Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ENG 07-17
City Report to PiCKERiNG Executive Committee Report Number: ENG 07-17 Date: April 3, 2017 From: Richard Holborn Director, Engineering Services Subject: Asphalt Resurfacing on Various City Streets, Trails and Driveways - Tender No. T-2-2017 - File: A-1440 Recommendation: 1. That Tender No. T-2-2017 for Asphalt Resurfacing on Various City Streets, Trails & Driveways as submitted by Furfari Paving Co. Ltd. in the total tendered amount of $1,487,065.99 (HST included) be amended to include an additional $33,743.30 (HST included) for expansion of the Strouds Lane Project from Foxwood Trail to Amberlea Road be accepted; 2. That the total gross project cost of$1,858,871.00 (HST included), including the tender amount and other associated costs, and the total net project cost of$1,673,971.00 (net of HST rebate) be approved; 3. That Council authorize the Director, Finance & Treasurer to finance the net project cost of $1,673,971.00 as follows: a) The sum $1,084,777.00 as approved in the 2017 Capital Budget to be funded by a transfer from the Federal Gas Tax Reserve Fund; b) The sum of$390,315.00 as approved in the 2017 Capital Budget to be funded from the Ontario Community Infrastructure Fund (OCIF) Grant; c) The sum of$47,000.00 for the Kinsmen Park Maintenance Road be financed by undertaking an internal loan for a term of 5 year; d) The sum of$109,000.00 for the Waterfront Trail be financed by undertaking an internal loan for a term of 5 years; e) The sum of$41,655.00 as approved in the 2016 Capital Budget to be funded by a transfer from the Roads & Bridges Reserve Fund; f) The balance sum of$1,224.00 be funded from property taxes; and 4. That the appropriate officials of the City of Pickering be authorized to take the necessary actions as indicated in this report. ENG 07-17 April 3, 2017 Subject: Asphalt Resurfacing on Various City Streets, Trails & Driveways Page 2 Executive Summary: As part of the 2017 Capital Budget, asphalt resurfacing for the following locations were approved as construction projects: • Alwin Circle • Pickering Parkway • Glenanna Road • Strouds Lane • Dixie Road (Kingston Road north 500 metres) • Dixie Road (Maple Ridge Drive north to the north limit of Hydro Corridor) • Southview Drive • Goldenridge Road Golf Club Road, Kinsmen Park Maintenance Road (driveway) and the reconstruction of the Waterfront Trail were approved as construction projects in the 2016 Capital Budget. Tender No. T-2-2017 was issued on Wednesday, February 1, 2017 with a tender closing date of Wednesday, February 22, 2017. The low bid of$1,520,809.29 (HST included) submitted by Furfari Paving Co. Ltd. is recommended for approval. The total gross project cost is estimated at $1,858,871.00 (HST included) with an estimated total net project cost of$1,673,971.00 (net of HST rebate). Financial Implications: 1. Tender Amount Tender No. T-2-2017 $1,315,987.60 Recommendation 1 29,861.33 Sub-total $1,345,848.93 HST (13%) 174,960.36 Total $1,520,809.29 2. Estimated Project Costing Summary Tender No. T-2-2017 —Tender for Asphalt Resurfacing on Various City Streets, Trails and Driveways $1,345,849.00 Associated Costs Materials Testing 30,000.00 Construction Contingency (20% ) 269,170.00 Sub Total - Costs $1,645,019.00 HST (13%) 213,852.00 Total Gross Project Costs , $1,858,871.00 HST Rebate (11.24%) (184,900.00) Total Net Project Costs $1,673,971.00 CORP0227-07/01 revised ENG 07-17 April 3, 2017 Subject: Asphalt