the proposed reduction of residential parking, PTC Ownership has submitted a Parking Reduction Review, prepared by BA Group. The review identified that the proposed reduction is appropriate, for the following reasons: • parking sales trends were observed at other developments located within the Pickering City Centre, including the Universal City development located to the south, which saw an overall parking demand of 0.71 spaces per unit; • recent residential buildings within the Greater Toronto Area have received parking reduction approvals when located in proximity to an existing transit hub; • the reduction is consistent with Ontario’s New Five Year Climate Change Action Plan, which supports reduced single-passenger vehicle trips, eliminating minimum parking requirements, especially in transit corridors, and supports cycling, walking and use of transit; PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 17 • the proposed development has access to many existing non-automobile modes of travel, including the Pickering GO Train, GO Regional bus services, multiple Durham Region bus services, and key pedestrian connections; • the proposed development will have access to planned transit improvements, including the Durham-Scarborough Bus Rapid Transit, the Durham Region Transit Pickering Parkway Terminal Expansion and Metrolinx’s Regional Express Rail; and • the implementation of sustainable Transportation Demand Management (TDM) measures for the development, to reduce overall reliance on single-occupancy vehicles while promoting more active modes of transportation, by: • providing sidewalks and cycling routes along all new public and private streets within the project area; • providing a mix of uses to enable residents to walk to key destinations, including the Pickering Town Centre and the commercial/retail uses located at grade; • allowing purchasers to only pay for the amount of parking they require; and • advertising the different modes of transportation available (i.e., Go Transit, indoor bicycle lockers). Staff support the applicant’s request to reduce the minimum parking ratio, which is consistent with the City Centre objective to create a pedestrian-focused neighbourhood and support alternative modes of travel. 6.10 The applicant will enter into appropriate arrangements to ensure the proposed buildings do not obstruct the Region’s emergency radio communication network The Durham Regional Police Service ("DRPS") has stated that certain proposed buildings within the development will be an obstruction to the Region’s Public Safety Microwave paths and affect the system's operation for Police and Fire communications. To address this issue, DRPS has noted the following options for the applicant: 1. reduce the height of the proposed buildings that are directly in the path; 2. move the buildings out of the path; or 3. route the microwave path either over or around the obstructions (the costs associated with this option are the responsibility of the applicant). Through the recommended conditions of draft plan approval (see Condition 13 within Appendix I), the owner will be required to enter into any agreements and/or arrangements, including easements, that require the owner to relocate or replace, at its own expense, any antenna system and associated equipment required for the Region's emergency radio communications network, to the satisfaction of the City, the Region of Durham and Durham Regional Police. In addition, the condition states that site plan approval shall not be issued, and no building permit shall be issued, until such time as this condition is complied with. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 18 Through the site plan review process, City staff will continue to work with PTC Ownership, DRPS and the Region of Durham to ensure the development does not create obstruction issues with the Region’s Public Safety Microwave paths. 6.11 The proposed development achieves Level 1 of the City’s Sustainable Development Guidelines At the statutory public meeting, Committee members questioned if the proposed buildings will be high-performance buildings that are energy efficient and green. On behalf of PTC Ownership, JKO Planning Services Inc. has prepared a Sustainability Report for the Master Plan development, in accordance with the City’s Sustainable Development Guidelines. The proposed development achieves the minimum points required by the Guidelines and achieves Level 1 with an overall score of 50 points. The following optional sustainability measures to achieve the minimum Level 1 of the City’s Sustainable Development Guidelines are proposed: • redeveloping underutilized lands at higher densities; • providing amenities such as retail uses, entertainment and recreational facilities, within a 400-metre walking distance of residential units; • creating a mixed-use development with street-related retail components on the ground floor of multi-storey residential buildings; • including private lanes at the rear of street-related commercial units for service and loading purposes; • locating approximately 70 percent of the proposed density within a 250-metre walking distance of a transit stop; • utilizing transit