HomeMy WebLinkAboutCS 14-21 Report to Council Report Number: CS 14-21 Date: February 22, 2021 From: Brian Duffield (Acting) Director, Community Services Subject: Public Works Winter Activities update - Information Report - File: A-1440-21 Recommendation: 1. That Council receive Report CS 14-21 regarding Public Works Winter Activities for information. Executive Summary: Community Services Department staff submitted Report to Council CS 31-19 on December 16, 2019 which described winter activities provided by Public Works and recommended service level increases. Report CS 31-19, which was approved by Council through Resolution #194/19, recommended that additional staff, vehicles, equipment and material resources be phased in over 2020 and 2021 in order to provide an enhanced level of service with respect to winter maintenance. To that end, the 2020 Capital and Current Budgets included the associated costs for the first year of implementation. At this time, staff are presenting this update report on year one activities prior the submission of the 2021 Current and Capital Budgets which will complete the implementation of the Public Works winter level of services enhancements. Financial Implications: The equipment and vehicle costs reflected in the 2020 Capital Budget were funded from the vehicle replacement reserve or other funding sources. By employing this strategy, the City avoids debt interest costs. Last April, financial report (FIN 05-20) provided a financial update on the impact of COVID-19 on City operations. Under the direction of the previous CAO, senior staff implemented a cost containment exercise that included delayed hiring of new budgeted staff as a cost saving strategy. The effects of this cost containment strategy is reflected in the body of this report through cost savings. All cost figures shown in this report are Net of HST. Please see the description below for a summary of the costs incurred in 2020 to implement Public Works winter level of service enhancements in year one. Discussion: Staff were prepared and intended to implement the recommendations of Report CS 31-19 phased in over 2020, and 2021, as detailed in the report. However, the City’s response to COVID in 2020 changed these plans and staff deferred the start dates of new staff to CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 2 November 2020, where possible. Some positions were deferred to 2021. The intent was to have staff, vehicles and equipment in place for the November 2020/2021 winter control season. As detailed in the charts below, this goal was achieved for the successful delivery of the new levels of service for winter control. Report CS 31-19 also addressed growth in the City and detailed the additional resources needed to meet the maintenance and winter control increases in service, related to growth. Growth in Seaton slowed during COVID and therefore staff also deferred, where possible, the planned increases in staff, vehicles and equipment for 2020 and 2021 that are related to Seaton growth. The supply chain was severely impacted in 2020 and resulted in higher prices for vehicles and equipment and extended delivery dates. For this reason, staff chose to defer and re-budget growth related vehicles and equipment that were tendered in 2020 but closed at a cost not consistent with past purchases. The following charts represent the original Level of Service and Growth related additions to the 2020 and 2021 Current and Capital Budgets, with the actual costs and status to date. 2020 Level of Service: Item Budget Actual Cost Rationale Status Front Plow Attachment $30,000 $33,580 For existing loader to clear Pickering Soccer Club parking lot and other infrastructure Front Plow in service November 1, 2020 One ½ Ton Pickup Truck $45,000 $45,165 New Lead Hand, Parks & Property to conduct winter control inspections, deploy and support staff Truck in service November 16, 2020 Total $75,000 $78,745 2020 Growth: Item Budget Actual Cost Rationale Status 2 One Ton Salter with Plows $140,000 For all narrow roads and laneways included in Seaton (new 14th snowplow route) Re-budgeted in 2021 Capital Budget to $200,000 14th route to commence in 2021/2022 winter season Front Plow & Wing Attachment $20,000 To install on existing One Ton Salter for new laneways in Seaton Re-budgeted in 2021 Capital Budget to $40,000 Sidewalk Plow with Attachment $175,000 Increase in sidewalk and multi-use paths (MUP) inventory (new 8th sidewalk plow route) COVID deferral, funds carried over to 2021, to be tendered in Q2 2021 CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 3 Item Budget Actual Cost Rationale Status One Ton Truck $70,000 $68,823 For 2nd crew on manual clearing of walkways and crosswalks north of Taunton Road as 1st crew completes same, south of Taunton creating a significant time lag Truck in service November 1,2020 Total $485,000 $68,823 2021 Level of Service: Item Budget Actual Cost Rationale Status Half Ton Pick Up Truck $45,000 Utility Cut Inspector (also performing winter patrols) To be tendered in 2021 for an April start Total $45,000 Growth: Item Budget Actual Cost Rationale Status Five Ton Dump Truck with Plow & Wing $300,000 For 18 centre line-km of new roads in Seaton (new 15th snow plow route) Project deferred and to be re- submitted in 2022 Capital Budget 2 Brine Four or Five Ton Trucks $560,000 For anti-icing and can also be used as spare salters/plows Project deferred and to be re- submitted in 2022 Capital Budget Total $860,000 2020 Level of Service: Item Budget Actual 2020 Cost Rationale Status On Call Staff - Roads $26,500 $8,750 (Nov – Dec 2020 cost) For standby during the winter months including Loader Operator for Pickering Soccer Club parking lot Expanded roster of on-call Roads staff from 9 to 15 for improved response 24/7 CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 4 Item Budget Actual 2020 Cost Rationale Status 1 New Supervisor, Public Works Operations $139,496 To coordinate winter communications, weather forecast, Road Weather Information Systems, Public Facing Winter Portal and GPS/AVL monitoring and exception/stop reporting Position deferred in 2020 as COVID response. Position to be filled in February 2021 1 New Lead Hand, Parks & Property $111,187 $13,900 (Nov – Dec 2020 cost) To provide proper oversight of staff during winter events Position delayed in 2020 as COVID response. Position filled in November 2020 On Call Staff Parks $8,500 $2,830 (Nov – Dec 2020 cost) Increase the number of existing staff to be on call in order to provide winter control during winter events exceeding 13 hours in duration Expanded roster of on-call Parks staff from 7 to 11 for improved response time On Call Staff Property $7,000 $2,350 (Nov – Dec 2020 cost) Increase the number of existing staff to be on call in order to provide winter control during winter events exceeding 13 hrs. in duration Expanded roster of on-call Property staff as noted above 1 New Lead Hand, Municipal Garage $111,187 To introduce an afternoon shift that ensures service vehicles are on the road. Position will schedule staff, assign/oversee work and assist with repairs. Position delayed in 2020 as COVID response. Position filled January 12, 2021 1 New Mechanic, Municipal Garage $106,950 $66,850 (Aug – Dec 2020 cost) To introduce an afternoon shift that ensures service vehicles are on the road. Staff will perform non- scheduled repairs and prepare vehicles to on the road asap. Position delayed in 2020 as COVID response. Position filled in August 2020 Total $510,820 $94,680 CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 5 2020 Growth: Item Budget Actual 2020 Cost Rationale Status 1 New Maintenance Worker, Roads $65,938 $8,240 (Nov – Dec 2020 cost) For narrow roads in Seaton and others Position delayed in 2020 as COVID response. Position filled in November 2020 Brine Program $45,000 No 2020 increase. Brine supply costs taken from salt budget. For the purchase of salt and salt brine for additional road/sidewalk/MUP inventory as noted above Brine supply has been increased to $45,000 in the 2021 Current Budget. 2020 Brine consumption was taken from the Salt budget. 2 New Maintenance Workers, Parks & Property $87,917 $10,990 (Nov – Dec 2020 cost) For snow clearing in Seaton and manual snow clearing north of Taunton Positions delayed in 2020 as COVID response. Positions filled in November 2020 1 New Maintenance Worker, Parks & Property $43,959 $5,500 For snow clearing in Seaton and manual snow clearing north of Taunton and, in part, for enhanced winter trail maintenance (as per CS 33-19) Position delayed in 2020 as COVID response. Position filled in November 2020 Total $242,814 $24,730 2021 Level of Service: Item Budget Actual 2020 Cost Rationale Status 1 New Utility Cut Inspector $66,000 To conduct utility cut inspections, as well as bridge inspection/repairs, sidewalk inspections, and winter patrol duties To be posted In April 2021 1 New Mechanic, Municipal Garage $45,000 To expand an afternoon shift that ensures service vehicles are on the road. Staff will perform non- scheduled repairs and prepare vehicles to get on the road asap New position has been deferred to 2022 Current Budget as COVID response Total $111,000 CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 6 2021 Growth: Item Budget Actual 2020 Cost Rationale Status Contracted Snow Removal $50,000 For additional contracted snow removal on narrow roads in Seaton & others To be implemented in the 2021/2022 winter season Total $50,000 Enhanced Level of Service Staff have implemented new levels of service based on measured snow depths and Commercial Vehicle Operator’s Registration (CVOR) and the Highway Traffic Act Hours of Service requirements of driving consecutively for no more than 13 hours with a minimum 8 hour rest period. The following chart details the changes to level of service in 2020. a) Salting, Sanding and Plowing: Proposed Level of Service Measure Previous Level of Service New Level of Service Up to 2” of snow • urban roads salted within 6 hours, icy roads salted within 8 hours • rural roads sanded within 24 hours after the snow has stopped, if necessary for traction, icy conditions within 12 hours • urban roads salted, icy roads salted within 6 hours • rural roads sanded within 15 hours after the snow has stopped, if necessary for traction, icy conditions within 12 hours 2” to 4” of snow and stopped • urban roads salted and plowed within 13 hours (unless drivers time out and no back-ups are available or there is a lack of mechanics to return trucks onto the road) • rural roads plowed and sanded if necessary within 24-30 hours • urban roads salted and plowed within 13 hours (due to the introduction of enhanced on call schedule and new afternoon shift for mechanics) • rural roads plowed and sanded if necessary within 20 hours 4” to 8” of snow and stopped • urban roads salted and plowed within 30 hours • rural roads plowed and sanded within 36 hours • urban roads salted and plowed within 24 hours • rural roads plowed and sanded within 30 hours Beyond 8” of snow and stopped • urban roads salted and plowed within 36 hours • rural roads plowed and sanded within 36-40 hours • urban roads salted and plowed within 30 hours • rural roads plowed and sanded within 36 hours Although staff made deferrals in 2020 as a response to COVID, the focus on levels of service (LOS) over growth has had a significant effect on the performance of winter control activities. In all cases the levels of service (LOS) goals were met or exceeded during 2020/2021 winter events to date. CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 