Loading...
HomeMy WebLinkAboutFIN 02-19\ -Cd-po/- PICKERING Report to Council Report Number: FIN 02-19 Date: February 25, 2019 From: Stan Karwowski Director, Finance & Treasurer Subject: 2019 Current and Capital Budget Recommendation: 1. That Report FIN 02-19 of the Director, Finance & Treasurer be approved; 2. 3. That Council direct staff to include in casino revenue negotiations with Durham Region the principle that Durham Region shall develop and implement a Property Tax Relief program for low income Seniors & Persons with Disabilities for the Regional share of property taxes and the property tax relief shall be in the same percentage as the City of Pickering's program for Pickering; That the following reserves be established as a result of the City selling naming rights for various facilities: a) That a Library Building Reserve be established and this reserve be used for: construction of new library facilities, signage and other marketing costs associated with naming rights and or major renovations and these funds be applied towards the City Share of the project's cost; b) That a Recreation Complex Reserve be established and funds in this reserve be applied to cover signage and other marketing costs associated with naming rights and any debt costs associated with major renovations to the building; and c) That a Seaton Complex Reserve be established and these funds be used for: signage and other marketing costs associated with naming rights and the construction of a new recreational facility in Seaton and that these funds be applied towards the City Share of the building's cost. 4. That the following budget recommendations be approved; a) That the 2019 Current Budget expenditure for personnel costs, consisting of salaries and wages (Account 1100), overtime (Account 1200) and employer contributions (Account 1400), in the total amount of $57,514,793 be approved; b) That the 2019 Gross Current Budget expenditures for City purposes in the amount of $49,347,792 (excluding personnel expenditures) less estimated current revenues of $42,044,874 (City Revenues of $39,897,874 plus Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 2 $1,847,000 for assessment growth plus supplementary taxes of $300,000) and net transfer from the Rate Stabilization Reserve of $1,500,000 for City operations be approved; c) That the Capital from Current expenditure in the amount of $1,293,420 funded from property taxes be approved; and d) That the total final City levy under paragraphs a), b) and c) above, plus an additional $180,000 for two additional Fire Fighters, for a total final levy of $64,791,131 being an increase of approximately 2.47% over the 2019 budget, be approved; 5. That the 2019 Capital Budget for the City of Pickering with a Gross Expenditure of $76,995,776 be adopted as presented: a) That the following capital financing sources be approved as presented in the 2019 Capital Budget: Transfer froni Current Fund to Capital Fund Transfers from Reserves: -City Share Dev. Charges Projects (7022) -Rate Stabilization Reserve (7021) -Vehicle Replacement Reserve (7040) -Capital Replacement Reserve (7001) -Self-Insurance (7020) -Fence (7057) -Rec. Complex Core Surcharge (7034) -Dunbarton Pool Surcharge (7032) -Don Beer Arena Surcharge (7033) -Rec. Complex Arena (7036) -Rec. C_omplex Pool Surcharge (7035) Transfers from Reserve Funds: -Development Charges (7601 -7630) -Third Party Contribution (7501) -Federal Gas Tax Funds (7505) -Parkland (7502) -Building Permit (7506) -Seaton Land Group FIA (7713) Debt-5 yr Debt-10 yr Debt-20 yr Internal Loan - 5 yr $1,293,420 5,481,405 2,749,000 1,209,000 416,000 235,000 180,000 45,000. 20,000 20,000 20,000 18,000 12,267,155 10,891,000 3,180,000 126,195 52,000 37,772 . 480,000 3,620,000 7,091,765 782,000 Report FIN 02-19 Subject: 2019 Current and Capital Budget Internal Loan - 1 O yr Internal Loan -15 yr Sale of Land Donations Federal Grant -TBD Federal Grant -Canadian Heritage Legacy Fund Provincial Grant -TBD Provincial Grant -Invest in Ontario Total February 25, 2019 Page 3 695,000 565,000 12,000,000 228,500 13,085,984 105,000 93,000 8,580 $76,995,776 b) That total external debt financed by property taxes of $11,191,765 for the projects identified in the 2019 Capital Budget, and as indicated in this · report, in the amount of $480,000 for a period not to exceed 5 years, $3,620,000 for a period not to exceed 1 O years and $7,091,765 for a period not to exceed 20 years be approved; c) That the internal loans in the amount of $2,042,000 be undertaken at the discretion of the Director, Finance & Treasurer; d) That projects identified in the 2019 Capital Budget as being financed through the issuance of debt be subject to additional, specific approval of the expenditure and the financing by Council; e) That any debt repayment, interest or financing provisions contained in the annual Current Operating Budget not used in the current year's payments requirements may, at the discretion of the Director, Finance & Treasurer, be used to apply towards additional principal repayment, outstanding loan or debt charges or to reduce debt, internal loans or any other amounts to be financed; f) That all Capital expenditures or portions thereof approved in the 2019 Capital Budget to be financed through the issuance of debt may, at the discretion of the Director, Finance & Treasurer, be financed through internal loans, current or capital funds or a combination thereof; g) That the Director, Finance & Treasurer, be authorized to make draws from Reserve and Reserve Funds for projects included in the approved capital budget up to the amount approved; h) That the Village Green Seaton P-11 O (5780.1905) and Village Green Seaton P-111 (5780.1906) projects be deferred to 2020 and replaced with the Jackson Green Playground Equipment (5780.2004) project, which was in the 2020 forecast, and that this project be financed from the Parkland Reserve Fund; Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page4 i) That financing for the design and construction of the Centennial Park Picnic Shelter and Amenities (5780.1902) be changed from 15 year internal loan to 15 year external debt and that financing for the backhoe replacement (5319.1904) be changed from 5 year external debt to 5 year internal loan; j) That the Director, Finance & Treasurer be authorized at his discretion to apply any Casino revenues attributed to 2019 towards the payment of internal loans; k) That the Director, Finance & Treasurer be authorized at his discretion to apply any excess funds obtained through the issuance of debentures as provided for under Section 413 of the Municipal Act, 2001 as amended; I) That the funding for the Conservation Barn Reconstruction (57 44.1808.6500) be increased by $10,000 to fund additional construction costs and this cost be funded from a transfer from the Facilities Reserve (7055); 6. That the Director, Finance & Treasurer be authorized to transfer: a) Any surplus current operating funds at year-end in excess of approximately $125,000 be allocated in the following manner: the first $70,000 be allocated for the establishment of an elected officials life insurance reserve and this reserve be funded to a limit of $200,000 and that $100,000 be paid to the designated beneficiary and to amend section 07.02 of Council Compensation Policy ADM 190 accordingly; the remaining surplus be allocated in the following ratio: 25% to the Rate Stabilization Reserve (7021); 10% to the Facilities Reserve (7001) 15% to the Tennis Court Reserve (7049); and 50% to the City Share DC Projects Reserve (7022); b) Any surplus funds from the Emergency Operational Capital Needs Account (2901.0000.0000) to the Facilities Reserve; and c) The revenue from the sale of used vehicles recorded in account (1593.0001.0000) to the Vehicle Replacement Reserve (7040); 7. That the Director, Finance & Treasurer be authorized to make any changes or undertake any actions necessary, including amendments to sections 06 and 07 of Policy ADM 190, to ensure that the budget plan accommodates any reallocation of 2019 current operating expenditures and revenues resulting from any reorganization, including: an adjustment be made for the loss of the one-third nontaxable allowance by the federal government with an effective date of December 31, 2018 by adjusting elected officials salaries by thirty percent with corresponding adjustment to the benefit account with an effective date of January 1, 2019; the addition and establishment of a health care spending account for $5,000 per year with no carry civer provision or unused amount paid out; and to accommodate any labour relations settlements including adjusting the Personnel Report FIN 02-19 February 25, 2019 Page 5 Subject: 2019 Current and Capital Budget related accounts and that any revenue shortfall as a result of a Provincial tax policy change be adjusted through the 2019 final tax rates; 8. That the Director, Finance & Treasurer be authorized at his discretion to fund Property Tax Write-offs account (2134.0000.000) that exceed the budget provision due to assessment appeals that translates into a deficit position for the corporation and this shortfall be funded from a transfer from the Assessment Appeal Reserve (7011) and if this reserve is depleted then the shortfall be funded from the Rate Stabilization Reserve (7021) and that any shortfall from Payment-in-Lieu Education Share revenue estimates be funded from a transfer from the Rate Stabilization Reserve (7021); 9. That the Director, Finance & Treasurer be authorized to use any under expenditures from projects funded from Reserves or Reserve Funds to fund over expenditures for approved projects funded from the same source(s); 10. That the Financial Control Policy be amended to establish a capital projects contingency guideline of twelve percent and that the contingency funding excludes material test, permits, inspections services and soil testing; 11. That the Director, Finance & Treasurer be authorized at his discretion to close any prior year's capital expenditure accounts and to first apply any excess funding from property taxes to any over expenditure in other accounts and to secondly transfer any remaining excess funding back to the original sources of funds; 12. That Council approve the cancellation of the following approved capital projects: a) b) c) d) e) f)) g) h) i) (4) Oil Grit Separators (5321.1107) -$300,000 Oil Grit Separators (5321.1408) -$321,000 B-32 Krosno Creek -Flow Diversion Design (5321.1502) -$250,000 B-15 Krosno Creek Erosion Control (5321.1604)-$958,100 B32 a, b, c Krosno Creek Culvert Replacements Construction (5321.1605) - $1,750,000 Amberlea Park -Asphalt Pathways Reconstruction (5780.1617) -$35,000 Greenwood Baseball Fencing Replacement (5780.1616) -$130,000 Amberlea Park -Small Diamond Upgrades (5780.1715) -$100,000 Amberlea Park -Asphalt Pathways Reconstruction (Additional Funds Required) (5780.1722) -$10,000 · · Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 6 j) Recreation Complex -Diesel Backup Generator Replacement (5731.1702) -$200,000 k) Grand Esplanade Phase 1 a-Partnership Project Development (5701.1802) -$400,000 I) Grand Esplanade Phase 1 b-Design & Construction (5701.1803) - $26,500,000 m) Recreation Complex -Concourse Renovation Phase 1 Construction (5731.1805) -$960,000 n) FS# 5 Foundation Repairs & Underpinning (5340.1801) -$250,000 I o) Back-up Power to Banquet Hall Air Conditioning (5731.1812) -$145,000 p) Various Parks Lighting -LED Lighting Conversion (5780.1809)-$250,000 q) City-wide Walkways -LED Lighting Conversion (5311.1805) -$110,000 13. That the Director, Finance & Treasurer be authorized at his discretion to close any consulting account expenditure and corresponding revenue source that is over three years from the original purchase order date of issuance; 14. That the Director, Finance & Treasurer be authorized at his discretion to re-finance any capital expenditures that failed to meet the Federal Gas Tax reporting criteria from other sources including transfers of funds from reserves and reserve funds; 15. That the Director, Finance & Treasurer be authorized to: a) Undertake transactions in the spot or forward (12 months or less) currency markets in order to effect United States dollar denominated expenditures in the Current or Capital Budgets; b) Sign leases or rental agreements on the City's behalf for the provision of vehicles or equipment required for temporary use during periods of equipment breakdown or repair or during periods of increased need (e.g. inclement weather); c) Restate the 2019 Current Operating, User Fees and Capital Budgets to reflect: (i) any Council changes made at the February 25 Council meeting; (ii) any reorganization or personnel account changes (salary, benefits and overtime), (iii) reclassifications that result from salary increases or negotiated labour settlements; and d) To process budget transfers during the fiscal year which do not change the overall approved property tax levy; Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 7 16. That Council waive the Purchasing Policy where the estimated vehicle repair cost is below $30,000 (HST excluded) for all fleet vehicles and off road vehicle equipment in 2019; 17. That the Director, Finance & Treasurer be authorized to amend Policy ADM 190 with the following changes: subsection 07.01 b) ii) from 75 to 85; subsection 07.04 a) from more than four years to completion of a term; subsection 07.04 c) from 24 months to 36 months; an additional provision to subsection 09.05 to permit economy plus air travel for air travel over five hours; subsection 09.07 be amended to include a provision to exclude international air travel for economic development promotion; subsection 12.01 a) be revised from three years to 40 months and subsection 12.03 a) revised to indicate that land line telephone expense reimbursement will expire on November 14, 2022; 18. That the Director, Finance & Treasurer be authorized at his discretion to draw from the Winter Control Reserve to fund any current budget deficit as a result of higher than budget winter control costs; 19. That Council authorize the establishment of a Museum Collection Reserve and this reserve be used to fund collections development; artifact maintenance and conservation care of the museum's collection and that transfers from the following accounts be transferred to this reserve: unused funds from the Artefact Repairs & Maintenance Account (2744.2480.0000) and donations from account (2744.9977.0000); 20. That the following two new positions are on hold (Senior Economic Development Officer and Manager Arts Centre) pending a report to Council; 21. That Council approve the continuing engagement of the firm of Watson & Associates Economists Ltd. to be used for Development Charge issues, financial studies related or in support of the DC Background Study and issues related to the City, Seaton and/or Duffin Heights; 22. That the Financial Control Policy be amended to require Council approval for out of country conferences funded by the City; 23. That Council approve the continuing engagement of the following firms: Nixon Fleet & Poole LLP, Municipal Tax Advisor Group and Municipal Tax Equity Consultants to protect the property tax base by defending assessment appeals through proactive assessment base management; 24. That Council approve the single source of AECOM Canada Ltd in accordance with the City's Purchasing Policy Item 10:03 (c) to be the City's consultant for plans review assignments to ensure Building Code compliance for hi-rise residential and other complex building development projects for a one year period and that the expenditure for the services do not exceed $30,000 per project within the 2019 calendar year; Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 8 25. That Council accept and approve the proposal submitted by The Municipal · Infrastructure Group Limited to undertake consulting and professional services for the Pickering City Centre Stormwater Management Strategy Update, in the amount of $133,240 (HST included) in accordance with Purchasing Policy 10:03 (c) and that; a) The total gross project cost of $276,677 (HST included), including the . proposal amount, miscellaneous project allowances and contingency, and the total net project cost of $249,156 (net of HST rebate) be approved; and b) Council authorize the Director, Finance & Treasurer to finance the total net project cost of $249,156 as follows: (i) (ii) The sum of $224,240 to be funded from a transfer from the Development Charges -Stormwater Management (SWM) Reserve Fund (7611); and The sum of $24,916 to be funded from the Development Charges - City's Share Reserve (7022); 26. That the Director, Finance & Treasurer be authorized to initiate any additional assessment appeals necessary to protect the assessment base of the City; 27.. That the Director, Finance & Treasurer be authorized at his discretion to transfer any green energy rebates and revenue associated with the Claremont solar roof rental project account (1530.2620.0000) and other incentives and rebates account (2620.9993.0000) to the Reserve for Sustainable Initiatives; 28. That Council approves the following financial goals for the current term of office: a) Reduce the use of five year internal debt over the term of Council to nil by 2022; and b) That the City's annual contributions to the "Major Equipment" Parks and "Vehicles" reserves equals the annual amortization amount by 2022. 29. That Council amend the Community Grant policy as follows: a) That the recommended grant to Canadian Food Truck Festival ($3,000) be issued after the event; b) That the grant application deadline date for the 2020 Community Grant Program be October 25, 2019 to give community groups sufficient time to submit their applications; c) That an organization's or event's activities with high liability (e.g. fireworks, dunk tanks and pyrotechnics) be ineligible for community grant funding; Report FIN 02-19 February 25, 2019 Page 9 Subject: 2019 Current and Capital Budget d) e) That funding of insurance expenses be ineligible for the Community Grant Program; That the Chief Administrative Officer and Director, Finance & Treasurer be authorized to award up to $250 in minor community grants under the · following rules: i) That the organization has to complete the City's application form and their application has to meet the City's criteria; ii) That these organizations be permitted to receive only one $250 grant per term of Council and the funding for these grants be limited to the grant contingency allocation as provided in the grants budget; and iii) That staff report on an annual basis to Council with the list of successful $250 grant applicants as part of the budget process; 30. That any unused funds in excess of $1,000 for accessibility capital projects (6183) be transferred to the Reserve for Accessibility Initiatives;· 31. That Council approve the transfer of any Veridian funds exceeding the 2019 budget amount of $3,156,138 to the Roads and Bridges Reserve Fund; 32. That any unspent 2019 Local Planning Appeal Tribunal (LPAT) funds budgeted under General Government consulting account (2126.2392) be transferred to the Tennis Court Reserve; 33. That Council authorize the establishment of a Major Equipment Reserve and this reserve be used to fund the purchase of major equipment or major repairs; 34. That Council direct staff to report on Outstanding Capital projects as of July 31 st and December 31st of each year; 35. That Council approve the 2019 Low Income Seniors & Persons with Disabilities grant amount be increased from $300 to $330 per household; 36. That Council pass the attached General Municipal Fees and Charges By-law and adopt the changed fees for By-law and Animal Services as revised below and incorporate the user fee schedule into the 2019 Current budget: a) That Council approve revising "Schedule B -Fees Payable for Building Permits" of the Building By-law with the Building Permit fees listed in the 2019 User Fee Schedule; and b) That the fee structure for Seniors Snow Removal be revised to reflect criteria as presented below: Report FIN 02-19 Subject: 2019 Current and Capital Budget Single/Family Income Level Prior to Aoril 1, 2019 Receipt of Guaranteed Annual $0.00 Income Sunnlement (GAINS) Net Income $35.00 + HST < $75,910 Net Income> $35.00 + HST $75,911 and< $122,843 Net Income $35.00 + HST > $122,844 February 25, 2019 Page 10 April 2, 2019 $0.00 $60.00 + HST $90.00 + HST Not Eligible 37. That the appropriate City of Pickering officials be authorized take the necessary actions as indicated in this report. Executive Summary: This report contains a summary of the 2019 Current and Capital Budgets and a discussion of the recommendations. Financial Implications: The 2019 Current and Capital Budgets, if adopted as amended, will result in a property tax levy increase of 2.47% (City Share Only) over last year which translates into a 0.75% increase in the City's share of the total property tax bill. This increase, when combined with the Region and the School Boards increase, results in an average increase of 1.96% on the total property tax bill. This excludes any property tax shifts due to reassessment and potential Provincial tax policy changes. Any changes as a result of Provincial tax policy changes will be adjusted in the calculation of the final tax rates. Discussion: The recommendations put forth are those necessary to adopt and provide authority and direction for the 2019 Current and Capital Budgets for the City of Pickering. Explanation of Key Recommendations Casino Revenue Sharing Negotiation Principle with Durham Region - Recommendation 2 The City of Pickering offers low income seniors and persons with disabilities a property tax relief program. This program is very successful and in 2018, 191 individuals received the $300 grant from the City. (For 2019, the grant is being increased to $330.) Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 11 The Regional Municipality of Durham does not offer a similar program. The Region offers the Provincial mandated program that provides property tax relief in the form of a property tax deferral for assessment related increases that are in excess of the first 5% or $100 whichever is greater. · The City of Pickering has adopted a position that it would stiare up to 30% of its casino revenues for the general purpose of providing affordable housing. The details of the agreement still need to be finalized with Durham Region staff and the agreement would require Pickering council approval. The focus on funding affordable housing is in direct response to addressing a community need to provide affordable and safe housing that all people deserve. Keeping individuals in their homes is directly related to the City's initiative of assisting in addressing the affordable housing issue. If we do not help these seniors and persons with disabilities, they may have to sell their home that indirectly puts pressure on the affordable housing supply. The individuals who benefit from the City program would probably welcome the financial assistance for the Regional share of property taxes that represents 55% of their total residential property tax bill. Recommendation 2 is also innovative from the perspective that it starts the conversation with Regional staff that a "one size fits" all grant program based on property taxes is not fair to those municipalities that pay a higher percentage of the Regional residential tax bill. A home in Pickering has a higher assessment value in comparison to a similar home located in the eastern part of the Region and therefore, it pays a higher amount in property taxes. If a Pickering home pays $1,000 in Regional taxes and a home located in Durham east pays $800, a grant that provides $200 would provide a lower percentage of property tax relief to the Pickering property tax owner. Pickering's proposal is firmly rooted in the principle of fairness. If you pay more in property taxes than your Durham east neighbour, you would expect to receive a higher dollar amount of property tax subsidy. Establishment of Reserves Due to Naming Rights/Marketing Revenues - Recommendation 3 Over the past year, City staff working with the outside consultant have been successful in obtaining additional revenues through selling of facility naming and marketing rights. The purpose of recommendation three is to ensure that these funds are applied to a capital facility project and not used for general operating costs. Playground Capital Project Switch -Recommendation 5 h) This recommendation defers parks capital projects: Village Green Seaton P-110 (5780.1905) and Village Green Seaton P-111 (5780.1906) to 2020 and replaces them with the Jackson Green Playground Equipment (5780.2004) project that was in the 2020 forecast. The Jackson Green Playground Equipment project will be financed from the Parkland Reserve Fund. Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 12 Due to higher density being approved in Duffin Heights on the east side and the fact that only one park in the area has playground equipment, the community has requested additional playground equipment in Jackson Green (one of the Village Greens in Duffin Heights) that will benefit the youth in the community. The two parks projects that will be deferred to 2020 are no longer achievable in 2019 as the developer has not progressed as far as anticipated with their development. Cancellation of Capital Projects -Recommendation 12 The capital projects listed in recommendation 12, in the majority of situations have been re-budgeted in the 2019 capital budget due to the fact the original budget amount is too low due to the project delay. In most cases, by re-budgeting a higher amount, the project can proceed without staff either reducing the project's scope to address the funding shortfall or trying to find additional funds to cover the project's shortfall. In other cases, the projects cancelled were dependent on senior government grant funding which was not received. Establishment of Museum Reserve -Recommendation 19 The purpose of this reserve is to ensure that there are adequate funds available to meet the financial needs of the collection. A museum's collection is the most important component of a museum and having the financial strength to invest in the museum collection will help keep the museum vibrant and relevant. Two New Positions on Hold -Recommendation 20 These two positions (Manager Arts Centre and Senior Economic Development Officer) are on hold pending a further report to Council. The Civic Centre business case is currently forecast to go to Council in April and if Council "green lights the project," one of the recommendations would be for Council to approve filling this position. For the June Council meeting, a report will be prepared providing Council with the business case and supporting rationale to proceed with hiring of the Senior Economic Development position. Pickering City Centre Stormwater Management Strategy Update - Recommendation 25 The Municipal Infrastructure Group (TMIG) were first retained by the City in November 2012 to undertake the Pickering City Centre Stormwater Management (SWM) Strategy corresponding to the vision for the Pickering City Centre. The SWM Strategy was finalized in 2015, in conjunction with the Krosno Creek Flood Reduction Study Environmental Assessment (EA) and the specialized dual drainage PCSWMM model, analyses, and recommendations of that Study were applied and considered in the development of the SWM Strategy for the Pickering City Centre. The SWM Strategy established the required SWM criteria for redevelopment with the Pickering City Centre. It also recommended site specific criteria that any redevelopment in the flood storage area of the south parking lot of the Pickering Town Centre (PTC) Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 13 preserve the existing flood storage volume on the site, and that new development in the existing flood storage area be adequately flood proofed. Following the completion of the EA Study, TMIG were retained in 2015 to undertake the detailed design of the culvert replacements and erosion control for Krosno Creek, south of Highway 401. That design work is complete, with construction of those works anticipated during the winter of 2019-2020. In 2017, the City again contracted TMIG to update the PCSWMM model with more detailed topographic survey information of the south parking lot of th.e PTC, in an effort to more accurately characterize the ponding levels and volumes that occur in the flood storage area. This work was also utilized by the City during the appeal of the City Centre Zoning By-law to the Ontario Municipal Board (0MB) by OPB Realty Inc., .the owners of the PTC. In the Minutes of Settlement for that 0MB appeal, the City agreed to explore the feasible technical options for works upstream that would mitigate or resolve the need for the flood storage on the PTC Lands. Given the joint venture with OPB Realty Inc., CAPREIT and the City for the City Centre Project, the time is appropriate to initiate the feasibility analysis identified in the 0MB Settlement, in order to explore if the flood storage can be relocated or reduced, as it is anticipated that future phases of redevelopment will likely impact the existing flood storage area, along with the desire to relocate the City's trunk storm sewer that traverses the PTC site. The SWM Strategy should be reexamined, updated and refined to determine the best means of integrating the flood storage into the redevelopment of the PTC lands and/or relocating the flood storage elsewhere. Engineering Services staff requested a fee proposal from TMIG for this consulting assignment due to their extensive project history with the Krosno Creek Flood Reduction Study, the Pickering City Centre SWM Strategy, their knowledge and expertise, and on the basis that good value and significant time savings would be achieved since they have all the background information from the previous assignments. Staff are recommending Council approval of the fee proposal submitted by The Municipal Infrastructure Group Ltd. for Consulting and Professional Services for the Pickering City Centre Stormwater Management Strategy Update and Feasibility.Analysis in the amount $133,240 (HST included). It is also recommended that a net project cost of $249,156 (net of HST rebate) be approved. · Financial Goals for Current Term of Office -Recommendations 28 a) and b) Internal loans are financed from City's excess funds and for Pickering the major source - of these funds is development charges. With the City now entering an extended growth period, the City is going to need these DC dollars to pay for the growth related capital projects as identified in the 2018 Development Charges Study. Therefore, the City has to start increasing the funding to the various reserves to reduce the City's use of DC dollars. Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 14 Every municipality in Ontario is trying to address their infrastructure funding gap by increasing their annual reserve contributions. As a significant first step, staff are recommending that the annual contributions for the vehicles, parks and major equipment reserves be increased to match the annual amortization expense by 2022. To reach that goal in 2019, the annual contribution would have to be increased by $1.6 million or the budget levy increased from 2.47% to 5.0%. Changes to the Community Grants Policy -Recommendation 29 Staff are proposing a few minor modifications to the grants policy based on our experience to-date and to improve the program from the perspective of benefiting the Pickering volunteer community. By helping volunteer groups, the City by default is helping its residents. In 2015, the City revised the community grants program to a more formalized application process. This process is working well and there are several new volunteer groups now receiving funds to serve their Pickering constituency. However, during this time, staff have observed that there is a need to have an option available to provide volunteer groups the opportunity to secure some dollars who may have missed the application deadline for various reasons. Recommendation 29 e), establishes a vehicle for the City to provide some funding dollars and still maintain the integrity of the grant process. In other words, staff did not want to create a system that rewards groups that bypass the established process. Key components of this new process are: a group can only use this option once during Council's term; their application must comply with the City's grants policy criteria and the dollar amount is capped at $250. It is staff's intent to report on the use of this option as part of the annual budget process. Additional Veridian Dividends -Recommendation 31 It is staff's understanding that the merger between Veridian and Whitby Hydro will occur by at least the second quarter of this year or may be sooner. There may be a special dividend declared and recommendation 31 is allocating any of the additional dollars to the roads and bridges reserve fund. Reporting of Outstanding Capital Projects -Recommendation 34 As directed at the Executive Committee Budget meeting, staff will report on all outstanding capital projects valued at $100,000 or more. This report will be based on all activity to date as of July 31 st and December 31 st. The July 31 st date represents five months of activity past the budget approval date and should give staff sufficient time to address capital projects that were approved in the 2019 Capital budget. The reports will be based on the standard of a Purchase Order (PO) issuance. A PO represents that all of the staff work to initiate the project has been completed. At this stage the remaining work is with the vendor with staff oversight. In other words, the first report of the year will provide a list of all outstandin_g capital projects as of July 31 st including prior years' and Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 15 the 2019 Capital budget. An outstanding project is defined as a project that has not been issued a PO. Changes to the Fee Structure for Seniors Snow Removal -Recommendation 36 b) For the 2019 budget, the cost for the seniors' snow removal and persons with disabilities program increased from $126,000 to $315,000-an increase of 150%. The increased cost is reflection of the higher third party contract price and expansion of the program from 425 places to 500. When the program was first conceived, the theory was to help seniors/persons with disabilities with basic snow removal who were in need of this service. In many situations there was either no reliable young person to undertake the activity and or the "for profit cost" was prohibitive. Staff have conducted an informal investigation and some "for profit" companies charge $125 per month with a payment commitment of five months. Staff are proposing to revise the program from the perspective of matching the need to those individuals who may have a financial challenge to afford the private sector option. The revised user fee structure is based on the Federal Government's Old Age Security (OAS) clawback strategy. From an administrative perspective, staff do not anticipate any problems or difficulties due to the fact staff will use the Revenue Canada's Notice of Assessment document that individuals receive when they file their income tax. The "Net Income" line is identified in the Notice of Assessment and staff will use this figure to determine program eligibility and the corresponding fee. · 1f individuals do not file their income tax, they will automatically be disqualified from the program. 2019 Current Budget At the February 26, 2018 Council meeting, a resolution was adopted by Council where the base budget levy would be capped at 2.20%. At the February 14, 2019 Executive (Budget) Committee meeting, Council was presented with a proposed budget levy increase of 2.47%, which was accepted by the Executive Committee. Based on an average assessment of $463,908, the 2.47% increase (excluding the impact of reassessment) will result in an average increase of approximately $39.99 per year or 77 cents per week for the average residential dwelling in Pickering. Unlike goods purchased by consumers where there is a tangible product that is received each time there is a transaction, many City services provided to residents such as park or road maintenance are not paid for as the services are used or received. For this reason, many residents, may not be aware of the costs associated with the vast array of services offered by the City. The Chart below shows a breakdown of the cost of services that make up the average City share tax bill of $1,660 (based on an assessment of $463,908). Report FIN 02-19 Subject: 2019 _Current and Capital Budget February 25, 2019 Page 16 Chart One 2019 Average Budget Allocation for City Services· [ -Avera; h-o~;;hold'; ~~ope~y taxes (Ci;y sh~~e) -- Allocation for Municipal Services ----------------------- Dollar amount, based on the average residential tax bill -Municipal portion of property tax $1,660 Fire Services Roads, Bridges, Sidewalks and Streetlights City Facilities, Recreation Programs & Events Library General Government Expenditures Parks Engineering Services City Development Information Technology Office of the CAO (includes Customer Care) Contributions to Capital Projects Bylaw Services & Legal Human Resources Mayor, Council & Support Finance Clerks Office Public Affairs & Corp. Communications I 1 , $?70.3:0 ~""'!"-..-~1-•,"" $218.5~ · """~-..--;$137•,96 I """"""-- 1 -$128.62 ' """'"""' .... : $99;45 1 """"""-$ 81 . 36 ' I --,-$70,20 ~ $5q.06 ,-~31.3! j-~31.31 ,-~29.9~ ;-F9.s7 ~ $25,19 ;-$~3.3q j-$f2.9~ I" $15.25 ! $39 .24 0 50 100 150 200 250 300 350 400 450 Tax Increase Summary . The 2.47% City share tax increase translates into an increase of 0.75% on the total residential tax bill. The 2.47% levy increase comp·ares favourably to other municipalities, especially when one considers that Pickering has had the lowest tax rate among its Durham Region Lakeshore neighbours for over eighteen years (1998 up to 2016). Adding the Region's (2.20%) tax increase and Pickering's (2.47%) and the School Board's estimated 0% increase, the total increase for the average residential ratepayer will be approximately 1.96%. In 2000, Pickering Council approved a zero percent levy increase and since then, budget levy increases have ranged from 9.8% to 2.93%. As the Chart below shows, the 2.47% levy increase is the lowest increase the City has had over the last nineteen years. Report FIN 02-19 Subject: 2019 Current and Capital Budget Chart Two Budget Levy Increases 2000 to 2019 February 25, 2019 Page 17 10.0 .,..Z."-----------------------~ 9.0 · 8.0 · 7.0 · 6.0 · 5.0 · 4.0 · 3.0 · 2.0 · 1.0 · ___ 8.9 __ __,,-"'-------------------1 0.0 · 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 The table below provides a summary of the financial impact of the proposed 2019 tax levy increase based on various assessed values. Financial Impact of Budget Increase City Share Only Residential Assessment $400,000 $500,000 Increase (Over 2018) $34.76 $43.45 $600,000 $52,14 This is the third year of the Province's four year reassessment cycle. Assessment- related increases are phased-in over four years, and assessment-related decreases are implemented immediately. The City does not receive any additional revenue as a result of reassessment. The corresponding property tax rates are adjusted for the increase in reassessment values to create an overall property tax neutral position on a total property class basis. Inevitably, when there is an overall change in assessment values, there is shifting of the property tax burden among property classes, and as well among individual property owners within each property class. The impact on the individual homeowner is based on their specific reassessment increase, relative to the City-wide average of 6.52%, shown in the Table below. There are also assessment-related tax shifts for the Region and Education. These impacts will be based on the average reassessment increases on a Region-wide basis and for Education on a Province-wide basis. Report FIN 02-19 Subject: 2019 Current and Capital Budget Reassessment Increase Below6.52% Eauals 6.52% Above 6.52% Risk Analysis. February 25, 2019 Page 18 Assessment Related Impact on Taxes Decrease No Impact Increase At its core, the municipal budget is a projection of inflows and outflows for the coming year. Due to the timing of the budget preparation and approval, many of these projections need to be made with less than perfect information. In addition, these projections need to consider future events and circumstances that are often beyond the City's control. Therefore, as with any budget, there are risk factors associated with the draft 2019 City of Pickering budget being presented at the Executive (Budget) Committee meeting. The following is a list of some of the most important risks and rel1:1ted mitigating measures. A Fuel costs continue to be volatile over the last few years. The 2019 fuel budget includes an increase ($58,715) to better reflect 2018 actual fuel costs and potential fuel price increases in 2019. There is always a risk that a global crisis may increase fuel costs in the future. The possibility of fuel prices being volatile during 2019 is high, and the cost risk will be accommodated through the General Government contingency account. B During the last few years, there has been no predictable weather pattern for winter control activity/costs. The 2014 and the first half of the 2015 winter season was one of the worst on record. The 2019 winter control budget is based on December and the · first three weeks of January and therefore, the 2019 Winter Control budget includes a small increase ($5,000 If the current winter weather pattern changes, any additional cost pressures would be absorbed either through the Winter Control Reserve ($700,000) or through the General Government contingency account. . C The City is able to retain the Education share of the Payment-in-Lieu (PIL) property taxes for federal, provincial and regional properties located in the City. The largest properties are: OPG nuclear plant, Hydro One transformer station, the airport lands and the water pollution control plant. The Province has not released any information regarding the 2019 education rates and therefore, there is a possibility that the PIL revenue may not reach its 2019 budget target. Any significant revenue loss will be adjusted through the 2019 property tax rate report. D Budgets prepared early in the year are based on information that was available in December of last year. This has the potential to generate greater budget variances that might otherwise be experienced. In addition, the two senior levels of government (Federal and Provincial) have not yet released their 2019 budgets. There is a possibility of a positive or negative impact on the City based on the budget actions of the senior levels of government. Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 19 E General inflationary pressures that may continue to increase as the economy continues to improve. The likelihood of this risk materializing is rated as possible; the likely impact of the consequences is rated as moderate. The first signs of general inflationary pressures will probably be reflected in capital tender awards in March and April. F The outlook for the global economy has darkened. Global financing conditions have tightened, industrial production has moderated, trade tensions remain elevated and some large emerging market and developing economies have experienced significant financial market stress. In the British and European newspapers, Brexit with the FIXED exit date of March 2019 now appears to be a major concern. A bitter Brexit divorce may have global economy impacts Today, it is not surprising to read or hear financial experts mention the "R" word (recession). The last recession occurred in 2008 and the general rule of thumb is that there is an economic slowdown or recession every eight to ten years. It appears, we are now due for a financial downturn. -For 2019, the local economic story will be dominated by the closing of GM and its feeder plants. Pickering's geographical position will partially shield the City from the effect of GM's closure. The City is increasingly exposed to risk from a fluctuating US/CAN dollar exchange rate. Pickering is moving into a period of capital growth construction with planned multi-million dollar projects and fleet expansion. Many of the products are purchased from US manufacturers. Even products made in Canada have significant percentage of components from the US. The risk to our forecasts capital budgets is more significant due to the high value of projects we have in the five year forecast. 2019 Challenges and Opportunities Outstanding Assessment Appeals There is currently $5.5 billion in outstanding assessment appeals for the commercial and industrial property tax class for the City. These are multi-year appeals that range from 2009 up to 2019. The largest dollar value of assessment appeals outstanding are with the Pickering Town Centre or PTC. However, most mall owners in Ontario have appealed their property's assessment values partially due to the effects of online shopping and its impact on mall traffic and corresponding sales. The outstanding appeals go back six years and there may be some financial costs (property tax reimbursement) to the City. These appeals are mostly for large commercial and industrial properties with complex valuations that often have interests from multiple parties. The schedules are set by the · ARB and appeals can take years to resolve. Unfortunately, the majority of these appeals were not resolved in 2018. Therefore, these appeals are automatically deemed outstanding for the 2019 taxation year. Every year these appeals remain outstanding, the settlement cost increases, creating additional financial risk to the Corporation. For the last few years, staff have budgeted for the outstanding commercial and industrial Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 · Page 20 appeals and any funds remaining from these prior years has accrued to fund anticipated settlements in 2019. If the budget provisions are insufficient to fund the reductions, the City would draw on the Assessment Appeal reserve to fund any shortfall. 2019 User Fees and Charges Schedule · Every year, the City reviews its user fees, mainly for various recreational and cultural programs, to partially reflect the cost of delivering these programs. Council passed Resolution# 149/03 confirming the City's existing user fees through a specific by-law. This By-law has been updated as part of each year's budget process. Other fees have been introduced to address industry trends and their associated costs. The basic theory of user fees is to recover the cost of a service from an individual that is directly benefitting from that service. User fees promote efficient allocation of municipal resources because direct benefit recipients pay for the service they consume. The City of Toronto has adopted the philosophy that "it should charge full cost, without subsidy, for any service that delivers a direct benefit to individuals". If user fees don't recover the full cost of providing the service, by default, the property tax payer indirectly subsidizes the user. Debt Payments and Debt Financing of Capital Projects The 2019 current budget includes $4.8 million of taxpayer funder debt charges (interest and principal.) The taxpayer funded debt charges represent 7 .2% of the 2019 property taxes levied. In other words, for.every dollar collected -seven cents is applied to debt charges. In 2017, the Development Charges Operations Centre Reserve Fund borrowed $9.2 million to meet the fund.ing requirements for the new Operations Centre located on Clements Road. The principal and interest payments associated with this debt is $676,000 and is funded from DC payments of which the majority will be from Seaton development. The 2018 DC Background Study captured all of the interest and principal payment cost associated with this debt and these costs are reflected in the DC rates. The Current budget book section (Appendix A) includes a summary of the outstanding debt as of December 31, 2019. A high level summary of the City's debt is presented below: Report FIN 02-19 Subject: 2019 Current and Capital Budget · Debt Summary 2019 Debt External Debt Commitments External DC Debt Internal Loans Sub Total Prior Years' Approvals External Debt Internal Loans Sub Total Total Commitments -2019 Add: 2019 Debt Commitments 2019 External Debt 2019 New Loans Total Debt Commitments Millions ($) $21.9 9.5 .1Jl. $35.0 $5.2 0.9 $6.1 $41.1 $11.2 2.3 $54.6 February 25, 2019 Page 21 As stated last year, the Development Charges Reserve Fund -Operations Centre borrowed funds to meet its funding obligations for the new Operations Centre. Development Charges collected from new growth pay the principal and interest charges associated with this debt type. Excluding the DC debt, the City has financial commitments of $45.1 million Chart Three City of Pickering Forecasted Property Tax Funded Debt Charges Forecast /Interest & Principal) $8,000,000 $7,000,000 / $6,000,000 / $5,ooo,ooq - $4,000,000 $3,000,000 $2,000,000 ' ' ' . ' ' 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 .-Actual -Forecast Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 22 Property tax funded debt charges are forecast to increase by $870,700 in 2020 or 1.3% increase to the budget levy. Council has the ability to control the increase of future debt charges by either deferring or delaying debt financed projects. In addition, senior level government grant announcements may also have an impact on the rise and slope of the debt forecast line. The 2020 preliminary b1.1dget strategy is to have assessment growth fund the increase in debt charges. Debt Level and Provincial Guidelines In 2013, Council adopted a debt level standard where the City capped its debt payments at 15% of the total taxation revenue. The debt capacity used for 2019 is estimated to be around 8.58% for all debt (tax debt and DC Debt) which is below the 15% cap and well below the 25% Provincial limit. Chart Four provides a summary of the City's projected debt charges in relation to the City's 15% cap rule. Chart Four Debt Management The debt guideline limits taxation debt charges to 15% of taxation revenues 16.00% 14.00% 12.00% 10.00% 8.00% - 6.00% 4.00% ' 2012 - ' ' / ... - --------------r .,. . ·- ... --•---• .,. 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 -+-Council Target ..... Taxation Debt Charges as a % of Taxation Revenues -All Debt (3rd Party & DC Debt) As the above chart indicates, for 2019, the City is well below the 15% debt target limit. However, future debt projections based on the multi-year capital forecast indicate that the City will have some fiscal challenges in the next few years. In addition, senior government grant funding can also have a major impact on the amount of debt financing in the future. Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 23 The 2019 debt financed capital projects are listed below. External Debt and Internal Financing of Capital Projects City of Pickering 5, 10, 15 and 20 Year Debt Financing 2019 Capital BudQet Capital Proiect Code Debt -5 Years($) Description 5719.1906 $115,000 WSCC Roof Replacement & Repairs 5731.1909 120,000 Main Flat Roof and Skyliqht Retrofit 5319.1904 130,000 Backhoe Reolacement 5311.1904 150,000 Sidewalk Plow with Attachments Replacement 5731.1908 160,000 Recreation Complex Water and Fire Main Replacements 5311.1907 237,000 Ontario's Main Street Revitalization Proaram 5319.1901 350,000 Road Grader with Attachment Replacement Total Five Year Debt $1,262,000 Capital Proiect Code D.ebt -10 Years/$\ DescriPtion 5735.1901 $105,000 Ice Resurfacer Reolacement 5780.1910 190,000 Amberlea Park -Baseball Field Pathway Reconstruction 5735.1903 270,000 O'Brien Arena Header Replacement 5735.1902 310,000 Lobby and O'Brien Arena Skylight and Roof Reolacement 5780.1920 365,000 Brock Ridge Community Park - Baseball Diamond Improvements 5203.1904 400,000 Municipal Servicing 407 Corridor Lands Phase One 5780.1921 450,000 S.M. Woodsmere Park -Baseball Diamond Improvements 5731.1902 1,100,000 Rec. Complex Backup Generator Reolacement 5320.1901 1,125,000 Whitevale Master Drainage Plan Implementation -Construction Total Ten Year Debt $4,315,000 Capital Proiect Code Debt -15 Years 1$1 Description 5700.1906 $150,000 Council Chamber Flat Roof Replacement 5780.1902 415,000 Centennial Park -Picnic Shelter and Amenities Total Fifteen Year Debt $565,000 Capital Project Code Debt -20 Years ($) Description Report FIN 02-19 Subject: 2019 Current and Capital Budget 5719.1901 $4,641,765 5731.1901 2,450,000 Total Twentv Year Debt $7,091,765 Total Debt Financed $13,233,765 Proiects February 25, 2019 Page 24 · Pickering Heritage and Community Centre -Construction Rec. Complex Main Entrance and Core Area Renovations -Construction Borrowing or debt financing should not be viewed as a negative. The proper use of debt is an essential component of prudent fiscal strategy. The use of debt promotes intergenerational equity. By borrowing, Pickering can distribute the cost of the asset over the lifetime of the asset. Pickering should take advantage of current low interest rates but balance its use so that the City does not overextend itself beyond the 15% cap. 2019 Tax Rates As has been the case for the last few years, the 2019 Property Tax rates and corresponding levy By-law will be presented to Council after the City has received the education tax rates from the Province. 2019 Capital Budget This year, the draft Capital Budget is $77 million. The major capital projects.are: Pickering Heritage & Community·Centre Construction ($18.9 m); Krosno Creek Culvert Replacement ($4.8 m); Sandy Beach Rd. Reconstruction Phase 1 ($2.0 m) and Krosno Creek Storm Water Management Facility ($1.3 m) and many road resurfacing projects. Included in the 2019 capital budget is $2.0 million for the Civic Centre project. These dollars are for professional consulting ($500,000) mainly for legal and finance expertise to develop the business case and to review the complex legal documents. At a minimum, the Civic Centre project would probably have a 50 year life span. To put the project's life span into a historical context, you are sitting in Pickering in 1969 and you're telling an individual that GM in Oshawa would be closing its doors in 2019 and Sears Canada would go bankrupt (2018). As stated above, history tells us that we should expect the unexpected and that unanticipated change is a strong possibility. The key message for the City is to structure the legal agreements so that the City is protected as much as possible from these unanticipated events. Pension fund companies buy and sell malls as investments to protect their members from the fluctuations of the stock and bond markets. Any legal agreement that the City enters has to protect the City from a change in mall direction due to any future change in ownership. Staff's preliminary discussion with PTC executives indicates that the City may have to contribute up to $1.5. million in 2019 to help fund design and other costs. In April, staff will be bringing a report outlining the business case for the Civic Centre project and for Council to decide either to proceed or cancel the project/business relationship. Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 25 In the fall of this year, there will be a federal election. The 2019 capital budget has been designed to take advantage of any and or all possible senior government grant announcements. The capital budget includes three possible grant funding opportunities that are basically shovel ready. The table below provides a breakdown of these projects and reflects the benefits of the grant funding. 2019 Capital Budget Senior Government Grant Funding Opportunities .· Project Description Gross Cost Grant Funding City Share Request Whitevale Master Drainage $2,250,000 $1,125,000 $1,125,000 Plan Implementation Rec Complex Main Entrance 4,900,000 2,450,000 2,450,000 & Core Renovations Pickering Heritage & 18,883,967 9,441,984 9,441,983 Community Centre Total $13,016,984 $13,016,983 The City share cost will be funded through either, reserves, development charges and or debt. If the City does not receive any senior government grant funding, the project will not proceed in 2019. However, it is staff's intent to reintroduce these projects in the 2020 capital budget for Council's consideration. Without grant funding, the City would have to use debt financing and this additional cost will be addressed through a special levy. To replace the grant funding for all three projects, the 2020 budget levy would have to be increased by 1.53%. If the City does not receive any senior government grants, there is a possibility of receiving secondary grant funding related to accessibility funding. The opportunities related to accessibility grant funding are presented below. 2019 Capital Budget Secondary Government Grant Funding Opportunities Related to Accessibility · Gross Cost Federal City Share Government Estimated (33%) Recreation Complex Main $650,000 $214,500 $435,500 Entrance & Core Renovations Pickering Heritage & $900,000 $297,000 $603,000 Community Centre Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 26 In the past, the Federal Government's accessibility funding was limited to 33% of the project's cost. However, the Federal Government share would still be beneficial to the City. Implementation of "E Fleet Strategy for Cars and SUV's. In 2018, the City purchased its first all-Electric Vehicle (EV) (Chevrolet Bolt) and plug-in hybrid electric SUV vehicle (Mitsubishi Outlander). This pilot project provided an opportunity for staff to monitor the performance of these vehicles while reducing associated fuel consumption and ccarbon dioxide (CO2) emissions. Carbon dioxide (CO2) is the primary greenhouse gas emitted through the incomplete burning of fossil fuels (coal, natural gas, and oil). Based on the data collected during the monitoring period, positive results were achieved through substantial annual fuel costs which are displayed in the chart below. Annual Fuel Costs ($) $9,000.00 -------------------------- $3,000.00 $2,000.00 $0.00 Electric Vehicles Gasoline Vehicles Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 27 Also, the table below reflects total cost savings and CO2 emission reductions over a 7 year period. Savings 2018 Mitsubishi 2018 Chevrolet Bolt Outlander . Annual Fuel Saved 2,156 L 1,665 L Annual CO2 Emissions 6,566 kg 5,032 kg Saved Payback Period 3 years 2 years Lifetime Total Fuel Saved 15,093 L 11,656 L Total Reduction CO2 45,961 kg 35,224 kg Emissions Total Savings $14,165.73 $12,944.66 Note: These savings are relative to an equivalent purchase of a gasoline-powered vehicle. From the monitoring results above, there are justification to consider replacing all small gasoline powered vehicles with electric vehicles. Using the information from our 2019 capital budget and forecast, it was determined that it would take 7 years beginning in 2019 and ending in 2025 to replace the smaller vehicles as follows: Year 2019 2020 2021 2022 2023 2024 2025 No. of 3 4 4. 5 5 5 4 Vehicles The 2019 capital budget starts the City journey that over seven years will result in the City replacing all small gasoline -powered vehicles with electric vehicles. This Strategy does not include medium to large gasoline or diesel vehicles such as pickup trucks. Staff will monitor the marketplace for the release of large EV vehicles. As EV pickups and larger truck models become available from established manufacturers, staff will undertake its due diligence on all purchases to ensure City's requirements are met and benefits realized. Staff have consulted with other municipalities who have similar fleet programs and their experience indicates that EV purchases are sustainable and economically viable. Report FIN 02-19 Subject: 2019 Current and Capital Budget February 25, 2019 Page 28 As part of the pilot project, the City received a government grant for the installation of four electric vehicle charging stations, which were installed at the Civic Complex Underground Parking. Moreover, additional charging stations will be required to accommodate the expansion of the EV fleet. Also, the electrical vehicles have been programmed to only charge up during off-peak hours to take advantage of the reduced hydro rates. 2020 -2023 Capital Forecast Included in the capital budget book is the City's 2020 -2023 Capital Forecast which outlines the City's current financial plan. Provided below is a breakdown of the various funding sources related to the capital forecast. Draft 2019 Budget and 2020-2023 Capital Plan ($M) 2019 2020-2022 % Budget Planned Total Amount Amount Total Funding Development Charges $12.2 $114.2 $126.4 38.44 Debenture Financing 13.2 84.1 97.3 29.59 Other 39.0 4.2 43.2 13.14 Infrastructure Reserves 7.9 32.1 40.0 12.17 Federal Gas Tax 3.2 12.2 15.4 4.68 Capital from Taxation ___D _g ____Q_,Q 1.98 $76.8 $252.0 $328.8 As shown above, the City is relying on a substantial level of development charge funding for the City's future capital needs. There are rumors that the Province may be reducing Development Charges as part of its affordable housing strategy, and by default these costs would have to be either shifted to the property taxpayer or the project's scope reduced. 2020 Budget Timetable After the 2019 budget has been approved by Council, the senior finance staff team related to the budget process is then deployed to assist in wrapping up the 2018 fiscal year end accounting activities. When the year end process is completed, basically the entire senior finance team will be involved with the implementation of the new financial system. With a go live date of January 2 nd , 2020, finance staff will be \'Jorking around the clock for the last two to three months to have the financial system ready for the go live date. Therefore, the 2020 budget should be delayed until March or April of next year. However, staff would still seek pre-budget approval for traditional capital expenditures such as roads resurfacing to ensure that the project is completed during the spring or early summer. Deferring the 2020 budget by one or two months also creates the opportunity for the city to have a few more months of experience as it relates to casino revenues and corresponding revenue projections. Report FIN 02-19 Subject: 2019 Current and Capital Budget Attachments: 1. By-law to Confirm General Fees and Charges 2019 2. Budget Presentation, February 14, 2019 Prepared By: James Halsall Stan Karwowski February 25, 2019 Page 29 Manager, Budgets & Internal Audit Director, Finance & Treasurer Recommended for the consideration of Pickering City Tony Prevedel, P.Eng. Chief Administrative Officer ATTACHMENT#~TOREPORT#fW_OJ..