HomeMy WebLinkAbout2017 Draft Capital Budget Forecast
2017
Draft
Capital Budget
As Submitted to Executive Committee February 16, 2017
City of Pickering
2017 Draft Capital Budget
Table of Contents
Department Page
Budget Summaries 1
Mayor & Council 8
Community Services Department
Facilities 15
Civic Complex 5700 16
Senior Citizens Centre 5701 19
Dunbarton Pool 5713 21
Don Beer Arena 5715 23
Community Centres 5719 25
Recreation Complex - Central Core 5731 27
Recreation Complex - Pool 5733 31
Recreation Complex - Arenas 5735 33
Museum 5744 35
Public Works 37
Property Maintenance 5311 39
Roads Equipment 5319 42
Operations Centre 5315 44
Parks 5780 47
Fleet Vehicles 5990 60
Corporate Services Department 66
Information Technology 5206 67
Engineering Services Department 70
Streetlights & Signalization 5325 72
Sidewalks 5323 76
Stormwater Management 5410 80
Roads Projects 5320 84
Water Resources & Development Services 5613 99
Development Projects - (DC Funded) 5321 101
Finance Department 103A
Finance and Taxation 5203 103B
Fire Services Department
Fire Services 5340 104
Libraries
Library 5800 106
Forecast 2018-2021 109
City of Pickering
Five Year Capital Plan
2017 Five Year
Budget Total
Infrastructure Renewal $37,468,450 $106,937,150
Growth 7,675,630 65,619,610
45,144,080$ 172,556,760$
Financing Summary
2017 Five Year
Budget Total
Capital Paid from Property Taxes $1,319,600 $6,136,850
AIP Special Levy 0 3,250,000
Donations 0 75,000
Sale of Property 2,650,000 5,250,000
Federal Grants 1,125,000 2,878,750
Provincial Grants 1,699,815 3,625,745
External Debt 4,210,500 35,359,411
Internal Loan 1,911,000 13,636,000
Rate Stabilization Reserve 513,545 893,545
Discretionary Reserve & Reserve Funds 14,019,101 31,094,214
Third Party Contribution - Reserve Fund 1,875,000 2,866,000
Parkland - Reserve Fund 298,275 843,315
Federal Gas Tax - Reserve Fund 2,959,685 16,358,685
Development Charges - Reserve Fund 10,884,559 45,491,243
Road & Bridges - Reserve Fund 1,678,000 4,798,002
$45,144,080 $172,556,760
Draft 2017 Capital Budget Overview
Classification
Total
1
City of Pickering
Five Year Capital Plan
2017 2017-2021
Budget
Mayor $10,000
Council $5,000 65,000
5700 Civic Complex 820,000 3,835,000
5701 Senior Citizens Centre 140,000 840,000
5713 Dunbarton Pool 18,000 38,000
5715 Don Beer Arena 120,700 2,143,700
5719 Community Centres 232,000 1,329,000
5731 Rec.Complex-Core 745,500 5,596,500
5733 Rec. Complex-Pool 401,000 901,000
5735 Rec.Complex-Arenas 155,000 1,624,000
5744 Museum 112,000 369,000
5311 Property Maintenance 446,000 2,491,000
5319 Roads Equipment 265,000 1,551,000
5315 Operations Centre 23,610,000 26,210,000
5320 Roads Projects 688,500 8,484,500
5780 Parks 1,235,000 7,235,000
5990 Fleet Vehicles 286,250 3,107,950
5206 Information Technology 550,000 720,000
5325 Streetlights & Signalization 1,525,500 3,775,500
5410 Stormwater Management 4,595,000 27,765,000
5203 Finance and Taxation 0 4,000,000
5340 Fire Services 935,000 1,510,000
5800 Library 583,000 3,336,000
$37,468,450 $106,937,150
Infrastructure Renewal
Draft 2017 Capital Budget Overview
Infrastructure Renewal by Program
2
City of Pickering
Annual Debt Charges for Property Tax Financed 2017 Capital
Projects
Project# Description Annual 2017
Charges BUDGET
Internal Loan-5 Year
5311 .1707 Sidewalk Plow with Attachments Replacement $33,000 $151,000
5319.1705 Four Ton Dump Truck with Snow Plow Replacement 57,000 260,000
5340.1701 SCBA Replacement-Breathing Apparatus 77,000 350,000
5719.1704 Tomlinson Community Centre Accessibility Upgrades 29,000 130,000
5780.1715 Amberlea Park -Small Baseball Diamond Upgrades 22,000 100,000
5800.1702 Central Library Makerspace 22,000 100,000
Total Cost of Internal Loan -5 Year $240,000 $1 ,091,000
Internal Loan -10 Year
5325.1703 Whites Road (Seaton)· Streetlights $24,000 $200,000
5325.1704 Highway 7 -Streetlights -New 24,000 200,000
5731.1702 Rec. Complex Diesel Back Up Generator Replacement 24,000 200,000
5731.1705 Rec. Complex Roof Restoration and Partial Replacement 26,000 220,000
Total Cost of Internal Loan -10 Year $98,000 $820,000
Debt-5 Year
5319.1701 Street Sweeper Replacement $55,000 $250,000
Total Cost of Debt-5 Year $55,000 $250,000
Debt -10 Year
5320.1701 Westney Road-Full Road Reconstruction $36,000 $300,000
5780.1706 Frenchmans Bay Waterfront Master Plan (Phase 1) 30,000 247,500
Total Cost of Debt -10 Year $66,000 $547,500
Debt -15 Year
5410.1701 Abbott Crescent SWM Pond Reconstruction $30,000 $342,000
5410.1702 Marksbury Road Outfall Replacement 15,000 171 ,000
5700.1701 Civic Complex Roof Replacement 48,000 540,000
5733.1703 Rec. Complex Pool Roof Replacement 32,000 360,000
Total Cost of Debt -15 Year $125,000 $1,413,000
Debt -20 Year
5315.1701 New Operations Centre $147,000 $2,000,000
Total Cost of Debt-20 Year ~147,000 ~2,000,000
Grand Total $731,ooo II $6,121,500
5
Accessibility Capital Projects
2017 Draft Budget and 2018 to 2021 Forecast
Project Description
2017
Bayly Street -Multi-Use Path
F. Tomlinson Community Centre Accessibility Upgrades
Frenchman's Bay Waterfront Master Plan (Phase 1)
(gross project cost = $900,000)
Finch Avenue-Asphalt Sidewalks
Glendale Park & Playground Improvements
(gross project cost= $150,000)
Frenchman's Bay Rate Payers' Memorial Park Upgrades
(gross project cost= $275,000)
Duffin Heights Village Green Park (East).
(gross project cost= $190,000)
Fire Station # 2 Accessibility Washroom Design
Chair Lift Replacement
Amberlea Park Asphalt Pathways Reconstruction
Central Library Public & Staff Computer Workstations Replacement
(gross project cost= $30,000)
2018
Seaton Trail Heads and Primary Trail Network
New Sidewalk Installation -Pedestrian Bridge in conjunction with DC Project
W0-2 -Kingston Road (south side, 200 metres east of Rosebank Road)
to connect to concrete sidewalk
Rec. Complex Renovation of Main Reception, Public Concourse and West
Entrance (gross project cost= $1, 150,000)
Pathway Construction (Accessibility to Sportsfields)
Fire Station # 2 Accessibility Washroom Construction
2019
Bayly Street Sidewalks and Streetlights
(gross project cost= $1 ,077,000)
Seaton Trail Heads and Primary Trail Network
Rec. Complex Dressing Room Renovation (gross project cost = $2, 190,000)
Frenchman's Bay Waterfront Master Plan (Phase 2)
(gross project cost= $1 ,850,000)
Walkway Reconstruction -Between Elvira Court and Bruce Hanscombe Park
New Sidewalk Installation (Locations TBD)
Rotary Frenchmans Bay West Change/Washroom & Staff Room
(gross project cost= $375,000)
Trail from Creekside Park to Storm Water Management Pond
Pathway Construction (Accessibility to Sportsfields)
Mapleridge Park Master Plan & Implementation ·
(gross project cost= $250,000)
6
Cost
$230,000
180,000
180,000
100,000
75,000
55,000
38,000
25,000
15,000
10,000
6,000
$914,000
$717,000
200,000
150,000
150,000
75,000
$1,292,000
$538,500
717,000
500,000
370,000
200,000
200,000
187,500
175,000
100,000
50,000
$3,038,000
Accessibility Capital Projects
2017 Draft Budget and 2018 to 2021 Forecast
Project Description
2020
Kingston Road South Side Sidewalks and Streetlights
(gross project cost = $394,900)
.. Kingston Road North Side Sidewalks and Streetlights
(gross project cost = $323,1 00)
New Sidewalk Installation -Location TBD
City Development Service Counter Renovations & Accessibility Upgrades
(gross project cost = $495,000)
Pathway Construction (Accessibility to Sportsfields)
Reconstruction of Existing Asphalt Pathways
Frenchman's Bay Waterfront Master Plan (Phase 3)
(gross project cost = $500,000)
2021
Beachfront Park -Boardwalk Replacement (Elevated)
Seaton Trail Heads and Primary Trail Network
Don Beer Arena Concession Renovation
New Sidewalk Installation-Location TBD
Pathway Construction (Accessibility to Sportsfields)
7
Total
Cost
$197,450
161,550
200,000
100,000
150,000
150,000
100,000
$1,059,000
$1,200,000
717,000
200,000
200,000
150,000
$2,467,000
$8,770,000
Mayor R}'an
Expenditures
City of Pickering
2017
Capital Budget
6181 Other Fixed Assets
I I ~--l
Total Expenditures
2015
Budget
$10,000
$10,000
2015
YTD
Actuals
2016 2017
YTD Balance
Actuals Remaining
$0 $01 $10,000
$0 $01 $10,000
Financing 1.---------------~----------------_,
i
2823 Capital Paid from Property Taxes 1 ($1o,ooo>
Total Financingt-i __ (_$_1o_,o_o_o_)
As per Council Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, sofware and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $10,000 is remaining to be spent this year.
8
City of Pickering
2017
Capital Budget
K. Ashe, Reg. Coun. Ward 1
Expenditures
6181 Other Fixed Assets
2015
Budget
$10,000
$10,000
2015
YTD
Actuals
2016 2017
YTD Balance
Actuals Remaining
$0 $51 $9,949
$0 $51 $9,949 --------Total Expenditures
-----------------~--------~--------~ Financing
2823 Capital Paid from Property Taxes {$10,000}
Total Financing ($10,000}1
~-----.;...
As per Council Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, sofware and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $9,949 is remaining to be spent this year.
9
City of Pickering
2017
Capital Budget
B. Mclean, Reg. Coun. Ward 2
Expenditures
2015
Budget
2015
YTD
Actuals
2016
YTD
Actuals
2017
Balance
Remaining
6181 Other Fixed Assets $10,000 $770 $0 $9,230
Total Expenditures $10,0001 $770' $0. $9,230
-----+,----~--------~ Financing
2823 Capital Paid from Property Taxes ($10,000):
Total Financing ($1 0,000)1 __ _:_ ___ ;...__ _ __;...
As per Council Compensation Policy, (Subsection 12.01 ) $10,000 Is provided for
computer hardware, sofware and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $9,230 Is remaining to be spent this year.
10
'
City of Pickering
2017
Capital Budget
2015 2015
Budget' YTD
D. Pickles, Reg. Coun. Ward 3 Actuals
Expenditures
6181 Other Fixed Assets $10,000 $6301
Total Expenditures $10,000 $6301
Financing
2823 Capital Paid from Property Taxes ($10,000)
Total Financing ($10,000)1
I
As per Council Compensation Policy, (Subsection 12.01) $10,000 Is provided for
computer hardware, sofware and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $9,370 is remaining to be spent this year.
11
I
I
2016 2017
YTD Balance
Actuals Remaining
$0 $9,370
$0 $9,370
City of Pickering
2017
Capital Budget
2016 2015
Budget YrD
M. Brenner, City Coun. Ward 1 Actuals --~ I I Expenditures --I $7,500) 6181 Other Fixed Assets $0 ---T_5lt~l EX£enditures I $7,500[ $01 ---Financing I --
2823 Capital Paid from Property Taxes {$7,500) --. -. ... -Total Financing {$7,500) --I -
Councillor Brenner took his Oath of office on February 1, 2016. His computer
hardware and telecommunications Capital Budget is allocated over the remaining
years of his term. Approximately, $4,446 is remaining to be spent this year.
12
I
2016 2017
YTD Balance
Actuals I Remaining
I
$3,054 $4,446
$3,054 $4,446
I
City of Pickering
2017
Capital Budget
2015 2015
Budget YTD
1. Cumming, City Coun. Ward 2 Actuals
Expenditures
6181 Other Fixed Assets $10,0001 $5,925
Total Expenditures $10,ooo: $5,925
Financing I
2823 Capital Paid from Property Taxes ($10,000)1
Total Financing ($1 0,000)
As per Council Compensation Polley, (Subsection 12.01) $10,000 is provided for
computer hardware, sofware and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $2,538 is remaining to be spent this year.
1 .
2016 2017
YTD Balance
Actuals Remaining
$1,537 $2,538
$1 ,537 $2,538
I
I
I I
City of Pickering
2017
Capital Budget
2017
Budget
S. Butt, City Coun. Ward 3
Expenditures
6181 Other Fixed Assets
Financing
I -----·, . $5,000 r-,----Total Expenditures, $5,000
-r-, ----
2823 Capital Paid from Property Taxes ($5,000)
Total Financing I ($5,000)!
-r--, ----il
Councillor Butt took his Oath of Office on December 12, 2016. His computer
hardware and telecommunications Capital Budget is allocated over the remaining
years of his term. As per Council Compensation Polley, (Subsection 12.01 ),
these funds can only be spent in 2017.
14
Facilities Summary
Expenditures
6149 Restoration-Museum Bldg
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1610 Federal Grants
1623 Prov Grant
1702 Debt-10 Year
1703 Debt-15 Year
1711 Internal Loan-5 Year
1712 Internal Loan-10Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7032 R -Dunbarton Pool Surcharge
7033 R -Don Beer Arena Surcharge
7034 R -R/Cmplex Core Surcharge
7035 R -R/Cmplx Pool Surcharge
7036 R -R/Cmplx Arena Surcharge
7040 R -Vehicle Replacement
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
15
Run Date: Jan 25, 2017
2016 2017
Budget Budget
60,000
70,000 213,000
283,800 455,200
2,875,500 610,000
1,660,000 195,000
90,000
2,221,000 1,288,000
7,260,300 2,761,200
(300,000)
(390,000) (50,000)
(1 ,680,000)
(2,250,000) (900,000)
(86,000) (130,000)
(420,000)
(163,500) (337,000)
(1 ,605,000) (50,000)
(18,000)
(1 00,1 00) (15,700)
(68,000) (44,500)
(41,000)
(32,700)
(1 05,000)
(585,000) (650,000)
(7,260,300) (2, 761 ,200)
5700 Civic Complex
Expenditures
6173 Furniture & Fixtures
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
Total Expenditures
Financing
1703 Debt-15 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7505 RF -Federal Gas Tax
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
1 6
Run Date: Jan 25, 2017
2016 2017
Budget Budget
30,000 187,000
120,000 110,000
1,300,000
100,000 540,000
1,550,000 837,000
(540,000)
(17,000)
(1 ,430,000) (50,000)
(120,000) (230,000)
(1 ,550,000) (837,000)
5700 Civic Complex
5700.1701 Roof Replacement
1703 Debt-15 Year
6250 Construction Costs
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Lifecycle replacement of ballasted flat roof, including flashing and
insulation. Includes allowance for repairs to roof deck, adjoining
roof areas and skylights. The existing roof is original (1990) and at
the end of its life.
Total 5700.1701 Roof Replacement
5700.1702 Backup Boilers Replacement
6181 Other Fixed Assets
Life cycle replacement of two back up boilers installed in 1995.
They are in poor condition and require frequent maintenance and
repairs.
7505 RF-Federal Gas Tax
Total 5700.1702 Backup Boilers Replacement
5700.1703 Workstations, Partitions, Tables, Shelving
6173 Furniture & Fixtures
Replacement of original and worn furniture, some over 25 years old.
Spare parts are no longer available as original furniture
manufacturer is no longer in business. Includes replacement of
furniture in sufficiently poor repair to be considered a health and
safety hazard.
7021 R-Rate Stabilization
Total 5700.1703 Workstations, Partitions, Tables, Shelving
5700.1704 New Workstations & Privacy Walls
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Two new workstations and three sets of privacy screens for City
Development staff
Total 5700.1704 New Workstations & Privacy Walls
5700.1706 Air Handling Units -SF2 + RF2 Replacement
6173 Furniture & Fixtures
Lifecycle replacement of supply fan SF2 and return fan RF2 -
serving the main branch library, including controls upgrade. Both
are original equipment installed in 1990.
7505 RF-Federal Gas Tax
Total 5700.1706 Air Handling Units -SF2 + RF2 Replacement
17
Run Date: Jan 25, 2017
Funding Expense
(540,000)
540,000
(540,000) 540,000
110,000
(110,000)
(110,000) 110,000
25,000
(25,000)
(25,000) 25,000
(17,000)
17,000
(17,000) 17,000
120,000
(120,000)
(120,000) 120,000
5700 Civic Complex
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5700.1707 Boardroom Tables Replacement
6173 Furniture & Fixtures
Replacement of Main Committee room table, Boardroom table and
reception furniture.
7021 R-Rate Stabilization
Total 5700.1707 Boardroom Tables Replacement
Total 5700 Civic Complex
18
Run Date: Jan 25, 2017
Funding Expense
25,000
(25,000)
(25,000) 25,000
(837,000} 837,000
5701 Senior Citizens Centre
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
2823 Paid From Property Taxes
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
201_7
Draft Capital Budget
For Council Consideration
1 9
Run Date: Jan 25, 2017
2016 2017
Budget Budget
100,000 140,000
100,000 140,000
(15,000)
(1 00,000) (125,000)
(100,000) (140,000)
5701 Senior Citizens Centre
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5701.1701 Replace Air Handling Unit in Gym
6181 Other Fixed Assets
Lifecycle replacement of air handling unit AHU-2 serving the
gymnasium, including controls upgrade. The existing unit was
installed in 1992.
7505 RF-Federal Gas Tax
Total 5701.1701 Replace Air Handling Unit in Gym
5701.1702 Gontrols Air Compressor Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
.Lifecycle replacement of existing equipment installed in 1990.
Total 5701.1702 Controls Air Compressor Replacement
Total 5701 Senior Citizens Centre
20
Run Date: Jan 25, 2017
Funding Expense
125,000
(125,000)
(125,000) 125,000
(15,000)
15,000
(15,000) 15,000
(140,000) 140,000
5713 Dunbarton Pool
Expenditures
6178 Miscellaneous Equipment
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
7032 R -Dunbarton Pool Surcharge
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
21
Run Date: Jan 25, 2017
2016 2017
Budget Budget
18,000
900,000
900,000 18,000
. (900,000)
(18,000)
(900,000) (18,000)
5713 Dunbarton Pool
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5713.1701 Power Invertor Replacement
6178 Miscellaneous Equipment
Lifecycle replacement of power inverter for pool emergency lighting.
This is original equipment installed in 1970.
7032 R -Dunbarton Pool Surcharge
Total 5713.1701 Power Invertor Replacement
Total 5713 Dunbarton Pool
22
Run Date: Jan 25, 2017
Funding Expense
18,000
(18,000)
(18,000) 18,000
(18,000) 18,000
5715 Don Beer Arena
Expenditures
6178 Miscellaneous Equi'pment
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
2823 Paid From Property Taxes
_7033 R -Don Beer Arena Surcharge
7040 R -Vehicle Replacement
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
23
Run Date: Jan 25, 2017
2016 2017
Budget Budget
107,000 110,700
530,000 10,000
85,000
722,000 120,700
(480,000)
(15,000)
(92,000) (15,700)
(105,000)
(135,000)
(722,000) (120,700)
5715 Don Beer Arena
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5715.1701 Ice Resurfacer Replacement
6178 Miscellaneous Equipment
Lifecycle replacement of Ice Resurfacer (Vehicle #749) with
excessive service hours. The unit was purchased in 2003.
7040 R -Vehicle Replacement
Total 5715.1701 Ice Resurfacer Replacement
5715.1702 Motorized Overhead Door Replacement
6181 Other Fixed Assets
Lifecycle replacement of existing motorized overhead door at the
north end of Rink 2.
7033 R -Don Beer Arena Surcharge
Total 5715.1702 Motorized Overhead Door Replacement
5715.1704 Battery Ice Edger Replacement
6178 Miscellaneous Equipment
Battery Ice Edger Replacement.
7033 R -Don Beer Arena Surcharge
Total 5715.1704 Battery Ice Edger Replacement
Total 5715 Don Beer Arena
24
Run Date: Jan 25, 2017
Funding Expense
105,000
(105,000)
(105,000) 105,000
10,000
(10,000)
(10,000) 10,000
5,700
(5,700)
(5,700) 5,700
(120,700) 120,700
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5719 Community Centres Run Date: Jan 28, 2017
2016
Budget
Expenditures
Miscellaneous Equipment
Other Fixed Assets
Accessibility
Total Expenditures
Financing
Prov Grant
Internal Loan-5 Year
Paid From Property Taxes
Total Financing
Abbreviations
Brougham Hall Community Centre, 3590 Mowbray St.
Greenwood Community Centre, 3551 Greenwood Rd.
Mt. Zion Community Centre, 4230 Sideline 6
Petticoat Creek Community Centre, 470 Kingston Rd.
18,000
18,000
(18,000)
(18,000)
BHCC
GWCC
MZCC
PCCC
TCC
MZCC
wscc
Dr. Nelson F. Tomlinson Community Centre, 4941 Old Brock Rd.
Mt. Zion Community Centre, 4230 Sideline 6
West Shore Community Centre, 10·11-1 015 Bayly St.
25
2017
Budget
12,000
40,000
180,000
232,000
(50,000)
(130,000)
(52,000)
(232,000)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5719 Community Centres
5719.1701 PCCC Floor Machine Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Lifecycle replacement of one floor scrubber for Petticoat Creek
Community Centre. This machine allows staff to clean large floor
surfaces quickly and efficiently, and are invaluable for urgent
cleanup.
Total 5719.1701 PCCC Floor Machine Replacement
5719.1704 TCC Accessibility Upgrades
1623 Prov Grant
Enabling Accessibility Grant
1711 Internal Loan-5 Year
6183 Accessibility
Replace existing unit pavers at front entry of Dr. Nelson F.
Tomlinson Community Centre's poured concrete, including ramp
and raised slab at exterior change rooms. Renovate finishes and
fixtures at interior washrooms and exterior dressing rooms.
Relocate and hardwire automatic door controls. Improve flooring in
main entrance vestibule.
Total 5719.1704 TCC Accessibility Upgrades
5719.1706 GWCC Conductor Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replacement of Greenwood Community Centre high voltage
conductor. The unit has exceeded the manufacturer's useful life
span of 40 years and is at risk of failure at any time. This work will
be done at the same time that Veridian is replacing its transformer
at the community centre to avoid future costs should a failure occur.
Total 5719.1706 GWCC Conductor Replacement
Total 5719 Community Centres
26
Run Date: Jan 25, 2017
Funding Expense
(12,000)
12,000
(12,000) 12,000
(50,000)
(130,000)
180,000
(180,000) 180,000
(40,000)
40,000
(40,000) 40,000
(232,000) 232,000
5731 Rec.Complex=Core
Expenditures
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7021 R -Rate Stabilization
7034 R-R/Cmplex Core Surcharge
7505 RF -Federal Gas Tax
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
27
Run Date: Jan 25, 2017
2016 2017
Budget Budget
26,000
118,000 314,500
150,000 105,000
150,000 300,000
418,000 745,500
(420,000)
(141 ,000)
(120,000)
(68,000) (44,500)
(230,000) (140,000)
(418,000) (745,500)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5731 Rec.Complex-Core
5731.1701 Health Club Equipment Replacement
6178 Miscellaneous Equipment
Fitness Equipment Replacement: Spin Bikes (22).
7034 R -R/Cmplex Core Surcharge
Total 5731.1701 Health Club Equipment Replacement
5731.1702 Diesel Back Up Generator Replacement
1712 Internal Loan-10 Year
6178 Miscellaneous Equipment
Lifecycle replacement of original unit which will increase capacity
and add Information Technology server room to back up power and
future demand. (Installed in 1983).
Total 5731.1702 Diesel Back Up Generator Replacement
5731.1703 Electrical System Sub-Metering
6178 Miscellaneous Equipment
Install electrical sub-meters throughout the Pickering Recreation
Complex to allow for the monitoring of energy use by major
electrical systems, tracking performance and identifying
opportunities for energy savings. All electricity use at the complex
is presently tracked by a single meter. This project is intended to
help the City fulfill the mandate of the Corporate Energy
Management Plan.
7505 RF-Federal Gas Tax
Total 5731.1703 Electrical System Sub-Metering
5731.1704 Electrical Phase & Surge Protection
2823 Paid From Property Taxes
6181 Other Fixed Assets
Install surge and phase protection to critical systems throughout the
Pickering Recreation Complex. A need was identified following a
surge and phase failure in 2015 from a lightning strike. This will
protect major equipment.
Total 5731.1704 Electrical Phase & Surge Protection
5731.1705 Roof Restoration and Partial Replacement
1712 Internal Loan-10 Year
6250 Construction Costs
Replace deteriorated sections of existing roofing, and apply
restoration treatments to other aging roof areas to extend their life.
Includes roof in part of the core area, except the fitness studios.
28
Run Date: Jan 25, 2017
Funding Expense
44,500
(44,500)
(44,500) 44,500
(200,000)
200,000
(200,000) 200,000
60,000
(60,000)
(60,000) 60,000
(45,000)
45,000
(45,000) 45,000
(220,000)
220,000
5731 Rec.Complex-Core
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Total 5731.1705 Roof Restoration and Partial Replacement
5731.1706 Benches for Fitness Studio Hallways
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Additional benches for hallways on both levels of the fitness studios,
to match existing.
Total 5731.1706 Benches for Fitness Studio Hallways
5731.1708 Turnstile Security System
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replace existing sliding doors next to reception desk with
integrated turnstile entry system to better control access into
pay-for-use areas of the complex.
Total 5731.1708 Turnstile Security System
5731.1709 Renovate Meeting Rooms 1, 2 and 3
2823 Paid From Property Taxes
6181 Other Fixed Assets
Renovations of three meeting rooms on upper level at Pickering
Recreation Complex to include painting, ceiling tiles, new lighting,
flooring, kitchen area, signage and entrance/storage room doors.
Total 5731.1709 Renovate Meeting Rooms 1, 2 and 3
5731.1710 Tennis Court Divider Netting Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Remove and replace courts divider nets, repair all damaged
surfaces. Project also includes storm drain clean out access repairs
in four locations.
Total 5731.1710 Tennis Court Divider Netting Replacement
5731.1711 Weight Room Lighting Improvements
6250 Construction Costs
Replace existing lighting fixtures with LED fixtures for energy
savings. Introduce openings into exterior walls to provide natural
light through new windows. Apply film coatings on windows to
maintain privacy.
7505 RF-Federal Gas Tax
Total 5731.1711 Weight Room Lighting Improvements
29
Run Date: Jan 25, 2017
Funding Expense
(220,000) 220,000
(26,000)
26,000
(26,000) 26,000
(30,000)
30,000
(30,000) 30,000
(30,000)
30,000
(30,000) 30,000
(1 0,000)
10,000
(10,000) 10,000
80,000
(80,000)
(80,000) 80,000
5731 Rec.Complex=Core
Total 5731 Rec.Complex-Core
City of Pickering
2017
Draft Capital Budget
For Council Consideration
30
Run Date: Jan 25, 2017
Funding Expense
(745,500) 745,500
5733 Rec. Complex-Pool
Expenditures
6183 Accessibility
6250 Construction Costs
Total Expenditures
Financing
1703 Debt-15 Year
7035 R -R/Cmplx Pool Surcharge
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
31
Run Date: Jan 25, 2017
2016 2017
Budget Budget
15,000
386,000
401,000
(360,000)
(41 ,000)
(401 ,000)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5733 Rec. Complex-Pool
5733.1701 Replace Filter Elements & Covers
6250 Construction Costs
Replace Pool Filtration Elements & Covers.
7035 R-R/Cmplx Pool Surcharge
Total 5733.1701 Replace Filter Elements & Covers
5733.1702 Chair Lift Replacement
6183 Accessibility
Chair Lift Replacement.
7035 R-R/Cmplx Pool Surcharge
Total 5733.1702 Chair Lift Replacement
5733.1703 Pool Roof Replacement
1703 Debt -15 Year
6250 Construction Costs
Pool Roof Replacement -Lifecycle replacement of existing roof
(installed in 1999), including insulation.
