Loading...
HomeMy WebLinkAboutPLN 05-18C! 60/ DICKERING Report to Planning & Development Committee Report Number: PLN 05-18 Date: March 5, 2018 From: Kyle Bentley Director, City Development & CBO Subject: Draft Plan of Subdivision Application SP -2017-03 Marshall Homes (Copperfield) Ltd. Part of Lots 23, 24, 25 and 26, Plan 350 Recommendation: 1. That Draft Plan of Subdivision Application SP -2017-03, submitted by Marshall Homes (Copperfield) Ltd. on lands being Part of Lots 23, 24, 25 and 26, Plan 350, to establish a residential plan of subdivision consisting of 7 lots for detached dwellings as shown on Attachment #3 to Report PLN 05-18 and the implementing conditions of approval as set out in Appendix I, be endorsed. Executive Summary: The subject lands are located on the west side of Frontier Court, east of Rougemount Drive, north of Toynevale Road and south of Highway 401 within the Rosebank Neighbourhood (see Location Map, Attachment #1). Marshall Homes (Copperfield) Ltd. has submitted an application for a Draft Plan of Subdivision to facilitate a residential development consisting of seven lots for detached dwellings fronting onto an extension of Frontier Court (see Submitted Draft Plan of Subdivision, Attachment #3). Staff support the proposed draft plan of subdivision. The proposal demonstrates appropriate lotting pattern, lot sizes and lot frontages. The existing zoning standards which are proposed to remain the same, will ensure that the future dwellings will be in keeping with the character of the surrounding residential community. The applicant is proposing two-storey detached dwellings having maximum building heights of 9.5 metres which is in keeping with the existing zoning in the area. The proposal implements the policies of the Official Plan and is consistent with the Rosebank Neighbourhood policies. Accordingly, staff recommends that Council approve the Draft Plan of Subdivision Application SP -2017-03 and endorse the implementing conditions of approval, as set out in Appendix I. Financial Implications: No direct costs to the City are anticipated as a result of the recommendations of this report. Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 2 1. Background 1.1 Property Description The subject lands are located on the west side of Frontier Court, east of Rougemount Drive, north of Toynevale Road and south of Highway 401 within the Rosebank Neighbourhood (see Location Map, Attachment #1). The subject lands have an area of approximately 0.66 of a hectare and were created through a land assembly facilitated by various land division applications. The land division applications severed the rear yards of three properties (653, 655 and 661 Rougemount Drive) to the west fronting Rougemount Drive. Additional lands on the south side of Highway 401 were acquired from the Ministry of Transportation (MTO). There are currently no structures on the subject lands. However, there are a number of mature trees located on the site. Surrounding land uses to the east, west and south include low density residential development consisting of one and two-storey detached dwellings. Immediately to the north is Highway 401 (see Air Photo Map, Attachment #2). 1.2 Applicant's Proposal The applicant is proposing a residential development consisting of seven lots for detached dwellings fronting onto the extension of Frontier Court (see Submitted Draft Plan of Subdivision, Attachment #3). The proposed lot frontages will be approximately 15.2 metres and lot areas will range between 518 square metres and 976 square metres. Frontier Court is proposed to be extended approximately 30.0 metres to the west terminating in a cul-de-sac. A remnant parcel of land west of Lot 5 will be created through the proposed development. The applicant has indicated that the remnant parcel is intended to be conveyed to the abutting landowner to the south at 661 Rougemount Drive upon registration of the draft plan. The applicant is proposing to maintain the existing zoning standards which are the same as the abutting properties to the west and south and similar to the existing zoning standards of the adjacent properties to the east fronting onto Frontier Court (see Existing "R4" Zone Provisions, Attachment #4). 