--/~ The Corporation of the City of Pickering By-law No. XXXX/19 Being a by-law to amend By-law No. 6191/03 to confirm General Municipal Fees Whereas the Council of the Corporation of the City of Pickering enacted By-law 6191/03, as amended; on October 14, 2003 to confirm general municipal fees. Whereas Schedule "I" to By-law 6191/03 was updated and replaced under By-law, 6338/04, By-law 6519/05, By-law 6652/06, By-law 6677/06, By-law 6748/07 By-law 6857/08, By-law 6951/09, By-law 7032/10, By-law 7119/11, By-law 7194/12, By-law 7268/13, By-law 7339/14, By-law 7411/15, By-law 7478/16, By-law 7542/17 and By-law 7605/18; Now therefore the Council of the Corporation of the City of Pickering hereby enacts as follows: 1. Schedule "I" to By-law Number 6191/03, as amended, is hereby deleted and Schedule "I" attached hereto is substituted therefore. By-law passed this 25th day of February, 2019. David Ryan, Mayor Susan Cassel, City Clerk Schedule I -C~o/- PJ(KERJNG Summary of Fees & Charges 2019 Disclaimer: Finance Department To be considered by Executive (Budget) Committee on February 14, 2_019 and approved by Council on February 25, .2019 The following are a list of the current fees and charges in place in the City of Pickering at the time of printing. These fees and charges are subject to review and change. Please contact the appropriate City oe·partment for the actual fees in place at any specific time, or if you require any further information. · E. & O.E. By-law and Animal Services 2018 Current Fee 2019 Proposed Fee HST Proposed Fee · User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date . Bodv Rub Licences . Owner -not operator · $250.00/vr $250.00/vr N No Increase Operator -not owner $250.00/vr $250.00/vr N No Increase Owner/Operator $500.00/vr $500.00/yr N No Increase Attendant $150.00/yr $150.00/yr N No Increase Business Licences Home Base Business $50.00/yr $50.00/yr N No Increase Wreckina Yard $250.00/yr $250.00/yr N No Increase MarketsJ<100 stalls) $200.00/dav $200.00/dav N No Increase Markets (>99 stalls) $1,000.00/day $1,000.00/day N No Increase Public Hall $10.00/vr $10.00/vr N No Increase Temporarily keeping a prohibited $200.00/day $200.00/day N No Increase animal Pet Shops $250.00/vr $250.00/vr. N No Increase Boardina Kennels $250.00/vr $250.00/vr N No Increase Breeders $250.00/vr $250.00/vr · N No Increase Horse Ridina Establishment $250.00/vr $250.00/vr N No Increase Late fees -(Boarding, Breeden,, $50.00 $50.00 N No Increase Pet Shops & Horse Establishment) · Taxi Licences Plate Owner Licen·ce $250.00/yr $250.00/yr N No Increase Brokerage License $150.00/yr $150.00/yr N No Increase Taxicab Driver's License (Two $100.00 $100.00 N No Increase Years) Clean Air Cab Plate License $1,000.00/vr $1,000.00/vr N No Increase Plate Owner Licence-Clean Air $125.00/yr $125.00/yr N No Increase Cab Citv Plate Licence $2000.00/vr $2000.00/vr N. No Increase . Other Taxicab·Fees Transfer of owner's Plate $500.00 $500.00 N. No Increase Appeal $75.00 $75.00 N · No Increase Replacement Driver's Licence $20.00 $20.00 N No Increase Reolacement Taxicab Plates $100.00 $100.00 N No Increase Replacement of Tariff $10.00 $10.00 N No Increase Card/Passenger R & R Chanae of Reaistered Vehicle $100.00 $100.00 N No Increase Lease Filina $50.00 $50.00 N No Increase Re:inspection without taxicab $20.00 $20.00 N No Increase meter ' Re-inspection with taxicab meter $35.00 $35.00 N No Increase Late Can.cellation/No Show for $50.00 $50.00 N No Increase Inspection Plate Elioibilitv Lisf<annuallvl $75.00 · $75.00 N No Increase By-law and Animal Services · 2018 Current Fee 2019 Proposed Fee HST. Proposed Fee User Fee or ·charge · Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date . Cat & Doq Licences Sterilized $25.00/vr $25.00/yr N No Increase Unsterilized $50.00/yr $50.00/yr N No Increase Microchip -sterilized $20.00/yr $20.00/yr N No Increase Microchip -unsterilized $40.00/yr $40.00/yr N No Increase Replacement • $5.00/ea $5.00/ea N No Increase lmooundment Fees lmpoundment of dog or cat wearing current animal licence tag or microchipped 1st occurrence $40.00 $40.00 N No Increase 2nd or subsequent.occurrence $75.00 $75.00 -N No Increase 3rd or subsequent occurrence $125.00 $125.00 N No Increase After regular workina hours $120.00 $120.00 N No Increase Dailv Care Fee $20.00/dav $20.00/dav N No Increase lmpoundment of dog or cat not wearing current animal licence tao or microchinned 1st occurrence $50.00 $50.00 N No Increase 2nd or subsequent occurrence $75.00 $75.00 N No Increase 3rd or subsequent occurrence $125.00 $125.00 N No Increase After reaular workini:i hours $120.00 $120.00 N No Increase Daily Care Fee $20.00/day $20.00/day N No Increase . Service Fees -Owner Transfer of ownership of an $150.00 $150.00 N No Increase animal. Non-Resident-Transfer of $200.00 $200.00 N No Increase ownership Pick up and disposal of deceased owned animals Small -medium size $50.00 $50.00 N No Increase Medium -extra large size $80.00 $80.00 N No Increase Adoi:ition Fees Doas $250.00 · $250.00 N No Increase Cats $120.00 $120.00 N No Increase Obedience Doa Trainina $100.00 $100.00 y No Increase Adult Video Owner/Operator $1,500.00/vr $1,500.00/vr N No Increase Owner -not operator $1,400.00/vr $1,400.00/vr N No Increase Operator -not owner $100.00/vr $100.00/vr .N No Increase Fireworks Permits $100.00 $100.00 N No Increase . By-law and Animal Services 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date Hawker/ Peddler Licence Temporary Use (per day/per $20.00 $20.00 N No Increase location) Stationarv Use $250.00/yr $250.00/yr N No Increase Sians Temoorarv Sian -one month $50.00/ea $50.00/ea N No Increase Portable Sian Licence $50.00/ea $50.00/ea N No. Increase Banner and Inflatable Sian $50.00/ea $50.00/ea N No Increase Sidewalk Sian $100.00/ea $100.00/ea N · No Increase Billboard Annual Licence $500.00/ea $500.00/ea N . No Increase Additional fee for any sign $50.00/ea $50.00/ea N No Increase installed prior to licence insurance Redemption Fee -election signs $25.00/ea $25.00/ea N No Increase Redemption Fee -all signs less $25.00/ea $25.00/ea N No Increase than 2 m2 Redemotion Fee -all other sians $50.00/ea $50.00/ea N No Increase Sirm Variance -all other sirms · $100.00/ea $100.00/ea N No Increase Fence Variance Suooorted $100.00/ea $100.00/ea N No Increase Contested $250.00/ea $250.00/ea N No Increase Sidewalk Snow Clearing Less than 50' $93.75 $96.25 N January 1, 2019 ·Greater than 50' or corner lot $118.75 . $122.50 N January 1, 2019 Pre-saltina Less than 50' $31.25 $32.50 N Januarv 1, 2019 Greater than 50' $50.00 $51.25 N Januarv 1, 2019 Traffic & Parkina Removal of obstruction from City $50.00 $50.00 N No Increase road Return Fee -basketball net or $50.00 $50.00 N No Iner.ease other item Return Fee -shonnina cart $50.00 $50.00 N No Increase · Park Vendor Permits Kinsmen Park $3,000.00 $3,000.00 y No Increase Dunmoore Park $2,500.00 $2,500.00 y No Increase Bev Morqan Park $2,000.00 $2,000.00 y No Increase Chris Graham Fields $2,500.00 $2,500.00 y No Increase Princess Diana Park $2,500.00 $2,500.00 y No Increase St. Mary's Sports Field/Amberlea $2,000.00 $2,000.00 y · No Increase Park ( one vendor to service both sites) Minor Sports Or!'.lanizations $50.00 $50.00 y No Increase By-law and Animal Services . 2018 Current Fee 2019·Proposed Fee HST Proposed Fee User Fee o~ Charge Applicable {Excluding HST) {Excluding HST) {Y/N) Effective Date Other Permit Tree Cuttino Permit $100.00/each $100.00/each N No Increase Tree lnsoection fee $25.00 $25.00 N No Increase City Development Department -Planning 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge ' (Excluding HST) (Excluding.HST) Applicable. Effective Date IY/N) These fees are imnosed under the author irvoftheP/anninnAct, R.S.O.1990 c.P.13 ~ Planninn Documents Pickerinn Official Plan $200.00 $200.00 y No Increase Official Plan Comnendium $50.00 $50.00 y No Increase Seaton Sustainable Placemaking $50.00 $50.00 y No Increase Guidelines 1 City Centre Urban Design Guidelines $50.00 $50.00 y No Increase Develonment Guidelines $5.00-$20.00 $5.00-$20.00 y No lhcrease Snecial Studies . . $10.00-$20.00 $10.00-$20.00 y No Increase Zoninn Bv-laws 3036 -Set 13 Volume $100.00 $100.00 .Y No Increase 3036 -BvVolume $10.00 $10.00 y No Increase 2511,2520,3037, 7364/14 (Seaton), City · $40.00 $40.00 y No Increase Centre Summarv Residential Annlications $30.00 $30.00 y No Increase Summary Non-Residential Applications $30.00 $30.00 y No Increase 20 Year Household & Population $30.00 $30.00 y No Increase Proiections Ma""inn $5.00-$25.00 $5.00-$25.00 y No Increase Address Booklet $25.00-$50.00 $25.00-$50.00 y No Increase Fiche Prints Price Varies Price Varies y No Increase Snecial Mannina Renuests $53.10/hr $53.10/hr y No Increase PhotoCor ies ~ 6 or more nanes $0.50/ea $0.50/ea y No Increase CD co, ies of Documents $10.00/document $10.00/document y No Increase Planninn A"'"'lications Pre-submission Consultation $260.00 $260.00 N No Increase Telecommunications Tower Annroval $7 700.00 $7.700.00 N No Increase Minor Variallce Accessory buildings, structures, decks, $450.00 $600.00 N January 1, 2019 I, latforms & drivewav widen inn Residential Minor (a lot for a Detached dwelling unit, Semi-detached dwelling unit and/or Freehold Townhouse dwelling unit' Sinnle Variance $720.00 $800.00 N Januarv 1, 2019 MultinJe Variances $890.00 $1,000.00 N Januarv 1, 2019 Residential Major (all other residential and mixed use buildinns\ Sinnle Variance $1,740.00 $1,740.00 N No Increase Multinle Variances $1,950.00 $1 950.00 N No Increase Institutional Commercial & Industrial Sinnle Variance $1,960.00 $2 200.00 N Januarv 1. 2019 Multinle Variances $2.140.00 $2 400.00 N Januarv 1 2019 Tabling Fee & Recirculation (applicant $560.00 . $560.00 N No Increase initiatei:I' Snecial Meetinn $2 250.00 $3 500.00 N Januarv 1. 2019 Zoninn Bv-law Amendment Zoning By-law Amendment -Major 2 -$15,400.00 $15,400.00 N No Increase Base Fee Plus Fee ner Residential Unit First 25 units 11-25\ $160.00 $400.00 N Januarv 1 2019 Next 75 units/26-100\ $120.00 $300.00 N Januan• 1 2019 Next 100 Units'101-20CJ\ $80.00 $200.00 . N Januan, 1 2019 Next 800 Units /201-1,000\ $40.00 $100.00 N Januarv 1 2019 City Development Department -Planning ' HST User Fee or Charge 2018 Current Fee 2019 Proposed Fee Applicable Proposed Fee (Excluding HST) (Excluding HST) IY/Nl Effective Date Plus Fee per Non-Residential Ha of $320.00 $810.00 N January 1, 2019 Land Area Plus Fee per Development Block (Ha $200.00 $510.00 N January 1, 2019 of Land Areal Zonina Bv-law Amendment -Minor 3 $9,800.00 $11,000.00 N· January 1, 2019 Zonina Bv-law -Recirculation $1 130.00 $1,130.00 N No Increase Additional fee if within Oak Ridges $1,600.00 $2,000.00 .N January 1, 2019 Moraine or Greenbelt Zonina Bv-law -Removal of Holdina $2 800.00 $3,000.00 N Januan1 1, 2019 Zoning By-law -Removal of Holding $3,200.00 $3,800.00 N January 1, 2019 'Comolex/Block Plan Renuiredl Zoning By-law-Extension ofTemporary $15,400.00 $15,400.00 N No Increase· Use Bv-law Minister Zonina Order Minister Zoning Order Amendment -$2,200.00 $2,500.00 N January 1, 2019 Maier 10 Minister Zoning Order Amendment -$1,700.00 $2,000.0Q N January 1,'2019 Minor 11 Official Plan Amendment Pickering Official Plan Amendment -$34,000.00 $42,000.00 N January 1, 2019 Maior 4 Pickering-Official Plan Amendment -$15,600.00 $20,000.00 N January 1, 2019 Minor 5 Pickering Official Plan Amendment -$1,130.00 $1,130.00 N No Increase Recirculation Additional fee if within Oak Ridges $1,600.00 $2,000.00 N January 1, 2019 Moraine or Greenbelt Regional Official Plan -Amendment (not $9,000.00 $12,000.00 N January 1, 2019 nart of a Pickerina·OPA) Neighbourhood Development Guideline. $800.00 $1,000.00 N January 1, 2019 Amendment 6 Land Division Comments . $1 150.00 $1 500.00 N Januan•1 2019 Clearance .of Conditions $580.00 $750.00 N Januarv 1. 2019 Council authorization to proceed by land $4,000.00 $5,000.00 N January 1, 2019 division instead of draft pla~ of subdivision 8 Cash-in-Lieu of Parkland Convevance For the creation of up to 3 additional $5,330.00 per lot $5,330.00 per lot N No Increase lots For the creation of more than 3 5% of the value of the land 5% of the value of the land N No Increase additional lots Draft Plan of Subdivision Base Fee $24,600.00 $30 000.00 N Januan1 1, 2019 Plus Fee oer Residential Unit N First 25 units (1-25\ $410.00 $500.00 N Januarv 1. 2019 Next 75 units 126-100\ $330.00 $400.00 N Januan1 1, 2019 Next 100 Units (101-200) $250.00 $300.00 N Januan1 1 2019 · Next 800 Units /201-1,000l $160.00 $200.00 N Januarv 1 2019 Plus Fee per Non-Residential Ha of $130.00 $160,00 N January 1, 2019 Land Area Plus Fee per Development Block $80,00 $100.00 N January 1, 2019 /Ha of Land Areal Recirculation $1.130.00 $1,130.00 N No Increase City Development Department -Planning 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding_ HST) (Y/Nl Effective Date Additional fee if within. Oak Ridges $1,600.00 $2,000.00 N January 1, 2019 Moraine or Greenbelt Release of Draft Plan of $1,130.00 $1,'130.00 N No Increase Subdivision/Clearance Fee Revisions to Draft Approved Plan -$10,400.00 $12,000.00 N January 1, 2019 redline reviSions) -Base Fee Plus Fee per Additional Residential Units· First 25 units (1-251 $410.00 $500.00 N Januarv 1 2019 Next 75 units <26-1001 $330.00 $400.00 N Januarv 1. 2019 Next 100 Units (101-200) $250.00 $300.00 N Januarv 1, 2019 Next 800 Units (201-1 000\ $160.00 · $200.00 N Januan•1,2019 Plus Fee per Non-Residential Ha of $130.00 $160.00 N January 1, 2019 Land Area Plus Fee per Development Block (Ha $80.00 $100.00 N January 1, 2019 of Land Areal Major Revisions (prior to Draft Plan $9,400.00 . $10,000.00 N January 1;2019 Annrovall -Base Fee Plus Fee per Additional Residential Units First 25 units <1-251 $410.00 $500.00 N Januarv 1. 2019 Next 75 units (26-100) $330.00 $400.00 N Januarv 1 2019 Next 100 Units (101-200\' $250.00 $300.00 . N Januarv 1 2019 Next 800 Units (201-1 000\ $160.00 $200.00 N Januarv 1 2019 Plus Fee per Non-Residential Ha of $130.00 $160.00. N January 1,2019 Land Area Plus Fee per Development Block (Ha $80.00 $100.00 N January 1, 2019 of Land Areal Plan of Condominium Draft Plan of Condominium $11,700.00 $14.500.00 N Januarv 1 2019 Common Element Condominium $14 500.00 $20,000.00 N Januarv 1, 2019 Recirculation $1.130.00 '• $1 130.00 N No Increase Release of Draft Plan of $0.00 · $1,130.00 N March 1, 2019_ Condominium/Clearance Fee Condominium Conversion $14,500.00 $20,000.00 N Januarv 1 2019 Revisions to a Draft Approved Plan -$1,700.00 $2,100.00 N January 1, 2019 redline revisions) Site Plari Residential See "All Uses Residential, See "All Uses Residential, N No Increase Non-Residential, Mixed-Non-Residential, Mixed-Use) Use) Commercial -See "All Uses Residential, See "All Uses Residential, N No Increase Non-Residential, Mixed: Non-Residential, Mixed-Use) Use) Industrial See "All Uses Residential, See "All Uses Residential, N No Increase Non-Residential, Mixed-Non-Residential, Mixed-Use) Use) All Use~ (Residential, Non_-Residential, $6,900 $8,500 N January 1, 2019 Mixed-Use\ -Base Fee Plus Fee oer Residential u·nit. First 25 units <1-251 $290 $500 N Januarv 1, 2019 Next 75 units (26-1001 $230 $400 N Januarv 1 2019 Next 100 Units (101-200\ $170 $300 N Januarv 1 2019 Next 800 Units (201-1.000l $40 $75 N Januarv 1, 2019 Plus Fee per 2,000 m2 of Non-$3,400 $6,000 N January 1, 2019 Residential GFA City Development Department -Planning 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge (Excluding HST) (Excluding HST) Applicable Effective Date . IY/N) Minor Revision $2,000.00 $2,000.00 N No. Increase Maier Revision $7,500.00 $8,000.00 N Januarv 1, 2019 Compliance Inspections/LC Release $820.00 $820.00 N No Increase Renert /includes 2 insnectionsl Additional Compliance Inspections $350.00 $350.00 N No Increase Other Fees Peer Reviews 9 Full recovery of City costs Full recovery of City costs + 10% admin. fee + 10% admin. fee y No Increase Minor Revision to Approved Condo Site $100.00 $105.00 N January 1, 2019 Plan (by unit owner) I.e. decks, sheds, fences File Reactivation 7 $2,000.00 $2,000.00 N No Increase OPinion Letter for ComPlex lnauiries $550.00 $550.00 N No Increase Add Street Name to Annroved List $1 000.00 $1,000 y No Increase Refund of Annlication Fees 12 10% Admin. Fee 10% Admin. Fee y No Increase Film Permit Fees rnublic road usel $250.00 $250.00 y No Increase 1. fee applicable after Cpuncil adoption.· 2. An application for an amendment that is more significant in scale and scope than a minor zoning amendment, and which may have greater impact beyond the subject lands, as determined by the Director, City Development or designate. Major applications must meet one or more of the following conditions:· -an application relating to more than·one property r -a site specific application, if considered to _represent a large scale redevelopment . -any change in use and/or zone category, except as identified under a minor amendment -an application involving significant changes to th~ development standa~ds or generai provisions of the by-law .. -an application which requires major technical studies and extensive consultation - 3. An application for minor or small scale zoning amendment having no significant impact on adjoining lands, as determined by the Director, City Development or d~signate. Minor applications must be site specific and meet one or mare of the following conditions: -request for additional permitted use, within an existing building with no significant impact on existing development standards -changes in development standards or zone to.accommodate a residential severance to create one additional lot -,application for Tempora(Y Use 4. An application that is more significanfin scale and scope than a minor amendment and which may have greater impact or policy implications beyond the .subject lands, as determined by the Director, City Development or designa~e. Major applications·must meet one or more of the following conditions: -an application which requires major technical studies and extensive consultation -an application relating to more than one property -a site speci!'c application if considered to represent large scale redevelopment or significant change to the designations and permitt~d uses -an application involving significant changes tq the Policies of the Official Plan 5. An application for a minor, site specific and small scale amendITlent or exception to Official Plan policies and designations, having limited impact or policy implications beyond the subject lands,·as dEltermined by the Director, City Development or design~te. · 6. An application to aniend a Neighbourhood Development Guideline when the development proposal would necessitate an '.3-mendment to the Guideline or there is no other planning application being processed by Council. 7. Fee applies to planning applications that have been inactive over 1 year but less than 2 years. If the file has been inactive 2 or r'nore years! the file will be closed without notice and a new application will be required with current application fees being applied. 8. Charged only if no other planning applications are being processed by Council. 9. The applicant is responsible for the City's full costs of undertaking the peer review of any studies or drawings submitted in support of the application. This requirement applies to matters such as, but not limited to, the peer review of traffic, marketing, environmental; noise, engineering drawings and reports, and archite.ctural drawings." 10. A major Minister's Zoning Order application is where the proposed use or standards do not comply with the City's zoning by-law and a Rep~rt to Council is required. 11. ·A minor Minister's Zoning Order application is where the •pi-oposed use or standards comply with.the City's zoning by-la~. 12. Also subject to deduction of credit card fee if paid by credit card. City Dev.elopment Department ~ Building 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date · Building Permit Fees These fees are imposed under the authority of the Building Code Act, 1992, C.2_3 Demolition Permit $27.00/each 100m 2 of GFA $27.00/each 100m 2 of GFA N No Increase min $130,00 min $130.00 Conditional Permit 10% of Appl. Permit Fee to 10% of Appl. Permit Fee to N No Increase a m_ax of$3,100.00 in a max of $3, 100,00 in addition to applicable fee addition to applicable fee Change of Use Permit $280,50 . $280.50 N No Increase Authority to Occupy Permit . $306.00 $306.00 N No Increase Alternative Solution $204.00/hr (4 hour min) $204.00/hr (4 hour min) N No Increase Resubmission of Incomplete Application 25% of Application Fee 25% of Application Fee N No Increase Revision to Permit (houses) $130.00 $130.00 N No Increase Revision to Permit (all other building 15% of applicable permit fee 15% of applicable permit fee N No Increase hmes) to a max of $2 850.00 to a max of $2 850.00 Transfer of Permit $130.00 $130.00 N No Increase Re-examination Change in House Model $500.00 + fee prescribed in $500.00 + fee prescribed in N No Increase Part B for any additional Part B for any additional area area Re'examination Other Than Above 10% of applicable permit fee 10% of applicable permit fee N No Increase to a max of $1,300.00 to a max of $1,300.00 Certification of House Models $6.00/m 2 of GFA $6,00/m 2 of GFA N No Increase Re-certification of House Models $410.00 · $410,00 N .No Increase Reactivation of Dormant File $130.00 $130,00 N No Increase Building Permit Surcharge 25% ofFee ($130.00 min) 25% ofFee ($130.00 min) N No Increase Additional lnspecti9h $250.00 $250,00 N No Increase Minimum Building Permit Fee $130.00 $130.00 N No Increase Assembly Occupancies $20.00/each m2 of GFA $21.00/each m 2 of GFA N March 1, 2019 Institutional Occupancies $22.00/each m2 of GFA $24.00/each m' of GFA N March 1, 2019 Residential Occupancies $12.75/each m2 of GFA $13.00/each m' of GFA N March 1, 2019 Business & Personal Service & $13.00/each m' of GFA $13.25/each m' of GFA N March 1, 2019 Mercantile Occupancies (single storey) Business & Personal Services & $16.00/each m' of GFA $16.50/each m' of GFA N March 1, 2019 Mercantile Occupancies (multi storey) Farm & Unserviced Storage Buildings $5.50/each m' of GFA $5.50/each m 2 of GFA N No Increase Industrial Occupancies $9.50/each m' of GFA $9.75/each m' of GFA N March 1, 2019 Inferior Partitioning & Finishing $5.00/each m' of GFA $5.00/each m' of GFA N No Increase Minor Residential Structures and $1~0.00 $130,00 N No Increase Alterations Temporary Sales Centres $1,330.00 -$1,400.00 N March 1, 2019 Minor Non-Residential Structures $360.00 $360.00 N No Increase Alterations, Building and Structures Not $12.85/each $1,000 of $13.00/each $1,000 of N March 1, 2019 Provided Above construction value construction value City Development Department -Building· 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date Solar Collector for Single Dwelling Unit $150.00 $150.00 N No Increase Solar Collector for All Building Types $205.00/1 O panels $205.00/1 O panels N No Increase Wind Turbines $12.50/each $1,000.00 of $12.50/each $1,000.00 of N No Increase construdion value construction value Grading & Final Inspection Performance $2,000.00 $2,000.00 N No Increase Deposit (new detached and semi- detached dwelling units) townhouses & stacked townhouses Building permit fees are required to meet the City costs to administer and enforce the Building Code Act. Building permit fee amounts will not exceed the anticipated reasonable City costs to administer and enforce the Act following implementation of the changes in this schedule. Note, GFA represents Gross Floor Area. Sign Permit Fees Ground Sign $285.00 $300.00 N March 1, 2019 Wall Sign $285.00 $300.00 N March 1, 2019 Development Sign $285.00 $300.00 N March 1, 2019 Billboard Permit $285.00 $300.00 N March 1, 2019 Additional fee for any sign installed prior $285.00 $300.00 N March 1, 2019 to oSrmit issuance Sign Variance -ground sign, wall sign or $540.00 $560.00 N ·March 1, 2019 development sian Miscellaneous Charges Lawver .Compliance Letter $250.00 per request $250.00 per request N No Increase Recovery of costs for Clandestine $2,200.00 per investigation $2,200.00 per investigation y No Increase lnvestiaations /minimum /minimum Administrative Fee for Processing $515.00 $515.00 N No Increase Clandestine lnvesti•ations Request for Building and/or Planning $50.00/hr. $50.00/hr. y No Increase Records After Hours lnsnections $130.00/hr. (4 hr. min .