proximity, and providing pedestrian and cycling routes, to encourage alternative modes of transportation; • providing energy-efficient appliances; • maximizing water efficiency; and • providing on-site separation and storage for construction and residential waste management. Through the site plan review process, City staff will work with PTC Ownership to ensure the proposed sustainability measures are met. 6.12 All phases of development will be subject to site plan approval Detailed design issues to be dealt with through the site plan review process include matters such as, but is not limited to, refining building design and materials; finalizing landscaping; detailed design of the public roads; controlling drainage and grading, and detailing site servicing. PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 19 7. Conclusion Staff recommend that Council endorse Draft Plan of Subdivision SP-2021-02, as shown on Attachment #5 to this Report, and the conditions of approval set out in Appendix I to this Report. Staff support the rezoning application and recommend that Zoning By-law 7553/17 be amended to permit the site-specific exceptions. Staff recommend that the site-specific implementing by-law, containing the standards set out in Appendix II to this Report, be finalized and brought before Council for enactment. In addition, staff recommend that additional public notice is not required. 8. Applicant’s Comments The applicant has been advised of and concurs with the recommendations of this report. Appendices Appendix I Recommended Conditions of Approval for Draft Plan of Subdivision SP-2021-02 Appendix II Recommended Zoning By-law Provisions for Zoning By-law Amendment Application A 15/21 Attachments: 1. Location Map 2. Air Photo Map 3. Original Draft Plan of Subdivision 4. Original Phase 1 Master Plan 5. Revised Draft Plan of Subdivision 6. Revised Phase 1 Master Plan PLN 01-23 January 9, 2023 Subject: OPB Realty Inc. Page 20 Prepared By: Original Signed By Isabel Lima Planner II Original Signed By Tyler Barnett Principal Planner, Site Planning Original Signed By Nilesh Surti, MCIP, RPP Manager, Development Review & Urban Design Approved/Endorsed By: Original Signed By Catherine Rose, MCIP, RPP Chief Planner Original Signed By Kyle Bentley, P. Eng. Director, City Development & CBO IL:ld Recommended for the consideration of Pickering City Council Original Signed By Marisa Carpino, M.A. Chief Administrative Officer Appendix I to Report PLN 01-23 Recommended Conditions of Approval for Draft Plan of Subdivision SP-2021-02 Recommended Conditions of Approval for Draft Plan of Subdivision SP-2021-02 General Conditions 1.That the Owner shall prepare the final plan and shall include a land use table on thebasis of the draft plan of subdivision, prepared by Schaeffer Dzaldov Bennett Ltd., as revised and dated May 30, 2022, which illustrates 9 development blocks for a mix of high-density residential, office and commercial uses, 1 parkland block and 2 publicroads. Region of Durham 2.That the Owner shall submit plans showing any proposed phasing to the Region for review and approval, if this subdivision is to be developed by more than one registration. 3.That the Owner shall grant to the Region, any easements required to provide RegionalServices for this development and these easements shall be in locations and of suchwidths as determined by the Region. 4.That the Owner shall provide for the extension of such sanitary sewer and water supply facilities which are external to, as well as within, the limits of this plan that are required to service this plan. In addition, the Owner shall provide for the extension of sanitarysewer and water supply facilities within the limits of the plan, which are required toservice other developments external to this subdivision. Such sanitary sewer and watersupply facilities are to be designed and constructed according to the standards and requirements of the Regional Municipality of Durham. All arrangements, financial and otherwise for said extensions are to be made to the satisfaction of the RegionalMunicipality of Durham and are to be completed prior to final approval of this plan. 5.That prior to entering into a subdivision agreement, the Regional Municipality of Durhamshall be satisfied that adequate water pollution control plant and water supply plant capacities are available to the proposed subdivision. 6.That the Owner shall satisfy all requirements, financial and otherwise, of the RegionalMunicipality of Durham. This shall include, among other matters, the execution of asubdivision agreement between the Owner and the Region concerning the provision andinstallation of sanitary sewers, water supply, roads and other services. 7.That prior to the finalization of this Plan of Subdivision, the Owner must provide satisfactory evidence to the Region of Durham in accordance with the Region’s SiteContamination Protocol to address site contamination matters. 