2. Comments Received 2.1 October 2, 2017 Public Information Meeting, and Written Submissions A Public Information Meeting was held on October 2, 2017 at which two residents attended to express their concerns regarding the proposed development. The following is a summary of key concerns and comments: • the resident at 401 Frontier Court expressed concerns that the building height and massing of the proposed dwelling on Lot 1 would have a negative visual impact on their property as their home is a bungalow and requested that the dwelling on Lot 1 be restricted to a bungalow Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 3 • concerned that the existing adjacent residential lots will be impacted by storm drainage from the proposed development • concerned about the loss of existing trees on the subject lands • requested clarification regarding the construction management practices to ensure construction impacts such as dust, noise, mud tracking, parking of construction vehicles and other related construction activities are minimized 2.2 City Departments and Agency Comments 2.2.1 Region of Durham • the Regional Official Plan designates the subject lands as "Living Areas", which shall be used predominately for housing purposes • sanitary sewer and municipal water supply is available to service the proposed lots • the Region has no objection to draft approval of the subdivision plan and has provided its conditions of draft approval • as a condition of approval, a Record of Site Condition Compliant Phase Two Environmental Site Assessment (ESA) is required to further examine two areas of potential environmental concern identified by the Phase One ESA prepared by Soil Engineers Limited, which include: the past use of pesticides for farming purposes and a dry cleaner located approximately 171 metres north of the site • as a condition of approval, the filing of a Record of Site Condition with the Ministry of the Environment and Climate Change may also be required • the Region will also require a completed Reliance Letter and Certificate of Insurance to extend reliance to the Region for the environmental work 2.2.2 City of Pickering Engineering Services Department • no objection to the proposal subject to the conditions of draft approval provided • the owner shall satisfy all requirements, financial and otherwise of the City of Pickering including, among other matters, the execution of a subdivision agreement between the owner and the City concerning the provision and installation of roads, services, grading, drainage, utilities, tree compensation, construction management, cash in -lieu of parkland, noise attenuation and any other required matters 2.2.3 Durham Catholic District School Board • no objections to the proposal • students from this development will attend Father Fenelon Catholic Elementary School located at 795 Eyer Drive and St. Mary Catholic Secondary School located at 1918 Whites Road Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 4 2.2.4 Durham District School Board • no objections to the proposal • students from this development will be accommodated within existing schools 2.2.5 Ministry of Transportation (MTO) • no objection to the proposal • as condition of a draft approval, the owner shall submit a detailed stormwater management report in accordance with MTO Stormwater Management Requirements for review and approval • as a condition of draft approval, the owner shall submit a traffic impact study to assess site impacts on Highway 401 operations and ensure that appropriate mitigation, if required, is provided for • requests that the following Note to Draft Approval be included: • MTO Building & Land Use permits are required for all lots within a 395 metre radius of any Highway 401 intersection; MTO permits are also required prior to site grading/servicing/internal road construction and for site signs 3. Planning Analysis 3.1 The proposal conforms to the policies and provisions of the Pickering Official Plan and the Neighbourhood Development Guidelines The subjects lands are within the Rosebank Neighborhood and are designated "Urban Residential Areas — Low Density Areas" within the Pickering Official Plan, which provides for housing and related uses. This designation permits a density of up to and including 30 units per net hectare. However, the Rosebank Neighbourhood policies restrict lands west of Rosebank Road to the development and infilling of single detached dwellings and establishes a maximum residential density of 17 units per net hectare. The proposal is for 7 lots for detached dwellings having a density of approximately 12.5 units per net hectare. The Rosebank Neighbourhood Development Guidelines identify three distinct