HomeMy WebLinkAbout2016 Approved Capital Budget2016
Capital Budget
As approved by Council-March 29, 2016
City of Pickering
2016 Approved Capital ·Budget
Table of Contents
Department Page
Budget Summaries 1
Mayor & Council 9
Corporate Services Department 16
Finance and Taxation 5203 17
Information Technology 5206 19
Culture & Recreation Department ~3
Culture & Rec Admin 5711 24
Civic Complex 5700 26
Senior Citizens Centre 5701 28
Dunbarton Pool 5713 30
Don Beer Arena 5715 32
Community Centres 5719 35
Recreation Complex -Core 5731 37
Recreation Complex -Pool 5733 40
Recreation Complex -Arenas 5735 41
Museum 5744 44
Engineering & Public Works Department
Engineering Services 47
Engineering ~ervices -Admin 5335 48
Streetlights & Signalization 5325 49
Sidewalks 5323 53
Stormwater Management 5410 59
Water Resources & Development Services 5613 62
Development Projects-(DC Funded) 5321 64
Public Works 77
Property Maintenance 5311 79
Operations Centre 5315 82
Roads 5320 84
Parks 5780 111
Fleet Vehicles 5990 124
Fire Services Department
Fire Services . 5340 128
Library 5800 133
Common Budget Terms
Assessment Growth
The additional taxation revenue the City receives from new homes and businesses that
are built each year. This revenue is used to cover the cost of providing services to the
new residents/businesses and for long term financial planning.
Budget Levy
Sometimes referred to as the "Tax Levy", the budget levy is the total of all expenditures
funded by property taxes.
Capital Budget
One time expenditures for major projects (often referred to as "infrastructure") such as
roads, vehicles/equipment, parks, sidewalks, trails, streetlights, storm sewers,
playgrounds and buildings. It includes both the development of new, and the
maintenance/rehabilitation of existing infrastructure.
Current Budget
The expenditures (e.g., wages/benefits, supplies, contracted services, utilities, etc.)
required to deliver the day to day City services. It also includes the revenues that the
City receives (e.g., user fees, interest income, building permit fees, etc.).
Debt
A type of long term loan used as partial financing for major capital projects. The debt,
including interest, is repayable over 5 to 25 years. Debenture debt spreads the project
cost and related tax rate increase over a number of years and ensures that future
taxpayers pay their fair share of capital projects being completed today.
Development Charges
A charge paid by developers to partially pay for the cost of new capital projects required·
as a result of growth (e.g ., new roads, parks, trails, community centres, fire stations,
etc.). Development charges do not cover the entire cost of a capital project, as
·legislation requires municipalities to fund a portion of most projects. In addition, certain
expenditures are exempt from development charges and must be paid entirely by the
municipality.
Reserves/Reserve Funds
Dollars set aside for specific purposes, both current and capital budget items. There
are two main types of reserves/reserve funds:
Common Budget Terms
Statutory/Obligatory-municipalities are required by legislation to establish
certain reserve funds (e.g., Development Charges, Parkland)
Discretionary-can be established by Council for specific purpose (e.g., Vehicle
Replacement, Rate Stabilization)
City of Pickering
2016 Approved Capital Budget
Reconciliation
Draft Capital Budget as submitted to Executive
Committee-Mar 1Oth, 2016
Council Budget Report Changes
Add:
Kingston Rd. c:md Brock Rd. Streetlights and
Sidewalks
Museum Conservation Barn Reconstruction
(Note 1)
Reduce:
Operations Centre Redevelopment
Brock Rd. -Kingston Rd. to Finch Ave. Sidewalks
Revised 2016 Approved Capital Budget
$979,500
900,000
(24,600,000)
(30,000)
$57,873,150
(22,750,500)
$35,122,650
Note 1: The Museum Conservation Barn Reconstruction project is subject to
receiving ~enior government gra~t funding.
1
City of Pickering
Approved 2016 Capital Budget Overview
Five Year Capital Plan
2016
Classification Budget.
Infrastructure Renewal $25,127,350
Growth 9,995,300
Total $ 35,122,650
Financing Summary
2016
Budget
Capital Pa id from Property Taxes $1,043,100
Donations 20,000
Sale of Property 75,000
Federal Grants 300,000 .
Provincial Grants 1,027,740
External Debt 10,160,000
Internal Loan 976,000
Rate Stabilization Reserve 3,385 ,000
Discretionary Reserve & Reserve Funds 4,486,769
RF Third Party Con!ribution 600,000
RF Parkland 110,000
Federal Gas Tax Reserve Fund 6,575,000
Development Charges -Reserve Fund 5,072 ,781
Road ·& s·ridges -Reserve Fund 801,260
Other Revenue -York Region Project 490,000
$35,122,650
2
Five Year
Total
$114,371,000
55,337,980
$ 169,708,980
Five Year
Total
$6,222,100
355,000
75,000
450,000
1,407,740
41 ,450,593
13,112,750
3,430,000
36,502,217
1,400,000
890,040
17,970,000
40,957,280
4,996,260
490,000 .
$169,708,980
City· of Pickering
Approved 2016 Capital Budget Overview·
Infrastructure Renewal
Five Year Capital Plan
2016
Infrastructure Renewal by Program Budget
Mayor
Council $7,500
Finance & Taxation $75,000
Information Technology 292,450
Animal Services
Culture & Rec. Admin. 40,000
·Civic Complex 1,550,000
Senior Citizen Centre 100,000
Dunbarton Pool 900,000
Don Beer Arena 722,000
Community Centres 18,000
Recreati on Complex -Core 418,000
Recreation Complex -Pool
Recreation Complex -Arena . 2,336,300
Museum 1,176,000
Streetlights & Signalization 5,725,000
Sidewalks 400,000
Stormwater Management 40,000
Property Maintenance "290,000
Operations Centre 1,407,000
Roads 7,205,000
Parks 761 ,100
Fleet Vehicles 876,000
Fi.re Services 180,000
Library 608,000
$25,127,350
3
2016-2020
$10,000
67,5 00
3,075,000
2,7 01 ,6 00
45,000
40,000
4,040,000
755,000
958,000
1,962,000
805,000
5,283,500
226,000
3,985,300
1 ,441 ,000
5,925,000
500,000
3,040,000
. 2,660,000
26,5 07,000
30,445,000
7,857,100
7,370,000
1,310,000
3,362,000
$114,371,000
$37,500,000
$32,500,000
$27,500,000
$22,500,000
$17,500,000
$12,500,000
$7,500,000
~r;:,ro '};
I
City of Pickering
Capital Budget Summary
2006 to 2016
Accelerated Infrastructure Program
~
Frenchman's Bay
Harbour Entrance ~
LED Streetlights
Tree. Canopy
Re lacement
4
City of Pickering
2016 Capital Budget by Financing Source
($35.12 Mill ion )
FGT
19%
DC Funded
14%
Reserves &
Reserve Funds
17%
Taxes
3%
York Region
5
Gov. Grants
4%
Rate
Stabilization
Reserve .
10%
Debt
32%
City of Pickering
Annual Debt Charges for Debt Financed 2016 Capita l Projects
Project# Description Annual 2016
Charges BUDGET
Internal Loan -5 Year
5323.1605 Reconstruction of Waterfront Trail $33,000 $150,000
5744.1601 Conservation Barn Health & Safety Upgrades . 19,000 86,000
5780.1614 Kinsmen Park Maintenance Road 22,000 100,000
5780.1616 Greenwood Baseball Fencing -Replacement 29,000 130,000
5800.1603 Petticoat Creek Library Reading Garden Enclosure 27,000 125,000
Total Cost of Internal Loan-5 Year $130,000 $591,000
Internal Loan -10 Year
5320.1617 Westshore Neighborhood -Breezy Drive -Road Reconstruction $10,000 $85,000
5320.1633 B-29 Sandy Beach Road -EA, Design & Approvals 36,000 300,000
Total Cost of Internal Loan -10 Year $46,000 $385,000
5 Year Debt
5320.1603 Loader Replacement $44,000 $200,000
Total Cost of 5 Year Debt $44,000 $200,000
10 Year Debt
5320.1630 RU-13 Salem Road-Road Reconstruction $132,000 $1,100,000
5320.1631 Sixth Concession Road -Rd Reconstruction & Storm Sewer Repla 186,000 1,550,000
5320.1632 Westney Road -Road Reconstruction 186,000 1,550,000
5321.1605 B-32 a,b,c Krosno Creek Culvert Replacements Construction 118,000 980,000
5325.1601 Kingston Rd -Whites Rd Section -New Streetlights & Poles 24,000 200,000
5713.1601 Dunbarton Pool Deck Repairs/ Reconstruction 108,000 900,000
5715.1606 Don Beer Arena West Roof Replacement 58,000 480,000
5744.1602 Conservation Barn Reconstruction 36,000 300,000
Total Cost of 10 Year Debt $848,000 $7,060,000
15 Year Debt
5735.1604 Delaney Arena Improvements $199,000 $2,250,000
. Total Cost of 15 Year Debt $199,000 $2,250,000
20 Year Debt
5320.1604 Michell Bridge Rehabilitation $58,000 $650,000
Total Cost of 20 Year Debt $58,000 $650,000
~ Grand Total -$1 ,32s,ooo I $11 '136,000
6
Project Description
2016
City of Pickering
Acce~sibility Capital Projects Forecast
2016 to 2020
City Hall Accessibility Upgrades -Design and Construction
Rec. Complex Delaney Arena Improvements -Washroom/Changeroom Accessibility
Upgrades (gross project cost = $2,250,000)
Asphalt Sidewalks -Altona Road
Reconstruction of Waterfront Trail -Brock Road to Sandy Beach Road
Temporary Asphalt Sidewalks -Finch Avenue
Walkway Reconstruction -Finch Avenue to Lydia Crescent
Walkway Reconstruction-Longbow Drive to Rowntree Crescent
Amberlea Park Asphalt Pathways Reconstruction
Brock Road -Kingston Road to Finch Avenue Multi-Use Path
2017
Seaton Trail Heads and Primary Trail Network
Asphalt Sidewalks -Finch Avenue
Fire Station #2 -Washroom Accessibility Upgrades (Design and Construction)
2018
Kingston Road ~ South Side Street lighting and Sidewalks
Kingston Road -North Side Street lighting and Sidewalks
New Sidewalk Installations (Locations to be Determined)
Rotary Frenchmans Bay West -Washroom/Changeroom (gross project cost
Rec. Complex Renovation of Main Reception, Public Concourse and West
Entrance (gross project cost= $1,150,000)
Accessibility Pathways to Sportsfields
2019
Rec. Complex Arena Dressing Room Renovation (gross project cost= $2, 190,000)
New Sidewalk Installations (Locations to be Determined)
Walkway Reconstruction -Between Elvira Court and Bruce Hanscombe Park
Trail from Creekside Park to Storm Water Management Pond
Accessibility to Sports Fields (Pathways Construction)
Civic Complex Elevator Replacement (gross project cost= $11 0,000)
2020
Rec. Complex Arena -0' Brien Meeting Rooms Renovation (gross project
cost =$625,000)
New Sidewalk Installations (Locations to be Determined)
Accessibility to Sports Fields (Pathways Construction)
Cost
$1,300,000
360,000
180,000
150,000
150,000
90,000
50,000
35,000
30,000
$2,345,000
$717,000
100,000
100,000
$917,000
$394,900
323,100
200,000
187,500
150,000
150,000
$1,405,500
$500,000
200,000
200,000
175,000
100,000
55,000
$1,230,000
$312,500
200,000
150,000
$662,500
Total $6,560,000
7
City of Pickering
2016
Approved Capital Budget
2016 Accelerated Infrastructure Program (AlP) Project Listing
Project Description Gross Cost
1. Salem Road Reconstruction (DC project) $2,200,000
2. Sixth Concession Road Reconstruction and Storm
Sewer Replacement 1,550,000
3. Westney Road Reconstruction -Concession 7th to
Concession 8th 1,550,000
4. Sandy Beach Road EA, Design and Approvals (DC
project) 600,000
Total $5,900,000
City Cost
$1 '1 00,000
1,550,000
1,550,000
300,000
$4,500,000
It is anticipated that the Federal and/or Provincial Government will announce an
infrastructure grant program. The City intends to apply for grant funding for these projects
listed above. If the City is successful, the dollar savings would then be applied to the
projects listed below .
. The above AlP capital projects have now been allocated to their respective true cost
centres (5320 and 5321 ).
2016 Accelerated Infrastructure Program (AlP) Project Listing -Contingent on Senior
Government Grant Funding
Project Description
1. Kinsale Road Hard Surfacing
2. Sandy Beach Road Reconstruction and Storm Sewer
Installation
3. Sideline 14 Resurfacing
4. Westney Road Reconstruction -Concession 8th to
Concession 9th
Total
8
Gross Cost
$950,000 .
6,500,000
1,350,000
1,500,000
$10,300,000
City of Pickering Provincial Funding Grants
Provincial Transportation Initiatives (Til Grant 5999.0897.1623
Grant received in summer of 2007 to be used for transportation initiatives
Amount
Amount Received
Funds used in 2008
Year-end Dec 31, 2008
Projects completed I Funds Returned-2009
Year-end Dec 31, 2009
Funds used in 2010
Projects completed I Funds Returned-2010
Year-end Dec 31, 2010
Projects completed I Funds Returned-2011
Year-end Dec 31, 2011
Funds used in 2012
Projects completed I Funds Returned-2012
Year-end Dec 31, 2012
Funds used in 2013
Year-end Dec 31,2013
Funds used in 2014
Year-end Dec 31, 2014
Projects completed I Funds Returned-2015
Year-end Dec 31, 2015
Budgeted 2016
Projected Dec. 31, 2016
Availablei(Draws)
$1,066,500
(855,000)
211,500
215,000
426,500
(247,671)
58,259
237,088
105,177
342,265
(140,000)
29,386
231,651
(70,000)
161,651
0
161,651
124,252
285,903
(250,000)
$35,903
Municipal Rd & Infrastructure Grant (Provincial Budget) 5999.0898.1623
Grant received in April 2008 to be used for road and bridges
Amount Received
Funds used in 2008 budget
Additional Funding OES19-08 5320.0812
Projects completed I Funds Returned-201 0 & Prior
Funds used in 2010 budget
Projects completed I Funds Returned-2011
Year-end Dec 31, 2011
Funds used in 2012 budget
Year-end Dec 31,2012
Funds used in 2013 -2015
Projects completed I Funds Returned-2015
Year-end Dec 31, 2015
Budgeted 2016
Projected Dec. 31, 2016
$1,055,505
(885,000)
(100,000)
248,295
0
21,479
340,279
(235,000)
105,279
0
75,725
181,004
(150,000)
$31,004
Updated Apr. 6.
2016
City of Pickering Provincial Funding Grants
Invest in Ontario Act CIOAl 5999.0899.1623
Funds received as a result of Provincial budget surplus
City received funds in September 2008
Amount Received
Prior to 2009 Capital Budget
Dunbarton Pool-OES 37-08
Balance Dec. 31, 2008
2009 Approved Budget
Projects completed I Funds Returned
Balance Dec. 31, 2009
Funds used in 2010 Budget
Projects completed I Funds Returned-201 0
Additional Funds requested in 2010
Balance Dec. 31, 2010
Funds used in 2011 Budget
Projects completed I Funds Returned-2011
Report CS18-11 + over-exp
Balance Dec. 31, 2011
Funds used in 2012
Projects completed I Funds Returned-2012
Balance Dec. 31, 2012
Projects completed, funds returned
Funds used in 2013
Balance Dec. 31, 2013
Funds used in 2014
Projects completed I Funds Returned-2014
Balance Dec. 31, 2014
Funds used in 2015
Projects completed I Funds Returned-2015
Balance Dec. 31,2015
Budgeted 2016
Projected Dec. 31, 2016
iTotal Provincial Grants, Projected Dec. 31, 2016
$3,912,526
(350,000)
3,562,526
(2, 793,275)
906,501
1,675,752
(555,000)
446
(315,053)
806,145
(363,000)
237,531
(22,717)
657,959
(242,255)
244,284
659,988
38,746
(223,188)
475,546
(365,000)
13,824
124,370
(40,000)
80,201
164,571
(159,000)
$5,571
Updated Apr. 6,
2016
$72,47a ·
City of Pickering Updated April6, 2016
Federal Gas Tax Reserve Funds 7505
Opening Balance, Jan. 1 ,2011 $ 3,526,410
Amount Received -2011 2,694,431
Interest Income 70,450
Sub Total 6,291,291
Funds used in 2011 (1,314,194)
Year-end Balance Dec. 31, 2011 (GL) 4,977,097
Amount Received-2012 2,694,431
Interest Income 109,942
Funds used in 2012 (1 '764, 133)
Year-end Balance Dec. 31,2012 (GL) 6,017,336
Amount Received-2013 2,694,431
Interest I nco me 118,880
Funds used in 2013 (2,605,088)
Year-end Balance Dec. 31,2013 (GL) 6,225,559
Amount Received-2014 2,640,939
Interest Income 107,581
Funds used in 2014 (2,290,823)
Year-end Balance Dec. 31, 2014 (GL) 6,683,256
Amount Received -2015 2,568,953
Interest Income 81,058
Funds used in 2015 (1 ,333,636)
Year-end Balance Dec. 31, 2015 (GL) 7,999,731
Amount Receivable-2016 2,568,953
Interest Income -Estimated 85,000
Budget Commitments 2015 & Prior (1 ,451 ,800)
Budget 2016 -Capital (6,575,000)
Budget 2016 -Current (506,700)
Projected (Deficit) Dec 31, 2016 $ 2,120,184
Expenditures
City of Pickering
2016
Capital Budget
2015
Budget
2015
YTD
·Actuals
2016
Balance
Remaining
·-··-----~---·-····--. ...... ~.~--.. --.. ·---" ..... _ .. , .. '" ................... ~-~------........ _ ......... --······i ,.~1~-~--'?~~~~~x_e~ ~~~~~ _ ···-·" _____ .............. _____ i $10,000, $Oi $10,000
• -r, --------~---------,,--------~
__ ... _____ -~---··-"· --~-.. _. ··------· .... -~-~~~~-~~~~~~~tu.:_e_s_r! ____ $_1_o_.o_o_0+-1 ________ $_o_;_· ___ $_1_o_,o_o-to
Financing
2823 Capital Paid from Property Taxes
As per Council Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, sofware and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $10,000 is remaining to be spent this year.
9
City of Pickering
2016
Capital Budget
K. Ashe, Reg. Coun. Ward 1
Expenditures
6181 Other Fixed Assets
2015
Approved
Budget
.. I
.. !
$10,0001
2015
YTD
Actuals
$0
As per Council Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, software and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $10,000 is remaining to be spent this year ..
10
2016
Balance
Remaining
$10,000
$10,000
City of Pickering
2016
Capital Budget
B. Mclean, Reg. Coun. Ward 2
ExpenditLJres 1·-"·-----·------.-· .. -··---· ____ .__,, ... ,_, ________ ,_~---" ------------··---._ .. ,.,.,_,.,.............. "
6181 Other Fixed Assets
2015
Approved
Budget
2015
YTD
Actuals
----i· - -" ---------
$10,000 $770
As per Council Compensation Policy, (Subsection 12.01) $1 0;000 is provided for
computer hardware, software and telecommunication equipme-nt per term. As per
the policy these funds can only be spent during the first three years of office ..
Approximately, $9,230 is remaining to be spent this year.
11
2016
Balance
Remaining
$9,230
$9,230
City of Pickering
2016
Capital Budget
2015 2015 2016
Approved YTD Balance
Budget Actuals Remaining
$10,000 $630 $9,370
$10,oool $6301 $9,370
[_
2823 Capital Paid from Property Taxes
"'~--·-·------~-----~~---------------r--------~
Total Financing
($10,000) --1 ($10,000)
---1
As per Council Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, software and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $9,370 is remaining to be spent this year.
1 2
.. ,_--·m ~-
. -,. ""' ., ... ,., -~----,-, -·· -
City of Pickering
2016
Capital Budget
-· ' 2015 I 2015
I
Approved YTD
M. Brenner, City Coun~ Ward 1 Budget Actuals
Expenditures
61.81 Other Fixed Assets $0
$01
I
Financing
2823 Capital Paid from Property Taxes -I
I
Councillor Brenner took his Oath of office on February 1, 2016. His computer
hardware and telecommunications Capital Budget is allocated over the remaining
years of his term.
13
2016
Budget ·
$7,500
$7,500
($7,500)
($7,500)
City of Pickering
2016
Capital Budget
2015
Approved
Budget
Expenditures i --~-----------~---"·--------·-------------··-····--------------· ·----··---------~-~------------------------: ----".
2015
YTD
Actuals
2016
Balance
Remaining
---~~-~~-5?~~=~-~~-:~--~~:_et~---~---~--------------"---~-"--J $10,000 $5,925 $4,075
. Total Expenditures! $10,000\ $5,9251 $4,075
Fin_a_n~_i~_g -_--_-_---=~----~---------------_··· _ -----=----=-----------=----------=-~-___________ -1-____ _ -----1--__ _ __ _______ _
--~~-~--~~~-~ P_a_id_from_~r_o_pe_~X_Ta_x~~tal Fi~cingi :::~:~~~:~ :_ ~=:lt~~-~-----~~---~~~---. --------------------I I
As per Council. Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, software and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $9,440 is remaining to be spent this year.
City of Pickering
2016
Capital Budget
Expenditures
6181 Other Fixed Assets
2015
Approved
Budget
2015
YTD
2016
Balance
Actuals Remaining
..
$10,000 $4,774 $5,226
Total Expenditures $10,0001 $4,774j $5,226 -~---~--~~•·•~~·••-•-••--·••••••-•w••·•· , .... -···-••••·••-••~•·•••"''"'"'""""-"'''-"'''"'" '"""''··' ••t-----+------+------1
Financing ---------~· .. ·--·· ... j
2823 Capital Paid from Property Taxes ($10,000) I
------···--__ ---------------·····-··-------············-----------··-----~---T ___ o __ t.a __ I __ F __ i n_._a .. ____ n .. _ci ___ n .... g __ ,l-__ ($_1_0 ,_o_oo----!\ , _ I
As per Council Compensation Policy, (Subsection 12.01) $10,000 is provided for
computer hardware, software and telecommunication equipment per term. As per
the policy these funds can only be spent during the first three years of office.
Approximately, $9,032 is remaining to be spent this year.
15
City of Pickering
2016
Approved Capital Budget
04 Corporate Services Dept. Summary
Expenditures
6157 Vehicles-under $100,000
6174 System & Software Upgrade
6175 Hardware Replacements
6177 IT Infrastructure
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6265 Land Acquisition & Disp
Total Expenditures
Financing
1594 Sale of Land
2823 Paid From Property Taxes
7001 R -Capital Equipment Replacement
7021 R -Rate Stabilization
7040 R-Vehicle Replacement
7506 RF -Building Permit Stabilization
Total Financing
16
Run Date: Apr 5, 2016
2015 2016
Budget Budget
30,000
215,000
24,000 138,000-
193,375 154,450
9,000
5,000
75,000
476,375 367,450
(75,000)
(14,000)
(217,375) (292,450)
(120,000)
(30,000)
(95,000)
(476,375) (367,450)
5203 Finance and Taxation
Expenditures
6265 Land Acquisition & Disp
Total Expenditures
Financing
1594 Sale of Land
Total Financing
City of Pickering
2016
Approved Capital Budget
17
Run Date: Apr 5, 2016
2015 2016
Budget Budget
75,000
75,000
(75,000)
(75,000)
5203 Finance and Taxation
City of Pickering
2016
Approved Capital Budget
5203.1601 Sale & Disposition of Lands
1594 Sale of Land
6265 Land Acquisition & Disp
Funding required for appraisal and marketing costs associated with
1975 Clements Road and 2510 Brock Road. Additional dollars are
also required to fund land purchase costs.
Total 5203.1601 Sale & Disposition of Lands
Total 5203 Finance and Taxation
18
Run Date: Apr 5, 2016
Funding Expense
(75,000)
75,000
(75,000) 75,000
(75,000) 75,000
5206 Information Technology
Expenditures
617 4 System & Software Upgrade
6175 Hardware Replacements
6177 IT Infrastructure
Total Expenditures
Financing
7001 R -Capital Equipment Replacement
7021 R -Rate Stabilization
7506 RF -Building Permit Stabilization
Total Financing
City of Pickering
2016
Approved Capital Budget
1 9
Run Date: Apr 5, 2016
2015 2016
Budget Budget
215,000
24,000 138,000
193,375 154,450
432,375 292,450
(217,375) (292,450)
(120,000)
(95,000)
(432,375) (292,450)
City of Pickering
2016 Approved Capital Budget
Projects Listing
5206 Information Technology
5206.1601 Servers & Related Software
5206.1602 SAN Controller Upgrade
Project Name
5206.1603 Eng. & Public Works Plotter I Scanner I Copier
5206.1604 AudioNisual -Meeting Room Upgrades
5206.1605 Wi-Fi for Facilities and Public Spaces
5206.1606 Replacement PCs
5206.1608 Disaster Recovery -I nterneVSystems/Security
5206.1610 Amanda Upgrade
Total
20
Run Date: Apr 12, 2016
2016
Project
Budget
59,000
32,000
30,000
17,000
22,700
38,750
28,500
64,500
292,450
City of Pickering
2016
Approved Capital Budget
5206 Information Technology
5206.1601 Servers & Related Software
6175 Hardware Replacements
Server Hardware. Additional processing power and capacity are
required to manage new applications, storage requirements and
growth within the City of Pickering.
7001 R -Capital Equipment Replacement
Total 5206.1601 Servers & Related Software
5206.1602 SAN Controller Upgrade
6175 Hardware Replacements
SAN Disk Drives and Licensing. Data within the City of Pickering is
growing at over 3TB per year. During 2016 the City will need to
upgrade its data storage capacity which includes an increase in
licensing costs. IT staff will investigate technologies such as Cloud
Storage and Deduplication which may reduce City storage needs.
7001 R -Capital Equipment Replacement
Total 5206.1602 SAN Controller Upgrade
5206.1603 Eng. & Public Works Plotter I Scanner I Copier
6175 Hardware Replacements
One Plotter for Eng. & Public Works and one Large Format
Scanner/Copier for Operations Center. ·
7001 R -Capital Equipment Replacement
Total 5206.1603 Eng. & Public Works Plotter I Scanner I Copier
5206.1604 AudioNisual -Meeting Room Upgrades
6175 Hardware Replacements
7 Ceiling Mounted Wi-Fi capable projectors for meeting rooms in
the Civic Complex. This includes mounting and associated cabling
for power and HDMI connectivity. There will be an associated cost
savings for staff who set up for meetings as well as reduced time
wastage during meetings.
7001 R -Capital Equipment Replacement
Total 5206.1604 AudioNisual -Meeting Room Upgrades
5206.1605 Wi-Fi for Facilities and Public Spaces
6177 IT Infrastructure
Deployment of Wi-Fi access points for all City facilities, residents
and business people in Pickering. We will also be providing, if
feasible, Wi-Fi access for Esplanade Park, Kinsmen Park and
Millennium Square. '
21
Run Date: Apr 5, 2016
Funding Expense
59,000
(59,000)
(59,000) 59,000
32,000
(32,000)
(32,000) 32,000
30,000
(30,000)
(30,000) 30,000
17,000
(1.7,000)
(17,000) 17,000
22,700
City of Pickering
2016
Approved Capital Budget
5206 Information Technology
7001 R -Capital Equipment Replacement
Total 5206.1605 Wi-Fi for Facilities and Public Spaces
5206.1606 Replacement PCs
6177 IT Infrastructure
Many PC's used by City staff are between 7 and 10 years old. The
rate offailure is increasing which results in a loss of. productivity. IT
staff will replace the oldest PC's that have the highest risk of failure
and develop a 6 year replacement plan. The City will be replacing
50, 10 year old computers over the next 4 years.
7001 R -Capital Equipment Replacement
Total 5206.1606 Replacement PCs
5206.1608 Disaster Recovery -Internet/Systems/Security
6177 IT Infrastructure
Disaster Recovery Planning. Recommended provisioning for
Internet connection and hardware needed to maintain business
operations in a disaster situation. Required in 2016 are a resilient
Internet connection at our Disaster Recovery Site and a secure
firewall.
7001 R -Capital Equipment Replacement
Total 5206.1608 Disaster Recovery -Internet/Systems/Security
5206.1610 Amanda Upgrade
6177 IT Infrastructure
New modules for Amanda including Electronic Document
Management System (EDMS) and Deficiency Modules. Consulting
services required for the implementation of new modules.
7001 R -Capital Equipment Replacement
Total 5206.161 0 Amanda Upgrade
Total 5206 Information Technology
22
Run Date: Apr 5, 2016
Funding Expense
(22,700)
(22,700) 22,700
38,750
(38,750)
(38,750) 38,750
28,500
(28,500)
(28,500) 28,500
64,500
(64,500)
(64,500) 64,500
(292,450) 292,450
City of Pickering
2016
Approved Capital Budget
05 Culture & Recreation Dept. Summary
Expenditures
6149 Restoration -Museum Bldg
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
c
1623 Prov Grant
1702 Debt-10 Year
1703 Debt-15 Year
1711 Internal Loan-5 Year
1712 Internal Loan-10Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7032 R -Dunbarton Pool Surcharge
7033 R -Don Beer Arena Surcharge
7034 R -R/Cmplex Core Surcharge
7036 R -R/Cmplx Arena Surcharge
7505 RF-Federal Gas Tax
Total Financing
23
Run Date: Apr 5, 2016
2015 2016
Budget Budget
40,000 60,000
25,000 70,000
1,002,500 283,800
608,000 2,875,500
40,000 1,660,000
200,000 90,000
685,000 2,221,000
2,600,500 7,260,300
(15,000)
(300,000)
(390,000)
(1 ,680,000)
(2,250,000)
(355,000) (86,000)
(300,000)
(193,500) (163,500)
(806,000) (1 ,605,000)
(10,000)
(1 00,1 00)
(68,000)
(40,000) (32,700)
(881 ,000) (585,000)
(2,600,500) (7 ,260,300)
5711 Culture & Rec Admin.
Expenditures
6173 Furniture & Fixtures
Total Expenditures
Financing
7021 R-Rate Stabilization
Total Financing
City of Pickering
2016
Approved Capital Budget
24
Run Date: Apr 5, 2016
2015 2016
Budget Budget
40,000
40,000
(40,000)
(40,000)
5711 Culture & Rec Admin.
City of Pickering
2016
Approved Capital Budget
5711.1601 Bentley House Relocation -New works stations, etc.
6173 Furniture & Fixtures
Furniture and equipment moving costs from Bentley House to new
office location at 1101 Kingston Rd and new workstations, security
cameras, DVD recording unit and other related costs.
