Report to
Executive Committee
Report Number: FIN 18-17
Date: September 5, 2017
From: Stan KanNowski
Director, Finance & Treasurer
Subject: Tender/Contract Approval
- Approvals During Council Recess 2017
Recommendation:
1. That Report FIN 18-17 of the Director, Finance & Treasurer regarding tender and contract
approvals be received;
2. That Council pass a resolution ratifying the approval of the Tenders and Contracts by the
Chief Administrative Officer during Council's recess being: RFP -4-2017 Integrated
Transportation Master Plan; T-13-2017 City Hall Accessibility Upgrades at the Pickering
Civic Complex; 0-40-2017 Supply and Delivery of Two Multi -Purpose Tractors; and
3. That the appropriate City of Pickering officials be authorized to take the necessary actions
as indicated in this report.
Executive Summary: Council is required to approve contracts awarded by the Chief
Administrative Officer in accordance with Section 07 of the Purchasing Policy. The tender and
contract approvals contained in this Report met the City's Purchasing Policy, were within the
approved Budget and were approved by the Chief Administrative Officer during Council's
recess this year.
Financial Implications: The capital projects listed and described in this report are being
funded from various sources as approved by Council in the Capital Budget.
Discussion: Purchasing Policy Section 07 authorizes the Chief Administrative Officer to act
on behalf of Council in approving an award of a project, and the Treasurer is authorized to
approve financing for same, during any recess, break or absence of City Council, on the
condition that:
(a) The project is in a budget approved by Council;
(b) Such actions are in compliance with the Purchasing Policy and the Financial
Control Policy;
Report FIN 18-17 September 5, 2017
Subject: Tender/Contract Approval Page 2
- Council's Recess 2017
(c) The project is not debt financed; and
(d) A report respecting those approvals is subsequently submitted to Council.
The circumstances were such that one proposal, one tender and one quotation required
approval by the Chief Administrative Officer during Council's 2017 recess. It is recommended
that Council receive this Report for information and ratify the approval of RFP -4-2015
Integrated Transportation Master Plan; T-13-2017 City Hall Accessibility Upgrades at the
Pickering Civic Complex; Q-40-2017 Supply and Delivery of Two Multi -Purpose Tractors.
Therefore, pursuant to the Purchasing Policy, the following was approved by the Chief
Administrative Officer during the "recess" of Council
Request for Proposal No. RFP -4-2017 Integrated Transportation Master Plan
That Proposal No. RFP -4-2017, for Consulting Services for the preparation of an Integrated
Transportation Master Plan submitted by IBI Group Professional Services Inc. in the amount of
$387,465.70 (HST included) be accepted.
Financial Implications:
1. Proposal Amount
Proposal No. RFP -4-2015
HST 13%
Total
$342,890.00
44, 575.70
$387,465.70
2. Estimated Project Cost Summary
Request for Proposal No. RFP -4-2015
Additional Provision
Total Project Cost (excluding taxes)
HST (13%)
Total Gross Project Cost
HST Rebate (11.24%)
Total Net Project Cost
$342,890.00
1,057.00
343,947.00
44,713.00
$388,660.00
(38,660.00)
$350,000.00
3. Approved Source of Funds
Account Code Source of Funds
Development Charges -
2290.2392.0000 Reserve Fund Studies
Total Funds
Property Taxes
Budget
$315,000.00 $315,000.00
Required
$35,000.00
$350,000.00
$35,000.00
$350,000.00
Project Cost Under (Over) Approved Funds By
$0.00
Report FIN 18-17
Subject: Tender/Contract Approval
Council's Recess 2017
September 5, 2017
Page 3
Tender No. T-13-2017 City Hall Accessibility Upgrades at the Pickering Civic Complex
That Tender No. T-13-2017 submitted by J.J. McGuire General Contractors Inc. in the revised
amount of $514,150.00 (HST included) be accepted.
Financial Implications:
1. Tender Amount
Tender No. T-13-2017
Cash Allowance (Finish Hardware)
Cash Allowance (Adult Change Table)
Cash Allowance (Testing & Inspection)
Cash Allowance (Roofing)
Gross Tender Cost
HST (13%)
Total Gross Tender Cost
$420,000.00
10, 000.00
10, 000.00
5,000.00
10, 000.00
$455,000.00
59,150.00
$514,150.00
2. Estimated Project Cost Summary
Gross Tender Cost (T-13-2017)
Cabling
Council Area Reception
Furniture, Fixtures & Equipment
Contingency
Total Project Cost
HST (13%)
Total Gross Project Cost
HST Rebate (11.24% of Total Project Cost))
Total Net Project Cost
$455,000.00
8,000.00
20, 000.00
50, 000.00
63,000.00
$596,000.00
77,480.00
$673,480.00
(66,990.00)
$606,490.00
3. Approved Source of Funds
2015 Approved Current Budget
Project Code
5700.1602.6183
Total Funds
Source of Funds
Rate Stabilization
Reserve
Canada 150 Community
Infrastructure Program
Available Budget Required
$1,159,922.00 $540,490.00
66,000.00
$1,159,922.00 $606.490.00
Project Cost Under (Over) Approved Funds By
$553,432.00
Report FIN 18-17
Subject: Tender/Contract Approval
- Council's Recess 2017
September 5, 2017
Page 4
Quotation No. Q-40-2017 Supply and Delivery of Two Multi -Purpose Tractors
That Quotation No. 0-40-2017 submitted by Joe Johnson Equipment for two 2017 MT7
Trackless Multi -Purpose Tractors including a snow blower, stump grinder and spray tank, in
the amount of $294,041.00 (HST extra) be accepted.
Financial Implications:
1. Quotation Amount
Quotation No. Q-40-2017
HST (13%)
Total Gross Quotation Cost
$294,041.00
38,225.33
$332,266.33
2. Estimated Project Cost Summary
Quotation No. 0-40-2017
Optional Extra — Snow Blower
Optional Extra — Spray Tank
Optional Extra — Stump Grinder
Sub Total
HST (13%)
Total Gross Project Cost
HST Rebate (11.24%)
Total Net Project Cost
$260,836.00
15,400.00
4,405.00
13,400.00
$294,041.00
38,225.33
$332,266.33
(33,050.00)
$299,216.00
Report FIN 18-17
Subject: Tender/Contract Approval
- Council's Recess 2017
September 5, 2017
Page 5
3. Approved Source of Funds
Description
One Multi -Purpose
Tractor
One Multi -Purpose
Tractor with
optional Snow
Blower and Spray
Tank
One Optional
Stump Grinder
Attachment
Total Funds
Account Code Source of Funds
5311.1703.6178 DC City's Share
(38%) Reserve
5311.1703.6178 DC — Roads &
Related (62%)
Reserve Fund
5311.1707.6178 Internal Loan —
5yr
5311.1707.6178 Property Taxes
Available Budget Required
$55,643.00 $50,431.00
89,357.00 82,282.00
0 2,003.00
5780.1721.6178 Property Taxes 13 500.00 13,500.00
$309,500.00 $299,216.00
New Project Cost Under (Over) Approved Funds By
$10,284.00
Attachments:
1. Memorandum dated July 12, 2017 regarding RFP -4-2017
2. Memorandum dated June 29, 2017 regarding T-13-2017
3. Memorandum dated June 16, Revised August 4, 2017 regarding Q-40-2017
ared By:
Ray Rowrigues
Supervisor, Supply & Services
Approved/Endorsed By:
Stan Karwowski
Director, Finance & Treasurer
Recommended for the consideration
of Pickering City Council
rs
Tony Prevedel, P.Eng.