$150.00/hr. (4 hr. min N March 1, 2019 Licence/Zonina Comoliance letter $155.00 $155.00 N No Increase Records Management Fee $10.50 $10.75 N March 1, 2019 (houses and other minor residential alterations) Records Management Fee 0.5% to a maximum of 1 % to a maximum of N March 1, 2019 {all other permit applications) $155.00 ($10.50 min) $200.00 ($10.75 min) Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. (Y/N) Effective Date HST) HSTl Fitness Services Personal Training . Personal Training Individual Session -Members $62.00 $62.00 y No Increase -Non-members $72.00 $72.00 y No Increase Personal Training Intro Pack -Members $98.00 $98.00 y No Increase -Non-members $115.00 $115.00 y NO Increase Personal Training 5 pack -Members $237.00 $237.00 y No Increase -Non-members $277.00 $277.00 y No Increase Personal Training 10 pack -fv1embers $458,00 $458.00 y No 1.ncrease -Non-members $537.00 $537.00 y No Increase Personal Training 15 Pack -Members $665.00 $665.00 y No Increase -Non-members $780,00 $780.00 y No Increase Personal Training 20 Pack -Members $856.00 $856.00 y No Increase -Non-members $1,015.00 $1,015.00 y · No Increase Pickering's BigfJest Winner Rec Complex 1 O - 1 hour classes $93.00 $100.00 y March 1, 2019 Member Pickering's Biggest Winner Non-Member 10 -1 hour classes $206.00 $210.00 y March 1, 2019 · Semi Private Pilates ·Reformer 5 - 1 hour sessions $204.00 $204.00 y No Increase Private Pilates Reformer 5 -1 hour New $400.0Q .March 1, 2019 Private Yoga Therapy Intro Pack Members New $124.00 y March 1, 2019 Non-members New $143.00 y March 1, 2019 Private Yoga Therapy 5 Pack Members New $300.00 y March 1, 2019 Non-members New $345.00 y March 1, 2019 Private Yoga Therapy 10 Pack Members New $580.00 y March 1, 2019 Non-members New. $667.00 y March 1, 2019 Private Yoga Therapy 15 Pack Members New $840.00 y March 1, 2019 · Non-members New . $966.00 y March 1, 2019 Private Yoga Therapy 20 Pack Members New $1,085.00 y March 1, 2019 Non-members New $1,250.00 y March 1, 2019 Fascia! Stretch Therapy Intro Pack M~mbers New $124.00 y March 1, 2019 Non-members New $143.00 y March 1, 2019 Fascia! Stretch Therapy 5 pack Members New $300.00 y March 1, 2019 Non-members New $345.00 y March 1, 20'19 Fascia! Stretch Therapy 10 pack Members New $580.00 y March 1, 2019 Non-members New $667.00 y March 1, 2019 Fascia! Stretch Therapy 15 Pack Members New $840.00 y March 1, 2019 Non-members New $966.00 y March 1, 2019 Fascia! Stretch Therapy 20 Pack Members New $1,085.00 y March 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee cir Charge Fee Proposed Applica.ble Proposed Fee (Excluding Fee (Exel. Effective Date HST) HST) (Y/N) -. Non-members New $1,250.00 y March 1, 2019 Nutritional Consulting Full Service Twelve -30 minute consults, Member . $436.00 $436.00 y No Increase Full Service Twelve -30 minute. consults, Non-member $513.00 $513_00 y No Increase Initial Consultation -Member $75_00 $75.00 y No Increase -Non-members · $88_00 $88.00 y No Increase Follow Up Session -Member $35.00 $35.00 y No Increase -Non-members $41.00 $41.00 y No Increase Child Supervision Service C.S. 1 Hour · -Member $3.75 $4.00 N March 1, 2019. C.S.10 Pass -Member $37.00 $40_00 N March 1, 2019 C.S. 1 Hour -Non-members $5.25 $5.50 N March 1, 2019 C.S. 10 Pass -Non-members $52.50 $55_00 N March 1, 2019 Friendship Club $15.75 $16.00 N March 1, 2019 . Programs Fitness Registered -Children Yoga-Children Eight -50 minute classes $52.00 $52_00 N No Increase Zumba Kids Eight -45 minute cl"asses $52.00 $52_00 N No Increase Fitness Registered -Parent & Tot Salsa Tots Eight -45 minute classes $72.00 $72.00 N No Increase Fitness Registered -family Family Fit Yoga Eight-50 minute classes 1 adult & 1 child $100,00 $100,00 y No Increase each aQditional Family member $31.00 $31.00 N No Increase Family Zumba Eight-50 minute classes 1 adult & 1 child $100.00 $100.00 y No Increase each additional Family member $31,00 $31,00 N No Increase Fitness Registered -teens Operation Fit Six -1 hour classes $70.00 $70.00 N No Increase · Teen Fitness Camp Five -6-hour classes $307.00 $307.00 N No Increase Teen Boxing Bootcamp Eight -50 minute ·classes $70.00 $70.00 N No Increase Fitness Registered -Adults Zumba Eight -50 minute classes $72_00 $72.00 y No Increase Pilates Eight -50 minute classes $72.00. $72.00 y No Increase Yoga Eight -50 minute classes $72.00 $72.00 y No Increase Baby Boot Camp Eight -50 minute classes $72_00 $72.00 y No lncre'asB Yoga Pre-natal Eight -50 minute classes $72_00 $72.00 y No lnCrease Mom & Baby yoga Eight -50 minute classes $72_00 $72.00 y No Increase Total Barre Eight -50 minute classes $72.00 $72.00 y No Increase Cycle Fit Eight -50 minute classes $72.00 $72.00 y No Increase Cycle Pump Eight -50 minute classes $72.00 .$72.00 y No Increase Pilates Reformer Eight -~0 minute classes. $110_00 $110_00 y No Increase PiYo Strength Eight -50 minute classes $69.92 $72_00 y · No Increase Socacize Eight -50 minute classes $69.92 $72.00 y No Increase Yogalates Eight -50 minute classes $69.92 $72.00 y No Increase Pole Walking Six -50 minutes classes · $54,87 $72_00 y No Increase Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. Effective Date HSTl HSTl .(Y/N) Sunrise/Sunset Yoga & Meditation Eight -1 hour classes $72.00 $72.00 y No-Increase Meditation Eight -50 minute classes .$72.00 $72.00 y No Increase P90X Eight -50 minute classes $72.00 $72.00 y No Increase Pump it Up Eight -50 minute classes $72.00 $72.00 y No Increase Yoga-Gentle Eight -50 minute classes · $72.00 $72.00 y No Increase Yoga -Hatha Basic Eight -75 minute classes $105.00 $105.00 y No Increase Yoga -Hatha Advanced Eight -75 minute classes $105:00 $105.00 y No Increase Yoga-Power Eight -50 minute classes $72.00 $72.00 y No lnGrease Yoga -Vinyasa Eight -75 minute classes $105.00 $105.00 y No Increase Yoga -Vinyasa Eight-90 minute classes $130:00 $130.00 y No Increase Pound Eight-30 minute classes $36.00 $36.00 y No Increase Tabata Bootcamp Eight 50 minute classes $72.00 $72.00 y No Increase Yoga -Restorative Eight -50 minute classes $72.00 $72.00 y No Increase Zumba -Parent & Baby Eight -50 minute classes $72.00 $72.00 y No Increase Yoga in the Park Eight -.50 minute classes $72.00 $72.00 y No Increase Postnatal Pilates Eight -50 minute classes $72.00 $72.00. y No Increase Strong by Zumba Eight -50 minute classes $72.00 $72.00 y ·No Increase Goddess Flow Eight -60 minute classes New $72.00 y March 1, 2019 Body Shred Eight -50 minute classes New $72.00 y March 1, 2019 Carlates Eight -50 minute classes. New $72.00 y March 1, 2019 Cycle Fit Learn to Spin Eight -45 minute classes ·New $53.98 y March 1, 2019 Total Muscle Challenge Eight -50 minutes New $72.00 y March 1, 2019 Yoga Yin Eight -50 minute classes New $72.00 y March 1, 2019 Yoga Yin Eight -60 minute classes 'New $72.00 y March 1, 2019 Small Group Use It & Lose It Four.-1 hour classes New $44.00 y March 1. 2019 Earlv Riser Eioht -1 hour classes $90.00 $90.00 y No Increase StiilWinnino Ei •ht-1 hour classes $90.00 $90.00 y No Increase TRX Susnension Trainina Follr-1 hour classes New $44.00 y March 1 2019 Work It Four-1 hour classes New $44.00 y March 1, 2019 X-Fit Pickerina Four-1 hour classes New $44.00 y March 1. 2019 Fitness Registered -adult 55+ Nia 55+ Ten -1 hour classes $62.00 $65.00 y March 1, 2019 Keep Fit Ten - 1 hour classes $62.00 $65.00 y March 1, 2019 · Yoga 55+ Ten -1 hour classes $62.00 $65.00 y March 1, 2019 Yoga55+ Ten -50 minute classes $62.00 $62.00 y No Increase Zumba Gold 55+ Ten - 1 hour classes $62.00 $65.00 y March 1, 201.9 Cycle Fit 55+ Eight -30 minute classes $35.00 $35.00 y No Increase Aging Stronger Eight -1.5 hour classes $90.00 $90.00 y No Increase Forever Young Four-1-hour classes $60.00 $62.00 y March 1, 2019 Fit Fusion55+ Ten -50 minute classes $62.00 $65.00 y March 1, 2019 Stretch & Strengthen Ten-fhour classes $62.00 $65.00 y March 1, 2019 Stretch & Strengthen Ten -50 minute classes $62.00 $65.00 y March 1, 2019 Back to Basics Ten - 1 hour classes $62.00 $65.00 y March 1, 2019 Zumba Gold Toning Ten -1 hour classes New $65.00 y · March 1, 2019 Seated Zumba Gold Ten -1 hour classes New $65.00 y March 1, 2019 Ribbon Dance Fit · Ten -1 hour classes New $65.00 y March 1, 2019 Barre & Balance Ten - 1 hour classes New $65.00 y March 1, 2019 Chair Pilates Ten - 1 hour classes New $65.00 y March 1, 2019 Chair Yoga Ten -1 hour classes New $65.00 y. March 1, 2019 Cycle Pump Ten -45 minutes classes New $48.00 y March 1, 2019 Silver Strength Ten -1 hour classes New $65.00 Y. March 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee· (Excluding Fee (Exel. Effective Date HST) HST) (Y/N) Nia Silver Ten - 1 hour classes New $65.00 y March 1, 2019 Aquatic Programs Swim Preschool Ten -30 minute classes $95.00 $98.00 N September 1, 2019 Swim Kids 1-5 Ten -30 minute classes $95.00 $98.00 N September 1, 2019 Swim Kids 6-1 O Ten -45 minute classes $105.00 $108.00 N September 1, 2019 Summer Swim (DIP) Session Nineteen -45 minute classes $166.00 $166.00 N No Increase Youth Programs · Ten -45 minute classes $105.00 $108.00 N September 1, 2019 Canadian Swim Patrol Ten - 1 hour classes $102.00 $102.00 N No Increase Bronze Star Ten - 1 hour classes $117.00 $117.00 N No Increase Bronze Medallion & Emergency First Twenty~four hour program $230.00 $230.00 N No Increase Aid* Bronze Cross Twenty-four hour program $.180.00 $180.00 N No Increase NLS Forty hour program $298.00 $307.00 y September 1, 2019 Water Safetv Instructor Part 1 Eioht hours $238.94 $250.00 y Seotember 1 2019 Water Safety Instructor Part 2 20 hours $116.00 $122.00 y September 1, 2019 Lifesaving Society Instructors & 24 hours $195.oo· $200.00 y September 1, 2019 EmerQencv First Aid Society Withdrawal fee for Leadership Sixteen hours $37.00 $37.00 y No Increase Standard First Aid/CPR Sixteen hours $115.00 $120.00 y September 1, 2019 Standard First Aid/CPR (Staff) (New) Sixteen h~urs $77.00 $80.00 y September 1, 2019. SFA/CPR Recert (Staff) Eight hours $44.00 $45.00 y September 1, 2019 . CPR Six hours $56.00 $58.00 y September 1, 2019 CPR (Staff) Six hours $44.00 $45.00 y September 1, 2019 CPR Recert (Staff) Fciur hours $27.00 $28.00 y September 1, 2019 Aqua Adults . Ten -55 minute classes $105.00 $108.00 y September 1, 2019 Aqua Adults Ten -30 minute classes $90.00 $93.00 y September 1, 2019 Private Classes Ten -30 minute classes $289.00 $290.00 N September 1, 2019· Semi-Private Classes Ten -30 minute classes $176.00 $176.00 N No Increase Aquafit Ten -55 minute classes $89.00 $89.00 y No Increase Aquafit Twenty-55 minute classes $155.00 $155.00 y No Increase Aquafit Thirty-55 minute classes $232.00 $232.00 y No Increase Specialty Aquafit Ten -40 minute classes $76.00 $80.00 y September 1, 2019 Specialty Aquafit Twenty-40 minute classes $118.00 $120.00 y September 1, 2019 Aquafit Pay As You Go Add: Adult $13.00 $13.00 y No Increase Aquafit Pay As You Go Senior $7.00 $7.00 y No Increase 5 Pass $65.00 $65.00 y No Increase 10 Pass $130.00 $130.00 y No Increase Senior 5 pass $35.00 $35.00 y No Increase Senior 10 pass $70.00 $70.00 y No Increase Private 30 minutes · $31.00 · $31.00 N No Increase Youth Swim Fit 1 One Hour $105.00 $108.00 N September 1, 2019 Museum Education Outreach Pro~rams·(for students and non-students) (Per Student Fee) No HST for students/ HST for adults/seniors Weaving Wizards One - 2 hour class $5.75 $6.50 N/Y March 1, 2019 Buzzsaws & Building Blocks One - 2 hour class $5.25 $6.00 N/Y March 1, 2019 Wonderful Wool One -45 miriute class $4.00 $4.00 N/Y March 1, 2019 Thingamajigs One - 1 hour class $5.50 $5.50 ·N/Y March 1, 2019 Settlers Workshop One - 2 hour class $5.75 $6.00 N/Y March 1, 2019 Holiday Traditions Past & Present One - 2 hour class $5.75 $6.50 N/Y March 1, 2019 Fraktur One -2 hour class $5.75 $6.25 N/Y March 1, 2019 Sheep to Shawl One - 2 hour class $5.75 $6.25 N/Y March 1, 2019 Stunning Stencils One - 2 hour class $5.75 $6.50 N/Y March 1, 2019 Culture_ & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed ApjJlicable Proposed Fee (Excluding Fee (Exel. (Y/N) Effective Date HST) HST) Wordsmiths One - 2 hour class $5.75 $5.75 N/Y March 1, 2019 Museum Guest Soeaker Presentations 'Flat Rate Cost) Guest Speaker Presentations One -1 hour presentation $115.00 $119.47 y March 1 2019 Guest Speaker Presentations One - 2 hour presentation $235.00 $243.36 y March 1 2019 One - 1 hour production $250.00 $256.64. y March 1, 2019 . Pres~hool Programs Artful Toddler Twelve -1.25 hour classes $142.00 $146.00 N September 1, 2019 Kindergarten's Coming Twelve -2.25 hour classes $190.00 $195.00 N September 1, 2019 Exploring Math Twelve - 1 hour classes $112.00 $115.00 N September 1, 2019 Tots In Action Twelve -2 hour classes $157.00 $161.00 N September 1, 2019 Wiggles'n Giggles Twelve -45 minute ·classes $102.00 $105.00 .N September 1, 2019 Tum_ble Tots Twelve -45 minute classes $102.00 $105.00 N Septemb_er 1, 2019 Bouncin' Buddies Twelve -45 minute classes $102.00 $105.00 N September 1, 2019 Jumpin' Jax Twelve -1 hour classes $117.00· $120.00 N September 1, 2019 Junior.Gym Twelve -1 hour classes $117.00 $120.00 N September 1, 2019 Fun for Families Twelve -1 hour classes $133.00 $135.00 N September 1, 2019 Parent & Tot Skate Twelve -30 minute classes $87.00 · $90.00 N September 1, 2019 Pre School Skating I Twelve -30 minute classes $87.00 $90.00 N September 1, 2019 Pre School Skating II & Ill Twelve -45 minute classes $102.00_ $105.00 N September 1, 2019 Reading Rangers Twelve - 1 hour classes $112.00 $115.00 N September 1, 2019 Writing Wizards Twelve - 1 hour classes $112.00 $115.00 N September 1, 2019 Playtime for Little·Ones Twelve - 1 hour classes $112.00 $115.00 N September 1, 2019 Children & Youth Programs Creative Steps · Twelve -30 minute classes $70.00 $72.00 N September 1, 2019 Pre-Ballet Twelve -45 minute classes $88.00 $90.00 N September 1, 2019 Hip Hop Twelve -45 minute classes $88.00 $90.00 N September 1, 2019 Jazz Twelve -45 minute classes $88.00 $90.00 N September 1, 2019 Combo Dance (Jazz/HipHop) Twelve -45 minute classes $88.00 $90.00 N · September 1, 2019 Musical Theatre Twelve - 1 hour classes $92.00 $94.00 N September 1, 2019 Children's Art Ten -1.25 hour classes $82.00 $86.00 N September 1, 2019 Painting with Acrylics Eight -1.25 hour classes $82.00 $84.00 N September 1, 2019 Youth Art (does not include supplies) Ten-1.5 hour classes $72.00 $75.00 N September 1, 2019 Home Alone Four-1.5 hour classes $47.00 $50.00 N September 1, 2019 BreakdancinQ • T ery -1 hour classes $67.00 $70.00 N September 1, 2019 Children'sffeen Guitar-Level 1 Eight -1 hour classes $77.00 $80.00 N September 1, 2019. Karate Four months-· 1 hour classes $170.00 $175.0Q N September 1, 2019 Badminton Twelve - 1 hour classes $82.00 $85.00 N September 1, 2019 Basketball Fundamentals Ten -1 hour $68.00 ; $70.00 N September 1, 2019 Recreational Basketball Clinic Six - 2 hour classes $52.00 $56.00 N September 1, 2019 Ball Hockey Ten -1.5 hour classes $67.00 $70.00 N September 1, 2019 High Five 15+ One Day -7 hour class $76.56-$76.56 · y No Increase Indoor Games Ten -1.5 hour classes $67.00 $69.00 N September 1, 2019 Table Tennis Ten -1.5 h6ur classes $83.00 $87.00 N September 1, 2019 Cookina for Teens Eich! -1.5 hour classes $85.00 $75.22 N Seotember 1. 2019 Sona Writina & Performance 18+ Ten -1.5 hour classes $100.00 $100.00 y No Increase Life Skills For Kids Ten - 2 hour classes $70.00 $70.00 .N No Increase. Lego Club. Ten ~ 1 hour classes New $42.00 . N September 1, 2019 Speed & Agility Training Ten -1.5 hour classes New $110.00 N September 1, 2019 Job Prep Course Eioht -3 hour classes New $110.00 y September 1. 2019 Mother/Daughter Hip Hop Twelve:. 45 minute classes $88.50 $88.50 y No Increase Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. Effective Date HST\ HSTl (Y/N) M/D Hip Hop (2nd child) Twelve -45 minute classes $44.00. $44:0b N No Increase Tap· Twelve -30 minute cl~sses $68.00 $68.00 N No Increase Cirque d'Kids/Girls Gym Twelve -1.25 hour classes $124.00 $129.00 N September 1, 2019 Teen Cake Decorating · Ten - 1 hr classes $52.00 $52.00 N No Increase Recreation Basketball Clinic -winter 10 - 2 hour classes $67.00 $70.00. N September 1, 2019 Youth Volleyball Ten -1.5 hour classes ~ $83.00 $86.00 N September 1, 2019 Learn to skate Twelve -45 minute classes $102.00 $102.00 N No Increase Kids Baking Six -1.5 hour classes $101.00 $104.00 N September 1, 2019 Sewing & Needlework Eight - 1 hour classes $68.00 $68.00 N No Increase Friday Night Fun Centres Friday Nights -2 hours $5.25 $5.50 N September 1, 2019 Holiday Fun One -3.5 hour classes $22.00 $23.00 N September 1, 2019 Electronics & Robotics Eight -1.5 hour classes $170.00 $175.00 N September 1, 2019 Electronics & Robotics II Eight -1.5 hour classes New $185.00 N September.1, 2019 Kids Gym Club Twelve - 1 hour classes New $119.00 N September 1, 2019 Sculpting for Kids Nine-: 1.5 hour classes New $166.00 N September 1, 2019 P&C Badminton Eight - 1 hour classes · New $187.00 N September 1, 2019 P&C Basketball Eight - 1 hour classes New $112.00 N September 1, 2019 2nd child -Badminton/Basketball E;ight - 1 hour classes New . $56.00 N September 1, 2019 Dodgeball / Pickleball Eight - 1 hour classes New $80.00 N September 1, 2019 Contemporary 13 -·15 yrs Eight - 1 hour classes New $73.00 y September 1, 2019 Hip Hop 13-16 yrs Teri -1 hour classes New $90.00 y September 1, 2019 Dance Without Limits (10-12yrs) Ten-45 minute classes New $83.00 N September 1, 2019 Dodgeball 13 -16 yrs Ten - 1 hour classes New $70.00 y September 1, 2019 After School Drop In Program 9 month program -drop in/ hour New $15.00 + $5.50 .N September 1, 2019 Adult Programs Art/ Acrylic Ten - 2 hour classes $90.27 $90.27 .Y September 1, 2019 Art -Portrait Figure DraWing Ten - 2 hour New $92.92 y September 1, 2019 Learn to Draw/Improve Ten - 2 hour New $92.92 y September 1, 2019 Traditional Oil Painting Ten - 2 hour New $92.92 y September 1, 2019 Paint Like A Pro One -2 hour New $20.35 y September 1, 2019 Pottery Handbuilding .. Ten - 3 hour -New $257.52. y September 1, 2019 Pottery Wheel Ten - 3 hour New $257.52 y September 1, 2019 Adult Guitar Eight-1 hour classes $69.91 $71.68 y September 1, 2019 Ballroom Dance -Beginner . Ten -1 hou.r classes $57.52 $60.18 y September 1, 2019 Ballroom Dance -Intermediate Ten -1.5 hour classes $84.07 $88.50 y September 1, 2019 Bellydance . Twelve -1 ~our classes $81.42 $84.96 y September 1, 2019 Ladies Tap Twelve -1 hour classes $81,42 $84.96 y September 1, 2019 Line Dancing Eight - 1 hour $61.95 $84.96 y September 1, 2019 Spanish, Beginner/Int. Ten -2 hour classes $81.42 $84.96 y September 1, 2019 Karate Four months -1.5 hour classes $208.85 $216.81 y September 1, 2019 Skating Twelve -45 minute classes $92.04 $94.69 y September 1, 2019 Men's Power Hour Twelve -1 hour classes $62.83 $65.49 y September 1, 2019 Badminton Twelve -1.