7021 R-Rate Stabilization
Total 5711.1601 Bentley House Relocation -N~w works stations, e
Total 5711 Culture & Rec Admin.
25
Run Date: Apr 5, 2016
Funding Expense
40,000
(40,000)
(40,000) 40,000
(40,000) 40,000
5700 Civic Complex
Expenditures
6173 Furniture & Fixtures
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
Total Expenditures
Fin,ancing
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2016
Approved Capital Budget
26
Run Date: Apr 5, 2016
2015 2016
Budget Budget
25,000 30,000
16,000 120,000
1,300,000
230,000 100,000
271,000 1,550,000
(41,000)
(230,000) (1 ,430,000)
(120,000)
(271,000) (1 ,550,000)
5700 Civic Complex
5700.1601 Axial Fan Replacement
6181 Other Fixed Assets
City of Pickering
2016
Approved Capital Budget
Life cycle replacement of the supply and return fan (SF1 + RF1)
serving the main lobby area on both floors of the Civic Complex.
The existing unit is original (25 years old) and requires frequent
maintenance. Failure of this equipment could require the temporary
closure of the Civic Complex.
7505 RF-Federal Gas Tax
Total 5700.1601 Axial Fan Replacement
5700.1602 City Hall Accessibility Upgrades -Design & Constructior
6183 Accessibility
Design and construction of City Hall main floor renovations to make
the service counters,public washrooms and council chambers
accessible.
7021 R-Rate Stabilization
.Total 5700.1602 City Hall Accessibility Upgrades-Design & Canst
5700.1603 Brick Cladding Repairs
6250 Construction Costs
Removal of the existing crest on the west face of the tower revealed
wall construction not as shown on the original building drawings,
requiring additional removals and the installation of new backup
wall supports and insulation. This same condition could repeat on
the east face of the tower, and cannot be verified until the crest is
removed. (Additional funds for project 5700.1503). Pre-budget
approval received per Report CR 02-16.
7021 R-Rate Stabilization
Total 5700.1603 Brick Cladding Repairs
5700.1604 Workstations, Partitions, Tables, Shelving
6173 Furniture & Fixtures
Original furniture is at least 25 years old and starting to deteriorate.
Spare parts are no longer available as furniture manufacturer is no
longer in business.
7021 R-Rate Stabilization
Total 5700.1604 Workstations, Partitions, Tables, Shelving
Total 5700 Civic Complex
27
Run Date: Apr 5, 2016
Funding Expense
120,000
(120,000)
(120,000) 120,000
1,300,000
(1 ,300,000)
(1 ,300,000) 1,300,000
100,000
(100,000)
(100,000) 100,000
30,000
(30,000)
(30,000) 30,000
(1 ,550,000) .1,550,000
5701 Senior Citizens Centre
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2016
Approved Capital Budget
-
28
Run Date: Apr 5, 2016
2015 2016
Budget Budget
100,000
100,000
(100,000)
(100,000)
City of Pickering
2016
Approved Capital Budget
5701 Senior Citizens Centre
5701.1601 Boiler & Controls Replacement
6181 Other Fixed Assets
Boiler & Controls (Replacement) in 2nd floor mechanical room.
Boiler #2 is at the end of its life cycle and in poor condition. Its
replacement will include required upgrades to related control
systems to tie in with City-wide automation controls.
7505 RF-Federal Gas Tax
Total 5701.1601 Boiler & Controls Replacement
Total 5701 Senior Citizens Centre
29
Run Date: Apr 5, 2016
Funding Expense
100,000
(100,000)
(100,000) 100,000
(100,000) 100,000
5713 Dunbarton Pool
Expenditures
6178 Miscellaneous Equipment
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1712 Internal Loan-10 Year
7032 R -Dunbarton Pool Surcharge
Total Financing.
City of Pickering
2016
Approved Capital Budget
Run Date: Apr 6, 2016
2015 2016
Budget Budget
10,000
300,000 900,000
310,000 900,000
(900,000)
(300,000)
(10,000)
(310,000) (900,000)
Renovations to the building envelope and mechanical systems have been
completed over the past 10 years. No major works anticipated after 2016
unless identified in the facility condition assessment scheduled to be
completedin 2016.
30
5713 Dunbarton Pool
City of Pickering
2016
Approved Capital Budget
5713.1601 Dunbarton Pool Deck Repairs/ Reconstruction
1702 Debt-10 Year
6250 Construction Costs
Repairs to underside of the concrete pool deck required to address
structural deterioration. Includes replacing the entire pool deck tiling
and adding waterproofing membrane to reduce future deterioration.
Total 5713.1601 Dunbarton Pool Deck Repairs/ Reconstruction
Total 5713 Dunbarton Pool
31
Run Date: Apr 5, 2016
Funding Expense
(900,000)
900,000
(900,000) 900,000
(900,000) 900,000
5715 Don Beer Arena
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing·
1702 Debt-10 Year
2823 Paid From Property Taxes
7033 R -Don Beer Arena Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2016
Approved Capital Budget
32
Run Date: Apr 5, 2016
2015 2016
Budget Budget
365,000 107,000
530,000
85,000
365,000 722,000
(480,000)
(15,000)
(92,000)
(365,000) (135,000)
(365,000) (722,000)
City of Pickering
2016
Approved Capital Budget
5715 Don Beer Arena
5715.1601 Rubber Floor Replacement
6250 Construction Costs
Remove existing rubber floor, complete floor repairs and install full
replacement of skate tile rubber flooring in Rink 2 & 3
7033 R -Don Beer Arena Surcharge
Total 5715.1601 Rubber Floor Replacement
5715.1603 Ammonia Compressor Replacement
6181 Other Fixed Assets
Life cycle replacement of one ammonia compressor in the
refrigeration plant for rink slabs in i\renas #1 and #2. Compressors
are replaced at staggered intervals to spread out replacement costs
and regulate maintenance costs. They also undergo regular
refurbishment to maximize their potential life.
7505 RF-Federal Gas Tax
Total 5715.1603 Ammonia Compressor Replacement
5715.1605 Rooftop Unit Replacement (RTU-3)
6178 Miscellaneous Equipment
Lifecycle replacement of one rooftop unit (RTU-3) serving lobby
area
7505 RF-Federal Gas Tax
Total 5715.1605 Rooftop Unit Replacement (RTU-3)
5715.1606 Don Beer Arena West Roof Replacement
1702 Debt-10 Year
6181 Other Fixed Assets
Replace existing roof over Rink 2 at end of life.
Total 5715.1606 Don Beer Arena West Roof Replacement
5715.1607 Video Surveillance Camera Replacement
6178 Miscellaneous Equipment
Replacement of current analog camera to be compatible with digital
technology which provides a better picture quality. Analog
surveillance equipment at existing City facilities is being gradually
replaced in priority order with digital technology for insurance and
security purposes.
7033 R -Don Beer Arena Surcharge
Total 5715.1607 Video Surveillance Camera Replacement
5715.1608 Snack Bar Fryer Replacement
2823 Paid From Property Taxes
33
Run Date: Apr 5, 2016
Funding Expense
'85,000
(85,000)
(85,000) 85,000
50,000
(50,000)
(50,000) 50,000
85,000
(85,000)
(85,000) 85,000
(480,000)
480,000
(480,000) 480,000
7,000
(7,000)
(7,000) 7,000
(15,000)
5715 Don Beer Arena
6178 Miscellaneous Equipment
City of Pickering
2016
Approved Capital Budget
Lifecycle replacement of existing Snack Bar Fryer to maintain
Health & Food Safety standards
Total 5715.1608 Snack Bar Fryer Replacement
Total5715 Don Beer Arena
34
Run Date: Apr 5, 2016
Funding Expense
1'5,000
(15,000) 15,000
(722,000) 722,000
5719 Community Centres
Expenditures
6178 Miscellaneous Equipment
6183 Accessibility
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
2016
Approved Capital Budget
35
Run Date: Apr 5, 2016
2015 2016
Budget Budget
18,000
40,000
40,000 18,000
(40,000) (18,000)
(40,000) (18,000)
5719 Community Centres
City of Pickering
2016
Approved Capital Budget
5719.1601 Floor Machine Replacement -ESCC
2823 Paid From Property Taxes
6178 MisceUaneous Equipment
Life cycle replacement of one floor scrubber for ESCC. This
machine allows staff to clean large floor surfaces quickly and
efficiently, and are invaluable for urgent cleanup.
Total 5719.1601 Floor Machine Replacement-ESCC
5719.1604 PCCC -New Ice Maker in Kitchen
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
New Ice Maker to be installed in the kitchen of the Petticoat Creek
Community Centre. This ice maker will be a self-contained unit
compliant to the Regional Health Department's hygiene regulations
for food services and preparation.
Total 5719.1604 PCCC-New Ice Maker in Kitchen
Total5719 Community Centres
36
Run Date: Apr 5, 2016
Funding Expense
(1 0,000)
10,000
(1 0,000) 10,000
(8,000)
8,000
(8,000) 8,000
(18,000) 18,000
5731 Rec.Complex-Core
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7034 R -R/Cmplex Core Sur.charge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2016
Approved Capital Budget
37
Run Date: Apr 5, 2016
2015 2016
Budget Budget
67,500 118,000
426,000 150,000
155,000 150,000
648,500 418,000
(155,000)
(67,500)
(56,000) (120,000)
(68,000)
(370,000) (230,000)
(648,500) (418,000)
City of Pickering
2016
Approved Capital Budget
5731 Rec.Complex-Core
5731.1601 Banquet Hall Kitchen Renovations
6250 Construction Costs
Renovations to east and west side kitchens, including replacement
of kitchen floors and shutters.
7021 R-Rate Stabilization
Total 5731.1601 Banquet Hall Kitchen Renovations
5731.1602 Skylight Replacement
6250 Construction Costs
Lifecycle replacements for the over 40 skylights located over the
main lobby and mezzanine spaces in the Rec. Complex, several of
which have begun to leak over recent years. These skylights are
over 30 years old, well beyond their expected life, and are located
over sensitive public and program areas, such as the pool viewing
gallery and fitness area.
7505 RF-Federal Gas Tax
Total 5731.1602 Skylight Replacement
5731.1603 Health Club Equipment Replacement
6178 Miscellaneous Equipment
Fitness Equipment Replacement: Hack Squat Machine,
CrossAerobics Cardia Machine, Custom Shelving for Studio A
Storage (New), 2 Cybex Arc Trainers
7034 R -R/Cmplex Core Surcharge
Total 5731.1603 Health Club Equipment Replacement
5731.1605 HVAC Replacement (SF-7 & RF-7)
6181 Other Fixed Assets
End of life. replacement for SF-7 & RF-7, serving north corridor,
including controls upgrades
7505 RF-Federal Gas Tax
Total 5731.1605 HVAC Replacement (SF-7 & RF-7)
5731.1607 PA System Upgrades
6178 Miscellaneous Equipment
Upgrade existing Rec. Complex's PA system and control
equipment. Staff use the PA system for public announcements,
paging and emergency communications. This project is for the
replacement of control equipment only, including microphones, etc ..
Existing speakers and other components will be re-used where
feasible.
7021 R-Rate Stabilization
38
Run Date: Apr 5, 2016
Funding Expense
70,000
(70,000)
(70,000) 70,000
80,000
(80,000)
(80,000) 80,000
55,000
(55,000)
(55,000) 55,000
150;000.
(150,000)
(150,000) 150,000
50,000
(50,000)
5731 Rec.Complex-Core
City of Pickering
2016
Approved Capital Budget
Total 5731.1607 PA System Upgrades
5731.1608 Floor Auto Scrubber Replacement
6178 Miscellaneous Equipment
Lifecycle replacement of existing Floor Auto Scrubber. The new
scrubqer will be safer to operate and its hygienic solution and
recovery tanks will reduce mold, bacteria and odour.
7034 R -R/Cmplex Core Surcharge
Total 5731.1608 Floor Auto Scrubber Replacement
Total 5731 Rec.Complex-Core
39
Run Date: Apr 5, 2016
Funding Expense
(50,000) 50,000
13,000
' (13,000)
(13,000) 13,000
(418,000) 418,000
5733 Rec. Complex-Pool
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2016
Approved Capital Budget
40
Run Date: Apr 5, 2016
2015 2016
Budget Budget
50,000
50,000
(50,000)
(50,000)
5735 Rec.Complex-Arenas
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
Total Expenditures
Financing
1703 Debt-15 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7021 R -Rate Stabilization
7033 R -Don Beer Arena Surcharge
7036 R -R/Cmplx Arena Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
2016
Approved Capital Budget
41
Run Date: Apr 5, 2016
2015 2016
Budget Budget
560,000 40,800
96,000 1,935,500
360,000
200,000
856,000 2,336,300
(2,250,000)
(200,000)
(30,500)
(520,000) (15,000)
(8, 1 00)
(40,000) (32,700)
(96,000)
(856,000) (2,336,300)
City of Pickering
2016
Approved Capital Budget
5735 Rec.Complex-Arenas
5735.1601 Isolation Valves Replacement
6178 Miscellaneous Equipment
Life cycle replacement of isolation valves throughout the Arena
portions of the Rec. Complex. These valves enable parts of the
mechanical systems (e.g., water) throughout the facility to be
temporarily shut down for maintenance and repair. Many of these
valves are original to the building and no longer seal properly.
Failure to replace the valves could lead to entire portions of the
facility to be shut down to execute minor repairs.
7036 R -R/Cmplx Arena Surcharge
Total 5735.1601 Isolation Valves Replacement
5735.1602 Carbon Monoxide Detectors Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replace Carbon Monoxide Detectors (lifecycle replacement
throughout arena)
Total 5735.1602 Carbon Monoxide Detectors Replacement
5735.1603 Sand Filter & Water Pump Replacement (Delaney)
6181 Other Fixed Assets
Sand Filter & Water Pump Replacem~nt (Delaney)
7021 R-Rate Stabilization
Total 5735.1603 Sand Filter & Water Pump Replacement (Delaney)
5735.1604 Delaney Arena Improvements
1703 Debt-15 Year
6181 Other Fixed Assets
Delaney Arena replacement of mechanical equipment, dasher
boards, refrigerated rink slab, referee rooms, sound system,
seating, and accessibility upgrades to washrooms and change
rooms
6183 Accessibility
Total 5735.1604 Delaney Arena Improvements
5735;1605 Video Surveillance Camera and Digital Video Recorder R
6178 Miscellaneous Equipment
Lifecycle replacement of Video Surveillance Camera and Recorder.
Current equipment uses redundant technology and requires
frequent repairs.
7036 R -R/Cmplx Arena Surcharge
Total 5735.1605 Video Surveillance Camera and Digital Video Rec•
42
Run Date: Apr 5, 2016
Funding Expense
15,000
(15,000)
(15,000) 15,000
(30,500)
30,500
(30,500) 30,500
15,000
(15,000)
(15,000) 15,000
(2,250,000)
1,890,000
360,000
(2,250,000) 2,250,000
12,000
(12,000)
(12,000) 12,000
City of Pickering
2016
Approved Capital Budget
5735 Rec.Complex-Arenas
5735.1606 Battery Ice Edger Upgrade
6178 Miscellaneous Equipment
Current gas powered Battery Ice Edger can no longer be used
indoors due to health and safety concerns (CO gas emissions).
This specialized equipment is used daily for ice maintenance.
7036 R-R/Cmplx Arena Surcharge
Total 5735.1606 Battery Ice Edger Upgrade
5735.1607 Ice Maker Replacement for O'Brien Room Kitchen
6178 Miscellaneous Equipment
New ice maker will be self-contained unit compliant to the Regional
Health Department's hygiene regulations for food service and
preparation
7033 R -Don Beer Arena Surcharge
Total 5735.16071ce Maker Replacement for O'Brien Room Kitchen
Total5735 Rec.Complex-Arenas
43
Run Date: Apr 5, 2016
Funding Expense
5,700
(5,700)
(5,700) 5,700
8,100.
(8, 1 00)
(8, 1 00) 8,100
(2,336,300) 2,336,300
5744 Museum
Expenditures
6149 Restoration-Museum Bldg
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
1623 Prov Grant
1702 Debt-10 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
Total Financing
City of Pickering
2016
Approved Capital Budg~t
Run Date: Apr 6, 2016
2015 2016
Budget Budget
40,000 60,000
20,000 40,000
90,000
986,000
60,000 1,176,000
(15,000)
(300,000)
(390,000)
(300,000)
(86,000)
(45,000) (100,000)
(60,000) (1 '176,000)
The 2016 budget includes the recon~truction of the Conservation Barn
which is subject to receiving senior government grant funding.
44
5744 Museum
City of Pickering
2016
Approved Capital Budget
5744.1601 Conservation Barn Health & Safety Upgrades
1711 Internal Loan-5 Year
6250 Construction Costs .
Implement health & safety repairs and upgrades to systems, fixtures
and equipment in and around the Conservation Barn.
Total 5744.1601 Conservation Barn Health & Safety Upgrades
5744.1602 Conservation Barn Reconstruction
1610 Federal Grants
1623 Prov Grant
1702 Debt-10 Year
6250 Construction Costs
The project is subject to receiving senior government grant funding
and the approved City debt financed amount can be increased to
50% to match available grant funding. Reconstruction of the
Conservation Barn to include barrier free washrooms and dedicated
eating area for volunteers/staff, installation of well/water
treatment/septic system, and upgrades to security system to
safeguard artifacts. Reconstruction will maintain existing slabs on
grade, electrical and gas service connections, and the existing
Woodwrights workshop.
Total 57 44.1602 Conservation Barn Reconstruction
5744.1603 Conservation Barn Reconstruction (Design Only)
1623 Prov Grant
Invest in Ontario
6230 Prof/Consulting Fees
· Design for the reconstruction of the Conservation Barn to include
barrier free washrooms and dedicated eating area for
volunteers/staff, installation of well/water treatment/septic system
and upgrades to security system to safeguard artifacts.
Reconstruction will maintain existing slabs on grade, electrical and
gas service connections, and the existing Woodwrights workshop.
Total 5744.1603 Conservation Barn Reconstruction (Design Only)
5744.1604 Redman House Septic Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replace aging components of existing septic system and correct
plumbing deficiencies
Total 5744.1604 Redman House Septic Replacement
45
Run Date: Apr 5, 2016
Funding Expense
(86,000)
86,000
(86,000) 86,000
(300,000)
(300,000)
(300,000)
900,000
-
(900,000) 900,000
(90,000)
90,000
(90,000) 90,000
(40,000)
40,000
(40,000) 40,000
5744 Museum
City of Pickering
2016
Approved Capital Budget
5744.1605 Combination Barn Siding, Shingling & Foundation Repai
2823 Paid From Property Taxes
6149 Restoration-Museum Bldg
Lift building and pour new concrete slab on grade. Repair and
replace deteriorated cladding. Repairs to barn framing and
structure.
Total 5744.1605 Combination Barn Siding, Shingling & Foundatior
Total 5744 Museum
46
Run Date: Apr 5, 2016
Funding Expense
(60,000)
60,000
(60,000) 60,000
(1 '176,000) 1,176,000
City of Pickering
2016
Approved Capital Budget
06 Engineering Services Summary
Expenditures
6157 Vehicles -under $100,000
6181 Other Fixed Assets
6183 Accessibility
6221 Preliminary Engineering -Envirnmt Asesmt
6230 Prof/Consulting Fees
6250 Construction Costs
6251 Road Improvements
6252 Streetlights & Sidewalks
6253 Storm Water
6254 Traffic Signals
6265 Land Acquisition & Disp
Total Expenditures
Financing·
1623 Prov Grant
1702 Debt-10 Year
1711 Internal Loan-5 Year
1712 Internal Loan-10Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7022 R -DC's City's Share
7040 R-Vehicle Replacement
7501 RF-Third Party Contribution
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
7611 RF DC -Storm Water Mgmt
9960 Other Rev. York Reg. Project
Total Financing
47
Run Date: Apr 5, 2016
2015 2016
Budget Budget
30,000
760,000 400,000
118,000
600,000
120,000
1,075,000 9,929,500
273,200
45,000
788,478 2,708,100
240,000 700,000
10,000
3,011,478 14,785,800
(40,000) (215,000)
(2,280,000)
(400,000) (150,000)
(140,000) (300,000)
(158,000)
(90,000) (1 ,500,000)
(586,796) (1 ;584,856)
(30,000)
(562,500) (200,000)
(4,250,000)
(430,000) (3, 114,380)
(214, 182) (1 '191 ,564)
(360,000)
(3,011 ,478) (14, 785,800)
City of Pickering
2016
Approved Capital Budget
5335 Engineering Services -Admin
Expenditures
6157 Vehicles-under $100,000
Total Expenditures
Financing
7040 R -Vehicle Replacement
Total Financing
48
Run Date: Apr 5, 2016
2015 2016
Budget Budget
30,000
30,000
(30,000)
(30,000)
City of Pickering
2016
Approved Capital Budget
5325 Streetlights & Signalization
Expenditures
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
6254 Traffic Signals
Total Expenditures
Financing
1623 Prov Grant
1702 Debt-10 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7505 RF-Federal Gas Tax
Total Financing
49
Run Date: Apr 5, 2016
2015 2016
Budget Budget
200,000 200,000
120,000
5,380,000
240,000 25,000
440,000 5,725,000
(25,000)
(200,000)
(400,000)
(40,000)
(1 ,500,000)
(4,000,000)
(440,000) (5, 725,000)
City of Pickering
2016
Approved Capital Budget
5325 Streetlights & Signalization
5325.1601 Kingston Rd -Whites Rd Section -New Streetlights & Pc
1702 Debt-10 Year
6181 Other Fixed Assets
Kingston Road-Whites Road Section (Steeple Hill to Hwy. 401
Ramps) related to Durham· Bus Rapid Transit (BRT) project.
Estimate as per Region of Durham.
Total 5325.1601 Kingston Rd-Whites Rd Section-New Streetligh·
5325.1602 Traffic Signals/Controllers Replacement
1623 Prov Grant
Transportation Initiatives
6254 Traffic Signals
Traffic Signals/Controllers -Glenanna @ Walnut
Total 5325.1602 Traffic Signals/Controllers Replacement
5325.1603 Streetlight Luminaries Replacement -Phase 1
6230 Prof/Consulting Fees
Completion of an audit for the City's entire streetlight infrastructure
that will also provide detailed maps and design specifications for
LED replacements (Phase 2)
7505 RF-Federal Gas Tax
Total 5325.1603 Streetlight Luminaries Replacement-Phase 1
5325.1604 Streetlight Luminaries Replacement-Phase 2
6250 Construction Costs
Replacement of the City's existing streetlights (7, 1 00) with LED
lights. This cost includes: replacement of 300 poles in Bay Ridges
and other poles where required, trenching and wire replacement
costs associated with all poles replacements. LED benefits include:
operational savings, lower wattage, better optical control, reduction
of light pollution, better visibility for pedestrians/motorists and longer
product life expectancy.
7021 R-Rate Stabilization
7505 RF-Federal Gas Tax
Total 5325.1604 Streetlight Luminaries Replacement-Phase 2
Total 5325 Streetlights & Signalization
50
Run Date: Apr 5, 2016
Funding Expense
(200,000)
200,000
(200,000) 200,000
(25,000)
25,000
' (25,000) 25,000
120,000
(120,000)
(120,000) 120,000
5,380,000
(1 ,500,000)
(3,880,000)
(5,380,000) 5,380,000
(5,725,000) 5,725,000
AREAS OF
STREETLIGHTS
& POLES
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5325.1601 Kingston Road I Whites Road (Region BRT Project)
-New Streetlights and Poles
Financing Sources:
1702 Debt-10 Year
Location and Construction:
$200,000
$200,000
Region BRT Project-Kingston Road (Highway ~o. 2) at Whites Road Intersection -
from Steeple Hill, east to Delta Boulevard. The proposed works include installation of
additional streetlights and poles as required. This project will be coordinated with the
Region BRT Project.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5325.1602 Glenanna Road-Traffic Signals I Controllers Replacement $25,000
Financing Sources:
1623 Prov Grant-Transportation Initiatives $25,000
Location and Construction:
Glenanna Road -at the intersection of Glenanna Road and Walnut Lane. The
proposed works include replacement of the traffic controller.
5323 Sidewalks
Expenditures
6183 Accessibility
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan-5 Year
1712 Internal Loan-10Year
2823 Paid From Property Taxes
7022 R-DC's City's Share
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
Total Financing
City of Pickering
2016
Approved Capital Budget
53
Run Date: Apr 5, 2016
2015 2016
Budget Budget
118,000
140,000 580,000
258,000 580,000
(150,000)
(140,000)
(118,000)
(90,000)
(250,000)
(90,000)
{258,000) {580,000)
City of Pickering
2016
Approved Capital Budget
5323 Sidewalks
5323.1601 Asphalt Sidewalks-Finch Avenue
6250 Construction Costs
Asphalt Sidewalk-Finch Avenue. Valley Farm Road to Rosefield
Road
7505 RF-Federal Gas Tax
Total 5323.1601 Asphalt Sidewalks-Finch Avenue
5323.1602 Kingston Rd -Whites Rd Intersection
6250 Construction Costs
Kingston Road-Whites Road Intersection, (Steeple Hill to Hwy. 401
Ramps) related to Durham Bus Rapid Transit (BRT) project-
Estimate as per Region of Durham
7505 RF-Federal Gas Tax
Total 5323.1602 Kingston Rd -Whites .Rd Intersection
5323.1603 Asphalt Sidewalks -Altona Road
6250 Construction Costs
Asphalt Sidewalks -Altona Road from Finch Avenue to Sparrow
Circle, both sides (50/50).
7022 R-DC's City's Share
7610 RF DC-Roads & Related
Total 5323.1603 Asphalt Sidewalks -Altona Road
5323.1605 Reconstruction of Waterfront Trail
1711 Internal Loan-5 Year
6250 Construction Costs
Reconstruction of Waterfront Trail -Brock Road to Sandy Beach
Road -Existing asphalt surface removal, granular base repairs, and
new asphalt overlay.
Total 5323.1605 Reconstruction of Waterfront Trail
Total 5323 Sidewalks
54
Run Date: Apr 5, 2016
Funding Expense
150,000
(150,000)
(150,000) 150,000
100,000
(100,000)
(100,000) 100,000
'
180,000
(90,000)
(90,000)
(180,000) 180,000
(150,000)
150,000
(150,000) 150,000
(580,000) 580,000
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5323.1601 Finch Avenue -Asphalt Sidewalk $150,000
Financing Sources:
7505 RF -Federal Gas Tax $150,000
Location and Construction:
Finch Avenue -on the south side, from Valley Farm Road to Rosefield Road. The
proposed works include construction of asphalt sidewalk to complete the pedestrian
connection.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5323.1602 Kingston Road/Whites Road (Region BRT Project) -Sidewalk &
Accessibility Upgrades $100,000
Financing Sources:
7505 RF -Federal Gas Tax $100,000
Location and Construction:
Region BRT Project -Kingston Road (Highway No. 2) at Whites Road Intersection -
from Steeple Hill, east to Delta Boulevard. The proposed works include over-sizing and
infilling concrete sidewalk, and adding tactile surfacing for accessibility needs, to
various intersection corners and areas as required. This project will be coordinated
with the Region BRT Project.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5323.1603 Altona Road -Asphalt Sidewalks
Financing Sources:
7022 R -DC's City's Share
7610 RF DC -Roads & Related
Location and Construction:
$180,000
$90,000
90,000
$180.000
Altona Road-from Sparrow Circle, north to Finch Avenue (both sides). The proposed
works include installation of asphalt sidewalks.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5323.1605 Waterfront Trail -Reconstruction $150,000
Financing Sources:
1711 Internal Loan - 5 Year $150,000
Location and Construction:
Waterfront Trail-located adjacent to Montgomery Park Road (north side), from Brock
Road, west to Sandy Beach Road. The proposed works include the reconstruction of
existing Waterfront Trail.
5410 Stormwater Management
Expenditures
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
-Financing
1623 Prov Grant
9960 Other Rev. York Reg. Project
Total Financing
City of Pickering
2016
Approved Capital Budget
59
Run Date: Apr 5, 2016
2015 2016
Budget Budget
360,000
40,000 40,000
400,000 40,000
(40,000) (40,000)
(360,000)
(400,000) (40,000)
City of Pickering
2016
Approved Capital Budget
5410 Stormwater Management
5410.1601 Hedgerow Place Storm Sewer Improvements
1623 Prov Grant
Transportation Initiatives
6250 Construction Costs
Hedgerow Place Storm Sewer Improvements-work includes
installing double catchbasins and associated restoration on
Hedgerow Place to capture drainage from Shadybrook Drive ..
Total 5410.1601 Hedgerow Place Storm Sewer Improvements
Total5410 Stormwater Management
60
Run Date: Apr 5, 2016
Funding Expense
(40,000)
40,000
(40,000) 40,000
(40,000) 40,000
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5410.1601 Hedgerow Place-Storm Sewer Improvements $40,000
Financing Sources:
1623 Prov Grant -Transportation Initiatives $40,000
Location and Construction:
Hedgerow Place-from the Shadybrook Drive intersection, east to the low point in the
road. The proposed works include storm sewer improvements, such as adding
additional catch basins.