Resurfacing on Various City Streets, Trails & Driveways Page 3 3. Approved Source of Funds Location Expense Code Source of Funds Budget Required Alwin Circle 5320.1711.6250 Federal Gas Tax $255,000.00 $211,980.00 Pickering Parkway 5320.1712.6250 Federal Gas Tax 260,000.00 216,625.00 Glenanna Road 5320.1714.6250 Federal Gas Tax 300,000.00 254,418.00 Strouds Lane 5320.1715.6250 Federal Gas Tax 9,685.00 6,115.00 OCIF Grant 390,315.00 390,315.00 Dixie Road —Asphalt 5320.1716.6250 Federal Gas Tax 310,000.00 258,434.00 Resurfacing Dixie Road — Final Lift 5320.1717.6250 Federal Gas Tax 80,000.00 67,900.00 of Asphalt Southview Drive 5320.1719.6250 Federal Gas Tax 55,000.00 42,409.00 Goldenridge Road 5320.1726.6250 Federal Gas Tax 35,000.00 26,896.00 Golf Club Road 5320.1517.6250 Roads & Bridges 143,060.00 41,655.00 Reserve Fund Kinsmen Park 5780.1614.6129 Internal Loan 100,000.00 47,000.00 Maintenance Road — 5 Year Waterfront Trail 5323.1605.6250 Internal Loan 150,000.00 109,000.00 — 5 year Property Taxes 0.00 1,224.00 $2,088,060.00 $1,673,971.00 Net project costs (over) under approved funds $414,089.00 Overall, the 2017 asphalt resurfacing program on various streets, trails and driveways as a whole has an under expenditure of$414,089.00. However, two of these projects are using internal loan as a financing source and the under expenditure for these two projects results in a lower borrowed amount. The Golf Club Road project was first budgeted in 2015. Additional funding was requested in 2016. The funds from both years are now combined and carried over to 2017 under the 2015 account (5320.1517.6250), and as indicated in Table 3 above. Strouds Lane asphalt resurfacing was originally from Rosebank Road to Foxwood Trail. The tender came in significantly under budget. In order to maximize the Ontario Community Infrastructure Fund (OCIF), the project was extended from Foxwood Trail to Amberlea Road. CORP0227-07/01 revised ENG 07-17 April 3, 2017 Subject: Asphalt Resurfacing on Various City Streets, Trails & Driveways Page 4 Discussion: As part of the 2017 Capital Budget, asphalt resurfacing for the following locations were approved as construction projects: • Alwin Circle • Pickering Parkway (Glenanna Road to Valley Farm Road) • Glenanna Road (Heathside Crescent to Dixie Road) • Strouds Lane (Rosebank Road to Amberlea Road) • Southview Drive — Final lift of asphalt • Goldenridge Road • Dixie Road (Kingston Road north 500 metres) • Dixie Road - Final lift of asphalt (Mapleridge Drive to north limit of Hydro Corridor) In addition, as part of the 2016 Capital Budget, asphalt resurfacing for the following locations were approved as construction projects: • Golf Club Road (Whitevale) — Road Realignment • Waterfront Trail — Reconstruction (Brock Road to Sandy Beach Road) • Kinsmen.Park Maintenance Road (driveway) Tender No. T-2-2017 was issued on Wednesday, February 1, 2017 and closed on Wednesday, February 22, 2017 with ten bidders responding. The low bid submitted by Furfari Paving Co. Ltd. is recommended for approval. The total gross project cost is estimated at $1,858,871.00 (HST included), with an estimated total net project cost of$1,673,971.00 (net of HST rebate). References for Furfari Paving Co. Ltd., their waste management plan and list of sub-contractors have been checked and are deemed acceptable by the Manager, Capital Projects & Infrastructure. The Health & Safety Regulation Form, proof of Confined Space Entry Procedure and a list of employees