Design Precincts, each having their own separate guideline requirements. The majority of the subject lands are situated within Design Precinct No. 2, except for the northerly portions of proposed Lots 5, 6 and 7 which are situated within Design Precinct No. 1. The guidelines outline that residential development within both precincts shall be limited to detached dwellings only and that all new lots shall have minimum lot frontages of approximately 15.0 metres and minimum lot depths ranging between 30.0 metres and 36.0 metres. The proposed lots will have a minimum lot frontage of 15.0 metres and lot depths ranging between 30.0 metres and 48.0 metres, which comply with the requirements of the Rosebank Neighbourhood Development Guidelines. Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 5 The Official Plan also states that where new development is proposed within an existing neighbourhood or established area City Council shall encourage building design that reinforces and complements existing built patterns such as form, massing, height proportion, position relative to the street, and building area to site ratio. The applicant is proposing to develop the lots in accordance with the current "R4" zoning provisions (see Existing "R4" Zoning Provisions, Attachment #4). The existing zoning of the subject lands is the same as the abutting properties to the west and south and are similar to the existing zone standards of the adjacent properties to the east, fronting onto Frontier Court. Utilizing the existing "R4" zone standards will ensure that the future built form will be in keeping with the existing pattern of development within the surrounding area with respect to lot frontage, lot size, yard setbacks and lot coverage. 3.2 Proposed building height will be compatible with the existing building heights within the immediate area As noted above, the applicant is proposing to maintain the existing "R4" zone provisions. The existing "R4" zoning standards do not have a maximum building height requirement. The abutting properties to the west and south are also zoned "R4" and are occupied by detached bungalows and two-storey dwellings. The lands to the east are subject to site specific Zoning By-law 5688/00, which restricts dwelling heights to 9.0 metres except for the 3 properties on the south side of Frontier Court, where the maximum height of a dwelling is limited to 6.0 metres. At the September 11, 2017 Council meeting, Council approved the recommendations of Report PLN 15-17 (Infill and Replacement Housing in Established Neighbourhoods). One of the approved recommendations authorized staff to initiate a zoning by-law amendment to the general provisions of By-law 2511 to add a maximum building height where the site specific zoning amendments do not regulate maximum building height. At the November 6, 2017 Planning & Development Committee Meeting, the City Development Department presented an Information Report that proposed to amend the general provisions of By law 2511 to add a maximum building height requirement of 9.0 metres that would apply to the "R3" — Residential Third Density Zone and "R4" — Residential Fourth Density Zone. Staff's recommendation report to introduce a maximum building height will be considered by the Planning & Development Committee at its March 5, 2018 meeting. The applicant has submitted Conceptual Building Elevations (see Conceptual Building Elevations, Attachments #5, #6 & #7) and a preliminary siting plan for the future dwellings. The applicant has requested City Development staff to consider a maximum building height of 9.5 metres for the subject lands. Their request for the additional 0.5 of a metre in building height would provide for a marginal buffer to allow for grade differences of the various lots. The submitted conceptual elevations and siting plan demonstrate building heights ranging between 9.0 metres and 9.5 metres depending on their location and the grade. Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 6 Acknowledging that the applicant submitted an application for draft plan of subdivision with the understanding that there was no building height restriction in place and undertook the design of buildings in accordance with the existing by-law, staff have recommended in Report PLN 05-18, that a site specific exception be made in Zoning By-law 2511 to permit a maximum building height of 9.5 metres for the proposed development. Maintaining a maximum building height of 9.5 metres will ensure that the proposed dwellings will be compatible with the existing zoning within the immediate area. 3.3 Proposed grading and drainage from the development will not impact adjacent properties An area resident expressed concerns that abutting properties may be negatively impacted by stormwater runoff from the subject lands, should they be developed. A Functional Grading Plan, prepared by Candevcon Ltd., dated December 11, 2017, was submitted in support of the proposal. Split drainage and walkout drainage lots will be utilized within the proposed subdivision to ensure the proposed grades match existing boundary grades. Drainage from the front yards will outlet to the existing storm sewers on Frontier Court and drainage from the rear yards will be captured within infiltration trenches located in the proposed rear yards. An overall grading plan for the subdivision and a detailed stormwater management report will be prepared at the detailed design stage. Additional details and specifications will be established in coordination with the Engineering Services Department. The Recommended Conditions of Approval (see Appendix I) require the applicant to prepare and submit detailed drainage and grading plans. These plans will be reviewed further by City staff to ensure compliance with City's engineering standards. The required detailed drainage and grading plans for the development will ensure that drainage from the development will not impact adjacent properties. Drainage issues are not expected to impact the existing lots surrounding the subject property as a result of this development. 3.4 Noise Attenuation Measures A Noise Impact Study, prepared by YCA Engineering Ltd., dated June 23, 2016, was submitted in support of the proposal. The study recommends that the future dwellings be constructed with central air conditioning units and that warning clauses be registered on title on all lots. The Recommended Conditions of Approval require the applicant to agree in a subdivision agreement to implement noise control measures and warning clauses as recommended in the submitted noise study. The Noise Impact Study has been reviewed by the Region of Durham. The Region is satisfied with the noise consultant's recommendations. Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 7 3.5 A construction management plan will be implemented to minimize the impact of construction activities Area residents also expressed concerns regarding noise, dust, debris and traffic during the construction process of the future dwellings. The applicant has submitted a Construction Management and Erosion/Sediment Control Plan, prepared by Candevcon Ltd., dated June 20, 2017. The submitted construction management plan proposes a variety of mitigation measures to be implemented during the construction process in order to minimize any negative noise, dust and traffic impacts. The mitigation measures proposed include a mud mat at the construction exit to minimize debris from construction vehicles being tracked off the site, silt fencing to mitigate erosion impacts, and water trucks to control dust, as required. The Recommended Conditions of Approval require that the applicant enter into a Subdivision Agreement with the City. A condition of the Subdivision Agreement will require that the applicant implement the measures outlined in the submitted Construction Management and Erosion/Sediment Control Plan as approved by City staff. 3.6 Tree compensation will be required for the loss of existing vegetation Another concern identified was the loss of existing trees on the subject property. The applicant has submitted a Tree Inventory and Preservation Plan, prepared by Cosburn Nauboris Ltd., dated January 9, 2017, which surveyed and evaluated 47 trees on the subject lands and proposes to remove 37 trees, while protecting approximately 10 trees. The health condition of the trees proposed to be removed include poor, fair and good, with various trees highlighted as having poor structure. Appropriate tree protection fencing will be implemented throughout the construction process. The Recommended Conditions of Approval require the applicant to compensate the City for the loss of tree canopy through either payment of cash -in -lieu and/or replanting. 