Chief Administrative Officer
.CHMENT#/TO REPORT #
PICKERING
a i8 -1'Z
Memo
To: Tony Prevedel July 12, 2017
Chief Administrative Officer
From: Richard Holborn
Director, Engineering Services
Copy: Manager, Capital Projects & Infrastructure
Coordinator, Transportation Engineering
Subject: Integrated Transportation Master Plan
Proposal No. RFP -4-2017
File: A-1440
Overview: As part of the 2017 Engineering Services —Administration Current Budget, the
completion of the Integrated Transportation Master Plan was approved as a project with a budget of
$350,000.00.
Proposal No. RFP -4-2017 was issued on April 27, 2017 and closed on May 25, 2017 with five.
proposals being received by the closing date and time. The Evaluation Committee reviewed and
evaluated the five proposals received using criteria outlined in the Terms of Reference.
As the cost of the highest ranked submission exceeded the approved budget, staff exercised
Section 2.5 Stage IV — Ranking and Contract Negotiations of the Request for Proposal document for
improved pricing. As a result, the renegotiated proposal cost is within the approved budget amount.
It is recommended by the Evaluation Committee that IBI Group Professional Services Inc. be
retained to undertake the Integrated Transportation Master Plan at a cost of $387,465.70 (HST
included). The total net project cost is estimated to be $350,000.00.
In accordance with Section 10.04 of the Purchasing Policy, where the project cost of a consulting
assignment is more than $50,000.00, the award is subject to the approval of Council. Furthermore, in
accordance with Purchasing Policy Item 07.01, the Chief Administrative Officer is authorized to
act on behalf of Council during any recess of Council in approving an award of a project, and the
Treasurer is authorized to approve financing of same.
Recommendation:
1. That Proposal No RFP -4-2017, for Consulting Services for the preparation of an Integrated
, Transportation Master Plan submitted by IBI Group Professional Services Inc. in the amount
of $387,465.70 (HST included) be accepted;
2. That the total gross project cost of $388,660.00 (HST included), and the total net project cost
of $350,000.00 (net of HST rebate) be accepted;
3. That the Director, Finance & Treasurer be authorized to finance the total net project cost of
$350,000.00 as follows:
a) the sum of $315,000.00 as approved in the 2017 Current Budget to be funded from the
Development Charges Reserve Fund Studies; and
b) the sum of $35,000.00 as approved in the 2017 Current Budget to be funded from
property taxes;. and
4. That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this memo.
Financial Implications
1. Proposal Amount
Proposal from IBI Group Professional Services Inc. dated May 25, 2017
Integrated Transportation Master Plan $342,890.00
HST (13%) 44,575.70
Total Gross Project Cost $387.465.70
July 12, 2017
Integrated Transportation Master Plan
Proposal No. RFP -4-2017
Page 2of5
2. Estimated Project Costing Summary
Proposal Phases 1, 2, 3 and 4
Additional Provision
Total Project Cost (excluding taxes)
HST (13%)
Total Gross Project Cost
HST Rebate (11.24%)
Total Net Project Cost
$342,890.00
1,057.00
343,947.00
44,713.00
$388,660.00
(38,660.00)
$350 000.00
3. Approved Source of Funds — 2017 Current Budget
Account
Source of Funds
2290.2392.0000 Development Charges —
Reserve Fund Studies
Total Funds
Property Taxes
Available Budget Required
$315,000.00 $315,000,00
35,000.00 35,000.00
$350.000.00 $350,000.00
Net Project Cost under (over) Approved Funds
$0.00
Discussion: The 2017 Engineering Services — Administration Current Budget
included $350,000.00 for the completion of the Integrated Transportation Master Plan.
An Integrated Transportation Master Plan (ITMP) is a strategic planning document designed to
define the policies, programs and infrastructure improvements required to address existing and
future transportation needs. The City of Pickering ITMP will define a city-wide vision for the
development of transportation priorities, programs and networks that will guide future municipal
transportation investments in an integrated manner. The ITMP is a critical document in
determining the municipality's objectives of promoting mobility for all modes of transportation
improving existing and future transportation infrastructure and supporting a vibrant downtown
through a multi -model network.
The study is to be prepared in accordarice to the master planning process as defined in the
Municipal Class Environmental Assessment (EA). The completed ITMP will fulfill the requirements
of phases 1 and 2 of the Class EA process; that is to identify the need and justification and the
design process for all recommended projects.
The City of Pickering's current Trails and Bicycle Master Plan, was prepared in 1996. The
consultant will review, incorporate and expand upon the City's current Trails and Bicycle Master
Plan. The purpose of the proposed Active Transportation Plan for City of Pickering is to build upon
July 12,2017
Integrated Transportation Master Plan
Proposal No. RFP -4-2017
Page 3 of 5
the existing system of on and off-road pedestrian, trail and cycling facilities; link them together in
an integrated network that also supports transit use; and design existing and future programs to
promote, educate and encourage more people of all ages to choose active transportation modes
of movement more often, throughout the municipality and beyond in an environmentally and
financially sustainable manner.
A consultant is required to undertake the ITMP and to update the 1996 Trails and Bicycle Master
Plan, as part of the ITMP.
Proposal No. RFP -4-2017 was issued on April 27, 2017 to obtain proposals to undertake the
Integrated Transportation Master Plan. The RFP process closed on May 25, 2017, with five
proposals submitted.
The proposals were reviewed by the Evaluation Committee consisting of staff from the
Engineering Services and City Development Departments. Proposals were evaluated based on
the following criteria:
• Experience, Qualifications and References
• Project Deliverables
• Quality and Completeness of Proposal
• Pricing
IBI Group Professional Services Inc. is the highest ranked proponent. The proposal submitted by
IBI Group Professional Services Inc. exceeded the approved budget. In accordance with Section
2.5 of the Request for Proposal document, City staff met with representatives from IBI Group
Professional Services Inc. to negotiate improved pricing. As a result, the total net project cost
required is within budget.