Total 5733.1703 Pool Roof Replacement
Total 5733 Rec. Complex-Pool
32
Run Date: Jan 25, 2017
Funding Expense
26,000
(26,000)
(26,000) 26,000
15,000
(15,000)
(15,000) 15,000
(360,000)
360,000
(360,000) 360,000
(401,000) 401,000
5735 Rec.Complex-Arenas
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183. Accessibility
Total Expenditures
Financing
1703 Debt-15 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7033 R -Don Beer Arena Surcharge
7036 R -R/Cmplx Arena Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
'
33
Run Date: Jan 25, 2017
2016 2017
Budget Budget
40,800
1,935,500 155,000
360,000
2,336,300 155,000
(2,250,000)
(30,500)
(15,000)
(8, 1 00)
(32,700)
(155,000)
(2,336,300) (155,000)
5735 Rec.Complex=Arenas
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5735.1701 Delaney Evaporator Condenser Tower Replacement
6181 Other Fixed Assets
Life cycle replacement of evaporator condenser tower for Delaney
Rink (installed in 1990).
7505 RF-Federal Gas Tax
Total 5735.1701 Delaney Evaporator Condenser Tower Replaceme
5735.1703 O'Brien Change Room RTU-4 Replacement
6181 Other Fixed Assets
Life cycle replacement of rooftop unit (RTU-4) serving change rooms
for the O'Brien Arena. (Installed in 1990).
7505 RF-Federal Gas Tax
Total 5735.1703 O'Brien Change Room RTU-4 Replacement
Total 5735 Rec.Complex-Arenas
34
Run Date: Jan 25, 2017
Funding Expense
110,000
(11 0,000)
(11 0,000) 110,000
45,000
(45,000)
(45,000) 45,000
(155,000) 155,000
5744 Museum
Expenditures
6149 Restoration-Museum Bldg
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1610 Federal Grants
1623 Prov Grant
1702 Debt - 1 0 Year
1711 Internal Loan - 5 Year
2823 Paid From Property Taxes
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
35
Run Date: Jan 25, 2017
2016 2017
Budget Budget
60,000
40,000 50,000
90,000
986,000 62,000
1,176,000 112,000
(300,000)
(390,000)
(300,000)
(86,000)
(100,000) (112,000)
(1 '176,000) (112,000)
5744 Museum
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5744.1701 Site Security Improvements
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replace all three existing gates, add pedestrian doors at all three
gates, repair damaged sections of fencing and close opening in
fence line near gate 1. Add cameras to various locations.
Total 5744.1701 Site Security Improvements
5744.1702 Cedar Shake Roof Replacements (Phase 1)
2823 Paid From Property Taxes
6250 Construction Costs
Replacement of various existing cedar shake roofs at end of life.
Total 5744.1702 Cedar Shake Roof Replacements (Phase 1)
Total 5744 Museum
36
Run Date: Jan 25, 2017
Funding Expense
(50,000)
50,000
(50,000) 50,000
(62,000)
62,000
(62,000) 62,000
(112,000) 112,000
Public Works Summary
Expenditures
Parks -Landscape Refurbishment
Vehicles-under $100,000
Vehicles-Over $100,000
Miscellaneous Equipment
Other Fixed Assets
Accessibility
Prof/Consulting Fees
Construction Costs
Parks -Landscape Refurb-Seaton
Vehicles-Over $100,000-Seaton
Total Expenditures
Financing
Donations
Sale of land
Federal Grants
Prov Grant
Debt-5 Year
Debt-10 Year
Debt -20 year
Internal Loan-5 Year
Paid From Property Taxes
R -Self-Insurance
R -Rate Stabilization
R -DC's City's Share
R-Vehicle Replacement
R -Seaton Infrastructure Reserve
R-Seaton FIA Funding Reserve
RF -Third Party Contribution
City of Pickering
2017
Draft Capital Budget
For Council Consideration
37
Run Date: Jan 31,2017
2016 2017
Budget Budget
215,000 1,427,000
474,000 587,000
402,000 680,000
536,100 680,600
355,000 450,000
348,000
1,400,000 25,000
255,000 23,660,000
260,000
900,000
3,637,100 29,017,600
(20,000)
(150,000)
(450,000)
(109,000)
(200,000) (250,000)
(247,500)
(2,000,000)
(230,000) (511 ,000)
(169, 1 00) (329,600)
(31 ,000)
(220,000) (411 ,000)
(55,643)
(933,000) (1 ,007,000)
(60,000)
(24,000)
(325,000)
Public Works Summary
RF -Parkland
RF -Federal Gas Tax
RF DC-Fire
RF DC -Roads & Related
RF DC -Operations Services
RF DC -Parkland Development & Trails
RF -Operations Centre
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
38
Run Date: Jan 31, 2017
. 2016 2017
Budget Budget
(11 0,000) (298,275)
(215,000)
(850,000)
(89,357)
{9, 185,000)
(545,225)
(1 ,400,000) (12,229,000)
(3,637,100) (29,017,600)
5311 Property Maintenance
Expenditures
6129 Parks-Landscape Refurbishment
6178 Miscellaneous Equipment
6250 Construction Costs
Total Expenditures
Financing
1623 Prov Grant
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7022 R -DC's City's Share
7502 RF -Parkland
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
39
Run Date: Jan 25, 2017
2016 2017
Budget Budget
225,000
150,000 366,000
140,000
290,000 591,000
(50,000)
(151,000)
(70,000)
(225,000)
(55,643)
(100,000)
(140,000)
(89,357)
(290,000) (591 ,000)
City of Pickering
2017 Draft Capital Budget
Projects Listing
5311 Property Maintenance
Project Name
5311 Property Maintenance
5311.1701 Zero Turn Mowers Replacement (4)
5311.1702 Ash Tree Replacement Program (Phase 2)
5311.1703 Sidewalk Plow with Attachments -New
5311.1707 Sidewalk Plow with Attachments Replacement
Total
Total 5311 Property Maintenance
40
Run Date: Jan 28, 2017
2017
Project
Budget
70,000
225,000
145,000
151,000
591,000
591,000
5311 Property Maintenance
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5311.1701 Zero Turn Mowers Replacement (4)
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(4) Zero Turn Mowers with Turf Tires (replacements on a 4-year
cycle) Replace unit# 233 (2009), unit# 245 (2009), unit# 272
(20 1 0) and unit # 273 (201 0).
Total 5311.1701 Zero Turn Mowers Replacement (4)
5311.1702 Ash Tree Replacement Program (Phase 2)
6129 Parks-Landscape Refurbishment
Tree replacement due to drought and disease such as the emerald
ash borer (EAB). Project to be completed over a 2 year period and
its scope includes removal, stumping and replacement of damaged
trees.
7021 R -Rate Stabilization
Total 5311.1702 Ash Tree Replacement Program (Phase 2)
5311.1703 Sidewalk Plow with Attachments -New
6178 Miscellaneous Equipment
New Trackless Sidewalk plow due to increase in kilometers of
sidewalks cleared for winter control between 2003/04 and 2016/17.
7022 R -DC's City's Share
761 0 RF DC -Roads & Related
Total 5311.1703 Sidewalk Plow with Attachments-New
5311.1707 Sidewalk Plow with Attachments Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments (spray tank, snow blade, sander
and snow blower)-Replacement Unit# 755 (2001).
Total 5311.1707 Sidewalk Plow with Attachments Replacement
Total 5311 Property Maintenance
41
Run Date: Jan 25, 2017
Funding Expense
(70,000)
70,000
(70,000) 70,000
225,000
(225,000)
(225,000) 225,000
145,000
(55,643)
(89,357)
(145,000) 145,000
(151 ,000)
151,000
(151 ,000) 151,000
(591 ,000) 591,000
5319 Roads Equipment
Expenditures
6178 Miscellaneous Equipment
Total Expenditures
Financing
1623 Prov Grant
1701 Debt-5 Year
2823 Paid From Property Taxes
7020 R -Self-Insurance
7040 R -Vehicle Replacement
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
42
Run Date: Jan 25, 2017
2016 2017
Budget Budget
303,000 272,600
303,000 272,600
(40,000)
(200,000) (250,000)
(22,600)
(6,000)
(57,000)
(303,000) (272,600)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5319 Roads Equipment
5319.1701 Street Sweeper Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
(1) Replacement Street Sweeper-replace unit# 040 (2006 Elgin).
Total 5319.1701 Street Sweeper Replacement
5319.1702 Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replace unit #137 (2002 Dump Trailer).
Total 5319.1702 Trailer Replacement
5319.1703 Pavement Edger-New
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Pavement Edger (New).
Total 5319.1703 Pavement Edger-New
Total5319 Roads Equipment
43
Run Date: Jan 25, 2017
Funding Expense
(250,000)
250,000
(250,000) 250,000
(15,000)
15,000
(15,000) 15,000
(7,600)
7,600
(7,600) 7,600
(272,600) 272,600
Operations Centre
Expenditures
Miscellaneous Equipment
Prof/Consulting Fees
Construction Costs
Total Expenditures
Financing
Prov Grant
Debt-20 year
Paid From Property Taxes
R -Rate Stabilization
RF DC -Operations Services
RF -Operations Centre
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
44
Run Date: Jan 31, 2017
2016 2017
Budget Budget
7,000 10,000
1,400,000
23,600,000
1,407,000 23,610,000
(7,000)
(2,000,000)
(1 0,000)
(186,000)
(9, 185,000)
(1 ,400,000) (12,229,000)
(1 ,407 ,000) (23,61 0,000)
5315 Operations Centre
5315.1701 New Operations Centre
1704 Debt-20 year
6250 Construction Costs
City of Pickering
2017
Draft: Capital Budget
ForCouncliCon~derntion
Construction of a new Operations Centre. The project budget
includes costs for site preparation and servicing, landscaping, and
construction. The DC Reserve Fund will have to borrow external
funds to meet this obligation. The borrowing costs were included in
the new DC rate calculation and the borrowing term will be for 20
years.
7021 R -Rate Stabilization
7612 RF DC-Operations Services
7708 RF -Operations Centre
Total 5315.1701 New Operations Centre
5315.1702 King Pin Press Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
King Pin Press Replacement-to replace existing broken press.
Total 5315.1702 King Pin Press Replacement
Total 5315 Operations Centre
45
Run Date: Jan 31, 2017
Funding Expense
(2,000,000)
23,600,000
(186,000)
(9, 185,000)
(12,229,000)
(23,600,000) 23,600,000
(10,000)
10,000
(10,000) 10,000
(23,61 0,000) 23,610,000
5780 Parks
Expenditures
6129 Parks-Landscape Refurbishment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
6429 Parks -Landscape Refurb -Seaton
Total Expenditures
Financing
1592 Donations
1594 Sale of Land
1610 Federal Grants
1623 Prov Grant
1702 Debt-10 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7020 R-Self-Insurance
7021 R-Rate Stabilization
7192 R -Seaton Infrastructure Reserve
7193 R-Seaton FIA Funding Reserve
7501 RF -Third Party Contribution
7502 RF -Parkland
7505 RF-Federal Gas Tax
City of Pickering
2017
Draft Capital Budget
For Council Consideration
7620 RF DC-Parkland Development & Trails
Total Financing
47
Run Date: Jan 25, 2017
2016 2017
Budget Budget
215,000 1,202,000
76,100 32,000
355,000 450,000
348,000
25,000
115,000 60,000
260,000
761,100 2,377,000
(20,000)
(150,000)
(450,000)
(12,000)
(247,500)
(230,000) (100,000)
(169,100) (227,000)
(25,000)
(220,000)
(60,000)
(24,000)
(275,000)
(10,000) (298,275)
(75,000)
(545,225)
(761 '1 00) {2,377,000)
City of Pickering
2017 Draft Capital Budget
Projects Listing
5780 Parks
Project Name
5780 Parks
5780.1701 Glendale Park & Playground Improvements
5780.1702 Baseball Infield Drainage System-4 Diamonds
5780.1703 Sod Cutter Replacement
5780.1704 Portable Sand Sifter for Beachfront Park
5780.1705 WVCC Picnic Shelter Restoration
5780.1706 Frenchmans Bay Waterfront Master Plan (Phase 1)
5780.1707 Glengrove Park Reconstruction
5780.1708 D.H. Village Green Park (East)-New
5780.1709 Frenchman's Bay Memorial Park Upgrades
5780.171 0 Balsdon Park Masterplan -Design only
5780.1711 D.H. Village Green (Tillings) Playground Equipment
5780.1712 Hyd-A-Way Garbage Bin -Beachfront Park
5780.1713 lnground Garbage/Recycle Units
5780.1714 Enclosed Trailer Replacement
5780.1715 Amberlea Park -Small Diamond Upgrades
5780.1721 Stumper Attachment for Skid Steer-New
5780.1722 Amberlea Park -Asphalt Pathways Reconstruction
5780.1723 Village Green-Mattamy (Seaton) Dev.-Taunton Subdivision
Total
Total 5780 Parks
48
Run Date: Jan 28, 2017
2017
Project
Budget
150,000
60,000
6,500
20,000
35,000
900,000
250,000
190,000
275,000
25,000
25,000
10,000
35,000
12,000
100,000
13,500
10;000
260,000
2,377,000
2,377,000
5780 Parks
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5780.1701 Glendale Park & Playground Improvements
1594 Sale of Land
6129 Parks-Landscape Refurbishment
Glendale Park-Park lmproverrents -upgrades to park including
walkway connection to Liverpool Road, fencing, lighting and
playground equipment. This project is subject to the Council
approval of land disposition.
6183 Accessibility
Total 5780.1701 Glendale Park & Playground Improvements
5780.1702 Baseball Infield Drainage System - 4 Diamonds
2823 Paid From Property Taxes
6250 Construction Costs
Baseball Infield Drainage System 4 Diamonds (Forestbrook Park
North, Dunmoore South, Centennial Park, Hydro f:?iamonds-
Kinsmen).
Total 5780.1702 Baseball Infield Drainage System - 4 Diamonds
5780.1703 Sod Cutter Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Sod Cutter Replacement.
Total 5780.1703 Sod Cutter Replacement
5780.1704 Portable Sand Sifter for Beachfront Park
2823 Paid From Property Taxes
6181 Other Fixed Assets
Portable Sand Sifter for Beachfront Playground.
Total 5780.1704 Portable Sand Sifter for Beachfront Park
5780.1705 WVCC Picnic Shelter Restoration
2823 Paid From Property Taxes
6181 Other Fixed Assets
Roof timber and cladding repairs to the existing play barn structure,
including provision of a new concrete floor slab located at the
Whitevale Community Centre.
Total 5780.1705 WVCC Picnic Shelter Restoration
5780.1706 Frenchmans Bay Waterfront Master Plan (Phase 1)
1610 Federal Grants
1702 Debt-10 Year
49
Run Date: Jan 25, 2017
Funding Expense
(150,000)
75,000
75,000
(150,000) 150,000
(60,000)
60,000
(60,000) 60,000
(6,500)
6,500
(6,500) 6,500
(20,000)
20,000
(20,000) 20,000
(35,000)
35,000
(35,000) 35,000
(450,000)
(247,500)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5780 Parks
6129 Parks -Landscape Refurbishment
Frenchmans Bay Watertront Master Plan-Phase 1 (45/55).
Reconstruction of Beachpoint Promenade (West Shore to boat
launch) including lay-by parking, pedestrian walkways, lighting,
sign age and trailhead for watertront trail. Project to proceed only if
senior government grant funding is received.
6183 Accessibility
7620 RF DC-Parkland Development & Trails
Total 5780.1706 Frenchmans Bay Waterfront Master Plan (Phase 1
5780.1707 Glengrove Park Reconstruction
6181 Other Fixed Assets
Glengrove Park Reconstruction.
7502 RF -Parkland
Total 5780.1707 Glengrove Park Reconstruction
5780.1708 D.H. Village Green Park (East) -New
6129 Parks -Landscape Refurbishment
Duffin Heights Village Green (East).
6183 Accessibility
7502 RF -Parkland
7620 RF DC -Parkland Development & Trails
Total 5780.1708 D.H. Village Green Park (East)-New
5780.1709 Frenchman's Bay Memorial Park Upgrades
6129 Parks -Landscape Refurbishment
Frenchman's Bay Rate Payers' Memorial Park-Park
Enhancements-upgrades to park including walkways, lighting,
children's playground, basketball court, gazebo/shade structure,
benches, waste receptacles and landscaping.
6183 Accessibility
7501 RF -Third Party Contribution
Total 5780.1709 Frenchman's Bay Memorial Park Upgrades
5780.1710 Balsdon Park Masterplan -Design only
2823 Paid From Property Taxes
6230 Prof/Consulting Fees
Balsdon Park Masterplan -Design only.
Total 5780.1710 Balsdon Park Masterplan-Design only
5780.1711 D.H. Village Green (Tillings) Playground Equipment
50
Run Date: Jan 25, 2017
Funding Expense
720,000
180,000
(202,500)
(900,000) 900,000
250,000
(250,000)
(250,000) 250,000
152,000
38,000
(23,275)
(166,725)
(190,000) 190,000
220,000
55,000
(275,000)
(275,000) 275,000
(25,000)
25,000
(25,000) 25,000
City of Pickering
2017
Draft Capita! Budget
For Council Consideration
5780 Parks
6129 Parks-Landscape Refurbishment
Duffin Heights Village Green (Tillings) Additional Playground
Equipment. Expansion of playground area in the village green and
installation of additional play equipment.
7502 RF -Parkland
Total 5780.1711 D. H. Village Green (Tillings) Playground Equipme1
5780.1712 Hyd-A-Way Garbage Bin -Beachfront Park
2823 Paid From Property Taxes
6181 Other Fixed Assets
Hyd-A-Way Garbage Bin -Beachfront Park.
Total 5780.1712 Hyd-A-Way Garbage Bin -Beachfront Park
5780.1713 lnground Garbage/Recycle Units
2823 Paid From Property Taxes
6181 Other Fixed Assets
lnground garbage/recycle units (14 units for 7 sets) for various
parks (Brockridge Park 6 units, Forestbrook Park 4 units, Major
Oaks Park 4 units)-(Sustainable).
Total 5780.1713 lnground Garbage/Recycle Units
5780.1714 Enclosed Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Enclosed Trailer -Replacement unit# 785 (2012).
Total 5780.1714 Enclosed Trailer Replacement
5780.1715 Amberlea Park-Small Diamond Upgrades
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Amberlea Park -Small Diamond -new fencing, player benches,
bleachers, backstop and wings.
Total 5780.1715 Amberlea Park-Small Diamond Upgrades
5780.1721 Stumper Attachment for Skid Steer -New
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Stumper Attachment for Skid Steer-Unit #768
Total 5780.1721 Stumper Attachment for Skid Steer-New
5780.1722 Amberlea Park-Asphalt Pathways Reconstruction
51
Run Date: Jan 25, 2017
Funding Expense
25,000
(25,000)
(25,000) 25,000
(10,000)
10,000
(10,000) 10,000
(35,000)
35,000
(35,000) 35,000
(12,000)
12,000
(12,000) 12,000
(1 00,000)
100,000
(100,000) 100,000
(13,500)
13,500
(13,500) 13,500
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5780 Parks
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Amberlea Park Asphalt Pathways-Reconstruction (Additional funds
required for project 5780.1617).
Total 5780.1722 Amberlea Park-Asphalt Pathways Reconstructio1
5780.1723 Village Green -Mattamy (Seaton) Dev. -Taunton Subdivi
6429 Parks -Landscape Refurb -Seaton
. Construction of one Seaton Village Greens park and water play
area. Project will only proceed when Seaton sidewalk savings are
received from the developer.
7192 R -Seaton Infrastructure Reserve
7193 R -Seaton FIA Funding Reserve
7620 RF DC-Parkland Development & Trails
Total 5780.1723 Village Green -Mattamy (Seaton) Dev. -Taunton l:
Total 5780 Parks
52
Run Date: Jan 25, 2017
Funding Expense
(10,000)
10,000
(10,000) 10,000
260,000
(60,000)
(24,000)
(176,000)
(260,000) 260,000
(2,377,000) 2,377,000
5990 Fleet Vehicles
Expenditures
6157 Vehicles-under $100,000
6158 Vehicles-Over $100,000
6458 Vehicles-Over $100,000-Seaton
Total Expenditures
Financing
1711 Internal Loan-5 Year
7040 R -Vehicle Replacement
7501 RF-Third Party Contribution
7605 RF DC -Fire
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
60
Run Date: Jan 25, 2017
2016 2017
Budget Budget
474,000 587,000
402,000 680,000
900,000
876,000 2,167,000
(260,000)
(876,000) (1 ,007,000)
(50,000)
(850,000)
(876,000) (2, 167 ,000)
2017 Proposed Vehicle Replacement List
New or Description of Expected Plans for Vehicle Other
Replacement Vehicle Requested Existing Equipment: Costs Primary User Vehicle being Replacement Funding
Year, Make, Unit# Replaced Reserve Source
Replacement 3/4 Ton Pickup Truck 2006 Ford, #778 $55,000 Community Centres Sale $55,000 0
Re_Qiacement Heavy Duty Pickup Truck 2003,#309 65,000 Museum Sale 65,000 0
Replacement 1/2 Ton Pickup Truck 2006 Ford, #206 32,000 Operations Centre Sale 32,000 0
Replacement 4 Ton Dump Truck 2005 International, #53 260,000 Roads ·Equipment Sale 0 $260,000
Replacement 5 Ton Dump Truck 2008 Sterling, #56 270,000 Roads Equipment Sale 270 000 0
Replacement 1/2 Ton Pickup Truck 2008 Ford, #758 35,000 Parks Sale 35,000 0
Replacement 1 Ton Truck 2008 Ford, #771 130,000 Parks Sale 130,000 0
Replacement 2 Ton Truck 2008 Ford, # 773 75,000 Parks Sale 75,000 0
Replacement 3 Ton Dump Truck 2000 GMC #734 75000 Parks Sale 75,000 0
Re_pjacement Midsize SUV 2006 Chevy Malibu, #410 32,000 By-Law Sale 32,000 0
Replacement Van Vehicle 2006 Chevy, #800 40,000 Animal Services Sale 40,000 0
en Replacement Midsize SUV 2008 Ford, #641 32,000 Eng. Services -Admin Sale 32,000 0
...... Replacement Midsize SUV 2008 Ford, # 636 32000 Eng. Services-Admin Sale 32,000 0
Re_pjacement Midsize SUV 2009 Ford, #638 32,000 Water Resources Sale 32,000 0
Replacement 1/2 Ton Pickup Truck 2009 GMC, #538 35,000 Fire Sale 35,000 0
Replacement Midsize Utility Vehicle 2008 Chevy, #556 35,000 Fire Re-purpose 35,000 0
New Midsize SUV 32,000 Parks 32,000 Oi
New Pumper Rescue (Seaton) 900,000 Fire 0 900,000
Total 18 $2,167,000 $1,007,000 $1,1 60,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5990 Fleet Vehicles
5219.1701 Van Replacement
6157 Vehicles-under $100,000
Replace unit #800 (2006 Chev) (5219 Animal Services).
7040 R-Vehicle Replacement
Total 5219.1701 Van Replacement
5220.1701 Midsize SUV Replacement
6157 Vehicles-under $100,000
Replace unit #41 0 (2006 Chevy Malibu) with Mid-size SUV (5220
By-Law Services).
7040 R-Vehicle Replacement
Total 5220.1701 Midsize SUV Replacement
5315.1703 1/2 Ton Pickup Truck Replacement
6157 Vehicles-under $100,000
HalfTon Pickup Truck-Replace unit #206 (2006 Ford) (5315
Municipal Garage).
7040 R-Vehicle Replacement
Total 5315.1703 1/2 Ton Pickup Truck Replacement
5319.1704 5 Ton Dump Truck with Snow Plow Replacement
6158 Vehicles-Over $100,000
Five Ton Dump Truck with Snow Plow-Replace unit #56 (2008
Sterling) (5319 Roads Equipment).
7040. R-Vehicle Replacement
Total 5319.1704 5 Ton Dump Truck with Snow Plow Replacement
5319.1705 4 Ton Dump Truck with Snow Plow Replacement
1711 Internal Loan-5 Year
6158 Vehicles-Over $100,000
Four Ton Dump Truck with Snow Plow-Replace unit #053 (2005
International) (5319 Roads Equipment).
Total 5319.1705 4 Ton Dump Truck with Snow Plow Replacement
5335.1701 Midsize SUVs Replacement (2)
6157 Vehicles-under $100,000
(2 units) Midsize SUVs-Replace unit #641 (2008 Ford Escape)
(5335 Engineering Services Admin) and replace unit #636 (2008
Ford Escape) (5335 Engineering Services-Admin).
7040 R-Vehicle Replacement
63
Run Date: Jan 25, 2017
Funding Expense
40,000
(40,000)
(40,000) 40,000
32,000
(32,000)
(32,000) 32,000
32,000
(32,000)
(32,000) 32,000
270,000
(270,000)
(270,000) 270,000
(260,000)
260,000
(260,000) 260,000
64,000
(64,000)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5990 Fleet Vehicles
Total 5335.1701 Midsize SUVs Replacement (2)
5340.1705 · 1/2 Ton Pickup Truck Replacement
6157 Vehicles-under $100,000
1/2 Ton Pickup truck-Replace unit #538 (2006 GMC) (5340 Fire
Services).
7040 R -Vehicle Replacement
Total 5340.1705 1/2 Ton Pickup Truck Replacement
5340.1707 Pumper Rescue (Seaton Fire Station A) -New
6458 Vehicles-Over $100,000-Seaton
Pumper Rescue-Seaton Fire Station A (5340 Fire Services).
7501 RF-Third Party Contribution
Contribution from OPG 7501.006
7605 RF DC -Fire
Total 5340.1707 Pumper Rescue (Seaton Fire Station A)-New
5340.1709 Midsize Utility Vehicle Replacement
6157 Vehicles-under $100,000
Midsize Utility Vehicle -Replace unit# 556 (2008 Chev Impala)
(5340 Fire Services).
7040 R -Vehicle Replacement
Total 5340.1709 Midsize Utility Vehicle Replacement
5613.1702 Midsize SUV Replacement
6157 Vehicles-under $100,000
Midsize SUV-Replace unit #638 (2009 Ford Escape) (5613 Water
Resources & Development Services).
7040 R -Vehicle Replacement
Total 5613.1702 Midsize SUV Replacement
5719.1705 3/4 Ton Pickup Truck with Tail Gate Lift Replacement
6157 Vehicles-under $100,000
%Ton Pick-up Truck with Tail Gate Lift to replace unit# 778 (2006
Ford)(5719 Community Centres).
7040 R -Vehicle Replacement
Total 5719.1705 3/4 Ton Pickup Truck with Tail Gate Lift Replacerr
5744.1705 Heavy Duty Pickup Truck Replacement
6157 Vehicles-under $100,000
64
Run Date: Jan 25, 2017
Funding Expense
(64,000) 64,000
35,000
(35,000)
(35,000) 35,000
900,000
(50,000)
(850,000)
(900,000) 900,000
35,000
(35,000)
(35,000) 35,000
32,000
(32,000)
(32,000) 32,000
55,000
(55,000)
(55,000) 55,000
65,000
5990 Fleet Vehicles
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Heavy Duty Pickup Truck with extended cab, rear dump bucket and
snow plow attachments to replace unit #309 (2003)(57 44 Museum).
7040 R-Vehicle Replacement
Total 5744.1705 Heavy Duty Pickup Truck Replacement
5780.1716 3 Ton Dump Truck with Chipper Body Replacement
6158 Vehicles-Over $100,000
Replace Unit# 734 (2000 GMC)(5780 Parks) -(Re-budgeted from
2016).
7040 R -Vehicle Replacement
Total 5780.1716 3 Ton Dump Truck with Chipper Body Replaceme
5780.1717 1/2 Ton Pickup Truck Replacement
6157 Vehicles-under $100,000
1/2 Ton 4x4 Pickup Truck-Replace unit# 758 (2008 Ford) (5780
Parks).
7040 R -Vehicle Replacement
Total 5780.1717 1/2 Ton Pickup Truck Replacement
5780.1718 Midsize SUV-New
6157 Vehicles-under $100,000
Midsize SUV-New (5780 Parks).
7040 R-Vehicle Replacement
Total 5780.1718 Midsize SUV-New
5780.1719 1 Ton Trucks with Aluminum Dump Body Replacement (
6157 Vehicles-under $100,000
(2 units) -One Ton Trucks with Aluminum Dump Body-Replace
unit #771 (2008 Ford) (5780 Parks) and replace unit #773 (2008
Ford) (5780 Parks).
7040 R-Vehicle Replacement
Total 5780.1719 1 Ton Trucks with Aluminum Dump Body Replace
Total 5990 Fleet Vehicles
65
Run Date: Jan 31,2017
Funding Expense
(65,000)
(65,000) 65,000
150,000
(150,000)
(150,000) 150,000
35,000
(35,000)
(35,000) 35,000
32,000
(32,000)
(32,000) 32,000
130,000
(130,000)
(130,000) 130,000
(2, 167 ,000) 2,167,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Corporate Services Dept. Summary
Expenditures
6175 Hardware Replacements
6177 IT Infrastructure
Total Expenditures
Financing
7001 R-Capital Equipment Replacement
Total Financing
66
Run Date: Jan 25, 2017
2016 2017
Budget Budget
138,000 74,500
154,450 211,750
292,450 286,250
(292,450) (286,250)
(292,450) (286,250)
5206 Information Technology
Expenditures
6175 Hardware Replacements
6177 IT Infrastructure
Total Expenditures
Financing
7001 R -Capital Equipment Replacement
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
67
Run Date: Jan 25, 2017
2016 2017
Budget Budget
138,000 74,500
154,450 211,750
292,450 286,250
(292,450) (286,250)
(292,450) (286,250)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5206 Information Technology
5206.1701 Servers & Related Software
6175 Hardware Replacements
Server and Software Upgrade " Cloud Backup Solution.