8.That the Owner shall agree in the City of Pickering Subdivision Agreement to provideengineering plans to the satisfaction of the Regional Municipality of Durham which shows the location of all transit-related infrastructure/facilities (including how it coordinates with proposed landscaping, driveway entrances and other facilities) withinthe draft plan of subdivision. Recommended Conditions of Approval Page 2 Subdivision Agreement 9.That the Owner enters into a subdivision agreement with and to the satisfaction of the City of Pickering to ensure the fulfillment of the City’s requirements, financial andotherwise, which shall include, but not necessarily be limited to the conditions outlined inthis document. 40M-Plan 10.That the Owner submits a Draft 40M-Plan to the satisfaction of the City Development Department. Street Names 11.The owner shall name road allowances included in this draft plan to the satisfaction ofthe Regional Municipality of Durham and the City of Pickering. 12.That street signage be provided to the satisfaction of the City of Pickering. NextGen Public Safety Radio Service 13.That the Owner has entered into such agreement(s) and/or arrangements, includingeasements, as are satisfactory to the City, the Region of Durham and Durham RegionalPolice providing for the Owner to relocate or replace, at its own expense, any antennasystem and associated equipment required for the Region’s emergency radio communications network. Site plan approval shall not be issued, and no building permitshall be issued, until such time as this condition is complied with. Development Charges & Development Review & Inspection Fee 14.That the Owner satisfies the City financially with respect to the Development Charges Act. 15.That the Owner satisfies the City with respect to payment for the Development Services Engineering Review Fee, Lot Grading Review Fee, Road Degradation Fee, StreetlightPole Numbering Fee and Development Services Inspection Fees. Stormwater 16.That the Owner satisfies the Director, Engineering Services, respecting the stormwaterdrainage and management system to service all the lands in the subdivision, and any provision regarding easements. 17.That the Owner satisfy the Director, Engineering Services regarding the provision ofstormwater maintenance fees. 18.That the Owner agrees that all stormwater management facilities will be designed to beconsistent with the Council approved Stormwater Management Strategy Pickering City Centre, dated April 2015 and consistent with the executed Minutes of Settlementbetween the City and OPB Realty Inc., dated January 15, 2018 (OMB case No.PL170549) Recommended Conditions of Approval Page 3 19.That the owner shall agree in the subdivision agreement, in wording acceptable to the City, to maintain all stormwater management and erosion and sedimentation control structures operating and in good repair during the construction period. Grading 20.That the Owner satisfies the Director, Engineering Services, respecting the submissionand approval of a Grading Control Plan. 21.That the Owner satisfies the Director, Engineering Services, respecting authorization from abutting landowners for all off-site grading. Geotechnical Investigation 22.That the Owner satisfies the Director, Engineering Services, respecting the submissionand approval of a geotechnical investigation. Fill & Topsoil 23.That the City of Pickering’s Fill & Topsoil By-law prohibits soil disturbance, removal, orimportation of material to the site unless a permit has been issued. No on-site worksprior to Draft Plan Approval is permitted. A Fill and Topsoil Permit will be required shouldgrading works proceed prior to a Subdivision Agreement. Construction/Installation of City Works & Services 24.That the Owner satisfies the Director, Engineering Services, respecting the constructionof Municipal Services such as roads, curbs, storm sewers, sidewalks, and boulevarddesigns through the submission and approval of Site Servicing Plan(s). 25.That the Owner satisfy the City respecting arrangements for the provision of all servicesrequired by the City. 26.That the Owner satisfies the appropriate authorities respecting arrangements for theprovision of underground wiring, street lighting, cable television, natural gas and othersimilar services. 27.That the Owner agrees that the cost of any relocation, extension, alteration or extraordinary maintenance of existing services necessitated by this development shall be the responsibility of the Owner. 28.That the Owner satisfy the City with respect to arrangements necessary to provide forcoordination of services and roads with adjacent lands and any phasing of developmentthat may be required. Phasing & Development Coordination 29.That if this subdivision is to be developed by more than one registration, the Owner willbe required to submit a plan showing the proposed phasing, all to the satisfaction of theRegion of Durham and the City. Recommended Conditions of Approval Page 4 Dedications/Transfers/Conveyances/Reserves 30.That the Owner conveys to the City, at no cost, any easements and any reserves as required by the City. 31.That the Owner conveys to the City, at no cost, Street B and Street D for municipalpublic roads. Easements 32.That the Owner, to the satisfaction of the Director, Engineering Services, provide any required easement for works, facilities or use rights that are required by the City ofPickering. 