The Health & Safety Statement signed by IBI Group Professional Services Inc. and Certificate of
Clearance issued by the Workplace Safety & Insurance Board have been reviewed by the Human
Resources Specialist and deemed acceptable. The Certificate of Insurance has been reviewed by -
the Manager, Budgets & Internal Audit, and is deemed acceptable.
Upon careful examination of all proposals and relevant documents received, the Engineering
Services Department recommends the acceptance of Proposal No. RFP -4-2017 submitted by IBI
Group Professional Services Inc. in the amount of $387,465.70 (HST included) and that the total
net project cost of $350,000.00 (net of HST rebate) be approved.
July 12, 2017
Integrated Transportation Master Plan
Proposal No. RFP -4-2017
Page 4of5
Prepared By:
a �
�^I . ,
Nadeem Zahoor, P.Eng., M.Eng.
Transportation Engineer
Darrell Seisky, C.E.T., CMM III
iaft-RichardHolborn, P.Eng
Director, Engineering Services
Approved/Endorsed By:
,1-84. Stan Karwowski, MBA, CPA, CMA
Manager, Capital Projects & Infra structure Director, Finance & Treasurer
Vera A. Felgemacher
CSCMP, CPPO, CPPB, CPM, CMM III
Manager, Supply & Services
Approval
sm.fOF
Tony Prev-:e ' Eng.
Chief Administr'rati Officer
NZ:mjh
July 12, 2017
Integrated Transportation Master Plan
Proposal No. RFP -4-2017
Page 5 of 5
ATTACH
DICKERING
i "7
Memo
To: Tony Prevedel
Chief Administrative Officer
From: Marisa Carpino
Director, Community Services
Copy: Director, Finance & Treasurer
Division Head, Operations
Manager, Supply & Services
Manager, Facilities Capital Projects
Senior Financial Analyst, Capital & Debt Management
Subject: Tender No. T-.13-2017
- City Hall Accessibility Upgrades
File: A-1440
June 29, 2017
Overview:
The Pickering Civic Complex opened in 1990, prior to many of the legislative requirements included
in the present version of the Ontario Building Code. The facility houses most of the City's
administration departments, including their respective points of service for residents, businesses
and visitors. alike.
AECOM Canada Inc. was retained in 2016, as per Request for Proposal RFP -9-2016, to undertake
design for renovations to the ground floor of City Hall to include:
a) Council Chambers;
b) Ground Floor Public Washrooms and Customer Care Service Counter; and
c) City Development Service Counter.
These public areas are in need of renovation in order to improve service capabilities and to
address changes in accessibility legislation since its original construction. AECOM Canada Inc.
was tasked with designing the renovation of the three distinct areas in an effort to maintain
consistency of its final appearance. -
On February 10, 2017,.Request for Proposal RFP -3-2017 was publically released for the
Prequalification of general. contractors for Accessibility Upgrades in the Pickering Civic Complex. A
total of eight proposals were received by the deadline of Thursday, March 2, 2017. Based on the
results of the evaluation rated criteria, two general contractors were successfully prequalified by the
City to submit bids for consideration.
Tender No. T-13-2017 was released to the prequalified general contractors and was also made
available for information to the public on the City's website on May 2, 2017 and closed on May 25,
2017.
The lowest submitted compliant bid exceeded the approved budget for the project. Tender T-13-
2017 required bidders to provide a breakdown of pricing by area so staff could assess the costs
associated with each of the three project areas. Supply & Services staff were directed to approach
the lowest compliant bidder to investigate whether the Company would hold its price for lobby
washrooms and service counters, if the Council Chambers renovation (Item 1.1 of tendering
document) was removed from the project scope of work. J.J. McGuire General Contractors Inc.
have agreed to do so on June 13, 2017. Reducing the scope of work for all other compliant bids in
the same manner would not change the resulting lowest bidder.
Having deleted Item 1.1, Renovation of Council Chambers, including all related work on north side
of main lobby and Item 1.4 Supply & Install Furniture and associated cash allowances which are no
longer required, the low bid submitted by J.J. McGuire General Contractors Inc. in the revised
amount of $514,150.00 (HST included) is recommended for approval. The total gross project cost
is estimated to be $673,480.00 (HST included) and the total net project cost is estimated to be
$606,490.00 (net of.HST rebate).
Recommendation:
1. That Tender No. T-13-2017 submitted by J.J. McGuire General Contractors Inc. in the
revised amount of $514,150.00 (HST included) be accepted;
2. That the total gross project cost of $673,480.00 (HST included), including the amount of the
tender, contingency and other associated costs, and the total net project cost of
$606,490.00 (net of HST rebate), be approved; •
That the Director, Finance & Treasurer be authorized to finance the net project cost of
$606,490.00 (net of HST rebate) as follows:
a) The sum of $540,490.00 as provided for the 2016 Civic Complex Capital Budget to
be funded by a transfer from the Rate Stabilization Reserve; and
b) The sum of $66,000.00 to be funded from the Canada 150 Community Infrastructure
Program through the Government of Canada.
4. That the appropriate City of Pickering officials be authorized to take the necessary actions
as indicated in this report.
June 29, 2017 Page 2 of 7
City Hall Accessibility Upgrades
Financial Implications:
1. Tender Amount
Tender No. T-13-2017
Cash Allowance (Finish Hardware)
Cash Allowance (Adult Change Table)
Cash Allowance (Testing & Inspection)
Cash Allowance (Roofing)
Gross Tender Cost •
HST (13%)
Total Gross Tender Cost
$420,000.00
10,000.00
10,000.00
5,000.00
10,000.00
$455,000.00
59,150.00
$514,150.00
2. Estimated Project Costing Summary
Gross Tender Cost (T-13-2017)
Cabling
Council Area Reception
Furniture, Fixtures & Equipment
Contingency
Total Project Cost
HST (13%)
Total Gross Project Cost
HST Rebate (11.24% of Total Project Cost)
Total Net Project Cost
$455,000.00
8,000.00
20,000.00
50,000.00
63,000.00
$596,000.00
77,480.00
$673,480.00
(66, 990.00)
$606.490.00
3. Approved Source of Funds
4
Description Project Code Source of Funds
City Hall 5700.1602.6183 Rate Stabilization
Accessibility Reserve
Upgrades
Canada 150 Community
Infrastructure Program
Total Funds
Available Required
Budget
$1,159,922.00 $540,490_00
$66,000.00
$1.159 922.00 $606 490.00
Project Cost under (over) approved funds by $553,432.00
June 29, 2017
City Hall Accessibility Upgrades
Page 3 of 7
This project was approved in 2016 in the amount of $1.3.miliion. Design work has proceeded, and
was approved by Council in 2016 through Report CR 13-16, RFP -9-2016. A net project cost of
$140,078.00 (net of HST rebate) which included the proposal amount and contingency provision
has been set -side for this purpose_
Taking into consideration the above design cost, there are unspent funds of $1,159,922.00
available for the current construction component.