7001 R -Capital Equipment Replacement
Total 5206.1701 Servers & Related Software
5206.1702 SAN Storage Upgrade REC Complex
6175 Hardware Replacements
Dell Compellent Controller and SAN Disk Upgrade.
7001 R -Capital Equipment Replacement
Total 5206.1702 SAN Storage Upgrade REC Complex
5206.1704 Video Conferencing Solution
6175 Hardware Replacements
Adding video conference capability to boardrooms for Engineering
and City Development Departments.
7001 R -Capital Equipment Replacement
Total 5206.1704 Video Conferencing Solution
5206.1705 Wi-Fi for Facilities and Public Spaces
6177 IT Infrastructure
Continued Deployment of Cisco Meraki Wi-Fi access points for City
facilities. Monthly internet fees included in Current Budget.
7001 R -Capital Equipment Replacement
Total 5206.1705 Wi-Fi for Facilities and Public Spaces
5206.1706 Replacement PCs
6177 IT Infrastructure
Four year plan to replace 50 PC's per year.
7001 R -Capital Equipment Replacement
Total 5206.1706 Replacement PCs
5206.1708 1GB Internet Upgrade
6177 IT Infrastructure
1GB Internet Services for City of Pickering to support Cloud
Services -The City will require hardware and software upgrades to
Firewalls, Intrusion Prevention and Email.
7001 R -Capital Equipment Replacement
Total 5206.1708 1GB Internet Upgrade
5206.1709 Computer Room I Network Upgrades
68
Run Date: Jan 25, 2017
Funding Expense
33,000
(33,000)
(33,000) 33,000
36,000
(36,000)
(36,000) 36,000
5,500
. (5,500)
(5,500) 5,500
11,000
(11 ,000)
(11 ,000) 11,000
38,750
(38,750)
(38,750) 38,750
24,000
(24,000)
(24,000) 24,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5206 Information Technology
6177 IT Infrastructure
Datacentre and Distributed Network Hardware Upgrades (new UPS,
network switching components, etc.).
7001 R-Capital Equipment Replacement
Total 5206.1709 Computer Room I Network Upgrades
5206.1710 Offsite Upgrade Disaster Recovery
6177 IT Infrastructure
Storage ($55,000) and Server ($50,000) upgrades for the City's
Disaster Recovery site to ensure the continuity of business
operations in the event of a disaster.
7001 R -Capital Equipment Replacement
Total 5206.1710 Offsite Upgrade Disaster Recovery
Total 5206 Information Technology
69
Run Date: Jan 25, 2017
Funding Expense
33,000
(33,000)
(33,000) 33,000
105,000
(105,000)
(1 05,000) 105,000
(286,250) 286,250
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Engineering Services Dept Summary
Expenditures
6181 Other Fixed Assets
6221 Preliminary Engineering -Envirnmt Asesmt
6230 Prof/Consulting Fees
6250 Construction Costs
6251 Road Improvements·
6252 Streetlights & Sidewalks
( 6253 Storm Water
6254 Traffic Signals
6265 Land Acquisition & Disp
Total Expenditures
Financing
1610 Federal Grants
1623 Prov Grant
1702 Debt-10 Year
1703 Debt-15 Year
1704 Debt -20 year
1711 Internal Loan-5Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7022 R -DC's City's Share
7501 RF -Third Party Contribution
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
7611 RF DC -Storm Water Mgmt
7709 RF -Roads & Bridges
7711 RF -OCIF Grant
9960 Other Rev. York Reg. Project
70
Run Date: Jan 25, 2017
2016 2017
Budget Budget
400,000 200,000
1,000,000 900,000
120,000 75,000
16,894,500 5,925,000
273,200 280,530
45,000
2,708,100 1,525,500
700,000 50,000
10,000
22,150,800 8,956,030
(675,000)
(330,000) (1 ,259,500)
(5,380,000) (300,000)
(513,000)
(650,000)
(150,000)
(385,000) (400,000)
(50,000)
(1 ,500,000)
(1 ,584,856) (65,553)
(600,000) (1,100,000)
(5,775,000) (2,309,685)
(3, 114,380) (214,977)
(1, 191 ,564)
(801 ,260) (1 ,678,000)
(198,740) (390,315)
(490,000)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Engineering Services Dept. Summary
Total Financing
71
Run Date: Jan 25, 2017
2016 2017
Budget Budget
(22, 150,800) (8,956,030)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5325 Streetlights & Signalization
Expenditures
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
6254 Traffic Signals
Total Expenditures
Financing
1623 Prov Grant
1702 Debt-10 Year
1712 Internal Loan-1 0 Year
282:3 Paid From Property Taxes
7021 R-Rate Stabilization
7505 RF -Federal Gas Tax
Total Financing
72
Run Date: Jan 25, 2017
2016 2017
Budget Budget
200,000
120,000
5,380,000 900,000
25,000 50,000
5,725,000 950,000
(25,000)
(200,000)
(400,000)
(50,000)
(1 ,500,000)
(4,000,000) (500,000)
(5,725,000) (950,000)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5325 Streetlights & Signalization
5325.1701 Traffic Signals/Controllers (Valley Farm Rd.)
2823 Paid From Property Taxes
6254 Traffic Signals
Valley Farm Road at Fieldlight Traffic Signals/Controllers-
Replacement.
Total 5325.1701 Traffic Signals/Controllers (Valley Farm Rd.)
5325.1702 Traffic Signals/Controllers (Sandy Beach Rd.)
2823 Paid From Property Taxes
6254 Traffic Signals
Sandy Beach Road at Kinsmen/OPG Parking Lot Traffic
Signals/Controllers -Replacement.
Total 5325.1702 Traffic Signals/Controllers (Sandy Beach Rd.)
5325.1703 Whites Road (Seaton) -Streetlights
1712 Internal Loan-1 0 Year
6250 Construction Costs
Illumination on Whites Road from Highway 7 to South Limit of
Highway 407 Interchange (in conjunction into MTO construction of
interchange).
Total 5325.1703 Whites Road (Seaton)-Streetlights
5325.1704 Highway 7 -Streetlights -New
1712 Internal Loan-1 0 Year
6250 Construction Costs
Illumination on Highway ?on both the east and west approach to
Whites Road.
Total 5325.1704 Highway 7-Streetlights -New
5325.1705 Streetlight Luminaries Replacement -Phase 3
6250 Construction Costs
Additional poles, trenching, wiring and arm replacements to be
funded by Independent Electricity System Operator (IESO)
Incentive.
7505 RF-Federal Gas Tax
Total 5325.1705 Streetlight Luminaries Replacement-Phase 3
Total 5325 Streetlights & Signalization
73
Run Date: Jan 25, 2017
Funding Expense
(25,000)
25,000
(25,000) 25,000
(25,000)
25,000
(25,000) 25,000
(200,000)
200,000
(200,000) 200,000
(200,000)
200,000
(200,000) 200,000
500,000
(500,000)
(500,000) 500,000
(950,000) 950,000
5323 Sidewalks
'
Expenditures
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan-5 Year
7022 R -DC's City's Share
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
Total Financing
City of Pickering
2017
Draft Capital Budget
For Council Consideration
76
Run Date: Jan 25, 2017
2016 2017
Budget Budget
580,000 330,000
580,000 330,000
(150,000)
(90,000)
(250,000) (330,000)
(90,000)
(580,000) (330,000)
5323 Sidewalks
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5323.1701 Finch Avenue -Asphalt Sidewalk
6250 Construction Costs
Asphalt Sidewalk-Finch Avenue south side, Rosefield Road
westerly 200 metres.
7505 RF-Federal Gas Tax
Total 5323.1701 Finch Avenue-Asphalt Sidewalk
5323.1702 Bayly Street -Multi-use Path
6250 Construction Costs
Multi-use Path -Bayly Street, West Shore Community Centre to
Begley Street.
7505 RF-Federal Gas Tax
Total 5323.1702 Bayly Street-Multi-use Path
Total 5323 Sidewalks
77
Run Date: Jan 25, 2017
Funding Expense
100,000
(100,000)
(100,000) 100,000
230,000
(230,000)
(230,000) 230,000
(330,000) 330,000
5410 Stormwater Management
Expenditures
6250 Construction Costs
6253 Storm Water
Total Expenditures
Financing
1610 Federal Grants
1623 Prov Grant
1703 Debt-15 Year
Total Financing
City ·of Pickering
2017
Draft Capital Budget
For Council Consideration
80
Run Date: Jan 25, 2017
2016 2017
Budget Budget
40,000
1,525,500
40,000 1,525,500
(675,000)
(40,000) (337,500)
(513,000)
(40,000) . (1 ,525,500)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5410 Stormwater Management
5410.1701 Abbott Crescent SWM Pond -Reconstruction
1610 Federal Grants
Clean Water and Wastewater Fund (CWWF) Grant-Federal
1623 Prov Grant
Clean Water and Wastewater Fund (CWWF) Grant-Provincial
1703 Debt-15 Year
6253 Storm Water
Abbott Crescent SWM Pond Cleanout (Design, Approvals &
Construction). Project will only proceed if grant funding is received.
Total 5410.1701 Abbott Crescent SWM Pond -Reconstruction
5410.1702 Marksbury Road Outfall -Replacement
1610 Federal Grants
Clean Water and Wastewater Fund (CWWF) Grant-Federal
1623 Prov Grant
Clean Water and Wastewater Fund (CWWF) Grant-Provincial
1703 Debt-15 Year
6253 Storm Water
Marksbury Road Outfall Replacement. Project will only proceed if
grant funding is received.
Total 5410.1702 Marks bury Road Outfall -Replacement
Total5410 Stormwater Management
81
Run Date: Jan 25, 2017
Funding Expense
(450,000)
(225,000)
(342,000)
1,017,000
(1 ,017 ,000) 1,017,000
(225,000)
(112,500)
(171 ,000)
508,500
(508,500) 508,500
(1 ,525,500) 1,525,500
5320 Roads Projects
Expenditures
City of Pickering
2017
Draft Capital Budget
For Council Consideration
6221 Preliminary Engineering -Envirnmt Asesmt
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1623 Prov Grant
1702 Debt-10 Year
1704 Debt -20 year
1712 Internal Loan-10 Year
7501 RF -Third Party Contribution
7505 RF-Federal Gas Tax
7709 RF -Roads & Bridges
7711 RF-OCIF Grant
9960 Other Rev. York Reg. Project
Total Financing
84
Run Date: Jan 25, 2017
2016 2017
Budget Budget
400,000 900,000
75,000
6,965,000 4,695,000
7,365,000 5,670,000
(115,000) (922,000)
(3, 1 00,000) (300,000)
(650,000)
(85,000)
(400,000) (900,000)
(1 ,525,000) (1 ,479,685)
(801 ,260) (1 ,678,000)
(198,740) (390,315)
(490,000)
(7,365,000) (5,670,000)
Project Description
2017
Northem Roads Hard Surfacing Strategy
Capital Projects
2017 Draft Budget and 2018 to 2021 Forecast
Westney Road -Full Road Reconstruction -From Eighth Concession Road to
Ninth Concession Road
2018
Sideline 14 -Reconstruction -From Hwy. 407 to Seventh Concession Road
2019
Seventh Concession Road -Reconstruction -From Sideline 32 to Sideline 26
Kinsale Road -Hard Surfacing -From Hwy 407 to Seventh Concession Road
2020
Seventh Concession Road -Reconstruction-From Sideline 26 to Sideline 22
Seventh Concession Road -Reconstruction -From Sideline 22 to Brock Rd.
2021
Sideline 24 -Reconstruction -From Hwy 407 to Whitevale Rd.
Total
85
Cost
$1,800,000
$1,800,000
$925,000
$925,000
$2,150,000
975,000
$3,125,000
$1,525,000
1,525,000
$3,050,000
$975,000
$975,000
$9,875,000
City of Pickering
2017 Draft Capital Budget
Projects listing
5320 Roads Projects
Project Name
5320 Roads Projects
5320.1701 Westney Road-Full Road Reconstruction
5320.1702 Highway 401/Church Street-Class EA!PD
5320.1703 Pickering Broadband Initiative
5320.1708 Michell Bridge (7001) Rehabilitation -Construction
5320.1709 Greenwood Bridge (6001) Rehabilitation -D&A
5320.1711 Alwin Circle -Asphalt Resurfacing
5320.1712 Pickering Parkway -Asphalt Resurfacing
5320.1714 Glenanna Road -Asphalt Resurfacing
5320.1715 Strouds Lane-Asphalt Resurfacing
5320.1716 Dixie Road -Asphalt Resurfacing
5320.1717 Dixie Road -Final Lift of Asphalt
5320.1719 Southview Drive-Final Lift of Asphalt
5320.1726 Goldenridge Road -Asphalt Resurfacing
Total
Total 5320 Roads Projects
86
Run Date: Jan 28, 2017
2017
Project
Budget
1,800,000
900,000
175,000
1,025,000
75,000
255,000
260,000
300,000
400,000
310,000
80,000
55,000
35,000
5,670,000
5,670,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5320 Roads Projects
5320.1701 Westney Road -Full Road Reconstruction
1702 Debt-10 Year
6250 Construction Costs
Westney Road -Full Road Reconstruction (From Concession 8 to
Concession 9).
7709 RF -Roads & Bridges
Total 5320.1701 Westney Road-Full Road Reconstruction
5320.1702 Highway 401/Church Street-Class EAIPD
6221 Preliminary Engineering -Envirnmt Asesmt
Highway 401 at Church Street Municipal Class Environmental
Assessment for a highway interchange. The Class EA would include
confirmation of need and justification, identification of alternative
solutions, preliminary design to select a preferred alternative, and
completion of an Environmental Assessment Report. Project to
proceed once funding has been confirmed.
7501 RF -Third Party Contribution
Total 5320.1702 Highway 401/Church Street-Class EA/PD
5320.1703 Pickering Broadband Initiative.
6250 Construction Costs
Whites Road (Seaton) from Highway 7 to Taunton Road. The
proposed works include installation of conduit, fiber optic cable and
appurtenant hand wells/access points for the purpose of enabling
high speed internet access to the Seaton Employment Lands. This
work is in coordination with the Seaton landowners' group and the
Region of Durham.
7505 RF-Federal Gas Tax
Total 5320.1703 Pickering Broadband Initiative
5320.1708 Michell Bridge (7001) Rehabilitation-Construction
1623 Prov Grant
OCIF Grant-Application based "Top up"
6250 Construction Costs
Michell Bridge Rehabilitation-Bridge Deck Rehabilitation.
7709 RF-Roads &Bridges
Total 5320.1708 Michell Bridge (7001) Rehabilitation-Constructio
5320.1709 Greenwood Bridge (6001) Rehabilitation -D&A
6230 Prof/Consulting Fees
87
Run Date: Jan 25, 2017
Funding Expense
(300,000)
1,800,000
(1 ,500,000)
(1 ,800,000) 1,800,000
900,000
(900,000)
(900,000) 900,000
175,000
(175,000)
(175,000) 175,000
(922,000)
1,025,000
(1 03,000)
(1 ,025,000) 1,025,000
75,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5320 Roads Projects
Greenwood Bridge (6001) Rehabilitation-Design/Approvals.
7709 RF -Roads & Bridges
Total 5320.1709 Greenwood Bridge (6001) Rehabilitation-D&A
5320.1711 Alwin Circle -Asphalt Resurfacing
6250 Construction Costs
Alwin Circle Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1711 Alwin Circle -Asphalt Resurfacing
5320.1712 Pickering Parkway -Asphalt Resurfacing
6250 Construction Costs
Glenanna Road to Valley Farm Road.
7505 RF-Federal Gas Tax
Total 5320.1712 Pickering Parkway-Asphalt Resurfacing
5320.1714 Glenanna Road -Asphalt Resurtacing
6250 Construction Costs
Heathside Crescent to Dixie Road.
7505 RF-Federal Gas Tax
Total 5320.1714 Glenanna Road-Asphalt Resurtacing
5320.1715 Strouds Lane -Asphalt Resurfacing
6250 Construction Costs
Rosebank Road to Foxwood Trail.
7.505 RF-Federal Gas Tax
7711 RF-OCIF Grant
Total 5320.1715 Strouds Lane-Asphalt Resurfacing
5320.1716 Dixie Road -Asphalt Resurfacing
6250 Construction Costs
Kingston Road north 500 metres.
7505 RF-Federal Gas Tax
Total 5320.1716 Dixie Road -Asphalt Resurfacing
5320.1717 Dixie Road -Final Lift of Asphalt
6250 Construction Costs
Dixie Road Final Lift of Asphalt in conjunction with the Region of
Durham's Sanitary Sewer Project -Maple Ridge Drive to north limit
of Hydro Corridor.
7505 RF-Federal Gas Tax
88
Run Date: Jan 25, 2017
Funding Expense
(75,000)
(75,000) 75,000
255,000
(255,000)
(255,000) 255,000
260,000
(260,000)
(260,000) 260,000
300,000
(300,000)
(300,000) 300,000
400,000
(9,685)
(390,315)
(400,000) 400,000
310,000
(31 0,000)
(310,000) 310,000
80,000
(80,000)
· 5320 Roads Projects
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Total 5320.1717 Dixie Road-Final Lift of Asphalt
5320.1719 Southview Drive -Final Lift of Asphalt
6250 Construction Costs
Southview Drive -Final Lift of Asphalt.
7505 RF-Federal Gas Tax
Total 5320.1719 Southview Drive-Final Lift of Asphalt
5320.1726 Golden ridge Road -Asphalt Resurfacing
6250 Construction Costs
Goldenridge Road-Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1726 Goldenridge Road -Asphalt Resurfacing
Total 5320 Roads Projects
89
Run Date: Jan 25, 2017
Funding Expense
(80,000) 80,000
55,000
(55,000)
(55,000) 55,000
35,000
(35,000)
(35,000) 35,000
(5,670,000) 5,670,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5613 Water Resources & Development Services
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
7501 RF-Third Party Contribution
Total Financing
99
Run Date: Jan 25, 2017
2016 2017
Budget Budget
200,000 . 200,000
200,000 200,000
(200,000) (200,000)
(200,000) (200,000)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5613 Water Resources & Development Services
5613.1701 Various Construction Projects
6181 Other Fixed Assets
Various Construction Projects Related to Development (Funded
from Third Party Contributions).
7501 RF -Third Party Contribution
Total 5613.1701 Various Construction Projects
Total 5613 Water Resources & Development Services
100
Run Date: Jan 25, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5321 Development Projects-(DC Funded)
Expenditures
6221 Preliminary Engineering -Envirnmt Asesmt
6250 Construction Costs
6251 Road Improvements
6252 Streetlights & Sidewalks
6253 Storm Water
6254 Traffic Signals
6265 Land Acquisition & Disp
Total Expenditures
Financing
1623 Prov Grant
1702 Debt-10Year
1712 Internal Loan-10 Year
7022 R-DC's City's Share
7610 RF DC -Roads & Related
7611 RF DC -Storm Water Mgmt
Total Financing
101
Run Date: Jan 25, 2017
2016 2017
Budget Budget
600,000
3,929,500
273,200 280,530
45,000
2,708,100
675,000
10,000
8,240,800 280,530
(150,000)
(2,080,000)
(300,000)
(1 ,494,856) (65,553)
(3,024,380) (214,977)
(1 '191 ,564)
(8,240,800) (280,530)
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5321 Development Projects-(DC Funded)
5321.1703 Walnut Lane Extension -Study, EA & Detail Design
6251 Road Improvements
Walnut Lane Extension Study & EA and Detail Design (related to
TC-26, TC-27, TC-28) (75/25).
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1703 Walnut Lane Extension-Study, EA & Detail Desig
5321.1704 DH-7 and DH-8 Zents Drive -Oversizing
6251 Road Improvements
DH-7 and DH-8 Zents Drive Oversizing-North (east/west) Collector
between Tillings Road and Brock Road known as Zents Drive.
Completion of works to fulfill obligations of the subdivision
agreement for oversizing from a local road to a collector road.
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1704 DH-7 and DH-8 Zents Drive-Oversizing
Total 5321 Development Projects-(DC Funded)
102
Run Date: Jan 25, 2017
Funding Expense
250,000
(62,500)
(187,500)
(250,000) 250,000
30,530
(3,053)
(27,477)
(30,530) 30,530
(280,530) 280,530
5340 Fire Services
Expenditures
Hardware Replacements
Miscellaneous Equipment
Other Fixed Assets
Accessibility
Prof/Consulting Fees
Construction Costs
Survey/Engineering/Agency Fees-Seaton
Prof/Consulting Fees-Seaton
Other Construction Related Costs-Seaton
Total Expenditures
Financing
Internal Loan-5 Year
Paid From Property Taxes
R -Capital Equipment Replacement
R -Rate Stabilization
R -DC's City's Share
RF -Third Party Contribution
RF DC-Fire
Total Financing
Abbreviations
City of Pickering
2017
Draft Capital Budget
For Council Consideration
FS#2
FS#4
FS#5
FS#6
NewFS
Fire Station #2, 553 Kingston Rd.
Fire Station #4, 4941 Old Brock Rd.
Fire Station #5, 1616 Bayly St.
Fire Station #6, 1115 Finch Ave.
New Fire Station, 271 0 Brock Rd.
104
Run Date: Jan 28, 2017
2016 . 2017
Budget Budget
25,000 40,000
60,000 800,000
40,000
25,000
10,000
85,000 30,000
34,000
356,500
396,000
966,500 935,000
(350,000)
(95,000) (135,000)
(25,000)
(60,000)
(19,663)
(450,000)
(766,837)
(966,500) (935,000)
5340 Fire Services
City of Pickering
2017
Draft Capital Budget
For Council Consideration
5340.1701 SCBA Replacement-Breathing Apparatus
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
SCBA Replacement-New 2013 NFPA compliant breathing
apparatus.
7501 RF-Third Party Contribution
Contribution from OPG 7501.006
Total 5340.1701 SCBA Replacement-Breathing Apparatus
5340.1702 FS #4 Furnace & Condenser Replacements
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lifecycle replacement of furnaces #1 and #2, and condensers #1
and #2, all original to the building and installed in 1997 at Fire
Station #4.
Total 5340.1702 FS #4 Furnace & Condenser Replacements
5340.1703 FS #2 & #6 Roof Access Ladders
2823 Paid From Prpperty Taxes
6250 Construction Costs
Permanent Roof Access Ladder at Fire Stations# 2 and # 6.
Total 5340.1703 FS #2  Roof Access Ladders
5340.1706 Dispatch Crisys System Hardware Upgrade
2823 Paid From Property Taxes
6175 Hardware Replacements
Dispatch Crisys System Hardware Upgrade.
Total 5340.1706 Dispatch Crisys System Hardware Upgrade
5340.1708 FS #2 Accessible Washroom -Design
2823 Paid From Property Taxes
6183 Accessibility
Fire Station #2-Accessible Washroom-Design.
Total 5340.1708 FS #2 Accessible Washroom -Design
Total 5340 Fire Services
105
Run Date: Jan 25, 2017
Funding Expense
(350,000)
800,000
(450,000)
(800,000) 800,000
(40,000)
40,000
(40,000) 40,000
(30,000)
30,000
(30,000) 30,000
(40,000)
40,000
(40,000) 40,000
(25,000)
25,000
(25,000) 25,000
(935,000) 935,000
5800 Library
Expenditures
Furniture & Fixtures
Miscellaneous ~quipment
Book Collection Material
Accessibility
Construction Costs
Total Expenditures
Financing
Internal Loan-5 Year
Paid From Property Taxes
R -Rate Stabilization
R -Provision for Library-Eastern Branch
Total Financing
Abbreviations
City of Pickering
2017
Draft Capital Budget
For Council Consideration
PCL
PC
CM
Pickering Central Library, One The Esplanade
Petticoat Creek Branch, 470 Kingston Rd.
Claremont Branch, 4941 Old Brock Rd.
106
Run Date: Jan 28, 2017
2016 2017
Budget Budget
22,000 25,000
15,000 36,000
431,000 396,000
6,000
265,000 220,000
733,000 683,000
(125,000) (100,000)
(608,000). (463,000)
(52,545)
(67,455)
(733,000) (683,000)
5800 library
5800.1701 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
This budget is based on a formula which includes community
demand, material costs and industry norms.
Total 5800.1701 Collection Materials
5800.1702 PCL Makerspace
1711 Internal Loan-5 Year
6250 Construction Costs
Purchase of portable walls, benches, stools, and equipment to
create a technology learning and collaboration centre at the
Pickering Central Library. The Makerspace area will be a food and
refreshment free zone to prevent damage to the equipment and
furniture.
Total 5800.1702 PCL Makerspace
5800.1703 PCL Skylight Replacement Phase 2
6250 Construction Costs
Replace existing Pickering Central Library skylights to resolve
ongoing leak issues -Phase II.
7021 R-Rate Stabilization
7042 R -Provision for Library-Eastern Branch
Total 5800.1703 PCL Skylight Replacement Phase 2
5800.1704 Microfilm Reader I Printer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replacement of current public microfilm reader equipment with new
equipment that is easier to use and has many more features.
Total 5800.1704 Microfilm Reader I Printer Replacement
5800.1705 PCL Computer Workstations Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replacement of public and staff computer workstations (20 in total)
at the Pickering Central Library that are older than 5 years with new
equipment.
107
Run Date: Jan 25, 2017
Funding Expense
(396,000)
396,000
(396,000) 396,000
(1 00,000)
100,000
(1 00,000) 100,000
120,000
(52,545)
(67,455)
(120,000) 120,000
(12,000)
12,000
(12,000) 12,000
(30,000)
24,000
5800 Library
6183 Accessibility
City of Pickering
2017
Draft Capital Budget
For Council Consideration
Total 5800.1705 PCL Computer Workstations Replacement
5800.1707 PCL Staff Workstation Replacement
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Replacement of Library staff workstation furniture (desks) which is
10-25 year old. 17 workstations need replacing at the Pickering
Central Library and the Library will replace as many of them as
these funds will provide for.
Total 5800.1707 PCL Staff Workstation Replacement
Total 5800 Library
108
Run Date: Jan 25, 2017
Funding Expense
6,000
(30,000) 30,000
(25,000)
25,000
(25,000) 25,000
(683,000) 683,000
City of Pickering
2017 Capital B.udget & 201:8· 2021 Forecast
Orga.nlzatfo n R\n Date~ !FII!'b 1 , ro:t 1
I 2017 I 2018 i 2019-2021 I I Total
Draft Budget i Forecast Forecast i i
1.-. _.,,
:-
I Mayo1 & Council 5,000 701000 75,000
''"'' .. ····-
Community Services Dept.-Facilities 2,8811200 4,422,000 141524,000 2118271200
W>~•·"""'-"'~ ... .,.,....-,., "'"'"•'.W.'N-•,_,, ·-~~---mo-•.-v• o"--~·---"''""""·•~• ..... -~----........... -----. ·----~ ~--~--........ ~. '"··-· .. ..
Community Services Dept.-Public Works 27,759,600 71214,000 28J501000 63,723,600 ---:--
1 Cot !JUr d lt: Services ~pt. 3581250 731,700 2,235,000 : ~ ~?.1 qc;(') i ·-:----., ...
fEtrgilrt:t!rin0 ~pt. 9,052,030 141379,000 38,7031647 62,134,677
Finance Dept 4,000,000 4,0001000 .---.. ~'"''"" ·~
Fire Services ~pt. i 1,905,000 611801000 211261333 101211,333
I u1 lry 683,000 444,000 :, 3,633,000 4,760,000
'-"~
Total :::n..., .......... '-~' t:::. 42,644,080 37,370,700 ! 9o,o41,9so 1 170,056,760
. -~---· --------~ ' .
-! 1 .... .. , .. ,, .... ,,,6 ... : --
Donations 75,000 75,000
~-
Sale of Land !_ 150,000 800,000 11800,000
........ '' i' Federal Grants 11125,000 1,753,7~ 2,878,750
~--.,. "" ' ..... ---~~ --~~ -~~
Provincial Grants 1,699,815 1,054,998 8701932 3,625,745
Debt 4,2101500 6,1771500 24,971,411 ~c;. ~t:;.Q .111
:-..
Internal Loan 1,911,000 5,6201000 6,105,000 13,636,000 ....... ;--. .•..... , .... .....
Paid from Pi u!Jt:l LY Taxes 1,319,600 11556,000 312611250 6,136,850
AlP II Sped Levy '.:l_?l)()_(')(')(') ~ ?r:;n nnn ., ---~----~-~~---.-~· ... ··---~~-
Rate Stabilization Reserve. 5131545 25,000 355,000 8931545
DC ity's Share Reserve ,,, "I' ~~R111n 41114,926 ..... --., ·• c·-•rc-~-,. , n --,. ,.
Other Reserves 116681905 1,548,740 11,532,643 14,750,288
Reserve Fund-3rd 1rty Contributions 11875,000 3901000 6011000 2,8661000
Reserve Fund-Parkland 298, 115,000 4301040 843,315
Reserve Fund -Federal Gas Tax 219591685 ~ Lto.a. nnn o onr:; nnn 161358,685 -, i· ......