33.That the Owner conveys any easements to any utility to facilitate the installation of theirservices in a location(s) satisfactory to the City and the utility. 34.That the Owner arrange, at no cost to the City, any easements required on third party lands for servicing and such easements shall be in a location as determined by the Cityand/or the Region and are to be granted upon request at any time after draft approval. Construction Management Plan 35.That the Owner satisfies the City respecting the submission and approval of aConstruction Management/Erosion & Sediment Control Plan, with such Plan to contain, among other matters: (i)details of erosion and sedimentation controls during all phases of construction andprovide maintenance requirements to maintain these controls as per the City’sErosion & Sediment Control Guideline for Urban Construction; (ii)addressing the parking of vehicles and the storage of construction and building materials during servicing and construction, and ensuring that such locations willnot impede the flow of traffic or emergency vehicles on either existing streets, orproposed public streets; (iii)confirmation that the City’s Noise By-law will be adhered to and that all contractors, trades and suppliers are advised of this By-law; (iv)the provision of mud and dust control on all roads within and adjacent to the site; (v)type and timing of construction fencing; (vi)location of construction trailers; and (vii)details of the temporary construction access. Fencing 36.That the Owner satisfies the City with respect to the provision of temporary fencingaround the entire perimeter of the subject lands during construction, prior to thecommencement of any works. Recommended Conditions of Approval Page 5 Landscaping 37.That the Owner satisfies the Director, Engineering Services, respecting the submission and approval of a Street Tree Planting Plan. Tree Compensation 38.That the Owner agrees that prior to final approval of the draft plan, or any phase thereof,compensation for the loss of tree canopy will be required either through replacement planting or cash-in-lieu, to be paid to the City of Pickering. In accordance with Council Resolution #387/18, approved on January 15, 2018, tree removal compensation is to becalculated in accordance with the City of Pickering Tree Inventory, Preservation andRemoval Compensation requirements. Where compensation through replanting is beingconsidered, the Owner will be required to provide a Landscape Plan indicating the location, size and species of all trees, including boulevard trees, to the satisfaction of the Director, Engineering Services. Engineering Plans 39.That the Owner satisfy the City respecting the submission of appropriate engineeringdrawings that detail, among other things, City services, roads, storm sewers, sidewalks,lot grading, streetlights, fencing, and tree planting, and financially-secure such works. 40.That the engineering plans be coordinated with the architectural design objectives. 41.That the Owner ensure that the engineering plans are coordinated with thestreetscape/architectural control guidelines and further that the engineering planscoordinate the driveway, street hardware, and street trees to ensure that conflicts do notexist, asphalt is minimized and all objectives of the streetscape/architectural control guidelines can be achieved. Noise Attenuation 42.That the Owner agrees in the subdivision agreement to implement noise controlmeasures and warning clauses as recommended in the Noise Report. Parkland Dedication 43.That the Owner conveys to the City, at no cost and in a physical condition acceptable tothe City, Block 2 for the purposes of parkland dedication, in order to satisfy Section42(1) of the Planning Act. 44.That prior to the City accepting any park block, the Owner shall submit a detailed grading plan that demonstrates the park block will function to the satisfaction of the City of Pickering. Fire 45.That the Owner agrees that no development will proceed on any land until adequateservices are available, including adequate water pressure, to the satisfaction of theCity’s Fire Services Department. Recommended Conditions of Approval Page 6 Model Homes 46.That the Owner enters into a model home agreement with the City, if applicable for this draft plan. All model homes must satisfy all architectural requirements. Metrolinx 47.That the following clause shall be inserted in all development agreements, offers topurchase and agreements of Purchase and Sale or Lease of any residential dwellingunit within 300 metres of the railway right-of-way: “Warning: Metrolinx and its assigns and successors in interest has or have a right-of-way within 300 metres from the landthe subject hereof. There may be alterations to or expansions of the rail or other transitfacilities on such right-of-way in the future including the possibility that Metrolinx or anyrailway entering into an agreement with Metrolinx to use the right-of-way or their assignsor successors as aforesaid may expand their operations, which expansion may affect the environment of the occupants in the vicinity, notwithstanding the inclusion of anynoise and vibration attenuating measures in the design of the development andindividual units. Metrolinx