City of Pickering
2016
Approved Capital Budget
5613 Water Resources & Development Services
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
7501 RF -Third Party Contribution
Total Financing
62
Run Date: Apr 5, 2016
2015 2016
Budget Budget
200,000 200,000
200,000 200,000
(200,000) (200,000)
(200,000) (200,000)
City of Pickering
2016
Approved Capital Budget
5613 Water Resources & Development Services
5613.1601 Various Construction Projects
6181 Other Fixed Assets
Various Construction Projects Related to Development (Funded
from Third Party Contributions)
7501 RF -Third Party Contribution
Total 5613.1601 Various Construction Projects
Total5613 Water Resources & Development Services
63
Run Date: Apr 5, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
·' (200,000) 200,000
City of Pickering
2016
Approved Capital Budget
5321 Development Projects-(DC Funded}
Expenditures
6221 Preliminary Engineering -Envirnmt Asesmt
6250 Construction Costs
6251 Road Improvements
6252 Streetlights & Sidewalks
6253 Storm Water
6254 Traffic Signals
6265 Land Acquisition & Disp
Total l;xpenditures
Financing
1623 Prov Grant
1702 Debt-10 Year
1712 Internal Loan-10 Year
7021 R-Rate Stabilization
7022 R -DC's City's Share
7501 RF -Third Party Contribution
7610 RF DC-Roads & Related
7611 RF DC -Storm Water Mgmt
Total Financing
64
Run Date: Apr 5, 2016
2015 2016
Budget Budget
600,000
895,000 3,929,500
273,200
45,000
788,478 2,708,100
675,000
10,000
1,683,478 8,240,800
(150,000)
(2,080,000)
(300,000)
(90,000)
(586,796) (1 ,494,856)
(362,500)
(430,000) (3,024,380)
(214,182) (1, 191 ,564)
(1 ,683,478) {8,240,800)
City of Pickering
2016 Approved Capital Budget
Projects Listing
5321 Development Projects-(DC Funded)
Project Name
5321.1601 Park Crescent-Road Reconstruction
5321.1602 Brock Road (Hwy. 401 to Bayly St.)
5321.1603 Kingston Rd. & Brock Rd. Streetlights & Sidewalks
5321.1604 B-15 Krosno Creek Erosion Control
5321.1605 B-32 a,b,c Krosno Creek Culvert Replacements Construction
5321.1606 DH-3-Tillings Road Oversizing
5321.1607 Bl-15 Squires Beach Rosd-Intersection Improvement & Traffic Signals Installation
5321.1608 RU-13 Salem Road-Road Reconstruction
5321.1609 B-29 Sandy Beach Road-EA, Design & Approvals
Total
65
Run Date: Apr 5, 2016
2016
Project
Budget
750,000
45,000
979,500
958,100
1,750,000
273,200
685,000
2,200,000
600,000
8,240,800
City of Pickering
2016
Approved Capital Budget
5321 Development Projects-(DC Funded)
5321.1601 Park Crescent -Road Reconstruction
6250 Construction Costs
Park Crescent (from Cliffview Road to the terminus) road
reconstruction, storm sewer installation, utility relocation and
complete landscaping and driveway .restoration where required.
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1601 Park Crescent-Road Reconstruction
5321.1602 Brock Road (Hwy. 401 to Bayly St.)
6252 Streetlights & Sidewalks
Additional Funds required for project 5321.1311 Brock Road (BI-3)
both sides (50/50%). Hwy. 401 to Bayly St.
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1602 Brock Road (Hwy. 401 to Bayly St.)
5321.1603 Kingston Rd. & Brock Rd. Streetlights & Sidewalks
1623 Prov Grant
Provincial Budget Grant (5999.0898.1623)
6250 Construction Costs
Consolidation of previously approved capital projects into one
capital project for 2016. Construction of streetlights and sidewalks
on Kingston Rd. and Brock Rd. to be done in conjunction with the
Durham Region's Bus Rapid Transit Program. The project scope
includes: (V-1) Kingston Rd. (South Side)-Brock Rd. to Hydro
Corridor, (V-2) Kingston Rd. (South Side)-Brock Rd. to Southview
Drive, (V-4) Kingston Rd. (North Side) -Brock Rd. to Bainbridge
Drive, (V-13) Brock Rd. (East Side)-Finch Ave. to Duffins Creek,
(V-15) Brock Rd. (East Side)-Finch Ave. to Kingston Rd. and Brock
Rd. (ljiJest Side) -Kingston to Finch Ave.
7022 R -DC's City's Share.
7610 RF DC -Roads & Related
Total 5321.1603 Kingston Rd. & Brock Rd. Streetlights & Sidewalk
5321.1604 B-15 Krosno Creek Erosion Control
6253 Storm Water
B-15 Krosno Creek Erosion Control (44/56)-Reytan Blvd. to
Parkham Cres. Construction
7022 R -DC's City's Share
66
Run Date: Apr 5, 2016
Funding Expense
750,000
(375,000)
(375,000)
(750,000) 750,000
45,000
(22,500)
(22,500)
(45,000) 45,000
(150,000)
979,500
(354,750)
(474,750)
(979,500) 979,500
958,100
(536,536)
City of Pickering
2016
Approved Capital Budget
5321 Development Projects-(DC Funded)
7611 RF DC -Storm Water Mgmt
Total 5321.1604 B-15 Krosno Creek Erosion Control
5321.1605 B-32 a,b,c Krosno Creek Culvert Replacements Constru<
1702 Debt-10 Year
6253 Storm Water
B-32 a,b,c Krosno Creek Culvert Replacements Construction
(44/56)
7611 RF DC -Storm Water Mgmt
Total 5321.1605 B-32 a,b,c Krosno Creek Culvert Replacements Ct
5321.1606 DH-3 -Tillings Road Oversizing
6251 Road Improvements
DH-3 Oversizing of Collector (90/1 0)
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1606 DH-3-Tillings Road Oversizing
5321.1607 Bl-15 Squires Beach Road -Intersection Improvement &
6254 Traffic Signals
Bl-15 Squires Beach Road -Intersection Improvement & Traffic
Signals Installation at Church/Clements Road to Bayly (74/26).
Replaces project 5321.0607 and 5321.0832
6265 Land Acquisition & Disp
To be funded 100% by R-DG's City's Share. Replaces project
5320.0912
7022 R -DC's City's Share
7610 RF DC -Roads & Related
Total 5321.1607 Bl-15 Squires Beach Road -Intersection Improver
5321.1608 RU-13 Salem Road -Road Reconstruction
1702 Debt-10 Year
6250 Construction Costs
Full Road Reconstruction from Fifth Concession Road to Hwy 7
(50/50). This project will be submitted for senior government grant
funding that may reduce the amount to be debt financed.
7610 RF DC -Roads & Related
Total 5321.1608 RU-13 Salem Road-Road Reconstruction
5321.1609 B-29 Sandy Beach Road -EA, Design & Approvals
1712 Internal Loan-10 Year
67
Run Date: Apr 5, 2016
Funding Exp.ense
(421,564)
(958, 100) 958,100
(980,000)
1,750,000
(770,000)
(1,750,000) 1,750,000
273,200
(27,320)
(245,880)
(273,200) 273,200
675,000
10,000
(178,750)
(506,250)
(685,000) 685,000
(1 '1 00,000)
2,200,000
(1,100,000)
(2,200,000) 2,200,000
(300,000)
City of Pickering
2016
Approved Capital Budget
5321 Development Projects-(DC Funded)
6221 Preliminary Engineering -Envirnmt Asesmt
Environmental Assessment, Detail Design & Approvals for future
road reconstruction (50/50}. This project will be submitted for senior
government grant funding that may reduce the amount to be debt
financed.
7610 RF DC -Roads & Related
Total 5321.1609 8-29 Sandy Beach Road-EA, Design & Approval:
Total 5321 Development Projects-(DC Funded)
68
Run Date: Apr 5, 2016
Funding Expense
600,000
(300,000)
(600,000) 600,000
(8,240,800) 8,240,800
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount
5321.1601 Park Crescent -Reconstruction
Financing Sources:
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Location and Construction:
$750,000
$375,000
375,000
$750.000
Park Crescent-from Cliffview Road south to the terminus. The proposed works
include road reconstruction (excavation, new granular base, asphalt, and concrete
curb/gutter), storm sewer installation, utility relocation and complete landscape (grading
and sodding) and driveway restoration where required. This work is in coordination
with the Sorbara Group (Orchard Ridge-560 Park Crescent).
! )
.•L-e''
r
\
l
I
I
t'
l
1
l
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
· 5321.1603 Kingston Rd. & Brock Rd. Streetlights & Sidewalks
Financing Sources:
1623 Prov Grant
7022 R -DC's City's Share
761 0 RF DC -Roads & Related
Location and Construction:
$979,500
$150,000
$354,750
$474,750
Consolidation of previously approved capital projects into one capital project for 2016.
Construction of streetlights and sidewalks on Kingston Rd. and Brock Rd. to be done in
conjunction with the Durham Region's Bus Rapid Transit Program. The project scope
includes: (V-1) Kingston Rd. (South Side)-Brock Rd. to Hydro Corridor, (V-2) Kingston
Rd. (South Side)-Brock Rd. to Southview Drive, (VA) Kingston Rd. (North Side)-
Brock Rd. to Bainbridge Drive, (V-13) Brock Rd. (East Side)-Finch Ave. to Duffins
Creek, (V-15) Brock Rd. (East Side)-Finch Ave. to Kingston Rd. and Brock Rd. (West
Side)-Kingston to Finch Ave.
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5321.1604 B-15 Krosno Creek -Erosion Control
Financing Sources:
7022 R -DC's City's Share
7611 RF DC-Storm Water Mgmt
Location and Construction:
$958,100
$536,536
421,564
$958.100
Krosno Creek-from Reytan Boulevard, south to Parkham Crescent. The proposed
works include shoreline reinforcement and erosion control measures.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5321.1605 B-32a,b,c-Krosno Creek-Culvert Replacements
Financing Sources:
1702 Debt-10 Year
7611 RF DC-Storm Water Mgmt
Location and Construction:
$1,750,000
$980,000
770,000
$1,750.000
Krosno Creek-The subject culverts are located under Morden Lane, Reytan
Boulevard and Alyssum Street. The proposed works include replacement of the 3
existing structures with larger culverts to increase capacity.
I \ \ I \ \ ,,,
' ' ' " " \ ' \ ' \ \ \
\ I
I I
I \
I I I I
I I I
I I -I ~-\ \.,_---
A -----.).----------
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5321.1606 DH-3 Tillings Road-Road Oversizing
Financing Sources:
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Location and Construction:
$273,200
$27,320
245,880
$273.200
Tillings Road-from the south Terminus of Tillings Road, south 290m. The proposed
funds are the City's share for works to widen the future road in conjunction with
development.
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5321.1607 Bl-15 Squires Beach Road -Intersection Improvements
and Traffic Signals Installation
Financing Sources:
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Location and Construction:
$685,000
$178,750
506,250
$685.000
Squires Beach Road-at the intersection of Squires Beach Road and Clements Road.
The proposed works include intersection improvements and traffic signals installation.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5321.1608 RU-13 Salem Road -Road Reconstruction
Financing Sources:
1702 Debt-10 Year
761 0 RF DC -Roads & Related
Location and Construction:
$2,200,000
$1,100,000
$1,100,000
$2.200.000
Salem Road-from Fifth Concession Road, north to Highway No.7. The proposed
works include road reconstruction. ·
ALEX
I 0 l:'i Ill
0::
0::
0 0
SUBJECT
AREA
ROBERTSON----------'
PARK }-0 z <{ Vl
MONTGOMERY ROAD
STREET
ROAD
I 0 <{ w Ill
CONTROL PLANT
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5321.1609 B-29 Sandy Beach Road -Environmental Assessment,
Detail Design and Approvals
Financing Sources:
1712 Internal Loan-10 Year
7610 RF DC-Roads & Related
Location and Study Area:
$600,000
$300,000
$300,000
$600.000
Sandy Beach Road-from Montgomery Park Road, north to Bayly Street (R.R. #22).
The proposed study area includes a Municipal Class Environmental Assessment, Detail
Design and Approvals for the future road reconstruction project.
07 Public Works Summary
Expenditures
6129 Parks-Landscape Refurbishment
6131 Street and Park Tree Replacement
6157 Vehicles-under,$100,000
6158 Vehicles -Over $100,000
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
City of Pickering
2016
Approved Capital Budget
6221 Preliminary Engineering -Envirnmt Asesmt
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
1623 Prov Grant
1701 Debt-5 Year
1702 Debt-10 Year
1704 Debt -20 year
1711 Internal Loan-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7001 R -Capital Equipment Replacement
7020 R -Self-Insurance
7021 R-Rate Stabilization
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7041 R -Easement Settlement
7501 RF -Third Party Contribution
77
Run Date: Apr 5, 2016
2015 2016
Budget Budget
415,000 215,000
1,000,000
230,000 474,000
550,000 402,000
676,500 536,100
371,000 355,000
100,000
400,000
1,174,500 1,400,000
11,985,500 7,220,000
16,502,500 11,002,100
(20,000)
(544,803)
(742,803) (224,000)
(200,000)
(1 ,630,500) (3, 1 00,000)
(650,000)
(445,000) (230,000)
(213,334) (85,000)
(130,600) (169,100)
(28,000)
(31 ,000)
(3,431 '500) (220,000)
(139,500)
(1 ,088,000) '(933,000)
(20,000)
(9,400) (400,000)
07 Public Works Summary
7502 RF-Parkland
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
7612 RF DC-' Operations Services
City of Pickering
2016
Approved Capital Budget
~
7620 RF DC -Parkland Development & Trails
7708 RF -Operations Centre
7709 RF -Roads & Bridges
7711 RF-OCIF Grant
9960 Other Rev. York Reg. Project
Total Financing
78
Run Date: Apr 5, 2016
2015 2016
Budget Budget
(227,500) (11 0,000)
(1,100,000) (1 ,740,000)
(1,100,000)
(1 ,231 ,586)
(112,500)
(1,725,474) (1 ,400,000)
(682,000) (801 ,260)
(198,740)
(1 ,900,000) (490,000)
(16,502,500) (11,002,100)
5311 Property Maintenance
Expenditures
6131 Street and Park Tree Replacement
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1623 Prov Grant
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7041 R -Easement Settlement
7501 RF -Third Party Contribution
7502 RF -Parkland
7505 RF-Federal Gas Tax
7612 RF DC -Operations Services
Total Financing
City of Pickering
2016
Approved Capital Budget
79
Run Date: Apr 5, 2016
2015 2016
Budget Budget
1,000,000
552,000 150,000
150,000
50,000 140,000
1,752,000 290,000
(50,000) .
(105,600)
(1 ,260,000)
(139,500)
(202,000)
(20,000)
(9,400)
(100,000)
(140,000)
(15,500)
(1 ,752,000) (290,000)
City of Pickering
2016 Approved Capital Budget
Projects Listing
5311 Property Maintenance
Project Name
5311.1601 (4) Outfront Mowers /Zero Turn Mowers Replacement
5311.1603 Walkway Reconstruction
5311.1604 16' Area Mower Replacement
5311.1606 Walkway Reconstruction
Total
80
Run Date: Apr 5, 2016
2016
Project
Budget
50,000
90,000
100,000
50,000
290,000
City of Pickering
2016
Approved Capital Budget
5311 Property Maintenance
5311.1601 (4) Outfront M.owers /Zero Turn Mowers Replacement
1623 Prov Grant
Invest in Ontario
6178 Miscellaneous Equipment
(4) Outfront Mowers /Zero Turn Mowers (replacements on a 4-year
cycle)
Total 5311.1601 (4) Outfront Mowers /Zero Turn MowersReplacerr
5311.1603 Walkway Reconstruction
6250 Construction Costs
Walkway Reconstruction -Finch Avenue to Lydia Crescent, safety
issue for winter maintenance
7505 RF-Federal Gas Tax
Total 5311.1603 Walkway Reconstruction
5311.1604 16' Area Mower Replacement
6178 Miscellaneous Equipment
(1) Replacement 16' Area Mower-Replacement of unit# 788
(2004)
7502 RF -Parkland
Total 5311.160416' Area Mower Replacement
5311.1606 Walkway Reconstruction
6250 Construction Costs
Walkway Reconstruction -Longbow Drive to Rowntree Crescent
7505 RF-Federal Gas Tax
Total 5311.1606 Walkway Reconstruction
Total 5311 Property Maintenance.
81
Run Date: Apr 5, 2016
Funding Expense
(50,000)
50,000
(50,000) 50,000
90,000
(90,000)
(90,000) 90,000
100,000
(100,000)
(100,000) 100,000
50,000
(50,000)
(50,000) 50,000
(290,000) 290,000
5315 Operations Centre
Expenditures
6178 Miscellaneous Equipment
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1610 Federal Grants
1623 Prov Grant
7612 RF DC -Operations Services
7708 RF -Operations Centre
Total Financing
City of Pickering
2016
Approved Capital Budget
82
Run Date: Apr 5, 2016
2015 2016
Budget Budget
7,000
994,500 1,400,000
2,610,000
3,604,500 1,407,000
(331 ,470)
(331,470) (7,000)
(1,216,086)
(1 ,725,474) (1 ,400,000)
(3,604,500) (1,407,000)
5315 Operations Centre
City of Pickering
2016
Approved Capital Budget
5315.1601 New Operations Centre -Design & Project Mgmt
6230 Prof/Consulting Fees
New Operations Centre ~ Project design and project management.
7708 RF -Operations Centre
Total 5315.1601 New Operations Centre-Design & Project Mgmt
5315.1603 Miscellaneous Equipment
1623 Prov Grant
Invest in Ontario
6178 Miscellaneous Equipment
Air conditioning recovery and charging unit for vehicles -
Replacement
Total 5315.1603 Miscellaneous Equipment
Total 5315 Operations Centre
83
Run Date: Apr 5, 2016
Funding Expense
1,400,000
(1 ,400,000)
(1 ,400,000) 1,400,000
(7,000)
7,000
(7,000) 7,000
(1 ,407,000) 1,407,000
5320 Roads
Expenditures
6158 Vehicles-Over $100,000
6178 Miscellaneous Equipment
City of Pickering
2016
Approved Capital Budget
6221 Preliminary Engineering -Envirnmt Asesmt
6250 Construction Costs
Total Expenditures
. Financing
1623 Prov Grant
1701 Debt-5 Year
1702 Debt-10Year
1704 Debt -20 year
1712 Internal Loan-10Year
2823 Paid From Property Taxes
7001 R -Capital Equipment Replacement
7020 R -Self-Insurance
7021 R-Rate Stabilization
7040 R -Vehicle Replacement
7501 RF -Third Party Contribution
7505 RF-Federal Gas Tax
7610 RF DC-Roads & Related
7709 RF -Roads & Bridges
7711 RF-OCIF Grant
9960 Other Rev. York Reg. Project
Total Financing
84
Run Date: Apr 5, 2016
2015 2016
Budget Budget
550,000
54,500 303,000
400,000
8,685,500 6,965,000
9,290,000 7,668,000
(198,000) (155,000)
(200,000)
(1 ,630,500) (3,100,000)
(650,000)
(85,000)
(25,000)
(8,000)
(6,000)
(2,096,500)
(550,000) (57,000)
(400,000)
(1 '1 00,000) (1 ,525,000)
(1, 1 00,000)
(682,000) (801 ,260)
(198,740)
(1 ,900,000) (490,000)
(9,290,000) (7 ,668,000)
City of Pickering
2016 Approved Capital Budget
Projects Listing
5320 Roads
Project Name
5320.1601 Notion Rd/Squires Beach Rd E.A. Review
5320.1602 Hotbox Asphalt Heater Replacement
5320.1603 Loader Replacement
5320.1604 Michell Bridge Rehabilitation
5320.1605 Altona Bridge (1 0002) Replacement-Design/Approvals
5320.1606 Third Concession Road Reconstruction
5320.1607 Timmins Gardens & Boxworth Place Reconstruction
5320.1608 Water Tanks for Tandem Dump Trucks (New)
5320.1609 Canso Drive -Asphalt Resurfacing
5320.1610 Glenanna Road-Asphalt Resurfacing
5320.1611 The Esplanade North-Asphalt Resurfacing
5320.1612 McPherson Court -Asphalt Resurfacing
5320.1613 Stonepath Circle-Asphalt Resurfacing
5320.1614 Shadybrook Drive-Asphalt Resurfacing
5320.1615 Eyer Drive-Asphalt Resurfacing
5320.1616 Rossland Road Reconstruction
5320.1617 Westshore Neighbourhood-Breezy Drive-Road Reconstruction
5320.1618 Westshore Neighbourhood-Essa Crescent-Road Reconstruction
5320.1619 Westshore Neighbourhood -Vistula Drive -Road Reconstruction
5320.1620 Golf Club Road-Road Realignment
5320.1621 Liverpool Road Bell Cabinet Relocation
5320.1622 Road Line Painter -Replacement
5320.1623 Sidewalk Grinder-New
5320.1631 Sixi:h Concession Road-Rd Reconstruction & ·storm Sewer Replacement
5320.1632 Westney Road -Road Reconstruction
Total
85
Run Date: Apr 5, 2016
2016
Project
Budget
400,000
30,000
200,000
650,000
250,000
490,000
650,000
57,000
165,000
425,000
130,000
160,000
200,000
150,000
70,000
225,000
85,000
40,000
50,000
100,000
25,000
10,000
6,000
1,550,000
1,550,000
7,668,000
City of Pickering
2016
Approved Capital Budget
5320 Roads
5320.1601 Notion Rd/Squires Beach Rd E.A. Review
, 6221 Preliminary Engineering -Envirnmt Asesmt
Notion Road/Squires Beach Road Municipal Class Environmental
Assessment for a crossing of Hwy 401. The Class EA would include:
confirm need and justification, identify and evaluate alternative
solutions and· opportunities, select a preferred implementation
strategy, complete an Environmental Study Report (ESR). Project to
proceed once funding has been received.
7501 RF -Third Party Contribution
Total 5320.1601 Notion Rd/Squires Beach Rd E.A. Review
5320.1602 Hotbox Asphalt Heater Replacement
1623 Prov Grant
Transportation Initiatives
6178 Miscellaneous Equipment
(1) Replacement-replace unit# 143 (2011 KM International)
Total 5320.1602 Hotbox Asphalt Heater Replacement
5320.1603 Loader Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
(1) Loader Replacement-Replace unit# 112 (1997 Case)
Total 5320.1603 Loader Replacement
5320.1604 Michell Bridge Rehabilitation
1704 Debt -20 year
6250 Construction Costs
Michell Bridge (7001) Structure Repairs Overlay & Concrete
Repairs.
Total 5320.1604 Michell Bridge Rehabilitation
5320.1605 Altona Bridge (10002) Replacement-Design/Approvals
6250 Construction Costs
Altona Bridge (1 0002) Replacement-Design/Approvals
7709 RF -Roads & Bridges
Total 5320.1605 Altona Bridge (10002) Replacement-Design/Appr
5320.1606 Third Concession Road Reconstruction
6250 Construction Costs
Third Concession Road Reconstruction (Whites Road to Rosebank
Road) (funded by SEC enhancements)
9960 Other Rev. York Reg. Project
86
Run Date: Apr 5, 2016
Funding Expense
400,000
(400,000)
(400,000) 400,000
(30,000)
-
30,000
(30,000) 30,000
(200,000)
200,000
(200,000) 200,000
(650,000)
650,000
(650,000) 650,000
250,000
(250,000)
(250,000) 250,000
490,000
'·
(490,000)
City of Pickering
2016
Approved Capital Budget
5320 Roads
Total 5320.1606 Third Concession Road Reconstruction
5320.1607 Timmins Gardens & Boxworth Place Reconstruction
6250 Construction Costs
Timmins Gardens & Boxworth Place -Full Reconstruction
7505 RF-Federal Gas Tax
7709 RF -Roads & Bridges
Total 5320.1607 Timmins Gardens & Boxworth Place Reconstructi
5320.1608 Water Tanks for Tandem Dump Trucks (New)
6178 Miscellaneous Equipment
Two (2) New Water Tanks for Tandem Dump Trucks
7040 R -Vehicle Replacement
Total 5320.1608 Water Tanks for Tandem Dump Trucks (New)
5320.1609 Canso Drive-Asphalt Resurfacing
6250 Construction Costs
Acron Lane to Central Street
7505 RF-Federal Gas Tax
Total 5320.1609 Canso Drive -Asphalt Resurfacing
5320.1610 Glenanna Road -Asphalt Resurfacing
6250 Construction Costs
Fairport Road to Heathside Crescent
7505 RF-Federal Gas Tax
7711 RF-OCIF Grant
Total 5320.1610 Glenanna Road -Asphalt Resurfacing
5320.1611 The Esplanade North -Asphalt Resurfacing
6250 Construction Costs
Glenanna Road to Valley Farm Road
7505 RF-Federal Gas Tax
Total 5320.1611 The Esplanade North -Asphalt Resurfacing
5320.1612 McPherson Court -Asphalt Resurfacing
6250 Construction Costs
McPherson Court -Asphalt Resurfacing
7505 RF-Federal Gas Tax
Total 5320.1612 McPherson Court -Asphalt Resurfacing
5320.1613 Stonepath Circle -Asphalt Resurfacing
6250 Construction Costs
87
Run Date: Apr 5, 2016
Funding Expense
(490,000) 490,000
650,000
(198,740)
(451 ,260)
(650,000) 650,000
57,000
(57,000)
(57,000) 57,000
165,000
(165,000)
(165,000) 165,000
425,000
(226,260)
(198,740)
(425,000) 425,000
130,000
(130,000)
(130,000) . 130,000
160,000
(160,000)
(160,000) 160,000
200,000
City of Pickering
2016
Approved Capital Budget
5320 Roads
Stonepath Circle -Asphalt Resurfacing
7505 RF-Federal Gas Tax
Total 5320.1613 Stonepath Circle -Asphalt Resurfacing
5320.1614 Shadybrook Drive -Asphalt Resurfacing
6250 Construction Costs
Strouds Lane to Belinda Court
7505 RF-Federal Gas Tax
Total 5320.1614 Shadybrook Drive-Asphalt Resurfacing
5320.1615 Eyer Drive -Asphalt Resurfacing
6250 Construction Costs
Oklahoma Drive to north of Hampton Court
7505 RF-Federal Gas Tax
Total 5320.1615 Eyer Drive-Asphalt Resurfacing
5320.1616 Rossland Road Reconstruction
6250 Construction Costs
East of Southcott Road to Pickering/Ajax border in conjunction with
Town of Ajax project
7505 RF-Federal Gas Tax
Total 5320.1616 Rossland Road Reconstruction
5320.1617 Westshore Neighbourhood -Breezy Drive -Road Recom
1712 Internal Loan-10 Year
6250 Construction Costs
West Shore Neighborhood -Road reconstruction. Cost sharing with
Region of Durham. (Additional Funds 5320.1514)
Total 5320.1617 Westshore Neighbourhood-Breezy Drive-Road I
5320.1618 Westshore Neighbourhood -Essa Crescent-Road Reco
1623 Prov Grant
Transportation Initiatives
6250 Construction Costs
West Shore Neighborhood -Road reconstruction & road
restoration. Cost sharing with Region of Durham. (Additional Funds
5320.1515)
Total 5320.1618 Westshore Neighbourhood-Essa Crescent-Roa1
5320.1619 Westshore Neighbourhood -Vistula Drive -Road Recon!
1623 Prov Grant
Transportation Initiatives
88
Run Date: Apr 5, 2016
Funding Expense
(200,000)
(200,000) 200,000
150,000
(150,000)
(150,000) 150,000
70,000
(70,000)
(70,000) 70,000
225,000
(225,000)
(225,000) 225,000
(85,000)
85,000
(85,000) 85,000
(40,000)
40,000
(40,000) 40,000
(50,000)
City of Pickering
2016
Approved Capital Budget
5320 Roads
6250 Construction Costs
West Shore Neighborhood -Road reconstruction. Cost sharing with
Region of Durham. (Additional Funds 5320.1516)
Total 5320.1619 Westshore Neighbourhood-Vistula Drive-Road
5320.1620 Golf Club Road -Road Realignment
6250 Construction Costs
Golf Club Road (Whitevale) Realignment (including excavation,
new granular materials, base asphalt & utility relocation).
(Additional funds 5320.1517).
7709 RF -Roads & Bridges
Total 5320.1620 Golf Club Road-Road Realignment
5320.1621 Liverpool Road Bell Cabinet Relocation
1623 Prov Grant
Transportation Initiatives
6250 Construction Costs
Liverpool Road Bell Cabinet Relocation in association with
roadwork completed south of Krosno Boulevard (cost shared with
Bell)
Total 5320.1621 Liverpool Road Bell Cabinet Relocation
5320.1622 Road Line Painter -Replacement
1623 Prov Grant
Transportation Initiatives
6178 Miscellaneous Equipment
Road Line Painter-Replacement Unit #S21 0 ( over 15 years old)
Total 5320.1622 Road Line Painter -Replacement
5320.1623 Sidewalk Grinder-New
6178 Miscellaneous Equipment
New Sidewalk Grinder
7020 R -Self-Insurance
Total 5320.1623 Sidewalk Grinder-New
5320.1631 Sixth Concession Road -Rd Reconstruction & Storm Se
1702 Debt-10 Year
6250 Construction Costs
89
Run Date: Apr 5, 2016
Funding Expense
50,000
(50,000) 50,000
100,000
(1 00,000)
(1 00,000) 100,000
(25,000)
25,000
(25,000) 25,000
(1 0,000)
10,000
(1 0,000) 10,000
6,000
(6,000)
(6,000) 6,000
(1 ,550,000)
1,550,000
5320 Roads
City of Pickering
2016
Approved Capital Budget
Full Road Reconstruction and storm sewer replacement -from
Westney Road westerly to Highway ?(including new granular base,
base asphalt, storm sewer replacement and boulevard works). This
project will be submitted for senior government grant funding "that
may reduce the amount to be debt financed.
Total 5320.1631 Sixth Concession Road-Rd Reconstruction & Stc
5320.1632 Westney Road -Road Reconstruction
1702 Debt-10 Year
6250 Construction Costs
Full Road Reconstruction from Seventh Concession Road to Eighth
Concession Road. This project will be submitted for senior
government grant funding that may reduce the amount to be debt
financed.
