Report Number: ENG 05-18
Date: April 10, 2018
From: Richard Holborn
Director, Engineering Services
Subject: Rotary Frenchman's Bay West Park Reconstruction — Phase 1
- Tender No. T-3-2018
- File: A-1440
Recommendation:
1. That Tender No. T-3-2018 as submitted by Melfer Construction Inc. in the total tendered
amount of $1,649,999.00 (HST included) be accepted;
2. That Council approve to single source the contract administration and construction
supervision to MBTW Group in the amount �f $73,760.00 (HST extra) for Tender No. T-
#2018 Rotary Frenchman's Bay West Park Reconstruction — Phase 1;
3. That the total gross project cost of $2,322,809.00 (HST included), including the tendered
amount and other associated costs and the total net project cost of $2,091,761.00 (net of
HST rebate) be approved;
4. That the Director, Finance & Treasurer be authorized to finance the total net project cost in
the amount of $2,091,761.00 as follows:
a) The sum of $1,149,761.00 be funded by Development Charges — City's Share;
b) The sum of $942,000.00 be funded by Development Charges - Parks & Recreation
Services;
c) The Treasurer be authorized to make any changes, adjustments, and revisions to
amounts, terms, conditions, or take any actions necessary in order to effect the
foregoing; and
5. That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this report.
Executive Summary: As part of the 2018 Parks Capital Budget, funds were approved for the
reconstruction of Rotary Frenchman's Bay West Park — Phase 1. The project includes the
reconstruction of Beachpoint Promenade from West Shore Boulevard to the first parking area,
including the addition of lay-by parking spaces, reconstruction of the existing parking area,
construction of the waterfront trail and secondary trail system, and installation of an interpretive
educational kiosk, public art, site furniture, trees, shrubs and ground covers.
Tender No. T-3-2018 was issued on February 20, 2018 and closed on March 14, 2018 with four
bidders responding. The low bid submitted by Melfer Construction Inc. in the amount of
$1,649,999.00 (HST included) is recommended for approval. The total gross project cost which
ENG 05-18 April 10, 2018
Subject: Rotary Frenchman's Bay West Park
Reconstruction — Phase 1
Tender No. T-3-2018
Page 2
includes the tender amount, optional tendered items, utility relocation costs, tree removal costs,
other associated costs, and a contingency, is estimated at $2,322,809.00 (HST included) and the
total net project cost is estimated at $2,091,761.00 (net of HST rebate). A 15% contingency is
included in the estimated project cost to cover any unforeseen costs such as electrical service
connection issues, additional material quantities, and poor soils conditions.
In 2015, Council Resolution # 117/15 approved Proposal No. RFP -16-2015 submitted by The
MBTW Group to undertake the preparation of detailed design drawings and specifications for
Rotary Frenchman's Bay West Park. Staff recommends continuing with The MBTW Group to
undertake the contract administration, construction supervision and certification works associated
with Tender No. T-3-2018, Rotary Frenchman's Bay West Park Reconstruction — Phase 1 as set
out in a fee proposal dated March 19, 2018 in the amount of $73,760.00 (HST extra).
Financial Implications:
1. Tender Amount
Tender No. T-3-2018
HST (13%)
Total
$1,460,176.11
189,822.89
$1,649,999.00
2. Estimated Project Costing Summary
Tender No. T-3-2018 — Tender for Rotary Frenchman's Bay West Park
Reconstruction — Phase 1
Site Furniture provided as Optional Items in Tender No. T-3-2018 (not
included in the Total Tendered Amount)
Associated Costs
Utility Relocations
Materials Testing Allowance
Construction Administration Fees (The MBTW Group)
Tree Removal Services (Davey Tree Expert Co.)