trained in confined space entry procedure, and a current Certificate of Clearance issued by the Workplace Safety & Insurance Board submitted by Furfari Paving Co. Ltd. have been reviewed by the Coordinator, Human Resources, and deemed acceptable. The Certificate of Insurance has been reviewed by the Manager, Budgets & Internal Audit, and is deemed acceptable. In conjunction with staffs review of the contractor's previous work experience and the bonding available on this project, the tender is deemed acceptable. Upon careful examination of all tenders and relevant documents received, the Engineering Services Department recommends acceptance of the low bid submitted by Furfari Paving Co. Ltd., • for Tender No. T-2-2017 in the amount of$1,520,809.29 (HST included), and that the total net project cost of$1,673,971.00 be approved. Attachments: 1. Supply & Services Memorandum dated February 24, 2017 2. Record of Tenders Opened and Checked 3. Location Maps CORP0227-07/01 revised ENG 07-17 April 3, 2017 Subject: Asphalt Resurfacing on Various City Streets, Trails & Driveways Page 5 Prepared By: Approved/Endorsed By: K vin Cahill, CET., CRS Ric and Holborn, P. Eng. en'or Coordinator, Capital Projects Director, Engineering Services Darr II Selsky, CET. CMM III Stan Karwowski, MBA, CPA, CMA Man ger, Capital Projects & Infrastructure Director, Finance & Treasurer Vera A. F Igemacher CSCMP, CPPO, CPPB, CPM, CMM III Manager, Supply & Services Caryn Kong, CPA, CGA Senior Financial Analyst Capital & Debt Management KC:mjh Recommended for the consideration of Pickering City Council • Tony Prevede , P.Eng. Chief Administrative Officer CORP0227-07/01 revised ATTACHMENT# ` TO REPORT#ENG off-1 l • • • • PiCKERiNG • • Memo • .• To: Richard Holborn February 24, 2017 Director, Engineering Services • From: Vera A. Felgemacher • Manager, Supply& Services • • Copy: Manager, Capital Projects and Infrastructure •• Sr. Coordinator, Projects Supervisor, Supply& Services Subject: Tender No. T-2-2017 • • • Tender for Asphalt Resurfacing on Various City Streets, Trails and Driveways Closing: Wednesday, February 22, 2017 —2:00pm • File: F-5400-001. • • . Tender No. T-2-2017 was advertised on the City's website on February 1, 2017. Ten • companies have submitted a bid for this project: • • A copy of the Record of Tenders Opened and Checked used at the public tender opening is • attached. Tenders shall be irrevocable for 60 days after the official closing date and time. • Purchasing Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit prices and extensions unit prices shall govern and extensions will be corrected accordingly, which has been completed below. • The unsuccessful Bidder's tendering deposit, other than a bid bond, shall be returned to the applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item 13.03 (w). Three (3).bids have been retained for review at this time.and are attached. Summary • • • Harmonized Sales Tax Included • m; :!J ,. :::, I. /� nt: After-.Calpulation:Check • • '' :.P .r.�.::. :,:.,:M t.•,1.:. _ if,l"• 11. �'! ..1....11.,M - .'-i-_,.. :.Nt.",..'7', ..•.,.._,N.. ... .......: ........ . :4 _..... .. .;.. ... ;i:G;j1•:'i;?,C.i i;�':.-i E:'.;;.:'::.%iii'� <:"r..irr �L' i r��.-. :..>:,., .a 51. n ...'Sk Furfari Paving Co. Ltd. $1,487,065.99 $1,487,065.99 C. Valley Paving Ltd. $1,532,282.26 0 $1,532,282.26 Four Seasons•Site Development Ltd. $1,579,913.46 • $1,579,879.56 Forest Contractors Ltd. $1,685,540.68 $1,683,611.54 • D. Crupi & Sons Ltd. . $1,821,766.17 $1,821,766.17 ,.... ... ..