~ hour classes $94.69 $97.35 y September 1, 2019 Volleyball, Competitive Ten - 2 hour classes $103.54 $107.08 y September 1, 2019 Volleyball, Recreation Twelve -1.5 hour classes $94.69 $97.35 y September 1, 2019 Digital Camera WS's One - 2 hour class $27.43 $27.43 y September 1, 2019 Cake Decoiating Eight -1.5 hour classes New $77.88 y. September 1, 2019 Essential Oils Six -2 hour classes New $113.00 y September 1, 2019 Older Adult Programs 55+ Da11ce Twelve -1 hour classes $44.25 $45.13 y September 1, 2019 55+ Dance Ten -1 hour classes $37.17 $38.05 y September 1, 2019 Art Classes Ten - 2 hour classes $49.56 $51.33 y September 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge -Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. Effective Date HST\ HST\ (Y/N) Sewing (includes all eight week classe~\ · Eight - 2 hours classes $45.13 $46.01 y September 1, 2019 Euchre Six -2 hour classes $36.28 $38.05 y September 1, 2019 Computers Six - 2 hour classes · $53.09 $54.87 y September 1, 2019 Guitar Ten -1 hour .New $61.95 y September 1, 2019 Learn to play pool Ten -1 hour New $35.40 y September 1, 2019 Learn to Skate Ten - 1 hour classes $37.17 $38.05 y September 1, 2019 Spanish (all levels) Tell -2 hour classes $42.48 $44.25 . y September 1, 2019 Pickleball Ten - 2 hour ·classes $48.67 $48.67 y September 1, 2019 Volleyball T6n - 1 hour classes $48.67 $50.44 y September 1; 2019 Cooking Six -1.5 hour $57.52 $57.52 y No Increase Tai Chi Ten - 1 hour classes $26.10 $29.20 y September 1, 2019 American Sign Language Ten -1 hour $36.28 $38.05 y September 1, 2019 Photography 55+ Eight-2 hour New $50.44 y Septembe, 1, 2019 lpad / Computer Tech Programs Six-2 hour New $53.98 y September 1, 2019 Badminton Ten -2_ hour New $50.44 y September 1, 2019 Bridge (all levels) Ten -2.5 hour $39.82 $41.59 y September 1, 2019 Workshops Life Writing One - 2 hour class $14.16 $14.16 y No Increase Sewing Workshops Two - 2 hour classes $22.12 $22.12 y No Increase Hockey 101 Workshop Two -1.5 bour classes $8.85 $8.85 y No Increase Floral Creations One - 2 hour class New $57.52 y September 1, 2019 Jewelry Creations One -2.5 hour class New $48.67 y September 1, .2019 Paint Like a Master Workshop One -2 hour class New $22.12 y September 1, 2019 Museum Programs Kids in the Village Summer Craft & One -·2 hour class $10.00 $10.00 y No Increase Games Proaram Mother's Day Tea Qne -1.5 hour sitting $24.00 $24.78 y September 1, 2019 Summer Solstice/Harvest Suppers One - 3 hour class $57.00 $58.41 y March 1, 2019 Heritaae Cookinn Workshon One - 3 hour class $28.00 $29.20 y March 1 2019 Heritane Cookinn Workshon One -5 hour class $48.00 $49.56 y March 1 2019 PMV Workshop One - 3 hour class $20.00 $20.00. y No Increase Themed Tea Workshop One -2 hour presentation $30.00 · $30.97 y March 1, 2019 Give ita Tn, One -2 hour class $10.00 $10.00 y No Increase Camps March Break Camp (Arts/Sports/Mini/Skate) Extend a Camp· Five days $80.00 $84.00 N September 1, 2019 Full Day Program Five days $200.00 $210.00 N September 1, 2019 Junior Chef Camp ·Five Days $252.00 .$252.00 N No Increase Breakdance Camp Five Days $198.00 $210.00 N September 1, 2019 Summer camps -Extend-a-Camp 4 Days $65:00 $68.00 N September 1, 2019 5 Days $80.00 $84.00 N September 1, 2019 Summer Camps -Adventure/Art/Sports/Mini Pidaca/Museum . Full Day Program Four days $160.00 $170.00 N September 1, 2019 Five days $200.00 $210.00 N September 1, 2019 Summer Camps -Dance/Drama & Junior Firefighter Full Day Program Four days $175.00 $185.00 N-September 1, 2019 Five days $220.00 $230.00 N September 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge · Fee Proposed Applicable Propos.ed Fee (Excluding Fee (Exel. Effective Date HST\ HST\ (Y/N) Specialty Arts Camp Four.days New $194.00 N September 1, 2019 Five days New $244.00 N September 1, 2019 Counsellor in Training Ten days $307.00 $312.00 N September 1, 2019 Assistant Counsellor Minimum 4 weeks $115.04 $123.90 y September 1, 2019 PA Day Camps One Day $40.00 $42.00 N September 1, 2019 PA Day Camps Extended Care One Day $16.00 $16.00 N· No Increase Museu~ Interpreter in Training Minimum4 $315.00 $315.00 y · No Increase Contract Camps Skateboard Camp $177.00 $161.06 y September 1, 2019 Memberships: Pickering Recreation Complex * Pre Expansion Memberships * Health Club Adult, daytime Annu<?,I $506.00 $506.00 y No Increase * Racquetball Adult ' Daytime, Annual $511.00 $536.00 y September 1, 2019 * Combination Adult Full, Annual $700.00 $735.00 y September 1, 2019 Adult, grandfather, full, corp Annual $561.00 $590.00 y September 1, 2019 Night Hawk Annual $254.00 $267.00 y March 1, 2019 * Tennis Adult Resident, Daytime, Annual $515.00 $542.00 ·y September 1, 2019 * Tennis Adult Non-resident, Daytime, Annual $607.00 $638.00 y September 1, 2019 * Golden Adult Full, Annual $1,326.00 $1,395.00 y September 1, 2019 Adult· Daytime, Annual $1,134.00 $1,190.00 y September 1, 2019 New Expansion Memberships Basic Health Adult Annual $438.00 $438.00 y No Increase Adult Seasonal · $197.00 $197.00 y No Increase Adult Corporate $350.00 $350.00 y No Increase Youth Annual $260.00 $265.00 y September 1, 2018 Youth Seasonal $117.00 $120.00 y September_1, 2018 Family Annual $920.00 $936.00 y September 1, 2018 Health+ Adult Annual $645.00 $645.00 y No Increase Adult Seasonal $290.00 $290.00 y No .Increase Adult Corporate $516.00 $516.00 y No Increase · Youth Annual $310.00 $322.00 y September 1, 2019 Youth Seasonal $140.00 $145.00 y September 1, 2019 Family Annual $1,278.00 $1,289.00 y September 1, 2019 Student Annual $323.00 $516.00 . y September 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Appli.cable Proposed Fee {Excluding Fee {Exel. {Y/N) Effective Date HSTl HST) Basic Squash Adult Annual $567.00 $567.00 y No Increase Seasonal $255.00 $255.00 y No Increase Adult corporate Annual $454.00 $454.00 y No Increase Youth Annual $231.00 $255.00 y September 1, 2019 Seasonal $104.00 $114.00 y S_eptember 1, 2019 Family Armual $1,082.00 $1,104.00 y September 1, 2019 Squash+ Adult Annual $710.00 $710.00 y No Increase Adult Seasonal . $320.00 $320.00 y No liicrease Adult Corporate . $568:00 $568.00 y No Increase Youth Annual $336.00 $355.00 y September 1, 2019 Youth Seasonal $151.00 $160.00 y September 1, 2019 Family Annual $1,491.00 $1,420.00 y September 1, 2019 Student Annual $355.00 $568.00 y Septe_mber 1, 2019 Basic Racquetball Adult Annual $515.00 $515.00 y No Increase S_easonal $232.00 $232.00. y No Increase Adult corporate Annual $412.00 $412.00 y No Increase Youth Annual $231.00 $231.00 .Y No Increase Seasonal $104.00 $104.00 y No lilcrease Family Annual $1,004.00 $1,004.00 y NO Increase Racquetball + Adult Annual $646.00 $646.00 y No Increase Adult Seasonal $291.00 $291.00 y No Increase Adult Corporate $517.00 . $517.00 y No Increase Youth Annual $336.00 $336.00 y No Increase Youth Seasonal $151.00 $151.00 y No·lncrease Family Annual $1,305.00 · $1,305.00 y No Increase Basic Tennis {Resident) Adult Resident Annual $540.00 $567.00 y September 1, 2019 Resident Seasonal $243.00 $255.00 y September 1, 2019 Youth Resident Annual $242.00 $255.00 y · September 1, 2019 Resident Seasonal $109.00 $114.00 y September 1, 2019 Fainily Resident Annual $1,052.00 $1,104.00 y September 1, 2019 Tennis + (Resident) Adult Resident Annual $714.00 $714.00 y No Increase Resident Seasonal $321.00 $321.00 y No Increase Youth Resident Annual $347.00 $355.00 y September 1, 2019 Resident Se~sonal . $156.00 $160.00 y September 1, 2019 Family Resident Annual $1,418.00 $1,420.00 y September 1, 2019 Basic.Tennis (Non-Resident) Adult Non-resident Annual $615.00 $646.00 y September 1, 2019 Non-resident Seasonal $277.00 $290.00 y September 1, 2019 Youth Non-resident Annual $268.00 $323.00 y September 1, 2019 Non-resident Seasonal $121.00 $145.00 y September 1, 2019 Family Non-resident Annual $1,191.00 $1,292.00 y September 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. Effective Date HSTl HSTl (YIN) Tennis+ (Non-Resident) Adult Non-resident Annual $788.00 $827.00 y September 1, 2019 Non-resident Seasonal $355.00 $372.00 y September 1, 2019 Youth Non-resident Annual $373.00 $414.00 y September 1, 2019 Non-resident Seasonal $168.00 $186.00 y September 1, 2019 Family Non-resident Annual $1,555.00 $1,655.00 y September 1, 2019 Golden Adult Annua! $1,622.00 $1,670.00 y September 1, 2019 Adult Seasonal $730.00 $751.00 y September 1, 2019 Adult Corporate $1,298.00 $1,336.00 y September 1, 2019 Youth Annual $556.00 $611.00 y September 1, 2019 Youth Seasonal $250.00 $275.00 y September 1, 2019 Family Annual $2,989.00 $3,115.00 y September 1, 2019 Fitness Class Memberships Basic Fitness Adult Annual $447.00 $447.00 y No Increase Adult Seasonal $200.00 $200.00 y No Increase Youth Annual $265.00 $265.00 y No Increase Youth Seasonal $120.00 $120.00 y No Increase Family Annual $936.00 $936.00 y No Increase Fitness+ Adult Annual $549.00 $549.00 y No Increase . Adult Seasonal $247.00 $247.00 y No Increase Memberships: Pickering Rec. Complex and Dunbarton Indoor Pool Aquatic Memberships Adult Annual $184.00 $189.00 y March 1, 2019 Family Annual $313.00 $322.00 y March 1, 2019 Youth/Disabled/Senior Annual $123.00 $127.00 y March 1, 2019 Adult Seasonal $82.00 $82.00 y No Increase Family Seasonal $117.00 $120.00 y March 1, 2019 Youth/Disabled/Senior Seasonal $52.00 $52.00 y No Increase Aquatic+ Adult Annual $310.00 $310.00 y No Increase Youth/Disabled/Senior Annual $195.00 $195.00 y No Increase Adult Seasonal $170.00 $170.00 y No Increase Youth/Disabled/Senior Seasonal $107.00 $107.00 y No Increase Admissions & Passes Pickering Museum Village Season Pass Family/Daycare (2 adults, 5 children) $75.22 $75.22 y No increase· Season Pass Twin (1 adult, 1 guest) $48.67 $48.67 y No increase Admissions & Passes Fitness Admissions Fitness Room Single Admission $12.00 $12.00 y No Increase Fitness Room Five Pass $60.00 $60.00 y No Increase Studio A, B, C Aquafit One and half class $18.00 $18.00 y No Increase Studio A, B, C Aquafit Drop in Non-Member $12.50 $12.50 y No Increase Registered Group Fitness Programs-· Non Members $12.50 $12.50 y No Increase Drop-In Pricing Culture & Recreation 2018 Current 2019 HST User Fee or Charge· Fee Proposed Applicable Proposed Fee (Excluding Fee {Exel. Effective Date HSTl HSTl (Y/N) Registered Group Fitness Programs -For Specialty Health Members $3.50 $3.50 y No Increase Drop-In Pricing Arena Admissions Public Skating Single Admission -Youth $3.54 $3.54 y No Increase Ten Pass -Youth $26.55 $26.55 y No Increase Single Admission -Adult $4.42 $4.42 y No Increase Ten Pass -Adult $35.40 $35.40 y No Increase . Family Pass $13.27 $13.27 y No Increase Family 1 o -Pass $75.22 $75.22 y No Increase Parent & Tot Single Adult Admission .$2.6q $2.66 y No Increase .Non Prime Time Skate Single Admission $1.33 $1.33 y No Increase Shinny Single Admission $4.43 $4.43 y No Increase Twentv Pass $72.56 $72.56 y No Increase Special Promotion (Toonie Skate) $1.77 $1.77 y . No Increase (Family Day Skate) Youth Single $1.77 $1.77 y No Increase Family Single $4.43 $4.43 y No Increase Racquet Sports Admissions Squash/Racquetball Prime Time $14.00 $14.00 y No Increase Non-prime Time $11.00 $11.00 y No Increase Tennis Prime Time $34.50 $34.50 y No Increase Non-prime Time $27.50 $27.50 y No Increase Family Day Activity Passport $15.75 $20.00 y September 1, 2019 Swimming Admissio~s Youth/Senior/Disabled Single Admission $2.88 $2.88 y No Increase Youth/Senior/Disabled . Ten Pass $23.90 . $23.90 y No Increase Adult Single $4.43 $4.43 y No Increase Adult Ten Pass $35.40 $35.40 y No Increase Family Single $8.85 $9.25 y September 1, 2019 Family Ten Pass $72.57 $76.00 y September 1, 2019 Museum Admissions -General Publjc Admissions Adults Single Admission $7.96 $8.85 y March 1, 2019 StudenVSenior Single Admission $7.08 $7.97 y March 1, 2019 Children Single Admission $5.75 $6.20 y March 1, 2019 Family Single Admission -$23.01 $26.55 y March 1, 2019 Museum Admissions -Education Tours School Tours -Intro to Pioneers Half day, per student $8.00 $8.25 N March 1, 2019 School Tours -Winter Celebrations Half day, per student . $9.00 $9.25 N March 1, 2019 · School Tours -Community Connections Half day, per student $8.25 $8.50 N .March 1, 2019 School Tours -School Days Half day, per student $8.00 $8.25 N March 1, 2019 School Tours -Wonderful Wool Half day, per student $8.00 $8.25 N March 1, 2019 School Tours -Candlemaking Full day, per student $15.75 $16.25 N March 1, 2019 School Tours -Weaving Full day, per student $13.75 $14.25 N March 1, 2019 School Tours -Con_flict and Change . Full day, per student $14.25 $14.75 N March 1, 2019 School Tours -Toys, Games and Leisure Activities Full day, per student $12.25 $14.00 N March 1, 2019 School Tours -Stencilling Full day, per student $12.25 $14.00 N March 1, 2019 School Tours -BlacksmithinQ Full dav. oer student $15.25 $15.25 N No increase A Soirit Walk Student Perform·ance / Educ. lesson $10.50 $11.00 N March 1 2019 School Tours -Undemround Railroad Full dav, per student $14.25 $14.75 N March 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. Effective Date HSTl HSTl (Y/N) Museum Admissions -Public Booked Tours Public Booked Tours 2 hrs, ner nerson $8.00 $8.85 y March 1, 2019 Rental Fees: Pickering Rec. Complex·and Don Beer Arena Ice Rental Rates Pickering Youth Affiliate Hourly rate, prime time $182.00 $188.00 y September 1, 2019 Hourly rate, non-prime time $135,25 $135.00 y September 1, 2019 · Adults & Residents Affiliate Hourly rate, prime time $225.00 $232.00 ·y September 1, 2019 Hourly rate, non-prirhe time . $160.00 · $165.00 y September 1, 2019 Non-Resident ·Hourly rate, prime'time $241.75 $250.00 y September 1, 2019 Hourly rate, non-prime time $189.75 $190.00 y September 1, 2019 Elementary Schools Hourly rate, prime tilTle . $182.00 $188.00 y September 1, 2019 Hourly rate, nori-prime time $63.00 $65.00 y September 1, 2019 High School. Hourly rate, prime time $204.00 $205.00 y September 1, 2019 Hourly rate, non-prime time $63.00 $65.00 y September 1, 2019 Industrial/Commercial Hourly rate, prime time $218.75. $232.00 y September 1, 2019 Hourly rate, non-prime time $161.00 $165.00 y September 1, 2019 Summer Ice (Hourly prime time) New $225.00 y January 1, 2019 Summer Ice (Hourly non-prime time) New $160,00 y January 1, 2019 Pad Rental Leagues Hourly rate $83,00 $85.00 y March 1, 2019 · · General Flat rate, full day $1,876.00 $1,932.00 Y. March 1, 2019 General Hourly rate $88.00 $91.00 y March 1, 2019 Day-Camp Use (Weather related) Hourly rate $13.25 $14.00 y March 1, 2019 Pickering Museum Village Herita_ge Buildings & Sp~ces (rentals available from April to October, before dusk) Resident Flat rate, 3 hours day of rental New $530.00 y March 1, 2019 Non-Resident Flat rate, 3 hours day of rental New $575.00 y March 1, 2019 Resident· Flat rate (8 hours max) New $795.00 y March 1, 2019 Non-Resident Flat rate (8 hours max) ~ New $915.00 y March 1, 2019 Community Group Flat.rate, max. 4 hours (during office New $140.00 y March 1, 2019 hours' Rentals -additionS!I staff Hourly rate required for additional staffing $38.00 $40.00 ·y March 1, 2019 requirements or on Stat Holidays at large bookings/private event.s or on .Stat Holidays Grounds for Photos lrentals availab1e·trom Anril to October, before dusk\ Resident Flat rate, 2 hours day of rental $105.00 $155.00 y March 1, 2019 Non-Resident Flat rate, 2 hours day of rental $124.00 $175.00 y · March 1, 2019 Photography Club Flat rate, max. 4 hours (public hrs.) $133.00 $140.00 y March 1, 2019 . Pickering Rec. Complex & Dunbarton Indoor Pool Pool Rentals Private Rental -Rec Complex Hourly rate, max 19 (RC) $114.00 $120.00 y March 1, 2019 · Private Rental -Dunbarton Pool Hourly rate, max 1'9 (DIP) $102.00 $107.00 y March 1, 2019 Private Rental -Rec Complex Hourly rate, max 50 (RC) $138.00 $145.00 y March 1, 2019 Private Rental Hourlv rate, max 50 IDIP\ $120.00 $126.00 y March 1, 2019 Minor Sport Group Hourly rate (RC) $72.12 $76.00 y March 1, 2019 Minor Sport Group Hourly rate (DIP) $75.66 $80.00 y March 1, 2019 Extra Lifeguard Hourly rate $27.30 $29.00 y March 1, 2019 Culture & Recreation . 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee . (Excluding Fee (Exel . (Y/N) Effective Date HST) HST) Instructor ' Hourly rate $31.00 $33.00 . y March 1, 2019 Board of Education Hourly rate $68.14 $72.00 y March 1, 2019 Swim Meet Hourly rate . $141.00 $148.00 y March 1, 2019 Pickering Rec. Complex FaCilities Mat Room Off Court Training Hourly rate $26.00 $27.00 y .March 1, 2019 Martial Arts Hourly rate $31.50 $33.00 y March 1, 2019 After Hour Tennis Rentals F9ur Courts Hourly rate $120.00 $126.00 y March.1, 2019 Pool & Fitness Meeting Room: . Swim Party Rental Flat rate, 1.5 hours· $41.00 $43.00 y March.1, 2019 Meeting Room 1 Resident· Flat rate, whole day $173.00 $178.00 y March 1, 2.019 Non-resident Flat rate, whole day $220.00 $220.00 ·y No Increase Residen.t Hourly rate $33.b0 $35.00 y March 1, 2019 Non-~sident Hourly rate $47.00 $47.00 y No Increase Daytime, busin~ss, resident Flat rate, business hours $110.00 $115.00 y March 1, 2019 Qaytime, business, non-resident Flat rate, business hours · $147.00 $147.00 y No Increase Community Group Flat rate, max. 4 hours $37.00 $40.00 y March 1, 2019 Meeting Room~ 1 & 2 Resident Flat rate, whole.day $278.00 $286.00 y March 1, 2019 Non-resident Flat rate, whole day $378,00 $378.00 y No Increase Resident Hourly rate $49.00 $55.00 y March 1, 2019 Non-resident Hourly rate $68.00 $68.00 y No Increase . Daytime, business, resident Flat rate, business hours $154.00 $154.00 y No Increase Daytime, bu~iness, non-resident Flat rate, business hours $194.00 $194.00 y No Increase Community Group Flat rate, max. 4 Hours $68.00 $70.00 y March 1, 2019 Meeting Rooms 1, 2 & 3 Resident Flat rate, whole day $450.00 $450.00 y No Increase Non-resident Flat rate, whole day $567.00 $567.00 y No Increase Resident Hourly rate $71.00 $75.00 y March 1, 2019 Non-resident Hourly rate $94.00 $94.00 y No Increase Daytime, business, resident Flat rate, business hours $215.00 $215.00 y No Increase Daytime, business, non-resident Flat rate, business hours $284.00 $284.00 y No Increase Community Group Flat rate, max. 4 hours $73.00 $77.00 y March 1, 2019 New Year's Eve, resident Flat rate, whole day $903.00 $950.00 y March 1, 2019 O'Brien Meeting Room A or B Resident Flat rate, whole day $236.00 $243.00 y March 1, 2019 Non-resident .Flat rate, whole day $304.00 $304.00 y No Increase Resident Hourly rate $49.00 $52.00 y March 1, 2019 Non-resident Hourly r.at!3 $47.00 $57.00 y March 1, 2019 Daytime, business, resident Flat rate, business hours $104.00 $109.00 y March 1, 2019 Daytime, business, non-resident Flat rate, business hours $147.00 $147.00 y No Increase Community Group Flat rate, max. 4 hours $42.00 $44.00 y March 1, 2019 O'Brien Meeting Rooms A & B . Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee(Excl. (Y/N) Effective Date HSTl HSTl Resident Flat rate, whole day $483.00 $507.00 y March 1, 2019 Non-resident Flat rate, whole day $593.00 $620.00· y No Increase Resident Hourly rate $100.00 $105.00 y No Increase Non-resident Hourly rate $131.00 $131.00 y No Increase Daytime, business, resident Flaf rate, business hours $214.00 $225.00 y ·March 1, 2019 Daytime, business, non-resident Flat rate, business hour5; $289.00 $289.00 y No Increase Tournament bookings Flat rate, per day $241.00 $241.00 y No Increase Community. Group Flat rate, max. 4 hours $73.00 $77.00 y March 1, 2019 New Year's Eve Flat rate, whole day $960.00 $1,008.00 y March 1, 2019 Pickering Rec. Complex East or West Salon Resident Flat rate, whole day (Monday -Sunday) $725.00 $754.00 y March 1, 2019 Non-resident Flat iate, whole day (Monday -Sunday) $945.00 $945.00 y No Increase Su~day, resident Flat rate, daytime $470.00 $520.00 y March 1, 2019 Sunday, non-resident Flat rate, daytime $595.00 $595.00 y No Increase Children's Banquets Flat rate, max. 4 hours $155.00 $170.00 y March 1, 2019 New Year's Eve, resident Flat rate, whole day $1,659.00 $1,659.00 y No Increase New Year's Eve, non-resident Flat rate, whole day $1,827.00 $1,827.00 y -No Increase Special Events Musical Flat rate, resident/community grbup $1,916.00 $1,916.00 y No lncre·ase Resident 1 /2 Day Flat rate, max. 6 hours $367.00 $385.00 Y. March 1, 2019 Non-resident 1/2 Day Flat rate, max. 6 hours $488.00 $488.00 y Na Increase· Pickering Recreation Complex East & West Salons (Both· Ro!)ms) Resident Flat rate, whole day (Monday -Sunday) $1,344.00 · $1,344.00 y No Increase Nan-resident Flat rate, whole day (Monday -Sunday) $1,748.00 $1,748.00 y NO Increase Sunday, resident Flat rate (daytime) $850.00 $892.00 y March 1, 2019 Sunday, non-resident Flat rate (daytime) $1,039.00 $1,039.00 y No Increase New Year's Eve, resident Flat rate $2,514.00 $2,514.00 y Np lricr~ase New Year's Eve, non-resident Flat rate $2,767.00 $2,767.00 y No Increase Special Events Musical Flat rate -resident/community group only $3,832.00 $3;832.00 y No Increase Entertainment/Private Concerts 1Newl~ Deposit $656.00 $656.00 y No Increase Resident 1 /2 Day Flat rate, max. 6 hours $698.00 $732.00 y March 1, 2019 Non-resident 1/2 Day Flat rate, max. 6-hours $850.00 $850.00 y Na Increase Georg"e Ashe Community Centre ~ Paris or Franklin Meeting Room Resident Flat rate $378.00 $390.00 y March 1, 2019 Non-resident Flat rate $572.00 $572.00 y No Increase Daytime, business, resident Flat rate $108.00 $113.00 y March 1, 2019 Daytime, business, nan-resident Flat rate $131.00 $131.00 ·Y No Increase Community Group Flat rate $31.00 $33.00 y March 1, 2019 Resident Hourly rate $49.00 $52.ob y March 1, 2019 Non-resident Hourly rate $84.00 $84.00 y No Increase After School Admissions $40.00 $40.00 N No Increase Paris & Franklin Meeting Rooms Resident Flat rate $688.00 $708.00 y March 1, 2019 Non-resident Flat rate $892.00 $935.00 y No Increase Daytime, business, resident Flat rate $193.00 $199.00 y March 1, 2019 Daytime, business, non-resident Flat rate $273.00 $273.00 y No Increase Community Group Flat rate $31.50 $33.00 y March1,2019 · Resident Hourly rate $88.00 $97.00 y March 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel. Effective Date HSTl HSTl (Y/N) Non-resident Hourly rate $120.00 $120.00 y No Increase New Year's Eve, resident . Flat rate $1,386.00 $1,455.00 y March 1, 2019 Children's Banquets, resident Flat rat~, resident/cqmmunity group· $137.00 $150.00 Y· March 1, 2019 Don Beer Banquet Han Resident Flat rate $567.00 $567.00 y No Increase Non-resident Flat rate $598.00 $598.00 y No Increase Daytime, business, resident Flat rate · $209.00 $220.00 y No Increase Daytime, business, non-resident Flat rate $173.00 $173,00 y No Increase Sunday to Thursday, resident Hourly rate $61.00 $64.00 y No Increase Sunday to Thursday, non-resident Hourly rate $63.00 $63.00 y No Increase Sunday, resident Flat rate (daytime) $399.00 $399.00 y No Increase Sunday, non-resident Flat rate (daytime) $546.00 $546.00 y No Increase Children's Banquets (Community Flat rate $144.00 $151.00 y March 1, 2019 Group Only) Tournament Rate Flat