Total 5320.1632 Westney Road-Road Reconstruction
Total5320 Roads
90
Run Date: Apr 5, 2016
Funding Expense
(1 ,550,000) 1,550,000
(1 ,550,000)
1,550,000
(1 ,550,000) 1,550,000
(7,668,000) 7,668,000
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1601 Notion Road/Squires Beach Road Highway 401 Crossing
-Municipal Class Environmental Assessment $400,000
Financing Sources:
7501 .RF-Third Party Contribution $400,000
Location and Study Area:
Notion Road/Squires Beach Road-for the area located between Kellino Road, north to
Pickering Parkway. The proposed study would include a Municipal Class
Environmental Assessment for a crossing of Highway 401.
The Class EA would include:
• confirm need and justification
• identify and evaluate alternative solutions and opportunities
• select a preferred implementation strategy
• complete an Environmental Study Report (ESR)
City of Pickering
SUBJECT
AREA
Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1604 Michell Bridge-Rehabilitation $650,000
Financing .Sources:
1704 Debt -20 year $650,000
Location and Construction:
Michell Bridge -located on the Seventh Concession Road, west of Sideline 32, over
the Duffins Creek. The proposed works include bridge rehabilitation.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1605 Altona Bridge-Design and Approvals for Future Replacement $250,000
Financing Sources:
7709 RF -Roads & Bridges $250,000
Location and Construction:
Altona Bridge -located on the Uxbridge Pickering Townline, east of Sideline 30, over
the Duffins Creek. The proposed works include preliminary design and approvals for
the future bridge replacement.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1606 Third Concession Road -Road Reconstruction $490,000
Financing Sources:
9960 Other Rev. York Reg. Project $490,000
Location and Construction:
Third Concession Road-from Whites Road, west to Rosebank Road. The proposed
works include road reconstruction.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1607 Timmins Gardens and Boxworth Place-Road Reconstruction
Financing Sources:
7709 RF -Roads & Bridges
7505 RF-Federal Gas Tax
$650.000
Location and Construction:
$650,000
$451,260
198,740
Timmins Gardens -from Batory Avenue, east and south to Vistula Drive. The
proposed works include road reconstruction.
Boxworth Place-from Timmins Gardens to the south terminus. The proposed works
include road reconstruction.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1609 Canso Drive -Asphalt Resurfacing $165,000
Financing Sources:
7505 RF-Federal Gas Tax . $165,000
Location and Construction:
Canso Drive-from Acorn Lane, north to Central Street (R.R. #5). The proposed works
include asphalt resurfacing (double lift).
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1610 Glenanna Road-Asphalt Resurfacing
Financing Sources:
7505 RF-Federal Gas Tax
7711 RF-OCIF Grant
Location and Construction:
$425,000
$226,260
198,740
$425.000
Glenanna Road-from Fairport Road, east to Heathside Crescent. The proposed
works include asphalt resurfacing (double lift).
cf-
0 0
cf-8
0 ~ ~ 0 0
City of Pickering Engineering & Public Works Department
2016Approved Budget
Budget Amount:
5320.1611 The Esplanade North -Asphalt Resurfacing $130,000
Financing Sources:
7505 RF-Federal Gas Tax $130,000
Location and Construction:
The Esplanade North-from Glenanna Road, east to Valley Farm Road. The proposed
works include asphalt resurfacing (double lift).
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1612 McPherson Court-Asphalt Resurfacing $160,000
Financing Sources:
7505 RF -Federal Gas Tax . $160,000
Location and Construction:
McPherson Court -·from Brock Road to the east terminus . The proposed works
include asphalt resurfacing (double lift).
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1613 Stonepath Circle-Asphalt Resurfacing $200,000
Financing Sources:
7505 RF-Federal Gas Tax $200,000
Location and Construction:
Stonepath Circle-from Aspen Road, to Aspen Road. The proposed works include
asphalt resurfacing (double lift).
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1614 Shadybrook Drive-Asphalt Resurfacing $150,000
Financing Sources:
7505 RF-Federal Gas Tax $150,000
Location and Construction:
Shadybrook Drive -from Strouds Lane, south to Belinda Court. The proposed works
include asphalt resurfacing (double lift).
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1615 Eyer Drive -Asphalt Resurfacing $70,000
Financing Sources:
7505 RF-Federal Gas Tax $70,000
Location and Construction:
_Eyer Drive-from Oklahoma Drive to 165m north Oust north of Hampton Court). The
proposed works include asphalt resurfacing (double lift).
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1616 Rossland Road ..:.... Road Reconstruction $225,000
Financing Sources:
7505 RF -Federal Gas Tax $225,000
Location and Construction:
Rossland Road-from Southcott Road, eastto the Ajax/Pickering Boundary. The
proposed works include road reconstruction in conjunction with the Town of Ajax Road
Project.
REGION AND CITY
PROJECT AREA
(DIFFERENT
PROJECT NUMBER)
REGION AND CITY
PROJECT AREA
(DIFFERENT
PROJECT NUMBER)
REGION AND CITY
PROJECT
AREA
City of Pickering Engineering & Public Works Department
2016Approved Budget
Budget Amount
5320.1617 Breezy Drive-Road Reconstruction $85,000
Financing Sources:
1712 Internal Loan-10 Year $85,000
Location and Construction:
Breezy Drive-from Leaside Street, east and south to the terminus. The proposed
works include road reconstruction (excavation, new granular base, asphalt, and
concrete curb/gutter), and complete landscape (grading and sodding) and driveway
restoration where required. This work is in conjunction with the Region of Durham
Sanitary Oversizing Project.
These funds are in addition to project 5320.1514-$420,500.
REGION AND CITY
PROJECT AREA
(DIFFERENT
PROJECT NUMBER)
GION AND CITY
PROJECT
AREA
REGION AND CITY
PROJECT AREA
(DIFFERENT
PROJECT NUMBER)
MAN'S rrEJ~~~Y
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1618 Essa Crescent-Road Reconstruction $40,000
Financing Sources:
1623 Prov Grant-Transportation Initiatives $40,000
Location and Construction:
Essa Crescent-from Breezy Drive north to the first bend (21Om). The proposed works
include road reconstruction (excavation, new granular base, asphalt, and concrete
curb/gutter), and complete landscape (grading and sodding) and driveway restoration
where required. This work is in conjunction with the Region of Durham Sanitary
Oversizing Project.
These funds are in addition to project 5320.1515-$190,000.
REGION AND CITY
PROJECT.
AREA
REGION AND CITY
PROJECT AREA
{DIFFERENT
PROJECT NUMBER)
REGION AND CITY
PROJECT AREA
(DIFFERENT
PROJECT NUMBER)
rvlAN'5 rREN~~y
City of Pickering Engineering & Public Works Department
· 2016 Approved Budget
Budget Amount:
5320.1619 Vistula Drive -Road Reconstruction $50,000
Financing Sources: ,
1623 Prov Grant -Transportation Initiatives $50,000
Location and Construction:
Vistula Drive-from the Region Easement at Vistula Drive, north to the bend (285m).
The proposed works include road reconstruction (excavation, new granular base,
asphalt, and concrete curb/gutter), and complete landscape (grading and sodding) and
driveway restoration where required. This work is in conjunction with the Region of
Durham Sanitary Oversizing Project.
These funds are in addition to project 5320.1516 -$250,000.
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1620 Golf Club Road (Whitevale) -Road Realignment $100,000
Financing Sources:
7709 FR ~ Roads & Bridges $1oo:ooo
Location and Construction:
Golf Club Road (Whitevale)-825m south of Whitevale Road, where the Duffins Creek
is adjacent to the road (approx. 150m). The proposed works include realigning the road
further away from the creek erosion.
These funds are in addition to project 5320.1517-$100,000.
FAIRVIEW
AVENUE
SUBJECT
AREA
w
:J z w > <(
PROGRESS
FRENCHMAN'S
BAY EAST
PARK
(/)
<(
_J
(_')
:J
0
0
AVENUE
OLD ORCHARD
AVENUE
COMMERCE
1--w w
0:: 1--(/)
0 [!J <(
0 l> 11:
STREET
_J
0 0
()_ BROADVIEW
11: w > STREET
:J
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount
5320.1621 Liverpool Road-Bell Cabinet Relocation $25,000
Financing Sources:
1623 Prov Grant-Transportation Initiatives $25,000
Location and Construction:
Liverpool Road-located at the intersection of Liverpool Road and Old Orchard Avenue
(east side). The Bell Cabinet Relocation Project is in association with completed road
work in 2013 (to be cost shared with Bell). The proposed works include reconstruction
of the Bell underground vault and relocation of the above grade cabinet that is in
conflict with the existing sidewalk.
0
<{
0 a:
'{
0
0 0
0 <{
[l_
0 <r:
0
ct
>-GREENWOOD~
SIXTH
GREENWOOD
UNfT£0
f-
(f) w
CHURCH ~
A CONCESSION
GREENWOOD PARK&-
COMMUNITY CENTRE DRIVE
ROAD
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1631 Sixth Concession Road -Road Reconstruction and
Storm Sewer Replacement
Financing Sources:
1702 Debt-10 Year
Location and Construction:
$1,550,000
$1,550,000
Sixth Concession Road-from Westney Road, west to Greenwood Road. The
proposed works include road reconstruction and storm sewer replacement.
City of Pickering ·Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5320.1632 Westney Road-Road Reconstruction $1,550,000
Financing Sources:
1702 Debt-10 Year $1,550,000
Location and Construction:
Westney Road-from Seventh Concession Road, north to Efghth Concession Road.
The proposed works include road reconstruction and upgrade to hard surface.
·s7ao Parks
Expenditures
6129 Parks-Landscape Refurbishment
6157 Vehicles -under $1 00,000
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees .
6250 Construction Costs
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
1623 Prov Grant
1711 Internal Loan-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7001 R-Capital Equipment Replacement
7020 R -Self-Insurance
7021 R-Rate Stabilization
7040 R -Vehicle Replacement
7502 RF -Parkland
7505 RF-Federal Gas Tax
City of Pickering
2016
Approved Capital Budget
7620 RF DC -Parkland Development & Trails
Total Financing
111
Run Date: Apr 5, 2016
2015 2016
Budget Budget
415,000 215,000
230,000
70,000 76,100
221,000 355,000
100,000
180,000
640,000 115,000
1,856,000 761,100
(20,000)
(213,333)
(213,333) (12,000)
(445,000) (230,000)
(213,334)
(169, 1 00)
(20,000)
(25,000)
(75,000) (220,000)
(336,000)
(227,500) (10,000)
(75,000)
(112,500)
(1 ,856,000) (761,100)
City of Pickering
2016 Approved Capital Budget
Projects Listing
5780 Parks
Project Name
5780.1601 Brockridge Park Jr. Playground Replacement
5780.1602 Gator Utility Vehicle Replacement
5780.1603 Central Control Irrigation System
5780.1604 Village EastTennis Courts Resurfacing
5780.1607 Centennial Park Parking Lot
5780.1609 Trailer for Equipment Replacement
5780.1610 Automatic Rotary Blade Sharpener (New)
5780.1611" Glengrove Park Playground
5780.1612 Baseball Infield Drainage System-(4) Diamonds
5780.1613 Box Scraper Attachment with Laser Level System
5780.1614 Kinsmen Park Maintenance Road
5780.1616 Greenwood Baseball Fencing-Replacement
5780.1617 Amberlea Park Asphalt Pathways Reconstruction
5780.1619 J. McPherson Park, Parking Lot Lighting
5780.1621 Solar/Wind Lighting for Kinsmen Soccer Pathway-New
5780.1622 Tractor for Ball Drag Replacement
Total
112
Run Date: Apr 5, 2016
2016
Project
Budget
35,000
20,000
12,000
65,000
80,000
12,500
20,000
20,000
60,000
31,600
100,000
130,000
35,000
29,000
46,000
65,000
761,100
City of Pickering
2016
Approved Capital Budget
5780 Parks
5780.1601 Brockridge Park Jr. Playground Replacement
6250 Construction Costs
Brockridge Park Jr. Playground Replacement (due to a fire)
7020 R-Self-Insurance
7502 RF -Parkland
Total 5780.1601 Brockridge Park Jr. Playground Replacement
5780.1602 Gator Utility Vehicle Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Gator Utility Vehicle Replacement-Unit #772 (2008)
Total 5780.1602 Gator Utility Vehicle Replacement
5780.1603 Central Control Irrigation System
1623 Prov Grant
Invest in Ontario
6178 Miscellaneous Equipment
Central Control Irrigation System -controls irrigation via computer
program (Additional Funds 5780.1215).
Total 5780.1603 Central Control Irrigation System
5780.1604 Village East Tennis Courts Resurfacing
2823 Paid From Property Taxes
6181 Other Fixed Assets
Village East Tennis-resurface two tennis courts
Total 5780.1604 Village East Tennis Courts Resurfacing
5780.1607 Centennial Park Parking Lot
6129 Parks -Landscape Refurbishment
Centennial Park parking lot-add curbing and resurface, drainage
improvements.
7021 R-Rate Stabilization
Total 5780.1607 Centennial Park Parking Lot
5780.1609 Trailer for Equipment Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(1) Enclosed Trailer for Equipment-replace unit# 7 42 (2011)
Total 5780.1609 Trailer for Equipment Replacement
5780.1610 Automatic Rotary Blade Sharpener (New)
2823 Paid From Property Taxes
113
Run Date: Apr 5, 2016
Funding Expense
35,000
(25,000)
(1 0,000)
(35,000) 35,000
(20,000)
20,000
(20,000) 20,000
(12,000)
12,000
(12,000) 12,000
(65,000)
65,000
(65,000) 65,000
80,000
(80,000)
(80,000) 80,000
(12,500)
12,500
(12,500) 12,500
(20,000)
City of Pickering
2016
Approved Capital Budget
5780 Parks
6178 Miscellaneous Equipment
To sharpen rotary lawn mower blades (new)-To prolong the life of
the blades.
Total 5780.1610 Automatic Rotary Blade Sharpener (New)
5780.1611 Glengrove Park Playground
2823 Paid From Property Taxes
6250 Construction Costs
Remove peastone, replace safety surfacing, add curbing and
drainage
Total 5780.1611 Glengrove Park Playground
5780.1612 Baseball Infield Drainage System -(4) Diamonds
1592 Donations
6250 Construction Costs
Baseball Infield Drainage System -(4) Diamonds. Mens Slo Pitch
League to provide $20,000 donation. Project to proceed when
financial commitment is received.
7021 R-Rate Stabilization
Total 5780.1612 Baseball Infield Drainage System-(4) Diamonds·
5780.1613 Box Scraper Attachment with Laser Level System
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Box Scraper Attachment with Laser Level System for baseball
infields
Total 5780.1613 Box Scraper Attachment with Laser Level System
5780.1614 Kinsmen Park Maintenance Road
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Kinsmen Park Maintenance Road -asphalt surface from gates to
washrooms and all gravel area in front
Total 5780.1614 Kinsmen Park Maintenance Road
5780.1616 Greenwood Baseball Fencing -Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Greenwood Baseball Fencing -Replacement to include outfield
· fence
Total 5780.1616 Greenwood Baseball Fencing-Replacement
114
Run Date: Apr 5, 2016
Funding Expense
20,000
(20,000) 20,000
(20,000)
20,000
(20,000) 20,000
(20,000)
60,000
(40,000)
(60,000) 60,000
(31 ,600)
31,600
(31 ,600) 31,600
(1 00,000)
100,000
(1 00,000) 100,000
(130,000)
130,000
(130,000) 130,000
City of Pickering
2016
Approved Capital Budget
5780 Parks
5780.1617 Amberlea Park Asphalt Pathways Reconstruction
6129 Parks-Landscape Refurbishment
Amberlea Park Asphalt Pathways -Reconstruction
7021 R-Rate Stabilization
Total 5780.1617 Amberlea Park Asphalt Pathways Reconstruction
5780.1619 J. McPherson Park, Parking Lot Lighting
6181 Other Fixed Assets
LED Solar Lighting -J. McPherson Park Parking Lot
7505 RF -Federal Gas Tax
Total 5780.1619 J. McPherson Park, Parking Lot Lighting
5780.1621 Solar/Wind Lighting for Kinsmen Soccer Pathway -New
6181 Other Fixed Assets
Solar/Wind Lighting for Kinsmen Soccer Pathway
7505 RF-Federal Gas Tax
Total 5780.1621 Solar/Wind Lighting for Kinsmen Soccer Pathway
5780.1622 Tractor for Ball Drag Replacement
6181 Other Fixed Assets
Tractor for Ball Drag (Replacement) -to replace unit# 724 (2006)
and unit# 766 (2006) with a single larger unit
7021 R-Rate Stabilization
Total 5780.1622 Tractpr for Ball Drag Replacement
Total 5780 Parks
115
Run Date: Apr 5, 2016
Funding Expense
35,000
(35,000)
(35,000) 35,000
29,000
(29,000)
(29,000) 29,000
46,000
(46,000)
(46,000) 46,000
65,000
(65,000)
(65,000) 65,000
(761,100) 761,100
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1601 Brock Ridge Park-Junior Playground
Equipment Replacement
Financing Sources:
7020 R-Self-Insurance
7502 RF -Parkland
Location and Construction:
$35,000
$25,000
10,000
$35.000
Brock Ridge Park-is located adjacent to Brock Road. The proposed works include the
replacement of the junior playground equipment.
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1607 Centennial Park -Parking Lot Refurbishment $80,000
Financing Sources:
7021 R-Rate Stabilization $80,000
Location and Construction:
Centennial Park-The parking lot is located adjacent to Brock Road. The proposed
works include additional curbing and granulars, new asphalt, and drainage
improvements.
t: 0
f5 iii
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1611 Glengrove Park-Playground Refurbishment $20,000
Financing Sources:
2823 Paid From Property Taxes $20,000
·Location and Construction:
Glengrove Park-The playground is located adjacent to Field light Boulevard. The
proposed works include removal of the existing peastone and replace with safety
surfacing, the addition of curbing and drainage improvements.
ALEX
ROBERTSON
PARK
City of Pickering
>-0 z <{
Ul
r:r:
0
0
CL FELDSPAR
0 COURT
0 u
0 r:r:
0 >-I
MONTGOMERY PARK ROAD
Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1614 Kinsmen Park-Maintenance Road Resurfacing $100,000
Financing Sources:
1711 Internal Loan-5 Year $100,000
Location and Construction:
Kinsmen Park-is located adjacent to Sandy Beach Road. The proposed works include
adding an asphalt surface to the existing gravel maintenance road (from the gates to
the washrooms) and all gravel areas surrounding the building.
0 0 0 :;:: z w w 0:: C)
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1616 Greenwood Park-Baseball Fencing Replacement $130,000
Financing Sources:
1'711 Internal Loan - 5 Year $130,000
Location and Construction:
Greenwood Park-the park is located adjacent to Greenwood Road. The proposed
works include the removal and replacement of the existing baseball diamond backstop
and outfield fencing.
0:::
0
0:::
<(
0 w u
w
_j
o_
<(
2
0::: w
::J
0
<(
0 0:::
:{ z
<(
Q) w
(j)
0
0:::
w
0:::
D~
FLAVELLE
SQUARE
w >
0:::
0
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1617 Amberlea Park-Asphalt Pathways Reconstruction $35,000
Financing Sources:
7021 R-Rate Stabilization $35,000
Location and Construction:
Amberlea Park -is located adjacent to Braeburn Crescent The proposed works
include existing asphalt pathways reconstruction and new asphalt pathways installation.
City of Pickering E,ngineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1619 J. McPherson Park-Parking Lot Light Installation $29,000
Financing Sources:
7505 RF-Federal Gas Tax $29,000
Location and Construction:
J. McPherson Park-is located adjacent to Parkside Drive. The proposed works
include the installation of parking lot lighting (using a LED Solar Light system).
ALEX
ROBERTSON
PARK
City of Pickering
0 <(
0
0:::
>-0 z
<(
U1
MONTGOMERY
(Y
0
0
~ FELDSPAR
0 COURT
0 u
SUBJECT
PARK
0
0:::
0 >-I
PARI< ROAD
Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5780.1621 Kinsmen Park-Soccer Pathway Lighting Installation $46,000
Financing Sources:
7505 RF-Federal Gas Tax $46,000
Location and Construction:
Kinsmen Park-is located adjacent to Sandy Beach Road. The proposed works include
the installation of a solar-wind lighting system along the soccer pathway.
5990 Fleet Vehicles
Expenditures
6157 Vehicles-under $100,000
6158 Vehicles-Over $100,000
Total Expenditures ·
Financing
7040 R -Vehicle Replacement
Total Financing
City of Pickering
2016
Approved Capital Budget
2015
Budget
For 2016, all vehicles are now budgeted in this cost centre.
124
Run Date: Apr 6, 2016
2016
Budget
474,000
402,000
876,000
(876,000)
(876,000)
City of Pickering
2016 Budgeted Vehicle Expenditures Summary
Number Cost
Type of Vehicle of $
Vehicles
By-Law Services Replacement Vehicle 1 $30,000
Eng. Services -Admin (2) Midsize SUV Replacement 2 60,000
Development Services Midsize SUV Replacement 1 30,000
Roads Pickup Truck -4X4 Replacement 1 38,000
4 Ton Dump Truck with Plow 1 260,000
Parks 1 Ton Dump Truck 1 65,000
1 Ton Dump Truck with Tailgate 1 70,000
3 Ton Dump Truck 1 90,000
Garbage Truck Replacement 1 142,000
Fire Command Vehicle Replacement 1 91,000
TOTAL 11 $876,000
Budgeted Vehicle Expenditures 2009-2016
$2,500,000
2,000,000
1,500,000
1,000,000
500,000
2009 2010 2011 2012 2013 2014 2015 2016
• Light Duty Vehicles 4 or 5 ton Dump Trucks (Includes Graders) • Large Fire Vehicles
---------------------------,
2014 2015 2016 :
!
6 11 9 I
2009 2010 2011 2012 2013
Light Duty Vehicles 3 5 8 5 7
Dump Trucks 1 2 1 1 1 1 2 3
Large Fire Vehicles 1 1 1 1 1
125
City of Pickering
2016
Approved Capital Budget
5990 Fleet Vehicles
5220.16.01 Vehicle Replacement
6157 Vehicles-under $100,000
Replace Chevy Malibu #409 (2006) with full size Pickup Truck
(5220 By-Law Services)
7040 R -Vehicle Replacement
Total 5220.1601 Vehicle Replacement
5320.1624 Single Axle 4 Ton Dump Truck with Snow Plow Replacer
6158 Vehicles-Over.$100,000
Single Axle 4 Ton Dump Truck with Plow-Replace unit #54 (2005
International) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1624 Single Axle 4 Ton Dump Truck with Snow Plow R4
5320.1625 Pickup Truck -4X4 Replacement
6157 Vehicles-under $100,000
Pickup Truck 4X4 with diesel engine -Replace unit #759 (2008
Ford F250) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1625 Pickup Truck-4X4 Replacement
5335.1601 (2) Midsize SUV Replacement
6157 Vehicles -under $100,000
(2 units) -Mid Size SUV-Replace unit #627 (1999 Ford
Explorer)(5335 Engineering Services -Admin) and Replace unit
#632 (2005 Ford Escape) (5335 Engineering Services -Admin)
7040 R -Vehicle Replacement
Total 5335.1601 (2) Midsize SUV Replacement
5340.1605 Command Vehicle Replacement
6157 Vehicles-under $100,000
Command Vehicle -Replace unit #555 (2007 Silverado) (5340
Fire Services)
7040 R -Vehicle Replacement
Total 5340.1605 Command Vehicle Replacement
5613.1602 Midsize SUV Replacement
6157 Vehicles-under $100,000
Replace unit #635 (2003 Chev Tracker) (5613 Development
Services)
7040 R -Vehicle Replacement
126
Run Date: Apr 5, 2016
Funding Expense
30,000
(30,000)
(30,000) 30,000
260,000
(260,000)
(260,000) 260,000
38,000
(38,000)
(38,000) 38,000
60,000
(60,000)
(60,000) 60,000
.
91,000
(91 ,000)
(91 ,000) 91,000
30,000
(30,000)
City of Pickering
2016
Approved Capital Budget
5990 Fleet Vehicles
Total 5613.1602 Midsize SUV Replacement
5780.1605 One Ton Dump Truck with Tailgate Lift Replacement
6157 Vehicles-under $100,000
One Ton Pickup Truck with Tailgate Lift-Replace unit #763 (2006
Ford F350) (5780 Parks)
7040 R -Vehicle Replacement
Total 5780.1605 One Ton Dump Truck with Tailgate Lift Replacemt
5780.1627 One Ton Dump Truck Replacement
6157 Vehicles-under $100,000
One Ton Dump Truck-Replace unit #765 (2007 Ford F350) ( 5780
Parks)
7040 R -Vehicle Replacement
Total 5780.1627 One Ton Dump Truck Replacement
5780.1628 Three Ton Dump Truck with Chipper Body Replacement
6157 Vehicles-under $100,000
Three Ton Dump Truck with Crew Cab and Chipper Body-Replace
unit #734 (2000 GMC 60)( 5780 Parks)
7040 R -Vehicle Replacement
Total 5780.1628 Three Ton Dump Truck with Chipper Body Replac
5780.1629 Garbage Truck Replacement
6158 Vehicles-Over $100,000
Replace #7 41 Garbage Truck (2007 Ford/Haulall) (split stream
garbage & recycling) (5780 Parks)
7040 R -Vehicle Replacement
Total 5780.1629 Garbage TruckReplacement
Total 5990 Fleet Vehicles
127
Run Date: Apr 5, 2016
Funding Expense
(30,000) 30,000
70,000
(70,000)
(70,000) 70,000
65,000
(65,000)
(65,000) 65,000
90,000
(90,000)
(90,000) 90,000
142,000
(142,000)
(142,000) 142,000
{876,000) 876,000
5340 Fire Services
Expenditures
6157 Vehicles -under $100,000
6158 Vehicles-Over $100,000
6175 Hardware Replacements
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
City of Pickering
2016
Approved Capital Budget
6420 Survey/Engineering/Agency Fees -Seaton
6430 Prof/Consulting Fees -Seaton
6460 Other Construction Related Costs -Seaton
Total Expenditures
Financing
1701 Debt-5 Year
1702 Debt-10 Year
2823 Paid From Property Taxes
7001 R -Capital Equipment Replacement
7021 R-Rate Stabilization
7022 R -DC's City's Share
7605 RF DC -Fire
Total Financing
128
Run Date: Apr 5, 2016
2015 2016
Budget Budget
220,000
1,100,000
25,000
60,000
221,000
10,000
261,000 85,000
34,000
356,500
396,000
1,802,000 966,500
(677,009)
(1 '1 00,000)
(25,000) (95,000)
(25,000)
(60,000)
(19,663)
(766,837)
(1 ,802,000) (966,500)
5340 Fire Services
City of Pickering
2016 Approved Capital Budget
Projects Listing
Project Name
5340.1601 New Fire Hall to service Seaton-Site Preparation
5340.1602 New Fire Hall to service Seaton -Design
5340.1603 Fire Hall #5 -Plumbing System Upgrade
5340.1604 Fire Hall #4 -Generator Room & Equipment Upgrades
5340.1606 Fire Dispatch Equipment Replacement
5340.1607 Emergency Generator (New)
Total
129
Run Date: Apr 12, 2016
2016
Project
Budget
430,000
356,500
45,000
50,000
25,000
60,000
966,500
City of Pickering
2016
Approved Capital Budget
5340 Fire Services
5340.1601 New Fire Hall to service Seaton -Site Preparation
6420 Survey/Engineering/Agency Fees-Seaton
6460 Other Construction Related Costs -Seaton
Servicing of proposed site which includes off-site servicing, removal
of existing structures, environmental assessment, geotechnical and
topographical surveys.
7022 R -DC's City's Share
7605 RF DC -Fire
Total 5340.1601 New Fire HaU to service Seaton-Site Preparation
5340.1602 New Fire Hall to service Seaton -Design
6430 Prof/Consulting Fees -Seaton
Design/construction of a new, single-storey fire hall, with a puilding
footprint of approximately 9,000 square feet on a 4 acre site.
7022 R -DC's City's Share
7605 RF DC -Fire
Total 5340.1602 New Fire Hall to service Seaton-Design
5340.1603 Fire Hall #5 -Plumbing System Upgrade
2823 Paid From Property Taxes
6230 Prof/Consulting Fees
Design work for renovation of existing living quarters to create
accessible wash~oom and separate women's dressing room.
6250 Construction Costs
Replacement of aging plumbing system components, including
consulting fees and construction based on 2015 system audit.
Total 5340.1603 Fire Hall #5-Plumbing System Upgrade
5340.1604 Fire Hall #4 -Generator Room & Equipment Upgrades
2823 Paid From Property Taxes
6250 Construction Costs
Generator and furnace intake air and exhaust line modifications
necessary to maintain clearances, and required safety upgrades to
comply with changes to codes and regulations.
Total 5340.1604 Fire Hall #4-Generator Room & Equipment Upgra
5340.1606 Fire Dispatch Equipment Replacement
6175 Hardware Replacements
Replacement of dispatch equipment (consoles and servers) for joint
dispatch centre (Pickering share).
130
Run Date: Apr 5, 2016
Funding Expense
34,000
396,000
(10,750)
(419,250)
(430,000) 430,000
356,500
(8,913)
(347,587)
(356,500) 356,500
(45,000)
10;000
35,000
(45,000) 45,000
(50,000)
50,000
(50,000) 50,000
25,000
City of Pickering
2016
Approved Capital Budget
5340 Fire Services
7001 R • Capital Equipment Replacement
Total 5340.1606 Fire Dispatch Equipment Replacement
5340.1607 Emergency Generator (New)
6178 Miscellaneous Equipment
New emergency generator for back up power at Fire Hall #2.
Replaces project 5340.1401.
