Loading...
HomeMy WebLinkAboutENG 09-19Cfy �t DICKERING Report to Council Report Number: ENG 09-19 Date: September 23, 2019 From: Richard Holborn Director, Engineering Services Subject: Tender for Centennial Park Picnic Shelter and Amenities - Tender No. T-27-2019 - File: A-1440 Recommendation: 1. That Tender No. T-27-2019 as submitted by Loc -Pave Construction Limited in the total tendered amount of $352,797.30 (HST included) be accepted; 2. That the total gross project cost of $398,523.00 (HST included), including the tendered amount and other associated costs and the total net project cost of $358,882.00 (net of HST rebate) be approved; 3. That the Director, Finance & Treasurer be authorized to finance the total net project cost in the amount of $358,882.00 as follows: a) The sum of $358,000.00 as approved in the 2019 Parks Capital Budget to be financed by the issuance of debentures by The Regional Municipality of Durham over a term not to exceed 15 years; b) The sum of $882.00 to be funded from property taxes; c) The annual repayment charges in the amount of approximately $31,640.00 be included in the annual Current Budget for the City of Pickering commencing 2019, or such subsequent year in which the debentures are issued and continuing thereafter until the debenture financing is repaid, d) The Treasurer be authorized to make any changes, adjustments, and revisions to amounts, terms, conditions, or take any actions necessary in order to effect the foregoing; 4. That the draft By-law attached to this report be enacted; and 5. That the appropriate officials of the City of Pickering be authorized to take the necessary actions as indicated in this report. ENG 09-19 September 23, 2019 Subject: Tender for Centennial Park Picnic Shelter and Amenities Tender No. T-27-2019 Page 2 Executive Summary: As part of the 2019 Parks Capital Budget, funds were approved for the Centennial Park Picnic Shelter and Amenities project. The project includes the design, supply and installation of a 12m x 18m (40 foot by 60 foot) steel picnic shelter, site grading, asphalt pathways connecting the picnic shelter to the existing washroom facility, the existing playground area and the existing parking lot, and associated site works. The selection of the preferred supplier and subcontractor, PlayPower LT Canada Inc. for the design, supply and installation of a picnic shelter was completed under Quotation No. Q-25-2019 (refer to CAO approval memo dated July 24, 2019) and the cost of the shelter was carried as a cash allowance in the total bid price submitted by Loc -Pave Construction Limited as part of Tender No. T-27-2019. Prior to the detailed design and tender of this project, a master plan for additional site improvements in Centennial Park was prepared. A copy of the master plan was included in an Information Notice that was hand delivered to the neighbourhood residents for their information and comment on August 3, 2018. Tender No. T-27-2019 was issued on August 13, 2019 and closed on September 5, 2019 with 5 bidders responding. The low bid submitted by Loc -Pave Construction Limited in the amount of $352,797.30 (HST included), is recommended for approval. The total gross project cost which includes the tender amount, a contingency and other associated costs, is estimated at $398,523.00 (HST included) and the total net project cost is estimated at $358,882.00 (net of HST rebate). A 12 percent contingency is included in the estimated project cost to cover any unforeseen costs such as poor soils conditions. Financial Implications: 1. Tender Amount Tender No. T-27-2019 — Tender for Centennial Park Picnic Shelter and Amenities (includes Q-25-2019 cash allowance for the design, supply, and installation of a picnic shelter) HST (13%) Total $312,210.00 40,587.30 $352,797.30 2. Estimated Project Costing Summary Tender No. T-27-2019 — Tender for Centennial Park Picnic Shelter and Amenities (includes Q-25-2019 cash allowance for the design, supply, and installation of a picnic shelter) Associated Costs Materials Testing Allowance Project Contingency (12%) Sub Total — Costs HST (13%) Total Gross Project Costs HST Rebate (11.24%) Total Net Project Costs $312,210.00 3,000.00 37,465.00 352,675.00 45,848.00 $398,523.00 (39,641.00) $358,882.00 ENG 09-19 Subject: Tender for Centennial Park Picnic Shelter and Amenities Tender No. T-27-2019 September 23, 2019 Page 3 3. Approved Source of Funds — 2019 Parks Capital Budget Account Code 5780.1902.6129 Source of Funds Debt — 15 year Property Taxes Budget Required $375,000.00 $358,000.00 0.00 882.00 Total $375,000.00 $358,882.00 Net project costs (over) under approved funds $16,118.00 The total budget approved for this project was $415,000 however $40,000 was allocated for repairs to the bocce courts which were completed earlier this calendar year. As such, the balance of $375,000 has been shown as the budget amount left available for this project. Discussion: As part of the 2019 Parks Capital Budget, funds were approved for the Centennial Park Picnic Shelter and Amenities project. Prior to the detailed design and tender of the proposed works, a master plan for site improvements was prepared. The master plan included the reconstruction of the baseball diamond recently completed under Tender No. T-3-2019 as well as the work proposed in Tender No. T-27-2019. A copy of the master plan was included in an Information Notice that was hand delivered to the neighbourhood residents for their information and comment on August 3, 2018. Selection of the picnic shelter structure was completed through Quotation No. Q-25-2019. Upon evaluation of the received quotes, PlayPower LT Canada Inc. was the top ranked respondent and was recommended for award. The CAO approval memo dated July 24, 2019 is included in this report as Attachment #5. The work to be completed in Tender No. T-27-2019 includes the following items: • installation of a 12m x 18m (40 foot by 60 foot) steel picnic shelter located west of the existing washroom facility • accessible pathways connecting the parking lot, ball diamond, washrooms, picnic shelter and existing playground • associated site grading and tree planting Tender No. T-27-2019 was issued on August 13, 2019 and closed on September 5, 2019 with 5 bidders responding. The low bid submitted by Loc -Pave Construction Ltd. is recommended for approval. Loc -Pave Construction Ltd. have successfully completed several projects for the City of Pickering including the reconstruction of Glengrove Park and the construction of the concrete multi -use path on Bayly Street (from Begley Street to the West Shore Community Centre) in 2017, and the recently completed reconstruction of the baseball diamond in Centennial Park. ENG 09-19 September 23, 2019 Subject: Tender for Centennial Park Picnic Shelter and Amenities Tender No. T-27-2019 Page 4 References for Loc -Pave Construction Ltd. and their Waste Management Plan have been reviewed and are deemed acceptable by the Manager, Capital Projects & Infrastructure. The City's Health & Safety Policy form and current Certificate of Clearance issued by the Workplace Safety & Insurance Board have been submitted by Loc -Pave Construction Ltd. The Certificate of Insurance has been reviewed by the Manager, Budgets & Internal Audit and is deemed acceptable. In conjunction with staff's review of the contractor's previous performance on City projects and references available on this project, the tender is deemed acceptable. Upon careful examination of all tenders and relevant documents received, the Engineering Services Department recommends the acceptance of the low bid submitted by Loc -Pave Construction Ltd. for Tender No. T-27-2019 in the amount of $352,797.30 (HST included) and that the total net project cost of $358,882.00 (net of HST rebate) be approved. Attachments: 1. Supply & Services Memorandum dated September 6, 2019 2. Record of Tenders Opened 3. Being a by-law to authorize the Centennial Park Picnic Shelter and Amenities project in the City of Pickering and the issuance of debentures in the amount of $358,000.00 4. Location Map 5. CAO approved memo dated July 24, 2019 for Quotation No. Q-25-2019 ENG 09-19 Subject: Tender for Centennial Park Picnic Shelter and Amenities Tender No. T-27-2019 September 23, 2019 Page 5 Prepared By: Arnold Mostert, OALA Senior Coordinator, Landscape & Parks DevIopment Scott Booker Manager, Capital Projects & Infrastructure Ray Rodrigues, CPPB Manager, Supply & Services AM:mjh Approved/Endorsed By; chard Holborn, P.Eng Director, Engineering Services Tom Stan