Additional funds received in 2017 as a result of successful grant application received from the
Federal Government's Canada 150 Community Infrastructure Program helps to partially offset the
project costs. ,
Discussion:
The Pickering Civic Complex has reached the mid -point of its overall life expectancy and is starting
to show signs of age, including the need to update public areas to meet changes in accessibility
requirements, point of service needs and technology.
The existing ground floor public washrooms are too small to be converted into barrier -free
washrooms meeting current building code requirements without losing required fixtures or incurring
major expenses. Instead, a new separate universal washroom will be constructed immediately to
the north of the existing washrooms which will be re -finished. The new universal washroom will
meet current code requirements, including the provision of an adult change table. During the
construction, patrons will be directed to the upstairs public washrooms while those on the ground
floor are unavailable.
Construction of the universal washroom will encroach into the existing space of the Customer Care
Centre. As a result, additional floor space in the lobby will be captured into the new Customer Care
Centre in order to maintain its current level of service. The existing service counters in this area
will be replaced with millwork designed to comply with AODA requirements. Doors accessed by
only authorized key card holders will be added to the hallways leading into the Council and
Administration office areas in order to improve security and facilitate the lockdown procedures, as
required. This enclosed hallway (or vestibule) will create a waiting area with the elimination of the
underutilized closets.
The City Development service counters on the west side of the ground floor lobby will be replaced
to match the layout and style of the new Customer Care Centre service counters, and provide the
same level of accessible service. A new meeting room with separate public and private access will
be created near the elevator, as well as a permanent security guard station immediately to the
north. The new counters will encroach into the lobby to be symmetrical with counters at Customer
Care Centre, providing needed space for staff displaced by creation of the new meeting room. A
wind screen will be added by the north lobby entrance to protect City Development staff and
patrons from gusting winds when the doors are opened. Secure doors will be added to control
June 29, 2017 Page 4 of 7
City Hall Accessibility Upgrades
access to staff areas from the north entrance. Staff will gain access through all controlled access
points using their existing key cards.
Renovations of the Customer Care Centre and main floor public washrooms will be compressed to
minimize the duration of any disruptions, and will likely begin in early August for a duration of
approximately six to eight weeks. During this time, Customer Care staff will be relocated to
available space immediately adjacent to the elevator. Those Customer Care staff not directly
interacting with the public will be temporarily moved to available workstations elsewhere in City
Hall. The security guard will be without a dedicated work station for the duration of this part of the
work.
Renovations of the City Development service area will not commence until operations at Customer
Care Centre are restored. Arrangements will be made for the relocation or creation of temporary
service counters to maintain City Development operations. Every effort will be made to mitigate the
impact of this project on visitors, Council and staff. Localized disruptions to the parking garage
immediately below the areas of work will be required, but scheduled for evenings or weekends
whenever possible.
The City prequalified two general contractors with experience in this type of project through a
prequalification process under Request for Proposal No. RFP -3-2017. AECOM Canada Inc.
prepared drawings and specifications for Tender No. T-13-2017, City Hall Accessibility Upgrades at
Pickering Civic Complex tendering document. A mandatory site visit was held on May 9, 2017 and
the two prequalified bidders attended, of which both bidders have submitted a tender for this
project which closed on Thursday, May 25, 2017.
As part of the prequalification process, the health andsafety related documents provided by J.J.
McGuire General Contractors Inc. were deemed acceptable to the Coordinator, Human Resources,
and the previous work experience and references were deemed acceptable to the Community
Services Department. Certificate of Insurance and bonding available were deemed acceptable to
Manager, Budgets & internal Audit. The submitted Waste Management Plan and proposed list of
sub -trades is deemed acceptable to the Community Services Department. In conjunction with the
foregoing approvals, the bid is deemed acceptable.
The lowest submitted compliant bid exceeded the remaining approved budget for the project.
Tender 1-13-2017 required bidders to provide a breakdown of pricing by area enabling assessment
of the costs associated with each of the three project areas. Supply & Services staff were directed
to approach the lowest compliant bidder to investigate whether the Company -would hold its price
for the lobby washroom. and service counter renovations,. if the Council Chambers renovation -was
removed from the project scope of work. J.J. McGuire General Contractors Inc. have agreed to do
so on June 13, 2017. Reducing the scope of work for all other compliant bids in the same manner
would not change the resulting lowest bidder.
In accordance with Purchasing Policy Item 07.01, the Chief Administrative Officer is authorized to
act on behalf of Council in approving an award of a project, and the Treasurer is authorized to
approve financing for same, during any recess, break or absence of Council on the condition that:
June 29, 2017 Page 5 of 7
City Hall Accessibility Upgrades
a) The project is in a budget approved by Council;
b) Such actions are in with the Purchasing Policy and the Financial Control
Policy;
c) The Project is not debt financed; and
d) A report respecting those approvals is subsequently submitted to Council.
Upon careful examination of all tenders and relevant documents received, the Community Services
Department recommends the acceptance of the low bid submitted by J.J. McGuire General
Contractors Iric. for Tender No, T-13-2017 in the revised amount of $514,150.00 (HST included)
and that the total net project cost of $606,490.00 (net of HST rebate) be approved.
Attachments:
1. Supply & Services Memorandum dated May 25, 2017
2. Record of Tenders Opened & Checked
3. CAO Memorandum dated June 8, 2017
June 29, 2017 Page 6 of 7
City Hall Accessibility Upgrades
Prepared By:
{A, 6
�I
Si
1/4 -/
IJ
Vince Plouffe, OAA, MRAIC
Manager, Facilities Capital Projects
Approved/Endorsed By:
Marisa Carpino, MA
Direc-or, Community Services
.v£
Stan Kar wowski, MBA, CPA, CMA
Director, Finance & Treasurer
f�.dvti�� f�l
Briar Duffield
Divisipn Head, Operations
Vera A. Aelgemacher
CSCMP, CPPO, CPPB, CPM, CMM 111
Manager, Supply & Services
Caryn Kong, CPA, CGA
Senior Financial Analyst -Capital and
Debt Management
Tony Prevedel, P.Eng,
Chief Administrative Officer
MC:vp
June 29, 2017
City Hall Accessibility Upgrades
Page 7 of 7
'--O o/
PICKERING
Memo
Marisa Carpino May 25, 2017
Director, Community Services
From: Vera A. Felgemacher
Manager, Supply & Seriices
Copy: Administrative Assistant, Community Services
Supervisor, Supply & Services
Subject: Tender No. T-13-2017
Tender for City Hall Accessibility Upgrades at the Pickering Civic Complex
Closing: Thursday, May 25, 2017 — 2:00pm
File: F-5400-001.