will not be responsible for any complaints or claims arisingfrom use of such facilities and/or operations on, over or under the aforesaid right-of-way.” 48.That the Owner shall grant Metrolinx an environmental easement for operational emissions, registered on title against the subject lands in favour of Metrolinx. Canadian National Railway (CNR) 49.That the Owner shall engage a consultant to undertake an analysis of noise. At aminimum, a noise attenuation barrier shall be adjoining and parallel to the railway rights-of-way, having returns at the ends, and a minimum total height of 5.5 metres above top- of-rail. Acoustic fence to be constructed without openings and of a durable materialweighing not less than 20 kilograms per square metre of surface area. Subject to thereview of the noise report, the Railway may consider other measures recommended byan approved Noise Consultant. 50. That the following clause be inserted in all development agreements, offers to purchase, and agreements of Purchase and Sale or Lease of each dwelling unit within 300 metresof the railway right-of-way: “Warning: Canadian National Railway Company or itsassigns or successors in interest has or have a rights-of-way within 300 metres from theland the subject hereof. There may be alterations to or expansions of the railwayfacilities on such rights-of-way in the future including the possibility that the railway or its assigns or successors as aforesaid may expand its operations, which expansion mayaffect the living environment of the residents in the vicinity, notwithstanding the inclusionof any noise and vibration attenuating measures in the design of the development andindividual dwelling(s). CNR will not be responsible for any complaints or claims arising from use of such facilities and/or operations on, over or under the aforesaid rights-of-way.” Recommended Conditions of Approval Page 7 51.That the Owner shall through restrictive covenants to be registered on title and all agreements of purchase and sale or lease provide notice to the public that any noise and vibration isolation measures implemented are not to be tampered with or alteredand further that the Owner shall have sole responsibility for and shall maintain thesemeasures to the satisfaction of CNR. 52.That the Owner shall enter into an Agreement with CNR stipulating how CNR's concernswill be resolved and will pay CNR's reasonable costs in preparing and negotiating the agreement. 53.That the Owner shall be required to grant CNR an environmental easement foroperational noise and vibration emissions, registered against the subject property infavour of CNR. Bell Canada 54.That the Owner acknowledges and agrees to convey any easement(s) as deemednecessary by Bell Canada to service this new development. The Owner further agreesand acknowledges to convey such easements at no cost to Bell Canada. 55.That the Owner agrees that should any conflict arise with existing Bell Canada facilitieswhere a current and valid easement exists within the subject area, the Owner shall be responsible for the relocation of any such facilities or easements at their own cost. Other Approval Agencies 56.That any approvals which are required from the Region of Durham or any utility for thedevelopment of this plan be obtained by the Owner and upon request writtenconfirmation be provided to the City as verification of these approvals. Plan Revisions 57.That the Owner acknowledges and agrees that the draft plan of subdivision andassociated conditions of approval may require revisions to the satisfaction of the City,to implement or integrate any recommendation resulting from studies required as conditions of approval. 58.That the Owner revises the draft plan as necessary to the satisfaction of the City, toaccommodate any technical engineering issues which arise during the review of the finalengineering drawings. Required revisions may include revising the number of buildinglots or reconfiguring the roads or lots to the City’s satisfaction. 59.That the Owner agrees to implement the requirements of all studies that are required by the City for the development of this draft plan of subdivision to the satisfaction of the City. Appendix II to Report PLN 01-23 Recommended Zoning By-law Provisions for Zoning By-law Amendment Application A 15/21 Draft The Corporation of the City of Pickering By-law No. XXXX/23 Being a By-law to amend Restricted Area Zoning By-law 7553/17, as amended, to implement the Pickering Official Plan, Region of Durham, South Part of Lots 21 and 22, Concession 1, City Centre Neighbourhood, City of Pickering (A 15/21) Whereas the Council of The Corporation of the City of Pickering deems it desirable to permit the development of mixed use residential buildings, on lands being the South Part of Lots 21 and 22, Concession 1, in the City of Pickering; And whereas an amendment to By-law 7553/17, as amended, is therefore deemed necessary; Now therefore the Council of The Corporation of the City of Pickering hereby enacts as follows: 1.Section 6, Exceptions, and Schedule 7 of Zoning By-law 7553/17, as amended, is further amended by adding a new Exception E19 as follows: E19 (Part of Lots 21 and 22, Concession 