Reserve Fund -il1 ~~~Permit Stabilization
''""" 1? ??Q nnn .. ...
Reserve Fund-OfJ"'' aLtUII;:) Centre 12,229,000 ----·
Reserve Fund -Roads & I ridges 1,678,000 870,002 2,2501000 4,798,002
Reserve Fund-Stormwater lgl ...... ; .. :··· .....
Reserve Fund-DC Fire Protection 850,000 51040,000 711183 5,961,183
--~· -···-,---......
Reserve Fund DC Roads & Related 3041334 4,322,500 71047,275 1116741109 ---·· ··-"~~--. --,--------· -·-··-···-,---·--·
Reserve Fund -DC Storm 3421880 1,447,069 11789,949
Reserve Fund-DC OtJ" atiu119 Centre 9,185,000 4051000 394,500 9,984,500 .,. ........... ••~•• '"" ••w• ""~'""' ~-""'" -.. .. ---·------~-------~ .... ~ ··--· Reserve Fund DC Parkland n lt:IJL 545,225 11671,460 8J401170 101956,855
Reserve Fund -DC Recreation Facilities 511051897 511051897 .......... ...... .. .
~-~-~--~.~Y. .. ~ .. F~~~L: .... I? .. ~.~ip_r~~y .... ... ., .. ; .... -~--?,750 -~8t.7!?9
Other Revenue-York Region Enhancements
Total Financing I 42,644,oso 1 37,370,700 9o,o41,98o 1 170,056,760
109
Capital Forecast Financing
By Source ·
$45,000,000
$40,000,000
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
2017 2018 . 2019
• Grants • Debt
2020 2021
• Paid from Property Taxes Reserves/Other Sources
• Federal Gas Tax
11 0
City of Pickering
Major Capital Projects
2018 to 2022
(Alphabetical Order)
Estimated
Net Estimated Property
Estimated I Financing Debt Operating Tax Levy
Maior Caoital Proiects Proiect Cost Debt (20 yrs) Non Debt Payments Costs Impact
Animal Shelter $ 2,750,000 $ 1,375,000 $ 1,375,000 $ 110,340 $ 100,000 0.35%
~ ~
Greenwood
Community Park 6,500,000 3,575,000 2,925,000 260,790 125,000 I • 0.64%
t-~--a.
-a. Library Expansion 20,000,000 11,200,000 8,800,000 -a. 861 ,000 400,000 2.10% c
Museum VIsitor Centre 18,700,000 6,000,000 12,700,000 481,460 216,460 1.16%
Senior & Youth Centre 24,500,000 5,218,000 19,282,000 418,700 -408.610 1.38%
Totals $ 72,450,000 $ 27,368,000 $ 45,082,000 $ 2,132,289 -$ 1,250,070
5111 Mayor
5111.1901 Computer Equipment Mayor
2823 Paid From Property Taxes
6181 Other Fixed Assets
City of Pickering
2019
Capital Forecast
As per Council Compensation & Communication Policy, $1 0,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5111.1901 Computer Equipment Mayor
Total 5111 Mayor
113
Run Date: Jan 26, 2017
Funding Expense
(1 0,000) I
10,000
(1 0,000) 10,000
{10,000) 10,000
5113 Council
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
114
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
60,000
60,000
(60,000)
(60,000)
City of Pickering
2019
Capital Forecast
5113 Council
5113.1901 Computer Equip Reg. Coun. Ward 1
2823 Paid From Property Taxes
6181 Other Fixed Assets
As. per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1901 Computer Equip Reg. Coun. Ward 1
5113.1902 Computer Equip Reg. Coun. Ward 2
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1902 Computer Equip Reg. Coun. Ward 2
5113.1903 Computer Equip Reg. Coun. Ward 3
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1903 Computer Equip Reg. Coun. Ward 3
5113.1904 Computer Equip City Coun. Ward 1
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1904 Computer Equip City Coun. Ward 1
5113.1905 Computer Equip City Coun. Ward 2
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1905 Computer Equip City Coun. Ward 2
5113.1906 Computer Equip City Coun. Ward 3
115
Run Date: Jan 26, 2017
Funding Expense
(1 0,000)
10,000
(1 0,000) 10,000
(1 0,000)
10,000
(1 0,000) 10,000
(1 0,000)
10,000
(1 0,000) 10,000
(1 0,000)
10,000
(1 0,000) 10,000
(1 0,000)
10,000
(1 0,000) 10,000
5113 Council
2823 Paid From Property Taxes
6181 Other Fixed Assets
City of Pickering
2019
Capital Forecast
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1906Gomputer Equip City Coun. Ward 3
Total 5113 Council
116
Run Date: Jan 26, 2017
Funding Expense
(1 0,000)
10,000
(10,000) 10,000
(60,000) 60,000
5700 Civic Complex
Expenditures
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
145,000
500,000
60,000
705 000
(60,000)
(25,000)
(620,000)
(705,000)
117
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
25,000 25,000
250,000
190,000 660,000 315,000
100,000
110,000 695,000
325 000 1 480 000 565 000
(495,000)
(11 0,000) (880,000) (270,000)
(55,000) (105,000)
(250,000)
(160,000) (45,000)
(325,000) (1 ,480,000) (565,000)
5700 Civic Complex
City of Pickering
2018
Capital Forecast
5700.1801 Air Handling Units -SF4 + RF4 Replacement
6173 Furniture & Fixtures
Lifecycle replacement of supply fan SF-4 and return fan RF-4
serving the basement of the Civic Complex, including controls
upgrade. Both are original equipment installed in 1990.
7505 RF-Federal Gas Tax
Total 5700.1801 Air Handling Units-SF4 + RF4 Replacement
5700.1802 Main Chiller Plant Replacement
6181 Other Fixed Assets
Lifecycle replacement of Main Chiller Plant that provides cooling for
air conditioning throughout the Civic Ccimplex and Main Branch
Library. This is original equipment installed in 1990.
7505 RF-Federal Gas Tax
Total 5700.1802 Main Chiller Plant Replacement
5700.1803 Information Services Area Office Reconfiguration
2823 Paid From Property Taxes
6250 Construction Costs
Reconfigure Information Services offices to accommodate future
staffing needs. Includes demolition, new partitions, doors,
hardware, furniture, security, HVAC, sprinkler, finishes, lighting,
power and data modifications.
Total 5700.1803 Information Services Area Office Reconfiguration
5700.1804 Workstations, Partitions, Tables, Shelving
6173 Furniture & Fixtures
Replacement of original and worn furniture, some over 25 years old.
Spare parts are no longer available as original furnitur~
manufacturer is no longer in business. Includes replacement of
furniture in sufficiently poor repair to be considered a health and
safety hazard.
7021 R-Rate Stabilization
Total 5700.1804 Workstations, Partitions, Tables, Shelving
Total 5700 Civic Complex
118
Run Date: Jan 26, 2017
Funding Expense
120,000
(120,000)
(120,000) 120,000
500,000
(500,000)
(500,000) 500,000
(60,000)
60,000
(60,000) 60,000
25,000
(25,000)
(25,000) 25,000
(705,000) 705,000
5700 Civic Complex
City of Pickering
2019
Capital Forecast
5700.1901 Air Handling Units -SF3 + RF3 Replacement
6181 Other Fixed Assets
Lifecycle replacement of supply fan SF-3 and return fan RF-3
serving the council chambers in city hall, including controls
upgrade. Both are original equipment installed in 1990.
7505 RF-Federal Gas Tax
Total 5700.1901 Air Handling Units -SF3 + RF3 Replacement
5700.1903 Air Controls Compressor Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lifecycle replacement of original air controls compressor, supplying
pneumatic controls throughout the Civic Complex. This is original
equipment installed in 1990.
Total 5700.1903 Air Controls Compressor Replacement
5700.1904 Resurface South Parking Lot
1711 Internal Loan-5 Year
6250 Construction Costs
Resurface staff and visitor parking lot on Esplanade South,
including repairs to curbs and catch basins, and new line painting.
Lifecycle replacement. Costs to be shared 50/50 with library.
Total 5700.1904 Resurface South Parking Lot
5700.1905 Workstations, Partitions, Tables, Shelving
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Replacement of original and worn furniture, some over 25 years old.
Spare parts are no longer available as original furniture
manufacturer is no longer in business. Includes replacement of
furniture in sufficiently poc;>r repair to be considered a health and
safety hazard.
Total 5700.1905 Workstations, Partitions, Tables, Shelving
Total 5700 Civic Complex
11 9
'
I ~~
Run Date: Jan 26, 2017
Funding Expense
160,000
(160,000)
(160,000) 160,000
(30,000)
30,000
(30,000) 30,000
(11 0,000)
110,000
(11 0,000) 110,000
(25,000)
25,000
(25,000) 25,000
(325,000) 325,000
5700 Civic Complex
City of Pickering
2020
Capital Forecast
5700.2001 Parking Garage Ramp & Heating System
1711 Internal Loan-5 Year
6250 Construction Costs
Parking Garage Ramp & Heating System. Lifecycle replacement of
original 1990 installation. Heating system failure will shut ramp
down.
Total 5700.2001 Parking Garage Ramp & Heating System
5700.2002 City Dev. Service Counter Renovations
1702 Debt-10 Year
6183 Accessibility
Replace and reconfigure building and planning department service
counter. Design work completed as part of 2017 council chamber
renovation. Construction phased to limit the extent of disruptions· to
the operation of the Civic Complex.
6250 Construction Costs
Total 5700.2002 City Dev. Service Counter Renovations
5700.2003 Workstations, Partitions, Tables, Shelving
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Replacement of original and worn furniture, some over 25 years old.
Spare parts are no longer available as original furniture
manufacturer is no longer in business. Includes replacement of
furniture in sufficiently poor repair to be considered a health and
safety hazard.
Total 5700.2003 Workstations, Partitions, Tables, Shelving
5700.2004 Clock Tower Steel Restoration & Painting
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Steel restoration and repainting of steel structures, roofi,ng and trim
at top of central tower at the Civic Complex. The existing steel and
metalwork is peeled, cracked and failing in various areas, resulting
in increasing wear and corrosion which is visible from the ground
level. Project costs include grinding, weld and metal repairs,
sandblasting and repainting the entire upper portion of the central
tower.
Total 5700.2004 Clock Tower Steel Restoration & Painting
5700.2005 Washroom Renovations (Phase 1)
2823 Paid From Property Taxes
120
. Run Date: Jan 26, 2017
Funding Expense
(300,000)
300,000
(300,000) 300,000
(495,000)
100,000
395,000
(495,000) 495,000
(25,000)
25,000
(25,000) 25,000
(480,000)
480,000
(480,000) 480,000
(80,000)
5700 Civic Complex
6181 Other Fixed Assets
City of Pickering
' 2020
Capital Forecast
Replacing aging fixtures, partitions, counters and finishes in upper
floor public men's and women's washrooms.
Total 5700.2005 Washroom Renovations (Phase 1)
5700.2006 Gas Monitor Replacement
1711 Internal Loan-5 Year
6181 'Other Fixed Assets
Lifecycle replacement of existing gas monitors installed in 2008.
Total 5700.2006 Gas Monitor Replacement
Total 5700 Civic Complex
121
Run Date: Jan 26, 2017
Funding Expense
80,000
(80,000) 80,000
(100,000)
100,000
(100,000) 100,000
(1 ,480,000) 1,480,000
City of Pickering
2021
Capital Forecast
5700 Civic Complex
5700.2101 Window Replacement (Phase 1)
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Replacement of Civic Complex Windows (Phase 1). Lifecycle
replacement "to original windows.
Total 5700.2101 Window Replacement (Phase 1)
5700.2102 Washroom Renovations (Phase 2)
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Replacing aging fixtures, partitions, counters and finishes staff
washrooms men's and women's washrooms. Phase 2 will focus on
men's and women's staff washrooms on both floors, on the west
side of the building.
Total 5700.2102 Washroom Renovations (Phase 2)
5700.2103 Clock Tower LEO Conversion
6181 Other Fixed Assets
Existing clocktower lighting fixtures are original (30 years old) and
in need of frequent repairs. Replacing the existing fluorescent
tubes with LED lighting strips will improve the level of illumination,
make it more consistent with the backlit crests installed in 2016 and
reduce the frequency of required replacements.
7505 RF-Federal Gas Tax.
Total 5700.2103 Clock Tower LED Conversion
5700.2104 Workstations, Partitions, Tables, Shelving
6178 Miscellaneous Equipment
Replacement of original and worn furniture, some over 25 years old.
Spare parts are no longer available as original furniture
manufacturer is no longer in business. Includes replacement of
furniture in sufficiently poor repair to be considered a health and
safety hazard.
7021 R-Rate Stabilization
Total 5700.2104 Workstations, Partitions, Tables, Shelving
Total 5700 Civic Complex
122
Run Date: Jan 26, 2017
Funding Expense
(150,000)
150,000
(150,000) 150,000.
(120,000)
120,000
(120,000) 120,000
45,000
(45,000)
(45,000) 45,000
250,000
(250,000)
(250,000) 250,000
(565,000) 565,000
5701 Senior Citizens Centre
Expenditures
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan -5 Year
2823 Paid From Property Taxes
7505 RF -Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
123
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
500,000
30,000 170,000
30 000 500 000 170 000
(170,000)
(30,000)
{500,000)
(30,000) (500,000) (170,000)
5701 Senior Citizens Centre
5701.1901 Kitchen Retrofit
2823 Paid From Property Taxes
6250 Construction Costs
City of Pickering
2019
Capital Forecast
Kitchen Retrofit of Senior Citizens Centre to upgrade finishes and
fixtures.
Total 5701.1901 Kitchen Retrofit
Total 5701 Senior Citizens Centre
. 124
Run Date: Jan 26, 2017
Funding Expense
(30,000)
30,000
(30,000) 30,000
(30,000) 30,000 .
5701 Senior Citizens Centre
City of Pickering
2020
Capital Forecast
5701.2001 Main Chiller Plant Replacement
6181 Other Fixed Assets
Main Chiller Plant Replacement. Lifecycle replacement of original
equipment providing air conditioning to the Senior Citizens Centre.
7505 RF-Federal Gas Tax
Total 5701.2001 Main Chiller Plant Replacement
Total5701 Senior Citizens Centre
125
Run Date: Jan 26, 2017
Funding Expense
500,000
(500,000)
(500,000) 500,000
(500,000) 500,000
5701 Senior Citizens Centre
City of Pickering
2021
Capital Forecast
5701.2101 Roof Replacement Mechanical Room & Storage
1711 Internal Loan-5 Year
6250 Construction Costs
Lifecycle replacement of roof over mechanical room & storage.
Total 5701.2101 Roof Replacement Mechanical Room & Storage
Total 5701 Senior Citizens Centre
126
Run Date: Jan 26, 2017
Funding Expense
(170,000)
170,000
(170,000) 170,000
(170,000) 170,000
5713 Dunbarton Pool
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
127
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
20,000
20 000
(20,000)
(20,000)
5713 Dunbarton Pool
City of Pickering
2019
Capital Forecast
5713.1901 Controls Air Compressor Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lifecycle replacement of controls air compressor (installed 2005).
Total 5713.1901 Controls Air Compressor Replacement
Total 5713 Dunbarton Pool
128
Run Date: Jan 26, 2017
Funding Expense
(20,000)
20,000
(20,000) 20,000
(20,000) 20,000
5715 Don Beer Arena
Expenditures
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1703 Debt -15 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7033 R -Don Beer Arena Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
1,180,000
1180 000
(590,000)
(450,000)
(140,000)
(1 '180,000)
129
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
190,000 220,000
200,000
233,000
423 000 220 000 200 000
(200,000)
(233,000)
(30,000)
(190,000) (190,000)
(423,000) (220,000) (200,000)
City of Pickering
2018
Capital Forecast
5715 Don Beer Arena
5715.1801 Parking Lot Resurfacing
1702 Debt-10 Year
6250 Construction Costs
Grind and replace base and top coat asphalt for parking lot and
both driving aisles. Existing pavement at end of life.
Total 5715.1801 Parking Lot Resurfacing
5715.1802 Rink 1 & 2 Ice Resurfacer Room Addition
1703 Debt-15 Year
6250 Construction Costs
New addition on the north side of pads 1 & 2 to allow the ice
resurfacer to exit and enter the pads from new dasherboard gates
into a new structure. The addition will act as the Ice Resurfacer
garage, fill station and maintenance room for the equipment. The
existing resurfacer room is undersized, reqlJiring purchase of
custom resurfacers due to cramped space, and will be re-purposed
as a maintenance and storage room. This project is a health and
safety-based improvement.
Total 5715.1802 Rink 1 & 21ce Resurfacer Room Addition
5715.1805 Rubber Flooring Replacement
1711 Internal Loan-5 Year
6250 Construction Costs
Remove existing rubber floor, complete floor repairs and install full
replacement of skate tile rubber in Rink 3, extending flooring to
connect between rinks 2 and 3.
Total 5715.1805 Rubber Flooring Replacement
Total5715 Don Beer Arena
130
Run Date: Jan 26, 2017
Funding Expense
(590,000)
590,000
(590,000) 590,000
(450,000)
450,000
(450,000) 450,000
(140,000)
140,000
(140,000) 140,000
(1 '180,000) 1,180,000
City of Pickering
2019
Capital Forecast
5715 Don Beer Arena
5715.1901 Arena Lighting Upgrades (Rinks 2 & 3)
6181 Other Fixed Assets
Arena Lighting Upgrades to rinks 2 & 3 for energy efficiency.
Relocate existing fixtures from Rink 3 to rink 2 and install new LED
fixtures in Rink 3.
7505 RF-Federal Gas Tax
Total 5715.1901 Arena Lighting Upgrades (Rinks 2 & 3)
5715.1902 Custodial Rooms Refurbishment
2823 Paid From Property Taxes
6250 Construction Costs
Upgrades to plumbing, fixtures, wall/floor finishes, lighting, and
racking for storage in existing custodial rooms in poor condition
throughout the facility.
Total 5715.1902 Custodial Rooms Refurbishment
5715.1903 New West Parking Entrance Enclosure
2823 Paid From Property Taxes
6250 Construction Costs
Construct a new vestibule at the exit doors leading to the west
parking lot to assist with weather protection, maintenance and
energy conservation. This is the closest building entrance to the
parking lot and frequently used as an exit by patrons.
Total 5715.1903 New West Parking Entrance Enclosure
5715.1904 Lobby Washroom Renovation (Rink 2)
2823 Paid From Property Taxes
6250 Construction Costs
Replacement of aging fixtures, flooring, toilet partitions, counters
and lighting in public washrooms near Rink 2.
Total 5715.1904 Lobby Washroom Renovation (Rink 2)
5715.1905 Foreperson Office Renovation
2823 Paid From Property Taxes
6250 Construction Costs
Renovate foreperson's office to repaint, replace flooring; lighting,
furniture, 2 computer monitors and shelving.
Total 5715.1905 Foreperson Office Renovation
Total 5715 Don Beer Arena
131
Run Date: Jan 26, 2017
Funding Expense
190,000
(190,000)
(190,000) 190,000
(80,000)
80,000
(80,000) 80,000
(55,000)
55,000
(55,000) 55,000
(80,000)
80,000
(80,000) 80,000
(18,000)
18,000
(18,000) 18,000
(423,000) 423,000
City of Pickering
2020
Capital Forecast
5715 Don Beer Arena
5715.2001 Low E (Emissivity) Ceilings (Rinks 1 & 2)
6181 Other Fixed Assets
Lifecycle replacement of existing low emissivity ceilings in Rinks 1 &
2.
7505 RF-Federal Gas Tax
Total 5715.2001 Low E (Emissivity) Ceilings (Rinks 1 & 2)
5715.2002 Bleacher Gas Heaters Upgrade
6181 Other Fixed Assets
Replace existing electric bleacher heaters in rinks 1 & 2 with
gas-fired heaters for cost and energy efficiency. Existing heaters
are at end of life.
7505 RF-Federal Gas Tax
Total 5715.2002 Bleacher Gas Heaters Upgrade
5715.2003 Ammonia Chiller Replacement
6181 Other Fixed Assets
Lifecycle replacement of ammonia chiller installed in 2000.
7033 R -Don Beer Arena Surcharge
Total 5715.2003 Ammonia Chiller Replacement
Total 5715 Don Beer Arena
132
Run Date: Jan 26, 2017
Funding Expense
70,000
(70,000)
(70,000) 70,000
120,000
(120,000)
(120,000) 120,000
30,000
(30,000)
(30,000) 30,000
(220,000) 220,000
5715 Don Beer Arena
City of Pickering
2021
Capital Forecast
5715.2101 Don Beer Arena Concession Renovation
1711 Internal Loan-5 Year
6183 Accessibility
Renovation of concession stand and adjacent seating area
(millwork, plumbing, counter, floor replacement etc.).
Total 5715.2101 Don Beer Arena Concession Renovation
Total5715 Don Beer Arena
133
Run Date: Jan 26, 2017
Funding Expense
(200,000)
200,000
(200,000) 200,000
(200,000) 200,000
/
City of Pickering
Multi-Year Capital Forecast
2018-2021
5719 Commun!ty Centres Run Date: Jan 28, 2017
2018 2019
Forecast Forecast
Expenditures
6181 Other Fixed Assets 250,000 12,000
6230 Prof/Consulting Fees
6250 Construction Costs 65,000 20,000
Total Expenditures 315,000 32 000
Financing
1702 Debt-10 Year
2823 Paid From Property Taxes (145,000) (12,000)
7505 RF-Federal Gas Tax (170,000) (20,000)
Total Financing (315,000) (32,000)
Abbreviations
Brougham Hall Community Centre, 3590 Mowbray St.
Greenwood Community Centre, 3551 Greenwood Rd.
Mt. Zion Community Centre, 4230 Sideline 6
Petticoat Creek Community Centre, 470 Kingston Rd.
2020
Forecast
290,000
50,000
340,000
(100,000)
(240,000)
(340,000)
BHCC
GWCC
MZCC
PCCC
TCC
MZCC
wscc
Dr. Nelson F. Tomlinson Community Centre, 4941 Old Brock Rd.
Mt. Zion Community Centre, 4230 _Sideline 6
West Shore Community Centre, 1011.,-1015 Bayly St.
134
2021
Forecast
20,000
390,000
410 000
(300,000)
(11 0,000)
(410,000)
City of Pickering
2018
Capital Forecast
5719 Community Centres
5719.1801 GWCC Septic Tank & Bed Retrofit
2823 Paid From Property Taxes
6250 Construction Costs
Lifecycle replacement of select components of the septic system,
including holding tank, methane removal system and leaching bed,
and related plumbing at the Greenwood Community Centre.
Total 5719.1801 GWCC Septic Tank & Bed Retrofit
5719.1802 PCCC Heating Boiler Replacement
6181 Other Fixed Assets
Lifecycle replacement of heating plant boiler at Petticoat Creek
Community Centre. Existing equipment is original, installed in 2000.
7505 RF -Federal Gas Tax
Total 5719.1802 PCCC Heating Boiler Replacement
5719.1804 TCC Boiler and Tank Replacement
6181 Other Fixed Assets
Life cycle replacement of heating plant boiler and hot water storage
tank at the Pr. Nelson F. Tomlinson Community Centre. These are
original units installed in 1997.
7505 RF -Federal Gas Tax
Total 5719.1804 TCC Boiler and Tank Replacement
5719.1805 BHCC Roof Restoration
2823 Paid From Property Taxes
6181 Other Fixed Assets
Repair of existing heritage wood roof structure and replacement of
existing metal roof at Brougham Hall Community Centre.
Total 5719.1805 BHCC Roof Restoration
5719.1806 GWCC Parking Lot Resurfacing
2823 Paid From Property Taxes
6250 Construction Costs
Resurface parking lot and driveway at end of life at Greenwood
Community Centre, including line painting and drainage repairs.
Total 5719.1806 GWCC Parking Lot Resurfacing
Total 5719 Community Centres
135
Run Date: Jan 26, 2017
Funding Expense
(25,000)
25,000
(25,000) 25,000
60,000
(60,000)
(60,000) 60,000
110,000
(11 0,000)
(110,000) 110,000
(80,000)
80,000
(80,000) 80,000
(40,000)
40,000
(40,000) 40,000
(315,000) 315,000
5719 Community Centres
5719.1901 PCCC HVAC Rebalancing
6250 Construction Costs
City of Pickering
2019
Capital Forecast
HVAC Rebalance at Petticoat Creek Community Centre. Test,
adjust, and balance supply air from all HVAC mechanical
equipment.
7505 RF-Federal Gas Tax
Total 5719.1901 PCCC HVAC Rebalancing
5719.1902 MZCC, BHCC & WSCC Hot Water Tank Replacements
2823 Paid From Property Taxes
6181 Other Fixed Assets
Life cycle replacement of domestic hot water tanks in three facilities,
Mt Zion, Brougham Hall and West Shore Community Centres.
Grouping replacement together will be cost effective with one
vendor.
Total 5719.1902 MZCC, BHCC & WSCC Hot Water Tank ReplacemE
Total 5719 Community Centres
136
Run Date: Jan 26, 2017
Funding Expense
20,000
(20,000)
(20,000) 20,000
(12,000)
12,000
(12,000) 12,000
(32,000) 32,000
5719 Community Centres
City of Pickering
2020
Capital Forecast
5719.2001 TCC & PCCC Alarm System Upgrades
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lifecycle upgrades to existing fire and security alarm system
hardware ·at Dr. Nelson F. Tomlinson and Petticoat Creek
Community Centres.
Total 5719.2001 TCC & PCCC Alarm System Upgrades
5719.2002 PCCC East Wall Replacement Design
2823 Paid From Property Taxes
6230 Prof/Consulting Fees
Petticoat Creek Community Centre East Wall Replacement-
Design.
Total 5719.2002 PCCC East Wall Replacement Design
5719.2003 PCCC Domestic Hot Water Tanks Replacement
6181 Other Fixed Assets
Lifecycle replacement of original domestic hot water tanks at
Petticoat Creek Community Centre installed in 2000.
7505 RF -Federal Gas Tax
Total 5719.2003 PCCC Domestic Hot Water Tanks Replacement
5719.2007 TCC Multiple Rooftop Unit Replacements
6181 Other Fixed Assets
Lifecycle replacement of rooftop HVAC units AC-1, AC-2, AC-3,
AC-4 and AC-5 at Dr. Nelson F. Tomlinson Community Centre. All
units are original, installed in 1997.
7505 RF -Federal Gas Tax
Total 5719.2007 TCC Multiple Rooftop Unit Replacements
Total 5719 Community Centres
137
Run Date: Jan 26, 2017
Funding Expense
(50,000)
50,000
(50,000) 50,000
(50,000)
50,000
(50,000) 50,000
20,000
(20,000)
(20,000) 20,000
220,000
(220,000)
(220,000) 220,000
(340,000) 340,000
5719 Community Centres
City of Pickering
2021
Capital Forecast
5719.2102 PCCC Seniors AC Unit Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lifecycle replacement of seniors room air conditioning unit at the
Petticoat Creek Community Centre. The unit is original, installed in
2000. Its compressor was replaced in 2014, extending its life, but it
will be due for replacement by 2021.
Total 5719.2102 PCCC Seniors AC Unit Replacement
5719.2103 WSCC Roof Replacement & Repairs
2823 Paid From Property Taxes
6250 Construction Costs
Replace roof and complete repairs including roof deck, flashing and
caulking at West Shore Community Centre.
Total 5719.2103 WSCC Roof Replacement & Repairs
5719.2106 PCCC East Wall Replacement Construction
1702 Debt-10 Year
6250 Construction Costs
Reconstruction of the east exterior wall at the Petticoat Creek
Community Centre, including re-grading, walkway repairs, window
replacements, roofing and drainage repairs required to address
ongoing water infiltration.
Total 5719.2106 PCCC East Wall Replacement Construction
Total 5719 Community Centres
138
Run Date: Jan 26, 2017
Funding Expense
(20,000)
20,000
(20,000) 20,000
(90,000)
90,000
(90,000) 90,000
(300,000)
300,000
(300,000) 300,000
(410,000) 410,000
5720 Seaton Community Centre
Expenditures
6430 Prof/Consulting Fees -Seaton
Total Expenditures
Financing
2824 Paid From Property Taxes -Seaton
7193 R-Seaton FIA Funding Reserve
7621 RF DC-Recreation Facilities
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
139
2019
Forecast
Run Date: Jan 26, 2017
2020 2021
Forecast Forecast
75,000 4,654,000
75000 4,654,000
(9,000)
(558,480)
(66,000) (4,095,520)
(75,000) (4,654,000)
City Qf Pickering
2020
Capital Forecast
5720 Seaton Community Centre
5720.2001 Seaton Community Centre-Site Plan Investigations
2824 Paid From Property Taxes -Seaton
6430 Prof/Consulting Fees-Seaton
Site Plan Investigations for the new Seaton Community Centre.
Includes surveys, geotechnical testing and other site-related
investigations.
7621 RF DC-Recreation Facilities
Total 5720.2001 Seaton Community Centre-Site Plan lnvestigatio
Total5720 Seaton Community Centre
140
Run Date: Jan 26, 2017
Funding Expense
(9,000)
75,000
(66,000)
(75,000) 75,000
(75,000) 75,000
City of Pickering
2021
Capital Forecast
5720 Seaton Community Centre
5720.2101 Seaton Community Centre -Design Only
6430 Prof/Consulting Fees -Seaton
Seaton Community Centre-Design Only.