7021 R-Rate Stabilization
Total 5340.1607 Emergency Generator (New)
Total 5340 Fire Services
131
Run Date: Apr 5, 2016
Funding Expense
(25,000)
(25,000) 25,000
60,000
(60,000)
(60,000) 60,000
(966,500) 966,500
City of Pickering Engineering & Public Works Department
2016 Approved Budget
Budget Amount:
5340.1601 New Seaton Fire Hall-Site Preparation
5340.1602 New Seaton Fire Hall -Design
Financing Sources:
7022 R -DC's City's Share
7605 RF DC-Fire
Location and Construction:
$430,000
$356,500
$19,663
$766,837
New Seaton Fire Hall-located adjacent to Zents Drive, west of Brock Road (R.R. #1).
The proposed site preparation works include off-site servicing, demolition of two
structures at 2710 Brock Road, environmental assessment, geotechnical and
topographical surveys.
The proposed site design works include retaining a consulting firm to undertake space
planning, design development and detailed site and building design.
5800 Library
Expenditures
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6179 Book Collection Material
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
City of Pickering
2016
Approved Capital Budget
7042 R -Provision for Library-Eastern Branch
Total Financing
133
Run Date: Apr 5, 2016
2015 2016
Budget Budget
22,000
15,000
452,000 431,000
50,000
20,000
265,000
522,000 733,000
(125,000)
(452,000) (608,000)
(65,000)
(5,000)
(522,000) (733,000)
City of Pickering
2016
Approved Capital Budget
5800 Library
5800.1601 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and·packaging.
This budget is based on a formula which includes community
demand, material costs and industry norms.
Total 5800.1601 Collection Materials
5800.1602 Central Library Skylight Replacement
2823 Paid From Property Taxes
6250 Construction Costs
Replace existing skylights. Lifecycle replacement of leaking
skylights.
Total 5800.1602 Central Library Skylight Replacement
5800.1603 Petticoat Creek Library Reading Garden Enclosure
1711 Internal Loan-5 Year
6250 Construction Costs
Construct Enclosed Reading Garden (750 sq. ft. in area) at Petticoat
Creek.
Total 5800.1603 Petticoat Creek Library Reading Garden Enclosur•
5800.1604 Central Library Teen Space
2823 Paid From Property Taxes
6250 Construction Costs
Renovate Central Library to create Teen Space
Total 5800.1604 Central Library Teen Space
5800.1605 Central Library Shelving Replacement
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Shelving for Central Library Collection (H&S)
Total 5800.1605 Central Library Shelving Replacement
5800.1606 Video Surveillance Camera Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
134
Run Date: Apr 5, 2016
Funding Expense
(431 ,000)
431,000
(431 ,000) 431,000
(90,000)
' 90,000
(90,000) 90,000
(125,000)
125,000
(125,000) 125,000
(50,000)
50,000
(50,000) 50,000
(22,000)
22,000
(22,000) 22,000
(15,000)
15,000
5800 Library
City of Pickering
2016
Approved Capital Budget
Replacement of current analog camera to be compatible with digital
technology which provides a better picture quality. Analog
surveillance equipment at existing City facilities is being gradually
replaced in priority order with digital technology for insurance and
security purposes.
Total 5800.1606 Video Surveillance Camera Replacement
Total 5800 Library
135
Run Date: Apr 5, 2016
Funding Expense
(15,000) 15,000
(733,000) 733,000
City of Pickering
2016 Capital Budget &2017-2020 Forecast
Organization
136
Run Date: Apr 5,
2018-2020 L._ _ Total
Forecast I
70,000 77,500 :------1,963,700 5,953,600
10,237,000
67,862,047
19,650,800 -----.-
129,429,247
$45,000,000
$40,000,000
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,000,000
$5,000,000
$0
City of Pickering
Capita l Forecast Financing
By Source
2016 2017 2018 2019
• Grants • Debt
2020
• Paid from Property Taxes Reserves/Other Sources
Federal Gas Tax • York Region Enhancements
137
City of Pickering
Major Capital Projects
2017 to 2021
(Alphabetical Order)
Estim ated
Net Estimated Property
Estimated I Financing Debt Operating Tax Levy
Major Capital Projects Project Cost Debt (20 yrs) Non Debt Payments Costs Impact
Animal Shelter $ 2,750,000 $ 1,375,000 $ 1,375,000 $ 110,340 $ 100,000 0.39%
Greenwood
Community Park 6,500,000 6,500,000 -521,580 125,ooo I 1 1.21%
__.
w Li brary Expansion 15,000,000 7,876,000 7,124,000 631 ,990 327,000 1.80% (X)
Museum Visitor Centre . 18,700,000 6,000,000 12,700,000 481 ,460 216,460 1.31%
Senior & Youth Centre 24,500,000 5,218,000 19,282,000 418,700 -408,610 1.55%
Totals $ 67,450,000 $ 26,969,000 $ 40,481,000 $ 2,164,069 $ 1,1 77,070
5111 Mayor
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
139
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
10,000
10 000
(10,000)
(10,000)
5111 Mayor
City of Pickering
2019
Capital Forecast
5111.1901 Computer Equipment Mayor Ryan
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5111.1901 Computer Equipment Mayor Ryan
Total 5111 Mayor
140
Run Date: Apr 6, 2016
Funding Expense
(10,000)
10,000
(10,000) 10,000
(10,000) 10,000
5113 Council
Expenditures
6181 Other Fixed Assets
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
141
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
60,000
60 000
(60,000)
(60,000)
City of Pickering
2019
Capital Forecast
5113 Council
5113.1901 Computer Equip Reg. Coun. Ward 1
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1901 Computer Equip Reg. Coun. Ward 1
5113.1902 Computer Equip Reg. Coun. Ward 2
2823 Paid From Property Taxes
61.81 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1902 Computer Equip Reg. Coun. Ward 2
5113.1903 Computer Equip Reg. Coun. Ward 3
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1903 Computer Equip Reg. Coun. Ward 3
5113.1904 Computer Equip City Coun. Ward 1
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1904 Computer Equip City Coun. Ward 1
5113.1905 Computer Equip City Coun. Ward 2
2823 Paid From Property Taxes
6181 Other Fixed Assets
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1905 Computer Equip City Coun. Ward 2
5113.1906 Computer Equip City Coun. Ward 3
142
Run Date: Apr 6, 2016
Funding Expense
(10,000)
10,000
(10,000) 10,000
(10,000)
10,000
(10,000) 10,000
(10,000)
10,000
(10,000) 10,000
(10,000)
. 10,000
(10,000) 10,000
(10,000)
10,000
(10,000) ' 10,000
5113 Council
2823 Paid From Property Taxes
6181 Other Fixed Assets
City of Pickering
2019
Capital Forecast
As per Council Compensation & Communication Policy, $10,000 is
provided for computer hardware, software and telecommunications
per term.
Total 5113.1906 Computer Equip City Coun. Ward 3
Total 5113 Council
143
Run Date: Apr 6, 2016
. Funding Expense
(10,000)
10,000
(10,000) 10,000
(60,000) 60,000
City of Pickering
Multi-Year Capital Forecast
2017-2020
04 Corporate Services Dept. Summary
2017
Forecast
Expenditures
6173 Furniture & Fixtures
6174 System & Software Upgrade 3,000,000
6175 Hardware Replacements 268,000
6177 ITinfrastructure 254,450
6178 Miscellaneous Equipment
6181 Other Fixed Assets
Total Expenditures 3 522 450
Financing
1711 Internal Loan - 5 Year
1713 Internal Loan-15 Year (3,000,000)
2823 Paid From Property Taxes
7001 R -Capital Equipment Replacement (522,450)
Total Financing (3,522,450)
144
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
20,000
106,700 600,000 850,000
330,000
10,000
15,000
436 700 645 000 850 000
(500,000)
(45,000)
(436,700) (600,000) (350,000)
(436,700) (645,000) (850,000)
5203 Finance and Taxation
Expenditures
6174 System & Software Upgrade
Total Expenditures
Financing
1713 Internal Loan -15 Year
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
3,000,000
3 000 000
(3,000,000)
(3,000,000)
145
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
5203 Finan-ce and Taxation
5203.1701 New Financial System
1713 Internal Loan -15 Year
6174 System & Software Upgrade
New Financial System
Total 5203.1701 New Financial System
Total 5203 Finance and Taxation
City of Pickering
2017
Capital Forecast
146
Run Date: Apr 6, 2016
Funding Expense
(3,000,000)
3,000,000
(3,000,000) 3,000,000
(3,000,000) 3,000,000
5206 Information Technology
Expenditures
6175 Hardware Replacements
6177 IT Infrastructure
Total Expenditures
Financing
1711 lnterl")al Loan-5 Year
7001 R -Capital Equipment Replacement
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
268,000
254,450
522 450
(522,450)
(522,450)
147
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
106,700 600,000 850,000
330,000
436 700 600 000 850 000
(500,000)
(436,700) (600,000) (350,000)
(436,700) (600,000) (850,000)
City of Pickering
2017
Capital Forecast
5206 Information Technology
5206.1701· Servers & Related Software
6175 Hardware Replacements
· Server and Software Upgrade
7001 R -Capital Equipment Replacement
Total 5206.1701 Servers & Related Software
5206.1702 SAN Storage Upgrade
6175 Hardware Replacements
Pell Compellent SAN Disk Upgrade
7001 R -Capital Equipment Replacement
Total 5206.1702 SAN Storage Upgrade
5206.1703 Telecoms PBX Upgrade I Replacement
6175 Hardware Replacements
Telecomms PBX Upgrade I Replacement
7001 R -Capital Equipment Replacement
Total 5206.1703 Telecoms PBX Upgrade I Replacement
5206.1704 Video Conferencing Solution
6175 Hardware Replacements
Video Conferencing for Facilities
7001 R -Capital Equipment Replacement
Total 5206.1704 Video Conferencing Solution
5206.1705 Wi-Fi for Facilities and Public Spaces
6177 IT Infrastructure
Continued Deployment of Cisco Meraki Wi-Fi access points for all
City facilities
7001 R -Capital Equipment Replacement
Total 5206.1705 Wi-Fi for Facilities and Public Spaces
5206.1706 Replacement PCs
6177 IT Infrastructure ·
4 Year Plan to replace 50 PC's per year
7001 R -Capital Equipment Replacement
Total 5206.1706 Replacement PCs
5206.1707 Operations Center Technology
6177 IT Infrastructure
Infrastructure, Networking, Systems, PC's, Etc. for new Operations
Centre
148
Run Date: Apr 6, 2016
Funding Expense
33,000
(33,000)
(33,000) 33,000
18,000
(18,000)
(18,000) 18,000
200,000
(200,000)
(200,000) 200,000
17,000
(17,000)
(17,000) 17,000
22,700
(22,700)
(22,700) ,22,700
38,750
(38,750)
(38,750) 38,750
100,000
5206 Information Technology
7001 R -Capital Equipment Replacement
City of Pickering
2017
Capital Forecast
Total 5206.1707 Operations Center Technology
5206.1708 1GB Internet
6177 IT Infrastructure
1GB Internet Services for City of Pickering
7001 R -Capital Equipment Replacement
Total 5206.17081GB Internet
5206.1710 Computer Room I NetWork Upgrades
6177 IT Infrastructure
Upgrades for Computer Room including switches, monitoring
systems and Connectivity
7001 R -Capital Equipment Replacement
Total 5206.1710 Computer Room I Network Upgrades
Total 5206 Information Technology
149
Run Date: Apr 6, 2016
Funding Expense
(100,000)
(100,000) 100,000
28,500
(28,500)
(28,500) 28,500
64,500
(64,500)
(64,500) 64,500
(522,450) 522,450
City of Pickering
2018
Capital Forecast
5206 Information Technology
5206.1801 Servers & Related Software
6175 Hardware Replacements
Servers & Related Software
7001 R -Capital Equipment Replacement
Total 5206.1801 Servers & Related Software
5206.1802 PCs, Laptops
6175 Hardware Replacements
PCs, Laptops
7001 R -Capital Equipment Replacement
Total 5206.1802 PCs, Laptops
5206.1803 PC's I AutoCAD and Graphic Workstations
6175 Hardware Replacements
PC's I AutoCAD and Graphic Workstations
7001 R -Capital Equipment Replacement
. Total 5206.1803 PC's I AutoCAD and Graphic Workstations
5206.1805 Business Applications Development
6177 IT Infrastructure
Infrastructure and Public Works System. Investigate solutions and
through consultation evaluate systems for the design, construction,
and management of public infrastructure.
7001 R -Capital Equipment Replacement
Total 5206.1805 Business Applications Development
5206.1806 Biometric Systems ·
6177 IT Infrastructure
Biometric Systems for Facilities and Card Access Replacement
7001 R -Capital Equipment Replacement
Total 5206.1806 Biometric Systems
5206.1807 Undefined Expenditures
6177 IT Infrastructure
Smart City infrastructure deployments -Increase Wi-Fi base and
add sensors to City facilities, vehi.cles and assets.
7001 R-Capital Equipment Replacement
Total 5206.1807 Undefined Expenditures
Total 5206 Information Technology
150
Run Date: Apr 6, 2016
Funding Expense
33,000
(33,000)
(33,000) 33,000
30,000
(30,000)
(30,000) 30,000
43,700
(43,700)
(43,700) . 43,700
30,000
(30,000)
(30,000) 30,000
100,000
(1 00,000)
(100,000) 100,000
200,000
(200,000)
(200,000) 200,000
(436,700) 436,700
5206 Information Technology
City of Pickering
2019
Capital Forecast
5206.1901 Server I Hardware Upgrades and Replacements
6175 Hardware Replacements
Upgrade and replacement of Server hardware
7001 R -Capital Equipment Replacement
Total 5206.1901 Server I Hardware Upgrades and Replacements
. 5206.1902 Information Security Enhancements
6175 Hardware Replacements
Security upgrades and enhancements including endpoint
protection, mobile device security and end user training and
awareness
7001 R-Capital Equipment Replacement
Total 5206.1902 Information Security Enhancements
5206.1903 Enterprise Resident Relationship Management Systein
6175 Hardware Replacements
Review and implementation of an enterprise resident relationship
management system that will enable the City to view resident
information from a single application
7001 R -Capital Equipment Replacement
Total 5206.1903 Enterprise Resident Relationship Management Sy
Total 5206 Information Technology
151
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
200,000
(200,000)
(200,000) 200,000
200,000
(200,000)
(200,000) 200,000
(600,000) . 600,000
City of Pickering
2020
Capital Forecast
5206 Information Technology
5206.2001 SAN Upgrade I Cloud Storage Solution.
6175 Hardware Replacements
City data storage will need to be reviewed and our existing SAN
upgraded or replaced. In 2020, the City is projected to be
managing 200 TB ofdata
7001 R -Capital Equipment Replacement
Total 5206.2001 SAN Upgrade I Cloud Storage Solution
5206.2002 City Network Upgrades
6175 Hardware Replacements
Our Network infrastructure will need to be upgraded and faster,
Intelligent networking components will be required.
7001 R -Capital Equipment Replacement
Total 5206.2002 City Network Upgrades
5206.2003 Wi-Fi Sensor Deployment -lOT
1711 ·Internal Loan-5 Year
6175 Hardware Replacements
Lower power Sub-gigahertz wireless sensor deployment for Internet
of Things and Connected Community Initiative. Sensors can
monitor Temperature, Humidity, Light, Proximity, Ultraviolet, C02,
etc. Can be used for smart parking, structural health, urban noise
maps, electromagnetic field levels, traffic congestion, smart lighting
and waste management.
Total 5206.2003 Wi-Fi Sensor Deployment-lOT
Total 5206 Information Technology
152
Run Date: Apr 6, 2016
Funding Expense
150,000
(150,000)
(150,000) 150,000
200,000
(200,000)
(200,000) 200,000
(500,000)
500,000
(500,000) 500,000
{850,000) 850,000
5219 Animal Services
Expenditures
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
153
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
20,000
10,000
15,000
45 000
(45,000)
(45,000)
City of Pickering
2019
Capital Forecast
5219 Animal Services
5219.1902 Equipment for New Shelter
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Purchase of equipment necessary to operate a new animal shelter
Total 5219.1902 Equipmentfor New Shelter
5219.1903 Cat Cages (New)
2823 Paid From Property Taxes
6181 Other Fixed Assets
Purchase of cat cages for new animal shelter
Total 5219.1903 Cat Cages (New)
5219.1904 Furniture for New Shelter
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Purchase of furniture for new animal shelter
Total· 5219.1904 Furniture for New Shelter
Total 5219 Animal Services
154
Run Date: Apr 6, 2016
Funding Expense
(1 0,000)
10,000
(1 0,000) 10,000
(15,000)
15,000
(15,000) 15,000
(20,000)
20,000
(20,000) 20,000
{45,000) 45,000
City of Pickering
Multi-Year Capital Forecast
2017-2020
05 Culture & Recreation Dept. Summary
2017
Forecast
Expenditures
6173 Furniture & Fixtures 25,000
6178 Miscellaneous Equipment 362,500
6181 Other Fixed Assets 235,000
6183 Accessibility
6230 Prof/Consulting Fees 27,000
6250 Construction Costs 1,504,000
6265 Land Acquisition & Disp
6430 Prof/Consulting Fees -Seaton
Total Expenditures 2153,_500
Financing
1701 Debt-5 Year
1702 Debt-10 Year (890,000)
1711 Internal Loan-5 Year (300,000)
1712 Internal Loan-10 Year
2823 Paid From Property Taxes (70,000)
7032 R -Dunbarton Pool Surcharge (18,000)
7033 R -Don Beer Arena Surcharge
7034 R -R/Cmplex Core Surcharge ' (44,500)
7035 R -R/Cmplx Pool Surcharge (26,000)
7040 R -Vehicle Replacement (100,000)
7505 RF-Federal Gas Tax (705,000)
Total Financing (2, 153,500)
155
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
145,000 . 25,000 25,000
46,000 90,000
417,000 720,000 2,795,000
150,000 555,000 312,500
100,000
1,679,000 2,110,000 912,500
80,000
75,000
2 617 000 3 500 000 4120,000
(450,000)
(1 '150,000) . (2,190,000) (975,000)
(464,000) (560,000) (1 ,530,000)
(80,000)
(127,000) (490,000) (100,000)
(30,000)
(46,000)
(80,000)
(300,000) (180,000) (1 ,485,000)
(2,617,000) (3,500,000) (4,120,000)
5700 Civic Complex
Expenditures
6173 Furniture & Fixtures
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1711 Internal Loan -·5 Year
2823 Paid From Property Taxes
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
25,000
440,000
465 000
(440,000)
(25,000)
(465,000)
156
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
145,000 25,000 25,000
235,000 1,240,000
55,000
300,000
145 000 315 000 1 565 000
(110,000) (930,000)
(25,000) (45,000) (25,000)
(120,000) (160,000) (610,000)
(145,000) (315,000) (1 ,565,000)
5700 Civic Complex
5700.1701 Roof Replacement
1702 Debt-10 Year
6250 Construction Costs
City of Pickering
2017
Capital Forecast
Roof Replacement of original 27 year roof system.
Total 5700.1701 Roof Replacement
5700.1703 Workstations, Partitions: Tables, Shelving
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Original furniture is at least 26 years old and starting to deteriorate.
Spare parts are no longer available as furniture manufacturer is no
longer in business. '
Total 5700.1703 Workstations, Partitions, Tables, Shelving
Total 5700 Civic Complex
157
Run Date: Apr .6. 2016
Funding Expense
(440,000)
440,000
·(440,000) 440,000
(25,000)
25,000
(25,000) 25,000
(465,000) 465,000
5700 Civic Complex
City of Pickering
2018
Capital Forecast
5700.1801 Air Handling Units -SF4 + RF4 Replacement
6173 Furniture & Fixtures
Air Handling Units -SF4 + RF4 (Replacement). Lifecycle
replacement of original 28 year old equipment.
7505 RF-Federal Gas Tax·
Total 5700.1801 Air Handling Units -SF4 + RF4 Replacement
5700.1804 Workstations, Partitions, Tables, Shelving
2823 Paid From Property Taxes
6173 Furniture & Fixtures
· Original furniture is at least 27 years old and starting to deteriorate.
Spare parts are no longer available as furniture manufacturer is no
longer in business.
Total 5700.1804 Workstations, Partitions, Tables, Shelving
Total 5700 Civic Complex
158
Run Date: Apr 6, 2016
Funding Expense
120,000
(120,000)
(120,000) 120,000
(25,000)
25,000
(25,000) 25,000
(145,000) 145,000
City of Pickering
2019
Capital Forecast
5700 Civic Complex
5700.1901 Air Handling Units -SF3 + RF3 Replacement
6181 Other Fixed Assets
AicHandling Units-SF3 + RF3 (Replacement). Lifecycle
replacement of original 29 year old equipment.
7505 RF-Federal Gas Tax
Total 5700.1901 Air Handling Units -SF3 + RF3 Replacement
5700.1903 Air Compressor Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Air Compressor Replacement of original equipment
Total 5700.1903 Air Compressor Replacement
5700.1905 Workstations, Partitions, Tables, Shelving
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Original furniture is at least 28 years old and starting to deteriorate.
Spare parts are no longer available as furniture manufacturer is no
longer in business.
Total 5700.1905 Workstations, Partitions, Tables, Shelving
5700.1906 Civic Complex Elevator Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
6183 Accessibility
Civic Complex Elevator Replacement of original 29 year old unit
that will be upgraded to the accessibility standards.
Total 5700.1906 Civic Complex Elevator Replacement
Total 5700 Civic Complex
159
Run Date: Apr 6, 2016
Funding Expense
160,000
(160,000)
(160,000) 160,000
(20,000)
20,000
(20,000) 20,000
(25,000)
25,000
(25,000) 25,000
(11 0,000)
55,000
55,000
(11 0,000) 110,000
(315,000) 315,000
5700 Civic Complex
City of Pickering
2020
Capital Forecast
5700.2001 Main Chiller Plant Replacement
6181 Other Fixed Assets
Replace Main Chiller Plant. Lifecycle replacement of original 30
year old equipment.
7505 RF-Federal Gas Tax
Total 5700.2001 Main Chiller Plant Replacement
5700.2002 Backup Boilers Replacement
6181 Other Fixed Assets
Replace Backup Boilers. Lifecycle replacement of original 30 year
old mechanical equipment.
7505 RF-Federal Gas Tax
Total 5700.2002 Backup Boilers Replacement
5700.2003 Civic Complex Parking Garage Ramp & Heating System
1711 Internal Loan-5 Year
6250 Construction Costs
Parking Garage Ramp & Heating System. Lifecycle replacement of
original 30 year old installation.
Total 5700.2003 Civic Complex Parking Garage Ramp & Heating S
5700.2005 Workstations, Partitions, Tables, Shelving
2823 Paid From Property Taxes
6173 Furniture & Fixtures
Original furniture is at least 29 years old and starting to deteriorate.
Spare parts are no longer available as furniture manufacturer is no .
longer in business.
Total 5700.2005 Workstations, Partitions, Tables, Shelving
. 5700.2006 City Hall Tower Steel Restoration & Painting
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Steel restoration and repainting of steel structures, roofing and trim
at top of central tower at the Civic Complex. The existing steel and
metalwork is peeled, cracked and failing in various areas, resulting
in increasing wear and corrosion which is visible from the ground
level. Project costs include grinding, weld and metal repairs,
sandblasting and repainting the entire upper portion of the central
tower.
Total 5700.2006 City Hall Tower Steel Restoration & Painting
160
Run Date: Apr 6, 2016
Funding Expense
500,000
(500,000)
(500,000) 500,000
110,000
(11 0,000)
(11 0,000) 110,000
(300,000)
300,000
(300,000) 300,000
(25,000)
25,000
(25,000) 25,000
(480,000)
480,000
(480,000) 480,000
5700 Civic Complex
City of Pickering
2020
Capital Forecast
5700.2007 Window Replacement (Phase 1)
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Window Replacement (Phase ·1). Lifecycle replacement to original
windows.
Total 5700.2007 Window Replacement (Phase 1)
Total 5700 Civic Complex
1 61
Run Date: Apr 6, 2016
Funding Expense
(150,000)
150,000
(150,000) 150,000
(1 ,565,000) 1,565,000
5701 Senior Citizens Centre
Expenditures
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
2823 Paid From Property Taxes
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
125,000
125 000
(125,000)
(125,000)
162
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
500,000
30,000
30 000 500000
(30,000)
(500,000)
(30,000) (500,000)
5701 Senior Citizens Centre
City of Pickering
2017.
Capital Forecast
5701.1701 Replace Air Handling Unit in Gym
6181 Other Fixed Assets
Replace Air Handling Unit in Gym .. Lifecycle replacement of original
31 year old equipment.
7505 RF-Federal Gas Tax
Total 5701.1701 Replace Air Handling Unit in Gym
Total 5701 Senior Citizens Centre
163
Run Date: Apr 6, 2016
Funding Expense
125,000
(125;000)
(125,000) 125,000
(125,000) 125,000
5701 Senior Citizens Centre
5701.1901 Kitchen Retrofit
2823 Paid From Property Taxes
6250 Construction Costs
City of Pickering
2019
Capital Forecast
Kitchen Retrofit of Seniors Centre to upgrade finishes and fixtures.
Total 5701.1901 Kitchen Retrofit
Total 5701 Senior Citizens Centre
164
Run Date: Apr 6, 2016
Funding Expense
(30,000)
30,000
(30,000) 30,000
(30,000) 30,000
5701 Senior Citizens .Centre
City of Pickering
2020
Capital Forecast
5701.2001 Main Chiller Plant Replacement
6181 Other Fixed Assets
Main Chiller Plant Replacement Lifecycle replacement of original
equipment providing air conditioning to the Seniors Center.
7505 RF-Federal Gas Tax
Total 5701.2001 Main Chiller Plant Replacement
Total 5701 Senior Citizens Centre
165
Run Date: Apr 6, 2016
Funding Expense
500,000
(500,000)
(500,000) 500,000
(500,000) 500,000
5713 Dunbarton Pool
Expenditures
6178 Miscellaneous Equipment.
6181 Other Fixed Assets
Total Expenditures
Financing
7032 R -Dunbarton Pool Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
18,000
18,000
(18,000) .
(18,000)
166
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
40,000
40 000
(40,000)
(40,000)
5713 Dunbarton Pool
5713.1701 Power Invertor Replacement
6178 Miscellaneous Equipment
City of Pickering
2017
Capital Forecast
Power Invertor Replacement. Lifecycle replacement of original
equipment.
7032 R -Dunbarton Pool Surcharge
Total 5713.1701 Power Invertor Replacement
Total 5713 Dunbarton Pool
167
Run Date: Apr 6, 2016
Funding EXpense
18,000
(18,000)
(18,000) 18,000
(18,000) 18,000
5713 Dunbarton Pool
5713.1801 Lighting Upgrades
6181 Other Fixed Assets
Lighting Upgrades over pool deck
7505 RF -Federal Gas Tax
Total 5713.1801 Lighting Upgrades
Total 5713 Dunbarton Pool
City of Pickering
2018
Capital Forecast
168
Run Date: Apr 6, 2016
Funding Expense
40,000
(40,000)
(40,000) 40,000
(40,000) . 40,000
5715 Don Beer Arena
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1701 Debt-5 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7033 R -Don Beer Arena Surcharge
7040 R -Vehicle Replacement
7505 RF -Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
100,000
100 000
(100,000)
(100,000)
169
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
190,000 220,000
450,000 80,000 200,000
450 000 270 000 420 000
(450,000)
(190,000) (200,000)
(80,000)
(30,000)
(190,000)
(450,000) (270,000) (420,000)
5715 Don Beer Arena
5715.1701 Ice Resurfacer Replacement
6178 Miscellaneous Equipment
City of Pickering
2017
Capital Forecast
Ice Resurfacer (Replacement). The unit is 23 years old and has a
life cycle of 20 years.
7040 R -Vehicle Replacement
Total 5715.1701 Ice Resurfacer Replacement
Total 5715 Don Beer Arena
170
Run Date: Apr 6, 2016
Funding Expense
100,000
(100,000)
(100,000) 100,000
(100,000) 100,000
5715 Don Beer Arena
City of Pickering
2018
Capital Forecast
5715.1802 Don Beer New Ice Hesurfacer Room & Entrance
1701 Debt-5 Year
6250 Construction Costs
New Ice Resurfacer Room & Entrance
Total 5715.1802 Don Beer New Ice Resurfacer Room & Entrance
Total5715 Don Beer Arena
171
Run Date: Apr 6, 2016
Funding Expense
(450,000)
450,000
(450,000) 450,000
(450,000) ,. 450,000
5715 Don Beer Arena
City of Pickering
2019
Capital Forecast
5715.1901 Don Beer Arena Lighting Upgrades
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Arena Lighting Upgrades to rinks 2 & 3 for energy efficiency
Total 5715.1901 Don Beer Arena Lighting Upgrades
5715.1902 Custodial Rooms Refurbishment
2823 Paid From Property Taxes
6250 Construction Costs
Custodial rooms refurbishment (upgrades to plumbing, fixtures,
wall/floor finishes, lighting, racking for storage)
Total 5715.1902 Custodial Rooms Refurbishment
Total5715 Don Beer Arena
172
Run Date: Apr 6, 2016
Funding Expense
(190,000)
190,000
(190,000) 190,000
(80,000)
80,000
(80,000) 80,000
(270,000) 270,000
City of Pickering
2020,
Capital Forecast
57.15 Don Beer Arena
5715.2001 Low E (Emissivity) Ceilings
6181 Other Fixed Assets
Low E (Emissivity) Ceilings in Rinks 1 & 2. Lifecycle replacement.
7505 RF-Federal Gas Tax
Total 5715.2001 LowE (Emissivity) Ceilings
5715.2002 Bleacher Gas Heaters Upgrade
6181 Other Fixed Assets
Replace Bleacher Electric Heaters with Gas
7505 RF-Federal Gas Tax
Total 5715.2002 Bleacher Gas Heaters Upgrade
5715.2003 Ammonia Chiller Replacement
· 6181 Other Fixed Assets
Replace Ammonia Chiller. Lifecycle replacement.