-.. ....:.,:_.._ .•.........::....:., elndere 'oiint. Af eck _ ... , ,.. ..r..... __ .. . . _....._.;.T _ _ ,� to Ca �_..... otal`.T d�A � . h Ashland Paving Ltd. $1,951,245.95 $1,951,245.95 Bevcon Construction & Paving Ltd. $2,027,137.79 $2,034,155.09 Brennan Paving & Construction Ltd. $2,358,358.25 $2,358,358.25 Dig-Con International Ltd. $2,690,439.60 $2,690,439.60 Automatic Rejection: Addendum #1 not acknowledged. Serve Construction Ltd. Reference: Purchasing Policy No. PUR 010, Item 23.02 — 11, Information to Bidders— Item 9, 12, 21, 23, 24, 25, 37, 38, 39,Addendum #1 and Advertisement Pursuant to Information to Bidders Item 26 and Tendering Specifications Items 20 and 21, the • following documentation will be requested of Furfari Paving Co. Ltd. for your review during the evaluation stage of this tender call. Please advise if Supply& Services is to proceed with collecting the following documentation: (a) A copy of the Health and Safety Policy to be used on this project; (b) A copy of the current Clearance Certificate issued by Workplace Safety & Insurance • Board; (c) A list of employees trained in the confined space entry procedure who will be working on this project; (d) The City's certificate of insurance or approved alternative form completed by the Bidder's agent, broker or insurer; and (e) A Waste Management Plan. A budget of$1,500,000 was provided to Supply & Services for this procurement. In accordance with Purchasing Policy Item 06.04, the authority for the dollar limit as set out below excludes HST. As such, in accordance with Purchasing Policy Item 06.11, where the compliant quotation or tender meeting specifications and offering best value to the City is acceptable or where the highest scoring proposal is recommended and the estimated total purchase price is: (c) Over$250,000, the Manager may approve the award, subject to theapproval of the Director, Treasurer, CAO and Council. Please include the following items in your report/memo: 1. if Items (a) through (b) noted above are acceptable to the Co-ordinator,Health &Safety or designate; 2. if Item (d) is acceptable to the Manager, Budgets & Internal Audit; 3. if Items (c) and (e) are acceptable to Engineering Services; 4. if the list of submitted subcontractors is acceptable to Engineering Services; February 23, 2017 Tender No. T-2-2017 Page 2 Asphalt Resurfacing on Various City Streets, Trails and Driveways ••.• 5, any past work experience with [ow bidder Furfari Paving Co. Ltd. including work location; ,. 6.. without past work experience, if reference information is acceptable to Engineering; 7. the appropriate account number{s)to.which this work is to be charged, " B. the budget arnount(s)assigned thereto, y 9, Treasurer's confirmation of funding, • 10: related departmental approvals; and 11. related comments specific to the project. After. receiving Council's approval, an.approved"on-line" requisition will be required to proceed; ;;i Enquiries can be directed to the'City's website for the unofflCial bid results:as read out at.the public tender otening, dr to Supply& Services. Bidders will be advised-of the outcom-e'in due • course. Seoiu equire further information, please feel free to.contact Mie_or a moniker of Supply I VAFIsb , Attachments (4) . s - lj • si zi 1.i . s iL I l i February:23., 2017 ii Tender No. T-2-2017 Page 3 Asphalt Resurfacing on Various City Streets, Trails and Driveways l • City of Pickering Record of Tenders Opened and Checked Tender Description: Asphalt Resurfacing on Various City Streets,Trails&Driveways Tender No.: T-2-2017 I, Date: • Wednesday, February 22,2017 Time: Approx.2:15 pm Local Time r = Agreement Bidder Name Bid to Addendum#1 Total Tendered Amount Bidder Sign In Comments Deposit Bond Acknowledged ,,Lg .:5___ Ashland Paving Ltd. Q� oV $ /, 9�/ a�� 9 T ^� Bevcon Construction& ir v/ $ Q d-7 /37. 