7193 R-Seaton FIA Funding Reserve
7621 RF DC -Recreation Facilities
Total 5720.2101 Seaton Community Centre -Design Only
Total5720 Seaton Community Centre
! (, 1
Run Date: Jan 26, 2017
Funding Expense
4,654,000
(558,480)
(4,095,520)
(4,654,000) 4,654,000
(4,654,000) 4,654,000
5731 Rec.Complex-Core
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1610 Federal Grants
1623 Prov Grant
1701 Debt-5 Year
1702 Debt -10 Year
1703 Debt-15 Year
1711 Internal Loan-5 Year
1713 Internal Loan -15 Year
2823 Paid From Property Taxes
7034 R -R/Cmplex Core Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
46,000
185,000
150,000
100,000
900,000·
1 381 000
(500,000)
(650,000)
(128,000)
(23,000)
(80,000)
(1,381,000)
142
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
45,000 45,000 45,000
35,000 700,000
500,000
1,850,000 250,000
2 395 000 80 000 995 000
(1 ,095,000)
(250,000)
(1 ,095,000)
(160,000) (550,000)
(150,000)
(45,000) (45,000) (45,000)
(35,000)
(2,395,000) (80,000) (995,000)
5731 Rec.Complex-Core
City of Pickering
2018
Capital Forecast
5731.1801 Health Club Equipment Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Fitness Equipment Replacement: Treadmills (2), Ellipticals (2),
Strength Machine, Arc Trainers (2).
7034 R -R/Cmplex Core Surcharge
Total 5731.1801 Health Club Equipment Replacement
5731.1802 Air Handling Units-RF13 + RF10 Replacement
6181 Other Fixed Assets
Air Handling Units -RF13 + RF1 0 (Replacement). Lifecycle
replacement of original equipment installed in 1983, including
controls upgrade.
7505 RF-Federal Gas Tax
Total 5731.1802 Air Handling Units-RF13 + RF10 Replacement
5731.1803 Exterior Directional Signage
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replace existing and provide additional exterior directional signage
around the Pickering Recreation Complex to assist patron
wayfinding to arenas and other program-specific amenities.
Total 5731.1803 Exterior Directional Signage
5731.1804 Replace LED Display on Roadside Pylon Sign
2823 Paid From Property Taxes
6181 Other Fixed Assets
Rep lac~ existing digital display and banners of the roadside pylon
sign by Valley Farm Road with new LED display screen and
banners. The current display screen is at the end of life and
requires frequent repairs. Banners are faded and thereby ineligible
requiring replacement.
Total 5731.1804 Replace LED Display on Roadside Pylon Sign
5731.1805 Renovation of Recreation Complex Lobby
1623 Prov Grant
1702 Debt-10Year
6183 Accessibility
6230 Prof/Consulting Fees
143
Run Date: Jan 26, 2017
Funding Expense
(23,000)
46,000
(23,000)
(46,000) 46,000
80,000
(80!000)
(80,000) 80,000
(40,000)
40,000
(40,000) 40,000
(65,000)
65,000
(65,000) 65,000
(500,000)
(650,000)
150,000
100,000
5731 Rec.Complex-Core
6250 Construction Costs
City of Pickering
2018
Capital Forecast
This project is subject to receiving Provincial grant funding of
$500,000 through the Ontario 150 Community Capital Program.
Project Design and Reconstruction to include the Pickering
Recreation Complex's main reception area with single and fully
accessible reception counter, updated public concourse and west
entrance site works to include sidewalk, driveway, pathway, curb
and canopy repairs.
Total 5731.1805 Renovation of Recreation Complex Lobby
Total 5731 Rec.Complex-Core
144
Run Date: Jan 26, 2017
Funding Expense
900,000
(1 '150,000) 1,150,000
(1 ,381 ,000) 1,381,000
City of Pickering
2019
Capital Forecast
5731 Rec.Complex-Core
5731.1901 Dressing Room Renovation
161 0 Federal Grants
Project to proceed subject to senior government funding.
1703 Debt-15 Year
6183 Accessibility
6250 Construction Costs
The design and renovation of the Pickering Recreation Complex's
dressing rooms which entails a complete gut renovation of the
entire ground floor change room to encompass both male and
female members and public change rooms. The project includes
the removal of all non-load bearing partitions and interior finishes to
permit total reconfiguration of the existing spaces. This renovation
will upgrade the change rooms to current recreation facility
standards, incorporate fully accessible design and use low
maintenance, energy efficient design wherever possible.
Total 5731.1901 Dressing Room Renovation
5731.1903 Tennis Court Roof Replacement
1711 Internal Loan-5 Year
6250 Construction Costs
Replacement of the Pickering Recreation Complex's Tennis Court
Roof, partial replacement south roof.
Total 5731.1903 Tennis Court Roof Replacement
5731.1904 Health Club Equipment Replacement
6178 Miscellaneous Equipment
Fitness Equipment Replacement: Treadmills (2), Ellipticals (4),
Rowers (4).
7034 R-R!Cmplex Core Surcharge
Total 5731.1904 Health Club Equipment Replacement
Total 5731 Rec.Complex-Core
145
Run Date: Jan 26, 2017
Funding Expense
(1,095,000)
(1,095,000)
500,000
1,690,000
(2, 190_,000) 2,190,000
(160,000)
160,000
(160,000) 160,000
45,000
(45,000)
(45,000) 45,000
(2,395,000) 2,395,000
5731 Rec.Complex-Core
City of Pickering
2020
Capital Forecast
5731.2002 Health Club Equipment Replacement
6178 Miscellaneous Equipment
Fitness Equipment Replacement: Treadmills (2), Ellipticals (2), Arc
Trainers (2).
7034 R -R/Cmplex Core Surcharge
Total 5731.2002 Health Club Equipment Replacement
5731.2003 Light Replacement in Mechanical Rooms
6181 Other Fixed Assets
Light Replacement in Mechanical Rooms (replace last ofT121ights)
to high efficiency LED lighting.
7505 RF-Federal Gas Tax
Total 5731.2003 Light Replacement in Mechanical Rooms
Total 5731 Rec.Complex-Core
146
Run Date: Jan 26, 2017
Funding Expense
45,000
(45,000)
(45,000) 45,000
35,000
(35,000)
(35,000) 35,000
(80,000) 80,000
City of Pickering
2021
Capital Forecast
5731 Rec.Complex-Core
5731.2101 Building Automation System Upgrade
1701 Debt-5 Year
6181 Other Fixed Assets
Lifecycle upgrade to the Pickering Recreation Complex's existing
building automation system (BAS). The existing system has been
expanded gradually over the last 20 years and is nearing the end of
viability of its software and hardware components and requires a
general overhaul and upgrade. The existing building automation
system (BAS) needs to have planned upgrades every 1 0 years to
keep up with technology.
Total 5731.2101 Building Automation System Upgrade
5731.2102 Direct Digital Controls Upgrades
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Lifecycle replacement of Direct Digital Controls Panel (DOC's),
which interface Honeywell SAS controls and equipment.
Total 5731.2102 Direct Digital Controls Upgrades
5731.2103 Heating Boilers Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Lifecycle replacement of heating boilers in mechanical room
located in the Pickering Recreation Complex Core.
Total 5731.2103 Heating Boilers Replacement
5731.2104 Paint Tennis Court Walls & Ceiling
1711 Internal Loan-5 Year
6250 Construction Costs
Painting of the Recreation Complex's tennis courts' walls and
ceiling for four full size tennis courts.
Total 5731.2104 Paint Tennis Court Walls & Ceiling
5731.2105 Health Club Equipment Replacement
6178 Miscellaneous Equipment J
Fitness Equipment Replacement: Treadmills (2), Recumbent Bikes
(2), Strength Machines (2).
7034 R -R/Cmplex Core Surcharge
Total 5731.2105 Health Club Equipment Replacement
5731.2106 Paint Roof Steel & Deck
147
I
Run Date: Jan 26, 2017
Funding Expense
(250,000)
250,000
(250,000) 250,000
(100,000)
100,000
(100,000) 100,000
(150,000)
150,000
(150,000) 150,000
(1 00,000)
100,000
(100,000) 100,000
45,000
(45,000)
(45,000) 45,000
5731 Rec.Complex-Core
1711 Internal Loan-5 Year
6181 Other Fixed Assets
City of Pickering
2021
Capital Forecast
The white space frame, roof steel and deck throughout the core
area of the Pickering Recreation Complex needs repainting. The
existing paint is delaminating due to age .. The complex
configuration of the white tubular roof framing is difficult to access
and paint. Preparation and spraying will require scaffold access.
Epoxy paint will give the paint system another 30 year life cycle.
Total 5731.2106 Paint Roof Steel & Deck
5731.2107 Roof Replacement
1713 Internal Loan-15 Year
6250 Construction Costs
Replace deteriorated sloped metal lower roofs next to the banquet
hall and at meeting rooms and tenant suites on the south side of the
main lobby
Total 5731.2107 Roof Replacement
Total 5731 Rec.Complex-Core
148
Run Date: Jan 26, 2017
Funding Expense
(200,000)
200,000
(200,000) 200,000
(150,000)
150,000
(150,000) 150,000
(995,000) 995,000
5733 Rec. Complex-Pool
Expenditures
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1711 Internal Loan-5 Year
7035 R -R/Cmplx Pool Surcharge
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
149
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
200,000
300,000
200 000 300 000
(300,000)
(120,000)
(80,000)
(200,000) (300,000)
5733 Rec. Complex-Pool
5733.1901 Pool Bleachers
6181 Other Fixed Assets
City of Pickering
2019
Capital Forecast
Pool Bleachers (Replacement). Lifecycle replacement of original
1983 retractable bleachers.
7035 R -R/Cmplx Pool Surcharge
Total 5733.1901 Pool Bleachers
5733.1902 Painting & Repairs to Pool Roof, Beams & Deck
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Pool Beams and Deck (Inspection, Painting & Minor Repairs).
Total 5733.1902 Painting & Repairs to Pool Roof, Beams & Deck
Total 5733 Rec. Complex-Pool
150
Run Date: Jan 26, 2017
Funding Expense
80,000
(80,000)
(80,000) 80,000
(120,000)
120,000
(120,000) 120,000
(200,000) 200,000
5733 Rec. Complex-Pool
5733.2102 Pool Deck Tile Replacement
1702 Debt -10 Year
6250 Construction Costs
City of Pickering
2021
Capital Forecast
Lifecycle removal and replacement of swimming pool deck tiles.
Total 5733.2102 Pool Deck Tile Replacement
Total 5733 Rec. Complex-Pool
151
Run Date: Jan 26, 2017
Funding Expense
(300,000)
300,000
(300,000) 300,000
(300,000) 300,000
5735 Rec.Complex-Arenas
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1711 Internal Loan - 5 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
244,000
450,000
694,000
(450,000)
(244,000)
(694,000)
152
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
105,000 110,000
100,000 80,000
70,000
310,000
205,000 570,000
(70,000)
(420,000)
(100,000) (80,000)
(105,000)
(205,000) (570,000)
5735 Rec.Complex-Arenas
City of Pickering
2018
Capital Forecast
5735.1801 O'Brien Refrigeration Plant Rebuild
6181 Other Fixed Assets
Lifecycle rebuild of assorted equipment in O'Brien Arena
refrigeration plant (built 1990), including 3 compressors, pumps and
other refrigeration components.
7505 RF-Federal Gas Tax
Total 5735.1801 O'Brien Refrigeration Plant Rebuild
5735.1803 O'Brien Lobby Roof Replacement
1702 Debt-10 Year
6250 Construction Costs
Lifecycle replacement of original O'Brien Arena lobby roof (installed
in 1990).
Total 5735.1803 O'Brien Lobby Roof Replacement
Total 5735 Rec.Complex-Arenas
153
Run Date: Jan 26, 2017
Funding Expense
244,000
(244,000)
(244,000) 244,000
(450,000)
450,000
(450,000) 450,000
(694,000) 694,000
5735 Rec.Complex-Arenas
5735.1901 Ice Resurfacer Replacement
6178 Miscellaneous Equipment
City of Pickering
2019
Capital Forecast
Lifecycle replacement of Ice Resurfacer (Vehicle #750) with
excessive service hours. The unit was purchased in 2011.
7021 R-Rate Stabilization
Total 5735.1901 Ice Resurfacer Replacement
5735.1903 O'Brien Rubber Flooring Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Life cycle replacement of skate rubber flooring in O'Brien Arena
change rooms and adjoining corridors.
Total 5735.1903 O'Brien Rubber Flooring Replacement
Total 5735 Rec.Complex-Arenas
154
· Run Date: Jan 26, 2017
Funding Expense
105,000
(105,000)
(105,000) 105,000
(100,000)
100,000
(100,000) 100,000
(205,000) 205,000
5744 Museum
Expenditures
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
6265 Land Acquisition & Disp
Total Expenditures
Financing
1711 Internal Loan-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
27,000
40,000
80,000
147 000
(80,000)
(67,000)
(147,000)
156
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
30,000
80,000 80,000
30 000 80,000 80 000
(80,000) (80,000)
(30,000)
(30,000) (80,000) (80,000)
City of Pickering
2018
Capital Forecast
5744 Museum
5744.1801 Museum Land Purchase
1712 Internal Loan-10 Year
6265 Land Acquisition & Disp
Purchase of available land on the west side of the upper site at the
Pickering Museum Village from the Toronto Region Conservation
Authority (TRCA). This land is currently part of the Greenwood
Conservation Area. The sale of the land was supported by the
TRCA at a meeting held in January 2011, and is recorded in the
Brock Lands Master Plan.
Total 5744.18{)1 Museum Land Purchase
5744.1802 Corrective Drainage Measures
2823 Paid From Property Taxes
6230 Prof/Consulting Fees
A Civil Engineer or Water Management Engineer to be contracted
to survey the drainage issues on the Lower Site of the Museum to
determine corrective drainage measures to deal with ongoing
drainage problems.
Total 5744.1802 Corrective Drainage Measures
5744.1803 Retaining Wall, Guard and Handrail Repairs
2823 Paid From Property Taxes
6250 Construction Costs
Localized repairs to the wood pier retaining wall, guards and
handrails along the trail connecting the upper and lower sites due to
deterioration caused by ongoing erosion.
Total 5744.1803 Retaining Wall, Guard and Handrail Repairs
Total 5744 Museum
157
Run Date: Jan 26, 2017
Funding Expense
(80,000)
80,000
(80,000) 80,000
(27,000)
27,000
(27,000) 27,000
(40,000)
40,000
(40,000) 40,000
(147,000) 147,000
5744 Museum
5744.1902 Pedestrian Bridge Repairs
2823 Paid From Property Taxes
6181 Other Fixed Assets
Pedestrian Bridge Repairs.
City of Pickering
2019
Capital Forecast
'
Total 5744.1902 Pedestrian Bridge Repairs
Total5744 Museum
158
Run Date: Jan 26, 2017
Funding Expense
(30,000)
30,000
(30,000) 30,000
(30,000) 30;000
5744 Museum
City of Pickering
2020
Capital Forecast
5744.2002 Cedar Shake Roof Replacements (Phase 2)
1711 Internal Loan-5 Year
6250 Construction Costs
Replacement of various existing cedar shake roofs at end of life.
Total 5744.2002 Cedar Shake Roof Replacements (Phase 2)
Total 5744 Museum
Run Date: Jan 26, 2017
Funding Expense
(80,000)
80,000
(80,000) 80,000
(80,000) 80,000
5744 Museum
City of Pickering
2021
Capital Forecast
5744.2101 Cedar Shake Roof Replacements (Phase 3)
1711 Internal Loan-5 Year
6250 Construction Costs
Replacement of various existing cedar shake roofs at end of life.
Total 5744.2101 Cedar Shake Roof Replacements (Phase 3)
Total 5744 Museum
160
Run Date: Jan 26, 2017
Funding Expense
(80,000)
80,000
(80,000) 80,000
(80,000) 80,000
5311 Property Maintenance
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6478 Miscellaneous Equipment-Seaton
Total Expenditures
Financing
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7190 R-Property Fence Line
7502 RF -Parkland
7612 RF DC -Operations Services
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
330,000
100,000
145,000
575 000
(145,000)
(185,000)
(14,500)
(100,000)
7620 R.F DC -Parkland Development & Trails (130,500)
Total Financing (575,000)
1 61
Run Date: Jan 28, 2017
2019 2020 2021
Forecast Forecast Forecast
445,000 325,000 450,000
250,000 100,000
200,000
895 000 325 000 550,000
(525,000)
(70,000) (70,000) (80,000)
(15,500) (370,000)
(100,000) (100,000) (100,000)
(200,000)
(139,500) '
(895,000) (325,000) (550,000)
City of Pickering
2018
Capital Forecast
5311 Property Maintenance
5311.1801 Sidewalk Plow with Attachments Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments-Replace unit #757 (2004).
Total 5311.1801 Sidewalk Plow with Attachments Replacement
5311.1802 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fence Replacement.
7190 R-Property Fence Line
Total 5311.1802 Property Line Fence Replacement
5311.1805 Area Mower Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Area Mower-Replace unit# 739 (201 0).
Total 5311.1805 Area Mower Replacement
5311.1806 Zero Turn Mowers Replacement (4)
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(4) Zero Turn Mowers (replacements on a 4-year cycle) Replace
unit #751 (2011), unit #752 (2011), unit# 325 (2013) and unit# 326
(2013).
Total 5311.1806 Zero Turn Mowers Replacement (4)
5311.1.807 Additional Sidewalk f'low (Seaton) -New
6478 Miscellaneous Equipment-Seaton
Additional Trackless Sidewalk Plow.
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5311.1807 Additional Sidewalk Plow (Seaton)-New
Total 5311 Property Maintenance
162
Run Date: Jan 28, 2017
Funding Expense
(145,000)
145,000
(145,000) 145,000
100,000
(1 00,000)
(100,000) 100,000
(115,000)
115,000
(115,000) 115,000
(70,000)
70,000
(70,000) 70,000
145,000
(14,500)
(130,500)
(145,000) 145,000
(575,000) 575,000
City of Pickering
2019
Capita! Forecast
5311 Property Maintenance
5311.1901 Zero Turn Mowers Replacement (4)
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Zero Turn (replacements on a 4-year cycle) Replace unit# 327
(2013) unit #328 (2013), unit #297 (2014) and unit# 298 (2014).
Total 5311.1901 Zero Turn Mowers Replacement (4)
5311.1902 Area Mower Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Area Mower Replacement Unit# 710 (2011 ).
Total 5311.1902 Area Mower Replacement
5311.1903 401 Brock Road On/Off Ramp Landscape
1711 Internal Loan-5 Year
6181 Other Fixed Assets
401 Brock Road On/Off Ramp Landscape Reconstruction including
Welcome to Pickering Sign.
Total 5311.1903 401 Brock Road On/Off Ramp Landscape
5311.1904 Sidewalk Plow with Attachments Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments Replacement-Unit #756 (2009).
Total 5311.1904 Sidewalk Plow with Attachments Replacement
5311.1905 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line. Fencing.
7190 R-Property Fence Line
Total 5311.1905 Property Line Fence Replacement
5311.1906 Walkway Reconstruction
6183 Accessibility
Walkway Reconstruction -Between Elvira Court and Bruce
Hanscombe Park.
7502 RF-Parkland
Total 5311.1906 Walkway Reconstruction
5311.1907 16' Area Mower Replacement
1711 Internal Loan-5 Year
163
Run Date: Jan 28, 2017
Funding Expense
(70,000)
70,000
'
(70,000) 70,000
(115,000)
115,000
(115,000) 115,000
(150,000)
150,000
(150,000) 150,000
(145,000)
145,000
(145,000) 145,000
100,000
(100,000)
(100,000) 100,000
200,000
(200,000)
(200,000) 200,000
(115,000)
5311 Property Maintenance
6178 Miscellaneous Equipment
City of Pickering
2019
Capital Forecast
16' Area Mower Replacement-Unit #710 (2011).
Total 5311.190716' Area Mower Replacement
Total 5311 Property Maintenance
164
Run Date: Jan 28, 2017
Funding Expense
115,000
(115,000) 115,000
(895,000) 895,000
5311 Property Maintenance
City of Pickering
2020
Capital Forecast
5311.2001 Zero Turn mowers Replacement (4)
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(4) Zero Turn mowers (replacements on a 4-year cycle) ~ Replace
unit# 299 (2014), unit# 300 (2014), unit_# 401 (2015) and unit#
402 (2015).
Total 5311.2001 Zero Turn mowers Replacement (4)
5311.2002 Property Line Fence Replacement
6178 Miscellaneous Equipment
Property Line Fence Replacement.
7190 R -Property Fence Line
Total 5311.2002 Property Line Fence Replacement
5311.2004 Additional Sidewalk Plow -New
6178 Mfscellaneous Equipment
Sidewalk Plow (New) (90/1 0). Project to be included in the 2018 DC
study.
7040 R-Vehicle Replacement
7612 RF DC-Operations Services
Total 5311.2004 Additional Sidewalk Plow-New
Total 5311 Property Maintenance
165
Run Date: Jan 28, 2017
Funding Expense
(70,000)
70,000
(70,000) 70,000
100,000
(100,000)
(100,000) 100,000
155,000
(15,500)
(139,500)
(155,000) 155,000
(325,000) 325,000
City of Pickering
2021
Capital Forecast
5311 Property Maintenance
5311.2101 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fences Replacement.
7190 R-Property Fence Line·
Total 5311.2101 Property Line Fence Replacement
5311.2102 Sidewalk Plows with Attachments Replacement
6178 Miscellaneous Equipment
(2) Sidewalk Plows With Attachments Replacement -Replace unit
# 792 (2013) & Replace unit #753 (2013).
7040 R -Vehicle Replacement
Total 5311.2102 Sidewalk Plows with Attachments Replacement
5311.2103 Wide Area Mower Replacement
6178 Miscellaneous Equipment
Wide Area Mower.
7040 R -Vehicle Replacement
Total 5311.2103 Wide Area Mower Replacement
5311.2104 Zero Turn Mowers Replacement (4)
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(4) Zero Turn Mowers-Replacement.
Total 5311.2104 Zero Turn Mowers Replacement (4)
5311.2105 Covered Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(1) Covered Trailer Replacement.
Total 5311.2105 Covered Trailer Replacement
Total5311 Property Maintenance
166
Run Date: Jan 28, 2017
Funding Expense
100,000
(1 00,000)
(100,000) 100,000
260,000
(260,000)
(260,000) 260,000
110,000
(11 0,000)
(110,000) 110,000
(68,000)
68,000
(68,000) 68,000
(12,000)
12,000
(12,000) 12,000
(550,000) 550,000
5319 Roads Equipment
Expenditures
6178 Miscellaneous Equipment
Total Expenditures
Financing
1701 Debt-5 Year
2823 Paid From·Property Taxes
7040 R-Vehicle Replacement
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
583,000
583 000
(565,000)
(18,000).
{583,000)
167
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
675,000 10,000 18,000
675 000 10 000 18 000
(480,000)
(85,000) (10,000) (18,000)
(11 0,000)
{675,000) {10,000) {18,000)
5319 Roads Equipment
City of Pickering
2018
Capital Forecast
5319.1801 Hydroscopic Excavator Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
Hydroscopic Excavator-Replacement unit #114 (2004 Gradall).
Total 5319.1801 Hydroscopic Excavator Replacement
5319.1802 Loader Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
Loader-Replace unit# 115 (2005 Case Loader).
Total 5319.1802 Loader Replacement
5319.1803 Road Asphalt Roller Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Roller -Replace unit # 1 OOR (2006 Raglan Road Roller).
Total 5319.1803 Road Asphalt Roller Replacement
Total5319 Roads Equipment
168
Run Date: Jan 26, 2017
Funding Expense
(375,000)
375,000
(375,000) 375,000
(190,000)
190,000
(190,000) 190,000
(18,000)
18,000
(18,000) 18,000
(583,000) 583,000
City of Pickering
2019
Capital Forecast
5319 Roads Equipment
5319.1901 Road Grader Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
Road Grader-Replace unit# 100 (2009 John Deere).
Total 5319.1901 Road Grader Replacement
5319.1902 Culvert Steamer/Cleaner Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
One Steamer/Cleaner-Replacement.
Total 5319.1902 Culvert Steamer/Cleaner Replacement
5319.1903 Tractor Replacement-With Attachments
1701 Debt-5 Year
6178 Miscellaneous Equipment
Tractor Replacement with mower & snow blower attachments.
· Replace unit# 116 (2009 John Deere).
Total 5319.1903 Tractor Replacement-With Attachments
5319.1904 Asphalt Roller Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Roller-Replace unit# 126 (1995 Stone).
Total 5319.1904 Asphalt Roller Replacement
5319.1905 Asphalt Roller Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replace unit #135 (1993 Asphalt Roller Trailer).
Total 5319.1905 Asphalt Roller Trailer Replacement
5319.1906 Hydro Seeder Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Loader-Replace unit# 138 (2009 Turf Maker Hydro Seeder).
Total 5319.1906 Hydro Seeder Replacement
5319.1912 Backhoe Replacement
6178 Miscellaneous Equipment
Backhoe -Replace unit# 101 (201 0 John Deere) which will then be
transferred to the Pickering Village Museum.
169
Run Date: Jan 26, 2017
Funding Expense
(31 0,000)
310,000
(310,000) 310,000
(35,000) '
35,000
(35,000) 35,000
(170,000)
170,000
(170,000) 170,000
(25,000)
25,000
(25,000) 25,000
(10,000)
10,000
(10,000) 10,000
(15,000)
15,000
(15,000) 15,000
110,000
-----,
5319 Roads Equipment
. 7040 R -Vehicle Replacement
Total 5319.1912 Backhoe Replacement
Total 5319 Roads Equipment
City of Pickering
2019
Capital Forecast
170
Run Date: Jan 26, 2017
Funding Expense
(11 0,000)
(110,000) 110,000
(675,000) 675,000
5319 Roads Equipment
City of Pickering
2020
Capital Forecast
5319.2002 Hydraulic Hammer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Total 5319.2002 Hydraulic Hammer Replacement
Total5319 Roads Equipment
171
Run Date: Jan 26, 2017
Funding Expense
(10,000)
10,000
(1 0,000) 10,000
(10,000) 10,000
5319 Roads Equipment
City of Pickering
2021
Capital Forecast
5319.2101 Road Asphalt Roller Replacement
2823 Paid From Property Taxes
6178 Miscellane.ous Equipment
Roller-Replace unit# 1 08R (2008 Raglan Roller).
Total 5319.2101 Road Asphalt Roller Replacement
Total5319 Roads Equipment
172
Run Date: Jan 26, 2017
Funding Expense
(18,000)
18,000
(18,000) 18,000
(18,000) 18,000
5315 Operations Centre
Expenditures
6173 Furniture & Fixtures
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1594 Sale of Land
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
--600,000
200,000
800 000
(800,000)
(800,000)
173
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
1,800,000
1 800 000
(1,800,000)
(1 ,800,000)
5315 Operations Centre
City of Pickering
2018
Capital Forecast
5315.1801 Furniture & Fixtures for New Operations Centre
1594 Sale of Land
6173 Fumiture & Fixtures
Furniture & Fixtures for the New Operations Centre to include desks,
chairs, garbage/recycling containers, kitchen
equipment/appliances, computers, printers, security cameras,
building signage and moving costs.
Total 5315.1801 Furniture & Fixtures for New Operations Centre
5315.1802 Operations Centre Demolition & Remediation Plan
1594 Sale of Land
6230 Prof/Consulting Fees
Consulting Services to prepare remediation plan and cost estimate
. for demolition and remediation.
Total 5315.1802 Operations Centre Demolition & Remediation Plar
Total 5315 Operations Centre
174
Run Date: Jan 26, 2017
Funding Expense
(600,000)
600,000
(600,000) 600,000
(200,000)
200,000
(200,000) 200,000
(800,000) 800,000
5315 Operations Centre
City of Pickering
2019
Capital Forecast
5315.1901 Operations Centre Demolition & Site Remediation Plan
1594 Sale of Land
6250 Construction Costs
Operations Centre Demolition & Site Remediation Plan.
Total 5315.1901 Operations Centre Demolition &Site Remediation
Total 5315 Operations Centre
175
Run Date: Jan 26, 2017
Funding Expense
(1 ,800,000)
1,800,000
(1 ,800,000) 1,800,000
(1 ,800,000) 1,800,000
5780 Parks
Expenditures
6129 Parks-Landscape Refurbishment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
6429 Parks -Landscape Refurb -Seaton
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
1701 Debt-5Year
1702 Debt-10Year
1703 Debt -15 Year
1711 Internal Loan-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7190 R-Property Fence Line
7193 R-Seaton FIA Funding Reserve
7502 RF -Parkland
7505 RF-Federal Gas Tax
7612 RF DC-Operations Services
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
700,000
414,000
1,160,000
150,000
160,000
1,467,000
4 051 000
(75,000)
(350,000)
(605,000)
(150,000)
(249,000)
(18,000)
(50,000)
(176,040)
(115,000)
(560,000)
(162,000)
7620 RF DC -Parkland Development & Trails (1,540,960)
Total Financing (4,051 ,000)
176
1-
Run Date: Jan 28, 2017
2019 2020 2021
Forecast Forecast Forecast
2,617,500 3,990,000 120,000
40,000 265,000 12,000
990,000 930,000 1,960,000
882,500 400,000 150,000
100,000
1,917,000 4,050,000 3,774,000
6 547 000 9 635 000 6 016 000
(658,750)
(250,000) (150,000) '
(508,750)
(1 ,925,000) (1 ,200,000)
(1 ,200,000) (780,000) (300,000)
(195,000) (60,000) (132,000)
(206,250) (285,000)
(150,000)
(50,000) (50,000) (50,000)
(534,000) (3, 143,040)
(230,040)
. (560,000) (280,000) (560,000)
(2,688,21 0) (5,421 ,000) (630,960)
(6,547,000) (9,635,000) (6,016,000)
City of Pickering
2018
Capital Forecast
5780 Parks
5780.1801 Pathway Construction (Accessibility to Sports Fields)
1712 Internal Loan-10 Year
6183 Accessibility
Pathway Construction (accessibility to sports fields). Park locations
to be determined.