3.7 Technical matters will be addressed as conditions of subdivision approval To ensure an appropriate development, the City, Region and Agency requirements have been provided as conditions of approval for the subdivision application. Technical matters to be further addressed include, but not limited to: • construction management/erosion and sediment control • stormwater management • on-site grading and drainage • site servicing • fencing • noise attenuation measures • payment of cash -in -lieu of parkland dedication The conditions of approval set out in Appendix I to this Report address these (and other) matters. It is recommended that Council endorse these conditions. Report PLN 05-18 March 5, 2018 Subject: Marshall Homes (Copperfield) Ltd. Page 8 4.0 Applicant's Comments The applicant has been advised of and supports the recommendations of this report. Appendices Appendix I Recommended Conditions of Approval for Draft Plan of Subdivision SP -2017-03 Attachments 1. Location Map 2. Air Photo Map 3. Submitted Draft Plan of Subdivision 4. Existing "R4" Zoning Provisions 5. Submitted Conceptual Building Elevations 6. Submitted Conceptual Building Elevations 7. Submitted Conceptual Building Elevations Prepared By: Cody Morrison Planner I 5, esti Surti, MCIP, RPP Manager, Development Review & Urban Design CM:NS:Id Approved/Endorsed By: L Catherine Rose, MCIP, RPP Chief Planner Kyle Bentley, P. Eng. Director, City Development & CBO Recommended for the consideration of Pickering City Council Tony Prevedel, P.Eng. Chief Administrative Officer 14, 249/8 Appendix I to Report PLN 05-18 Recommended Conditions of Approval for Draft Plan of Subdivision SP -2017-03 Recommended Conditions of Approval for Draft Plan of Subdivision SP -2017-03 General Conditions 1. That the Owner shall prepare the final plan generally on the basis of the draft plan of subdivision, prepared by Design Plan Services, identified as Drawing Number 1592-9, dated April 6, 2017, which illustrates 7 lots for detached lots and a road (extension of Frontier Court). Subdivision Agreement 2. That the Owner enters into a subdivision agreement with and to the satisfaction of the City of Pickering to ensure the fulfillment of the City's requirements, financial and otherwise, which shall include, but not necessarily be limited to the conditions outlined in this document. 40M -Plan 3. That the Owner submits a Draft 40M -Plan to the satisfaction of the City Development Department. Street Names 4. That street names and signage be provided to the satisfaction of the Region and the City. Development Charges & Development Review & Inspection Fee 5. That the Owner satisfies the City financially with respect to the Development Charges Act. 6. That the Owner satisfies the City with respect to payment for engineering review fees, lot grading review fee and inspection fees. Architectural Control 7. That the Owner submits preliminary model designs for sale to be reviewed and approved by the City's Urban Design Review Consultant. The Owner will be responsible for the City's full cost of undertaking this review. Pre -Condition Survey 8. That the Owner submits a pre -condition survey for 401, 402, 403 and 404 Frontier Court to the satisfaction of the City. The surveys must be prepared by a qualified professional and must be undertaken prior to any site works commencing. Recommended Conditions of Approval Page 2 (SP -2017-03 Marshall Homes (Copperfield) Ltd.) Stormwater 9. That the Owner satisfies the Director, Engineering Services respecting the stormwater drainage and management system to service all the lands in the subdivision and any provision regarding easements. 10. That the Owner satisfies the Director, Engineering Services for contributions for stormwater maintenance fees. 11. That the Owner satisfies the Director, Engineering Services for the design and implementation of stormwater management facilities and easements for outfalls and access to the outfalls. Grading 12. That the Owner satisfies the Director, Engineering Services respecting the submission and approval of a grading control plan. 13. That the Owner satisfies the Director, Engineering Services respecting authorization from abutting landowners for all off-site grading. Geotechnical Investigation 14. That the Owner satisfies the Director, Engineering Services respecting the submission and approval of a geotechnical investigation. Fill & Topsoil 15. That the Owner acknowledges that the City's Fill & Topsoil Disturbance By-law prohibits vegetation or soil disturbance, vegetation or soil removal or importation to the site. No on-site works prior to the City issuing authorization to commence works is permitted. Construction/Installation of City Works & Services 16. That the Owner satisfies the Director, Engineering Services respecting the construction of roads, storm sewers, sidewalks and boulevard designs through the submission and approval of a site servicing plan. 17. That the Owner satisfy the City respecting arrangements for the provision of all services required by the City. 18. That the Owner satisfies the appropriate authorities respecting arrangements for the provision of underground wiring, street lighting, cable television, natural gas and other similar services. 