HomeMy WebLinkAboutENG 15-20 Report to Council Report Number: ENG 15-20 Date: December 14, 2020 From: Richard Holborn Director, Engineering Services Subject: Request for Additional Funding for Consulting Services - Beachfront Park Rehabilitation & Needs Assessment Study - File: A-1440 Recommendation: 1. That the additional fee proposal as submitted by the MBTW Group Inc. in the gross amount of $15,086.00 (HST included) and a net amount of $13,585.00 (net of HST rebate) for the increase in scope of work for the Beachfront Park Rehabilitation & Needs Assessment Study, and associated costs for Geotechnical Investigations in the gross amount of $1,718.00 (HST included) and a net amount of $1,547.00 (net of HST rebate) be accepted; 2. That the Director, Finance & Treasurer be authorized to finance the increase in the total net project cost in the amount of $15,132.00 as follows: a) The sum of $10,214.00 by a transfer from the Development Charges Growth-Related Studies Reserve Fund; b) The sum of $4,918.00 from property taxes; and, 3. That the appropriate officials of the City of Pickering to authorized to take the necessary actions as indicated in this report. Executive Summary: The MBTW Group Inc. (MBTW) was retained for the preparation of the Beachfront Park Rehabilitation & Needs Assessment study in the amount of $49,780.00 (HST extra) in December 2019. The MBTW proposal was approved by the Treasurer and Chief Administrative Officer through a memo dated December 4, 2019 (Attachment #1) in accordance with the Purchasing Policy Item 10.03 (b). The study is well underway and has involved consultation with the Toronto and Region Conservation Authority (TRCA). In order for TRCA to complete their preliminary review of the concept plans, some additional studies and information are required that go beyond the consultants original scope of work. The cost to complete this additional work by MBTW is estimated at $13,350.00 (excluding HST). Geotechnical information has also been requested for the beach area in order to determine the future possible rate of erosion. GHD have provided a proposal for soil sampling and analysis at an estimated cost of $1,520.00 (excluding HST). The revised total net project cost for this phase of the study is estimated to be approximately $65,788.00. In accordance with the Purchasing Policy Item 10.03 (c), since the award to MBTW will now exceed $50,000, approval for the increase in scope is required by Council. ENG 15-20 December 14, 2020 Subject: Request for Additional Funding for Consulting Services Beachfront Park Rehabilitation & Needs Assessment Study Page 2 Financial Implications: 1. Additional Fee Proposal Amount Fee Proposal dated November 18, 2020 Scope Change for Beachfront Park Rehabilitation & Needs Assessment HST (13%) Total Gross Additional Fee Cost HST Rebate (11.24%) Total Net Additional Fee Cost $13,350.00 1,736.00 15,086.00 1,501.00 $13,585.00 2. Estimated Project Costing Summary Original amount for Beachfront Park Rehabilitation & Needs Assessment $49,780.00 Scope Change for Beachfront Park Rehabilitation & Needs Assessment 13,350.00 Geotechnical Investigations (GHD) Subtotal HST (13%) Total Revised Gross Project Cost HST Rebate (11.24%) Total Net Project Cost 1,520.00 $64,650.00 8,405.00 73,055.00 (7,267.00) $65,788.00 3. Source of Funds (2020 Current Budget – Uncommitted funds in 2290.2392) Account Code Source of Funds Required 2290.2392.0000 Development Charges Reserve Fund – Growth Related Studies (67.5%) $10,214.00 Property Taxes (32.5%) 4,918.00 Total Additional Required Funds $15,132.00 Staff recommend the approval of an increase in the total net project cost to $65,788.00 from the amount that was approved by the Chief Administrative Officer in a memo dated December 4, 2019. Due to the increase in scope, the award to MBTW will exceed $50,000 and in accordance with the Purchasing Policy, item 10.03 (c), consulting and professional services above $50,000 is subject to the additional approval of Council. In accordance with the Purchasing Policy item 10.03 (b),the original award of $49,780.00 (HST extra) to MBTW was previously approved by the Manager, Supply & Services, Director, Engineering Services, Treasurer and the Chief Administrative Officer. Council approval is being sought at this time for the increase in the total net project cost amount of $15,132.00 in order to satisfy additional study requirements as requested by the TRCA, and to increase the award to MBTW as the amount now exceeds $50,000.00. ENG 15-20 December 14, 2020 Subject: Request for Additional Funding for Consulting Services Beachfront Park Rehabilitation & Needs Assessment Study Page 3 Discussion: The MBTW Group Inc. (MBTW) was retained for the preparation of the Beachfront Park Rehabilitation & Needs Assessment study in the amount of $49,780.00 (HST extra) in December 2019. The MBTW proposal was approved by the Treasurer and Chief Administrative Officer through a memo dated December 4, 2019 in accordance with the Purchasing Policy. Item 10.03 (b). The study is well underway and has involved consultation