Project Signage
Construction Contingency (15%)
Sub Total — Costs
HST (13%)
Total Gross Project Costs
HST Rebate (11.24%)
Total Net Project Costs
$1,460,176.00
151,800.00
$25,000.00
10,000.00
73,760.00
85,551.00
7,500.00
241,796.00
2,055,583.00
267,226.00
$2,322,809.00
(231,048.00)
$2,091,761.00
CORP0227-07/01 revised
ENG 05-18
Subject: Rotary Frenchman's Bay West Park
Reconstruction — Phase 1
Tender No. T-3-2018
April 10, 2018
Page 3
Approved Source of Funds — 2018 Parks Capital Budget
Account Code
5780.1822.6129
Total
Source of Funds
Debt — 10 year
R — DC's City Share
RF — DC — Parks & Recreation Services
Budget Required
$1,000,000.00 $0.00
515,250.00 1,149,761.00
1,239,750.00 942,000.00
62,755,000.00 $2,091,761.00
Net project costs (over) under approved funds
$663,239.00
The financing strategy has been revised to reflect the lower tender price. By avoiding debt
financing, the City will save approximately $194,000 in interest charges.
Discussion: As part of the 2018 Parks Capital Budget, funds were approved for the
first phase of construction, to implement the Rotary Frenchman's Bay West Park Master Plan.
Rotary Frenchman's Bay West Park is located on the east side of West Shore Boulevard, south of
Sunrise Avenue. The Toronto and Region Conservation Authority (TRCA) acquired, much of this
land in the late 1960's to bring this waterfront property into public ownership. In the early 1990's
the TRCA, in consultation with the City and local community, developed a park plan for this area.
The TRCA and City of Pickering entered into a management agreement for this parcel of property
in 2001 and as required under the joint management agreement, a park master plan was
developed that was endorsed by the TRCA and City of Pickering in 2002. With the proposed
reconstruction of the harbour entrance, discussions with the Pickering Rouge Canoe Club for
more permanent facilities, and the removal of the leash free area from the plan as requested by
area residents, the master plan was revisited in 2012. The revised Master Plan was endorsed by
Council in November 2012 (Report No. CS 39-12, Resolution #140/12) followed by the
reconstruction of the harbour entrance.
The MBTW Group was hired to prepare detailed drawings for the Master Plan implementation
(Resolution #117/15). This consulting firm should also be retained for contract administration and
construction supervision, which includes inspections of the installation of the works and
certification that the works are carried out in accordance with the approved drawings and
specifications of Tender No. T-3-2018.
In accordance with Purchasing Policy 10.03 (c) where the project or annual cost of a consulting or
professional service assignment is expected to be more than $50,000.00 and the initiating Director
intends to acquire the services without obtaining written proposals, the Director shall submit a
Report to Council to obtain approval to engage the services of a particular consultant. Staff
recommends acceptance of the fee proposal dated March 19, 2018 submitted by The MBTW
Group for contract administration and construction supervision in the amount of $73,760.00 (HST
extra).
CORP0227-07/01 revised
ENG 05-18 April 10, 2018
Subject: Rotary Frenchman's Bay West Park
Reconstruction — Phase 1
Tender No. T-3-2018
Page 4
The tender for Rotary Frenchman's Bay West Park Reconstruction — Phase 1 (Tender No. T-18-
2017) was originally issued in September 2017. Two bids were received but both bids exceeded
the Phase 1 budget of $900,000 by a significant amount. Staff were of the opinion that the bids
received did not reflect the true value of the project, and should not be accepted. Alterations were
made to the design drawings and tender documents and additional funding was requested and
approved in the 2018 Parks Capital Budget.
The project includes the following items:
• Reconstruction of Beachpoint Promenade from West Shore Boulevard to the first parking area
• Reconstruction of the first parking area
• Addition of layby parking along both sides of Beachpoint Promenade
• Installation of LED lights at pedestrian crossing points
• Construction of waterfront trail and secondary trail system
• Construction of an interpretive educational kiosk
• Installation of public art: "Our House" by Dorsey James (donated by Pickering Rotary Club)
• Installation of new picnic tables, park benches and in -ground waste receptacles
• Tree, shrub and groundcover planting
Tender No. T-3-2018 was issued on February 20, 2018 and closed on March 14, 2018 with four
bidders responding. The low bid submitted by Melfer Construction Inc. is recommended for
approval. Melfer Construction Inc. have successfully completed numerous projects for the City of
Pickering including the construction of the reading garden at the George Ashe Library &
Community Centre, Amberlea Park ball diamond reconstruction, Duffin Heights West Village
Green, and Don Beer Memorial Park.