Karwowski, MBA, CPA, CMA Director, Finance & Treasurer Recommended for the consideration of Pickering City Council Tony Prevedel, P.Eng. Chief Administrative Officer 412.016/ GLS od PICKERING Attachment #1 to Report ENG 09-19 Memo To: Richard Holborn September 6, 2019 Director, Engineering Services From: Lisa Chang Buyer, Supply & Services Copy: Administrative Assistant, Engineering Services Manager, Supply & Services Sr. Coordinator, Landscape & Parks Development Manager, Capital Projects & Infrastructure Subject: Tender No. T-27-2019 Tender for Centennial Park Picnic Shelter and Amenities Closed: Thursday, September 5, 2019 — 2:OOpm File: F-5400-001 Tender No. T-27-2019 was advertised on the City's website on Tuesday, August 13, 2019. Five companies have submitted a bid for this project. A copy of the Record of Tenders Opened and Checked used at the public tender opening is attached. Tenders shall be irrevocable for 60 days after the official closing date and time. Purchasing Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit prices and extensions unit prices shall govern and extensions will be corrected accordingly, which has been completed below. The unsuccessful Bidder's tendering deposit, other than a bid bond, shall be returned to the applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item 13.03 (w). Three (3) bids have been retained for review at this time and are attached. Summary Harmonized Sales Tax Included Bidder Total Tendered Amount After Calculation Check Loc -Pave Construction Limited $352,797.30 $352,797.30 Melfer Construction Inc. $400,782.75 $400,782.75 Cedargreen Landscape Contractors Ltd. $415,364.55 $415,364.55 Norfield Construction Inc. $434,161.29 $434,188.63 C&C Built Right Ltd. $478,560.65 $478,560.65 Pursuant to Information to Bidders Item 26 Pre -Condition of Award and Item 20 Tendering Specifications, the following documentation will be requested of Loc -Pave Construction Limited for your review during the evaluation stage of this tender call. Please advise if Supply & Services is to proceed with collecting the following documentation: (a) A copy of the City's Health and Safety Policy form currently dated and signed; (b) A copy of the current Clearance Certificate issued by Workplace Safety & Insurance Board; (c) The City's certificate of insurance or approved alternative form completed by the Bidder's agent, broker or insurer; and (d) Waste Management Plan. A budget of $375,000.00 was provided to Supply & Services for this procurement. If the recommendation to award exceeds the budgeted amount, refer to Financial Control Policy Item 11 for additional instructions. In accordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out below excludes HST. As such, in accordance with Purchasing Policy Item 06.11, where the compliant quotation or tender meeting specifications and offering best value to the City is acceptable or where the highest scoring proposal is recommended and the estimated total purchase price is: (c) Over $250,000, the Manager may approve the award, subject to the approval of the Director, Treasurer, CAO and Council. Please include the following items in your report: 1. if Items (a) through (b) noted above are acceptable to the Co-ordinator, Health & Safety or designate, if required; 2. if Item (c) is acceptable to the Manager, Budgets & Internal Audit; 3. if the list of subcontractors is acceptable to Engineering Services 4. if Item (d) is acceptable to Engineering Services 5. any past work experience with low bidder Loc -Pave Construction Limited including work location 6. without past work experience, if reference information is acceptable to Engineering Services 7. the appropriate account number(s) to which this work is to be charged; 8. the budget amount(s) assigned thereto; 9. Treasurer's confirmation of funding; 10. related departmental approvals; and September 6, 2019 Tender No. T-27-2019 Page 2 11. related comments specific to the project. After receiving Council's approval, an approved "on-line" requisition will be required to proceed. Enquiries can be directed to the City's website for the unofficial bid results as read out at the public tender opening or to Supply & Services. Bidders will be advised of the outcome in due course. If you require further information, please feel free to contact me or a member of Supply & Services. LC Attachments (6) September 6, 2019 Tender No. T-27-2019 Page 3 644 PICKERING City of Pickering Record of Tenders Opened and Checked Tender Description: Centennial Park Picnic Shelter and Amenities Tender No.: Date: Time: T-27-2019 Wednesday, September 5, 2019 Approx. 