rate, daily, Don Beer only $273.00 $273.00 y No Increase New Year's Eve, resident Flat rate . $1,092.00 $1,146.00 y March 1, 2019 New Year's Eve, non-resident · Flat rate $1,335.00 $1,335.00 y No Increase West Shore Community Centre Resident Flat rate· $725.00 $725.00 y No Increase Non-resident Flat rate $945.00 $945.00 y No Increase Daytime, business, ·resident Flat rate $199.00 $205.00 y March 1, 2019 Daytime, business, non-reside.nt Flat rate $284.00 $295.00 y March 1, 2019 Sunday to Thursday, resident Hourly rate $93.00 $93.00 y No Increase Sunda" to Thursda" non-resident . Hourlv rate $126.00 $126.00 y No Increase Friday, resident Flat rate $546.00 $546.00 y No Increase Fridav non-resident Flat rate $708.00 $708.00 y No Increase Children's Banquets (Community Flat rate $144.00 $150.00 y March 1, 2019 Groun Onlv\ NewYea~s Eve, resident Flat rate $1,470.00 $1,543.00 y March 1, 20_19 New Year's Eve, non-resident Flat rate $1,780.00 $1,780.00 y No Increase East Shore Community Centre Room 2 or Room4 -Meeting · Resident Hourly rate $32.00 $34.00 y March 1, 2019 Non-Resident Hourly rate $48.00 $48.00 y No Increase Gymnasium -Meeting/Sports Resident Hourly rate $48.00 $51.00 y March 1, 2019 Non-Resident Hourly rate $58.00 $58.00 y No Increase Room 2 and Room 4 -Social Resident Flat rate $252.00 $260.00 y March 1, 2019 Non-Resident Flat rate ' $347.00 $347.00 y No Increase New Years Eve -Resident Flat rate $509.00 $535.00 y March 1, 2019 New Years Eve -Non-Resident Flat rate $698.00 $698.00 y No Increase Gymnasium -Social Resident Flat rate $540.00 $556.00 y March _1, 2019 Non-Resident Flat rate $661.00 $661.00 y No Increase New Year's Eve, resident Flat rate $1,040.00 $1,092.00 y March 1, 2019 New Year's Eve, nqn-resident Flat rate $1,270.00 $1,270.00 y No Increase COmmunity Room Daily Flat rate $336.00 $353.00 y March 1, 2019 Meeting -Resident Hourly rate $40.00 $42.00 y March 1, 2019 Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applic.able Proposed Fee (Excluding · Fee (Exel. (Y/N) Effective Date HSTl HSTl Meeting -Non-Resident Hourly rate $47.00 $50.00 y March 1, 2019 Social -Resident Hourly rate $63.00 $66.00 y · March 1, 2019 Social -Non-Resident Hourly rate $74.00 $74.oo· y No Increase Rental Extra Fees Listing Community Groups · 12 bookings $144.00 $150.00 y March 1, 2019 Administration Fee $40.00 $40.00 y No ·increase Maintenance Fee Hourly rate $31.00 $33.00 y No Increase De1mage/Security Deposit $300.00 $300.00 y No Increase . Damage/Security Deposit (Jack & Jill $500.00 $500.00 y No Increase Parties) (Refundable) New Staff Overtime for Event Hourly rate $60.00 $60.00 y March 1, 2018 (earlyAate opening) · Performing Rights Tariff Without Flat rate (301 -500 capacity) $61.69 $61.69 y No Increase Dancing -Banquet Hall Performing Rights Tariff Without Flat rate (1 -101 capacity) $20.56 $20.56 y No Increase Dancing -George Ashe Community Centre Paris Room, George Ashe Community Cen'tre Franklin Room, O'Brien Room A, 0 1Bri8n Room B, East Shore Community Centre Community Room, East Shore Community Centre.Room #2 and East Shore Community Centre Room #4 Performing Rights Tariff Without Flat rate (101 -300 capacity) $29.56 $29.56 .Y No Increase Dancing -West Salon, East Salon, O'Brien Rooms, Don Beer, Westshore Community Centre, George Ashe Community Centre Banquet Hall and East Shore Community Centre Gymnasium Performing Rights Tariff With Dancing -Banquet Hall Flat rate (301 -500 capacity) $123.38 $123.38 y No Increase · Performing Rights Tariff With Dancing -George Ashe Community Flat rate (1 -101 capacity) $~1.13 $41.13 y No Increase Centre Paris Room, George Ashe Community Centre Franklin Room, O'Brien Room A, O'Bri~n Room B, East Shore Community Centre Community Room, East Shore Community Centre Room #2 and East Shore Community Centre Room #4 . Performing Rights Tariff With Flat rate (101 -300 capacity) $59.17 $59.17 y No Increase Dancing -West Salon, East Salon, O'Brien Rooms, Don Beer, Westshore Community Centre, George Ashe Community Centre Banquet Hall, East Shore Community Centre Gymnasium Events Pre-teen Dance Single Admission -purchased online in $8.85 $8.85 y No Increase advance Poinsettia Tea Single Admission $6.19 $7.07 y September 1, 2019 · Big Band Single Admission $6.19 $6.19 y No Increase Culture & Recreation .. 2018 Current 2019 HST User Fee or Charge Fee Proposed · AppliGable Proposed Fee (Excluding Fee (Exel. Effective Date HST\ HST\ (Y/N) Big Band (Seniors Month) · Single Admission $6.19 $6.19 y No Increase Museum Events Adults $9.73 .. $10.62 y March 1, 2019 Museum Events Students/Seniors $7.96 $8.85 y March 1, 2019. Museum Events Children $6.19. $6.64 y March 1, _2019 Museum Event . Family. $26.55 $30.98 y March 1, 2019 A Spirit Walk Single Admission $22.12 $22.12 y No Increase Artiest Vendor Fee Sing!~ Space $30.97 $30.97 y No ·Increase Artist Vendor Preniium Fee Single Space with Table and Tent $120.00 $120.00 y No Increase Artist Vendor Fee at City Concerts in Single Space $22.12 $22.12 y No Increase Familv Dav $16.00 $22.12 y March 1 2019 Communitv· Event A'"'"'lication Fee sinale occurrence a,...,""lication · $25.00 . $25.00 y No Increase Community Festival Application Fee single occurrence application $100.00 $100.00 y No Increase Partner Event A""""lication Fee sinnle occurrence a"""'lication $250.00. $250.00 y No Increase Miscellaneo1.:1s Replacement Acc~ss ~ard $12.00 $12.Q0 y No Increase · Museum Filming/Photo Shoots Set dressing & clean Up, hourly. $85.00 $90.00 y No Increase Museum Filming/Photo Shoots Shooting time, hourly $200.00 $200.00 y No Increase Museum Filminn/Photo Shoots Shootinn time hourlv after 14 hours $275.00 $275.00 y No Increase Museum Filmin°/Photo Shoots Hourlv Fee -additional site suneivisor $40.00 $40.00 y No Increase Kindergym Birthday Parties · $160.00 $168.14 y September. 1, 2019 Creative Play Birthday Parties $160.00 $168.14 y September 1, 2019 Dance Birthday Parties $160.00 $168.14 y September 1, 2019 School Electives -Pottery 1.5 hour program/$ pp based on 10 studen New $160.00 N September 1, 2019 Pottery Birthday Parties New $216.00 y September 1, 2019 Pottery Supplies: Annual Membership (Open Studio) New $27.00 y March 1, 2019 Block of Clay New $33.00 y · March 1, 2019 Tool Kit New $22.00 y March 1, 2019 Fitness Birthday Party $158.00 $158.00 y No Increase Kinder Sur0 rise Birthda" Parties'Addition' $174.00 $183.00 y March 1. 2019 Princess Birthda 11 Pa'""'· 11 Children $184.00 $193.00 y March 1, 2019 Suner Hero Pa'""'· 11 Children $184.00 $193.00 y March 1. 2019 Museum Birthday Parties 16 Children $185.84 $194.69 y March 1, 2019 Equipment Rental (Gym @ ESCC) Charge for usage of sports equip. (no $23.0Q $23.69 y September 1, 2019 staff) Games Room Party (GALCC / 12 children $143.36 $147.79 y September 1, 2019 ESCC) Games Room Party (GALCC / 24 children $166.37 $170.80 y September 1, .2019 ESCC) Sensational Sports Parties 12 children $143.36 $147.79 y September 1, 2019 Sensational Sports Parties 24 children $166.37 $170.80 y September 1, 2019 Recreation Complex Filming Hourly $200.00 $200.00 y No Increase Program Administration Fee HST will be added to applicable programs $10.50 $11.00 y March 1, 2019 Membership Administration Fee $38.50 $38.50 y No Increase NSF Charge Per cheque $48.00 $48.00 · N No Increase Additional R.eceipt Charge Per family $5.00 $5.00 y No Increase Food Truck various based upon event attendani::e Various Various y No Increase Culture & Recreation 2018 Current 2019 HST User Fee or Charge Fee Proposed Applicable Proposed Fee (Excluding Fee (Exel.· (Y/N) Effective Date HST) HSTl Marketing Promotions City Brochure Advertising Community Group -Full Page $761.06 $761.06 y No Increase Commercial Rate -Full Page $796.46 $836.28 y September 1, 2019 Community Group -Half Page $490.27 $490.27 y No Increase Commercial Rate -Half Page . $539.82 $566.81 y September 1, 2019 Community Group -Full Colour Added to New $190.00 N September 1, 2019 Half Page Commercial Rate -Full Colour Added to New $200.00 N September 1, 2019 Half Page Community Group -Full Colour Added to New $125.00 N September 1, 2019 Full Page Commerical Rate -Full Colour Added to New $135.00 N September 1, 2019 Full Page * Classes may vary from ·5 to 15 weeks ** Classes may vary from 5 to 15 weeks. Single class participation is available · *** Must also provide completed criteria listing prior to confirmation Development Services 2018 Curren!Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date Miscellaneous Charges Ci.lrb Cut -new de\lelopment not $45.00 per metre or part thereof $48.00 per metre or part thereof y M~rch 1, 2019 assumed by municipality, infill building with a minimum charge of . with a ·min.imum charge of permit or industrial/commercial $300.00 $325.00 development Curb Infill $185.00/m $185.00/m y No Increase Sidewalk Repair $175.00/m2 $175.00/m 2 y No Increase Municioal Consent Fee · $450.00/street . $450.00/street N No Increase Stormwater Maintenance Fee $2 200.00/hectare $2 200.00/hectare N No Increase Cash-in-lieu of water aualitv treatment $40.000.00/imo.ha $40.000.00/imo.ha N" No Increase Newspaper Bcix Pad Permit Application $50.00/box $50.00/box N . No Increase Newsoaoer Box Installation $250.00 -$500.00 $250.00 -$500.00 · N No Increase Newsoaoer Box Annual Maintenance $15.00/box $15.00/box N No Increase Road Cleanina Contract cost+ 10% admin fee Contract cost +·10% admin fee y No Increase Tree Removal Compensation 1 $500.00/tree to a max of $500.00/tree to a max of N No Increase $3,000.00/dwelling unit and $3,000.00/dwelling unit and $7,500.00/1 ooo m' or any_part $7,500.00/1000 m' or any part thereof for industrial and thereof for industrial and commercial develooments commercial develooments Pool Enclosure Permit $350.00 $350.00 N No Increase Lot Grading Review Residential Lot Gradinn Review Fee $75.00/unit $75.00/unit N No Increase Infill Buildina Permit New Construction and/or Foundation $750.00 $750.00 N No Increase Modification lanv nart thereof\ Addition to existina structure $75.00 $75.00 N No Increase Damaae Deoosits Pool $1 000.00 $1 000.00 N No Increase Water/Sewer Connection $1 000.00 $1 000.00 N No Increase Residential Buildina Permit-Rural UD to $4 500.00 UD to $4 500.00 N No Increase Residential Buildina Permit-Urban UD to $5.000.00 UD to $5 000.00 N No Increase Commercial Buildino $5 000.00 -10.000.00 $5.000.00 -10 000.00 N No· Increase Fill/Topsoil Permit One Year Permit $1,900.00 + $1,000.00/hectare to $1,000.00 + $1,000.00/hectare to N No Increase a max of $5,000 + $2.00/m3 of a total· maximum fee of $5,000 + imoorted fill $2.00/m3 of imported fill One Year Extension $1.000.00 $1.000.00 N No Increase Penaltv & Investiaation Fee $5 000.00 $5,000.00 N No Increase Erosion & Sediment Control Security 100% of estimated cost of 100% of estimated cost of N No Increase Erosion & Sediment Control Erosion & Sediment Control Measures Measures Road Damaae Securitv Rural Paved Road $5.000.00/km · $5.000.00/km N No Increase Rural Surface Treat/Gravel Road $10.000.00/km $10,000.00/km N No Increase Subdivisions Engineering Review Based on total cost of Municipal Based on total cost of Municipal · Works 4 Works 4 Engineedng Review Fee 2 1.25% with a minimum of 1.25% with a minimum of N No Increase Detailed Desion Packaoe $5,000.00 $5_,000.00 Surcharge for 4th Submission_ of Detailed 33.3% of total Engineering Design 33.3% of total Engineering N No Increase Design Package (payable at submission) Re\liew Fee with a minimum bf Design Review Fee with a 3 $2,600.00 minimum of $2,600.00 Additional sutcharge for Submission of . 20% of tot.al Engineering Design 20% of total Engineering Design N No Increase each Detailed Design Package after 4th ReviBw Fee with a minimum of 'Review Fee with a minimum of Submission (payable at submission) 3 $2,600.00 $2,600.00 Inspection Based on total cost of Municipal Based on total·.cost of Municipal Works 4 Works 4 <$250,000 8% with a minimum of $5!000 ~.% with a minimum of $5,000 N No Increase $250 000 -500 000 6.00% 6.00% N No Increase . Development Services 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date - $500 000 -$1.5 million 4.50% 4.50% N No Increase $1.5 million -$5.0 million 3.75% 3.75% N No Increase >"$5 million 3.50% 3.50% N No Increase Site Plans . Engineerin!:I Review Engineeril1g Review Fee 2 Development Site Area <= 1,000 Development Site Area <= 1,000 N No Increase Detailed Design Package m 2 , fixed fee of $1,000 m 2 , fixed fee of $1,000 Development Site Area Development Site Area N No Increase 1,001 m 2 to 3000 m 2 fixed fee of 1,001 m 2 to 3000 m 2 fixed fee of $3,000 $3,000 Development Site Area Development Site Area N No Increase > 3,001" m 2 based on the sliding > 3,001 m 2 based on the sliding scale of tOtaf cost of Civil Works 5 scale of total cost of Civil Works 5 noted below noted below <$250,000 8% with a minimum of $5,000 8% with a minimum of $5,000 N No Increase $250,000 -$500 000 6.00% 6.00% N No Increase · $500 ooo -$1.5 million 4.50% 4.50% N No lnCrease . $1.5 million -$5.0 million 3.75% 3.75% N No Increase > $5 million 3.50% 3.50% N No Increase . Surcharge for submission of each $2,600.00 $2,600.00 N No lncreas!=); Detailed Design Package after 3rd submission tnavable at submission) 3 Inspection · Based on total cost of Civil Works 5 lnspection.F.ees New Development Site Area <= 1,000 m N January 1, 2019 •2 , fixed fee of $1,000 New Development Site Area N January 1, 20_19 1,001 m 2 to_3000 m 2 fixed fee of $3,000 f\!ew Development Site Area N January 1, 2019 > 3,001 !Tl 2 based_ on the sliding scale of total cost of Civil Works 5 noted below <$250,000 8% with a minimum of $5,000 8% with a minimum of $5,000 N No Increase $250 000 -$500 000 6.00% 6.00% N ·No Increase $500 000 -$1.5 million 4.50% 4.50% N No Increase $1.5 million -$5.0 million 3.75% 3.75% N No Increase ·> $5 million 3.50% 3.50% N No Increase Surcharge for more than two inspections $820.00 per inspection $820.00 per inspection N · No Increase required due to unaddressed deficiencies identified during earlier inspections (payable at inspection) Land Division EnQineerinQ Review up to 4 •ro •osed lots $1,500.00 $1,500.00 N No Increase >4 proposed lots if not completed as $2,500.00 $2,500.00 N No Increase a Draft Plan of Subdivision Clearance of Conditions u• to 4 orooosed lots $2 000.00 $2 000.00 N No Increase >4 proposed lots if not completed as $5,000.00 . $5,000.00 N No Increase a Draft Plan of Subdivision Develoome·nt Agreements Inspection 4% of the total cost of Municipal 4% of the_total cost of Municipal N No Increase Works 4 ' Works 4 . Other Fees Re-circulation of Drawings due to $2,600.00 $2,600.00 N No Increase revisions by Owner (payable· at re- circulation' Engineering Studies 6 (payable at subrllission of studv) New Studv $7 500.00 oer Stud, $7 500.00 oer Stud, N No Increase Development Servi.ces · 2018·Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (YIN) Effective Date Update or amendment to existing study $2,50•.op per Study $2,500.00 per Study N No Increase Peer Reviews 7 · Full recovery of City costs + 10% Full recovery of City costs+ 10% y No Increase Admin. Fee Admin. Fee Miscellaneous submissions not identified greater of percentage fee (based greater of percentage fee (based N No Increase under a fee category as determined by. on total cost of Civil Works) 6.6% on total cost of Civil Works) 6.6% the Director, Engineering Services or or estimated hourly rate $125/hr or estimated hourly rate $125/hr desi"'nate min of 4 hours min of 4 hours . Footnotes 1. Tree Removal Compensation to be calculated in accordance with the City of Pickering Tree Inventory, Preservation and Removal Comnensation renuirements 8--r0ved b" Council Januarv 1'5. 2018. Resolution# 387/18. . 2. 75% of the Engineering Revi!':;:W Fee payable ·at 2nd Submission, with the resulting 25% payable at signature of subdivision/site nlan anreement. 3. Above noted surcharges shall be discounted by 50% should less than half of the total plans/reports require revisions at the discretion of the Director, Ennineerinn & Services or desianate. · ·· 4. Municinal Works are defined as all future owned Municinal Works excludinn sanita-· and water distribution works. 5. Civil Works are·defined as all nrivatelv owned Civil Works excludinn sanitar., and water distribution works. 6. Review and a""'"'roval of larne scale 7. Applicant is responsible for the City's full costs of undertaking the peer review of any Study, report, drawing submitted in support of the design. This would include, but is not limited to hydrogeological, geotechnical & Siope stability, fluvial geomorphology, soils etc. Engineering Services 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding 1'.!ST) (Y/N) Effective Date Road Cut Degradation Fee $25/m2 of pavement cut $25/m2 of pavement cut y No Increase Driveway Widenings/Extensions $100 per application $100 per application N No Increase Driveway Entrance Curb Cut $45.00 per metre or part $48.00 per metre or part y March 1, 2019 thereof with a minimum thereof with a minimum charge of $300.00 charge of $325.00 Pre-installed Storm Sewer Connection $650.00 $700.00 y March 1, 2019 a Road Occuoancv Damaqe Deoosit Smaller Commercial Project or Repetitive New $5,000.00 Security or Letter N March 1, 2019 Utility Program (less than 1 month of Credit (1 month duration) refundable) Larger Commercial Project or Repetitive New $10,000.00 Security or N March 1, 2019 Utility Program (less than 12 months Letter of Credit (12 months duration) refundable) Finance Department 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge. Applicable (Excluding HST) (Excluding HST) (YIN) Effective Date Bidders cost to pick bid document package. Range: Range: Price range based upon the size .of the $50.00 to $250.00 $50.00 to $250.00 N No Increase document package, drawings, soils report, consulting reports -relative to the size of the project Letter of Credit Administration Draw Fee $250.00 $250.00 N No Increase (Excluding· Subdivision_ and Development Agreements) Returned Pavments $46.00 $46.00 N No Increase Electronic Pavment Correction $46.00 $46.00 N No Increase Post Dated Cheaue Retrieval Fee $46.00 $46.00 N No Increase New Roll Number Set Up Fee $50.00 $50.00 N · No Increase Residential AMortionment Fee $50.00 $50.00 N No Increase Commercial Annortionment Fee $250.00 $250.00 N No Increase Ownershi• Change Administration Fee $35.00 $35.Q0 N No Increase Preparation of Property Tax Registration $600.00 $600.00 N ' No Increase Extension Agreement Receiot for Income Tax Iner roll number) . $10.00 ·$10.00 N No Increase *If you are 65 years of age or older as of . $0.00 $0.00 N No Increase December 31, 2017, the fee for an Income Tax Receipt will be $0 for those properties in the RT tax class Property Tax Account Analysis/Research -$35.00/hr $35.00/hr N No increase includes archival records (One hour min.) Addition of water/sewer lien •er roll number $25.00 $25.00 N No Increase Addition of POA lien •er roll number $25.00 $25.00 N No Increase Addition of Development Charges lien per _roll $25.00 $25.00 N No Increase number . Duolicate Tax Bill per roll number $10.00 $10.00 N No Increase Statement of Account •er roll number $10.00. $10.00 N No Increase Overdue/Arrears Notices $5.00 $5.00 N No Increase Tax Certificates -No Verbal provided $65.00 $65.00 N No Increase Tax Certificates Faxed (24 hour turn around) $85.00 $85.00 · N No Increase 3571358 Applications $25;00 $25.00 N No Increase (Depending on value of rebate) Fee for section 357 applications be waived for tax relief applications filed under s.357(1)(1.d) for poverty and sickness. Tax Collection/Tax Reaistration Letters $35.00 $35.00 N No Increase Tax Billing for Mortgage Company $12.50 $15.00 N March 1,2019 (Annual fee for Final Payment Listing Per roll number) . Farm Debt Letter $65.00 $65.00 N No Increase Fire Services Department ' 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date Information Com, of Fire Incident Summarv Renort $150.00 $150.00 y No Increase Fire Reports/Records (not.applicable to formal $150.00 $150.00 y No Increase requests in accordance with the Municipal Freedom of. Information and Protection of Privacy Act, including requests from property owner and/or other government agencies) File Searches (Searches from our existing filing $150.00 $150.00 y. No Increase network) Inspections Legal Inspections (Generally requests from legal $200.00 $200.00 y No Increase firms) Multi-Unit Residential Inspections 'uoon reauestl · $200.00 $200.00 y No Increase Boarding/Lodging/Rooming House Inspections $200.00 $200.00 y No Increase 'unon renuest\ · · · Institutional lnsoections lunon renuestl $200.00 $200.00 y No Increase Educational Occupancy Inspections (upon $200.00 $200.00 y No Increase renuest\ Mercantile lnsoections luoon reauestl $200.00 $200.00 y No Increase Business and Personal Services Inspections $200.00 $200.00 y No Increase ·unon renuest\ Industrial lnsnections luoon reauesti "$200.00 $200.00 y No Increase Dav Care lnsnections lunon renues!