Total 5780.1801 Pathway Construction (Accessibility to Sports Fie
5780.1802 Greenwood Tennis Courts Reconstruction
1711 Internal Loan - 5 Year
6181 Other Fixed Assets
Greenwood Tennis Courts Reconstruction.
Total 5780.1802 Greenwood Tennis Courts Reconstruction
5780.1803 Enclosed Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Enclosed Trailer-Replacement Unit# 723 (2013).
Total 5780.1803 Enclosed Trailer Replacement
5780.1804 Dunmoore Park-Parking Lot Reconstruction
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Pave & Curb Dunmoore Park Gravel Parking Lot.
Total 5780.1804 Dunmoore Park-Parking Lot Reconstruction
5780.1806 Soil Renovator Attachment-New
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
For Turf, Sportfield Renovations.
Total 5780.1806 Soil Renovator Attachment-New
5780.1807 Claremont Park-Baseball Field Reconstruction
1701 Debt-5 Year
6181 Other Fixed Assets
Reconstruction of Baseball field including replacement of back stop
and lighting, repairs to infield and outfield, and addition of first
baseline fencing to prevent vehicle damage.
Total 5780.1807 Claremont Park-Baseball Field Reconstruction
5780.1809 Kinsmen Park -New Artificial Field Spectator Seating
1592 Donations
177
Run Date: Jan 28, 2017
Funding Expense
(150,000)
150,000
(150,000) 150,000
(145,000)
145,000
(145,000) 145,000
(12,000)
12,000
(12,000) 12,000
(155,000)
155,000
(155,000) 155,000
(22,000)
22,000
(22,000) 22,000
(350,000)
350,000
(350,000) 350,000
(75,000)
City of Pickering
2018
Capital Forecast
5780 Parks
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Concrete Spectator Seating for Berm at Kinsmen Artificial Field.
Subject to Hydro One Approval.
Total 5780.1809 Kinsmen Park-New Artificial Field Spectator Sea
5780.1810 Village Green Construction -New
6129 Parks-Landscape Refurbishment
Village Green Construction -Kindwin Development (Brock Road).
7620 RF DC -Parkland Development & Trails
Total 5780.1810 Village Green Construction -New
5780.1811 Mid Size Tractor Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Mid Size Tractor Replacement-to replace unit# 721 (2006) & unit#
767 (2006) with a single larger unit.
Total 5780.1811 Mid Size Tractor Replacement
5780.1812 Litter Picker Vacuum -New
6178 Miscellaneous Equipment
Litter Picker Vacuum (90/1 0).
7022 R -DC's City's Share
7612 RF DC -Operations Services
Total 5780.1812 Litter Picker Vacuum -New
5780.1813 Garbage Packer -New
6178 Miscellaneous Equipment
Garbage Packer (90/1 0).
7022 R -DC's City's Share
7612 RF DC-Operations Services
Total 5780.1813 Garbage Packer-New
5780.1814 Area Mower Replacement
6178 Miscellaneous Equipment
Area Mower Replacement.
7502 RF -Parkland
Total 5780.1814 Area Mower Replacement
5780.1815 Kinsmen Park-Football Field Lighting Replacement
6181 Other Fixed Assets
178
Run Date: Jan 28, 2017
Funding Expense
(75,000)
150,000
(150,000) 150,000
250,000
(250,000)
(250,000) 250,000
(85,000)
85,000
(85,000) 85,000
30,000
(3,000)
(27,000)
(30,000) 30,000
150,000
(15,000)
(135,000)
(150,000) 150,000
115,000
(115,000)
(115,000) 115,000
280,000
City of Pickering
2018
Capital Forecast
5780 Parks
Kinsmen Football Field Lighting Replacement (L.E.D).
7505 RF-Federal Gas Tax
Total 5780.1815 Kinsmen Park -Football Field Lighting Replacem1
5780.1816 Greenwood Park -Baseball Field Lighting Replacement
6181 Other Fixed Assets
Greenwood Park Baseball Field Lighting Replacement (L.E.D).
7505 RF-Federal Gas Tax
Total 5780.1816 Greenwood Park-Baseball Field Lighting Replac~
5780.1817 Dunmoore Tennis Courts Resurfacing
2823 Paid From Property Taxes
6181 Other Fixed Assets
Dunmoore Tennis-Resurface 4 Tennis Courts.
Total 5780.1817 Dunmoore Tennis Courts Resurfacing
5780.1818 Parks Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fencing.
7190 R-Property Fence Line
Total 5780.1818 Parks Property Line Fence Replacement
5780.1819 Village Greens -Seaton
6429 Parks -Landscape Refurb -Seaton
Village Greens (88/12).
7193 R -Seaton FIA Funding Reserve
7620 RF DC-Parkland Development & Trails
Total 5780.1819 Village Greens-Seaton
5780.1821 Paving & Line Painting of Kinsmen North·Parking Lot
1.711 Internal Loan-5 Year
6250 Construction Costs
Paving & Line Painting of Kinsmen North Parking Lot-Pending
OPG permission.
Total 5780.1821 Paving & Line Painting of Kinsmen North Parking
5780.1822 Trail Heads/ Primary Trail Network -Seaton
6429 Parks -Landscape Refurb -Seaton
Trail Heads/ Primary Network (88/12).
7193 R-Seaton FIA Funding Reserve
179
Run Date: Jan 28, 2017
Funding Expense
(280,000)
(280,000) 280,000
280,000
(280,000)
(280,000) . 280,000
(55,000)
55,000
(55,000) 55,000
50,000
(50,000)
(50,000) 50,000
750,000
(90,000)
(660,000)
(750,000) 750,000
(160,000)
160,000
(160,000) 160,000
717,000
(86,040)
5780 Parks
City of Pickering
2018
Capital Forecast
7620 RF DC -Parkland Development & Trails
Total 5780.1822 Trail Heads/ Primary Trail Network -Seaton
5780.1823 Maple Ridge Tennis Courts Reconstruction
1711 Internal Loan-5 Year
6129 Parks -Landscape Refurbishment
Maple Ridge Tennis Courts-Reconstruction.
Total 5780.1823 Maple Ridge Tennis Courts Reconstruction
Total 5780 Parks
180
Run Date: Jan 28, 2017
Funding Expense
(630,960)
(717,000) 717,000
(145,000)
145,000
(145,000) 145,000
(4,051 ,000) 4,051,000
5780 Parks
5780.1901 Gator Utility Vehicle -New
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
City of Pickering
2019
Capital Forecast
New Gator Utility Vehicle -for events & Beach point Promenade
Maintenance.
Total 5780.1901 Gator Utility Vehicle-New
5780.1902 Frenchmans Bay Waterfront Master Plan (Phase 2)
1610 Federal Grants
Project to proceed subject to senior government funding.
1702 Debt-10Year
6129 Parks-Landscape Refurbishment
Frenchmans Bay Waterfront MasterPlan-Phase 2 (45/55).
Construction of boardwalk (boat launch to harbour entrance),
reconstruction of boat launch and docking facilities and shoreline
restoration works.
6183 Accessibility
7620 RF DC -Parkland Development & Trails
Total 5780.1902 Frenchmans Bay Waterfront Master Plan (Phase 2
5780.1903 Brockridge Park-Parking Lot Paving & Line Painting
1711 Internal Loan - 5 Year
6250 Construction Costs
Brockridge Park Parking Lot-Paving Gravel & Line Painting-
subject to TRCA approval.
Total 5780.1903 Brockridge Park-Parking Lot Paving & Line Paini
5780.1904 St. Mary Park -Soccer Field Rehabilitation
1711 Internal Loan -5 Year
6129 Parks-Landscape Refurbishment
St Mary's East Soccer Field Rehabilitation Partnership with DDCSB.
Remove 3"" of existing surface, add 6"'' topsoil, crown field, add
complete irrigation.
Total 5780.1904 St. Mary Park -Soccer Field Rehabilitation
5780.1905 Pathway Construction (Accessibility to Sports Fields)
1711 Internal Loan-5 Year
6183 Accessibility
Accessibility to sports fields/pathway construction -various parks.
Total 5780.1905 Pathway Construction (Accessibility to Sports Fie
181
Run Date: Jan 28, 2017
Funding Expense
(25,000)
25,000
(25,000) 25,000
(508,750)
(508,750)
1,480,000
370,000
(832,500)
(1 ,850,000) 1,850,000
(100,000)
100,000
(100,000) 100,000
(200,000)
200,000
(200,000) 200,000
(100,000)
100,000
(100,000) 100,000
City of Pickering
2019
Capital Forecast
5780 Parks
5780.1906 Neighbourhood Parks -Seaton
6429 Parks -Landscape Refurb -Seaton
Neighbourhood Parks (Seaton) (88/12).
7502 RF -Parkland
7620 RF DC -Parkland Development & Trails
Total 5780.1906 Neighbourhood Parks-Seaton
5780.1907 Village Greens (3) -Seaton
6429 Parks -Landscape Refurb -Seaton
Village Greens (3) (Seaton) (88/12).
7502 RF -Parkland
7620 RF DC -Parkland Development & Trails
Total 5780.1907 Village Greens (3) -Seaton
5780.1908 Trail Heads/Primary Trail Network -Seaton
6429 Parks -Landscape Refurb -Seaton
Trail Heads and Primary Trail Network (Seaton) (88/12).
7502 RF -Parkland
7620 RF DC -Parkland Development & Trails
Total 5780.1908 Trail Heads/Primary Trail Network -Seaton
5780.1909 Amberlea Park Hard Ball Diamond -Outfield Fence
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Amberlea Hard Ball Diamond-Outfield Fence Replacement ( 6 Foot
Fence, 0-pipe Cap and Earthworks).
Total 5780.1909 Amberlea Park Hard Ball Diamond-Outfield Fenc
5780.1910 Village East Park-Parking Lot Expansion
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Village East Park-Parking Lot Expansion (Granular).
Total 5780.1910 Village East Park-Parking Lot Expansion
5780.1911 Enclosed Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Enclosed Trailer Replacement.
Total 5780.1911 Enclosed Trailer Replacement
182
Run Date: Jan 28, 2017
Funding Expense
750,000
(90,000)
(660,000)
(750,000) 750,000
450,000
(54,000) . .
(396,000)
(450,000) 450,000
717,000
(86,040)
(630,960)
(717,000) 717,000
(150,000)
150,000
(150,000) 150,000
(100,000)
100,000
(100,000) 100,000 .
(15,000)
' 15,000
(15,000) 15,000
5780 Parks
5780.1912 Douglas Park -Parking lot
2823 Paid From Property Taxes
6129 Parks -Landscape Refurbishment
Douglas Park-Parking lot.
City of Pickering
2019
Capital Forecast
Total 5780.1912 Douglas Park-Parking lot
5780.1913 Rotary Frenchmans Bay West-Change/Washrooms & S1
6129 Parks-Landscape Refurbishment
Rotary Frenchmans Bay West-Washrooms/ Changerooms/Staff
Room (45/55) (50% of the cost associated with accessibility).
6183 Accessibility
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.1913 Rotary Frenchmans Bay West-Change/Washroor
5780.1914 Kinsmen Park -South Baseball Field Lighting
6181 Other Fixed Assets
Kinsmen South Baseball Field Lighting Replacement (L.E.D).
7505 RF-Federal Gas Tax
Total 5780.1914 Kinsmen Park-South Baseball Field Lighting
5780.1915 Kinsmen Park -Artificial Soccer Field Lighting
6181 Other Fixed Assets
Kinsmen Artificial Soccer Field Lighting Replacement (L.E.D).
7505 RF-Federal Gas Tax
Total 5780.1915 Kinsmen Park-Artificial Soccer Field Lighting
5780.1916 Lookout Point Park -Baseball Fencing Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lookout Point Baseball Fencing Replacement.
Total 5780.1916 Lookout Point Park-Baseball Fencing Replacem«
5780.1917 Parks Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fence Replacement.
7190 R-Property Fence Line
Total 5780.1917 Parks Property Line Fence Replacement
5780.1918 Trail from Creekside Park to SWM Pond
183
Run Date: Jan 28, 2017
Funding Expense
(75,000)
75,000
(75,000) 75,000
187,500
187,500
(206,250)
(168,750)
(375,000) 375,000
280,000
(280,000)
(280,000) 280,000
280,000
(280,000)
(280,000) 280,000
(80,000)
80,000
(80,000) 80,000
50,000
(50,000)
(50,000) 50,000
5780 Parks
1711 Internal Loan - 5 Year
6183 Accessibility
City of Pickering
2019
Capital Forecast
Trail from Creekside Park to SWM Pond -Asphalt.
Total 5780.1918 Trail from Creekside Park to SWM Pond
5780.1919 Mapleridge Park Master Plan & Implementation
1701 Debt-5 Year
6129 Parks -Landscape Refurbishment
Mapleridge Park Master Plan & Implementation -remove baseball
diamond and replace with mini soccer field. New soccer nets,
relocate path to avoid flood plain, upgrade all other pathways,
replace walkway lighting and wiring, remove concrete foundation.
6183 Accessibility
Total 5780.1919 Mapleridge Park Master Plan & Implementation
5780.1920 Pave Kinsmen Park South Parking Lot
1711 Internal Loan-5 Year
6129 Parks -Landscape Refurbishment
Pave Kinsmen South Parking Lot-pending OPG permission.
Total 5780.1920 Pave Kinsmen Park South Parking Lot
5780.1921 Kirkey Field Baseball Fencing Replacement -
1711 Internal Loan - 5 Year
6129 Parks-Landscape Refurbishment
Kirkey Field Baseball Fencing Replacement.
Total 5780.1921 Kirkey Field Baseball Fencing Replacement
5780.1922 Sandy Beach Tennis Courts Resurfacing
1711 lnterna·l Loan-5 Year
6129 Parks-Landscape Refurbishment
Sandy Beach Tennis Courts Resurfacing.
Total 5780.1922 Sandy Beach Tennis Courts Resurfacing
5780.1923 East Spit Lighting -New
1610 Federal Grants
6181 Other Fixed Assets
Lighting along the Frenchman's Bay east spit from Millennium
Square to Harbour Entrance. Project to proceed subject to senior
government funding.
Total 5780.1923 East Spit Lighting-New
184
Run Date: Jan 28, 2017
Funding Expense
(175,000)
175,000
(175,000) 175,000
(250,000)
200,000
50,000
(250,000) 250,000
(150,000)
150,000
(150,000) 150,000
(125,000)
125,000
(125,000) 125,000
(1 00,000)
100,000
(100,000) 100,000
(150,000)
150,000
(150,000) 150,000
5780 Parks
Total 5780 Parks
City of Pickering
2019
Capital Forecast
185
Run Date: Jan 28, 2017
Funding Expense
(6,547 ,000) 6,547,000
5780 Parks
City of Pickering
2020
Capital Forecast
5780.2001 New 4x4 Tractor Loader with Beach Groomer
6178 Miscellaneous Equipment
4x4 Tractor Loader with Beach Groomer (Beach point Promenade)-
New.
7040 R -Vehicle Replacement
Total 5780.2001 New 4x4· Tractor Loader with Beach Groomer
5780.2002 Glendale Tennis Courts Resurfacing
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Glendale Tennis Courts Resurfacing.
Total 5780.2002 Glendale Tennis Courts Resurfacing
5780.2003 Centennial Park-Baseball Lighting Replacement
6181 Other Fixed Assets
Centennial Park Baseball Lighting Replacement (L.E.D.).
7505 Ri=-Federal Gas Tax
Total 5780.2003 Centennial Park-Baseball Lighting Replacement
5780.2004 Baseball Infield Drainage System -4 Diamonds
2823 Paid From Property Taxes
6129 Parks.-Landscape Refurbishment
Baseball Infield Drainage System-4 Diamonds.
Total 5780.2004 Baseball Infield Drainage System -4 Diamonds
5780.2005 Waterfront Splashpad Redesign/Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Waterfront Splashpad Redesign/Replacement.
Total 5780.2005 Waterfront Splashpad Redesign/Replacement
5780.2006 Pathway Construction (Accessibility to Sports Fields)
1711 Internal Loan -5 Year
6183 Accessibility
Accessibility Pathways to Sportfields.
Total 5780.2006 Pathway Construction (Accessibility to Sports Fie
5780.2007 Reconstruction of Existing Asphalt Pathways
1711 Internal Loan-5 Year
6183 Accessibility
186
Run Date: Jan 28, 2017
Funding Expense
150,000
(150,000)
(150,000) 150,000
(1 00,000)
100,000
(100,000) 100,000
280,000
(280,000)
(280,000) 280,000
(60,000)
60,000
(60,000) 60,000
(200,000)
200,000
(200,000) 200,000
(150,000)
150,000
(150,000) 150,000
(150,000)
150,000
City of Pickering
2020
Capital Forecast
5780 Parks
Reconstruction of Existing Asphalt Pathways -Locations to be
determined.
Total 5780.2007 Reconstruction of Existing Asphalt Pathways
5780.2008 Woodsmere Park -Baseball Diamond Reconstruction
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Woodsmere Baseball Diamond Reconstruction.
Total 5780.2008 Woodsmere Park-Baseball Diamond Reconstruc
5780.2009 Parks· Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fence Replacement.
7190 R -Property Fence Line
Total 5780.2009 Parks Property Line Fence Replacement
5780.2010 Area Mower -New
6178 Miscellaneous Equipment
Area Mower New (90/1'0). Project to be included in 2018 DC study.
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.2010 Area Mower-New
5780.2011 Neighbourhood Parks -Seaton
6429 Parks-Landscape Refurb -Seaton
Neighbourhood Parks Seaton (88/12).
7193 R -Seaton FIA Funding Reserve
7620 RF DC -Parkland Development & Trails
Total 5780.2011 Neighbourhood Parks-Seaton
5780.2012 Village Greens (6) -Seaton
6429 Parks-Landscape Refurb -Seaton
Village Greens (6) Seaton (88/12).
7193 R -Seaton FIA Funding Reserve
7620 RF DC -Parkland Development & Trails
Total 5780.2012 Village Greens (6)-Seaton
5780.2013 Community Parks -Seaton
6429 Parks-Landscape Refurb -Seaton
Community Parks Seaton (86/14).
187
Run Date: Jan 28, 2017
Funding Expense
(150,000) 150,000
(180,000)
180,000
(180,000) 180,000
50,000
(50,000)
(50,000) 50,000
115,000
(10,000)
(105,000)
(115,000) 115,000
750,000
(90,000)
(660,000)
(750,000) 750,000
900,000
(108,000)
(792,000)
(900,000) 900,000
2,400,000
City of Pickering
2020
Capital Forecast
5780 Parks
-
7193 R-Seaton FIA Funding Reserve
7620 RF DC -Parkland Development & Trails
Total 5780.2013 Community Parks-Seaton
5780.2014 Community Park Greenwood Conservation Lands Phase
1703 Debt-15 Year
6129 Parks-Landscape Refurbishment
Community Park Greenwood Conservation Lands (45/55).
7620 RF DC -Parkland Development & Trails
Total 5780.2014 Community Park Greenwood Conservation Lands
5780.2015 Frenchman's Bay Waterfront Master Plan (Phase.3)
6181 Other Fixed Assets
Frenchman's Bay Waterfront Master Plan-Phase Ill. Construction
oftrail system through park, viewing platforms, signage and park
furniture.
6183 Accessibility
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.2015 Frenchman's Bay Waterfront Master Plan (Phase:
5780.2017 Village East Parking Lot and Driveway -Asphalt Surfacir
1701 Debt-5 Year
6129 Parks-Landscape Refurbishment
Village East Parking Lot and Driveway-Curb and Resurface.
Total 5780.2017 Village East P.arking Lot and Driveway -AsphaltS
Total5780 Parks
188
Run Date: Jan 28, 2017
Funding Expense
(336,000)
(2,064,000)
(2,400,000) 2,400,000
(1,925,000)
3,500,000
(1 ,575,000)
(3,500,000) 3,500,000
400,000
100,000
(275,000)
(225,000)
(500,000) 500,000
(150,000)
150,000
(150,000) 150,0.00
(9,635,000) 9,635,000
5780 Parks
City of Pickering
2021
Capital Forecast
5780.2101 Beachfront Park -Boardwalk Replacement (Elevated)
1703 Debt -15 Year
6181 Other Fixed Assets
Beachfront Park Boardwalk Replacement (Elevated).
Total 5780.2101 BeachfrontPark-Boardwalk Replacement (Eleva!
5780.2102 Kinsmen Park -Artificial Turf. Fencing Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Kinsmen Artificial Turf Fencing Replacement-12ft heighU
screening.
Total 5780.2102 Kinsmen Park-Artificial Turf Fencing Replaceme
5780.2103 Baseball Lighting Replacement-Hydro Diamond East
6181 Other Fixed Assets
Baseball Lighting Replacement-Hydro Diamond East.
7505 RF-Federal Gas Tax
Total 5780.2103 Baseball Lighting Replacement-Hydro Diamond I
5780.2104 Baseball Lighting Replacement-Hydro Diamond West
6181 Other Fixed Assets
Baseball Lighting Replacement-Hydro Diamond West.
7505 RF -Federal Gas Tax
Total 5780.2104 Baseball Lighting Replacement-Hydro Diamond'
5780.2105 Outdoor Exercise Equipment-Location TBD
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Outdoor Exercise Equipment-Location to be determined.
Total 5780.2105 Outdoor Exercise Equipment-Location TBD
5780.2106 Pathway Construction (Accessibility to Sports Fields)
1711 Internal Loan - 5 Year
6183 Accessibility
Accessibility Pathways to Sports Fields.
Total 5780.2106 Pathway Construction (Accessibility to Sports Fie
5780.2108 Parks Property Line Fences Replacement
6181 Other Fixed Assets
Property Line Fences Replacement.
189
Run Date: Jan 28, 2017
Funding Expense
(1 ,200,000)
1,200,000
(1 ,200,000) 1,200,000
(150,000)
150,000
(150,000) ·.150,000
280,000
(280,000)
(280,000) 280,000
280,000
(280,000)
(280,000) 280,000
(60,000)
60,000
(60,000) 60,000
(150,000)
150,000
(150,000) 150,000
50,000
5990 Fleet Vehicles
Expenditures
6157 Vehicles.-under $100,000
6158 Vehicles -Over $100,000
6159 Fire Veh-Over $100,000
6457 Vehicles -Under $100,000 -Seaton
Total Expenditures
Financing
1702 Debt-10 Year
7022 R -DC's City's Share
7040 R-Vehicle Replacement
7501 RF-Third Party Contribution
7605 RF DC - Fire
7612 RF DC-Operations Services
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
463,000
810,000
750,000
2 023;000
(750,000)
(27,000)
(1 ,003,000)
(243,000)
(2,023,000)
1 91
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
750,000 784,000 243,000
425,000 555,000
750,000 750,000
33,333
1 208 333 2 089 000 993 000
(750,000) (750,000)
(1 '175,000) (1 ,084,000) (243,000)
(1 ,000)
(32,333)
(255,000)
(1,208,333) (2,089,000) (993,000)
5990 Fleet Vehicles
City of Pickering
2018
Capital Forecast
5220.1801 1/2 Ton Pickup Truck Replacement
6157 Vehicles -under $1 00,000
Replacing 2006 Chevy Colorado Pickup Truck unit #411 (2006
Chev) with Half Ton Pickup Truck (5220 By-Law Services).
7040 R -Vehicle Replacement
Total 5220.18011/2 Ton Pickup Truck Replacement
5319.1804 4 Ton Dump Trucks with Snow Plow Replacement (2)
6158 Vehicles -Over $100,000
(2 units) -Four Ton Dump Trucks with Snow Plow-Replace unit
#060 (20071nternational) (5319 Roads Equipment) and replace
unit #57 (2009 International) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1804 4 Ton Dump Trucks with Snow Plow Replacemen·
5319.1805 4 Ton Dump Truck with Snow Plow -New
6158 Vehicles-Over $100,000
(1) Four Ton Dump Trucks with Snow Plow (5319 Roads
Equipment) -New.
7022 R -DC's City's Share
7612 RF DC-Operations Services
Total 5319.1805 4 Ton Dump Truck with Snow Plow-New
5319.1806 · 1 Ton Truck with Aluminum Dump Body Replacement
6157 Vehicles-under $100,000
One Ton Truck with Aluminum Dump Body-Replace unit #039
(201 0 Dodge Ram) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1806 1 Ton Truck with Aluminum Dump Body Replacen
5319.1807 1 Ton Truck with Utility Body (Sign Truck) Replacement
6157 Vehicles -under $1 00,000
One Ton Truck with Utility Body (Sign Truck)-Replace unit #58
(2009 Ford) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1807 1 Ton Truck with Utility Body (Sign Truck) Replac1
5319.1808 1 Ton Trucks with Aluminum Dump Body Replacement (
6157 Vehicles -under $100,000
192
Run Date: Jan 26, 2017
Funding Expense
35,000
(35,000)
(35,000) 35,000
540,000
(540,000)
(540,000) 540,000
270,000
(27,000)
(243,000)
(270,000) 270,000
65,000
(65,000)
(65,000) 65,000
95,000
(95,000)
(95,000) 95,000
130,000
5990 Fleet Vehicles
City of Pickering
2018
Capital Forecast
(2 units)-Replace unit #62 (2011 Dodge) (5320 Roads) and
replace unit #63 (2011 Dodge) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.18081 Ton Trucks with Aluminum Dump Body Replace
5335.1801 Midsize SUV Replacement
6157 Vehicles-under $1 00,000
Vehicle-Replace unit #639 (2011 Ford Escape) (5335 Engineering
Services -Admin).
7040 R -Vehicle Replacement
Total 5335.1801 Midsize SUV Replacement
5340.1805 Fire Pumper Tankers Replacement
1702 Debt-10 Year
6159 Fire Veh -Over $100,000
One Pumper Tanker to replace unit #502 (2002 GMC), unit #518
(1999 Freightliner) and unit #51 9 (1999 Freightliner) (5340 Fire
Services).
Total 5340.1805 Fire Pumper Tankers Replacement
5780.1820 1 Ton Crew Cab Pickup Truck Replacement
6157 Vehicles -under $1 00,000
One Ton Crew Cab Pickup Truck-Replace unit #754 (2011 Ford)
. (5780 Parks).
7040 R -Vehicle Replacement
Total 5780.1820 1 Ton Crew Cab Pickup Truck Replacement
5780.1825 1 Ton Truck with Aluminum Dump Body Replacement
6157 Vehicles -under $1 00,000
(1 unit)-One Ton Truck with Aluminum Dump Body-Replace unit
#702 (2010 Dodge Ram) (5780 Parks).
7040 R-Vehicle Replacement
Total 5780.18251 Ton Truck with Aluminum Dump Body Replacen
Total 5990 Fleet Vehicles
193
Run Date: Jan 26, 2017
Funding Expense
(130,000)
(130,000) 130,000
33,000
(33,000)
(33,000) 33,000
(750,000)
750,000
(750,000) 750,000
40,000
(40,000)
(40,000) 40,000
65,000
(65,000)
(65,000) 65,000
(2,023,000) 2,023,000
City of Pickering
2019
Capital Forecast
5990 Fleet Vehicles
5220.1901 Midsi_ze SUV Replacement
6157 Vehicles-under $100,000
Vehicle-Replace unit #416 (2012 Chrysler)(5220 By-Law).
7040 R -Vehicle Replacement '
Total 5220.1901 Midsize SUV Replacement
5220.1902 Midsize Utility Vehicle Replacement
6157 Vehicles-under $100,000
Midsize Utility Vehicle -Replace unit #417 (2012 Chev)(5220
By-Law).
7040 R -Vehicle Replacement
Total 5220.1902 Midsize UtilitY Vehicle Replacement
5315.1902 1 Ton Truck with Service Body Replacement
6157 Vehicles-under $100,000
One Ton Truck with Service Body-Replace unit #208 (2010 Ford)
(5315 Operations Centre-Municipal garage).