2:15 pm Local Time Bidder Name Total Tendered Amount Bidder Sign In Comments Locpave Construction $3 \/ - DO Mefer Construction Inc. $ ? C. 0-3- , (7 Bidder name error: Bid submitted by Melfer Construction Inc. Norfield Construction Inc. $ 1 4 2i , S C&C Built Right Ltd. $ �1 ' ' 11 ; 0 (7 V Cedargreen Landscape Contractors Ltd. j L � �,. � � � j $ S City S, ` Present Other The information is strictly preliminary, pending revi-w and verification of conformance to terms, conditions and specifications. 61.-60 ONO podeH 01 Z# TuewgoenV Attachment #3 to Report ENG 09-19 The Corporation of the City of Pickering By-law No. Being a by-law to authorize the Centennial Park Picnic Shelter and Amenities project in the City of Pickering and the issuance of debentures in the amount of $358,000.00. Whereas Section 11 of the Municipal Act, 2001, as amended, provides that a lower -tier municipality may pass by-laws respecting matters within the spheres of jurisdiction described in that Section; and, Whereas Subsection 401(1) of the Municipal Act, 2001, as amended, provides that a municipality may incur a debt for municipal purposes, whether by borrowing money or in any other way; and, Whereas Subsection 401(3) of the Municipal Act, 2001, as amended, provides that a lower -tier municipality in a regional municipality does not have the power to issue debentures; and, Whereas The Regional Municipality of Durham (the "Region") has the sole authority to issue debentures for the purposes of its lower -tier municipalities including The Corporation of the City of Pickering (the "City"); and, Whereas the Council of the City wishes to proceed with debenture financing for the Centennial Park Picnic Shelter and Amenities project and; Whereas before authorizing the construction in respect of the Centennial Park Picnic Shelter and Amenities project, the Council of the City had the Treasurer update the City's Annual Repayment Limit, the Treasurer calculated the estimated annual amount payable in respect of such project and determined that such annual amount would not cause the City to exceed the updated limit and therefore, Local Planning Appeal Tribunal approval is not required as per Section 401 of the Municipal Act, 2001, as amended, and the regulations made thereunder; And whereas after determining that Local Planning Appeal Tribunal approval is not required, the Council of the City approved report ENG 09-19 on the date hereof and awarded Tender No. T-27-2019 for the Centennial Park Picnic Shelter and Amenities project; By-law No. Page 2 Now therefore the Council of The Corporation of the City of Pickering hereby enacts as follows: 1. That the City proceed with the project referred to as "Centennial Park Picnic Shelter and Amenities" 2. That the estimated costs of the project in the amount of $358,882.00 be financed as follows: a) the sum of $358,000.00 be financed by the issue of debentures by The Regional Municipality of Durham over a term not to exceed 15 years; and b) the sum of $882.00 be funded by property taxes; 3. That the funds to repay the principal and interest of the debentures be provided for in the annual Current Budget for the City commencing in 2019 or such subsequent year in which the debentures are issued and continuing thereafter until the debenture financing is repaid. By-law passed this 23th day of September, 2019. David Ryan, Mayor Susan Cassel, City Clerk C4d4 DICKERING Attachment #4 to Report ENG 09-19 Engineering Services Department Tender No. T-27-2019 Centennial Park Picnic Shelter and Amenities Project Location Map Ctly 9/ DICKERING Attachment #5 to Report ENG 09-19 Memo To: Tony Prevedel July 24, 2019 Chief Administrative Officer From: Richard Holborn Director, Engineering Services Copy: Director, Finance & Treasure Manager, Capital Projects & Infrastructure Manager, Supply & Services Senior Coordinator, Landscape & Parks Development Subject: Quotation No. Q-25-2019 - Design, Supply & Installation of a