Tender No. T-13-2017 was advertised on the City's website on May 2, 2017. A mandatory site
visit was held on Tuesday, May 9, 2017 at 10:00 a.m. The two (2) prequalified bidders have.
submitted a bid for this project.
A copy of the Record of Tenders Opened and Checked used at the public tender opening is
attached. Tenders shall t)e irrevocable for 60 days after the official closing date and time.
Purchasing. Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit prices
and extensions unit prices shall govem and extensions will be corrected accordingly, which has
been completed below.
The unsuccessful Bidder's tendering deposit, other than a bid bond, shall be returned to the
applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item 13.03 (w). The
two (2) bids have been retained for review at this time and are attached.
Summary
Harmonized Sales Tax Included
J.J. McGuire General Contractors
$1,310,800.00
After Calculate®n G--.
$1,310,800.00
ROSSCLAIR Contractors Inc.
$1,500,301.00
$1,500,301.00
Pursuant to Information to Bidders Item 28 and Tendering Specifications Items 20 and 21, the
following documentation will be requested of J.J. McGuire General Contractors
for your review during the evaluation stage of this tender call.
Please advise if Supply & Services is to proceed with collecting the following documentation:
(a) A copy of the current Clearance Certificate issued by Workplace Safety & Insurance
Board;
(b) The City's certificate of insurance or approved alternative form completed by the Bidder's
agent, broker or insurer;
(c) A completed Sub -contractors List, listing all sub -contractors who may be carrying out any
part of this Contract;
(d) A completed Accessibility Regulations for Contract Services form; and
(e) A Waste Management Plan
A budget of $1,050,000.00 was provided to Supply & Services for this procurement.
In accordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out
below excludes HST.
As such, in accordance with Purchasing Policy Item 06.11, where the compliant quotation or
tender meeting specifications and offering best value to the City is acceptable or where the
highest scoring proposal is recommended and the estimated total purchase price is:
(c) Over $250,000, the Manager may approve the award, subject to the approval of the
Director, Treasurer, CAO and Council.
Please include the following items in your report:
1. if Items (a) and (d) noted above are acceptable to the Acting Co-ordinator, Human
Resources or designate;
2. if Item (b) is acceptable to the Manager, Budgets & Internal Audit;
3. if Items (c) and (e) are acceptable to Community Services;
any past work experience with low bidder J.J. McGuire General Contractors
4. including work location;
5. the appropriate account number(s) to which this work is to be charged;
6. the budget amount(s) assigned thereto,
7. Treasurer's confirmation of funding;
8, related departmental approvals; and
• 9. related comments specific to the project.
After receiving Council's approval, an approved "on-line" requisition will be required to proceed.
May 25, 2017
Tender No, T-13-2017
City Hall Accessibility Upgrades at the Pickering Civic Complex
Page 2
Enquiries can be directed to the City's website for the unofficial bid results as read out at the
public tender opening or to Supply &Services. Bidders will be advised of the outcome in due
course. -
If yo require further information, please feel free to contact me or a member of Supply &
Ser* es.
VAF/sb
Attachments
May 25, 2017
Tender No. T-13-2017
City Hall Accessibility Upgrades at the Pickering Civic Complex
Page 3
0
0
O
0
0
$Si cc
Y 0
0 a M.
E ® E
p b .•U
93 0
0 U ,
8A
,O
ffi
t S
O
N
=
es• F_
tiZS
'U
N
to -
CO a
• >.
$R LO
IC N
O,
� O
O H H <
Q
0
U
0
• z
0 0
ro 4 E0
CO N S ._
Comments
Bidder Sign in
Th\H-Th.:L.
Total Tendered
Amount
• P
dR
V
iv
• O
9
�;
1
O
M
O
ee
Addendum
.#1 and #2
Acknowledged
Agreement
to
Bond
O
p '.
N
0
G-
Attended
Mandatory.
Site Visit
N
N
>->-
Bidder Name
J.J. McGuire General
Contractors
•
RossClair Contractors
Inc.
X46
DICKERING
CAO 22-17
Memo
To: Mayor RVan and
Members of Council
From: Tony Prevedel
Chief Administrative Officer
Copy: Directors
City Clerk
Division Head, City Administration
Division Head, Operations
Supervisor, Facilities Operations.
Manager, Customer Care
• Subject: Council Chambers & First Floor Renovations
- Report CS 16-17 .
Tender for City Hall Upgrades (Tender No. T-13-2017)
File: 0-8200
June 8, 2017
Due to the concerns raised with respect to the re -design of the Council Chambers, we have pulled
Report CS 16-17 scheduled to be considered at Monday's meeting of Council. We want to ensure •
that Council are supportive of the end result. Staff have met, and propose the following course of
action:
1. Council Chambers Project
This will need to be re -designed and retendered. The Director, Finance & Treasurer has
advised that staff can prepare a report to Council in September 2017 seeking 2018 pre-
budget approval to design and construct the Council Chambers project. This would allow
staff to work with a firm to re -design the Chambers with Council's input. We will go out to
tender once an overall satisfaction with the design`has been achieved. If the tender is
issued in December 2017, we will have bur confirmed project cost in time to be included
with precision in the 2018 Capital Budget. This will provide staff with .the opportunity to
start the project at the end of June 2018, with the intent to have it completed in October
2018, to coincide with Council recess due to the election. This would minimize the
relocation of Council meetings to just the month of September 2018. .
2. Service Counters, Accessible Universal Washroom and•tncreased Security Measures
-We are proposing to negotiate with ttie pregUalified-low bidder to continue with the balance
of the contract. This work can be awarded by the CAO as per Section 07 of the Purchasing
Policy. Work can then proceedwhich allows us the City to keep the Canada.150 grant of
$66,000 which was earmarked for the washrooms only (and must be spent before the end
of 2017). Please keep in mind that work cannot be completed for the universaVaccessible
washroom without encroaching on the Customer Care Centre, and therefore we must
proceed accordingly.
The following is a brief overview for your reference:
Service Counters includes accessible counters, re -alignment of service space and
security access controls
• Customer Care Centre -
8 City Development — will also include a new meeting room _
Increased Security Access
• Designated security guard station
CounciVAdministration area will include the removal of a non -accessible
service counter, new reception area and security card access to the open
office area.
Washrooms
• New Universal Accessible Washroom (including change tables for children
and those with special needs) and upgrades to existing.washrooms
We trust you wilt find this course of action acceptable. Please let me know if you have any
additional concerns or questions. Otherwise, staff will proceed based on the proposed course of..
action.
TP:jh
June 8, 2017.