\ $200.00 $200.00 y No Increase Group/Foster Home Inspections ·uoon reauestl · $200.00 $200.00 y No Increase Occunant Load lnsnectionslunon renuesl\ $200.00 $200.00 y No Increase Liquor Licensing Requests (includes occupant $200.00 $200.00 y No Increase load calculations) (upon request) Inspection requests not within scheduled hour~ Actual Costs Actual Costs y No.Increase of work (if applicable, includes (if applicable, includes other additional rates) other additional rates) Federal and/or Provincial Property Inspections · $410.0d $410.00 . y No Increase (upon request) (Not applicable to properties with a Memorandum of Understanding (MOU)) Alarm Response First response to malicious and/or nuisance Nil · Nil N No Increase false alarms, for same address, within 12 month period Second and subsequent malicious and/or $450.00 $450.00 N No Increase nuisance false alarms, for same address, ·within 12 month period, per fire apparatus dispatched First response to false alarm as a result of work Nil Nil N. No Increase being performed on a fire alarm system or emergency system, for same address, within 12 month period Fire Services Department 201 B Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date Second and subsequent false alarm 9s a result $450.00 $450.00 N No Increase of work being performed on a fire alarm system or emergency system, for same address, within 12 month period, per fire apparatus dispatched First response to unapproved open air burning, Nil Nil N No Increase for same address, within 12 month period Second and subsequent response to $450.00 $450.00 N No Increase unapproved open air burning, for same address, within 12 month period, per fire apparatus dispatched Fires on or beside rail lines (Railway properties) Actual Costs Actual Costs N No Increase (if applicable, includes (if applicable, includes use of fire apparatus use of fire apparatus and other additional and other additional rates) rates) other Securitv Kev Safes /Boxes) $200.00 $200.00 y No Increase If it is necessary to retain private contractor, rent Actual Costs (If Actual Costs (If y No Increase special equipment not normally carried on a fire_ applicable, includes. applicable, includes apparatus in order to determine origin and use of fire apparatus use of fire apparatus cause," suppress or extinguish a fire, preserve and other additional and other additional property, prevent fire spread, make safe or rates) rates) otherwise eliminate an emergency Standby for movie shoots Actual staffing costs ·Actual staffing costs y No Increase plus $450.00 per hour plus $450.00 per hour for use of fire for use offire apparatus and any apparatus and any ' other additional rates other additional rates Propane facility fire protection and safety review $300.00 $300.00 y No Increase of Risk and Safety Management Plan Fire Extinnuisher Train inn .$200.00 $200.00 y No Increase Fire apparatus on scene of a motor vehicle $450.00 $450.00 N No Increase accident and/or fire for non resident (MTO Rates) Legal Services 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge (Excluding HST) (Excluding HST) Applicable Effective Date (Y/N) Nolan, $50.00 $50.00 N No Increase Agreements Subdivision $8,000.00 $10,000.Q0 y March 1, 2019 Subdivision (Amending -Major) $2,500.00 $2,500.00 y · No Increase Subdivision (Amending -Minor' $1,000.00 $1,000.00. y No Increase Site Plan Control (Standard) $1,500.00 $1,500.00 y No Increase Site Plan Control /Custom\ $2,500.00 $2,500.00. y No Increase Site Plan Control /Amending) $750.00 $750.00 y No Increase Develonment /Major' $7,500.00 $7,500.00 y · No Increase Develonment /Minor\ . $3,500.00 $3,500.00 y No Increase Develo•ment /Amending -Maier\ $1,500.00 $1,500.00 y No Increase Development (Amending -Minor' $750.00 $750.00 y No Increase : Pre-Servicinn $3,500.00 $3,500.00 y No Increase Pre-Servicina (Amendina -Maior\ $1,200.00 $1,200.00 y No Increase Pre-Servicina !Amendina -Minorl $750.00 $750.00 y No Increase Encroachment $1,000.00 $1,000.00 y No Increase Encroachment (Renewal/Assignment) $200.00 $200.00 y No Increase Demolition $500.00 $500.00 y No Increase Model Home $750.00 $1,200.00 y March 1, 2019 Miscellaneous, Road Improvements/ $1,200.00 $1,200.00 y No Increase Road Construction; Road Servicing, Snatial Senaration . Develonment Processes Teraview -Title Search /Per PIN\ $25.00 $30.00 y March 1 2019 Teraview or Laserfische Document $15.00 $20.00 y March 1, 2019 Download (Per Document) Teraview -Document Review/Sign-off $60.00 $60.00 y No Increase Draft Plan Approval Clearance $1,250.00 $1,250.00 y No Increase (M-Plan to Registry Office) Assumption -Plans of Subdivision $2,000.00 $2,500.00 y March 1, 2019 Assumption -Road Servicing $1,000.00 y new-March 1, /Development Agreements 2019 Part Lot Control -Base Fee $500.00 $1,000.00 y March 1, 2019 -Per Unit Fee $100.00 $100.00 y No Increase -Secondarv Process $150.00 $150.00 y No Increase Road Related Processes . Road Dedicatio~/Naming $300.00 $300.00 y No Increase Road Closinn $1,200.00 $1,200.00 y No Increase Release/Abandonment Processess Release of Agreements - Development, · $300.00 $300.00 y No Increase Encroachment, Licence, PteServicing, Demolition, Model Home Release of Miscellaneous Documents, $300.00 $350.00 y March 1, 2019 Certificates/Orders, Postponements, Notices Legal Services . 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge (Excluding HST) (Excluding HST) Applicable Effective Date (Y/N) Release/Abandonment of Easements $500.00 $500.00 y No Increase (Requiring Council Approval) Acnuisition/Disnosal Transfer of Land $250.00 $350.00 y March 1, 2019 Transfer of Easement $250.00 $350.00 y March 1, 2019 Release/Abandonment of Easements $250.00 $350.00 y March 1, 2019 (Storm Drainage-Vehicular/Pedestrian) Miscellaneous Processes Reporting/Disbursements $150.00 $150.00 y No Increase Max 5 documents1 Re.porting/Disbursements $50.00 $50.00 y No Increase (Each additional document over 5) Right of Re-e·ntrv Letters/Assumntion $150.00 $150.00 y No Increase Administration Fee -Letter of Credit Draw $250.00 $250.00 y No Increase · Insurance (Per Draw) Permission to Enter Authorization $250.00 .Y New -March 1, (Over City Property) 2019 ) Legislative Services 2018 Current Fee 2019 Proposed Fee HST · Proposed Fee User Fee or Charge (Excluding HST) (Excluding HST) Applicable Effective Date . IY/Nl Lotteries Bazaar, Break open Raffle 1.5% of gross prize 1.5% of gross prize N No lnc~ease value (minimum fee of value (minimum fee of $15.00) $15.00) other Marriaae Licence $130.00/ea $130.00/ea N No Increase Marriaae Ceremonies $275.00/ea $275.00/ea y No Increase Burial Permits $25.00/ea $25.00/ea N No Increase . Photoconvina Up lo five pages free -additional P<!ges $0.50/ea $0.50/ea y No Increase Council Anenda $350.00/vr $350.00/vr y No Increase Executive/Plannina Aaenda $350.00/vr $350.00/vr y No Increase Commissioning & Certification of $25.00 up to 5 $25.00 up to 5 N No Increase Documents (commissioning for signatures signatures P\!nsion forms is unofficially exempt) $5.00 per signature $5.00 per signature after 5 after5 Public Works 2018 Current Fee 2019 Proposed Fee HST Proposed Fee User Fee or Charge (Excluding HST) (Excluding HST) Applicable Effective Date · . (YIN) Sports Tournaments -User Fee $550.00/weekend $550.00/weekend y No Increase Excludes league tournaments (2-3 days) (2-3 days) $275.00/day $275.00/day Sport Camps-User Fee $550.00/week $750.00/week y September 1, 2019 (Full Park) (Full Park) $275.00/week $375.00/week (Partial Park) (Partial Park) Park Permit Fee (0-49) Per Day New $50.00 y March 1; 2019 Park Permit Fee (0-49) Per Day New $40.00 y March 1, 2019 Community Group Rate Park Permit Fee (50-199) Per Day New $150.00 · y September 1, 2019 Park Permit Fee (50-199) Per Day New $125.00 y September 1, 2019 Community Group Rate Park Permit Fee (200-349) Per Day New $400.00 y September 1, 2019 Park Permit Fee (200-349) Per Day New $330.00 y September 1, 2019 Communitv Groun Rate Park Permit Fee (350-499) Per Day. New $650.00 y September 1, 2019 Park Permit Fee (350-499) Per Day New $540.00 y September 1, 2019 Community Group Rate Park Permit Fee (500-999) Per Day . New $900.00 y September 1, 2019 Park Permit Fee (500-999) Per Day New $750.00 y· September 1, 2019 Community Group Rate Park Permit Fee (1000-4999) Per Day New $1,200.00 y March 1, 2019 Park Permit Fee (1000-4999) Per Day New $1,000.00 y March 1, 2019. Community Group Rate Park Permit Fe·e (5000+) Per Day New $1,500.00 y March 1, 2019 Park Permit Fee (5000+) Per Day New $1,250.00 y March 1, 2019 Communitv Group Rate Park Filming Permit (Per Day) $500.00 $500.00 y No Increase Civic Complex Courtyard Permit Fee $20 per hour $20 per hour y No Increase Non Commercial Photographer Park $50 per day $50 per day ·y No Increase Permit Fee Special Events/Picnics/School Events -$135.00 $135.00 y No Increase Picnic Tables (5 per load) -Delivery & Pick Up Special Events/Picnics/School Everits -$40.00 $40.00 y No Increase Garbage Cans (5 per load) Delivery & Pick Up Special Events/Picnics/BBQ's/School . $40.00 $40.00 y No Increase Events -Barricades (5 per load) Delivery & Pick Up Special Events/Picnics/School Events -$60.00 $60.00 y No Increase Road Closure (Flat Rate) Temporary Fence Enclosures (Beer $180.00 $186.00 y March 1, 2019 Tent) Sport Field Lighting Fee Youth Groups $13.00/hr .Youth Groups $13.00/hr y No Increase Adult Groups $25.00/hr Adult Groups $25,00/hr . Sports Field Booking Permit Fee $1 DO.DO/field/season $125.00/field/season y September 1, 2019 Public Works 2018 Current Fee· 2019 Proposed Fee HST Proposed Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) (Y/N) Effective Date Artificial Turf Soccer Field Youth Groups $40/hr. Youth Groups $40/hr. y No Increase Adult Groups $80/hr. Adult Groups $80/hr. Road Occupancy Permits $120.00 $120.00 N No Increase Driveway Entrance 9 metres x 400 $1,700.00 $2,000.00 y · March 1, 2019 millimetres Driveway .Entrance 9 metres to 15 $1,700.00 $2,000.00 ·y March 1, 2019 metres Plus $175.00 per metre in Plus $175.00 per metre in excess of 9 metres excess of 9 metres Plus $45.00 per coupler Plus $45.00 per coupler when required when required Driveway Entrance extension of existing $175.00 per metre .$175.00 per metre Y. No Increase culvert Plus $45.00 per coupler Plus·$45.00 per coupler Min Charge $250.00 Min Charge $250.00 Driveway Entrance, culvert other than as Contract Cost Contract Cost y No Increase described above (lime and material) (lime & material) New rural driveway _entrance $1,000.00 $1,000.00 y No Increase (No Culvert) Commemorative Tree and Plaque $600.00 $700.00 N March 1, 2019 Commemorative Bench and Plaque $2,200.00 $2,200.00 N Nci Increase Hydro/lighting charges for tennis courts $330.00 per court per $340.00 per court per y March 1, 2019 season season Seniors a_nd Persons With Disabilities $35.00 $60.00 y March 1, 2019 Snow Removal Program For those individuals receiving GAINS*, $0.00 $0.00 N No Increase the fee for the Seniors and Persons With Disabilities Snow Removal Program will be $0.00 Special Events at Espl,made Park -$750.00 $750.00 y No Increase Gazebo Backdrop/Sound/Wind Panels Delivery, Set.Up & Pick Up Rental Extra Fees Listinn Sport Field Security Deposit $500.00 $500.00 · N · No Increase (Refundable) -Seasonal Permit Holders Sport Field Security Deposit $200.00 $200.00. N No Increase (Refundable) -Casual Permit Holders Administration Fee . $40.00 $40.00 y No Increase Additional Staff fee for liquor licenced $60.00 $60.00 y No Increase permits (per day) Park Damage/Security Deposit I (Refundable) (0-99 people) $50.00 $50.00 N No Increase Park Damage/Security Deposit ·New $125.00 N M_arch 1, 2019 (Refundable) (100-199 people). Park Damage/Security Deposit $250.00 $250.00 N No Increase (Refundable) (200-499 people) Park Damage/Security Deposit $500.00 · $500.00 N No Increase (Refundable) (500-999 people) Public Works 2018 Current Fee 2019 Proposed Fee HST Proposed .Fee User Fee or Charge Applicable (Excluding HST) (Excluding HST) {Y/Nl Effective Date Park Damage/Security Deposit $750.00 $750.Q0 N No Increase (Refundable) (1000-4999 people) Park Damage/Security Deposit · $1,000.00 $1,000.00 N No Increase (Refundable) ,/5000+ people) * Guaranteed Annual Income System --C,t:.,,/-- PICKERJNG 2019 Draft Current & Capital Budgets Introduction Budget Development Principle: "Obligations to Future Generations" Invocation by Pastor Mel Finlay Budget Impact on Residential Taxpayer Current Budget Asset Management Capital Budget Financial Position and Debt Budget Report and Housekeeping Items ---G/;Y,/-- PJCKERJNG Budget Levy Increases 2001 to 2019 Lowest Increase in 19 Years _.,Hll-111-111-"R-U--IO-aC-IO--•~:•~,,; :-11--III-IH•,;=·•";•"•_"1,.c-l, --c1:,,1-- PICKERING ••• ••- ATTACHMENT#~ TO REPORT#.CL~IJ_:-1 1 How is the Residential Tax Bill Allocated? Pickering Durham Region School Boards 30.27% 54.99% 14.74% . •• . . Residential Tax BIii -~Gt!J,!-- p]CKERJNG Pickering Share Budget Levy Impact on Residential Property Taxes Year Ancs&molll "" Region Educalbn , .. ~ .. S-163.90'0 S1.619.04 $2,11-11.12 naae, SS.3~9.7Q 2D1Slnc-,.,, ,.,., ·~ DOiiar "-" "-" ""' '"" ,,_,,,.,, = ""-" ;~ Pi!rceniilf191ncnlllH '·"' Pickering'• Dollar lncruse 1• Len than Durham Region's ------Cl.9 ,f---·--·-- p]CKERJ NG Pickering's Budget Levy Increases , ... c;:;;.;;,:;.;:..;;;:;.;::=:;:11iia.:=:::JI uo.,. i--1 ••·rG:4 IID ; ·er rx , .. 1.&l'!I. 201Q lncn,ase ls below the In Hatton rate --Cf:14-- PJCKERJNG ~-- pi<kering.ca 2 Reducing Future Levy Increases Pkkonng 78.90% 21.10% Mlnlssauga 69.20% 30.80% Pickering Property Taxes with Mississauga Assessment Structure ~;;;;;;;;;~ring RevlHd Plcknrlng Estlm;rted 2018 with rncro2U<I Non Dollar Realdnntl~I Savlngu $500,000 $1,NS $1,530 $214 $600,000 $2. 094 $1,8:j!i $257 $700,000 $2,443 $2,142 $300 --0<'/4--\~ PICKERING d~ ~--- Shifting the Property Tax Base Case Study: Economic Development of Pickering Innovation Corridor Lands Property Tax Comparison Based on 100Acres IB•nf ••W:-• $1,965 Commerdal $169,000 The abcve table e~cludes any add~lonal asseument lrom the constructJon of any buildings ---0/:;,/--- PICKERING 2019 Budget Levy Increase Comparison with our Durham Neighbours --Cl!J,f---· PICKERING Pickering Ajax• Whitby• Oshawa Clarington• •Notyetccnfirmed 2.47 4.50 5,89 1.88 4.50-5.20 ____.--,· P, ... P~brina.oa -· !Nohflng.ca 3 1 ,E•~e!)dlUf., 2 R\'>'"'U!!S 3 ,SubTCW(Untsl•:ll 4 '~lalfr~_eu....,1 Ii ,CityO~r.1111r>_1(Unt13_•-0 Ii 8u;c:ltt'l'IIIJ11r)'TUR\'>'e<iuu 7 ·esimaiiciASSOu,;..;tGr""1h a NetOtr()p(nUc,ns RMeSWt!finttMnwr, 2019 Budget Summary As of FRbn.1uy 14. 2019 "" """' $113,752,T.15 !SU'l0,150) -50,161'1,579 ~ S6J.583,1SII Sl)!M,555 ~-· ~- S65,029,100 S:l,7211,0ll -300.000 -sci· "-""" $64,729,100 $1,382,031 9 PnO' Vta'I Slt~IJI ~ l!. 10 Base Budget PoslUon $63,229,100 $1,382,031 "" ~-· -S105M.t!5a5 .1ur,; ,J9,897,e74 111!% Wl,S64.711 sm, J.2!li2ll ,Hlll $68.7511,m sn~ -300,000 IINI~ :l.J!Z..M.Q Jfl'>i $66,111,131 1.11'-' "-""" $64,611,131 ~ ,m. . , ,$1,562,031 , ' ~ 2..(7% Streetlights Hydro Costs -· /-------. . .,,-/ \ . / LEO ,--;-.---Streetlight ---C,/~,t-- PICKERING •== 11.IOO<CO """""" '''°""" 11:lOQC(\l 11,0:,:c,:,o ,~= -= <AS -· ,.,, :,,11 ~ .... Assessment Growth ,.,. "'" ,.,. r.,o - -----· ~-C/y,/-- PJCKERJNG ....... 4 Buildln9 Pennlt Revenue & Assessment Growth .. ~DOO;-.·•. . I "-<r.ODOO: l>DOO.DOO "-==i r "~:!~,. ~,.· ~------·.,.· = ~ >0'4 :0" ,'C,& l'OU :,:,10 -·-·---Cl:1 ,/-- PJCKERJ NG Planning Appllcatlon Fees ------------~------...... __ ,_ 11.ll»C<O RDOO@ 11.mm " 1014 m, :o,, ,a,o _, --9-. --Cl:14--- pJCKERJNG Investment In Reserves & Reserve Funds Measuring our Progress ·--"""'""' .... -.. ... s-. ... ,,,_, .. .... ,. -......... v ................ ..... ,._ ... ~---·~ -•""1• ----C/9 ,{---· PICKERING ~.., .... ... '-'I.ii» :om' "" -. ... ~ ... ~ m_o;,,;; ,:-i:11,. ,;,:,DOOj 1 ,o,m. '"~ m~ :!"'- •»ooo:. no@ :,:ooo' e:=ooo m11~ mi:o soo,i: •:i:,;,; ~- 1 %1$:0>l ·----· 5 Analysis & Summary -Property Tax Grant Program for Low Income: Seniors & Persons with Disabllltles , Program is working well. , 191 individuals received grant funding in 2018. • Successful applicants will be mailed an applicaUon in late May for 2019. What Assistance Level ls the City providing as It relates to City Share Taxes? Grant Avel"8ge City Share Taxes $300.00 $1,354,00 "22.1% 2019 Proposed Grant Is $330.00 --Gf:;,/-- PJCKERJNG Property Tax Grant Program Statistics --04./-- PICKERJNG •2017 •2018 Community Grants Update and Review Budget report will Include the following recommendations: Proposed Grant Application deadline dale: October 25, 2019 Following expenses-are not eligible: Liability Insurance ltems/acllvitleswith high llablli\y (e.g. Fireworks, dunk tanks and pyrotechnics). SUCl,000.00 »00,000.00 snc,coo.oo S100,000.00 SIW,000.00 $100,00000 ,_oo ,_ --Glf;,/-- PJCKERJNG • " " •••~ ,.,. '"" m• 1011 _,...,..,...,, ...... -· 6 M!>nthly Tax Breakdown vs Common Fe~s and Expenses Community Programs and Public Library Services Events $1.70eo,Moolli liiiirtH $11.50 Per Month [~] Compared to: Compared to· Average hardccver bo<lk for $24.95 A pair of movie tkkots forS30 Flra Service,, Roads, Brldgos and Sidewalks $32.60 Per Monj 8 $17.45 Per Month ii Compared to: -. , Compere to: There Is no comparison for Private snow plov.ing at $50/hour public safety - -·---Cly,(-- PICKERING Monthly Tax Breakdown vs Common Fees and Expenses ,' Planning and Davo!opmenl Facilities, P•rka and Trail, Services $24 95 ,., •oo• IHI $7 .56 Per Month ~ Compared to: A family day pass at an. Compared to: amusement park rorS100 P/annlnll/englneerlng consun,ng fees atappro)dmately$15Mlour By.Jaw and licensing nrvla,s Museum $1. 77 Per Month ~ $1.61 PerMonlh -Compared to: Compared to: A pair ol ROM admission tickets lor Licence plate renewal forS120J)'ear ,., --Cty,t'-- PICKERING Annual Amortization vs Proposed Reserve Contribution UCO.C>Oll ,.000.c«I :.5COC<l0 :.coo.coo ~ ,.,oo.coo . •.=,coo ~-L r .. u ... .. .... ~q .... •:<l!1 ___ ---Ctg,/--- PICKERING -~ L I """""' -5-Uomt P•"• •:<ll9--.eo,,,w,,,, -----· _,, -· ----_ .. plo,orir,;.oo -· 7 Capital Budget Summary Major Capital Projects of Interest: • Pickering Heritage & Community (Combined Museum, Community Centre and Library Archives) Krosno Creek Culvert Replacement Sandy Beach Rd. Reconstruction Phase 1 Krosno Creek SWM Facility Construction --C,"."-y,/--- PICKERING 2019 Draft Cap Ital Budget b1 Financing Source ($77 Mllllon) --/, ... I ! ··--··-··--· C/.9 ,/ -·--·-·--·· PICKERING 2019 uralt Cap,tal cuuget anu 2020 -2023 ._.ap,ta, Funding Soun:e: Oewlqxnert Ctnrges 1~t~_ue_Rc,s_e~ !)~~F!~<;[rg CapilatfromT~tic;n Federal Gas Tax "''" ---C/p,/-- PICKERJNG Plan ($Ml 2019 2020-2022 Budgvt Planned Amooot Amount Toal "' 1142 "" ,. 32.1 400 132 .. , 97.3 ,, " 65 32 12_2 '" 390 " 432 768 2$20 3288 ' 384% 122% 29.6% 20S 47% 13m i. -· pi<htlngca 8 E Fleet Strategy Goals Reduce fuel consumption. Reduce Pickering's impact on the environment. Pilot Study Results I --.:·•·· . • ' < •• , ' A B Combined City!Highway MPG Litres per 100 km --C~'/,/-- PJCKERJNG 119 1.98 74 3.09 E Fleet Implementation Strategy 28 •~- To replace all or the City's small vehicles (cars & SUV's) wltti etlher EV or plug-In hybrids. l'!l!JIE!!JIE!IIIE!!.ll&!IIIIEl!!IIE!!lllli!!III 3 450.000.00 ,100,000.00 ,so.ooo 00 300,000.00 250.000.00 · 200,000.00 , 150,000.00 • 100,000.00 · 50.000.00 0.00 --Cd~,/-- PJCKERJNG 12ll,02S ' ' 4 30 Diesel and Gasollne In Litres ..... .. -GM -()jo•ol 116.772 1183511 120 169 11Uol5 2015 20111 ----------- Senior Government Grant Funding Opportunities -----~ ..... . Whllevale Master --~ $1,125,000 $1,\25,000 _llrv.ag• Rec Compu Main $4,900,000 "-~""' $2,450,000 Entranee & Coco R•nov•tlore Plekedng HOtftogo & $111.~0$7 $9,441.964 $9,441,963 -·-P10Je,ct will only $lart after grant funding has been confinned. W~houtgrant funding, the City would have lo Increase the budget Jevy by 1.53%,. !f senior grant funding I$ not available for the 2020 Budget, Councllwlll have to decide to c~her prott!ed with all three projects or pha$e ln over three year$. -------~ ~-G/:;,f-- PJCKERJNG 9 Civic Centre Decision 1.Senior staff will present a business case to Council in April/May. 2. Business case will focus on the financial and legal agreements. 3. Business case three sections: Cost Inputs, Revenues/Assessment and Legal Agreements. 4. Staff have already contacted Torys LLP regarding joint venture terms, and Watson & Associates to assist In reviewing and maximizing development charge funding. Possible Outcome: Higher DC Rates ---Cft1,/-- PICKERING Civic Centre Decision The business case will present: Flnanclal Analysis (Assumptions); Legal Agreements (Analysis, Liability & Risks) Pickering Council: Biggest Decision -Past, Present & Possible Largest Dollar Value Investment Decision $10D.D Million ~-Cly,/-- PICKERING Time Horizon (SO plus years) Civic Centre Decision Staff's goal Is to ensure that the City's current and long term Interests are protected. Challenge: Fl/lure proof as best as possible In the context of a SO year tlme hori:i:on. Try to anticipate changing environment from a technology. legal and ownership perspective. Example: Pension Funds buy and sell shopping centres and the legal agreement has to be structured to protect the City's Interests and partnership. ---Cly,/----· PICKERING ..... ,, -- I -· I 10 sa.000.000 57,000,000 $6,000,000 55,000.000 $4,000.000 53,000,000 52,000,000 - City Projected Property Tax Funded Debt Charges (Interest & Payments) 2012 2013 2014 2015 2016 2017 2018 2019 2020 202\ 2022 ---C,I:; ,/-~ PICKERING Debt Management Tile debt guldelrne llmllt laullon d<bl cha.gos to 1H, cltaullon ro\lcnU•• 1200l', ·-·-•.00%· 1012 2013 101• 201~ 2016 2017 2018 2019 2020 "'21 20:2 -CourolTa,EIOI -~--C,/:;,/-- PICKERING Goal -r.,.,.,,,D<-b<Cha<go>o•a%o1To,o"'°""'.,._ -,.,.D<bl(lldPart,lOC:DOt] User Fees To charge ccmparablo fHS where there are ether ccmparable municipal ccmpat1s0ns. Munldpal Act permits the charging of fees !er the munlclpalltyto reccver Its ccsts. User Foos are reviewed every year as part cflhe budget precess. The user foo schedule provides a summarycfthe c;tyfees Including ell pre posed changes --C,/:;,f-- PICKERING pl<uring.oo 11