7033 R -Don Beer Arena Surchc;~rge
Total 5715.2003 Ammonia Chiller Replacement
5715.2004 Don Beer Arena Concession Renovation
1711 Internal Loan - 5 Year
6250 Construction Costs
Renovation of Concession (millwork, plumbing, counter, floor
replacement etc.). Current Rental Income is $10,000/year.
Total 5715.2004 Don Beer Arena Concession Renovation
Total5715 Don Beer Arena
173
Run Date: Apr 6, 2016
Funding Expense
70,000
(70,000)
(70,000) 70,000
120,000
(120,000)
(120,000) 120,000
30,000
(30,000)
(30,000) 30,000
(200,000)
200,000
(200,000) 200,000
(420,000) 420,000
5719 Community Centres
Expenditures
6178 Miscellaneous Equipment .
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1702 Debt -1 0 Year
.2823 Paid From Property Taxes
7505 RF -Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
10,000
10,000
-
(10,000)
(10,000)
174
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
37,000 135,000 500,000
85,000 20,000
122 000 155 000 500 000
(350,000)
(62,000) (135,000)
(60,000) (20,000) (150,000)
(122,000) (155,000) (500,000)
5719 Community Centres
City of Pickering
2017
Capital Forecast
5719.1701 Floor Machine Replacement -PCCC
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Life cycle replacement of one floor scrubber for PCCC. This
machine allows staff to clean large floor surfaces quickly and
efficiently, and are invaluable for urgent cleanup.
Total 5719.1701 Floor Machine Replacement-PCCC
Total5719 Community Centres
175
Run Date: Apr 6, 2016
Funding Expense
(10,000)
10,000
(10,000) 10,000
(1 0,000) 10,000
5719 Community Centres
City of Pickering
2018
Capital Forecast
5719.1801 Septic Tank & Bed (Greenwood Community Centre)
2823 Paid From Property Taxes
6250 Construction Costs
Septic Tank & Bed (Greenwood Community Centre). Lifecycle
replacement of old septic bed.
Total 5719.1801 Septic Tank & Bed (Greenwood Community Centr
5719.1802 Heating Boiler Replacement -PCCC
6250 Construction Costs
Heating Boiler Replacement (Petticoat Creek Community Centre).
Lifecycle replacement of original equipment.
7505 RF -Federal Gas Tax
Total 5719.1802 Heating Boiler Replacement-PCCC
5719.1803 PCCC Exterior LED Signage
2823 Paid From Property Taxes
6181 · Other Fixed Assets
PCCC exterior LED signage
Total 5719.1803 PCCC Exterior LED Signage
Total 5719 Community Centres
176
Run Date: Apr 6, 2016
Funding Expense
(25,000)
25,000
(25,000) 25,000
60,000
(60,000)
(60,000) 60,000
(37,000)
37,000
(37,000) 37,000
(122,000) 122,000
5719 Community Centres
City of Pickering
2019
Capital Forecast
5719.1902 Roof Replacement Northern Facilities
2823 Paid From Property Taxes
6181 OtherFixed Assets
Roof Replacement Northern Facilities
Total 5719.1902 Roof Replacement Northern Facilities
5719.1903 Boiler Replacement (Claremont Community Centre)
2823 Paid From Property Taxes
6181 Other Fixed Assets
Boiler Replacement at Claremont Community Centre. Lifecycle
replacement of original 26 year old equipment.
Total 5719.1903 Boiler Replacement (Claremont Community Centr
5719.1904 HVAC Rebalance at Petticoat Creek Community Centre (
6250 Construction Costs
HVAC Rebalance at Petticoat Creek Community Centre (PCCC)
7505 RF-Federal Gas Tax
Total 5719.1904 HVAC Rebalance at Petticoat Creek Community C
Total5719 Community Centres
177
Run Date: Apr 6, 2016
Funding Expense
(75,000)
75,000
(75,000) 75,000
(60,000)
60,000
(60,000) 60,000
20,000
(20,000)
(20,000) 20,000
(155,000) 155,000
5719 Community Centres
City of Pickering
2020
Capital Forecast
5719.2001 Claremont CC RTU Replacement
6181 Other Fixed Assets
Replace RTU 1 ,2,4 & 5 at Claremont Community Centre. Lifecycle
replacement of original equipment.
7505 RF-Federal Gas Tax
Total 5719.2001 Claremont CC RTU Replacement
5719.2002 PCCC East Wall Replacement
1702 Debt-10 Year
6181 Other Fixed Assets
Replace East Wall of Petticoat Creek Community Centre
Total 5719.2002 PCCC East Wall Replacement
5719.2003 PCCC Domestic Hot Water Tanks Replacement
6181 Other Fixed Assets
Replace Domestic Hot Water Tanks at Petticoat Creek Community
Centre. Lifecycle replacement of original 20 year old equipment.
7505 RF-Federal Gas Tax
Total 5719.2003 PCCC Domestic Hot Water Tanks Replacement
Total 5719 Community Centres
178
Run Date: Apr 6, 2016
Funding Expense
130,000
(130,000)
(130,000) 130,000
(350,000)
350,000
(350,000) 350,000
20,000
(20,000)
(20,000) 20,000
(500,000) 500,000
5720 Seaton Community Centre
Expenditures
6430 Prof/Consulting Fees -Seaton
Total Expenditures
Financing
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
-
179
Run Date: Apr 12,2016
2018 2019 2020
Forecast Forecast Forecast
75,000
75 000
(75,000)
(75,000)
City of Pickering
2020.
Draft Capital Budget
For Council Consideration
5720 Seaton Community Centre
5720.2001 Seaton Community Centre -Preliminary Design & Site PI
2823 Paid From Property Taxes
6430 Prof/Consulting Fees -Seaton
Seaton Community Centre-Preliminary Design & Site Plan
Drawings
Total 5720.2001 Seaton Community Centre-Preliminary Design &
Total 5720 Seaton Community Centre
180
Run Date: Apr 12, 2016
Funding Expense
(75,000)
75,000
(75,000) 75,000
(75,000) 75,000
5731 Rec.Complex-Core
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1702 Debt-10 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7034 R -R/Cmplex Core Surcharge
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
234,500
580,000
814 500
(190,000)
(44,500)
(580,000)
(814,500)
181
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
46,000
120,000 50,000 235,000
150,000 500,000
100,000
900,000 1,950,000
1316000 2,500 000 235 000
(1,150,0,00) (2,190,000)
(260,000) (200,000)
(40,000) (50,000)
(46,000)
(80,000) (35,000)
(1 ,316,000) (2,500,000) (235,000)
5731 Rec.Complex-Core
City of Pickering
2017
Capital Forecast
5731.1701 Health Club Equipment Replacement
6178 Miscellaneous Equipment
Fitness Equipment Replacement: Smith Machine, Half Rack,
Uprights Bikes (5), Stair Climbers (3), Stairmill, Bench
7034 R -R!Cmplex Core Surcharge
Total 5731.1701 Health Club Equipment Replacement
5731.1702 Diesel Back Up Generator Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Diesel Back Up Generator (Replacement). Lifecycle replacement of
original 34 year old equipment with unit providing increased
capacity .
Total 5731.1702 Diesel Back Up Generator Replacement
5731.1705 Roof Replacement
6250 Construction Costs
Roof Replacement over core complex area
7505 RF-Federal Gas Tax
Total 5731.1705 Roof Replacement
Total 5731 Rec.Complex-Core
182
Run Date: Apr 6, 2016
Funding Expense
44,500
(44,500)
(44,500) 44,500
(190,000)
190,000
(190,000) 190,000
580,000
(580,000)
(580,000) 580,000
(814,500) 814,500
City of Pickering
2018
Capital Forecast
5731 Rec.Complex-Cor~
5731.1801 Health Club Equipment Replacement
6178 Miscellaneous Equipment
Spin Bikes (5), Ellipticals (2), Strength Machine
7034 R -R/Cmplex Core Surcharge
Total 5731.1801 Health Club Equipment Replacement
5731.1802 Air Handling'Units-RF13 + RF10 Replacement
6181 Other Fixed Assets
Air Handling Units-RF13 + RF10 (Replacement). Lifecycle
replacement of original 37 year old equipment.
7505 RF-Federal Gas Tax
Total 5731.1802 Air Handling Units-RF13 + RF10 Replacement
5731.1803 Rec. Complex Exterior Directional Signage
2823 Paid From Property Taxes
6181 Other Fixed Assets
Rec. Complex Exterior Directional Signage
Total 5731.1803 Rec. Complex Exterior Directional Signage
5731.1805 Rec. Complex Renovation of Main Reception, Public Cor
1702 Debt-10 Year
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
Project design and construction costs. Renovation of main
reception, public concourse and west entrance site works to include
sidewalk, pathway, curb and canopy repairs
Total 5731.1805 Rec. Complex Renovation of Main Reception, Pub
Total 5731 Rec.Complex-Core
183
Run Date: Apr 6, 2016
Funding Expense
46,000
(46,000)
(46,000) 46,000
80,000
(80,000)
(80,000) 80,000
(40,000)
40,000
(40,000) 40,000
(1 '150,000)
150,000
100,000
900,000
(1 '150,000) 1,150,000
(1 ,316,000) 1,316,000
City of Pickering
2019
Capital Forecast
5731 Rec.Complex-Core
5731.1901 Rec. Complex Dressing Room Renovation
1702 Debt-10 Year
6183 Accessibility
6250 Construction Costs
Dressing room design and renovation which entails a complete gut
renovation of the entire ground floor change room to encompass
both male and female members arid public change rooms. The
project includes the removal of all non-load bearing partitions and
interior finishes to permit total reconfiguration of the existing spaces.
This renovation will upgrade the change rooms to current
recreation facility standards, incorporate fully accessible design and
use low maintenance, energy efficient design wherever possible.
Total 5731.1901 Rec. Complex Dressing Room Renovation
5731.1902 BAS Upgrade Honeywell System
2823 Paid From Property Taxes
6181 Other Fixed Assets
BAS Upgrade Honeywell System
Total 5731.1902 BAS Upgrade Honeywell System
5731.1903 Rec. Complex Tennis Court Roof Replacement
1711 Internal Loan - 5 Year
6250 Construction Costs
Replacement of Tennis Court Roof
Total 5731.1903 Rec. Complex Tennis Court Roof Replacement
5731.1904 Rec. Complex Paint Tennis Court Walls & Ceiling
1711 Internal Loan-5 Year
6250 Construction Costs
Painting of tennis courts' walls and ceiling. A large area is required
to be painted as the Rec. Complex houses four full size tennis
courts in an interior space that is 220ft. long and 126 ft. wide, with
ceiling heights ranging from 30 to 40 ft. Project costs include
materials and labour, lift rental costs and protection of netting and
court surfaces.
Total 5731.1904 Rec. Complex Paint Tennis Court Walls & Ceiling
Total 5731 Rec.Complex-Core
184
Run Date: Apr 6, 2016
Funding Expense
(2,190,000)
500,000
1,690,000
(2, 190,000) 2,190,000
(50,000)
50,000
(50,000) 50,000
(160,000)
160,000
(160,000) 160,000
(100,000)
100,000
(100,000) 100,000
(2,500,000) 2,500,000
5731 Rec.Complex-Core
City of Pickering
2020
Capital Forecast
5731.2001 Rec. Complex Paint Roof Steel & Deck
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Paint Roof Steel & Deck
Total 5731.2001 Rec. Complex Paint Roof Steel & Deck
5731.2003 Light Replacement in Mechanical Rooms
6181 Other Fixed Assets
Light Replacement in Mechanical Rooms (replace last ofT121ights)
to high efficiency lighting
7505 RF-Federal Gas Tax
Total 5731.2003 Light Replacement in Mechanical Rooms
Total 5731 Rec.Complex-Core
185
Run Date: Apr 6, 2016
Funding Expense
(200,000)
200,000
(200,000) 200,000
35,000
(35,000)
(35,000) 35,000
{235,000) 235,000
5733 Rec. Complex-Pool
Expenditures
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan-5 Year
7035 R -R/Cmplx Pool Surcharge
Total Financing.
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
26,000
26 000
(26,000)
{26,000)
186
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
120,000 80,000
120 000 80 000
(120,000)
(80,000)
{120,000) (80,000)
5733 Rec. Complex-Pool
City of Pickering
2017
Capital Forecast
5733 .. 1701 Replace 'Filter Elements & Covers
6250 Construction Costs
Replace Filter Elements & Covers
7035 R -R/Cmplx Pool Surcharge
Total 5733.1701 Replace Filter Elements &Covers
Total5733 Rec. Complex-Pool
187
Run Date: Apr 6, 2016
Funding Expense
26,000
(26,000)
(26,000) 26,000
(26,000) 26,000
5733 Rec. Complex-Pool
· City of Pickering
2018
Capital Forecast
5733.1801 Rec. Complex Pool Beams and Deck (Inspection, Paintin
1711 Internal Loan-5 Year
6181 dther Fixed Assets
Pool Beams and Deck (Inspection, Painting & Minor Repairs)
Total 5733.1801 Rec. Complex Pool Beams and Deck (Inspection,
Total 5733 Rec. Complex-Pool
188
Run Date: Apr 6, 2016
Funding Expense
(120,000)
120,000
'(120,000) 120,000
(1.20,000) 120,000
5733 Rec. Complex-Pool
5733.1901 Pool Bleachers
6181 Other Fixed Assets
City of Pickering
2019
Capital Forecast
Pool Bleachers (Replacement). Lifecycle replacement of original 37
year old retractable bleachers.
7035 R ~ R/Cmplx Pool Surcharge
Total 5733.1901 Pool Bleachers
Total 5733 Rec. Complex-Pool
189
Run Date: Apr 6, 2016
Funding Expense
80,000
(80,000)
(80,000) 80,000
(80,000) 80,000
5735 Rec.Complex-Arenas
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
Total Expenditures .
Financing
1702 Debt-10 Year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
110,000
450,000
560 ooo·
(450,000)
(110,000)
(560,000)
190
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
90,000
312,500
244,000 30,000 412,500
244 000 120 000 725 000
(625,000)
(244,000) (100,000)
(120,000)
(244,000) (120,000) (725,000)
5735 Rec.Complex-Arenas
City of Pickering
2017
Capital Forecast
5735.1701 Evaporator Condenser Tower Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Evaporator Condenser Tower Replacement. Lifecycle replacement
of original 26 year old quipment.
Total 5735.1701 Evaporator Condenser Tower Replacement
5735.1702 O'Brien Lobby Roof Replacement
1702 Debt-10 Year
6250 Construction Costs
O'Brien Lobby Roof Replacement. Lifecycle replacement of original
26 year old roof.
Total 5735.1702 O'Brien Lobby Roof Replacement
Total 5735 Rec.Complex-Arenas
191
Run Date: Apr 6, 2016
Funding Expense
(11 0,000)
110,000
•' (110,000) 110,000
(450,000)
450,000
(450,000) 450,000
(560,000) 560,000
5735 Rec.Complex-Arenas
City of Pickering
2018
Capital Forecast
5735.1801 O'Brien Refrigeration Room Equipment Rebuild
1711 Internal Loan-5 Year
6250 Construction Costs
O'Brien Refrigeration Room Rebuild. Lifecycle replacement of 27
·year old equipment that makes ice.
Total 5735.1801 O'Brien Refrigeration Room Equipment Rebuild
Total 5735 Rec.Complex-Arenas
192
Run Date: Apr 6, 2016
Funding Expense
(244,000)
244,000
(244,000) 244,000
(244,000) 244,000
5735 Rec.Complex-Arenas
City of Pickering
2019
Capital Forecast
5735.1902 Roof Top Unit (RTU-4) Replacement-Changerooms
2823 Paid From Property Taxes
6250 Construction Costs
RoofTop Unit-RTU-4 (Replacement-Changerooms). Lifecycle
replacement of 22 year old equipment.
Total 5735.1902 Roof Top Unit (RTU-4) Replacement -Changeroor
5735.1903 lc~ Resurfacer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replace Ice Resurfacer
Total 5735.1903 Ice Resurfacer Replacement
Total 5735 Rec.Complex-Arenas
193
Run ~ate: Apr 6, 2016
Funding Expense
(30,000)
30,000
(30,000) 30,000
(90,000)
90,000
(90,000) 90,000
(120,000) 120,000
City of Pickering
2020
Capital Forecast
5735 Rec.Complex-Arenas
5735.2001 O'Brien Rooms Renovations ·
1702 Debt-10 Year
6183 Accessibility
6250 Construction Costs
O'Brien Rooms Renovations. Re-design and Build Arena Office
Space-Service Area and Front Lobby Area for greater accessibility.
Banquet Hall, Kitchen & Washroom Renovations-O'Brien Arena
(50% of the project is Accessibility related)
Total 5735.2001 O'Brien Rooms Renovations
5735.2002 Rec. Complex Arena Parking Lot Resurfacing
1711 Internal Loan-5 Year
6250 Construction Costs
Lifecycle resurfacing of original parking lot.
Total 5735.2002 Rec. Complex Arena Parking Lot Resurfacing
Total 5735 Rec.Complex-Arenas
194
Run Date: Apr 6, 2016
Funding Expense
(625,000)
312,500
312,500
(625,000) 625,000
(100,000)
100,000
(1 00,000) 100,000
(725,000) 725,000
5744 Museum
Expenditures
6181 Other Fixed Assets
6230 Prof/Consulting Fees
6250 Construction Costs
6265 Land Acquisition & Disp
Total Expenditures
Financing
1711 Internal Loan - 5 Year
1712 Internal Loari-10 Year
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
27,000
8,000
35 000
(35,000)
_(35,000)
195
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
100,000 30,000 100,000
80,000
180 000 30 000 100 000
(1 00,000) (100,000)
(80,000)
(30,000)
(180,000) (30,000) (100,000)
5744 Museum
5744.1702 Reshingle Log House Roof
2823 Paid From Property Taxes
6250 Construction Costs
Reshingle Log House Roof
City of Pickering
2017
Capital Forecast
Total 5744.1702 Reshingle Log House Roof
5744.1703 Corrective Drainage Measures -Design Only
2823 Paid From Property Taxes
6230 Prof/Consulting Fees
A Civil Engineer or Water Management Engineer to be contracted
to survey the drainage issues on the Lower Site of the Museum to
determine corrective drainage measures to deal with ongoing
drainage problems.
Total 5744.1703 Corrective Drainage Measures-Design Only
Total 5744 Museum
196
Run Date: Apr 6, 2016
Funding Expense
(8,000)
8,000
(8,000) 8,000
(27,000)
27,000
(27,000) 27,000
(35,000) 35,000
5744 Museum
5744.1801 Museum Land Purchase
1712 Internal Loan-10 Year
6265 Land Acquisition & Disp
City of Pickering
2018
Capital Forecast
Purchase of available land on the west side of the upper site at the
Pickering Museum Village from the Toronto Region Conservation
Authority (TRCA). This land is currently part of the Greenwood
Conservation Area. The sale of the land was supported by the
TRCA at a meeting held in January 2011, and is recorded in the
Brock Lands Master Plan.
Total 5744.1801 Museum Land Purchase
5744.1802 Full Drainage Work on the Lower Museum Site
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Full drainage work on the lower museum site, as per plan coming
out of the consultant report completed in 2016
Total 5744.1802 Full Drainage Work on the Lower Museum Site
Total 5744 Museum
197
Run Date: Apr 6, 2016
Funding Expense
(80,000)
80,000
(80,000) 80,000
(100,000)
100,000
(100,000) 100,000
(180,000) 180,000
5744 Museum
5744.190'2 Bridge Repairs
2823 Paid From Property Taxes
6181 Other Fixed Assets
Bridge Repairs
Total 5744.1902 Bridge Repairs
Total 5744 Museum
City of Pickering
2019
Capital Forecast
198
Run Date: Apr 6, 2016
Funding Expense
(30,000) (
30,000
(30,000) 30,000
(30,000) 30,000
5744 Museum
City of Pickering
2020
Capital Forecast
5744.2001 Museum Gate & Fence Repair
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Museum Gate & Fence Repair to upper and lower museum site
Total 5744.2001 Museum Gate & Fence Repair
Total 5744 Museum
199
Run Date: Apr 6, 2016
Funding Expense
(100,000)
100,000
(100,000) 100,000
(100,000) . 100,000
City of Pickering
Multi-Year Capital Forecast
2017-2020
06 Engineering Services Summary
2017
Forecast
Expenditures
6181 Other Fixed Assets 200,000
6250 Construction Costs 100,000
6251 Road Improvements 653,300
6252 Streetlights & Sidewalks
6253 Storm Water 1,571,000
6254 Traffic Signals 50,000
Total Expenditures 2 574 300
Financing
1702 Debt-10 Year
1711 Internal Loan-5 Year (100,000)
2823 Paid From Property Taxes (50,000)
7022 R -DC's City's Share (837,770)
7501 RF-Third Party Contribution (200,000)
7505 RF-Federal Gas Tax
761 0 RF DC -Roads & Related (326,650)
7611 RF DC -Storm Water Mgmt (309,880)
771 0 RF -Stormwater Mgmt (750,000)
Total Financing (2,574,300)
200
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
918,000 200,000 200,000
200,000 200,000 200,000
2,145,000 3,212,800 2,500,000
1,077,000
2,293,666 1,071,000 2,803,581
50,000 50,000 50,000
5 606 666 5 810 800 5 753 581
(1,715,193) (2,144,900) (1,353,000)
(50,000) (50,000) (50,000)
(632,120) (769,620) (473,365)
(200,000) (200,000) (200,000)
(200,000) (200,000) (200,000)
I
(1 ,431,500) (1,606,400) (1,875,000)
(627,853) (89,880) (852,216)
(750,000) (750,000) (750,000)
(5,606,666) (5,81 0,800) (5,753,581)
City of Pickering
Multi-Year Capital Forec.ast
2017-2020
5325 Streetlights & Signalization
2017
Forecast
Expenditures
6254 Traffic Signals 50,000
Total Expenditures 50,000
Financing
2823 Paid From Property Taxes (50,000)
Total Financing (50,000)
201
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
50,000 50,000 50,000
50 000 50,000 50 000
(50,000) (50,000) (50,000)
(50,000) (50,000) (50,000)
City of Pickering
2017
Capital Forecast
5325 Streetlights & Signalization
5325.1702 (Sandy Beach Road) Traffic Signals/Controllers Replace!
2823 Paid From Property Taxes
6254 Traffic Signals
Sandy Beach Road @ Kinsmen Traffic Signals/Controllers -
Replacement
Total 5325.1.702 (Sandy Beach Road) Traffic Signals/Controllers R•
5325.1703 (Valley Farm Road) Traffic Signals/Controllers Replacem
2823 Paid From Property Taxes
6254 Traffic Signals
Valley Farm Road @ Fieldlight Traffic Signals/Controllers -
Replacement
Total 5325.1703 (Valley Farm Road) Traffic Signals/Controllers Re1
Total 5325 Streetlights & Signalization
202
Run Date: Apr 6, 2016
Funding Expense
(25,000)
25,000
(25,000) 25,000
(25,000).
25,000
(25,000) 25,000
{50,000) 50,000
City of Pickering
2018
Capital Forecast
5325 Streetlights & Signalization
5325.1802 Traffic Signals/Controllers Replacement
2823 Paid From Property Taxes
6254 Traffic Signals
Traffic Signals/Controllers Replacement (2) -Location TBD
Total 5325.1802 Traffic Signals/Controllers Replacement
Total 5325 Streetlights & Signalization
203
Run Date: Apr 6, 2016
Funding .Expense
(50,000)
50,000
(50,000) 50,000
(50,000) 50,000
City of Pickering
2019
Capital Forecast
5325 Streetlights & Signalization
5325.1902 Traffic Signals/Controllers Replacement
2823 Paid From Property Taxes
6254 Traffic Signals
Traffic Signals/Controllers Replacement (2) -Location TBD
Total 5325.1902 Traffic Signals/Controllers Replacement
Total 5325 Streetlights & Signalization
204
Run Date: Apr 6, 2016
Funding Expense
(50,000)
50,000
(50,000) 50,000
(50,000) 50,000
City of Pickering
2020
Capital Forecast
5325 Streetlights & Signalization
5325.2002 Traffic Signals/Controllers Replacement
2823 Paid From Property Taxes
6254 Traffic Signals
Traffic Signals/Controllers Replacement (2) -Location TBD
Total 5325.2002 Traffic Signals/Controllers Replacement
Total 5325 Streetlights & Signalization
205
Run Date: Apr 6, 2016
Funding Expense
(50,000)
50,000
(50,000) 50,000
(50,000) 50,000
5323 Sidewalks
Expenditures
6250 Construction Costs
Total Expenditures
Financing
'1711 Internal Loan-5 Year
7505 RF-Federal Gas Tax
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
100,000
100 000
(100,000)
(100,000)
206
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
200,000 200,000 200,000
200 000 200 000 200 000
(200,000) (200,000) (200,000)
(200,000) (200,000) (200;000)
5323 Sidewalks
City of Pickering
2017
Capital Forecast
5323.1701 Asphalt Sidewalks -Finch Avenue
1711 Internal Loan-5 Year
6250 Construction Costs
Asphalt Sidewalks-Finch Avenue
Total 5323.1701 Asphalt Sidewalks-Finch Avenue
Total 5323 Sidewalks
207
Run Date: Apr 6, 2016
Funding Expense
(100,000)
100,000
(100,000) 100,000
(100,000) 100,000
5323 Sidewalks
City of Pickering
2018
Capital Forecast
5323.1801 New Sidewalk Installations (Locations TBD)
6250 Construction Costs
. New Sidewalk Installations (Locations TBD)
7505 RF-Federal Gas Tax
Total 5323.1801 New Sidewalk Installations (Locations TBD)
Total 5323 Sidewalks
208
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
5323 Sidewalks
City of Pickering
2019
Capital Forecast
5323.1901 New Sidewalk Installations (Locations TBD)
6250 Construction Costs
New Sidewalk Installations (Locations TBD)
7505 RF-Federal Gas Tax
Total 5323.1901 New Sidewalk Installations (Locations TBD)
Total5323 Sidewalks
209
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200."000) 200,000
(200,000) 200,000
!-
5323 Sidewalks
City of Pickering
2020
Capital Forecast
5323.2001 New Sidewalk Installations (Locations TBD)
6250 Construction Costs
7505 RF-Federal Gas Tax
New Sidewalk Installations (Locations TBD)
Total 5323.2001 New, Sidewalk Installations (Locations TBD)
Total5323 Sidewalks
210
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
541 0 Stormwater Management
Expenditures
6253 Storm Water
Total Expenditures
Financing
7710 RF-StormwaterMgmt
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
750,000
750 000
(750,000)
(750,000)
211
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
750,000 750,000 750,000
750 000 750 000 750 000
(750,000) (750,000) (750,000)
(750,000) (750,000) (750,000)
5410 Stormwater Management
City of Pickering
2017
Capital Forecast
5410.1701. Abbott Crescent SWM Pond Cleanout Construction
6253 Storm Water
Abbott Crescent SWM Pond Cleanout (Design, Approvals &
Construction)
7710 RF -Sformwater Mgmt
Total 5410.1701 Abbott Crescent SWM Pond Cleanout Constructic
Total5410 Stormwater Management
212
Run Date: Apr 6, 2016
Funding Expense
750,000
(750,000)
(750,000) 750,000
(750,000) 750,000
5410 Stormwater Management
City of Pickering
2018
Capital Forecast
5410.1801 SWM Pond Cleanout Reconstruction
6253 Storm Water
Lisgold Subdivision Pond -Crossing Court SWM Pond Cleanout
Reconstruction.
7710 RF -Stormwater Mgmt
Total 5410.1801 SWM Pond Cleanout Reconstruction
Total5410 Stormwater Management
213
Run Date: Apr 6, 2016
Funding Expense
750,000
(750,000)
(750,000) 750,000
(750,000) 750,000
5410 Stormwater Management
City of Pickering
2019
Capital Forecast
5410.1901 SWM Pond Cleanout Reconstruction
6253 Storm Water
Voss subdivision pond -Valley Farm Road @Finch Avenue SWM
Pond Cleanout Reconstruction.
7710 RF-Stormwater Mgmt
Total 5410.1901 SWM Pond Cleanout ReconstruCtion
Total 5410 Stormwater Management
214
Run Date: Apr 6, 2016
Funding Expense
750,000
(750,000)
(750,000) 750,000
(750,000) 750,000
5410 Stormwater Management
City of Pickering
2020
Capital Forecast
5410.2001 SWM Pond Cleanout Reconstruction
6253 Storm Water
Crystal Forest Subdivision Pond-Chickadee Court SWM Pond
Cleanout Reconstruction.
