Loading...
HomeMy WebLinkAboutENG 01-20Cfy �t DICKERING Report to Council Report Number: ENG 01-20 Date: Feb 24, 2020 From: Richard Holborn Director, Engineering Services Subject: Marksbury Road Outfall — Replacement - Tender No. T2020-6 - File: A-1440 Recommendation: 1. That Tender No. T2020-6 as submitted by Esposito Bros. Construction Ltd. in the total tendered amount of $271,063.61 (HST included) be accepted; 2. That the total gross project cost of $415,663.00 (HST included), including the infrastructure design, permits, tendered amount, contract support, and other associated costs, and the total net project cost of $374,317.00 (net of HST rebate) be approved; 3. That Council authorize the Director, Finance & Treasurer to finance the total net project cost of $374,317.00 as follows: a) the sum of $187,159.00 to be funded from the Clean Water and Wastewater Fund, Federal contribution; b) the sum of $93,579.00 to be funded from the Clean Water and Wastewater Fund, Provincial contribution; c) the sum of $93,579.00, as provided for in the 2017 Stormwater Management Capital Budget to be financed by the issuance of debentures by the Regional Municipality of Durham over a term not to exceed 15 years; be revised to a transfer from the Rate Stabilization Reserve; and, 4. That the appropriate officials of the City of Pickering be authorized to take the necessary actions as indicated in this report. ENG 01-20 February 24, 2020 Subject: Marksbury Road Outfall — Replacement Tender No. T2020-6 Page 2 Executive Summary: Tender No. T2020-6 Marksbury Road Outfall — Replacement project was issued on Monday, January 20, 2020 with a tender closing date of Wednesday, February 12, 2020. The low bid of $271,063.61 (HST included) submitted by Esposito Bros. Construction Ltd. is recommended for approval. The total gross project cost is estimated at $415,663.00 (HST included) with an estimated total net project cost of $374,317.00 (net of HST rebate). Through a memorandum dated October 23, 2018, the Treasurer and Chief Administrative Officer approved the original fee proposal of $36,982.00 submitted by Chisholm, Fleming & Associates (CFA) to undertake the infrastructure design and coordination of all associated permits required for Tender No. T2020-6 Marksbury Road Outfall — Replacement project. This authorization was in accordance with Purchasing Policy Section 10.03 (b) as the assignment was between $30,000 to $50,000. Financial Implications: 1. Tender Amount Tender No. T2020-6 HST (13%) Total $239,879.30 31,184.31 $271,063.61 2. Estimated Project Costing Summary Tender Amount Associated Costs Consultant Design Fees Additional Consultant Design Fees Consultant Construction Support Permits (TRCA and MECP) Geotechnical Review and Materials Testing Traffic Control Plan and Signage, Temporary Driveway Utility Relocation Federal Gas Tax Sponsor Sign Contingency (15%) Sub Total - Costs HST (13%) Total Gross Project Cost HST Rebate (11.24%) Total Net Project Cost $239,879.00 36,982.00 12,000.00 2,500.00 8,500.00 10,000.00 15,000.00 2,000.00 5,000.00 35,982.00 $367,843.00 47,820.00 $415,663.00 (41,346.00) $374,317.00 ENG 01-20 Subject: Marksbury Road Outfall — Replacement Tender No. T2020-6 February 24, 2020 Page 3 3. Approved Source of Funds — 2017 Stormwater Management Capital Budget Source of Funds Budget Amount Committed Required for Total for Design/Permits Construction and Pre -Engineering CWWF Federal Contribution 50% CWWF Provincial Contribution 25% Debt — 15 Year Rate Stabilization Reserve 25% Total Funds $225,000.00 112,500.00 171,000.00 0.00 $508,500.00 $30,264.00 $156,894.00 $187,159.00 15,132.00 78,447.00 93,579.00 0.00 0.00 0.00 15,133.00 78,447.00 93, 579.00 $60,529.00 $313,788.00 $374,317.00 Net Project Cost under (over) Approved Funds $134,183.00 In October 2016, the City applied for funding for the Marksbury Road Outfall — Replacement project from the Clean Water and Wastewater Fund (CWWF), which was announced through the 2016 Federal Budget. In May 2017, the City was notified that this project was approved under the CWWF, with the federal and provincial governments contributing 50 percent and 25 percent of the estimated project costs, to a maximum of $225,000.00 and $112,500.00 respectively. Specialty work, such as stormwater outfall and erosion control works, similar to what is included in this project, can be difficult to construct, and there may be some unforeseen costs. Staff therefore recommend an