7040 R -Vehicle Replacement
Total 5315.19021 Ton Truck with Service Body Replacement
5319.1907 1 Ton Truck with Aluminum Dump Body Replacement
6157 Vehicles-under $100,000
One Ton Truck with Aluminum Dump Body Replacement-Replace
unit #65 (2012 Ford) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1907.1 Ton Truck with Aluminum Dump Body Replacen
5319.1908 4x4 Pickup Truck Replacement with Plow
6157 Vehicles-under $100,000
4x4 Pick up Truck with Snow Plow-Replace unit #64 (2012 Ford)
(5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1908 4x4 Pickup Truck Replacement with Plow
5319.1909 4 Ton Dump Truck with Snow Plow Replacement
6157 Vehicles-under $100,000
Four Ton Dump Truck with Snow Plow-Replace unit #061 (2010
International) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1909 4 Ton Dump Truck with Snow Plow Replacement
194
Run Date: Jan 26, 2017
Funding Expense
35,000
(35,000)
(35,000) 35,000
35,000
(35,000)
(35,000) 35,000
82,000
(82,000)
(82,000) 82,000
65,000
(65,000)
(65,000) 65,000
40,000
(40,000)
(40,000) 40,000
270,000
(270,000)
(270,000) 270,000
5990 Fleet Vehicles
City of Pickering
2019
Capital Forecast
5319.1910 Midsize Utility Vehicle Replacement
6157 Vehicles-under $100,000
Midsize Utility Vehicle -Replace unit# 038 (2008 Ford Escape)
(5319 Roads Equipment).
7040 R -Vehicle Replaceme"nt
Total_ 5319.1910 Midsize Utility Vehicle Replacement
5319.1911 5 Ton Dump Truck with Snow Plow Replacement
6158 Vehicles-Over $100,000
5 Ton Dump Truck with Plow-Replace unit #49 (2012
International) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.1911 5 Ton Dump Truck with Snow Plow Replacement
5340.1904 Small Vehicle (Seaton Fire Station A) -New
6457 Vehicles-Under $100,000-Seaton
Small Vehicle for Seaton Fire Station A (98/02) (5340 Fire
Services).
7501 RF -Third Party Contribution
Contribution from OPG 7501.006
7605 RF DC -Fire
Total 5340.1904 Small Vehicle (Seaton Fire Station A)-New
5340.1905 1/2 Ton Pickup Truck Replacement
6157 Vehicles-under $100,000
Half Ton Pickup Truck -Replace unit #558 (2008 Ford F250) (5340
Fire Services).
7040 R -Vehicle Replacement
Total 5340.1905 1/2 Ton Pickup Truck Replacement
5r340,1906 Midsize Utility Vehicles Replacements (2)
6157 Vehicles-under $100,000
(2 units) Replace unit# 561 (2012 Dodge Charger) and replace
unit # 562 (20 12 Dodge Charger) with Midsize utility vehicles (5340
Fire Services).
7040 R -Vehicle Replacement
Total 5340.1906 Midsize Utility Vehicles Replacements (2)
5340.1907 Midsize Vehicle Replacement
6157 Vehicles-under $100,000
195
Run Date: Jan 26, 2017
Funding Expense
35,000
(35,000)
(35,000) 35,000
275,000
(275,000)
(275,000) 275,000
33,333
(1 ,000)
(32,333)
(33,333) 33,333
38,000
(38,000)
(38,000) 38,000
70,000
(70,000)
(70,000) 70,000
35,000
5990 Fleet Vehicles
City of Pickering
2019
Capital Forecast
Replace unit# 577 (2014 Dodge Charger) with a midsize utility
vehicle (5340 Fire Services).
7040 R -Vehicle Replacement
Total 5340.1907 Midsize Vehicle Replacement
5613.1902 1/2 Ton Crew Cab Pickup Truck Replacement
6157 Vehicles -under $100,000
Half Ton Crew Cab Pickup Truck -Replace unit #600 (2012 Chev)
(5613 Development Services).
7040 R -Vehicle Replacement
Total 5613.1902 1/2 Ton Crew Cab Pickup Truck Replacement
5780.1924 Garbage Packer Replacement
6158 Vehicles-Over $100,000
Garbage Packer-Replace unit #762 (2012 Ford/Haulall) (5780
Parks).
7040 R -Vehicle Replacement
Total 5780.1924 Garbage Packer Replacement
Total 5990 Fleet Vehicles
196
Run Date: Jan 26, 2017
Funding Expense
(35,000)
(35,000) 35,000
45,000
(45,000)
. (45,000) 45,000
150,000
(150,000)
(150,000) 150,000
(1 ,208,333) 1,208,333
5990 Fleet Vehicles
.City of Pickering
2020
Capital Forecast
5319.2003 1/2 Ton Truck Pickup Trucks Replacement (2)
6157 Vehicles-under $1 00,000
(2 units) HalfTon Pickup Trucks-Replace unit #47 (2013 Ford)
(5319 Roads Equipment) and replace unit#66 (2013 Ford) (5319
Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.2003 1/2 Ton Truck Pickup Trucks Replacement (2}
5319.2004 1 Ton Truck with Utility Body Replacement
6157 Vehicles-under $1 00,000
One Ton Truck with Utility Body-Replace unit #24 (2012 Ford)
(5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.2004 1 Ton Truck with Utility Body Replacement
5319.2005 4 Ton Dump Truck with Snow Plow Replacement
6158 Vehicles-Over $100,000
4 Ton Dump Truck with Snow Plow-Replace unit# 059 ( 2011
International) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.2005 4 Ton Dump Truck with Snow Plow Replacement
5319.2006 5 Ton Dump Truck with Plow & Wing -New
6158 Vehicles-Over $100,000
Five Ton Dump Truck with Plow & Wing (New) (90/1 0). Project to be
included in the 20'18 DC study. (5319 Roads Equipment).
7040 R -Vehicle Replacement
7612 RF DC -Operations Services
Total 5319.2006 5 Ton Dump Truck with Plow & Wing-New
5319.2007 4 Ton Dump Truck Replacement
6157 Vehicles-under $100,000
F'our Ton Dump Truck~ Replace unit #48 (20121nternational)
(5319 Roads Equipment).
7040 R-Vehicle Replacement
Total 5319.2007 4 Ton Dump Truck Replacement
5340.2002 Command Vehicle Replacement
6157 Vehicles-under $100,000
197
Run Date: Jan 26, 2017
Funding Expense
84,000
(84,000)
. (84,000) 84,000
95,000
(95,000)
(95,000) 95,000
275,000
(275,000)
(275,000) 275,000
280,000
(25,000)
(255,000)
(280,000) 280,000
275,000
(275,000)
(275,000) 275,000
75,000
City of Pickering
2020
Capital Forecast
5990 Fleet Vehicles
Command Vehicle -Replace unit #575 (2112 Chev) (5340 Fire
Services).
7040 R -Vehicle Replacement
Total 5340.2002 Command Vehicle Replacement
5340.2003 Fire Pumper Rescue Replacement
1702 Debt-10 Year
6159 Fire Veh -Over $100,000
One Pumper/Rescue to replace unit# 540 (2006 Smeal) (5340 Fire
Services).
Total 5340.2003 Fire Pumper Rescue Replacement
5719.2004 Pickup Truck Replacement
6157 Vehicles -under $1 00,000
One Pick-up Truck-Replace unit #700 (2013)(5719 Community
Centres).
7040 R-Vehi.cle Replacement
Total 5719.2004 Pickup Truck Replacement
5719.2005 3/4 Quarter Ton Van Replacement
6157 Vehicles-under $100,000
3/4 Ton Van -Replace unit #798 (201 ~ Ford)(5719 Community
Centres).
7040 R -Vehicle Replacement
Total 5719.2005 3/4 Quarter Ton Van Replacement
5719.2006 Cargo Van Replacement
6157 Vehicles -under $100,000
3/4 Ton Van -Replace unit #801 (2013 Chev)(5719 Community .
Centres).
7040 R -Vehicle Replacement
Total 5719.2006 Cargo Van Replacement
5780.2016 Midsize SUV Replacement
6157 Vehicles-under $100,000
Midsize SUV-Replace unit# 709 (2011 Ford Escape)-(5780
Parks).
' 7040 R -Vehicle Replacement
Total 5780.2016 Midsize SUV Replacement
5780.2018 Van with Bucket Attachment Replacement
198
Run Date: Jan 26, 2017
Funding Expense
(75,000)
(75,000) 75,000
(750,000)
750,000
(750,000) 750,000
60,000
(60,000)
(60,000) 60,000
40,000
(40,000)
(40,000) 40,000
45,000
(45,000)
(45,000) 45,000
35,000
(35,000)
(35,000) 35,000
-----,
5990 Fleet Vehicles
6157 Vehicles-under $100,000
City of Pickering
2020
Capital Forecast
Van with Bucket Truck Replacement -Replace unit# 794 (2013
Ford)(5780 Parks).
7040 R -Vehicle Replacement
Total 5780.2018 Van with Bucket Attachment Replacement
Total 5990 Fleet Vehicles
199
Run Date: Jan 26, 2017
Funding Expense
75,000
(75,000)
(75,000) 75,000
(2,089,000) 2,089,000
5990 Fleet Vehicles
City of Pickering
2021
Capital Forecast
5319.2102 Midsize Utility Vehicle Replacement
6157 Vehicles -under $1 00,000
Midsize Utility Vehicle Replacement-Replace Unit# 022 (2014
Jeep Patriot) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.2102 Midsize Utility Vehicle Replacement
5319.2103 1 Ton Truck with Aluminum Dump Body & Tailgate Lift I<
6157 Vehicles -under $1 00,000
One Ton Truck with Aluminum Dump Body and Tailgate Lift
Replacement-Replace unit# 005 (2014 Dodge Ram) (5319
Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.2103 1 Ton Truck with Aluminum Dump Body & Tailgat
5319.2104 1 Ton Truck with Aluminum Dump Body Replacement
6157 Vehicles -under $1 00,000
One Ton Truck with Aluminum Dump Body Replacement-Replace
unit# 026 (2014 Dodge Ram) (5319 Roads Equipment).
7040 R -Vehicle Replacement
Total 5319.2104 1 Ton Truck with Aluminum Dump Body Replacen
5340.2103 Fire Pumper Rescue Replacement
1702 Debt-10 Year
6159 Fire Veh-Over $100,000
Pumper Rescue-Replace unit# 532 (2005 Smeal Pumper) (5340
Fire Services).
Total 5340.2103 Fire Pumper Rescue Replacement
5780.2115 1 Ton Truck with Aluminum Dump Body Replacement
6157 Vehicles-under $100,000
One Ton Truck with Utility Body Replacement-Replace Unit# 795
(2014 Ford F450) (5780 Parks).
7040 R-Vehicle Replacement
Total 5780.2115 1 Ton Truck with Aluminum Dump Body Replacen
Total 5990 Fleet Vehicles
200
Run Date: Jan 26, 2017
Funding Expense
35,000
(35,000)
(35,000) 35,000
75,000
(75,000)
(75,000) 75,000
65,000
(65,000)
(65,000) 65,000
(750,000)
750,000
(750,000) 750,ooo·
68,000
.(68,000)
(68,000) 68,000
(993,000) 993,000
5206 Information Technology
Expenditures
· 6175 Hardware Replacements
6177 IT Infrastructure
6190 New Corporate Projects
6477 IT Infrastructure -Seaton
Total Expenditures
Financing
1711 Internal Loan-5 Year
7001 R -Capital Equipment Replacement
7022 R -DC's City's Share
7605 RF DC -Fire
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
606,700
90,000
696 700
(500,000)
(196,700)
{696,700)
201
Run Date: Jan 27, 2017
2019 2020 2021
Forecast Forecast · Forecast
600,000 550,000 200,000
75,000 200,000
500,000
40,000
715 000 550 000 900 000
(675,000) (550,000) (900,000)
(1 1 150)
(38,850)
{715,000) {550,000) {900,000)
City of Pickering
2018
Capital Forecast
5206 Information Technology
5206.1801 Servers & Related Software
6175 Hardware Replacements
Servers & Related Software.
7001 R-Capital Equipment Replacement ·
Total 5206.1801 Servers & Related Software
5206.1802 PCs, Laptops
6175 Hardware Replacements
PCs, Laptops.
7001 R-Capital Equipment Replacement
Total 5206.1802 PCs, Laptops
5206.1803 PC's I AutoCAD and Graphic Workstations
6175 Hardware Replacements
PC's I AutoCAD and Graphic Workstations.
7001 R-Capital Equipment Replacement
Total 5206.1803 PC's I AutoCAD and Graphic Workstations
5206.1805 Business Applications Development
6177 IT Infrastructure
Infrastructure and Public Works System. Investigate solutions and
through consultation evaluate systems for the design, construction,
and management of pub)ic infrastructure.
7001 R-Capital Equipment Replacement
Total 5206.1805 Business Applications Development
5206.1807 Smart City Infrastructure
6177 IT Infrastructure
Investigate possible Smart City infrastructure deployments -
Increase Wi-Fi base and add sensors to City facilities, vehicles and
assets.
7001 R-Capital Equipment Replacement
Total 5206.1807 Smart City Infrastructure
5206.1808 Telecoms PBX Upgrade I Replacement
1711 Internal Loan-5 Year
6175 Hardware Replacements
Telecomms PBX Upgrade I Replacement including handsets,
consulting, trainin~, migration and deployment.
Total 5206.1808 Telecoms PBX Upgrade I Replacement
202
Run Date: Jan 27, 2017
Funding Expense
33,000
(33,000)
(33,000) 33,000
30,000
(30,000)
(30,000) 30,000
43,700
(43,700)
(43,700) 43,700
30,000
(30,000)
(30,000) 30,000
20,000
(20,000)
(20,000) 20,000
(500,000)
500,000
(500,000) 500,000
5206 Information Technology
City of Pickering
2018
Capital Forecast
. '
5206.1809 Operations Centre Technology
6177 IT Infrastructure
Infrastructure, Networking, Systems, PC's, Etc. for new Operations
Centre.
7001 R ~ Capital Equipment Replacement
Total 5206.1809 Operations Centre Technology
Total 5206 Information Technology
203
Run Date: Jan 27, 2017
Funding Expense
40,000
(40,000)
(40,000) 40,000
(696,700) 696,700
I
City of Pickering
2019
Capital Forecast
5206 Information Technology
5206.1901 Server I Hardware Upgrades and Replacements
6175 Hardware Replacements
Upgrade and replacement of Server hardware and storage.
-7001 R -Capital Equipment Replacement
Total 5206.1901 Server I Hardware Upgrades and Replacements
5206.1902 Information Security Enhancements
6175. Hardware Replacements
Security upgrades and enhancements including endpoint
protection, mobile device security and end user training and
awareness.
7001 R -Capital Equipment Replacement
Tqtal 5206.1902 Information Security Enhancements
5206.1903 Enterprise Resident Relationship Management System
6175 Hardware Replacements
Review and implementation of an enterprise resident relationship
management system that will enable the City to view resident
information from a single application.
7001 R-Capital Equipment Replacement
Total 5206.1903 Enterprise Resident Relationship Management Sy
5206.1904 Biometric Systems
6177 IT Infrastructure
Biometric Systems for Facilities and Card Access Replacement.
7001 R -Capital Equipment Replacement
Total 5206.1904 Biometric Systems
5206.1905 Fire Hall Technology
6477 IT Infrastructure-Seaton
Infrastructure, Networking, Systems, PC's, etc. for new Seaton Fire
Hall. -
7022 R -DC's City's Share
7605 RF DC -Fire
Total 5206.1905 Fire Hall Technology
Total 5206 Information Technology
20~
Run Date: Jan 27, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
200,000
(200,000)
(200,000) 200,000
200,000
(200,000)
(200,000) 200,000
75,000
(75,000)
(75,000) 75,000
40,000
(1,150)
(38,850)
(40,000) 40,000
(715,000) 715,000
City of Pickering
2020
Capital Forecast
5206 Information Technology
5206.2001 SAN Upgrade I Cloud Storage Solution
6175 Hardware Replacements
City data storage will need to be reviewed and our existing SAN
upgraded or replaced. In 2020, the City is projected to be
managing 200 TB of data.
7001 R -Capital Equipment Replacement
Total 5206.2001 SAN Upgrade I Cloud Storage Solution
5206.2002 City Network Upgrades
6175 Hardware Replacements
Our Enterprise Network infrastructure will need to be upgraded and
faster, Intelligent networking components will be required.
7001 R -Capital Equipment Replacement
Total 5206.2002 City Network Upgrades
5206.2003 Wi-Fi Sensor Deployment-lOT
6175 Hardware Replacements
Lower power Sub-gigahertz wireless sensor deployment for Internet
of Things and Connected Community Initiative. Sensors can
nionitor Temperature, Humidity, Light, Proximity, Ultraviolet, C02,
etc. Can be used for smart parking, structural health, urban noise
maps, electromagnetic field levels, traffic congestion, smart light~ng
and waste management.
7001 R -Capital Equipment Replacement
Total 5206.2003 Wi-Fi Sensor Deployment -lOT
Total 5206 Information Technology
205
Run Date: Jan 26, 2017
Funding Expense
250,000
(250,000)
(250,000) 250,000
200,000
(200,000)
(200,000) 200,000
100,000
(100,000)
(100,000) 100,000
(550,000) 550,000
5206 Information Technology .
City of Pickering
2021
Capital Forecast
5206.2101 Fiber Network Infrastructure Equipment, Fiberoptic
6175 Hardware Replacements
Network Infrastructure required to support Municipal Broadband
Network for Pickering. This will include Fiber Network Infrastructure
Equipment, Fiberoptic cabling and conduit.
7001 R-Capital Equipment. Replacement
Total 5206.2101 Fiber Network Infrastructure Equipment, Fiberopt
5206.2102 City Data
6177 IT Infrastructure
City data will need to be securely integrated and accessed for
Customer Relationship Management applications and data
analytics.
7001 R -Capital Equipment Replacement
Total 5206.2102 City Data
5206.2103 Smart City Technologies
6190 New Corporate Projects
Connected Pickering. Implementation of Smart City technologies to
ensure the City is able to take advantage of new technology trends
such as self-driving vehicles, smart lighting and automation of
manual processes.
7001 R -Capital Equipment Replacement
Total 5206.2103 Smart City Technologies
Total 5206 Information Technology
206
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
200,000
(200,000)
(200,000) 200,000
500,000
(500,000)
(500,000) 500,000
(900,000) 900,000
City of Pickering
Multi-Year Capital Forecast
2018-2021
5325 Streetlights & Signalization
2018
Forecast
Expenditures
6254 Traffic Signals 60,000
Total Expenditures 60 000
Financing
2823 Paid From Property Taxes (60,000)
Total Financing (60,000)
207
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast . Forecast
25,000 25,000 60,000
25000 25 000 60 000
(25,000) (25,000) (60,000)
(25,000) (25,000) (60,000)
City of Pickering
2018
Capital Forecast
5325 Streetlights & Signalization
5325.1802 Traffic Signals/Controllers Replacement
2823 Paid From Property Taxes
6254 Traffic Signals
Traffic Signals/Controllers Replacement (2) -Valley Farm Road at
Pickering Parkway, Twyn Rivers Drive at Woodview Ave.
Total 5325.1802 Traffic Signals/Controllers Replacement
Total 5325 Streetlights & Signalization
208
Run Date: Jan 26, 2017
Funding Expense
(60,000)
60,000
(60,000) 60,000
(60,000) 60,000
City of Pickering
2020
Capital Forecast
5325 Streetlights & Signalization
5325.2002 Traffic Signals/Controllers Replacement
2823 Paid From Property Taxes
6254 Traffic Signals
Traffic Signals/Controllers Replacement-Oklahoma Drive at Eyer
Drive (last replacement 2007).
Total 5325.2002 Traffic Signals/Controllers Replacement
Total 5325 Streetlights & Signalization
210
Run Date: Jan 26, 2017
Funding Expense
(25,000)
25,000
(25,000) 25,000
(25,000) 25,000
City of Pickering
2021
Capital Forecast
5325 Streetlights & Signalization
5325.2101 Traffic Signals/Controllers Replacement
2823 Paid From Property Taxes
6254 Traffic Signals
Traffic Signals/Controllers Replacement (2) Locations-Pickering
Parkway at Portland Court and Valley Farm Road at Esplanade
South.
Total. 5325.2101 Traffic Signals/Controllers Replacement ·
Total 5325 Streetlights & Signalization
211
Run Date: Jan 26, 2017
Funding Expense
(60,000)
60,000
(60,000) 60,000
(60,000) 60,000
5323 Sidewalks
Expenditures
6250 Construction Costs
Total Expenditures
Financing
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
200,000
200 000
(200,000)
(200,000)
212
Run Date: Jan 26, 2017
'
2019 2020 202r
Forecast Forecast Forecast
200,000 200,000 200,000
200JOOO 200 000 200 000
(200,000) (200,000) (200,000)
(200,000) (200,000) (200,000)
5323 Sidewalks
5323.1801 New Sidewalk Installation
6250 Construction Costs
City of Pickering
2018
Capital Forecast
New Sidewalk Installation -Pedestrian Bridge in conjunction with
DC Project W0-2-Kingston Road (south side, 200 metres east of
Rosebank Road) to connect to concrete sidewalk.
7505 RF-Federal Gas Tax
Total 5323.1801 New Sidewalk Installation
Total 5323 Sidewalks
213
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
5323 Sidewalks
City of Pickering
2019
Capital Forecast
5323.1901 New Sidewalk Installation (Location TBD)
6250 Construction Costs
New Sidewalk Installation (Locations TBD).
7505 RF-Federal Gas Tax
Total 5323.1901 New Sidewalk Installation (Location TBD)
Total 5323 Sidewalks
214
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
5323 Sidewalks
City of Pickering
2020
Capital Forecast
5323.2001 New Sidewalk Installation (Location TBD)
6250 Construction Costs
New Sidewalk Installation (Location TBD).
7505 RF-Federal Gas Tax
Total 5323.2001 New Sidewalk Installation (Location TBD)
Total 5323 Sidewalks
215
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
5323 Sidewalks
City of Pickering
2021
Capital Forecast
5323.2101 New Sidewalk Installation (Location TBD)
6250 Construction Costs
New Sidewalk Installation (Location TBD).
7505 RF -Federal Gas Tax
Total 5323.2101 New Sidewalk Installation (Location TBD)
Total5323 Sidewalks
216
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
' . I
5410 Stormwater Management
Expenditures
6253 Storm Water
Total Expenditures
Financing
1703 Debt-15 Year
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
750,000
750 000
(750,000)
(750,000)
217
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
750,000 750,000 750,000
750 000 750 000 750 000
(750,000) (750,000) (750,000)
(750,000) (750,000) (750,000)
5410 Stormwater Management
City of Pickering
2018
Capital Forecast
5410.1801 SWM Pond Cleanout Reconstruction
1703 Debt -15 Year
6253 Storm Water
Lisgold Subdivision Pond -Crossing Court SWM Pond Cleanout
Reconstruction.
Total 5410.1801 SWM Pond Cleanout Reconstruction
Total5410 Stormwater Management
218
Run Date: Jan 26, 2017
Funding Expense
(750,000)
750,000
(750,000) 750,000
(750,000) 750,000
541 0 Stormwater Management
City of Pickering
2019
Capital Forecast
5410.1901 SWM Pond Cleanout Reconstruction
1703 Debt-15 Year
6253 Storm Water
Voss subdivision pond -Valley Farm Roa,d at Finch Avenue SWM
Pond Cleanout Reconstruction.
Total 5410.1901 SWM Pond Cleanout Reconstruction
Total5410 Stormwater Management
219
Run Date: Jan 26, 2017
Funding Expense
(750,000)
750,000
(750,000) 750,000
(750,000) 750,000
5410 Stormwater Management
City of Pickering
2020
Capital Forecast
5410.2001 SWM Pond Cleanout Reconstruction
1703 Debt -15 Year
6253 Storm Water
Crystal Forest Subdivision Pond-Chickadee Court SWM, Pond
Cleanout Reconstruction.
Total 5410.2001 SWM Pond Cleanout Reconstruction
Total5410 Stormwater Management
220
Run Date: Jan 26, 2017
Funding Expense
(750,000)
750,000
(750,000) 750,000
(750,000) 750,000
5410 Stormwater Management
City of Pickering
2021
Capital Forecast
5410.2101 Bopa Pond -SWM Pond Cleanout Reconstruction
1703 Debt-15 Year
6253 Storm Water
Bopa Pond -Stoimwater Management Pond Cleanout
Reconstruction.
Total 5410.2101 Bopa Pond -SWM Pond Clean out Reconstruction
Total5410 Stormwater Management
221
Run Date: Jan 26, 2017
Funding Expense
(750,000)
750,000
(750,000) 750,000
(750,000) 750,000
5320 Roads Projects
. Expenditures
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1703 Debt-1'5 Year
1704 Debt -20 year
7057 R-AlP
7505 RF-Federal Gas Tax
7709 RF -Roads & Bridges
7711 RF -OCIF Grant
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
250,000
3,345,000
3,595 000
(550,000)
(1 ,620,000)
(870,002)
(554,998)
(3,595,000)
222
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
300,000
9,350,000 5,950,000 3,975,000
9 350 000 5,950,000 4 275 000
(3,529,068)
(1 ,525,000)
(1 ,225,000) (1 ,675,000) (1 ,000,000)
(975,000)
(2,000,000) (2,000,000) (2,525,000)
(750,000) (750,000) (750,000)
(870,932)
(9,350,000) (5,950,000) (4,275,000)
5320 Roads Projects
City of Pickering
2018
Capital Forecast
5320.1801 Hoover Bridge (7004) Replacement-D&A
6250 Construction Costs
Hoover Bridge (7004) Replacement Design/Approvals.
7709 RF -Roads & Bridges
Total 5320.1801 Hoover Bridge (7004) Replacement-D&A
5320.1802 Browning Avenue -Final Lift of Asphalt
6250 Construction Costs
Browning Avenue -Final Lift of Asphalt--Resurfacing Project.
7505 RF -Federal Gas Tax
Total 5320.1802 Browning Avenue -Final Lift of Asphalt
5320.1806 Altona Bridge (1 0002) Replacement -Construction
1704 Debt-20 year
6250 Construction Costs
Altona Bridge (1 0002) Replacement Construction.
Total 5320.1806 Altona Bridge (10002) Replacement-Constructio1
5320.1807 Whitevale Rd. Drainage lmprov. Road Reconstruction
6230 Prof/Consulting Fees
Whitevale Road -Drainage Improvements & Road Reconstruction-
Design only.
7709 RF -Roads & Bridges
Total 5320.1807 Whitevale Rd. Drainage lmprov. Road Reconstruc
5320.1808 Sixth Concession Road -Final Lift of Asphalt
6250 Construction Costs
Sixth Concession Road -Easterly from Highway 7 to Westney
Road-Final Lift of Asphalt.
7505 RF -Federal Gas Tax
Total 5320.1808 Sixth Concession Road -Final Lift of Asphalt
5320.1811 Sideline 14-Reconstruction
6250 Construc~ion Costs
Sideline 14 -Hwy. 407 to Seventh Concession Road -Reconstruct
granular base and hard surface.
7709 RF -Roads & Bridges
7711 RF -OCIF Grant
Total 5320.1811 Sideline 14-Reconstruction
5320.1816 Dixie Road -Asphalt Resurfacing
223
Run Date: Jan 26, 2017
Funding Expense
250,000
(250,000)
(250,000) 250,000
30,000
(30,000)
(30,000) 30,000
(550,000)
550,000
(550,000) 550,000
250,000
.' (250,000)
(250,000) 250,000
90,000
(90,000)
(90,000) 90,000
925,000
(370,002)
(554,998)
(925,000) . 925,000
City of Pickering
2018
Capital Forecast
5320 Roads Projects
6250 Construction Costs
Dixie Road Asphalt Resurfacing -500 metres north of Kingston
Road to Glenanna Road.
7505 RF-Federal Gas Tax
Total 5320.1816 Dixie Road-Asphalt Resurfacing
5320.1817 Barber Street-Asphalt Resurfacing
6250 Construction Costs
Barber Street Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1817 Barber Street-Asphalt Resurfacing
5320.1818 Geta Circle -Asphalt Resurfacing
6250 Construction Costs
Geta Circle Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1818 Geta Circle-Asphalt Resurfacing
5320.1819 Twyn Rivers Drive -Asphalt Resurfacing
6250 Construction Costs
Twyn Rivers Drive Asphalt Resurfacing -from Woodview Avenue to
Ashwood Gate.
7505 RF-Federal Gas Tax
Total 5320.1819 Twyn Rivers Drive -Asphalt Resurfacing
5320.1820 Rougemount Drive -Asphalt Resurfacing
6250 Construction Costs
Rougemount Drive Asphalt Resurfacing -from Oakwood Drive to
Rosebank Road.
7505 RF-Federal Gas Tax
Total 5320.1820 Rougemount Drive -Asphalt Resurfacing
5320.1821 Sultana Square -Asphalt Resurfacing
6250 Construction Costs
Sultana Square Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1821 Sultana Square -Asphalt Resurfacing
5320.1822 Bronwen Lane -Asphalt Resurfacing
6250 Construction Costs
Bronwen Lane Asphalt Resurfacing.
224
Run Date: Jan 26, 2017
Funding Expense
250,000
(250,000)
(250,000) 250,000
65,000
(65,000)
(65,000) 65,000
245,000
(245,000)
(245,000) 245,000
90,000
(90,000)
(90,000) 90,000
120,000
(120,000)
(120,000) 120,000
260,000
(260,000)
(260,000) 260,000
70,000
5320 Roads Projects
7505 RF-Federal Gas Tax
City of Pickering
2018
Capital Forecast
Total 5320.1822 Bronwen Lane-Asphalt Resurfacing
5320.1823 Patmore Lane -Asphalt Resurfacing
6250 Construction Costs
Patmore Lane Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1823 Patmore Lane-Asphalt Resurfacing
5320.1824 Rosebank Road -Asphalt Resurfacing
6250 Construction Costs
Rosebank Road Asphalt Resurfacing -from Rougemount Drive to
Rodd Avenue.