with City staff and the Toronto and Region Conservation Authority (TRCA). TRCA has reviewed the concept plans prepared by MBTW and has requested for some additional studies and information that is beyond the consultants original scope of work. This work includes the following: • review of other Coastal Engineering reports prepared by Baird Engineering; • assess flood hazard in the vicinity of the proposed washroom building; • site walk and additional meetings with the TRCA ; • test pit excavations (review geotechnical studies); and, • update of Flood Hazard report. Staff would like to receive general approval from TRCA on the concept plans before proceeding with the next phase of the Beachfront Park Rehabilitation & Needs Assessment study which includes stakeholder and public consultation. The additional work required to satisfy the TRCA request would be carried out by Shoreplan Engineering, the Coastal Engineering firm who is a sub-consultant for MBTW. Shoreplan’s costs to complete this work is estimated at $13,350.00 (excluding HST). Geotechnical information has also been requested for the beach area. A gradation analysis, which looks at the size and layering of the beach sand and gravel, is required in order to determine the possible future rate of erosion of the beach area. GHD have provided a proposal for the soil sampling and sieve analysis at an estimated cost of $1,520.00 (excluding HST). This study has been included in the 2017 DC Background Study, therefore it is eligible for DC funding. Funds in the amount of $100,000 were approved in the 2019 Current Budget (account 2290.2392.0000) for a Waterfront Park Needs Assessment. As the award to MBTW was only $49,780.00 (HST extra) the uncommitted funds were returned to source at the end of 2019. The additional project cost for the increase in scope is proposed to be funded from available uncommitted funds in account 2290.2392.0000 of the 2020 Current Budget with the source of financing being 67.5 per cent Development Charges Growth-Related Studies Reserve Fund and 32.5 per cent from property taxes. ENG 15-20 December 14, 2020 Subject: Request for Additional Funding for Consulting Services Beachfront Park Rehabilitation & Needs Assessment Study Page 4 In accordance with Purchasing Policy Item 10.03, the Manager may obtain the services of a particular consultant selected by the initiating Director without going through a competitive process. Where the funds are available in the approved budget and the project or annual cost of a consulting or professional service assignment is expected to be: c) Above $50,000 is subject to the additional approval of Council. The initiating Director shall submit the Report to Council to obtain approval. The revised total net project cost for this phase of the study is $65,788.00.The revised award to MBTW now falls within this level of approval. Attachments: 1. Approved Memo – Consulting Services, the MBTW Group Inc. – Beachfront Park Rehabilitation & Needs Assessment, dated December 4, 2019 2. Additional Services Request No. 1 from the MBTW Group Inc., dated November 18, 2020 3. Location Map Attachment #1 to Report #ENG15-20 T 416.449.7767 F 416.449.1803 255 Wicksteed Ave., Unit 1A, Toronto, ON, Canada M4H 1G8 www.mbtw-wai.com landscape architecture urban design design guidance golf design leisure design November 18, 2020  Attention: Arnold Mostert, OALA, Senior Coordinator  Landscape & Parks Development  Engineering Services  City of Pickering  Via Email: amostert@pickering.ca  Re: ADDITIONAL SERVICES REQUEST No.1:   Beachfront Park Rehabilitation MBTW Project Number CPG006  Dear Arnold,  As per recent discussions, please find below a summary of Additional Services required to fully address  project related commentary submitted by the TRCA. The scope of the Additional Services relates to coastal  engineering expertise, which we propose be supplied by Shoreplan Engineering. The scope of work includes:   a)Review of other coastal engineering reports prepared by Baird Engineering and supplied by the TRCA; b)Assess the Flood Hazard in the vicinity of the proposed washroom building; c)Site walk with the TRCA (already completed); d)Additional meeting allowance; e) Test pit excavations and comments; and f)Update of Flood Hazard report. Fees:  Estimated fee provided by Shoreplan Engineering for the above tasks is $13,350.00. Shoreplan’s  detailed fee estimate can be provided upon request.   Closure: The proposal outlines our understanding of the scope as of the date of this letter. Please do not  hesitate to contact our office should you have any questions or require clarifications. We look forward to  hearing from you.  Yours Truly,  The MBTW Group  Jana Joyce, OALA, CSLA, ASLA  Principal, Senior Landscape Architect  MBTW Group  255 Wicksteed Ave., Unit 1A  Toronto, ON, Canada M4H 1G8  T 416.449.7767 x 252  Attachment #2 to Report #ENG 15-20 LIVERPOOL ROADANNLAND STREET WHARF STREET 1:5,000 SCALE: Engineering Services Department Beachfront ParkLocation MapDecember 3, 2020 DATE: q Frenchman'sBay Lake Ontario Attachment #3 to Report #ENG 15-20