increase in the contingency rate from the standard 12 percent to 15 percent. The "amount committed" being presented in Table 3 is intended to provide complete information on this project, and not intended to seek additional funding for the design component. These "committed" costs include; consultant design, permits and authorizations, and pre -engineering work. Discussion: The existing Marksbury Road outfall is a 750mm (30 inch) corrugated metal pipe, servicing several catch basins, which drains the stormwater runoff in the road cul-de- sac and the surrounding area, into Lake Ontario. The original pipe was installed in 1988 and has reached the end of its lifecycle. In the last several years, the pipe has collapsed on several occasions, requiring emergency repairs from the City's Operations crews. Additionally, the existing pipe end protection (gabion baskets) and erosion control, no longer meets the requirements of the Toronto and Region Conversation Authority. In October 2016, the City applied for funding for this project from the CWWF, which was announced through the 2016 Federal Budget. In May 2017, the City was notified that this project ENG 01-20 February 24, 2020 Subject: Marksbury Road Outfall — Replacement Tender No. T2020-6 Page 4 was approved under the CWWF, with the federal and provincial governments contributing 50 percent and 25 percent, of the estimated project costs, to a maximum of $225,000.00 and $112,500.00 respectively. The CWWF stipulates that only costs incurred prior to March 31, 2020 are eligible for funding. Costs incurred after March 31, 2020 are to be borne by the City. Following approval of this tender, construction will commence immediately. A completion date of March 31, 2020 was stipulated in the tender document. Tender No. T2020-6 was issued on January 20, 2020 and closed on Wednesday, February 12, 2020 with ten bidders responding. The low bid submitted by Esposito Bros. Construction Ltd. is recommended for approval. The total gross project cost is estimated at $415,663.00 (HST included) with an estimated total net project cost of $374,317.00 (net of HST rebate). Award to the low bid submitted by Esposito Bros. Construction Ltd, will be conditional upon receiving the City's Health & Safety form, Certificate of Clearance issued by the Workplace Safety & Insurance Board, Certificate of Insurance and requisite approvals. In conjunction with staff's review of the contractor's previous work experience with the City and the bonding available on this project, the tender is deemed acceptable. Upon careful examination of all tenders and relevant documents received, the Engineering Services Department recommends acceptance of the low bid submitted by Esposito Bros. Construction Ltd. for Tender No. T2020-6 in the amount of $271,063.61 (HST included), and that the total net project cost of $374,317.00 (net of HST rebate) be approved. Attachments: 1. Supply & Services Memorandum dated February 18, 2020 2. Record of Tenders Opened and Checked 3. Location Map ENG 01-20 Subject: Marksbury Road Outfall — Replacement Tender No. T2020-6 Prepared By: (0i)4 4 Scott Booker February 24, 2020 Approved/Endorsed By: Rir and lborn, P.Eng. Manager, Capital Projects & Infrastructure ��'rector, Engineering Services Ray Rodrigues, CPPB Manager, Supply & Services SB:mjh Page 5 Stan Karwowski, MBA, CPA, CMA Director, Finance & Treasurer Recommended for the consideration of Pickering City Council Tony Prevedel, P.Eng. Chief Administrative Officer /7,247_0 GLS od PICKERING Attachment #1 to Report # ENG 01-20 Memo To: Richard Holborn February 18, 2020 Director, Engineering Services From: Justin MacDonald Senior Purchasing Analyst, Supply & Services Copy: Administrative Assistant, Engineering Services Manager, Supply & Services Subject: Tender No. T2020-6 Tender for Marksbury Road Outfall — Replacement Closed: Wednesday, February 12, 2020 — 2:OOpm File: F-5400-001 Tender No. T2020-6 was advertised on the City's website on January 20, 2020. A optional site visit was held on Tuesday, January 28, 2020 at 10:00 am. Ten companies have submitted a bid for this project. A copy of the Record of Tenders Opened and Checked used at the public tender opening is attached. Tenders shall be irrevocable for 60 days after the official closing date and time. Purchasing Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit prices and extensions unit prices shall govern and extensions will be corrected accordingly, which