19. That the Owner agrees that the cost of any relocation, extension, alteration or extraordinary maintenance of existing services necessitated by this development shall be the responsibility of the Owner. Recommended Conditions of Approval Page 3 (SP -2017-03 Marshall Homes (Copperfield) Ltd.) Phasing & Development Coordination 20. That if this subdivision is to be developed by more than one registration, the Owner will be required to submit a plan showing the proposed phasing, all to the satisfaction of the Region of Durham and the City. Dedications/Transfers/Conveyances 21. That the Owner conveys to the City, at no cost, all road allowances with the proper corner roundings and sight triangles. Easements 22. That the Owner conveys, to the satisfaction of the City, at no cost, any required easement for works, facilities or user rights that are required by the City. 23. That the Owner conveys any easement to any utility provider to facilitate the installation of their services in a location(s) to the satisfaction of the City and the utility provider. 24. That the Owner arranges, at no cost to the City, any easements required on third party lands for servicing and such easements shall be in a location as determined by the City and/or the Region and are to be granted upon request any time after draft approval. Construction Management Plan 25. That the Owner satisfies the City respecting the submission and approval of a Construction Management/Erosion & Sediment Control Plan; with such Plan to contain, among other matters: (i) details of erosion and sedimentation controls during all phases of construction and provide maintenance requirements to maintain these controls as per the City's Erosion & Sediment Control Guideline for Urban Construction (ii) addressing the parking of vehicles and the storage of construction and building materials during servicing and construction, and ensuring that such locations will not impede the flow of traffic or emergency vehicles on existing streets, or the proposed public street (iii) assurance that the City's Noise By-law will be adhered to and that all contractors, trades and suppliers are advised of this By-law (iv) the provision of mud and dust control on all roads within and adjacent to the site (v) type and timing of construction fencing (vi) location of construction trailers (vii) details of the temporary construction access Recommended Conditions of Approval Page 4 (SP -2017-03 Marshall Homes (Copperfield) Ltd.) Fencing 26. That the Owner satisfies the City with respect to the provision of temporary fencing around the entire perimeter of the subject lands during construction, prior to the commencement of any works. 27. That the Owner agrees to install a 1.8 metre high board -on -board wood privacy fence along the west, south and east property lines, where there is adjacent existing residential lots fronting onto Rougemount Drive, Toynevale Road, and Frontier Court. Landscaping 28. That the Owner satisfies the Director, Engineering Services respecting the submission and approval of a street tree -planting plan. 29. That the Owner satisfies the Director, Engineering Services with the submission of a tree preservation plan which will illustrate the protection of trees and other natural features where appropriate, with specific attention to preservation in all public open spaces prior to the approval of a preliminary grading plan. Tree Compensation 30. That the Owner agrees that prior to final approval of the draft plan, or any phase thereof, compensation for the loss, of tree canopy will be required either through replacement planting or cash -in -lieu, to be paid to the City of Pickering. In accordance with Council Resolution #387/18, approved on January 15, 2018, tree removal compensation is to be calculated in accordance with the City of Pickering Tree Inventory, Preservation and Removal Compensation requirements. Where compensation through replanting is being considered, the Owner will be required to provide a Landscape Plan indicating the location, size and species of trees to the satisfaction of the Director, Engineering Services. Engineering Plans 31. That the Owner ensures that the engineering plans are coordinated with the streetscape/architectural control guidelines and further that the plans coordinate the driveway, street hardware and street trees to ensure that conflicts do not exist, asphalt is minimized and all objectives of the streetscape/siting and architectural design statement can be achieved. 