Loading...
HomeMy WebLinkAboutBy-law 4694/95 THE CORPORATION OF THE TOWN OF PICKERING Dy-LAW NO, 4694/95 Being a by-law to amend By-law 1562/82 temporarily closing roads for construction purposes (Concession 7 Road and Strouds Lane). WHEREAS, pursuant to the provisions of the predecessor of section 208.43 of the Municipal Act, R.S.O. 1990, chapter M.45, the Council of The Corporation of the Town of Picketing enacted By-law 1562/82, providing for the temporary closing of roads under the jurisdiction of the Town for construction purposes; AND WHEREAS, it is necessary to amend that By-law in certain respects; NOW THEREFORE, the Council of The Corporation of the Town of Pickering HEREBY ENACTS AS FOLLOWS: 1. Schedule A to By-law 1562/82 is hereby amended by adding thereto Items 190 and 191, set out in Schedule I to this by-law. BY-LAW read a first, second and third time and finally passed this 6th day of November, 1995. ~ruce Taylor, Clerk ~ Z Z ILl .0 ,,,~ ~- ~ = - ~o,.~ Attachment For By-Law #1562/82 ~ ~ Temporary Road Closure for Construction ~'~c~'~[ Seventh Concession Road PUBLIC WORKS DEPARTMENT LOCATION MAP '1 EMPORARY ROAD CId.)SURE: Scxend~ Concession Road - from Westney Road, easlerly to Salem Road/Sideline 6). Road closed from November 7, 1995 to December 31,1995. CONS] RUCTION DURATION: Approxin',atcl) 7 weeks CONS [R[iCTION INCLI. IDI~S: Comt31ete Ro,'~d %% idcning and Reconstruclion (excavation, granular base, and asphall) · On the Sevcmh Concession Road~ between Westney Road and easterly to Station 0¢655m to match existing pavement widlh Io Ihe west · lo inlptovc vehicle sight distance b5 lowering the crest of the hill just east of \Veslney Road Complete Landscape I.~cstoration (grading, sodding, where required) The Town of Pickering ! Roads LEGAL SERVICES DEPARTMENT Ter~zlz:orary Closing Concession 7 Rvad Atlachment For By-Law #1562/82 Temporary Road Closure for Construction -Strouds Lane PUBLIC WORKS DEPARTMENT LOCATION MAP TEMPORARY ROAD CLOSURE: Strouds lane - from the intersection at Fairport Road to the inlersection at Spruce Hill Road Road closed from November 7, 1995 to December 31, 1995, CONSTRUCTION DURATION: Approximalely 7 weeks. CONSTRUCTION INCLUDES: Inslallation of Swrm & Sanitary Sewers · On SIiouds Lane, between Fairport Road and Spruce Hill Road to facilitate road drainage and provide servicing for homes along the streel and future devclopnlenl curb/gutter) Complete Landscape Restoration (grading, and sodding, v, here required) The Town of Pickering [ Roads LEGAL SERVICES DEPARTMENT ?cinerary Closing Strouds Lane THE CORPORATION OF THE TOWN OF PICKERING Being a by-law for closing temporarily to all traffic for construction purposes portions of highways under the Town's jurisdiction. WHEREAS, pursuant to the provisions of section 208.43 of the Municipal Act, R.S.O. 1980, chapter 302, by-laws may be passed by the council of a municipality for closing temporarily any highway or portion of a highway under the jurisdiction of the municipality for any period during the construction, repairing or improvement of such highway or portion thereof or of any works under, over, along, across or upon such highway or portion thereof; NOW THEREFORE, the Council of the Corporation of the Town of Picketing HEREBY ENACTS AS FOLLOWS: 1. Those highways or portions of highways set out in Column I of Schedule A attached hereto shall be temporarily closed to traffic between those limits set out in Column II therein, during those hours set out in Column III therein, on those days set out in Column IV therein, for the period of time set out in Column V therein. 2. While a highway or portion thereof is closed to traffic pursuant to section 1, above, there shall be erected at each end of such highway or portion thereof, and where an alternative route deviates therefrom, a barricade upon which an adequate warning device shall be exposed and in good working order continuously from sunset until sure/se and at such points there shall be erected a detour sign indicating the alternative route and containing a notice that the highway is closed to traffic. 3. Every person who uses a highway or portion of a highway while it is closed to traffic pursuant to this by-law does so at his own risk and the Town is not liable for any damages sustained by a person using the highway or portion thereof so closed to traffic. 4. Every person who ~ithout lawful authority uses a highway or portion thereof closed to traffic pursuant to this by-law and while it is protected in accordance with this by-law, or who removes or defaces any barricade, device, detour sign or notice placed thereon by lawful authority, is guilty of an offence and on conviction is liable to a penalty of not more than $50.00 and is also liable to the Town for any damage or injury occasioned by such wrongful use, removal or defacement. 4. This by-law shall not operate to close temporarily for a specified period of time in excess of seventy-two hours, any highway or portion thereof that enters upon or intersects the King's Highway without the consent of the Minister of Transportation and Communications, pursuant to section 24 of the Public Transportation and Highway Improvement Act, R.S.O. 1980, chapter 421, and the registration of the by-law in the Land Registry Office. BY-LAW read a first, second and third time and finally passed this 4th day of October, 1982. "John E. Anderson", Mayor (Signed) "Bruce Taylor". Town Clerk (Signed~