Loading...
HomeMy WebLinkAboutENG 08-21 Report to Executive Committee Report Number: ENG 08-21 Date: April 6, 2021 From: Richard Holborn Director, Engineering Services Subject: Krosno Creek Culvert Replacements – Gas Main Relocations Morden Lane, Reytan Boulevard, and Alyssum Street (including Sandy Beach Road) -File: A-1440 Recommendation: 1.That the cost proposals for gas main relocations submitted by Enbridge Gas Inc. for; Morden Lane, Reytan Boulevard, and Alyssum Street (including Sandy Beach Road) in the amount of $296,872.94 (HST included) be accepted; 2.That the total net project cost of $294,078.00 (net of HST rebate) for the proposals be approved; 3.That Council authorize the Director, Finance & Treasurer to fund the net project cost of $294,078.00 for the proposals as follows: a)the sum of $152,921.00 by a transfer from Development Charges City’s Share Reserve; b)the sum of $141,157.00 by a transfer from Development Charges-Stormwater Management Reserve Fund; and, 4.That the appropriate officials of the City of Pickering be authorized to take the necessary actions as indicated in this report. Executive Summary: The City of Pickering retained the services of The Municipal Infrastructure Group (TMIG) for the Krosno Creek Flood Reduction Study which was completed in February 2015. The study determined that the preferred solution to mitigate flooding, and ongoing erosion concerns along the creek, is to replace the existing culverts at Morden Lane, Alyssum Street, and Reytan Boulevard with larger culverts. Detailed design was completed by TMIG in the spring of 2019. Through the detailed design process, it was determined that gas main relocations are required to create the necessary space for construction of the proposed concrete box culverts. Enbridge Gas Inc. has provided cost proposals for the three gas main relocation sites on Morden Lane, Reytan Boulevard and Alyssum Street. The proposals provided are governed under the Municipal Franchise Agreement for Cost Sharing with Enbridge Gas Inc. The City’s apportioned cost is 35 per cent of the total project cost, while 65 per cent is the responsibility of Enbridge Gas Inc. The cost proposals indicate that the City’s portion of the works is $296,872.94 (HST included). Expense Code Source of Funds Budget Required for Enbridge Gas Inc. Relocation 5321.1910.6253 DC’s City Share (52%) $2,496,000.00 $152,921.00 DC Stormwater Management 2,304,000.00 141,157.00 (48%) Total $4,800,000.00 $294,078.00 Balance of Funds Available for Future Culvert Replacement Tender $4,505,922.00 ENG 08-21 April 6, 2021 Subject: Krosno Creek Culvert Replacements – Gas Main Relocations Morden Lane, Reytan Boulevard, and Alyssum Street (including Sandy Beach Road) Page 2 Financial Implications: The three cost proposals provided by Enbridge Gas Inc. (City of Pickering’s share only) dated December 22, 2020 are; 1. Proposal Amount Project #1 – Krosno Creek at Morden Lane $106,766.95 Project #2 – Krosno Creek at Reytan Blvd. 35,546.02 Project #3 – Krosno Creek at Alyssum Street (including Sandy Beach Road) $120,406.45 Subtotal 262,719.42 HST (13%) 34,153.52 Total $296,872.94 2.Estimated Project Costing Summary Proposal Submitted by Enbridge Gas Inc. $262,720.00 Project Contingency (10%) 26,272.00 Subtotal – Costs $288,992.00 HST (13%) 37,569.00 Total Gross Project Cost $326,561.00 HST Rebate (11.24%) (32,483.00) Total Net Project Cost $294,078.00 3.Approved Source of Funds – Development Projects Capital Budget As part of the 2019 Development Projects (DC Funded) Capital Budget, funds for the Krosno Creek – Culvert Replacements and Erosion Control Construction were approved in the amount of ENG 08-21 April 6, 2021 Subject: Krosno Creek Culvert Replacements – Gas Main Relocations Morden Lane, Reytan Boulevard, and Alyssum Street (including Sandy Beach Road) Page 3 $4,800,000.00 in account 5321.1910.6253. The project is funded by DC’s City Share (52 per cent) and DC Stormwater Management (48 per cent). The cost for the gas main relocations will be funded from this account. The balance will be used for the future culvert replacement tender. Discussion: The City of Pickering retained the services of The Municipal Infrastructure Group (TMIG) for the Krosno Creek Flood Reduction Study which was completed in February 2015. The study determined that the preferred solution to mitigate flooding, and ongoing erosion concerns along the creek, is to replace the existing culverts at Morden Lane, Reytan Boulevard and Alyssum Street with larger culverts. Detailed design was completed by TMIG in the spring of 2019. Through the detailed design process, it was determined that gas main relocations are required to create the necessary space for construction of the proposed concrete box culverts. The proposed gas main relocation requirements include; •Morden Lane – installation of a new gas main, 4” steel intermediate pressure (90m) pipe. The existing 4” gas main (south side) is to be abandoned; •Reytan Boulevard – installation of a new gas main, 2” plastic intermediate pressure (19m) pipe and one existing service to be relayed. The two existing 2” gas mains (north and south sides) are to be abandoned; and; •Alyssum Street (including Sandy Beach Road) – installation of a new gas main, 4” steel high pressure gas main along the east side of Sandy Beach Road, reconnecting two existing commercial services. Part of the existing 4” gas main on Alyssum Street is to be abandoned. Enbridge Gas Inc. has provided cost proposals for the three proposed gas main relocation sites. The cost proposals provided are governed under the Municipal Franchise Agreement for Cost Sharing with Enbridge Gas Inc. The City’s apportioned cost is 35 per cent of the total project cost, while 65 per cent is the responsibility of Enbridge Gas Inc.. The total estimate for the City’s portion is $296,872.94 (HST included). Engineering Services staff have reviewed the cost proposals and plans submitted by Enbridge Gas Inc. and recommend acceptance of the cost proposals from Enbridge Gas Inc. in the amount of $296,872.94 (HST included), and recommend a total net project cost of $294,078.00 (net of HST rebate) be approved. Attachment: 1.Location map ENG 08-21 April 6, 2021 Subject: Krosno Creek Culvert Replacements – Gas Main Relocations Morden Lane, Reytan Boulevard, and Alyssum Street (including Sandy Beach Road) Page 4 Prepared By: Approved/Endorsed By: Scott Booker Richard Holborn, P.Eng. Manager, Capital Projects & Infrastructure Director, Engineering Services Caryn Kong, CPA, CGA Stan Karwowski, MBA, CPA, CMA Senior Financial Analyst – Capital & Debt Director, Finance & Treasurer Management Original signed by:Original signed by: Original signed by:Original signed by: Original signed by: SB:mjh Recommended for the consideration of Pickering City Council Marisa Carpino, M.A. Chief Administrative Officer R U'"ff ,cE:N RRlD51IOAN ----( 6 /A----( \,_ i c0<'P... �I�f:I SUBJECT�L, G�cH � ,ci-if:L-pLJBI..J C AREAS Engineering Services Department Location Map Gas Main Relocations SCALE: DAlE: N.T.S. March 16 /2021 Attachment #1 to Report # ENG 08-21