32. That the Owner satisfies the City respecting the submission of appropriate engineering drawings that detail, among other things: City services, roads, storm sewers, sidewalks, lot grading, streetlights, fencing, tree planting; and financially -secure such works. Noise Attenuation 33. That the owner agrees in the subdivision agreement to implement noise control measures and warning clauses as recommended in the Noise Report. Recommended Conditions of Approval Page 5 (SP -2017-03 Marshall Homes (Copperfield) Ltd.) Parkland Dedication 34. That the Owner satisfies the City with respect to the payment of cash -in -lieu in accordance with the parkland dedication requirements of the Planning Act. Fire 35. That the Owner agrees that no development will proceed on any land until adequate services are available including adequate water pressure to the satisfaction of the City's Fire Services Department. Model Homes 36. That the Owner enters into a model home agreement with the City, if applicable for this draft plan. All model homes must satisfy all requirements of the siting and architectural design statement. Other Approval Agencies 37. That any approvals which are required from the Region of Durham, the Ministry of Transportation or any utility for the development of this plan be obtained by the Owner and upon request written confirmation be provided to the City as verification of these approvals. Plan Revisions 38. That the Owner acknowledges and agrees that the draft plan of subdivision and associated conditions of approval may require revisions to the satisfaction of the City, to implement or integrate any recommendation resulting from studies required as conditions of approval. 39. That the Owner revises the draft plan as necessary to the satisfaction of the City, to accommodate any technical engineering issues which arise during the review of the final engineering drawings. Required revisions may include revising the number of residential building lots or reconfiguring the roads or lots to the City's satisfaction. 40. That the Owner agrees to implement the requirements of all studies that are required by the City for the development of this draft plan of subdivision to the satisfaction of the City. Notes to Draft Approval 41. This draft approval shall lapse three years from the date the draft approval has been granted if the noted conditions have not been fulfilled, or if it has not been extended by the City of Pickering. ATTACHMENT # / TO REPORT # -/P • OQ .:ROrKRIDGE GAT_ 0 O z II ROUGE HILL COU 10NGSt014 ROAp 4 z m z SUBJECT LANDS FRONTIER RT o' 0 ce w 1- r w z I II E- ce 0 O z 0 0 >- J zI-- S TOYNEVALE ROAD INF • w 0 1- 0 0 w 0 0 0 J w > 0 2 z 1- 0 0 2 H z w 0 0) w 0 0 0 w J 0 2 I rya*161 IMP NMI ■ ./ 0 II I I 1 cdri PICKERING City Development Department Location Map File: SP -2017-03 Applicant:Marshall Homes (Copperfield) Ltd. Property Description: Part of Lots 23, 24, 25 & 26, Plan 350 5 The Corporation of the Cny of Pickering Produced On pan) under license from: c6 Queens P,rter, Ortano Mn shy of Natural Resources. Affrights reserved.5 Her Majesty the Queen In Right of Canada, Department of Hatual Resources. AA rights reserved.; �Teranet Enterprises los. and Its suppliers all rights reserved.; ® Municipal Property Assessment Corporation aM Its s pp€ea al rights reserved.; Date: Feb. 01, 2018 SCALE: 1:5,000 THI5 (5 NOT APIAN OF SURVEY. ATTACHMENT # cQ REPORT >f 2-N 05.-45 ed, Air Photo Map File: SP -2017-03 a PICKERING City Development Department Applicant:Marshall Homes (Copperfield) Ltd. Property Description:Part of Lots 23, 24, 25 & 26, Plan 350 Date: Feb. 01, 2018 ib M. Gorporopon orOw[Ay el Prckedni Piodueed Rn.Prt} under lloPno. Yem94w.r.on.i.r,El6.0I Meflbynl MaMl R..uuePP. All 16,..1511 HI PN.e v n1 WS" 4' VI .1...M1lr S01.1 [,...1. 