HomeMy WebLinkAboutENG 24-17DICKERING
Report to
Executive Committee
Report Number: ENG 24-17
Date: November 6, 2017
From: Richard Holborn
Director, Engineering Services
Subject: Pre — 2018 Capital Budget Approval
Consulting Services for Detailed Design for the Whitevale Master Drainage Plan
Implementation Project
- File: A-1440
Recommendation:
1. That Council approve the hiring of AECOM Canada Ltd. for the Detailed Design Services for
the Whitevale Master Drainage Plan Implementation Project in accordance with Purchasing
Policy 10.03(c), as the assignment has a value above $50,00000 and a competitive process
is not being followed, and therefore is subject to additional Council approvals;
2. That the fee proposal dated October 16, 2017 submitted by AECOM Canada Ltd. for the
Detailed Design Services for the Whitevale Master Drainage Plan Implementation Project in
the amount of $298,896.30 (HST included) be accepted;
3. That the total gross project cost of $345,736.00 (HST included), including the proposal
amount and other associated costs, and the total net project cost of $311,346.00 (net of HST
rebate) be accepted;
4. That Council provide pre — 2018 Capital Budget approval of the total net project cost of
$311,346.00 to retain the consulting services of AECOM Canada, and for other associated
costs;
5. That the Director, Finance & Treasurer be authorized to finance the estimated net project
cost of $311,346.00 by a transfer from the Roads & Bridges Reserve Fund;
6. That the funds required for Contract Administration and Field Inspection from AECOM
Canada Ltd. as outlined in the proposal, and any required associated costs be included with
the cost of construction in the appropriate year and be subject to approval through the future
year's. Capital Budget process;
7. That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this report.
Executive Summary: The Whitevale Master Drainage Plan, dated March 2013 was
completed by AECOM Canada Ltd. and endorsed by Council by Resolution # 183/14 on February
24, 2014. The recommended solutions from the plan were included in the Capital Forecast for
design in 2018, and construction in 2019 at a total estimated cost of $2.5 million.
ENG 24-17 November 6, 2017
Subject: Consulting Services for Detailed Design
for the Whitevale Master Drainage Plan Implementation Project Page 2
Due to severe storm events in summer 2017 resulting in flooding, property damage and damage
to municipal infrastructure, it became clear that implementation of the Whitevale Master Drainage
Plan is required as soon as possible to mitigate further damage, flooding and loss.
As AECOM was the author of the Whitevale Master Drainage Plan, City staff negotiated a
proposal from them to undertake the detailed design and approvals components of the
recommended solutions outlined in the Plan.
In accordance with City Purchasing Policy section 10.03(c), where a competitive process is not
followed, the Director initiating the assignment shall require Council approval to engage the
services of a particular consultant. The Director, Engineering Services is recommending Council
approval to retain AECOM Canada Ltd. for this assignment at a cost of $264,510.00 (plus HST).
The initial project award will consist of tasks related to detailed design services as outlined in
AECOM Canada Ltd.'s proposal at this time. Tasks related to contract administration and field
inspection as outlined in the fee proposal are accepted but will be funded in a future year along
with construction.
Pre — 2018 budget approval is required in order to have the assignment commence in time to
have the design, approvals, permits and tender documents complete for a possible 2019
construction.
Financial Implications:
1. Proposal Amount
Proposal from AECOM Canada Ltd. dated October 16, 2017
Whitevale Master Drainage Plan Implementation Project Detail Design
HST (13%)
Total
$264,510.00
34 386.30
$298,896.30
2. Estimated Project Costing Summary
Proposal
Associated Costs
Contingency (10% )
Toronto and Region Conservation Authority Permit Fees
Sub Total — Costs
HST (13%)
Total Gross Project Cost
HST Rebate, (11.24%)
Total Net Project Cost
$264,510.00
26,451.00
15,000.00
$305,961.00
39,775.00
$345,736.00
(34,390.00)
$311,346,00
C0RP0227-07101 revised
ENG 24-17
Subject: Consulting Services for Detailed Design
for the Whitevale Master Drainage Plan Implementation Project
November 6, 2017
Page 3
3. Approved Source of Funds — 2018 Pre -Budget Approval
Expense Code
5320.1898.6230
Total Funds
Source of Funds Pre — Budget Approval Amount
Roads & Bridges Reserve Fund
$311,346.00
$311,346.00
In order to advance this project, pre — 2018 budget approval is required, and this requirement is
reflected in Recommendation 4. Once the 2018 Capital Budget is approved, the purchase order
and costs incurred will be re -allocated to project code 5320.1807.6230.