The City's Health & Safety Regulation form and current Certificate of Clearance issued by the
Workplace Safety & Insurance Board has been submitted by Melfer Construction Inc. The
Manager, Capital Projects & Infrastructure has reviewed the Waste Management Plan submitted
by Melfer Construction Inc. and it is deemed acceptable. The Certificate of Insurance has been
reviewed by the Manager, Budgets & Internal Audit and is deemed acceptable. In conjunction with
staff's review of the contractor's previous performance on City projects and references available
on this project, the tender is deemed acceptable.
Upon careful examination of all tenders and relevant documents received, the Engineering
Services Department recommends the acceptance of the low bid submitted by Melfer
Construction Inc. for Tender No. T-3-2018 in the amount of $1,649,990.00 (HST included) and
that the total net project cost of $2,091,761.00 (net of HST rebate) be approved.
CORP0227-07/01 revised
ENG 05-18
Subject: Rotary Frenchman's Bay West Park
Reconstruction — Phase 1
Tender No. T-32018
Attachments:
April 10, 2018
Page 5
1. Supply & Services Memorandum dated March 19, 2018
2. Record of Tenders Opened and Checked
3, Location Map
4. MBTW Group proposal dated March 19, 2018
Prepared By:
,44-=)
Arnold Mostert
Senior Coordinator, Landscape &
Parks,Development
6,)(
Scott ooker
Ma• -ger, Capital Projects & Infrastructure
Ray Rodrigues
Manager, Supply & Services
AM:mjh
Approved/Endorsed By:
R iard Hol:orn
erector, Engineering Services
Stan Karwowski, MBA, CPA, CMA
Director, Finance & Treasurer
Recommended for the consideration
of Pickering City Council
Tony Prevedel, P. Eng.
Chief Administrative Officer
CORP0227-07101 revised
ATTACHMENT#_I TO REPORT# 646 °S_ /a
of
cdrd
DICKERING
Memo
To: Richard Holborn
Director, Engineering Services
From: Ray Rodrigues
Manager, Supply & Services
Copy: Administrative Assistant, Engineering Servcies
Subject: Tender No. T-3-2018
Tender for Rotary Frenchman's Bay West Park Reconstruction Phase 1
Closing: Wednesday, March 14, 2018 — 2:0'Opm
File: F-5400-001
March 19, 2018
Tender No. T-3-2018 was advertised on the City's website on February 20, 2018. Four (4)
companies have submitted a bid for this project.
A copy of the Record of Tenders Opened and Checked used at the public tender opening is
attached. Tenders shall be irrevocable for 60 days after the official closing date and time.
Purchasing Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit prices
and extensions unit prices shall govern and extensions will be corrected accordingly, whichhas
been completed below.
The unsuccessful Bidder's tendering deposit, other than a bid bond, shall be returned to the
applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item .13.03 (w).
Summary
Harmonized Sales Tax Included
5 Y
idden'
r2, ; _ � �r
a
F'Tx �ia Lr:
i} 3. _ .S t
43 }
�1'otal tendered Armount
3
�
c -1:+3 ty
'� i J 't�
Aft: r�Calc la
,'-- u tl
th
j
t.'lr..
I' t-,:,
{
1 C 1 b. 7T s}l ... . J r
�_. }'C 4
J. ?�.- ,) i
1 � S
JChec�tr
� .
t
4- R Ytl 1 i 1
._
l,�k."z ._.:3t. �`z3:3' .;'.Z. ..,r.?t ,.r..t..r 1� �` ....e5..
f
T .. CK ,
,a z;_�„ r.>.,� < i. ".�r_=J, ,.'_.a,...
� S,
�£f
f
..,:l:S....—
Melfer Construction Inc.
$1,649,999.00
$1,649,999.00
Blackstone Paving & Construction
Ltd.
$2,611,798.61
$2,611,798.61
Elirpa Construction & Materials Ltd.