0.PPdm.nl o/MIrnI RPw Vs.r A. r.e. n••r oil 0,..,..,., Enrw,,,m" Lk.AMiLL..w... ..rR71..,,Pd,', o klWuripei PmP wily AueluniiCPry PnIP n PN RP YwPloir MA Hoke roc.rwd, SCALE. �.rr7100❑ I FMB Pa ReytPLA Il OF SURVEY Alli N i r 1ACSC% /-`.... 5 3 e� �■ ■ Toynevale s� T s rte■ N°' ter' I\ '7 •! �, z ,s.z a_.J Road /� [ T h-- j j �_--+----� r - ',, Y Frontier t - r r----r^---r-� ---r----'-- �'\ l, J Court - r + , + + �Y 1 `,. , —1 �sr I I 1 r I I i I I ,. r I ---4 g 1 I u I 1m I- -- ---I + , -t 1 1 I 1 1 J I N Remnant Parcel E 1— z D p uta ce Fr 6611 I I 655 1 053 T 1 1 Submitted Draft Plan of Subdivision FILE No: SP-2017-03 Pj C E RI N V City Development Department APPLICANT Marshall Homes (Copperfield) Ltd. PROPERTY DESCRIPTION: Part of Lots 23, 24, 25 & 26, Plan 350 FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CffY OF PICKERING CITY DEVELOPMENT DEPARTMENT. DATE: Feb. 08, 2018 /ATTACHMENT # TO Existing "R4" Zoning Provisions Zoning By-law 2511 Provision Existing R4 Zone Standards Permitted Uses Detached dwelling Lot Area (min) 460 square metres Lot Frontage (min) 15.0 metres Front Yard (min) 7.5 .metres Side Yard (min) 1.5 metres on one side and 1.8 metres on the other side or 1.5 metres on both sides where a garage is erected as part of the detached dwelling Flankage Yard (min) 4.5 metres Rear Yard (min) 7.5 metres Lot Coverage (max) 33 percent v NOk �u 14 ' .41,0111111111111.Z. rig 11111.1. linal ill ME 11. Nina TCP Or RAM - _ — ` � r1 /1 —. 'i RIR■1111�s111Il-11111111111J _ AI 11 II . , ... — ~ 1___ —_ - — a 1 ..R■..■ 11 . to =111111= ice, � i t —... = M•--i,i� _ FOP OF TRMYAM. i l !- NE '1 , __- .... .__ .. _. TOP of NIWJ'V - I LI All m Imo. Pll �i-.1 1-.li _'.■■ �1 111 1 1 ■ IL rs• • - I 11■■■1111-1�:1 ' X111 ■■■ 1 FliI 11 1 .1 1-'t Op. �� 1 a 1�,l Pai - ■-■ IIA ■ ■ F3- ■-■ IIIIU1:1IItIII1/JNIIIIUIa; i• . - oOOO ■-■ OOC'e .�- -- �-' !i. Wall. r�1 111 i■ ■11 �-� III IIIi1Mg 1'1111- 1 �� 1 1 'r _ R • M1111�11 I R - i�Al.��- r I 11M 11.111 Mi . • - ..______ �... 1� �.-_.II %11111111\III 'ililio, .1111/11111\g 'iiiiiii. ---, D• 11111.1 ----+l---=�------+-•�I= �iilii dliiil FRONT ELEVATION 'A' FRONT ELEVATION 'B' Submitted Conceptual Building Elevations C4 ° FILE No: SP -2017-03 PICKERING APPLICANT: Marshall Homes (Copperfield) Ltd. City Development PROPERTY DESCRIPTION: Part of Lots 23, 24, 25 & 26, Plan 350 Department FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. DATE: Feb 1, 2018 A� I %4kt•, e\i\i\i\ ... Vii':-i `s,, n • A \� _ _ c :spa• ���� � n .ani\i��• n .—.`: air �� � .,,.. ; .'... �14 �u u . Alivir.a.saiml No leiiiiiii.Sin 111, /./rye _/.� �ti_/ - /N_� �y0y�� .■ice 1:2701�►■ ♦ e41.14 y �: 1■ MI U1 : r -----....—T.• No so �:;1- _--_ •iiiis : —_ 1111 ■ ;= _n! TOP OI'NrMtl N im NI Oh NI NI ffflll ;Olt �" NO 1711, II II I ral �� NI I�� RR �1 SNI ._/ 1 BB 11� '■'—" BBJ OR : WA• �/� �� <';NI 1 • 7 Q1/�-.//_.-//_._■/ = -= =I�I — !Hi . ....«.«_ .,.,..,...-.n ._. ... --_ TOP OF mueom 11 I�� .1a-111 .�� P.M��. ��1: �� _... _ ___ �=o� T������� __ ■ OF TOP Or YUtA7W }��� !,7'7'!11'` yM11N �I' ■ ��!��a a■�1�N��� •11 .. „ .w .S:-:. ��� AN ■I 11 1 N1 :,� 1• ■ Dom> ■.r.:57, e: ;it 1 11 y$�Q9jy NMI ■ 11 11 11 . • •I _ 11 71WI _� --- II 1/ t1 I� � n I � �lh\� I I- �Il��il � i 1 � I, 11 •o [ - �I1 X111 7 11 - 1! r1 11 p _4 _ _!Hwy)_I •;1 ■ �- III i ll�� – ®®G 1 1'� �i ,,I, !� rxcaawnrt — --- }�'- -fidii I IIIIII11 1111111r.' 1���.11111111 I111110h ti • �■� iir'w �'� 111 w.:, i'i i s FRONT ELEVATION 'A' FRONT ELEVATION'S' I% MADE Submitted Conceptual Building Elevations (4°6' FILE No: SP-2017-03 PICKERING APPLICANT: Marshall Homes (Copperfield) Ltd. City Development PROPERTY DESCRIPTION: Part of Lots 23, 24, 25 & 26, Plan 350 Department FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. DATE: Feb. 1, 2018 lir} I min 111 I iti .illi - -4-0.-------- 11•1111=1111•1111111111111 a; we ...drilaA cz '.Ill PERSPECTIVE � �'�� �_iii�II 1I.��rogrigiva 3rplZ VIEW I � I -:.�� Ri I� 1.1---- � ' - :4-'1. I ��111:1.11111 ® -�r�.-- r �Yi�•I "�. �, `'.'----�-._ I li d 1 I+��' ��I�IIIII�rII"iIIIIIII,����I" mui-- III �) IIV"lII r reg le l e IISI9'11111:1"i"1:14 �4 i®�u /� lei, a l o w/ * �P,pii■//���P ID IIIt� ) Ir��,:�� '14' .✓T - � 4Mwn-.n..rY'} 4' s' y S „n " Submitted Conceptual Building Elevations C4 4 FILE No: SP-2017-03 PICKERING APPLICANT: Marshall Homes (Copperfield) Ltd. City Development PROPERTY DESCRIPTION: Part of Lots 23, 24, 25 & 26, Plan 350 Department FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING CITY DEVELOPMENT DEPARTMENT. DATE: Feb. 1, 2018