1) Parent Zone: CC1, OS Schedule 7 Amending By-law: XXXX/23 6.19.1 Zone Provisions The following regulations apply: a) Notwithstanding Section 3.1, Table 1, related to Parking Space Requirements, the minimum parking ratio shall be 0.65 parking spaces per apartment dwelling unit for residents and 0.15 parking spaces per apartment dwelling unit for visitors, for the lands illustrated in figure 6.19.3 (a). b) Notwithstanding Schedule 5, related to Maximum Building Height, the maximum height of a building or structure wholly located within the area identified by the dashed lines as shown on Figure 6.19.3 (b) is specified by the number following the HT symbol as shown on Figure 6.19.3 (b). c) Notwithstanding Section 4.2 o), related to Amenity Space Requirements for Apartment Dwellings, the minimum indoor and outdoor amenity space requirements for apartment dwellings may be located on an abutting block within the lands as identified in Figure 6.19.3 (a), provided that: i.appropriate cross-use legal easement and/or an agreement are executed; and ii.the minimum aggregate amenity area requirement is provided in accordance with Sections 4.2 o) i) & ii) of By-law 7553/17, as amended. By-law No. XXXX/23 Page 2 Draft 6.19.2 Special Site Provisions a) Notwithstanding Section 4.2 a) and Schedule 3, related to Floor Space Index, the total land area of the lot, including lands conveyed to public ownership for a road widening, public street, and public park shall be deemed to be a lot for the purposes of calculating Floor Space Index (FSI), as shown on Figure 6.19.3 (a). b) Section 4.2 j) ii), related to Main Wall Stepback for Buildings greater than 37.5 metres in height, shall not apply to the lands illustrated in Figure 6.19.3 (a). c) Minimum building setback abutting an Open Space (OS) zone – 3.0 metres d) Require an aggregate minimum of 12,000 square metres of net floor area of Office use, Financial Institution, Medical Office, Post-Secondary School, Private School, Commercial School and Veterinary Clinic either in a single building or in multiple buildings within the lands as shown on Figure 6.19.3 (a). e) Require an aggregate minimum of 2,000 square metres of net floor area of non- residential uses, except for office, located on the first floor of a building or multiple buildings within the lands as shown on Figure 6.19.3 (a) of which a minimum of 150 square metres shall be provided on the first floor of each building. f) Notwithstanding Section 4.2 m), the following Buildings Requiring Active At Grade Frontages requirements shall apply: i.minimum – 40 percent of the first storey of a building along any street line and abutting an Open Space Zone with Active At Grade Frontages, residential lobbies, amenity space or at grade dwelling units, as shown on Schedule 6 of Bylaw 7553/17, as amended, shall comprise of openings and transparent glazing; ii.a primary entrance door with direct and unobstructed access to the public shall be incorporated into the wall of a building facing the street line and abutting an Open Space Zone; and iii.minimum ground floor height – 4.5 metres By-law No. XXXX/23 Page 3 Draft 6.19.3 Special Site Figures Figure 6.19.3 (a) By-law No. XXXX/23 Page 4 Draft Figure 6.19.3 (b) By-law No. XXXX/23 Page 5 Draft 2.Section 8, Schedule 1, Legend of Zoning By-law 7553/17, as amended, is further amended by adding the proposed roads as depicted on Schedule I to this By-law. 3.Section 8, Schedule 2, Land Use Categories, of Zoning By-law 7553/17, as amended, is further amended by rezoning the lands from City Centre One (CC1) to Open Space City Centre (OS) and adding the proposed roads as depicted on Schedule II to this By-law. 4.Section 8, Schedule 3, Minimum FSI, of Zoning By-law 7553/17, as amended, is further amended by adding the proposed roads as depicted on Schedule III to this By-law. 5.Section 8, Schedule 4, Minimum Building Height, of Zoning By-law 7553/17, as amended, is further amended by adding the proposed roads as depicted on Schedule IV to this By-law. 6.Section 8, Schedule 5, Maximum Building Height, of Zoning By-law 7553/17, as amended, is further amended by adding the proposed roads as depicted on Schedule V to this By-law. 7.Section 8, Schedule 6, Active Grade Frontages, of Zoning By-law 7553/17, as amended, is further amended by adding additional active grade frontages to the lands as depicted on Schedule VI to this By-law. 8.Section 8, Schedule 7, Exceptions, of Zoning By-law 7553/17, as amended, is further amended by adding E19 notation as depicted on Schedule VII to this By-law. 9.Section 6, Exception E3 of Zoning By-law 7553/17 is hereby amended by deleting Sections 6.3.3 f), 6.3.3 g) and 6.3.5. 10.That By-law 7553/17, as amended, is hereby further amended only to the extent necessary to give effect to the provisions of this By-law. Definitions and subject matters not specifically dealt with in this By-law shall be governed by relevant provisions of By-law 7553/17, as amended. 