Council Chambers and First Floor Renovations
Page 2 of 2
ATTACHMEtNT# TO REPORT# kit, JW /7
PICKERING
Memo
To: Tony Prevedei June 16, 2017
Chief Administrative Officer Reissued August 4, 2017
From: Marisa Carping
Director, Community Services -
Copy: Director, Finance & Treasurer
Division Head, Operations
Manager, Supply & Services
Senior Financial Analyst, Capital & Debt Management
Supervisor, Public Works Administration
Subject: Quotation No. Q-40-2017
Supply and Delivery of Two (2) Multi -Purpose Tractors
File: A-1440
Overview: Further to memo dated June 16, 2017, this revised memo has been submitted
with the recommendation to include in the purchase the stump grinder attachment of which
pricing was provided as optional in Q-40-2017.
The Property Maintenance section within the Community Services Department currently
utilizes seven Mufti -Purpose Tractors. The replacement of one Multi -Purpose Tractor (unit #
755, a 2001 Trackless) and one new Multi -Purpose Tractor, as an addition to the fleet, was
approved in the 2017 Property Maintenance Capital Budget, funded from DC's City Share,
DC Roads & Related Reserve and an internal five year loan.
The purchase of a stump grinder attachment for a skid steer unit #768 was approved in the
2017 Parks Capital Budget. After careful consideration, the stump grinder attachment for a
Multi -Purpose Tractor made more economical sense and was recommended for purchase
and was included as optional pricing in Q-40-2017.
On April 13, 2017, Quotation 0-40-2017 was sent to three companies and an advertisement
was placed on the City's website. Three companies responded by the closing date of May 9,
2017. The quotation for two 2017 MT7 Trackless Multi -Purpose Tractors including an optional
snow blower, stump grinder and spray tank, submitted by Joe Johnson Equipment, has
received the highest score from the Evaluation Committee, meets the required specifications
and is recommended for approval.
In accordance with Purchasing Policy Item 06,11(c), where the compliant quotation or
tender meeting specifications and offering best value to the City is acceptable and the
estimated total purchase price is over $250,000.00, the Manager may approve the award,
subject to the approval of the Director, Treasurer, CAO and Council.
In accordance with Purchasing Policy Item 07.01, the Chief Administrative Officer is
authorized to act on behalf of Council in approving an award of a project, and the Treasurer is
authorized to approve financing for same, during any recess, break or absence of Council on
conditions that have been met for this project.
Recommendation:
1. That Quotation No. 0-40-2017 submitted by Joe Johnson Equipment for two 2017 MT7
Trackless Multi -Purpose Tractors including a snow blower, stump grinder and spray
tank, in the amount of $294,041.00 (HST extra) be accepted;
2. That the total gross project cost of $332,266.00 (HST included) and the total net project
cost of $299,216.00 (net of HST rebate) be approved;
3. That the Director, Finance & Treasurer be authorized to fund the project as follows;
a) The sum of $50,431.00 be funded by a transfer from the DC's City Share Reserve
and the sum of $82,282.00 be funded by a transfer from the DC -Operations
Facilities & Vehicles Reserve Fund and;
b) The sum of $151,000.00 to be financed by aninternal loan for a period of 5 years
and the balance of $15,503.00 frorn property taxes; and
That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this memo.
Financial Implications
Quotation Amount
Quotation No. Q-40-2017
HST (13%) •
Total Gross Quotation Cost
$294,041.00
38 225.33
$332,266.33
2. Estimated Project Costing Summary
Quotation No. Q-40-2017
Optional Extra — Snow Blower
Optional Extra -- Spray Tank
Optional Extra — Stump Grinder
Sub Total
HST (13%)
Total Gross Project Cost
HST Rebate (11.24%)
Total Net Project Cost
$260,836.00
15,400.00
4,405.00
13,400.00
$294,041.00
38,225.33
$332,266.33
(33,050.001
$299,216.00
August 4, 2017
Quotation No. Q-40-2017
Page 2of4
Approved Source of Funds
Description Project Code Source of Funds Available Required
Budget
One Multi -Purpose 5311.1703.6178 DC's City's Share $55,643.00 $50,431.00
Tractor (38%) Reserve
5311.1703.6178 DC — Roads & 89,357.00 82,282.00
Related (62%)
Reserve Fund
One Multi -Purpose 5311.1707.6178 Internal Loan — 5yr 151,000.00 151,000.00
Tractor with
optional Snow
Blower and Spray
Tank
One Optional
Stump Grinder
Attachment
Total Funds
5311.1707.6178 Property Taxes
5780.1721.6178 Property Taxes
0 2,003.00
13,500.00 13,500.00
$309,500.00 $299,216.00
Net Project Cost under (over) Approved Funds
$10,284.00
Discussion: The Property Maintenance section within the Community Service
Department currently utilizes seven multi-purpose tractors. Multi-purpose tractors are used
primarily for winter control maintenance on City sidewalks. The replacement of one Multi -
Purpose Tractor (unit # 755, a 2001 Trackless) and the addition of one new Multi -Purpose
Tractor, due to an increase in the current number of kilometers of sidewalks maintained and
anticipated future growth, was approved in the 2017 Property Maintenance Capital Budget.
A stump grinder attachment for the Multi -Purpose Tractor will allow staff the ability to safely
and efficiently remove all stumps including the many ash tree stumps that exist in City parks
as a result of the Emerald Ash Borer infestation and resulting tree removals.
An Evaluation Committee consisting of Public Works staff met on May 18, 2017 and
evaluated the quotations based on the rated criteria. A combined average score for the
quotation was determined as part of Stage !land III of the evaluation process. Joe Johnson
Equipment has received the highest score.
August 4, 2017 Page 3 of 4
Quotation No. Q-40-2017
After careful review of the submission received, Public Works staff recommend acceptance of
the quotation submitted by Joe Johnson Equipment for two 2017 MT7 Trackless Multi -
Purpose Tractors including a snow blower, stump grinder and spray tank in the
amount of $332,266.33 (HST included) and that the total net project cost of $299,216.00
(net of HST rebate) be approved.
Prepared By:
Rob -Gagen
Approved/Endorsed By:
Marisa Ca no, MA
Supervisor, Parks Operations Director, Community Services
SfanjKarwowski, MBA, CPA, CMA
Dire4or, Finance &.Treasurer
Vera P/ Felgemacher
CSCMP, CPPO, CPPB, CPM, CMM 111
Manager, Supply & Services
Tony Prevedel, P. Eng.