771 0 RF -Stormwater Mgmt
Total 5410.2001 SWM Pond Cleanout Reconstruction
Total 5410 Stormwater Management
215
Run Date: Apr 6, 2016
Funding Expense
750,000
(750,000)
(750,000) 750,000
(750,000) 750,000
City of Pickering
Multi~Year Capital Forecast
2017-2020
5613 Water Resources & Development Services
2017
Forecast
Expenditures
6181 Other Fixed Assets 200,000
Total Expenditures 200 000
Financing
7501 RF -Third Party Contribution (200,000)
Total Financing (200,000)
216
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
200,000 200,000 200,000
200 000 200 000 200 000
,
(200,000) (200,000) (200,000)
(200,000) (200,000) (200,000)
City of Pickering
2017
Capital Forecast
5613 Water Resources & Development Services
5613.1701 Various Construction Projects
6181 Other Fixed Assets
Various Construction Projects Related to Development (Funded
from Third Party Contributions)
7501 RF -Third Party Contribution
Tot<\ I 5613.1.701 Various Construction Projects
Total5613 Water Resources & Developm~nt Services
217
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2018
Capital Forecast
5613 Water Resources & Development Services
5613.1801 Various Construction Projects
6181 Other Fixed Assets
Various construction projects related to Development (funded from
Third Party Contributions)
7501 RF-Third Party Contribution
Total 5613.1801 Various Construction Projects
Total 5613 Water Resources & Development Services
218
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2019
Capital Forecast
5613 Water Resources & Development Services
5613.1901 Various Construction Projects -6181 Other Fixed Assets
Various Construction Projects Related to Development (funded
from Third Party Contributions)
7501 RF -Third Party Contribution
Total 5613.1901 Various Construction Projects
Total5613 Water Resources & Development Services
219
Run Da.te: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
2020
Capital Forecast
5613 Water Resources & Development Services
5613.2001 Various Construction Projects
6181 Other Fixed Assets
Various Construction Projects Related to Development (funded
from Third Party Contributions)
7501 RF -Third Party Contribution
Total 5613.2001 Various Construction Projects
Total5613 Water Resources & Development Services
220
Run Date: Apr 6, 2016
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
City of Pickering
Multi-Year Capital Forecast
2017-2020
5321 Development Projects-(DC Funded)
2017
Forecast
Expenditures
6181 Other Fixed Assets
6251 Road Improvements 653,300
6252 Streetlights & Sidewalks
6253 Storm Water 821,000
Total Expenditures 1 474 300
Financing
1702 Debt-10 Year
7022 R -DC's City's Share (837,770)
7610 RF DC -Roads & Related (326,650)
7611 RF DC -Storm Water Mgmt (309,880)
Total Financing (1 ,47 4,300)
221
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
718,000
2,145,000 3,212,800 2,500,000
1,077,000
'1,543,666 321,000 2,053,581
4 406 666 4 610 800 4 553,581
(1 ,715, 193) (2, 144,900) (1 ,353,000)
(632,120) (769,620) (473,365)
(1 ,431 ,500) '(1 ,606,400) (1 ,875,000)
(627,853) (89,880) (852,216)
(4,406,666) (4,61 0,800) (4,553,581)
City of Pickering
2017
Capital Forecast
5321 Development Projects-(DC Funded)
5321.1701 Oil Grit Separators Frenchman's Bay
6253 Storm Water
Oil Grit Separators (28/72) Frenchman's Bay
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1701 Oil Grit Separators Frenchman's Bay
5321.1702 B-20 Krosno Creek SWM Facility@ Sandy Beach Rd -DE
6253 Storm Water
B-20 Krosno Creek SWM Facility@ Sandy Beach Rd. Design only.
(44/56)
7022 R -DC's City's Share
7611 RF DC-Storm Water Mgmt
Total 5321.1702 B-20 Krosno Creek SWM Facility@ Sandy Beach
5321.1706 RP-2 Finch Ave
6251 Road Improvements
RP-2 Finch Ave West of Altona Road Culvert Replacement (50/50)
7022 R -DC's City's Share
7610 RF DC -Roads & Related
Total 5321.1706 RP-2 Finch Ave
Total 5321 Development Projects-(DC Funded)
222
Run Date: Apr 6, 2016
Funding Expense
321,000
(231 '120)
(89,880)
(321,000) 321,000
500,000
(280,000)
(220,000)
(500,000) 500,000
653,300
(326,650)
(326,650)
(653,300) 653,300
(1 ,47 4,300) 1,474,300
City of Pickering
2018
Capital Forecast
5321 Development Projects-(DC Funded)
5321.1801 D-1 Kingston Road -North Side Steetlighting & Sidewall
6181 Other Fixed Assets
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1801 D-1 Kingston Road -North Side Steetlighting & S
5321.1802 D-2 Kingston Road -South Side Steetlighting & Sidewal
6181 Other Fixed Assets
7022 R -DC's City's Share
7610 RF DC -Roads & Related
Total 5321.1802 D-2 Kingston Road -South Side Steetlighting & S
5321.1804 Oil Grit Separators -Frenchman's Bay
6253 Storm Water
Oil Grit Separators (28/72) Frenchman's Bay
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1804 Oil Grit Separators-Frenchman's Bay
5321.1805 RU-4 Audley Road Reconstruction
1702 Debt-10 Year
6251 Road Improvements
RU-4 Audley Road (50/50) Fifth Concession to Hwy. #7-Two
Lane Rural Reconstruction
7610 RF DC-Roads & Related
Total 5321.1805 RU-4 Audley Rqad Reconstruction
5321.1806 B-19 Krosno Creek SWM Facility
6253 Storm Water
B-19 (44/56) Krosno Creek SWM Facility K16@ Wharf St. (EA,
Design & Approvals)
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1806 B-19 Krosno Creek SWM Facility
5321.1807 B-20 Krosno Creek -SWM Facility
1702 Debt-10 Year
6253 Storm Water
B-20 Krosno Creek-SWM Facility-Sandy Beach Road-K-20
Construction (44/56)
223
Run Date: Apr 6, 2016
Funding Expense
323,100
(161,550)
(161 ,550)
(323,100) 323,100
394,900
(197,450)
(197,450)
(394,900) 394,900
321,000
(231,120)
(89,880)
(321 ,000) 321,000
(1 ,072,500)
2,145,000
(1 ,072,500)
(2,145,000) 2,145,000
75,000
(42,000)
(33,000)
(75,000) 75,000
(642,693)
1,147,666
City of Pickering
2018
Capital Forecast
5321 Development Projects-(DC Funded)
7611 RF DC-Storm Water Mgmt
Total 5321.1807 B-20 Krosno Creek-SWM Facility
Total 5321 Development Projects-(DC Funded)
224
Run Date: Apr 6, 2016
Funding Expense
(504,973)
(1,147,666) 1,147;666
(4,406,666) 4,406,666
City of Pickering
2019
Capital Forecast
5321 Development Projects-(DC Funded)
5321.1902 Bl-1 Sidewalks & Streetlights -Bayly Street
1702 Debt-10 Year
6252 Streetlights & Sidewalks
81 -1 Sidewalks & Streetlights-Bayly Street (Church Street tq
Hydro Corridor-north and south sides) (50/50)
7022 R -DC's City's Share
Total 5321.1902 Bl-1 Sidewalks & Streetlights-Bayly Street
5321.1903 lnstall<!tion of 2 Oil Grit Separators
6253 Storm Water
Installation of 2 Oil Grit Separators for FB SWM Monitoring Pond
(28/72)
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1903 Installation of 2 Oil Grit Separators
5321.1905 Bl-8 Kellino Street-Road Reconstruction
1702 Debt-10 Year
6251 Road Improvements
Bl-8 Kellino Street-Squires Beach Rd. to Church St. (50/50)
7610 RF DC -Roads & Related
Total 5321.1905 BI-8 Kellino Street-Road Reconstruction
5321.1906 Bl-18 Squires Beach Road Reconstruction
1702 Debt-10 Year
6251 Road Improvements
Bl-18 Squires Beach Road (50/50). Bayly Street to CNR Tracks.
761 0 RF DC -Roads & Related
Total 5321.1906 Bl-18 Squires Beach Road Reconstruction
Total 5321 Development Projects-(DC Funded)
225
Run Date: Apr 6, 2016
Funding Expense
(538,500)
1,077,000
(538,500)
(1 ,077,000) 1,077,000
321,000
(231,120)
(89,880)
(321 ,000) 321,000
(803,200)
1,606,400
(803,200)
(1 ,606,400) 1,606,400
(803,200)
1,606,400
. (803,200)
(1 ,606,400) 1,606,400
(4,61 0,800) 4,610,800
City of Pickering
2020
Capital Forecast
5321 Development Projects-(DC Funded)
5321.2001 B-19 Krosno Creek SWM ·Facility
6253 Storm Water
8-19 Krosno Creek SWM Facility K16. Construction (44/56)
7022 R -DC's City's Share
7611 RF DC-Storm Water Mgmt
Total 5321.2001 B-19 Krosno Creek SWM Facility
5321.2002 Installation of Oil Grit Separators
6253 Storm Water
Installation of Oil Grit Separators (28/72) Frenchman's Bay
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.2002 Installation of Oil Grit Separators
5321.2003 TC-31 Arterial Road (Hydro Corridor, City Centre) Study
1702 Debt-10 Year
6251 Road Improvements
TC-31 Future Arterial Road in Hydro Corridor, City Centre-
Feasibility Study and Environmental Assessment (75/25)
7610 RF DC-Roads & Related
Total 5321.2003 TC-31 Arterial Road (Hydro Corridor, City Centre)
5321.2004 8-30 Krosno Creek SWM Facility
1702 Debt-10 Year
6253 Storm Water
8-30 Krosno Creek SWM Facility K19 Hydro Corridor-(44/56)
(feasibility, EA, Design, Land Cost & Approvals)
7611 RF DC-Storm Water Mgmt
Total 5321.2004 B-30 Krosno Creek SWM Facility
Total 5321 Development Projects-(DC Funded)
226
Run Date: Apr 6, 2016
Funding Expense
432,581
(242,245)
(190,336)
(432,581) 432,581
321,000
(231,120)
(89,880)
(321 ,000) 321,000
(625,000)
2,500,000
(1,875,000)
(2,500,000) 2,500,000
(728,000)
1,300,000
(572,000)
(1 ,300,000) 1,300,000
(4,553,581) 4,553,581
07 Public Works Summary
Expenditures
6129 Parks -Landscape Refurbishment
6157 Vehicles-under $100,000
6158 Vehicles-Over $100,000
6159 Fire Veh-Over $100,000
6173 Furniture & Fixtures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Constructidn Costs
6429 Parks -Landscape Refurb -Seaton
6457 Vehicles-Under $100,000-Seaton
6458 Vehicles-Over $100,000 -Seaton
6478 Miscellaneous Equipment-Seaton
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
1701 Debt-5 Year
1702 Debt - 1 o Year
1704 Debt -20 year
1711 Internal Loan-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7021 R-Rate Stabilization
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7055 R -Property Line Fencing
7502 RF -Parkland
7505 RF-Federal Gas Tax
7605 RF DC -Fire
7610 RF DC -Roads & Related
7612 RF DC-Operations Services
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
370,000
530,000
660,000
734,000
1,070,000
100,000
28,500,000
1,467,000 .
900,000
34 331 000
. (250,000)
(1 ,000,000)
(915,000)
(879,000)
(45,000).
(176,040)
(1 ,020,000)
(200,000)
(250,000)
(1 ,575,000)
(855,000)
(9, 183,200)
7620 RF DC -ParkiCJnd Development & Trails (1 ,290,960)
227
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
1,542,500 2,675,000 3,840,000
325,000 734,000 445,000
540,000 285,000 525,000
900,000 900,000 900,000
500,000
1,182,000 1,135,000 905,000
905,000 2,270,000 1,070,000
337,500 275,000 150,000
250,000 300,000
11,225,000 7,700,000 5,550,000
1,917,000 4,050,000
33,333
155,000
17 862 000 18 224 333 17 435 000
(135,000)
(150,000)
(525,000) (560,000)
(4,645,000) (6,867,500) (2,300,000)
(1 '175,000) (1 ,000,000) (1 ,500,000)
(960,000) (1 ,635,000) (1 ,250,000)
(150,000)
(412,000) (155,000) (11 0,000)
(256,750) (833) (2,509,500)
(1 ,035,000) (1 ,234,000) (850,000)
(300,000) (350,000) (200,000)
(100,000) (430,040)
(2,040,000) (2,340,000) (2,170,000)
(32,500)
(3,250,000)
(315,000) (364,500)
(713,250) (2,519,460) (5,181,000)
07 Public Works Summary
7708 RF -Operations Centre
7709 RF -Roads & Bridges
7711 RF -OCIF Grant
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017.-2020
2017
Forecast
(15,416,800)
(1 ,085,000)
(190,000)
(34,331 ,000)
.228
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
(500,000)
(1 '160,000) (950,000) (1 ,000,000)
(190,000)
(17 ,862,000) (18,224,333) (17 ,435,000)
5311 property Maintenance
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6250 Construction Costs
6478 Miscellaneous Equipment-Seaton
Total Expenditures
Financing
1711 Internal Loan - 5 Year
2823 Paid From Property Taxes
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7055 R-Property Line Fencing
7502 RF -Parkland
7612 RF DC-Operations Services
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
280,000
200,000
480 000
(130,000)
(50,000)
(100,000)
(200,000)
7620 RF DC -Parkland Development & Trails
Total Financing (480,000)
229
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
310,000 330,000 705,000
200,000 300,000
200,000
155,000
665 000 830 000 705 000
(250,000) (170,000)
(140,000) (60,000) (50,000)
(15,500) (15,500)
(170,000) (170,000) (130,000)
(200,000) (150,000) (200,000)
(200,000)
(139,500)
(139,500)
(665,000) (830,000) (705,000)
City of Pickering
2017
Capital Forecast
5311 Property Maintenance
5311.1701 (4) Outfront Mowers/Zero Turn Mowers
2823 Paid From Property Taxes -
6178 Miscellaneous Equipment
(4) Outfront Mowers/Zero Turn Mowers (replacements on a 4-year
cycle)
Total 5311.1701 (4) Outfront Mowers/Zero Turn Mowers
5311.1704 (1) 16' Area Mower Replacement
6178 Miscellaneous Equipment
(1) Replacement 16' Area Mower-unit #788 (2004)
7040 R -Vehicle Replacement
Total 5311.1704 (1) 16' Area Mower Replacement
5311.1705 Property Line Fence Replacement
6181 Other Fixed Assets
Property line fence replacement
7055 R-Property Line Fencing
Total 5311.1705 Property Line Fence Replacement
5311.1707 Sidewalk Plow with Attachments Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments-Replacement Unit# 755 (2001)
Total 5311.1707 Sidewalk Plow with Attachments Replacement
Total5311 Property Maintenance
230
Run Date: Apr 6, 2016
Funding Expense
(50,000)
50,000
'
(50,000) 50,000
100,000
(1 00,000)
(100,000) 100,000
200,000
(200,000)
(200,000) 200,000
(130,000)
130,000
(130,000) 130,000
(480,000) 480,000
City of Pickering
2018
Capital Forecast
5311 Property Maintenance
5311.1801 Sidewalk Plow with Attachments Repla~ement
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments -Replace unit #575 (2004)
7040 R -Vehicle Replacement
Total 5311.1801 Sidewalk Plow with Attachments Replacement
5311.1802 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fence Replacement
7055 R -Property Line Fencing
Total 5311.1802 Property Line Fence Replacement
5311.1805 Area Mower Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Area Mower-Replace unit# 739 (201 0)
Total 5311.1805 Area Mower Replacement
5311.1806 {4) Zero Turn Outfront Mowers Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
(4) Zero Turn Outfront Mowers (replacements on a 4-year cycle)
Total 5311.1806 {4) Zero Turn Outfront Mowers Replacement
5311.1807 Additional Sidewalk Plow {Seaton)
6478 Miscellaneous Equipment-Seaton
Additional Trackless Sidewalk Plow
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5311.1807 Additional Sidewalk Plow {Seaton)
Total 5311 Property Maintenance
231
Run Date: Apr 6, 2016
Funding Expense
170,000
(170,000)
(170,000) 170,000
200,000
(200,000)
(200,000) 200,000
(90,000)
90,000
(90,000) 90,000
(50,000)
50,000
(50,000) 50,000
155,000
J
(15,500)
(139,500)
(155,000) 155,000
{665,000) 665,000
City of Pickering
2019
Capital Forecast
5311 Property Maintenance
5311.1901 Outfront!Zero Turn Mower Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Outfront Mower (replacements on a 4-year cycle)
Total 5311.1901 Outfront!Zero Turn Mower Replacement
5311.1902 Area Mower Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Area Mower Replacement Unit# 710 (2011 ).
Total 5311.1902 Area Mower Replacement
5311.1903 401 Brock Road On/Off Ramp Landscape
1711 Internal Loan-5 Year
6181 Other Fixed Assets
401 Brock Road On/Off Ramp Landscape Reconstruction including
Welcome to Pickering Sign
Total 5311.1903 401 Brock Road On/Off Ramp Landscape
5311.1904 Sidewalk Plow with Attachments Replacement
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments Replacement-Unit #756 (2009)
7040 R -Vehicle Repiacement
Total 5311.1904 Sidewalk Plow with Attachments Replacement
5311.1905 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fencing
7055 R -Property Line Fencing
Total 5311.1905 Property Line Fence Replacement
5311.1906 Walkway Reconstruction
6250 Construction Costs
Walkway Reconstruction -Between Elvira Court and Bruce
Hanscombe Park
7502 RF -Parkland
Total 5311:1906 Walkway Reconstruction
Total 5311 Property Maintenance
232
Run Date: Apr 6, 2016
Funding Expense
(60,000)
60,000
(60,000) 60,000
(1 00,000)
100,000
(100,000) 100,000
(150,000)
150,000
(150,000) 150,000
170,000.
(170,000)
(170,000) 170,000
150;000
(150,000)
(150,000) 150,000
200,000
(200,000)
(200,000) 200,000
(830,000) 830,000
531_1 Property Maintenance
5311.2001 (4) Zero Turn mowers
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
City of Pickering
2020
Capital Forecast
(4) Zero Turn mowers (replacements on a 4-year cycle)
. Total 5311.2001 (4) Zero Turn mowers
5311.2002 Property Line Fence Replacement
6178 Miscellaneous Equipment
Property Line Fence Replacement
7055 R-Property Line Fencing
Total 5311.2002 Property Line Fence Replacement
5311.2003 Sidewalk Plow with Attachments Replacement
6178 Miscellaneous Equipment
Sidewalk Plow with Attachments -Replacement
7040 R -Vehicle Replacement
Total 5311.2003 Sidewalk Plow with Attachments Replacement
5311.2004 Sidewalk Plow (New)
6178 Miscellaneous Equipment
Sidewalk Plow (New) (90/1 0). Project to be included in the 2018 DC
study.
7022 R -DC's City's Share
7612 RF DC -Operations Services
Total 5311.2004 Sidewalk Plow (New)
5311.2005 Tractor/Mower/Trailer
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Tractor/Mower/Trailer
Total 5311.2005 Tractor/Mower/Trailer
Total 5311 Property Maintenance
233
Run Date: Apr 6, 2016
Funding Expense
(50,000)
50,000
(50,000) 50,000
200,000
(200,000)
(200,000) 200,000
130,000
(130,000)
(130,000) 130,000
155,000
(15,500).
(139,500)
(155,000) 155,000
(170,000)
170,000
(170,000) 170,000
(705,000) 705,000
5315 Operations Centre
Expenditures
6173 Furniture & Fixtures
6250 Construction Costs
Total Expenditures
Financing
7612 RF DC-Operations Services
7708 RF -Operations Centre
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
24,600,000
24 600 000
(9,183,200)
(15,416,800)
(24,600,000)
234
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
500,000
500 000
(500,000)
(500,000)
5315 Operations Centre
5315.1701 New Operations Centre
6250 Construction Costs
City of Pickering
2017
Capital Forecast
Construction of a new Operations Centre. The project budget
includes costs for site preparation and servicing, landscaping, land
and related costs, furniture and fixtures and construction. Site works
include the construction of a berm for sound abatement and related
landscaping costs. The DC Reserve Fund will have to borrow
external funds to meet this obligation. The borrowing costs were
included in the new DC rate calculation and the borrowing term will
be for 20 years.
7612 RF DC-Operations Services
7708 RF -Operations Centre
Total 5315.1701 New Operations Centre
Total 5315 bperations Centre
235
Run Date: Apr 6, 2016
Funding Expense
24,600,000
(9, 183,200)
(15,416,800)
(24,600,000) 24,600,000
(24,600,000) 24,600,000
5315 Operations Centre
City of Pickering
2018
Capital Forecast
5315.1801 Furniture & Fixtures for New Operations Centre
6173 Furniture & Fixtures
Furniture and Computer Related Equipment
7708 RF -Operations Centre
Total 5315.1801 Furniture & Fixtures for New Operations Centre
Total 5315 Operations Centre
236
Run Date: Apr 6, 2016
Funding Expense
500,000
(500,000)
(500,000) 500,000
(500,000) 500,000
5320 Roads
Expenditures
6178 Miscellaneous Equipment
6230 Prof/Consulting Fees
6250 Construction Costs
Total Expenditures
Financing
1701 Debt-5 Year
1702 Debt-10 Year
1704 Debt -20 year
1711 Internal Loan-5 Year
2823 Paid From Property Taxes
7'505 RF-Federal Gas Tax
7610 RF DC -Roads & Related
7709 RF -Roads & Bridges
7711 RF-OCIF Grant
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
420,000
75,000
3,840,000
4,335 000
(250,000)
(1 ,000,000)
-
(235,000)
(1 ,575,000)
(1 ,085,000)
(190,000)
(4,335,000)
237
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
410,000 480,000 100,000
250,000 300,000
11,065,000 7,400,000 5,400,000
11 725 000 8,180 000 5 500 000
(375,000) (310,000)
(3,250,000) (3,750,000) (900,000)
(1 '175,000) (1 ,000,000) (1 ,500,000)
(500,000) (170,000) (1 00,000)
(125,000)
(1 '700,000) (2,000,000) (2,000,000)
(3,250,000)
(1,160,000) (950,000) (1 ,000,000)
(190,000)
(11 '725,000) (8, 180,000) (5,500,000)
City of Pickering
2017
Capital Forecast
5320 Roads
5320.1701 Tractor Replacement .
2823 Paid From Property Taxes
6178 Miscellaneo!JS Equipment
Replace unit# 124 (1993 John Deere)
Total 5320.1701 Tractor Replaceme~t
5320.1702 Asphalt Roller Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replace unit# 126 (1995 Stone)
Total 5320.1702 Asphalt Roller Replacement
5320.1703 Street Sweeper Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
(1) Replacement Street Sweeper-replace unit# 040 (2006 Elgin)
Total 5320.1703 Street Sweeper Replacement
5320.1704 (3) Trailers Replacements
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Replace unit #135 (1993 Asphalt Roller Trailer) Replace unit# 136
(1999 Line Painting Trailer) Replace unit #137 (2002 Dump Trailer)
Total 5320.1704 (3) Trailers Replacements
5320 .. 1705 Brush Cutter Attachment for Gradall
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Brush Cutter-Hydraulic Attachment
Total 5320.1705 Brush Cutter Attachment for Gradall
5320.1706 Hoover Bridge (7004) Replacement Design/Approvals
6250 Construction Costs
Hoover Bridge (7004) Replacement Design/Approvals
7709 RF -Roads & Bridges
Total 5320.1706 Hoover Bridge (7004) Replacement Design/Appro•
5320.1707 Wilson Bridge Replacement
1704 Debt -20 year
6250 Construction Costs
238
Run Date: Apr6, 2016
' Funding Expense
(80,000)
80,000
(80,000) 80,000
(25,000)
25,000
(25,000) 25,000
(250,000)
250,000
(250,000) 250,000
(30,000)
30,000
(30,000) 30,000
(35,000)
35,000.
(35,000) 35,000
250,000
(250,000)
(250,000) 250,000
(1 ,000,000)
1,000,000
City of Pickering
2017
Capital Forecast
5320 Roads
Wilson Bridge (7002) Replacement Construction.
Total 5320.1707 Wilson Bridge Replacement
5320.1709 Greenwood Bridge (6001) Rehabilitation-Design/Apprm
6230 Prof/Consulting Fees
Greenwood Bridge (6001) Rehabilitation-Design/Approvals
7709 RF -Roads & Bridges
Total 5320.1709 Greenwood Bridge (6001) Rehabilitation-Design/
5320.1710 Kinsale Road Hard Surfacing
6250 Construction Costs
Kinsale Road Paving -Hwy 407 to Seventh Concession Road
upgrade to hard surface (1300m)
7709 RF -Roads & Bridges
7711 RF -OCIF Grant
Total 5320.1710 Kinsale Road Hard Surfacing
5320.1711 Alwin Circle -Asphalt Resurfacing
6250 Construction Costs
Alwin Circle Asphalt Resurfacing
7505 RF-Federal Gas Tax
Total 5320.1711 Alwin Circle-Asphalt Resurfacing
5320.1712 Pickering Parkway -Asphalt Resurfacing
6250 Construction Costs
Glenanna Road to Valley Farm Road
7505 RF-Federal Gas Tax
Total 5320.1712 Pickering Parkway-Asphalt Resurfacing
5320.1713 The Esplanade South -Asphalt Resurfacing
6250 Construction Costs
Glenanna Road to Valley Farm Road
7505 RF-Federal Gas Tax
Total 5320.1713 The Esplanade South-Asphalt Resurfacing
5320.1714 Glenanna Road -Asphalt Resurfacing
6250 Construction Costs
Heathside Crescent to Dixie Road
7505 RF-Federal Gas Tax
Total 5320.1714 Glenanna Road -Asphalt Resurfacing
239
Run Date:Apr6, 2016
Funding Expense
(1 ,000,000) 1,000,000
75,000
(75,000)
(75,000) 75,000
950,000
(760,000)
(190,000)
(950,000) 950,000
185,000
(185,000)
(185,000) 185,000
160,000
(160,000)
(160,000) 160,000
125,000
(125,000)
(125,000) 125,000
240,000
(240,000)
(240,000) 240,000
City of Pickering
2017
Capital Forecast
5320 Roads
5320.1715 Strouds Lane -Asphalt Resurfacing
6250 Construction Costs
Rosebank Road to Foxwood Trail
7505 RF-Federal Gas Tax
Total 5320.1715 Strouds Lane-Asphalt Resurfacing
5320.1716 Dixie Road -Asphalt Resurfacing
6250 Construction Costs
Kingston Road to Glenanna Road
7505 RF-Federal Gas Tax
Total 5320.1716 Dixie Road-Asphalt Resurfacing
5320.1717 Dixie Road -Final Lift of Asphalt
6250 Construction Costs
Dixie Road Final Lift of Asphalt in conjunction with the Region of
Durham's Sanitary Sewer Project-Maple Ridge Drive to north limit
of Hydro Corridor
7505 RF-Federal Gas Tax
Total 5320.1717 Dixie Road-Final Lift of Asphalt
5320.1718 Browning Avenue -Final Lift of Asphalt
2823 Paid From Property Taxes
6250 Construction Costs
Browning Avenue -Final Lift of Asphalt --Resurfacing Project
Total 5320.1718 Browning Avenue-Final Lift of Asphalt
5320.1719 Southview Drive -Final Lift of Asphalt
2823 Paid From Property Taxes
6250 Construction Costs
Southview Drive -Final Lift of Asphalt
Total 5320.1719 Southview Drive-Final Lift of Asphalt
Total 5320 Roads
240
Run Date: Apr 6, 2016
Funding Expense
335,000
(335,000)
(335,000) 335,000
455,000
(455,000)
(455,000) 455,000
75,000
(75,000)
(75,000) 75,000
(15,000)
15,000
(15,000) 15,000
(50,000)
50,000
(50,000) 50,000
(4,335,000) 4,335,000
City of Pickering
2018
Capital Forecast
5320 Roads
5320.1801 Greenwood Bridge (6001) Rehabilitation-Construction
1704 Debt -20 year
6250 Construction Costs
Bridge Repairs -Greenwood Bridge (6001)
Total 5320.1801 Greenwood Bridge (6001) Rehabilitation -Constrt
5320.1802 Hydroscopic Excavator Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment .
Hydroscopic Excavator-Replacement unit #114 (2004 Gradall)
Total 5320.1802 Hydroscopic Excavator Replacement
5320.1803 Sandy Beach Road Reconstruction & Storm Sewer lnsta
1702 Debt-10 Year
6250 Construction Costs
Sandy Beach Road reconstruction and storm sewer installation -
Bayly Street to Montgomery Park Road.