11.That this By-law shall come into force in accordance with the provisions of the Planning Act. By-law passed this XX day of XXXX, 2023. Draft__________ _________________________ Kevin Ashe, Mayor Draft__________ _________________________ Susan Cassel, City Clerk LEGEND SCHEDULE 1 PICKERING CITY CENTRE ZONING BY-LAW City Centre Proposed Roads KR O S N O C R E E K PI N E C R E E K ESPLANADE PARKKINGST O N R O A D THE ESPLAN A D E S O U T H THE ESPLAN A D E N O R T H DIEFENBAKER COURT AVONMOR E SQUARE PICKERING P A R K W A Y PIC K E R I N G P A R K W A Y FA R M VA L L E Y SA N D Y B E A C H R O A D ALLIANCE RO A D LI V E R P O O L R O A D LIV E R P O O L R O A D BAYLY STR E E T PLUMMER STREET SA L K R O A D RO A D GL E N D A L E D R I V E MA L D E N C R E S C E N T GLENANNA ROAD GL E N A N N A R O A D BRANDS COURTBICR O F T CO U R T BR O N T E SQ U A R E FIEL D L I G H T B O U L E V A R D FA Y L E E CRESCENT CR E S C E N T CANBOROUGH ANTON SQUARE BR O C K R O A D DREYBER COURT GETA CIRCLE ALWIN CIRCLE HIGHWAY 4 0 1 PORTLAND COURT JAYWIN CIRCLE DE N M A R R O A D C H A R LOTTE CIRCLE GL E N G R O V E ROAD GL E N V I E W R O A D ROSEFIELD ROAD RO S E F I E L D PO P P Y LANE M E MORY LANE LO D G E R O A D RO Y A L R O A D GUILD R O A D LEGEND - Land Use Categories SCHEDULE 2 PICKERING CITY CENTRE ZONING BY-LAW ¹ CC1 - City Centre One CC2 - City Centre Two CCR1 - City Centre Residential One CCR2 - City Centre Residential Two CCC - City Centre Civic OS - Open Space NHS - Natural Heritage System KR O S N O C R E E K PI N E C R E E K ESPLANADE PARK KINGS T O N R O AD THE ESPLA N A D E S O U T H THE ESPLA N A D E N O R T H DIEFENBAKER COURT AVONMO R E SQUARE PICKERIN G P A R K W A Y PIC K E R I N G P A R K W A Y FA R M VA L L E Y SA N D Y B E A C H R O AD ALLIANCE RO A D LI V E R P O O L R O A D LI V E R P O O L R O A D BAYLY ST R E E T PLUMMER STREET SA L K R O A D RO A D GL E N D A L E D R I V E MA L D E N C R E S C E N T GLENANNA ROAD GL E N A N NA RO A D BRANDS COURTBIC R O F T CO U R T BR O N T E SQ U A R E FIE L D L IGHT B O U L E V A R D FA Y L E E CRESCENT CR E S C E N T CANBOROUGH ANTON SQUARE BR O C K R O A D DREYBER COURT GETA CIRCLE ALWIN CIRCLE HIGHWAY 4 0 1 PORTLAND COURT JAYWIN CIRCLE DE N M A R R O A D C HARLOTTE CIRCLE GL E N G R O V E ROAD GL E N V I E W R O A D ROSEFIELD ROAD RO S E F I E L D PO P PY LANE M E MORY LANE LO D G E R O A D RO Y A L R O A D GUILD R O A D *boundary of Krosno Creek to be further refined From CC1 to OS LEGEND - Minimum FSI SCHEDULE 3 PICKERING CITY CENTRE ZONING BY-LAW ¹ 0.75 2 KR O S N O C R E E K PI N E C R E E K ESPLANADE PARKKINGST O N R O A D THE ESPLAN A D E S O U T H THE ESPLAN A D E N O R T H DIEFENBAKER COURT AVONMOR E SQUARE PICKERING P A R K W A Y PIC K E R I N G P A R K W A Y FA R M VA L L E Y SA N D Y B E A C H R O A D ALLIANCE RO A D LI V E R P O O L R O A D LIV E R P O O L R O A D BAYLY STR E E T PLUMMER STREET SA L K R O A D RO A D GL E N D A L E D R I V E MA L D E N C R E S C E N T GLENANNA ROAD GL E N A N N A R O A D BRANDS COURTBICR O F T CO U R T BR O N T E SQ U A R E FIEL D L I G H T B O U L E V A R D FA Y L E E CRESCENT CR E S C E N T CANBOROUGH ANTON SQUARE BR O C K R O A D DREYBER COURT GETA CIRCLE ALWIN CIRCLE HIGHWAY 4 0 1 PORTLAND COURT JAYWIN CIRCLE DE N M A R R O A D C H A R LOTTE CIRCLE GL E N G R O V E ROAD GL E N V I E W R O A D ROSEFIELD ROAD RO S E F I E L D PO P P Y LANE M E MORY LANE LO D G E R O A D RO Y A L R O A D GUILD R O A D LEGEND - Minimum Building Height SCHEDULE 4 PICKERING CITY CENTRE ZONING BY-LAW ¹ Layer 10.5 metres (3 Functional Floors) 19.5 metres 55.0 metre KR O S N O C R E E K PI N E C R E E K ESPLANADE PARKKINGST O N R O A D THE ESPLAN A D E S O U T H THE ESPLAN A D E N O R T H DIEFENBAKER COURT AVONMOR E SQUARE PICKERING P A R K W A Y PIC K E R I N G P A R K W A Y FA R M VA L L E Y SA N D Y B E A C H R O A D ALLIANCE RO A D LI V E R P O O L R O A D LIV E R P O O L R O A D BAYLY STR E E T PLUMMER STREET SA L K R O A D RO A D GL E N D A L E D R I V E MA L D E N C R E S C E N T GLENANNA ROAD GL E N A N N A R O A D BRANDS COURTBICR O F T CO U R T BR O N T E SQ U A R E FIEL D L I G H T B O U L E V A R D FA Y L E E CRESCENT CR E S C E N T CANBOROUGH ANTON SQUARE BR O C K R O A D DREYBER COURT GETA CIRCLE ALWIN CIRCLE HIGHWAY 4 0 1 PORTLAND COURT JAYWIN CIRCLE DE N M A R R O A D C H A R LOTTE CIRCLE GL E N G R O V E ROAD GL E N V I E W R O A D ROSEFIELD ROAD RO S E F I E L D PO P P Y LANE M E MORY LANE LO D G E R O A D RO Y A L R O A D GUILD R O A D LEGEND - Maximum Building Height SCHEDULE 5 PICKERING CITY CENTRE ZONING BY-LAW ¹ 17 metres 47 metres 77 metres 122 metres KR O S N O C R E E K PI N E C R E E K ESPLANADE PARKKINGST O N R O A D THE ESPLAN A D E S O U T H THE ESPLAN A D E N O R T H DIEFENBAKER COURT AVONMOR E SQUARE PICKERING P A R K W A Y PIC K E R I N G P A R K W A Y FA R M VA L L E Y SA N D Y B E A C H R O A D ALLIANCE RO A D LI V E R P O O L R O A D LIV E R P O O L R O A D BAYLY STR E E T PLUMMER STREET SA L K R O A D RO A D GL E N D A L E D R I V E MA L D E N C R E S C E N T GLENANNA ROAD GL E N A N N A R O A D BRANDS COURTBICR O F T CO U R T BR O N T E SQ U A R E FIEL D L I G H T B O U L E V A R D FA Y L E E CRESCENT CR E S C E N T CANBOROUGH ANTON SQUARE BR O C K R O A D DREYBER COURT GETA CIRCLE ALWIN CIRCLE HIGHWAY 4 0 1 PORTLAND COURT JAYWIN CIRCLE DE N M A R R O A D C H A R LOTTE CIRCLE GL E N G R O V E ROAD GL E N V I E W R O A D ROSEFIELD ROAD RO S E F I E L D