77 # Paving Ltd, o 101,7 �, Brennan Paving & �j � 3,5T, ,� OO Construction Ltd. 10 0 $ r 3 r l S c u'r`} t,vy(ee ccC.Valley Paving Ltd. 1Qet� V i ' $ / jo2/ '07, �6 ti" I e a- -�/ f- , l D. Crupi &Sons Ltd. iqt V ,/r $ 6 ??/� 766 , / 7 f,L jc y / Dtl-Con International ,./.. < $ 02 6 ?of43ii,-‘ o ...1—. 8 tc o , _Z Forest Contractors Ltd, �6�i (o X10 c� ,/ $ f/ 6 25;-5540 , 6�' f d'', Ct 0, a} ._ .7 &.,- o Q Four Seasons Site r/' 1: Development Ltd, 36 1070 /- i / $ 7, �7�� /`l /(e, .1/}4c 0 PAse L.r.k ..-,—.✓/- " Furfari Paving Co. Ltd. 66 (4 ,,,/ $ /1 ,,y/-7, .065-; P.p `";`-ten .. Cc_o - Serve Construction Ltd. X $ XLH C ' , City Staff Present Other 2.1it , The information is strictly preliminary, pending review and veri 'cation of conformance to terms,conditions and specifications. Page 2 of 2 ATTACHMENT#3 TO REPORT# ENG 07-17 6:Ey COLl Location Maps Report ENG 07-17 PICKERINGAsphalt Resurfacing on Various City Streets, Trails and Driveways (T-2-2017) Project Area No. 1 04 coo oCPQ �� `, O /-Vl; y1\•� O 3Q J \� ;- moo Y PicCkc6,,A, �g C �. v J ' C K° P p,::. P PRKW PY \e, o �G� � \ � G ,3 • SUBJECT -s" AREA DIANA. "I'" c'-1. Q Z O 'i Tad., \ oE . a� ar ,oO ; ciOJT�LF, part+cEsz of ORfIBF'R OVRt > � / d _ % WP-ES PARK NO }3 ' ^\P4 \r� � Location Map -Alwin Circle Project Area No. 2 '5-\\'d°' 4 ct,J,I V,-- " "1..;( _, k:, ,,o, ,,,gfol'„„ 's JII a \ :, o , 0 ___ mo +y O c H OWL R ROrD F i" ,e''''.aPaa R� mZ.o O� l Opp c<etiq �o JP�Po �� �,�.xP{ S d ‘e- SUBJECT •X01 S o a m AREA •..- 'O W N `, .••••••�Pj 2 26 U O OO ``P, e.'''' 'o aP bAllilL 9``'<' CO so © S '0 ,i),i) , , o RE -' 1 X01 'P 7.4 S a. ( l; GOER p+ OP //\J\ .00 \ Wo", G��P�. FRO PJENU- 4,405 c, J.\ ,o ‘,0„...„.____„____.).,0 ', , Location Map - Pickering Parkway I ii Page 1 of 6 c4 o Location Maps Report ENG 07-17 ER N G Asphalt Resurfacing on Various City Streets, Trails and Driveways (T-2-2017) Project Area No. 3 0ouNTCASTLE T -- 0 06 r O 0O CPN GEN CRESCENT a �P v U> O v REDBIRD .,COGE�O <' ,4 p W ti ZSO 3(\ 0 0 0.S..-40 !,_ O CRESCENT 'moi Z U W NF rZZ 0> rr0 Cl- c ER DRIVEZ GLENANNA uO� U \ R0?NEaP Ca ENPOSOP6-�NUS� � G DaO � � GRESGSUB ; r� ilp AREA g O ro 2 ...0--16 O �, 4 IP"- U 1 OrZ u� 00 •-::::00 j 0 �" n a W C W U rN (9, '-d- ON�'CP o W C" 7 y O WCL (\/ 1 1P-'Nj ' J \----\\---\R0�NT�O �O Z� ,Y, U , Location Map — Glenanna Road Ii W, Project rJ oject Area No. N 4 \-i / Z� \ GR ` ✓ ? G�N\ 4 300 WaO / O2 v . OQ D y, Z /O °C)6 t) S aW . CD aSjm COUy O � W 0 00O ZC GSoERE 0N � � • S� � RT . CO°:' ,t,OOO<TO; UNEE q� GANT DR\ 'CFERr T Pc, WmGRES `JRSqQ� rOR�EOD0lb O4. S DOyZ C'PJ�� 0 R ° SSNO GOUR ,SUBJECT - ° r N-Sgo°` �, AREA Pig cU SOUPRE BAYFlELD ST O Wp,NE OOj Q 0 FRO Y O vs O m N SEOC ' O K GRE NR O WNagU ,,0556,,,,K t) EYO j �� CL YI A , 111 �O d� 0 PE55,yOP "C S'Q W W U ,,,,sN.0. ..;,,,o0 ,,, ___---, ,,---\s--\ ___ , Location Map — Strouds Lane 1 . II Page 2 of 6 1 C4 601/ Location Maps Report ENG 07-17 PJCKER I N G Asphalt Resurfacing on Various City Streets, Trails and Driveways (T-2-2017) Project Area No. 5 o p K GRES E 2 SS GAO 0 o c ZU OU4' 4 RP•THM R � G P ENUO R �0��� U 7 OQ G Z i ,_ �� ,,y'.. 