$ 2,641,901.29
$ 2,641,901.29
Hawkins Contracting Services Ltd:
$2,868,117.95
$2,868,117.95
Pursuant to Information to Bidders item 26 and Tendering Specifications Item 22, the following
documentation will be requested of Melfer Construction Inc. for your review during the
ATTACHMENT#, / TO REPORT#= 0S--/8
2-- of 3
evaluation stage of this tender call. Please advise if Supply & Services is to proceed with
collecting the following documentation:
(a) A copy of the City's Health and Safety Policy form currently dated and signed;
(b) A copy of the current Clearance Certificate issued by Workplace Safety & Insurance
Board;
(c) The City's certificate of insurance or approved alternative form completed by the Bidder's
agent, broker or insurer; and
(d) Waste Management Plan.
A budget of $2,755,000 was provided to Supply & Services for this procurement.
If the recommendation to award exceeds the budgeted amount, refer to Financial Control Policy
Item 11 for additional instructions.
Inaccordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out
below excludes HST.
As such, in accordance with Purchasing Policy Item 06.11, where the compliant quotation or
tender meeting specifications and offering best value to the City is acceptable or where the
highest scoring proposal is recommended and the estimated total purchase price is:
(c) Over $250,000, the Manager may approve the award, subject to the approval of the
Director, Treasurer, CAO and Council.
Please include the following items in your report:
1. if Items (a) through (b) noted above are acceptable to the Co-ordinator, Health & Safety or
designate, if required;
.2. if Item (c) is acceptable to the Manager, Budgets & Internal Audit;
3. if the list of subcontractors is acceptable to Engineering Services;
4. if Item (d) is acceptable to Engineering Services;
5. any past work experience with low bidder Four Seasons Site Development Ltd. including
work location;
6. without past work experience, if reference information is acceptable to Engineering
Services; •
7. the appropriate account number(s) to which this work is, to be charged;
8. the budget amount(s) assigned thereto;
9. Treasurer's confirmation of funding;
10. related departmental approvals; and
11. related comments specific to the project.
After receiving Council's approval, an approved "on-line" requisition will be required to proceed.
February 20, 2018 •
Tender No, T-4-2018
Asphalt Resurfacing on Various City Streets
Page 2
ATTACHMENT# 1 , TOREPORT# ENFI 05-13
oaf
Enquiries can be directed to the City's website for the unofficial bid results as read out at the
• public tender opening or to Supply & Services. Bidders will be advised of the outcome in due
course.
If you require further information, please feel free to contact me or a member of Supply &
Services.
RR/jc ` .
Attachments
February 20, 2018
Tender No. T-4-2018
Asphalt Resurfacing on Various City Streets
Page 3
City of Pickering
Record of Tenders Opened and Checked
Tender Description: Rotary Frenchman's Bay West Park Reconstruction Phase 1
Tender No.: T-3-2018
Date: Wednesday, March 14, 2018
Time: Approx. 2:15 pm Local Time
Bidder Name
Total Tendered Amount
Bidder Sign n
Comments
Elirpa Construction &
Materials Ltd
i
,
f" (../
Meer Construction Inc
$ ,
�f
L- c.
` ,
p�N
L�fl
- ,
Hawkins Contracting
Services
$
/ 0 F
; .
L
0
Blackstone Paving &I
Construction Ltd
$
i`
A 'G�4--
$
City Staff Present
Other
The information is strictly preliminary, pending review and verification of conformance to terms, conditions and specifications.
Page 11
ATTACHMENTO TOREPORT#k EA/(1 OS- /S
sof_
Location Map
Rotary Frenchman's Bay West Park Reconstruction — Phase 1
Tender No. T-3-2018
ATTACHMENT# , TO REPORT# ENe7 os- / $
March 19, 2018
Landscape & Parks Development 1 Engineering Services
City of Pickering Town Hall
1 The Esplanade South, Pickering ON
L1V 6K7
Via Email: a mostertWpickering.ca
Attention: Arnold M❑stert, OALA, Senior Coordinator
mbtw wai
Re: Consulting Fees for Contract Administration kr Rotary Frenchman's Bay West Park
Reconstruction - Phase 1, T-3.2018
Dear Arnold,
We are very pleased to provide our team outline of services and associated fees for Phase 1 of the Rotary
Frenchman's Bay West Park Reconstruction project. Attached you will find our Time -Fee Matrix providing
detailed descriptions of the various tasks and estimated time allocations per team member. We have also
estimated our team disbursements for the undertaking.