Discussion: The Whitevale Master Drainage Plan (WMDP) dated March 2013, was
completed by AECOM Canada Ltd. and provides a comprehensive solution to the drainage
system deficiencies in the Hamlet of Whitevale. The WMDP was received and endorsed by
Council on February 24, 2014 by Resolution #183/14. Report ENG 04-14 concerning the WMDP
included a recommendation that staff be authorized to implement the recommendations of the
WMDP subject to budget and further Council approval for individual projects.
After the WMDP was received and endorsed by Council, staff included cost estimates in the
Capital Forecast for detailed design services and for construction. In the most recent Capital
Forecast (2018 — 2021), the detailed design is indicated as a 2018 project and construction is
indicated as a 2019 project. The total estimated cost of the improvements is $2.5 million.
During the period of 2014 — 2016, the Whitevale bridge was under construction and that project
included construction of a new storm sewer outfall on the east approach to the bridge. The storm
sewer outfall is an integral component to the new drainage system recommended in the WMDP.
The Whitevale Road storm sewer systems could not be improved prior to the new outfall being
completed.
In June and July 2017 severe rain storms in the Hamlet of Whitevale resulted in flooding and
property damage, including damage to municipal infrastructure. Although repairs were
undertaken and improvements have been made since the storm, it is apparent that the
implementation of the WMDP recommendations are required as soon as possible to mitigate
further damage, flooding and loss.
Recent discussions and correspondence with the Whitevale District Residents Associations about
managing stormwater in the Hamlet have highlighted the community's concern and the need for
an action plan. The action plan developed consists of short term interim solutions, that have been
implemented, and the acceleration of the WMDP recommended solutions.
In order to accelerate the detail design services required to implement the WMDP solutions, staff
contacted AECOM Canada Ltd., the authors of the WMDP. AECOM was requested to submit a
proposal based on their understanding of the project. An important element of the proposal is to
C0RP0227-07101 revised
ENG 24-17 November 6, 2017
Subject: Consulting Services for Detailed Design
for the Whitevale Master Drainage Plan Implementation Project Page 4
fulfill WMDP Environment Assessment commitments to involve the Whitevale District Residents
Association in the detailed design process and receive their input. The Whitevale District
Residents Association and their Drainage Committee were involved in the preparation of the
WMDP and their involvement lead to the success and acceptance of the plan.
The proposal from AECOM Canada Ltd. dated October 16, 2017 has been reviewed by staff and
the proposed work plan, deliverables, schedule and fee is deemed acceptable. The project team
assigned to the project has the qualifications and experience necessary to complete the project.
In order to have a detailed design and tender package completed by the end of 2018 in
preparation for spring 2019 construction (subject to further Council approval), it is necessary to
have the assignment commence in November 2017. To achieve this timetable, 2018 pre - budget
approval is required and is a recommendation within this report.
In accordance with City Purchasing Policy section 10.03(c), where a competitive process is not
followed, the Director initiating the assignment shall require Council approval to engage the
services of a particular consultant. The Director, Engineering Services is recommending Council
approval to retain AECOM Canada Ltd. for this assignment. The initial project award will consist of
tasks related to detailed design services as outlined in AECOM Canada Ltd.'s proposal dated
October 16, 2017. Tasks related to contract administration and field inspection as outlined in the
fee proposal are accepted but will be funded in a future year along with construction.
Attachments:
1. Location Map
CORP0227-07/01 revised
ENG 24-17 November 6, 2017
Subject: Consulting Services for Detailed Design
for the Whitevale Master Drainage Plan Implementation Project Page 5
Prepared/Approved/Endorsed By:
Richard Holborn, P.Eng.
Director, Engineering Services
Stan Karwowski, MBA CPA, CMA
Director, Finance & Treasurer
RH:mjh
Recommended for the consideration
of Pickerin• City Council
iLiv-Vki,r OF
Tony Pre de , P Eng.
Chief Administrate Officer
CORP0227-O7701 revised
11
j�4,�
e.
�`
L
r
'".:4
\
IROAD-
-J
(
WH 1 N/A
%
E
il ilililil
-
-.1
)ELINE 28 -
'ter+
CHURCHWIN
STREET ��\
ii
III
! 111111110 \
f11' WH1TEVALE ROAD =•.•-'
CY .w.�.�.�.�.' ' �' W
►-�-� w-a-�-�
z
Z ' IL-
Miff
nil
WI'
W
\.)
��
- yh
1
r�
,
I`ly ��',Ct
� iii .
�
U /f�
��
,.,1
/y'���
��
1111-
Q ,
i
0 ‘
1
est
, rf
4,
oS
Legend
a
o
Q
1
1
_CL
� --C
2E452
Subject Lands
ill `
Engineering Services
Location Map
Department
Hamlet of Whitevale
PICKERING
y r+° °° loci la, 2017