Picnic Shelter — Centennial Park - File: A-1440 Quotation No. Q-25-2019 for Design, Supply & Installation of a Picnic Shelter — Centennial Park, was issued on Thursday, June 6, 2019 and closed on Wednesday, June 26, 2019. Upon evaluation of the received quotes, PlayPower LT Canada Inc. was the top ranked respondent and is recommended for award of Quotation No. Q-25-2019. The price of the base structure is $130,540.51 (excluding HST). Separate price items were provided for optional upgrades to the structure. Optional features that are being considered are valued at a cost of $34,345.33 for a total cost of $164,885.84 (excluding HST). This project was approved in the 2019 Parks Capital Budget, account 5780.1902.6129, in the amount of $415,000.00. Approximately $40,000 was spent on upgrades to the bocci court leaving a balance of $375,000. In accordance with Purchase Policy Item 06.11 (b) where the compliant quotation or tender meeting specifications and offering best value to the City is acceptable or where the highest scoring proposal is recommended and the estimated total purchase price is: (b) Over $75,000 and up to $250,000, the Manager may approve the award, subject to the approval of the Director, Treasurer and the CAO. The Engineering Services Department is currently completing the tender documents for Tender No. T-27-2019, Centennial Park Picnic Shelter and Amenities. Upon approval, the picnic shelter proposed by PlayPower LT Canada Inc. will be specified in the document and a cash allowance for the structure be carried as part of this tender. Construction is scheduled to proceed this fall. Prepared By: Approved/Endorsed By: Arnold Mostert, C.A.L.A. Sr_ Coordinator, Landscape & Parks (Development 4f (r-- Richard Holborn, P. Eng, (1' Director, Engineering Services Scott Booker Manager, Capital Projects & Infrastructure Stan Karowowski, MBA, CPA, CMA Director, Finance & Treasurer Ray Rodrigues, CPPB Manager, Supply & Services Approval pew' Tony Prevedel, P.Eng. Chief Administrative Officer RH:mjh Attachment Supply & Services Memorandum dated July 23, 2019 July 24, 2019 Page 2 of 2 Quotation No. Q-25-2019 C4, P1CKE RiNG Memo To: Richard Holborn July 23, 2019 Director, Engineering Services From: Lisa Chang Capital Projects Buyer, Supply & Services Copy: Administrative Assistant, Engineering Services Manager, Supply & Services Sr. Coordinator, Landscape & Parks Development Subject: Quotation No. Q-25-2019 Design, Supply & Installation of a Picnic Shelter - Centennial Park Closing Date: Wednesday, June 26, 2019 at 12:00 Noon. File: F-5300-001 Quotation Q-25-2019 was advertised on the City's website on Thursday, June 6, 2019 of which seven company(ies) have responded. Stage 1— Mandatory Submission Requirements — determines which submissions satisfy all the mandatory submission requirements and provides Respondents the opportunity to rectify deficiencies. One Respondents rectified deficiencies in their submission within the rectification period. Seven proposals proceed to Stage II — Evaluation. A summary of the Stage II and 111 evaluation results for each quotation is attached. PlayPower LT Canada, Inc. is the top ranked respondent with a submitted price of $130,540.51 (HST Excluded). A budget of $250,000.00 was provided to Supply & Services for this procurement. If the recommendation to award exceeds the budgeted amount, refer to Financial Control Policy Item 11 for additional instructions. In accordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out below excludes HST. In accordance with Purchasing Policy, Item 06.11, where the compliant quotation or tender meeting specifications and offering best value to the City is acceptable or where the highest scoring proposal is recommended and the estimated total purchase price is: (b) Over $75,000 and up to $250,000, the Manager may approve the award, subject to the approval of the Director, Treasurer and the CAO. Please provide your recommendation in memo form. After receiving CAO's approval, a notification of award will be required to proceed. Please direct all enquiries to Supply & Services. Respondents will be advised in due course. If you require further information or assistance, do not hesitate to contact me or a member of Supply & Services. LC Attachments (3) Page 2 of 2