PO P P Y LANE M E MORY LANE LO D G E R O A D RO Y A L R O A D GUILD R O A D Active Grade Frontages added to proposed internal streets LEGEND - Exceptions SCHEDULE 7 PICKERING CITY CENTRE ZONING BY-LAW ¹ Exception ESPLANADE PARKKINGST O N R O A D THE ESPLAN A D E S O U T H THE ESPLAN A D E N O R T H DIEFENBAKER COURT AVONMOR E SQUARE PICKERING P A R K W A Y PIC K E R I N G P A R K W A Y FA R M VA L L E Y SA N D Y B E A C H R O A D ALLIANCE RO A D LI V E R P O O L R O A D LIV E R P O O L R O A D BAYLY STR E E T PLUMMER STREET SA L K R O A D RO A D GL E N D A L E D R I V E MA L D E N C R E S C E N T GLENANNA ROAD GL E N A N N A R O A D BRANDS COURTBICR O F T CO U R T BR O N T E SQ U A R E FIEL D L I G H T B O U L E V A R D FA Y L E E CRESCENT CR E S C E N T CANBOROUGH ANTON SQUARE BR O C K R O A D DREYBER COURT GETA CIRCLE ALWIN CIRCLE HIGHWAY 4 0 1 PORTLAND COURT JAYWIN CIRCLE DE N M A R R O A D C H A R LOTTE CIRCLE GL E N G R O V E ROAD GL E N V I E W R O A D ROSEFIELD ROAD RO S E F I E L D PO P P Y LANE M E MORY LANE LO D G E R O A D RO Y A L R O A D GUILD R O A D E19 E18 E10/E17 E16 E16 E15 E15 E14 E13 E12 E11 E10E9 E8 E7 E6 E5 E4 E3E2 E1   d aoewRiv G le n Ro a d G n gston R o a d ll e ve r p o o nanniKaRoiLad V a l l e y F a r m R o a d The E s p l a n a d e S City-Owned L a n d s Pickering P a r k w a y Highway 4 0 1 Sa n d y B e a c h R o a d RecreatiCompl on ex EsplanadePark Portion of Pickering Town Centre lands subject to applicatiSP-2021-02 & A 15/ons21 Location MapSP-2021-02 & A 15t I /21 nc.1355 K File:AppliMuni OPB RealAddress:t:lcani y ingston Road om: c paf the Ci City DevelopmentDepartment Date: Aug. 10, 2022 SCALE 1:5,000 © The Corporati© Queens Printe ity of Pickering Produced (in part) under license fo Ministr f Natural Resources. All rights reserved. ghon and on or, Ontarces. Al r; © He Inc. and its suppli r Majes ers. All he Queen in Right of Canada, Depa ts reserved.; © Municipal Propertyty trigh rtmentof NaturalAssessmen ResourCorporati l ri y o ts reserved.; © Teranet Entits suppliers. All rights rese erprises rved. :t THIS IS NOT A PLAN OF SURVEY. L:\PLANNING\01-MapFiles\SP\2021\SP-2021-02 & A 15-21 OPB Realty Inc\SP-2021-02_LocationMap_V3.mxd Attachment #1 to Report PLN 01-23 Attachment #2 to Report PLN 01-23 Kingston R o a d Gl enannaRoad Liverpool Road Sa n d y B e a c h R o a d Pickering Parkw a y Alliance Road V a l l e y F a r m R o a d Celebration Drive The Esplanade S The Esplanade N Highway 401 Air Photo MapFile:Applicant:SP-2021-02 & A 15/21 Date: Aug. 10, 2022 OPB Realty Inc. L:\PLANNING\01-MapFiles\SP\2021\SP-2021-02 & A 15-21 OPB Realty Inc\SP-2021-02_AirPhoto.mxd 1:5,000 SCALE:THIS IS NOT A PLAN OF SURVEY. © The Corporation of the City of Pickering Produced (in part) under license from: © Queens Printer, Ontario Ministry of Natural Resources. All rights reserved.; © Her Majesty the Queen in Right of Canada, Departmentof Natural Resources. All rights reserved.; © Teranet Enterprises Inc. and its suppliers. All rights reserved.; © Municipal PropertyAssessment Corporation and its suppliers. All rights reserved. City DevelopmentDepartment Portion of Pickering Town Centre lands Portion of Pickering Town Centre lands subject to applicationsSP-2021-02 & A 15/21 City-Owned Lan d s Municipal Address:1355 Kingston Road Attachment #3 to Report PLN 01-23 L:\Planning\01-MapFiles\SP\2021 Aug. 09, 2022DATE: Applicant: File No: Original Draft Plan of Subdivision FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. City Development Department SP-2021-02 & A 15/21 OPB Realty Inc. G l e n a n n a R o a d The Esplanade North The Esplanade South Pickering Parkway Va l l e y F a r m R o a d N City of Pickering Lands Portion of Pickering Town Centre lands Municipal Address: 1355 Kingston Road Lands Subject to Zoning By-law AmendmentLands Subject to Draft Plan of Subdivision Attachment #4 to Report PLN 01-23 L:\Planning\01-MapFiles\SP\2021 Aug. 09, 2022DATE: Applicant: File No: Original Phase 1 Master Plan FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. City Development Department SP-2021-02 & A 15/21 OPB Realty Inc. G l e n a n n a R o a d The Esplanade North The Esplanade South Pickering Parkway Va l l e y F a r m R o a d N City of Pickering Lands Portion of Pickering Town Centre lands Municipal Address: 1355 Kingston Road Building footprints are conceptual and are shown for illustrative purposes only Lands Subject to Zoning By-law Amendment Lands Subject to Draft Plan of Subdivision Attachment #5 to Report PLN 01-23 Revised Draft Plan of Subdivision City Development Department Aug. 15, 2022FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. SP-2021-02 & A 15/21 OPB Realty Inc.Applicant: DATE: File No: L:\Planning\01-MapFiles\SP\2021 Municipal Address: 1355 Kingston Road City Hall Pickering Town Centre Mall N Gle n a n n a R o a d Pickering Parkway Portion of Pickering Town Centre Lands Attachment #6 to Report PLN 01-23 Revised Phase 1 Master Plan (Maximum Building Heights) City Development Department Aug. 18, 2022FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. SP-2021-02 & A 15/21 OPB Realty Inc.Applicant: DATE: File No: L:\Planning\01-MapFiles\SP\2021 Municipal Address: 1355 Kingston Road N