has been completed below. The unsuccessful Bidder's tendering deposit, other than a bid bond, shall be returned to the applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item 13.03 (w). Three (3) bids have been retained for review at this time and are attached. Summary Harmonized Sales Tax Included Bidder Total Tendered Amount After Calculation Check Esposito Bros. Construction Ltd. $271,063.61 $271,063.61 Ratcliff Excavating & Grading Inc. $364,572.67 $364,803.19 Todd Brothers Contracting Limited $497,381.39 $497,381.39 Pine Valley Corporation $562,740.00 $562,740.00 2274084 Ontario Ltd. O/A GMP Contracting $563,221.61 $563,221.61 Hard Rock Sewer & Watermain Ltd. $564,340.08 $564,340.08 Real Landscaping Plus Inc. $777,628.17 $777,628.17 CSL Group Ltd. $969,785.21 $969,785.21 Elirpa Construction & Materials Ltd. $1,533,052.25 $1,533,052.25 Pursuant to Information to Bidders Item 32 Pre -Condition of Award and Item 20 Tendering Specifications, the following documentation will be requested of Esposito Bros. Construction Ltd. for your review during the evaluation stage of this tender call. Please advise if Supply & Services is to proceed with collecting the following documentation: (a) A copy of the City's Health and Safety Policy form currently dated and signed; (b) A copy of the current Clearance Certificate issued by Workplace Safety & Insurance Board; (c) The City's certificate of insurance or approved alternative form completed by the Bidder's agent, broker or insurer; and (d) Waste Management Plan. A budget of $508,500.00 was provided to Supply & Services for this procurement. In accordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out below excludes HST. As such, in accordance with Purchasing Policy Item 06.11, where the compliant quotation or tender meeting specifications and offering best value to the City is acceptable or where the highest scoring proposal is recommended and the estimated total purchase price is: (b) Over $75,000 and up to $250,000 the Manager may approve the award, subject to the approval of the Director, Treasurer and CAO. Please include the following items in your memo: 1. if Items (a) through (b) noted above are acceptable to the Co-ordinator, Health & Safety or designate, if required; 2. if Item (c) is acceptable to the Manager, Budgets & Internal Audit; 3. if the list of subcontractors is acceptable to Engineering Services; 4. if Item (d) is acceptable to Engineering Services; 5. any past work experience with low bidder Esposito Bros. Construction Ltd. including work location , 6. without past work experience, if reference information is acceptable to Engineering Services; 7. the appropriate account number(s) to which this work is to be charged; 8. the budget amount(s) assigned thereto; 9. Treasurer's confirmation of funding; 10. related departmental approvals; and 11. related comments specific to the project. Tender No. T2020-6 Page 2 After receiving CAO's approval, an approved "on-line" requisition will be required to proceed. Enquiries can be directed to the City's website for the unofficial bid results as read out at the public tender opening or to Supply & Services. Bidders will be advised of the outcome in due course. If you require further information, please feel free to contact me or a member of Supply & Services. JM Attachments (4) Tender No. T2020-6 Page 3 PICKERING Attachment #2 to Report # ENG 01-20 City of Pickering Record of Tenders Opened and Checked Tender Description: Marksbury Road Outfall — Replacement Tender No.: T2020-6 Date: Wednesday, February 12, 2020 Time: Approx. 2:15 pm Local Time Bidder Name Total Tendered Amount Bidder Sign In Ratcliff Excavating & Grading Inc. Pine Valley Corporation $ L«81 VOC2'`'o Hard Rock Sewer & Watermain Ltd. Real Landscaping Plus Inc. Todd Brothers Contracting Limited $ LIcfci,yl(� vv Dufferin Construction Company • - Bid Rejected: /7 , 23.02.14: Failu. the documents n Elirpa Construction & Materials Ltd. ti 1.15%, V�7Sy , Esposito Bros Construction cl ?c( 3v ---_,..--- CSL Group Ltd. CSL 56',.17 °° 2274084 Ontario Ltd. O/A GMP Contracting e to return s specified City Staff Present The information is strictly preliminary, pending review and verification of conformance to terms, conditions and specifications. Attachment #3 to Report # ENG 01-20 Cld ./ DICKERING Engineering Services Department Tender No. T2020-6 Marksbury Road Outfall — Replacement 0 0 c 4 0 0 LAKE ONTARIO SUBJECT AREA Location Map