Chief Administrative Officer
MC:bk
Attachments: Supply & Services Memorandum dated May 17, 2017
Supply & Services Memorandum dated May 24; 2017
Signed Memorandum dated June 16, 2017
August 4, 2017 Page 4 of 4
Quotation No. Q-40-2017
°l
PICKERING
Memo
To: Marisa Carpino
Director, Community Services
From: Vera A. Felgemacher
Manager, Supply & Services
Copy: Administrative Assistant, Community Services
Supervisor, Supply & Services
Subject: Quotation No. Q-40-2017
Quotation for Supply & Delivery of Two Multi -Purpose Tractors
Closing: Tuesday, May 9, 2017
File: F-5300-001
May 17, 2017
Quotation Q-40-2017 was sent to three (3) companies and advertised on the City's website, of
which three (3) companies have responded.
There are 2 stages in the evaluation process which are outlined in Part 2 — Evaluation of
Quotations of the quotation document.
Stage I determines which submissions satisfy all the mandatory submission requirements and
provides Respondents the opportunity to rectify deficiencies. One of the submissions. did not
satisfy the mandatory submission requirements and was provided the opportunity to rectify the
deficiencies and did within the rectification period. Three quotations proceeded to Stage II,
which consists of scoring each qualified quotation on the basis of the rated criteria outlined in
Part 2 of the quotation document.
Refer to Part 2 — Evaluation of Quotations, item 2.3.2 — Rated Criteria, Page 7 for instructions
on how each of the quotations is to be evaluated by the Evaluation Committee. Each member .
will review the submissions individually and carefully according to the criteria in the bid
document.
Upon completion of the individual scoring, return all Evaluation Committee score sheets with
signatures to Sue Burgess, Buyer. Pricing has been evaluated by Supply & Services, and a
score out of 20 points has been applied to the evaluation form. The completed evaluation
results will be provided to the Evaluation Committee for review and approval.
The following list of attachments has been provided to assist the Evaluation Committee to complete
their individual evaluations:
1. Stage 11— Evaluation of Rated Criteria;
2. Evaluation Form;
3. Spreadsheet showing points awarded for pricing; and
4. Copy of Request for Quotation Document
Hard copies of the submissions will be forwarded to the Supervisor, Public Works Administration, for
distribution to the Evaluation Committee.
Ple.se direct all enquiries to Supply & Services. Respondents will be advised of the outcome when
the ' ontract has been awarded.
require further information, please contact myself or a member of Supply & Services.
VAF/sb
Attachm-nts (4)
Quotation No. Q-40-2017
Supply & Delivery of Two Multi -Purpose
Tractors
Page 2 of 2
Dd
PICKERING
Memo
To: Marisa Carpino May 24, 2017
Director, Community Services
From: Vera A. Felgemacher
Manager, Supply & Services
Copy: Administrative Assistant, Community Services
Supervisor, Supply & Services
Subject Quotation No: Q-40-2017
Quotation for Supply and Delivery of Two Multi -Purpose Tractors
Closing: Tuesday, May 9, 2017
File: F-5300-001
Further to the memo dated May 17, 2017, four quotations proceeded to Stage II evaluation.
A summary of the Stage II and III evaluation results for each quotation is attached.
Joe Johnson Equipment is the top ranked respondent with a submitted price of $260,836.00
(HST excluded).
Delivery times provided by each Respondent are also indicated on the attached spreadsheet.
A budget of $296,000.00 was provided to Supply & Services for this procurement.
In accordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out below
excludes HST.
In accordance with Purchasing Policy, ]tem 06.11, where the compliant quotation or tender meeting
specifications and offering best value to the City is acceptable or where the highest scoring proposal is
recommended and the estimated total purchase price is:
(c) Over $250,000, the Manager may approve the award, subject to the approval of the Director,
Treasurer, CAO and Council.
Please provide your recommendation in memo form, as well as an on-line requisition.
Please girect all enquiries to Supply & Services. Respondents will be advised in due course.
If you r; quire further information or assistance, do not hesitate to contact me or a member of
Supply Services.
VAF/sb
Attachments (1)
>p
64
CKERING
Memo
To: Tony Prevedel
Chief Administrative Officer
From Marisa Carpino
Director, Community Services
Copy: Director, Finance & Treasurer
Division Head, Operations
Manager, Supply & Services
Senior Financial Analyst, Capital & Debt Management
Supervisor, Public Works Administration -
Subject: Quotation No: Q740-2017.
Supply and Delivery of Two (2) Multi -Purpose Tractors
- File: A-1440
June 16, 2017
Overview: The Property Maintenance section within the Community Service Department
currently utilizes seven Multi -Purpose Tractors. The replacement of one Multi -Purpose Tractor
(unit # 755, a 2001 Trackless) and one new.Multi-Purpose Tractor, as an addition to the fleet,
was approved in the 2017 Property Maintenance Capital Budget, funded from DC's City
Share, DG Roads & Related Reserve and an Internal Loan —.5 5 year.
On April 13, 2017, Quotation Q-40-2017 was sent to three companies and an advertisement
was placed on the City's website. Three companies have responded by the closing date of
May 9, 2017. The quotation for two 2017. MT7 Trackless Multi -Purpose Tractors including an
optional snow blower and spray tank, submitted by Joe Johnson Equipment, has received the
highest score from the Evaluation Committee, meets the required specifications and is
recommended for approval. .
In accordance with Purchasing Policy Item 06.11(c), where the compliant quotation or
tender meeting specifications and offering best value to the City is acceptable and the
estimated total purchase price is over $250,000.00, the Manager may approve the award,
subject to the approval of the Director, Treasurer, CAO and Council.
In accordance with Purchasing Policy Item 07.01, the Chief Administrative Officer is
authorized to act on behalf of Council in approving an award of a project, and the Treasurer is
authorized to approve financing for same, during any recess, break or absence of Council on
--.... conditions that have been met for this project.
Recommendation:
1: - That Quotation. No. Q-40-2Q17submitted by Joe Johnson Equipment for two 2017 MT7
• Trackless Multi -Purpose Tractors including a snow blower and spray tank, MI the amount
of $280,641.00 (HST extra) be accepted;,
2. That the total gross project cost of$ -317,124.00 (HST included) and the total net project
cost of $285,580.00 (net of HST rebate) be approved;
3. That the Director, Finance & Treasurer be authorized to fund the project as follows;
• a) The sum of $50,431,00 be funded by a transfer from the DC's City Share Reserve
and the sum of $82,282.00 be funded by a transfer from the DC -Operations
Facilities & Vehicles Reserve Fund and;
b) The sum of $151,000.00 to be financed by ari internal loan for a period of 5 years
and the balance of $1,867.00 from property taxes; and •
That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this memo.