7505 RF -Federal Gas Tax
Total 5320.1824 Rosebank Road -Asphalt Resurfacing
5320.1825 Miscellaneous -Asphalt Resurfacing
6250 Construction Costs
Miscellaneous Asphalt Resurfacing.
7505 RF-Federal Gas Tax
Total 5320.1825 Miscellaneous-Asphalt Resurfacing
Total 5320 Roads Projects
225
Run Date: Jan 26, 2017
Funding Expense
(70,000)
(70,000) 70,000
70,000
(70,000)
(70,000) 70,000
175,000
(175,000)
(175,000) 175,000
155,000
(155,000)
(155,000) 155,000
(3,595,000) 3,595,000
City of Pickering
2019
Capital Forecast
5320 Roads Projects
5320.1901 Liverpool Bridge (3) Replacement-D&A
6250 Construction Costs
Liverpool Bridge (3) Replacement-Design/Approvals.
7709 RF -Roads & Bridges
Total 5320.1901 Liverpool Bridge (3) Replacement-D&A
5320.1903 Greenwood Bridge (6001)-Rehabilitation Construction
1704 Debt -20 year
6250 Construction Costs
Bridge Repairs-Greenwood Bridge (6001).
Total 5320.1903 Greenwood Bridge (6001)-Rehabilitation Constn
5320.1904 Wilson Bridge Replacement -Construction
1704 Debt -20 year
6250 Construction Costs
Wilson Bridge (7002) Replacement Construction.
7709 RF -Roads & Bridges
Total 5320.1904 Wilson Bridge Replacement-Construction
5320.1907 Roads Resurfacing Projects (TBD)
6250 Construction Costs
Roads Resurfacing Projects.
7505 RF-Federal Gas Tax
Total 5320.1907 Roads Resurfacing Projects (TBD)
5320.1911 Whitevale Road Drainage lmprov. Road Reconstruction
1702 Debt-10 Year
6250 Construction Costs
Whitevale Road-Drainage Improvements & Road Reconstruction-
Construction.
7711 RF-OCIF Grant
Total 5320.1911 Whitevale Road Drainage lmprov. Road Reconstn
5320.1919 Seventh Concession Road -Reconstruction
1702 Debt-10 Year
6250 Construction Costs
Sideline Road 32 to Sideline Road 26-Road Reconstruction.
Total 5320.1919 Seventh Concession Road -Reconstruction
5320.1920 Kinsale Road -Hard Surfacing
226
Run Date: Jan 26, 2017
Funding Expense
250,000
(250,000)
(250,000) 250,000
(625,000)
625,000
(625,000) 625,000
(600,000)
1,100,000
(500;000)
(1 '1 00,000) 1,100,000
2,000,000
(2,000,000)
(2,000,000) 2,000,000
(1 ,379,068)
2,250,000
(870,932)
(2,250,000) 2,250,000
(2, 150,000)
2,150,000
(2, 150,000) 2,150,000
5320 Roads Projects
6250 Construction Costs
City of Pickering
2019
Capital Forecast
Kinsale Road Paving -Hwy 407 to Seventh Concession Road
upgrade to hard surface (1300m).
7057 R-AIP
Total 5320.1920 Kinsale Road-Hard Surfacing
Total5320 Roads Projects
227
Run Date: Jan 26, 2017
Funding Expense
975,000
(975,000)
(975,000) 975,000
(9,350,000) 9,350,000
5320 Roads Projects
City of Pickering
2020
Capital Forecast
5320.2004 Roads Resurfacing Projects (TBD)
6250 Construction Costs
Resurfacing Projects (TBD).
7505 RF-Federal Gas Tax
Total 5320.2004 Roads Resurfacing Projects (TBD)
5320.2009 Hoover Bridge (7004) Replacement-Construction
1704 Debt -20 year
6250 Construction Costs
Hoover Bridge (7004) Replacement/Construction.
7709 RF -Roads & Bridges
Total 5320.2009 Hoover Bridge (7004) Replacement-Construction
5320.2012 Radom Street Culverts (7) Replacement-D&A
6250 Construction Costs
Radom Street Culverts (7) Replacement Detail Design & Approvals.
7709 RF -Roads & Bridges
Total 5320.2012 Radom Street Culverts (7) Replacement -D&A
5320.2013 Seventh Concession Road (SL 26 to SL 22)
1703 Debt-15 Year
6250 Construction Costs
Seventh Concession Road (SL 26 to SL 22).
Total 5320.2013 Seventh Concession Road (SL 26 to SL 22)
5320.2014 Seventh Concession Road (SL 22 to Brock Road)
1704 Debt -20 year
6250 Construction Costs
Seventh Concession Road (SL 22 to Brock Road).
Total 5320.2014 Seventh Concession Road (SL 22 to Brock Road)
Total 5320 Roads Projects
228
Run Date: Jan 26, 2017
Funding Expense
2,000,000
(2,000,000)
(2,000,000) 2,000,000
(150,000)
650,000
(500,000)
(650,000) 650,000
250,000
/
(250,000)
(250,000) 250,000
(1 ,525,000)
1,525,000
(1 ,525,000) 1,525,000
(1 ,525,000)
1,525,000
(1 ,525,000) 1,525,000
(5,950,000) 5,950,000
5320 Roads Projects
City of Pickering
2021
Capital Forecast
5320.2101 Liverpool Bridge (3) Replacement-Construction
1704 Debt -20 year
6250 Construction Costs
Liverpool Bridge (3) Replacement Construction.
Total 5320.21 01. Liverpool Bridge (3) Replacement-Construction
5320,2103 Sideline 24 -Reconstruction
6250 Construction Costs
Sideline 24 -Highway 407 to Whitevale Road ~ Road
Reconstruction.
7505 RF-Federal Gas Tax
7709 RF -Roads & Bridges
Total 5320.2103 Sideline 24-Reconstruction
5320.2104 Toronto/ Pickering Townline Culvert (2004) -Replaceme1
6230 Prof/Consulting Fees
Toronto/ Pickering Townline Culvert (2004) Replacement-
Design/Approvals.
7709 RF -Roads & Bridges
Total 5320.2104 Toronto/ Pickering Townline Culvert (2004) -Repl;
5320.2105 Roads Resurfacing Projects (TBD)
6250 Construction Costs
Resurfacing Projects (TBD).
7505 RF-Federal Gas Tax
Total 5320.2105 Roads Resurfacing Projects (TBD)
Total 5320 Roads Projects .
229
Run Date: Jan 26, 2017
Funding Expense
(1 ,000,000)
1,000,000
(1 ,000,000) 1,000,000
975,000
(525,000)
(450,000)
(975,000) 975,000
300,000
(300,000)
(300,000) 300,000
2,000,000
(2,000,000)
(2,000,000) 2,000,000
(4,275,000) 4,275,000
City of Pickering
Multi-Year Capital Forecast
2018-2021
5613 Water Resources & Development Services
2018
Forecast
Expenditures
6181 Other Fixed Assets 200,000
Total Expenditures 200 000
Financing
7501 RF-Third Party Contribution (200,000)
Total Financing (200,000)
230
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
200,000 200,000 200,000
200 000 200 000 200 000
(200,000) (200,000) (200,000)
(200,000) (200,000) (200,000)
City of Pickering
2018
Capital Forecast
5613 Water Resources & Development Services
5613.1801 Various Construction Projects
6181 Other Fixed Assets
Va'rious construction projects related to Development (funded from
Third Party Contributions).
7501 RF -Third Party Contribution
Total 5613.1801 Various Construction Projects
Total 5613 Water Resources & Development Services
231
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2019
Capital Forecast
5613 Water Resources & Development Services
5613.1901 Various Construction Projects
6181 Other Fixed Assets
Various Construction Projects Related to Development (funded
from Third Party Contributions).
7501 RF-Third Party Contribution
Total 5613.1901 Various Construction Projects
Total 5613 Water Resources & Development Services
232
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2020
Capital Forecast
5613 Water Resources & Development Services
5613.2001 Various Construction Projects
6181 Other Fixed Assets
Various Construction Projects Related to Development (funded
from Third Party Contributions).
7501 RF -Third Party Contribution
Total 5613.2001 Various Construction Projects
Total 5613 Water Resources & Development Services
233
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2021
Capital Forecast
5613 Water Resources & Development Services
5613.2101 Various Construction Projects
6181 Other F.ixed Assets ·
Various Construction Projects Related to Development (funded
from Third Party Contributions).
7501 RF -Third Party Contribution
Total 5613.2101 Various Construction Projects
Total5613 Water Resources & Development Services
234
Run Date: Jan 26, 2017
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
Cicy of Pickering
Multi-Year Capital Forecast
2018-2021
5321 Development Projects-(DC Funded)
2018
Forecast
Expenditures
6181 Other Fixed Assets
6250 Construction Costs 6,500,000
6251 Road Improvements 2,145,000
6252 Streetlights & Sidewalks
6253 Storm Water 896,000
Total Expenditures 9 541,000
Financing
1702 Debt-10 Year (1 ,072,500)
7022 R -DC's City's Share (553, 120)
761 0 RF DC -Roads & Related (4,322,500)
7611 RF DC -Storm Water Mgmt (342,880)
9970 AlP II Special Levy (3,250,000)
Total Financing (9,541 ,000)
235
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
718,000
3,840,300
3,212,800 2,500,000 653,300
1,077,000
1,468,666 2,053,581
5,758 466 5 271 581 4 493 600
(2,787,593). (1 ,353,000)
(769,620) (832,365) (1 ,286,725)
(1 ,606,400) (2,234,000) (3,206,875)
(594,853) (852,216)
(5,758,466) (5,271,581) (4,493,600)
City of Pickering
2018
Capital Forecast
5321 Development Projects-(DC Funded)
5321.1801 B-29 Sandy Beach Road -Reconstruction & Storm Sewe
6250 Construction Costs
Sandy Beach Road reconstruction and storm sewer installation-
Bayly Street to Montgomery Park Road (50/50).
761 0 RF DC -Roads & Related
9970 AlP II Special Levy
Total 5321.1801 B-29 Sandy Beach Road-Reconstruction & Storn
5321.1802 B-20 Krosno Creek-SWM Facility at Sandy Beach Rd -[
6253 Storm Water
B-20 Krosno Creek SWM Facility at Sandy Beach Rd. (Feasibility,
EA, Design, Approvals & Land Cost) (44/56).
7022 R-DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1802 B-20 Krosno Creek -SWM Facility at Sandy Beac~
5321.1804 Installation of Oil Grit Separators -Frenchman's Bay
6253 Storm Water
Oil Grit Separators (28/72) Frenchman's Bay.
7022 R -DC's City's Share
7611 RF DC-Storm Water Mgmt
Total 5321.1804 Installation of Oil Grit Separators -Frenchman's E
5321.1805 RU-4 Audley Road -Reconstruction
1702 Debt-10 Year
6251 Road Improvements
RU-4 Audley Road {50/50) Fifth Concession to Hw'y. #7-Two
Lane Rural Reconstruction.
7610 RF DC -Roads & Related
Total 5321.1805 RU-4 Audley Road -Reconstruction
5321.1806 B-19 Krosno Creek-SWM Facility
6253 Storm Water
B-19 (44/56) Krosno Creek SWM Facility K16 at Wharf St. (EA,
Design & Approvals).
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1806 B-19 Krosno Creek -SWM Facility
Total 5321 Development Projects-(DC Funded)
236
Run Date: Jan 26, 2017
Funding Expense
6,500,000
(3,250,000)
(3,250,000)
(6,500,000) 6,500,000
500,000
(280,000)
(220,000)
(500,000) 500,000
321,000
(231 ,120)
(89,880)
(321 ,000) 321,000
(1 ,072,500)
2,145,000
(1 ,072,500)
(2,145,000) 2,145,000
75,000
(42,000)
(33,000)
(75,000) 75,000
(9,541 ,000) 9,541,000
City of Pickering
2019
Capital Forecast
5321 Development Projects-(DC Funded)
5321.1901 B-20 Krosno Creek-SWM Facility
1702 Debt -10 Year
6253 Storm Water
B-20 Krosno Creek-SWM Facility-Sandy Beach Road-K-20
Construction (44/56).
7611 RF DC -Storm Water Mgmt
Total 5321.1901 B-20 Krosno Creek-SWM Facility
5321.1902 Bl-1 Bayly Street -Sidewalks & Streetlights
1702 Debt-10 Year
6252 Streetlights & Sidewalks
B1 -1 Sidewalks & Streetlights-Bayly Street (Church Street to
Hydro Corridor-north and south sides) (50/50).
7022 R -DC's City's Share
Total 5321.1902 Bl-1 Bayly Street-Sidewalks & Streetlights
5321.1903 Installation of Oil Grit Separators (2)
6253 Storm Water
Installation of 2 Oil Grit Separators for FB SWM Monitoring Pond
(28/72).
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1903 Installation of Oil Grit Separators (2)
5321.1905 BI-B Kellino Street -Road Reconstruction
1702 Debt-10 Year
6251 Road Improvements
Bl-8 Kellino Street-Squires Beach Rd. to Church St. (50/50).
761 0 RF DC -Roads & Related
Total 5321.1905 BI-B Kellino Street-Road Reconstruction
5321.1906 Bl-1 B Squires Beach Road -Reconstruction
1702 Debt-10 Year
6251 Road Improvements
Bl-18 Squires Beach Road (50/50). Bayly Street to CNR Tracks.
761 0 RF DC -Roads & Related
Total 5321.1906 Bl-1 B Squires Beach Road -Reconstruction
Total 5321 Development Projects-(DC Funded)
237
Run Date: Jan 26, 2017
Funding Expense
(642,693)
1 '147,666
(504,973)
(1,147,666) 1,147,666
(538,500)
1,077,000
(538,500)
(1 ,077,000) 1,077,000
321,000
(231 '120)
(89,880)
(321 ,000) 321,000
(803,200)
1,606,400
(803,200)
(1 ,606,400) 1,606,400
(803,200)
1,606,400
(803,200)
(1 ,606,400) 1,606,400
(5,75B,466) 5,758,466
City of Pickering
2020
Capital Forecast
5321 Development Projects-(DC Funded)
5321.2001 B-19 Krosno Creek-SWM Facility
6253 Storm Water
B-19 Krosno Creek SWM Facility K16. Construction (44/56).
7022 R -DC's Cit¥'s Share
7611 RF DC-Storm Water Mgmt
Total 5321.2001 B-19 Krosno Creek-SWM Facility
5321.2002 Installation of Oil Grit Separators
6253 Storm Water
Installation of Oil Grit Separators (28/72) Frenchman's Bay.
7022 R -DC's City's Share
7611 RF DC-Storm Water Mgmt
Total 5321.2002 Installation of Oil Grit Separators
5321.2003 TC-31 Arterial Road (Hydro Corridor, City Centre) -Stud:
1702 Debt-10 Year
6251 Road Improvements
TC-31 Future Arterial Road in Hydro Corridor, City Centre-
Feasibility Study and Environmental Assessment (75/25).
7610 RF DC-Roads & Related
Total 5321.2003 TC-31 Arterial Road (Hydro Corridor, City Centre)
5321.2004 B-30 Krosno Creek -SWM Facility
1702 Debt-10 Year
6253 Storm Water
B-30 Krosno Creek SWM Facility K19 Hydro Corridor-(44/56)
(feasibility, EA, Design, Land Cost & Approvals).
7611 RF DC-Storm Water Mgmt
Total 5321.2004 B-30 Krosno Creek-SWM Facility
5321.2005 D-1 Kingston Road -North Side Steetlighting & Sidewal
6181 Other Fixed Assets
D-1 Kingston Road-North Side Steetlighting & Sidewalks (50/50).
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.2005 D-1 Kingston Road -North Side Steetlighting & S
5321.2006 D-2 Kingston Road -South Side Steetlighting & Sidewal
6181 Other Fixed Assets
238
Run Date: Jan 26, 2017
Funding Expense
432,581
(242,245)
(190,336)
(432,581) 432,581
321,000
(231 '120)
(89,880)
(321,000) 321,000
(625,000)
2,500,000
(1 ,875,000)
(2,500,000) 2,500,000
(728,000)
1,300,000
(572,000)
(1 ,300,000) 1,300,000
323,100
(161 ,550)
(161 ,550)
(323,100) 323,100
394,900
City of Pickering
2020
Capital Forecast
5321 Development Projects-(DC Funded)
D-2 Kingston Road -South Side Steetlighting & Sidewalks (50/50).
7022 R -DC's City's Share
761 0 RF DC -Roads & Related
Total 5321.2006 D-2 Kingston Road-South Side Steetlighting & S
Total 5321 Development Projects-(DC Funded)
239
Run Date: Jan 26, 2017
Funding Expense
(197,450)
(197,450)
(394,900) 394,900
(5,271 ,581) 5,271,581
City of Pickering
2021
Capital Forecast
5321 Development Projects-{DC Funded)
5321.2101 A-11, 8-27 (Plummer) -Hydro Corridor to West Limit
6250 Construction Costs
A-11 (Plummer) West Limit, Type 'C' Arterial (25/75).
7022 R -DC's City's Share
7610 RF DC -Roads & Related
Total 5321.2101 A-11, 8-27 (Plummer) -Hydro Corridor to West Lir
5321.2102 A-12, 8-28 (Plummer) -Krosno Creek Crossing
6250 Construction Costs
A-12 (Plummer) Bridge Structure Type 'C' Arterial (25/75).
7022 R -DC's City's Share
7610 RF DC -Roads & Related
Total 5321.~102 A-12, 8-28 (Plummer) -Krosno Creek Crossing
5321.2103 RP-2 Finch Avenue Culvert Replacement
6251 Road Improvements
RP-2 Finch Ave West of Altona Road Culvert Replacement (50/50).
7022 R-DC's City's Share
761 0 RF DC -Roads & Related
Total 5321.2103 RP-2 Finch Avenue Culvert Replacement
Total 5321 Development Projects-(DC Funded)
240
Run Date: Jan 26, 2017
Funding Expense
. 1,840,300
(460,075)
(1 ,380,225)
(1 ,840,300) 1,840,300
2,000,000
(500,000)
(1 ,500,000)
(2,000,000) 2,000,000
653,300
(326,650)
(326,650)
(653,300) 653,300
(4,493,600) 4,493,600
5203 Finance and Taxation
Expenditures
6174 System & Software Upgrade
Total Expenditures
Financing
1713 Internal Loan -15 Year
Total Financing
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
4,000,000
4 000 000
(4,000,000)
(4,000,000)
241
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
5203 Finance and Taxation
5203.1801 New Financial System
1713 Internal Loan -15 Year
6174 System & Software Upgrade
New Financial System
Total 5203.1801 New Financial System
To.tal 5203 Finance and Taxation
City of Pickering
2018
Capital Forecast
242
Run Date: Jan 26, 2017
Funding Expense
(4,000,000)
4,000,000
(4,000,000) 4,000,000
(4,000,000) 4,000,000
City of Pickering
Multi-Year Capital Fo·recast
2018-2021
5340 Fire Services
Expenditures
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
6450 Construction Costs -Seaton
Total Expenditures
Financing
1701 Debt-5 Year.
2823 Paid From Property Taxes
7501 RF -Third Party Contribution
7605 RF DC -Fire
Total Financing
Abbreviations
FS#2
FS#4 ·
FS#5
FS#6
NewFS
Fire Station #2, 553 Kingston Rd.
Fire Station #4, 4941 Old Brock Rd.
Fire Station #5, 1616 Bayly St.
Fire Station #6, 1115 Finch Ave.
New Fire Station, 2710 Brock Rd.
243
2018
Forecast
110,000
75,000
55,000
5,190,000
5 430 000
(200,000)
(190,000)
(5,040,000)
{5,430,000)
Run Date: Jan 28, 2017
2019 2020 2021
Forecast Forecast Forecast
20,000 20,000
35,000 300,000
55000 20 000 3oo·ooo
(300,000)
. (55,000) (20,000)
(55,000} (20,000) (300,000}
City ~f Pickering
2018
Capital Forecast
5340 Fire Services
5340.1801 New Fire Station to service Seaton -Construction
6450 Construction Costs -Seaton
Construction costs for new Seaton Fire Station including furniture,
fixtures and equipment.
7501 RF -Third Party Contribution
· Contribution from OPG 7501.006
7605 RF DC -Fire
Total 5340.1801 New Fire Station to service Seaton-Construction
5340.1802 FS #2, #5 and #6 Lighting Upgrades
2823 Paid From Property Taxes
6181 Other Fixed Assets
Upgrades to lighting at Fire Stations #2, #5 and #6 for energy
efficiency.
Total 5340.1802 FS #2, #5 and #6 Lighting Upgrades
5340.1803 FS #5 Upstairs Window Replacement
2823 Paid From Property Taxes
6250 Construction Costs
Replacement of windows located in upstairs of Fire Station #5.
Total 5340.1803 FS #5 Upstairs Window Replacement
5340.1807 Seaton FS Site Public Art Display
6181 Other Fixed Assets
Public Art Display-New Seaton Fire Station Site.
7501 RF-Third Party Contribution
Contribution from OPG 7501.006
Total 5340.1807 Seaton FS Site Public Art Display
5340.1808 FS #4 Kitchen Upgrade
2823 Paid From Property Taxes
6250 Construction Costs
Renovations to Fire Station# 4-Kitchen Upgrade.
Total 5340.1808 FS #4 Kitchen Upgrade
5340.1809 FS #2 Accessibility Upgrades
2823 Paid From Property Taxes
6183 Accessibility
Construction work to introduce an additional accessible washroom
at Fire Station #2 (built in the 1970s).
244
Run Date: Jan 26, 2017
Funding Expense
5,190,000
(150,000) .
(5,040,000)
(5, 190,000) 5,190,000
(70,000)
70,000
'
(70,000) 70,000
(30,000)
30,000
(30,000) 30,000
40,000
(40,000)
(40,000) 40,000
(25,000)
25,000
(25,000) 25,000
(75,000)
75,000
5340 Fire Services
City of Pickering
2018
Capital Forecast
Total 5340.1809 FS #2 Accessibility Upgrades
Total5340 Fire Services
245
Run Date: Jan 26, 2017
Funding Expense
(75,000) 75,000
(5,430,000) 5,430,000
5340 Fire Services
5340.1901 FS #2 Window Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
City of Pickering
2019
Capital Forecast
Renovation-· Window Replacement at Fire Station #2.
Total 5340.1901 FS #2 Window Replacement
5340.1902 FS #5 Roof Repairs
2823 Paid From Property Taxes
6250 Construction Costs
Renovation -Roof Repairs at Fire Station #5.
Total 5340.1902 FS #5 Roof Repairs
Total 5340 Fire Services
246
Run Date: Jan 26, 2017
Funding Expense
(20,000)
20,0QO
(20,000) 20,000
(35,000)
35,000
(35,000) 35,000
(55,000) 55,000
5340 Fire Services
5340.2001 FS #5 HVAC Balancing
2823 Paid From Property Taxes
6181 Other Fixed Assets
. HVAC Balancing at Fire Station #5.
Total 5340.2001 FS #5 HVAC Balancing
Total 5340 Fire Services
City of Pickering
2020
Capital Forecast
247
Run Date: Jan 26, 2017
Funding Expense
(20,000)
20,000
(20,000) 20,000
(20,000) 20,000
5340 Fire Services
City of Pickering
2/021
Capital Forecast
5340.2101 Fire HQ/Station #5 -Renovation
1701 Debt-5Year
6250 Construction Costs
Renovation Re-design Fire Headquarters/Station #5 Architect.
Total 5340.2101 Fire HQ/Station #5-Renovation
Total5340 Fire Services
248
Run Date: Jan 26, 2017
Funding Expense
(300,000)
300,000
, (300,000) 300,000
(300,000) 300,000
5800 Library
Expenditures
6173 Furniture & Fixtures l
6175 Hardware Replacements
6179 Book Collection Material
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1701 Debt-5 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
Total Financing
Abbreviations
City of Pickering
Multi-Year Capital Forecast
2018-2021
2018
Forecast
20,000
20,000
404,000
444 000
(444,000)
(444,000)
PCL
PC
CM
Pickering Central Library, One The Esplanade
Petticoat Creek Branch, 470 Kingston Rd.
Claremont Branch, 4941 Old Brock Rd.
249
Run Date: Jan 28, 2017
2019 2020 2021
Forecast Forecast Forecast
100,000
413,000. . 422,000 431 •. 000
30,000
290,0.00 623,000
703 000 1 075 000 531 000
(180,000) (623,000)
(110,000)
(413,000) (452,000) (531 ,000)
(703,000) (1 ,075,000) (531,000)
City of Pickering
2018
Capital Forecast
5800 Library
5800.1801 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
This budget is based on a formula which includes community
d.emand, material costs and industry norms.
Total 5800.1801 Collection Materials
5800.1802 PC Branch Computers Upgrade
2823 Paid From Property Taxes
6175 Hardware Replacements
Computer upgrades at Petticoat Creek Branch. The computers are
for staff and public use and are past their replacement date.
Total 5800.1802 PC Branch Computers Upgrade
5800.1803 Chairs Replacement
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Replacement of 30 year old wooden chairs that are falling apart at
the Library's public tables -Health & Safety issue.
Total 5800.1803 Chairs Replacement
Total5800 Library
250
Run Date: Jan 26, 2017
Funding Expense
(404,000)
404,000
(404;000) 404,000
(20,000)
20,000
(20,000) 20,000
(20,000)
20,000
(20,000) 20,000
(444,000) 444,000
5800 Library
5800.1901 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
-
City of Pickering
2019
Capital Forecast
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
This budget is based on a formula which includes community
demand, material costs and industry norms.
Total 5800.1901 Collection Materials
5800.1902 PCL Skylight Replacement Phase 3
1701 Debt-5 Year
6250 Construction Costs
Replace existing Pickering Central Library skylights to resolve
ongoing leak issues-Phase 3.
Total 5800.1902 PCL Skylight Replacement Phase 3
5800.1904 PCL Resurface Parking Lot
1711 Internal Loan-5 Year
6250 Construction Costs
Resurface Pickering Civic Complex and Central Public Library
parking lot. Costs shared with City (50% of total cost).
Total 5800.1904 PCL Resurface Parking Lot
Total5800 Library
251
Run Date: Jan 26, 2017
Funding Expense
(413,000)
413,000
(413,000) 413,000
(180,000)
180,000
(180,000) 180,000
(11 0,000)
110,000
(110,000) 110,000
(703,000) 703,000
5800 Library
5800.2101 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
City of Pickering
2021
Capital Forecast
Collection Materials. Library materials cover the following: Books,
movies, music and other types of materials along with their
processing and packaging. This budget is based on a formula
which includes community demand, material costs and industry
norms.
Total 5800.2101 Collection Materials
5800.2102 PC Furniture Replacement
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Replace furniture at Petticoat Creek Branch (tables, chairs, desks
etc. that are 20 years old).
Total 5800.2102 PC Furniture Replacement
Total 5800 Library
253
I.
Run Date: Jan 26, 2017
Funding Expense
(431,000)
431,000
(431,000) 431,000
(100,000)
100,000
(100,000) 100,000
(531,000) 531,000
City of Pickering
Multi-Year Capital Forecast
2018-2021
5801 Seaton Community Library
2018
Forecast
Expenditures
6430 Prof/Consulting Fees -Seaton
Total Expenditures
Financing
2823 Paid From Property Taxes
7193 R-Seaton FIA Funding Reserve ·
7621 RF DC-Recreation Facilities
7630 RF DC-Library
Total Financing
254
Run Date: Jan 26, 2017
2019 2020 2021
Forecast Forecast Forecast
25,000 1,299,000
25JOOO 1,299 000
(6,250)
(354,623)
(944,377)
(18,750)
(25,000) (1 ,299,000)
City of Pickering
2020
Capital Forecast
5801 Seaton Community Library
5801.2001 Seaton Community Library-Site Plan Investigations
2823 Paid From Property Taxes
6430 Prof/Consulting Fees -Seaton
Site Plan Investigations for the new Seaton Community Library.
Includes surveys, geotechnical testing and other site-related
investigations.
7630 RF DC -Library
Total 5801.2001 Seaton Community Library-Site Plan lnvestigati<
Total 5801 Seaton Community Library
255
i
1-
Run Date: Jan 26, 2017
Funding Expense
(6,250)
25,000
(18,750)
(25,000) 25,000
(25,000) 25,000
City of Pickering
2021
Capital Forecast
5801 Seaton Community Library
5801.2101 Seaton Community Library-Design Only
6430 Prof/Consulting Fees-Seaton
Seaton Community Library-Design Only.
7193 R -Seaton FIA Funding Reserve
7621 RF DC -Recreation Facilities
Total 5801.2101 Seaton Community Library-Design Only
Total 5801 Seaton Community Library
256
Run Date: Jan 26, 2017
Funding Expense
1,299,000
(354,623)
(944,377)
(1 ,299,000) 1,299,000
(1 ,299,000) 1,299,000