1.0 Our Understanding of the Scope and Process
Phase 1 initially is primarily civil engineering works and electrical engineering works related to the
reconstruction of Beachpoint Promenade, turning loop and parking area, With landscape paving elements
anticipated to be constructed In conjunction with this, and eventually the balance of the soft landscape works
to follow. We have included CA fees for MJS Consulting and Shoreplan to address the electrical and Structural
scopes of work respectively, and have also included a minor allowance for SLR Consulting to provide guidance
on existing and proposed plant materials should the need arise.
Please note that MBTW will function as the Prime Consultant overseeing the construction administration for
Phase 1 to ensure consistency in the implementation of the overall plan for the site, including future phases,
2.0 MBTW Team
Jana Joyce, GALA, CSLA, ASLA, Principal will continue to be the main point of contact for the MBTW Group
and will direct all Internal efforts to deliver the project. Jana will ensure that the design vision for the project
will thrive through all stages of design and detail development and construction.
Graham Carr, Dip. Arch. Tech., OALA Associate, Senior Project Manager will continue to be involved in the
project through the CA stage and will be the day-to-day contact person on the file. His familiarity with the
project and the contract documents will be beneficial In ensuring the successful contractor is executing the
project in accordance with the design requirements.
landscape architecture
T 41(1449.7767 urban design
F 416.449.1803 design guidance
2551Mcksteed Ave-, Unit 1A, Toronto, ON. Canada MAH 1G8 golf design
www.nrb tw-wai ,com leisure design
ATTACt-1MENT#, 11 TO REPORT#
—2—of
,mbtw W wai
David ibey, B.A., MLA Candidate is a Landscape Designer and will be working with Graham and Malcolm to
facilitate the execution of this project from its onset up until completion. David brings a wealth of experience
and understanding of plant materials, construction review and documentation work.
Malcolm Schell, Dip. L,A.T. Senior Project Manager is a Senior Contract Administrator at The MBTW Group
with over 40 years' experience in the landscape construction and development field. Malcolm has been site
supervisor in the landscape construction industry working on both park and commercial/industrial projects.
Malcolm will oversee MBTW's CA activities and will assist with conflicts/issues throughout the project.
MBTW can draw upon several in-house professionals to assist in the delivery of this project. Our in-house
talent includes graphic designers, horticulturalists, architects and landscape designers.
4.0 Project Schedule
We will perform the Consulting Services in accordance with the project construction schedules.
4.0 Fees for Services Summary
Landscape Consultant (Prime—The MBTW Group)
$36,060.00
Civil Consultant (R.V. Anderson)
$32,600.00
Electrical Consultant (M IS. Consulting)
$1,750.00
Structural Consultant (Shareplan)
$1,850.00
Ecolo: Consultant (S. L.R.)
$1,500.00
Total (excluding applicable taxes) (CAD)
$73,760.00
5.0 Payment
The MBTW Group will submit invoices to you that will include hours / time for our sub -consultants, At your
convenience, please provide a preferred template for invoices. Allowances for consultant work that are not
needed (i.e. SLR), will not be billed.
6.0 Closure
We would like to thank you for the opportunity to continue our involvement in this fantastic project. Our
scope description and fees enclosed in this document outline our understanding of the scope as of the date of
this letter. Should the scope change, or unforeseen situations occur, we would like to reserve the ability to
renegotiate our team compensation. Please do not hesitate to contact our office should you have any
questions, or require clarifications. We look forward to commencing this work.
Page...2
ATTACHMENT# 'TO REPORT# 1_ ILIO (35.18
—of 111 ]tw w ai
Yours Truly,
The MBTW Group
Jana Joyce, OALA, CSLA, ASLA
Principal, Senior Landscape Architect
MBTW Group
255 Wicicsteed Ave., Unit 1A
Toronto, ON, Canada M4H 1G8
T 416.449.7767 x 252
www.rnbtw-wai.com
Proposal Acceptance
On behalf of The City of Pickering, we hereby engage The MBTW Group on the terms noted herein.
Printed Name Title
Signature late
Page...3