Financial Implications
1. Quotation Amount
Quotation No. Q-40-2017
HST (13%)
Total Gross Quotation Cost
$280,641,00
36,483.33
$317,12433
2. Estimated Project Costing Summary
Quotation No. Q-40-2017 •
Optional Extra — Snow Blower
Optional Extra — Spray Tank
Sub Total
HST (13%)
Total. Gross Project Cost
HST Rebate (11:24%)
Total Net Project Cost
$260,836.00
15,400.00
4,405,00
$280,641.00
36 483.00
$317;124.00
(31,544.00)
•
$285-580:00
June16, 2017
Quotation No, Q-40-2017
Page 2 of 4.
3: Approved Source of Funds
Property Maintenance Capital Budget
Description Project Code
One Multi -Purpose 5311.1703,6178
Tractor
5311.1703.6178
One Multi -Purpose 5311.17072178
Tractor with
optional Snow
Blower and Spray
Tank
Total Funds
Source of Funds Available Required
Budget
DC's City's Share $55,643.00 $50,431.00
(38%) Reserve
DC Roads & 89,357.00 82,282.00
'Related (62%)
Reserve Fund
Internal Loan — 5yr 151,000.00. 151,000.00
5311.1707.6178 Property Taxes
1,867.00
$296,000.00 $285,580.00
Net Project Cost under (aver) Approved Funds
$10,420.00
Discussion: The Property Maintenance section within the Community Service
Department currently utilizes seven multi-purpose tractors. Multi-purpose tractors are used
primarily for winter control maintenance on City sidewalks. The replacement of one Multi -
Purpose Tractor (unit # 755, a 2001 Trackless) and the addition of one new Multi -Purpose
Tractor, due to an increase in the current number of kilometers of sidewalks maintained and
anticipated future growth, was approved in the 2017 Property Maintenance Capital Budget.
An Evaluation Committee consisting of Public Works staff met on May 18, 2017 and
evaluated the quotations based on the rated criteria. A combined average sabre for the
giaetation was determined as part of Stage II and III of the evaluation process. Joe. Johnson
Equipment has received the highest score.
After careful review of the submission received, Public Works staff recommend acceptance of
the quotation submitted by Joe Johnson Equipment for two 2017 MT7 Trackless Multi -
Purpose Tractors including a snow blower and spray tank in the amount of
$317,124.33 (HST included) and that the -total net project cost of $285,580:00 (net of HST
rebate) be approved.
June 16, 2017 Page 3 of 4
Quotation No. Q-40-2017
VBob Kuzlfiia, CSCMP, AMCT Marisa Carpino; MA
Supervisor, Public Works Administration Director, Community Services
Prepared By: Approved/Endorsed By:
Stan Karwowski, MBA, CPA, CMA
Director, Finance & Treasurer
1 Vera AY Felgemacher
CSCMP, CPPO, CPPB, CPM, CMM III
Dr Manager, Supply & Services
MC:bk
�vedel, P. ng.
ministrative Officer
Attachments: Supply& Services Memorandum dated May 17, 2017
Supply & Services Memorandum dated May 24, 2017
June 16, 2017 Page 4 of 4
Quotation. No. Q-40-2017
P CKERING
Memo
To: Marisa Carpino
Director, Community Services
From: Vera A Felgemacher
Manager, Supply & Services
Copy: Administrative Assistant,'Community Services
Supervisor, Supply & Services
Subject: Quotation No. Q-40-2017
Quotation for Supply & Delivery of Two Multi -Purpose Tractors
Closing: Tuesday, May 9, 2017
File: F-5300-001
May 17, 2017
Quotation Q-40.2017 was sent to three (3) companies and advertised on the City's website; of
which three (3) companies have responded. -
There are 2 stages, in the evaluation process which are outlined in Part 2 — Evaluation of
Quotations of the quotation document.
Stage I determines which submissions satisfy all the mandatory submission requirements and
provides Respondents the opportunity to rectify deficiencies. One of the submissions did riot
satisfy the mandatory submission requirements and was provided the opportunity to rectify the
deficiencies and did within the reoffication period. Three quotations proceeded to Stage II,
which consists of scoring each qualified quotation on the basis of the rated criteria outlined in
Part 2 of the quotation document.
Refer to Part 2 - Evaluation of Quotations, Item 2.3.2 -- Rated Criteria, Page 7 for instructions
on how each of the quotations is to be evaluated by the Evaluation Committee. Each member
will review the submissions individually and carefully according to the criteria in the bid
document. -
Upon completion of the individual scoring, return all Evaluation Committee score sheets with
signatures to Sue Burgess; Buyer. Pricing has been evaluated by Supply & Services, and a
score out of 20 points has been applied to the evaluation form. The completed evaluation
results will be provided to the Evaluation Committee for review and -approval.
The following list of attachments has been provided to assist the Evaluation Committee to complete
their individual evaluations:
1. Stage II — Evaluation of Rated Criteria;
2. Evaluation Form;
3. Spreadsheet showing points awarded for pricing; and
4- Copy of Request for Quotation Document
Hard copies of the submissions Will be forwardedto the Supervisor; Public Works: Adrrministretion; for,
distribution to the Evaluation Committee,
Pie se-direCt alt enquiries to Supply & Services, Respondents will be advised of the outcome When
the ohtract has been.awarded.
If y require further information, please contact rrryseff or a member of Supply & Services. -
VAp/sb
Attachn(4)
Quotation No, Q.-404017
Supply & Delivery of Two.Multi-Purpose
Tractors,
Page 2 of 2
'" 0 0i
PICKERING
Memo
To: Marisa Carpino
Director, Community Services
From: Vera A. Felgemacher
Manager, Supply & Services
Copy: Administrative Assistant, Community Services
Supervisor, Supply & Services
Subject: Quotation No. Q-40-2017
Quotation for Supply and Delivery of Two Multi -Purpose Tractors
Closing: Tuesday, May 9, 2017
File: F-5300-001
May24, 2017
Further to the memo dated May 17, 2017, four quotations proceeded to Stage ILevaluatior .
A summary of the Stage II and III evaluation results for each quotation is attached.
Joe Johnson Equipment is the top ranked respondent with a submitted price of $260,836.00
(HST excluded). - -
Delivery times provided -by each Respondent are also indicated on the attached spreadsheet.
A budget of $296,000.00 was provided td Supply & Services for this procurement.
In accordance with Purchasing Policy item 06.04, the authority for the dollar limit as set out below
excludes HST. -
in accordance with Purchasing Policy, item 06.11, where the .compliant quotation or tender meeting
specifications and offering best value to the City is acceptable or where the highest scoring proposal is
recommended and the estimated total purchase price is:
(c) Over $250, 000, the Manager may approve the award, subject to the approval of the Director,
Treasurer, .CAO and Council.
- Please provide your recommendation in memo form, as well as an on-line requisition,
Please tract all enquiries to Supply & Services. Respondents will be advised in due course.
If you r, quire further information or assistance, -do not hesitate to contact me or a member of.
Supplj Services. •
VAFIsb
Attachments -(1)