2 ' is D� REG d- v j 4 / i. G N 2 �/ AVENUE NsEPD'Disl \ �o ,3 n= Y� r RC) c9 3. EtJ C) 0 2 2''t_ ,''',y_ CI) )- pi \_)?• Q- c� 4 W 0 0 GREW O Q. Q 74°_.1 illO. o SUBJECT Go�DN 2 ra a LL AREA S Q D R OGE r- OU 0 O o Q-- 0� X d- 4 II V-RJ O ,.) Z �5 REET HTO OQ Q-- C''rev O G�O Rus 2 0 Jc'e, �\ d r\ ROPO p�il p622 1 0O ou PRTO, Location Map — Dixie Road 1 1 Project Area No. 6 RY�pOER cREG TPP"--W°°° NEI-1\A ,*ccp-oiRm ps'-> GRT. rASTPTIorI R°Po \ o crccRwooit Joy / Wo_oRosE OOURT 101111111 o I ISUBJECT CORRIDOR G \ Q E FIELDSTONAREA o HRVES HYDRO O . ; aiOe 1 DGRpo. W'N` ^�t d p -,s7 �OCA�URY J O EiGHTS / c" IIif 1 11101 ` ,ig€- O E O ' EGG��RT - 0\1\9'- t O P\� OO VZ P GOVON�pL �� OSE O �) li 8 OJR u `ERch / STREET r '-2 -)32 aCA 0 , �—' IGH75® O\ U 51:6, ir'�5aG0 A�_AN 8U RY irNUFPR✓ �^ O HPV ENV�i \a& billilliala — Location Map — Dixie Road ilI 1 I Page 3 of 6 i r. City n _ Location Maps Report ENG 07-17 PICKERINGAsphalt Resurfacing on Various City Streets, • Trails and Driveways (T-2-2017) Project Area No. 7 SUBJECT r+ ,,_-, AREA \ . •,\ GEN' \;, :; -\�,•• GRES 1�,•• _,\ s Li ,, 6'l .- ✓- '4 r o ,---i) Ct v-\\'4C\-\ \` : t\\ u CS, o 6 • GO°� KaO eC NR ' O )� 6Pr-i Z 2 ulJ// 2\ \------------- Location Map — Southview Drive Project Area No. 8 s c. GO,0 , vo GE-5. R EN m \lJ\ c'P goc-° �J N, ,� ov 06 v EoRJs �,, Q GOVE,\NE a0 JP i jON RO SUBJECT R`)SN ROGE AREA a Go"-°° ‘ RG a SpRUGE S DUNBARTON 8040 o 0 0 o n yo Location Map — Goldenridge Road Li Page 4 of 6 e 4 Location Maps Report ENG 07-17 P 1 K E 1 N G Asphalt Resurfacing on Various City Streets, Trails and Driveways (T-2-2017) Project Area No. 9 ILL•WSIDE O ICOLMARI AVENUE I COURT /1 Z QZ -0 Y O Z i_ y p PARK HAM0 Z Q 0 0, /, Q < ` CRESCENT 7 , /*!":<., 0 FELDSPAR J Q : O COURT PFRKET E FLOEPw000 1" (� �% /// / 0 ;=" Q r::!:::::;?:;-:::::-,,,,' j,l %, SUBJECT o // P5• ii PARK ALEX cL Q '%%%:L ,. M j ' >- I ROBERTSON --_-_;":"----,. .:. /PARK r 0 Z Q IP MONTGOMERY PARK ROAD If Location Map — Kinsmen Park Project Area No. 10 j coU a o °??, 0 ry a 06 Od SMEN „ \ OKINPARK 0 a 0 m O Z ROPO . J6 A E� �� SUBJECT �r„iM • AREA 1 I , `RrSpN 1 iy ;,;•'1,e!- R i1.4 . , TArjO >o .1,y .., r G 5 . PARK , : °0�ii .,i ' RA"(IN 04r. P CKERING G NE Location Map —Waterfront Trail • 1 Page 5 of 6 _______.,L___ _ —-- I� t 6 Location Maps Report ENG 07-17 PJCK E R 1 N G Asphalt Resurfacing on Various City Streets, Trails and Driveways (T-2-2017) Project Area No. 11 AI,' lVrN Vo"S EJ PLE Ypr� O y O c a\a � C6_ j SUBJECT AREA rj o I Location Map — Golf Club Road Proposed Construction Includes: The Work of this tender is to provide all machinery, tools, apparatus, materials and other means of construction for complete asphalt removal, supply and installation of new base and top course asphalt resurfacing on: Alwin Circle, Pickering Parkway, Glenanna Road, Strouds Lane, Dixie Road, Goldenridge Road, Golf Club Road, Kinsmen Park (Driveway) and Waterfront Trail. Additionally, the work of this tender is to provide all machinery, tools, apparatus and other means of construction, furnish all materials for an HL-3 asphalt overlay on Dixie Road (Maple Ridge Drive, north to the north limit of the Hydro Corridor) and Southview Drive. General Works may also include spot repairs to existing concrete curbs, gutters, concrete sidewalks,,driveway aprons, fine grading and line painting all in accordance with terms, conditions and specifications contained herein to the satisfaction of the City. • ; Page 6of6