7 Staff have tracked actual performance and the levels of service (LOS) achieved during the first 40 winter control events of the 2020/2021 winter control season, up to and including February 9, 2021. Of the 40 events, all have been in compliance with the new LOS. Of those events, 33 were less than 2” of snow, all of which were salted within 6 hours or sanded within 12 to 15 hours. Only 4 winter events were in the 2” to 4” range of snow and these were salted and plowed within 13 hours or plowed and sanded within 20 hours. Finally, 3 winter events that ranged from 4” to 8” in depth were salted and plowed within 24 hours and plowed and sanded within 30 hours. No events exceeding 8” in snow depth have been experienced this winter season to date. Public Works compliance with the proposed LOS is a result of an increase in the number of Roads staff on standby which ensures that one operator for each of the 13 urban and rural heavy truck paved routes reports to their route within 1 hour of notification. This has eliminated the past practice of sequencing completion of 6 heavy trucks on southern Collector Roads only (south of Concession 3) followed by northern Collector roads only. In many cases, as a result of this sequencing, local paved and unpaved (gravel) roads would receive delayed service. By having 13 Operators respond quickly to a call out, Collector and Local paved roads in each route are completed in priority with the first 7 finished immediately proceeding into a sanding operation on the 7 unpaved (gravel) to provide traction. This further enables Public Works to be in compliance of both the Highway Traffic Act Hours of Service for maximum of 13 hours of driving as per CVOR requirements and the Employment Standards Act for maximum 70 hours of work in a 7 day cycle. Of the 40 winter events to date, 32, or 80%, required the use of 1 or 2 spare salters in the Fleet. This highlights the importance of the Fleet garage as integral to the success of winter operations and 2 mechanics are on standby throughout the winter season to provide the support needed to keep vehicles & equipment on the road. Currently, Public Works maintains 3 spare standby salters and this is achieved by delaying the disposal date of vehicles that have been replaced as a life cycle replacement. One of the new Maintenance Worker positions has allowed Roads to address narrow roads, laneways and mews with a small 1 Ton combination salter and plow which is particularly important where daytime on-street parking is permitted. With the expansion of the brine program, 9 applications prior to forecasted snow and/or ice have been undertaken to date and provided safe road conditions as a 1 hour buffer while awaiting call-in staff on standby to arrive at the Operations Centre. Other Enhancements to Public Works Activities: As a result of hiring additional staff and equipment that can be effectively utilized 12 months a year, Public Works has also been able to: 1. Provide effective winter control to un-assumed roads including Enterprise Gateway in the Innovation Corridor as of February 3, 2021; 2. Provide effective winter control to un-assumed sidewalks including those found within parks such as Foxridge Trail as an outcome of intensification in the Seaton community; 3. As of April 2021, Public Works will monitor road allowances for utility cuts to ensure enhanced permanent repairs of the road infrastructure. Ensure other right-of-way permits have been taken to maintain the integrity of infrastructure, including those on Durham Regional roads that impact City of Pickering sidewalks, MUP and lighting; and, CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 8 4. Provide continuance of garbage collection in parks and on roadsides from Monday to Friday 5 days/ week which had to stop previously during winter control response. Next Steps: Through the 2021 and 2022 Capital and Current Budget processes, Public Works is continuing with year 2 of its implementation plan, as detailed in the table above to: 1. Provide an overnight winter patrol shift outside of normal business hours (3:00 pm to 11:30 pm Monday to Friday) for a more timely and customer oriented response to Customer Care calls and allow the on-call Foreperson to be freed up to supervise their call-in Operators for 13 hours, removing the necessity of overlap by additional Foreperson(s); 2. Provide an expanded anti-icing program based on road classification, i.e. all Arterial (posted speed of 60 km/hr) and Collector roads as well as other priority areas such as steep inclines, bridges and curves within regular working hours; 3. Provide an afternoon Fleet garage shift from 3:00 pm to 11:00 pm Monday to Friday to address repairs at the end of the normal workday in preparedness for overnight or next day utilization; 4. Improve salt & pickled sand usage on roads and sidewalks, multi-use paths and multi-use trails based on pre-approved application rates for frost/bridges, normal and heavy snowfalls; 5. Extend winter road and sidewalk services rationally to newly developing communities in Seaton and North East Pickering; and, 6. Provide additional snow removal where required on narrow roads, cul-de-sacs, laneways, streets with layby parking and sightline issues that are created over the winter season by snow windrows. Attachments: 1. None. CS 14-21 February 22, 2021 Subject: Public Works Winter Activities update Page 9 Prepared By: Approved/Endorsed By: Original Signed By Brian Duffield for: Original Signed By: Rob Burlie, P. Eng. Brian Duffield Manager, Public Works (Acting) Director, Community Services Original Signed By: Stan Karwowski, MBA, CPA, CMA Director, Finance & Treasurer BD:rb Recommended for the consideration of Pickering City Council Original Signed By: Marisa Carpino, MA Chief Administrative Officer