761 0 RF DC -Roads & Related
Total 5320.1803 Sandy Beach Road Reconstruction & Storm Sewe
5320.1804 Culvert Steamer/Cleaner Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
One Steamer/Cleaner-Replacement
Total 5320.1804 Culvert Steamer/Cleaner Replacement
5320.1805 Liverpool Bridge (3) Replacement -Design/Approvals
1711 Internal Loan - 5 Year
6250 Construction Costs
Liverpool Bridge (3) Replacement-Design/Approvals
Total 5320.1805 Liverpool Bridge (3) Replacement -Design/Appro•
5320.1806 Altona Bridge (1 0002) Replacement
.1704 Debt -20 year
6250 Construction Costs
Altona Bridge (1 0002) Replacement Construction
Total 5320.1806 Altona Bridge (1 0002) Replacement
5320.1807 Whitevale Road -Drainage Improvements & Road Recon
1711 Internal Loan-5 Year .
241
Run Date: Apr 6, 2016
Funding Expense
(625,000)
625,000
(625,000) 625,000
(375,000)
375,000
(375,000) 375,000
(3,250,000)
6,500,000
(3,250,000)
(6,500,000) 6,500,000
(35,000)
35,000
(35,000) 35,000
(250,000)
250,000
(250,000) 250,000
(550,000)
550,000
(550,000) 550,000
(250,000)
5320 Roads
6230 Prof/Consulting Fees
City of Pickering
2018
Capital Forecast
Whitevale Road -Drainage Improvements & Road Reconstruction-
Design only
Total 5320.1807 Whitevale Road-Drainage Improvements & Road
5320.1808 Sixth Concession Road -Final Lift of Asphalt
2823 Paid From Property Taxes
' 6250 Construction Costs
Sixth Concession Road -Easterly from Highway 7 to Westney
Road-Final Lift of Asphalt
Total 5320.1808 Sixth Concession Road-Final Lift of Asphalt
5320.1809 Roads Resurfacing Projects
6250 Construction Costs
Roads Resurfacing Projects
7505 RF-Federal Gas Tax
Total 5320.1809 Roads Resurfacing Projects
5320.1811 Sideline 14 Resurfacing
6250 Construction Costs
Sideline 14 -Hwy. 7 to Seventh Concession in conjunction with 407
overpass
7709 RF -Roads & Bridges
7711 RF-OCIF Grant
·Total 5320.1811 Sideline 14 Resurfacing
Total 5320 Roads
242
Run Date: Apr 6, 2016
Funding Expense
250,000
(250,000) 250,000
(90,000)
90,000
(90,000) 90,000
1,700,000
(1 ,700,000)
(1,700,000) 1,700,000
1,350,000
(1 '160,000)
(190,000)
(1 ,350,000) 1,350,000
(11 ,725,000) 11,725,000
City of Pickering
2019
Capital Forecast
5320 Roads
5320.1901 Westney Road Bridge (9005) Replacement -Design/App
6230 Prof/Consulting Fees
Lot 10-11 Ninth Concession Bridge (9005) Replacement-
Design/Approvals
7709 RF -Roads & Bridges
Total 5320.1901 Westney Road Bridge (9005) Replacement-Desi~
5320.1902 Road Grader Replacement
1701 Debt-5 Year
6178 Miscellaneous Equipment
Road Grader-Replace unit# 100 (2009 John Deere)
Total 5320.1902 Road Grader Replacement
5320.1903 Liverpool Bridge (3) Replacement Construction
1704 Debt -20 year
6250 Construction Costs
Liverpool Bridge (3) Replacement Construction
Total 5320.1903 Liverpool Bridge (3) Replacement Construction
5320.1904 Hoover Bridge (7004) Replacement/Construction
6250 Construction Costs
Hoover Bridge (7004) Replacement/Construction
7709 RF -Roads & Bridges
Total 5320.1904 Hoover Bridge (7004) Replacement/Construction
5320.1906 Tractor with Attachments Replacement
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
Tractor with Attachments -Replace unit# 100 (2009 John Deere)
Attachments including -Flail Mower, Snow Blower, Rotary Mower
Total 5320.1906 Tractor with Attachments Replacement
5320.1907 Roads Resurfacing Projects
6250 Construction Costs
Roads Resurfacing Projects
7505 RF-Federal Gas Tax
Total 5320.1907 Roads Resurfacing Projects
5320.1910 Westn·ey Road -Full Road Reconstruction
1702 Debt-10 Year
6250 Construction Costs
243
Run Date: Apr 6, 2016
Funding Expense
300,000
(300,000)
(300,000) 300,000
(310,000)
.310,000
(310,000) 310,000
(1 ,000,000)
1,000,000
(1 ,000,000) 1,000,000
650,000
(650,000)
(650,000) 650,000
(170,000)
170,000
(170,000) 170,000
2,000,000
(2,000,000)
(2,000,000) 2,000,000
(1 ,500,000)
1,500,000
5320 Roads
City of Pickering
2019
Capital Forecast
Westney Road -Full Road Reconstruction (From Concession 8 to
Concession 9)
Total 5320.1910 Westney Road-Full Road Reconstruction
5320.1911 Whitevale Road -Drainage Improvements & Road Recon
1702 Debt-10 Year
6250 Construction Costs
Whitevale Road -Drainage Improvements & Road Reconstruction-
Construction
Total 5320.1911 Whitevale Road -Drainage Improvements & Road
Total 5320 Roads
244
Run Date: Apr6, 2016
Funding Expense
(1 ,500,000) 1,500,000
(2,250,000)
2,250,000
(2,250,000) 2,250,000
(8, 180,000) 8,180,000
·5320 Roads
5320.2001. Backhoe Replacement
1711 Internal Loan - 5 Year
6178 Miscellaneous Equipment
City of Pickering
2020
Capital Forecast
Backhoe-Replace unit# 101 (2010 John Deere)
Total 5320.2001 Backhoe Replacement
5320.2002 Westney Road Bridge {9005) Replacement -Constructio1
1704 Debt -20 year
6250. Construction Costs
Lot 10-11 Ninth Concession Bridge (9005) Replacement -
Construction
Total 5320.2002 Westney Road Bridge {9005) Replacement-Cons1
5320.2004 Resurfacing Projects {TBD)
6250 Construction Costs
. Resurfacing Projects (TBD)
7505 RF-Federal Gas Tax
Total 5320.2004 Resurfacing Projects {TBD)
5320.2009 Seventh Concession Road Reconstruction
1702 Debt -10 Year
6250 Construction Costs
Seventh Concession Road -to York RR 30 to Sideline 30-Road
Reconstruction
7709 RF -Roads & Bridges
Total 5320.2009 Seventh Concession Road Reconstruction
Total5320 Roads
245
Run Date: Apr 6, 2016
Funding Expense
(100,000)
100,000
(100,000) 100,000
(1 ,500,000)
1,500,000
(1 ,500,000) 1,500,000
2,000,000
(2,000,000)
(2,000,000) 2,000,000
(900,000)
1,900,000
(1 ,000,000)
(1 ,900,000) 1,900,000
(5,500,000) 5,500,000
5780 Parks
Expenditures
6129 Parks-Landscape Refurbishment
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6230 Prof/Consulting Fees
6250 Construction Costs
6429 Parks -Landscape Refurb -Seaton
Total Expenditures
Financing
1592 Donations
1610 Federal Grants
1701 Debt-5 Year
1702 Debt -10 Year
1711 Internal Loan-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7055 R -Property Line Fencing
7502 RF -Parkland
7505 RF-Federal Gas Tax
7612 RF DC-Operations Services
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
370,000
34,000
870,000
25,000
60,000
1,467,000
2 826 000
(515,000)
(594,000)
(176,040)
(250,000)
7620 RF DC -Parkland Development & Trails (1 ,290,960)
Total Financing (2,826,000)
246
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
1,542,500 2,675,000 3,840,000
462,000 325,000 100,000
705,000 1,970,000 1,070,000
337,500 275,000 150,000
160,000 100,000 150,000
1,917,000 4,050,000
3 207 000 7 262 000 9 360 000
(135,000)
(150,000)
(1.50,000) (250,000)
(495,000) (2,217,500) (500,000)
(460,000) (1 '150,000) (980,000)
(150,000)
(147,000) (95,000) (60,000)
(241 ,250) (2,469,000)
(110,000)
(100,000) (200,000)
(100,000) (230,040)
(340,000) (340,000) (170,000)
(315,000)
(573,750) (2,519,460) (5, 181 ,000)
(3,207 ,000) (7,262,000) (9,360,000)
City of Pickering
2017
Capital Forecast
5780 Parks
5780.1701 Maple Ridge Tennis Courts Reconstruction
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Maple Ridge Tennis Courts-Reconstruction
Total 5780.1701 Maple Ridge Tennis Courts Reconstruction
5780.1702 Baseball Infield Drainage System 4 Diamonds
2823 Paid From Property Taxes
6250 Construction Costs
Baseball Infield Drainage System 4 Diamonds
Total 5780.1702 Baseball Infield Drainage System 4 Diamonds
5780.1703 Enclosed Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Enclosed Trailer -Replacement unit # 785 (2012)
Total 5780.1703 Enclosed Trailer Replacement
5780.1704 Portable Sand Sifter for Beachfront Playground
2823 Paid From Property Taxes
6181 Other Fixed Assets
Portable S;:md Sifter for Beachfront Playground
Total 5780.1704 Portable Sand Sifter for Beachfront Playground
5780.1705 Whitevale CC -Picnic Shelter Restoration
2823 Paid From Property Taxes
6181 Other Fixed Assets
Roof timber and cladding repairs to the existing· play barn structure,
including provision of a new concrete floor slab
Total 5780.1705 Whitevale CC-Picnic Shelter Restoration
5780.1706 Outdoor Exercise Equipment (New)
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Location to be Determined
Total 5780.1706 Outdoor Exercise Equipment (New)
5780.1707 Glengrove Park Reconstruction
6181 Other Fixed Assets
Glengrove Park Reconstruction
247
Run Date: Apr 6, 2016
Funding Expense
(145,000)
145,000
(145,000) 145,000
(60,000)
60,000
(60,000) 60,000
(12,000)
12,000
(12,000) 12,000
(20,000)
20,000
(20,000) 20,000
(35,000)
35,000
(35,000) ( 35,000
(50,000)
50,000
(50,000) 50,000
250,000
City of Pickering
2017
Capital Forecast
5780 Parks
7502 RF -Parkland
Total 5780.1707 Glengrove Park Reconstruction
5780.1708 Village Greens
6429 Parks -Landscape Refurb -Seaton
Village Greens (88/12)
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.1708 Village Greens
5780.1709 Trail Heads/ Primary Network
6429 Parks -Landscape Refurb -Seaton
Trail Heads/ Primary Network (88/12)
7022 R -DC's City's Share
7620 RF DC-Parkland Development & Trails
Total 5780.1709 Trail Heads/ Primary Network
5780.1710 Balsdon Park Masterplan -Design only
2823 Paid From Property Taxes
6230 Prof/Consulting Fees
Balsdon Park Masterplan -Design only
Total 5780.1710 Balsdon Park Masterplan-Design only
5780.1711 Rosebank Tennis Courts Reconstruction
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Rosebank Tennis-Reconstruct 2 Tennis Courts , new fencing and
drainage improvements
Total 5780.1711 Rosebank Tennis Courts Reconstruction
5780.1712 Soil Renovator Attachment
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
For Turf, Sportfield Renovations
Total 5780.1712 Soil Renovator Attachment
5780.1713 lnground Garbage/Recycle Units
2823 Paid From Property Taxes
6181 Other Fixed Assets
lnground garbage/recycle units for various parks. (Sustainable)
248
Run Date: Apr 6, 2016
Funding Expense
(250,000)
(250,000) 250,000
750,000
(90,000)
(660,000)
(750,000) 750,000
717,000
(86,040)
(630,960)
(717,000) 717,000
(25,000)
25,000
(25,000) 25,000
(180,000)
180,000
(180,000) 180,000
(22,000)
22,000
(22,000) 22,000
(35,000)
35,000
City of Pickering
2017
Capital Forecast
5780 Parks
Total 5780.1713 lnground Garbage/Recycle Units
5780.1714 Douglas Park -Parking lot
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Douglas Park -Parking lot
Total 5780.1714 Douglas Park-Parking lot
5780.1715 Amberlea Park -Small Diamond
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Amberlea Park -Small Diamond -new fencing, player benches,
bleachers, backstop and wings
Total 5780.1715 Amberlea Park-Small Diamond
5780.1717 Amberlea Hard Ball Diamond -Outfield Fence Replacem•
2823 Paid From Property Taxes
6181 Other Fixed Assets
Amberlea Hard Ball Diamond-Outfield Fence Replacement
Total 5780.1717 Amberlea Hard Ball Diamond-Outfield Fence Re~
5780.1718 Dunmoore Tennis Courts Resurfacing
2823 Paid From Property Taxes
6181 Other Fixed Assets
Dunmoore Tennis-Resurface ll-Tennis Courts
Total 5780.1718 Dunmoore Tennis Courts Resurfacing
5780.1721 Village East Park -Parking Lot Expansion
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Village East Park-Parking Lot Expansion (Granular)
Total 5780.1721 Village East Park·-Parking Lot Expansion
5780.1722 Claremont Park Baseball Fencing -Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Replace Claremont backstop to prevent damage to parked vehicle,
including tall fence extension on first baseline to protect vehicles in
parking lot
Total 5780.1722 Claremont Park Baseball Fencing-Replacement
Total 5780 Parks
249
Run Date: Apr 6, 2016
Funding Expense
(35,000) 35,000
(75,000)
75,000
(75,000) 75,000
(1 00,000)
100,000
(1 00,000) 100,000
(60,000)
60,000
(60,000) 60,000
(55,000)
55,000
(55,000) 55,000
(1 00,000)
100,000
(100,000) 100,000
(135,000)
135,000
(135,000) 135,000
(2,826,000) 2,826,000
City of Pickering·
2018
Capital Forecast
5780 Parks
5780.1801 Pathway Construction (Accessibility to Sports Fields)
1712 Internal Loan-10 Year
6183 Accessibility
Pathway Construction (accessibility to sports fields)
Total 5780.1801 Pathway Construction (Accessibility to Sports Fie
5780.1802 Greenwood Tennis Courts Reconstruction
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Greenwood Tennis Courts Reconstruction
Total 5780.1802 Greenwood Tennis Courts Reconstruction
5780.1803 Enclosed Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Enclosed Trailer-Replacement Unit# 723 (2013)
Total 5780.1803 Enclosed Trailer Replacement
5780.1804 Dunmoore Park Parking Lot Reconstruction
1711 Internal Loan-5 Year
6129 Parks-Landsc~pe Refurbishment
Pave & Curb Dunmoore Park Gravel Parking Lot
Total 5780.1804 Dunmoore Park Parking Lot Reconstruction
5780.1805 Rotary Frenchmans Bay West -Washrooms/ Changeroo1
6129 Parks-Landscape Refurbishment
Rotary Frenchmans Bay West-Washrooms/ Changerooms (45/55)
(50% of the cost associated with accessibility)
6183 Accessibility
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.1805 Rotary Frenchmans Bay West -Washrooms/ Char
5780.1807 Village East Parking Lot and Driveway -Asphalt Surfacir
1701 Debt-5 Year
6129 Parks-Landscape Refurbishment
Village East Parking Lot and Driveway-Curb and Resurface
Total 5780.1807 Village East Parking Lot and Driveway-AsphaltS
5780.1808 Frenchmans Bay Waterfront Master Plan (Phase 1)
250
Run Date: Apr 6, 2016
Funding Expense
(150,000)
150,000
(150,000) 150,000
(145,000)
145,000
(145,000) 145,000
(12,000)
12,000
(12,000) 12,000
(155,000)
155,000
(155,000) 155,000
187,500
187,500
(206,250)
(168,750)
(375,000) 375,000
(150,000)
150,000
(150,000) 150,000
City of Pickering
2018
Capital Forecast
5780 Parks
1702 Debt-10 Year
6129 Parks-Landscape Refurbishment
Frenchmans Bay Waterfront Master Plan-Phase 1 (45/55).
Reconstruction of Beach point Promenade (West Shore to boat
launch) including lay-by parking, pedestrian walkways, lighting,
sign age and trailhead for waterfront trail.
7620 RF DC -Parkland Development & Trails
Total 5780.1808 Frenchmans Bay Waterfront Master Plan (Phase 1
5780.1809 Kinsmen Artificial Field Spectator Seating
1592 Donations
2823 Paid From Property Taxes
6129 parks-Landscape Refurbishment
Concrete Spectator Seating for Berm at Kinsmen Artificial Field and
Replace all Fencing with Taller for Security
Total 5780.1809 Kinsmen Artificial Field Spectator Seating
5780.1811 Tractor f Mower I Trailer (New)
6178 Miscellaneous Equipment
Tractor I Mower I Trailer (90/1 0)
7022 R -DC's City's Share
7612 RF DC-Operations Services
Total 5780.1811 Tractor I Mower f Trailer (New)
5780.1812 Litter Picker Vacuum (New)
6178 Miscellaneous Equipment
Litter Picker Vacuum (90/1 0)
7022 R -DC's City's Share
7612 RF DC -Operations Services
Total 5780.1812 Litter Picker Vacuum (New)
5780.1813 Garbage Packer (New)
6178 Miscellaneous Equipment
Garbage Packer (90/1 0)
7022 R -DC's City's Share
7612 RF DC-Operations Services
Total 5780.1813 Garbage Packer (New)
5780.1814 Area Mower Replacement
6178 Miscellaneous Equipment
251
Run Date: Apr 6, 2016
Funding Expense
(495,000)
900,000
(405,000)
(900,000) 900,000
(75,000)
(75,000)
150,000
(150,000) 150,000
170,000
(17,000)
(153,000)
(170,000) 170,000
30,000
(3,000)
(27,000)
(30,000) 30,000
150,000
(15,000)
(135,000)
(150,000) 150,000
100,000
5780 Parks
Area Mower Replacement
7502 RF -Parkland
City of Pickering
2018
Capital Forecast
Total 5780.1814 Area Mower Replacement
5780.1815 Kinsmen Football Field Lighting Replacement
6181 Other Fixed Assets
Kinsmen Football Field Lighting Replacement (L.E.D)
7505 RF -Federal Gas Tax
Total 5780.1815 Kinsmen Football Field Lighting Replacement
5780.1816 Greenwood Park Baseball Field Lighting Replacement
6181 Other Fixed Assets
Greenwood Park Baseball Field Lighting Replacement (L.E.D)
7505 RF -Federal Gas Tax
Total 5780.1816 Greenwood Park Baseball Field Lighting Replace1
5780.1818 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fencing
7055 R -Property Line Fencing
Total 5780.1818 Property Line Fence Replacement
578,0.1819 Greenwood Baseball Fencing Replacement
1592 Donations
2823 Paid From Property Taxes
6181 Other Fixed Assets
Greenwood Baseball Fencing Replacement-pending 50%
donation from Baseball Association
Total 5780.1819 Greenwood Baseball Fencing Replacement
5780.1821 Pavement of Kinsmen North Parking Lot
1711 Internal Loan-5 Year
6250 Construction Costs
Pave Kinsmen North Parking Lot-Pending OPG permission
Total 5780.1821 Pavement of Kinsmen North Parking Lot
Total 5780 Parks
252
Run Date: Apr 6, 2016
Funding Expense
(1 00,000)
(1 00,000) 100,000
170,000
(170,000)
(170,000) 170,000
170,000
(170,000)
(170,000) 170,000
100,000
(100,000)
(1 00,000) 100,000
(60,000)
(60,000)
120,000
(120,000) 120,000
(160,000)
160,000
(160,000) 160,000
{3,207 ,000) 3,207,000
City of Pickering
2019
Capital Forecast
5780 Parks
5780.1901 Gator Utility Vehicle (New)
6178 Miscellaneous Equipment
New Gator Utility Vehicle -for events & Beach point Promenade
Maintenance
7040 R-Vehicle Replacement
Total 5780.1901· Gator Utility Vehicle (New)
5780.1902 Frenchmans Bay Waterfront Master Plan (Phase 2)
1702 Debt -10 Year
6129 Parks -Landscape Refurbishment
Frenchmans Bay Waterfront Master Plan-Phase 2 (45/55).
Construction of boardwalk (boat launch to harbour entrance),
reconstruction of boat launch and docking facilities and shoreline
restoration works.
7620 RF DC-Parkland Development & Trails
Total 5780.1902 Frenchmans Bay Waterfront Master Plan (Phase 2
5780.1903 Brockridge Park Parking Lot -Paving
1711 Internal Loan-5 Year
6250 Construction Costs
Brockridge Park Parking Lot-Paving Gravel -subject to TRCA
approval
Total 5780.1903 Brockridge Park Parking Lot-Paving
5780.1904 St. Mary Park -Soccer Field Rehabilitation
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
St Mary's East Soccer Field Rehabilitation Partnership with DDCSB.
Remove 3"'' of existing surface, add 6"" topsoil, crown field, add
complete irrigation
Total 5780.1904 St. Mary Park-Soccer Field Rehabilitation
5780.1905 Accessibility to Sports Fields/Pathway Construction -Va
1711 Internal Loan-5 Year
6183 Accessibility
Accessibility to sports fields/pathway construction -various parks
Total 5780.1905 Accessibility to Sports Fields/Pathway Constructi
5780.1906 Neighbourhood Parks (Seaton)
6429 Parks -Landscape Refurb -Seaton
Neighbourhood Parks (Seaton) (88/12)
253
Run Date: Apr 6, 2Q16
Funding Expense
25,000
(25,000)
(25,000) 25,000
(1 ,017 ,500)
1,850,000
(832,500)
(1 ,850,000) 1,850,000
(100,000)
100,000
(100,000) 100,000
(200,000)
200,000
(200,000) 200,000
(100,000)
100,000
(100,000) 100,000
750,000
City of Pickering
2019
Capital Forecast
5780 Parks
7502 RF -Parkland
7620 RF DC -Parkland Development & Trails
Total 5780.1906 Neighbourhood Parks (Seaton)
5780.1907 Village Greens (3) (Seaton)
6429 Parks -Landscape Refurb ~.Seaton
Village Greens (3) (Seaton) (88/12)
7502 RF -Parkland
· 7620 RF DC -Parkland Development & Trails
Total 5780.1907 Village Greens (3) (Seaton)
5780.1908 Trail Heads and Primary Trail Network (Seaton)
6429 Parks -Landscape Refurb -Seaton
Trail Heads and Primary Trail Network (Seaton) (88/12)
7502 RF -Parkland
7620 RF DC-Parkland Development & Trails
Total 5780.1908 Trail Heads and Primary Trail Network (Seaton)
5780.1910 4x4 Tractor Loader with Beach Groomer (Beachpoint Pre
1711 Internal Loan-5 Year
6178 Miscellaneous Equipment
4x4 Tractor Loader with Beach Groomer (Beach point Promenade)
New
Total 5780.1910 4x4 Tractor Loader with Beach Groomer (Beachpc
5780.1911 Enclosed Trailer Replacement
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Enc!osed Trailer Replacement
Total 5780.1911 Enclosed Trailer Replacement
5780.1912 Mid Size Tractor Replacement
6178 Miscellaneous Equipment
Mid Size Tractor Replacement-to replace unit# 721 (2006) & unit#
767 (2006) with a single larger unit
7040 R -Vehicle Replacement
Total 5780.1912 Mid Size Tractor Replacement
5780.1913 Beachfront Park Boardwalk Replacement (Elevated)
1702 Debt-10 Year
6181 Other Fixed Assets
254
Run Date: Apr 6, 2016
Funding Expense
(90,000)
(660,000)
(750,000) 750,000
450,000
(54,000)
(396,000)
(450,000) 450,000
717,000
(86,040)
(630,960)
(717,000) 717,000
(200,000)
200,000
(200,000) 200,000
(15,000)
15,000
(15,000) 15,000
85,000
(85,000)
(85,000) 85,000
(1 ,200,000)
1,200,000
5780 Parks
City of Pickering
2019
Capital Forecast
Beachfront Park Boardwalk Replacement (Elevated),
Total 5780.1913 Beachfront Park Boardwalk Replacement (Elevate
5780.1914 Kinsmen South Baseball Field Lighting Replacement
6181 Other Fixed Assets
Kinsmen South Baseball Field Lighting Replacement (L.E.D)
7505 RF-Federal Gas Tax
Total 5780.1914 Kinsmen South Baseball Field Lighting Replacem
5780.1915 Kinsmen Artificial Soccer Field Lighting Replacement
6181 Other Fixed Assets
Kinsmen Artificial Soccer Field Lighting Replacement (L.E.D)
7505 RF-Federal Gas Tax
Total 5780.1915 Kinsmen Artificial Soccer Field Lighting Replacen
5780.1916 Lookout Point Baseball Fencing Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Lookout Point Baseball Fencing Replacement
Total 5780.1916 Lookout Point Baseball Fencing Replacement
5780.1917 Property Line Fence Replacement
6181 Other Fixed Assets
Property Line Fence Replacement
7055 R -Property Line Fencing
Total 5780.1917 Property Line Fence Replacement
5780.1918 Trail from Creekside Park to SWM Pond
1711 Internal Loan - 5 Year
6183 Accessibility
Trail from Creekside Park to SWM Pond -Asphalt
Total 5780.1918 Trail from Creekside Park to SWM Pond
5780.1919 Mapleridge Park Master Plan & Implementation
1701 Debt-5 Year
6129 Parks-Landscape Refurbishment
Mapleridge Park Master Plan & Implementation -remove baseball
diamond and replace with mini soccer field. New soccer nets,
relocate path to avoid flood plain, upgrade all other pathways,
replace walkway lighting and wiring, remove concrete foundation.
Total 5780.1919 Mapleridge Park Master Plan & Implementation
255
Run Date: Apr 6, 2016
Funding Expense
(1 ,200,000) 1,200,000
170,000
(170,000)
(170,000) 170,000
170,000
(170,000)
(170,000) 170,000
(80,000)
80,000
(80,000) 80,000
200,000
(200,000)
(200,000) 200,000
(175,000)
175,000
(175,000) 175,000
(250,000)
250,000
(250,000) 250,000
5780 Parks
City of Pickering
2019
Capital Forecast
5780.1920 Pave Kinsmen South Parking Lot
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Pave Kinsmen South Parking Lot -pending OPG permission
Total 5780.1920 Pave Kinsmen South Parking Lot
5780.1921 Kirkey Field Baseball Fencing Replacement
1711 Internal Loan-5 Year
6129 Parks-Landscape Refurbishment
Kirkey Field Baseball Fencing Replacement
Total 5780.1921 Kirkey Field Baseball Fencing Replacement
5780.1922 Sandy Beach Tennis Courts Resurfacing
1711 Internal Loan-5 Year
6129 Parks -Landscape Refurbishment
Sandy Beach Tennis Courts Resurfacing
Total 5780.1922 Sandy Beach Tennis Courts Resurfacing
5780.1923 East Spit Lighting
1610 Federal Grants
6181 Other Fixed Assets
Lighting along the Frenchman's Bay east spit from Millennium
Square to Harbour Entrance. Project to proceed subject to senior
government funding.
Total 5780.1923 East Spit Lighting
Total 5780 Parks
256
Run Date: Apr 6, 2016
Funding Expense
(150,000)
150,000
(150,000) 150,000
(125,000)
125,000
(125,000) 125,000
(100,000)
100,000
(1 00,000) 100,000
(150,000)
150,000
(150,000) 150,000
(7 ,262,000) 7,262,000
City of Pickering
2020
Capital Forecast
5780 Parks
5780.2001 Kinsmen Artificial Turf Fencing Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Kinsmen Artificial Turf Fencing Replacement-12ft height/
screening
Total 5780.2001 Kinsmen Artificial Turf Fencing Replacement
5780.2002 Glendale Tennis Courts Resurfacing
1711 Internal Loan - 5 Year
6129 Parks-Landscape Refurbishment
Glendale Tennis Courts Resurfacing
Total 5780.2002 Glendale Tennis Courts Resurfacing
5780.2003 Centennial Park Baseball Lighting Replacement
6181 Other Fixed Assets
. Centennial Park Baseball Lighting Replacement
7505 RF-Federal Gas Tax
Total 5780.2003 Centennial Park Baseball Lighting Replacement
5780.2004 Baseball Infield Drainage System - 4 Diamonds
2823 Paid From Property Taxes
6129 Parks-Landscape Refurbishment
Baseball Infield Drainage System-4 Diamonds
Total 5780.2004 Baseball Infield Drainage System - 4 Diamonds
5780.2005 Waterfront Splashpad Redesign/Replacement
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Waterfront Splashpad Redesign/Replacement
Total 5780.2005 Waterfront Splashpad Redesign/Replacement
5780.2006 Accessibility Pathways to Sportfields
1711 Internal Loan-5 Year
6183 Accessibility
Accessibility Pathways to Sportfields
Total 5780.2006 Accessibility Pathways to Sportfields
5780.2007 Reconstruction of Existing Asphalt Pathways
1711 Internal Loan-5 Year
6250 Construction Costs
257
Run Date: Apr 6, 2016
Funding Expense
(150,000)
150,000
(150,000) 150,000
(1 00,000)
100,000
(1 00,000) 100,000
170,000
(170,000)
(170,000) 170,000
(60,000)
60,000
(60,000) 60,000
(150,000)
150,000
(150,000) 150,000
(150,000)
150,000
(150,000) 150,000.
(150,000)
150,000
City of Pickering
2020
Capital Forecast
5780 Parks
Reconstruction of Existing Asphalt Pathways
Total 5780.2007 Reconstruction of Existing Asphalt Pathways
.5780.2008 Woodsmere Baseball Diamond Refurbishment
1711 Internal Loan - 5 Year
6129 Parks -Landscape Refurbishment
Total 5780.2008 Woodsmere Baseball Diamond Refurbishment
5780.2009 Property Line Fence Replacement
1711 Internal Loan - 5 Year
6181 Other Fixed Assets
Total 5780.2009 Property Line Fence Replacement
5780.2010 Area Mower (New)
6178 Miscellaneous Equipment
Area Mower New (90/10). Project to be included in 2018 DC study.
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.2010 Area Mower (New)
5780:2011 Neighbourhood Parks -Seaton
6429 Parks -Landscape Refurb -Seaton
Neighbourhood Parks Seaton (88/12)
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.2011 Neighbourhood Parks -Seaton
5780.2012 Village Greens (6) -Seaton
6429 Parks -Landscape Refurb -Seaton
Village Greens (6) Seaton (88/12)
7022 R -DC's City's Share
7620 RF DC-Parkland Development & Trails
Total 5780.2012 Village Greens (6)-Seaton
5780.2013 Community Parks -Seaton
6429 Parks -Landscape Refurb -Seaton
Community Parks Seaton (86/14)
7022 R -DC's City's Share
7620 RF DC-Parkland Development & Trails
Total 5780.2013 Community Parks-Seaton
258
Run Date: Apr 6, 2016
Funding Expense
(150,000) 150,000
(180,000)
180,000
(180,000) 180,000
(100,000)
100,000
(100,000) 100,000
100,000
(10,000)
(90,000)
(100,000) 100,000
750,000
(90,000)
(660,000)
(750,000) 750,000
900,000
(108,000)
(792,000)
(900,000) 900,000
2,400,000
(336,000)
(2,064,000)
(2,400,000) 2,400,000
5780 Parks
City of Pickering
2020
Capital Forecast
5780.2014 Community Park Greenwood Conservation Lands Phase
6129 Parks-Landscape Refurbishment
Community Park Greenwood Conservation Lands (45/55)
7022 R -DC's City's Share
7620 RF DC -Parkland Development & Trails
Total 5780.2014 Community Park Greenwood Conservation Lands
5780.2015 Frenchman's Bay Waterfront Master Plan (Phase Ill)
1702 Debt-10 Year
6181 Other Fixed Assets
Frenchman's Bay Waterfront Master Plan-Phase Ill. Construction
of trail system through park, viewing platforms, signage and park
furniture.
Total 5780.2015 Frenchman's Bay Waterfront Master Plan (Phase I
Total 5780 Parks
259
Run Date: Apr6, 2016
Funding Expense
3,500,000
(1 ,925,000)
(1 ,575,000)
(3,500,000) 3,500,000
(500,000)
500,000
(500,000) 500,000
(9,360,000) 9,360,000
5990 Fleet Vehicles
Expenditures
6157 Vehicles-under $100,000
6158 Vehicles-Over $100,000
6159 Fire Veh-Over $100,000
6457 Vehicles-Under $100,000-Seaton
6458 Vehicles-Over $100,000-Seaton
Total Expenditures
Financing
1702 Debt-10 Year
1711 Internal Loan-5 Year
7021 R-Rate Stabilization
7022 R -DC's City's Share
7040 R -Vehicle Replacement
7605 RF DC - Fire
7612 RF DC -Operations Services
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
530,000
660,000
900,000
2 090 000
(270,000)
(45,000)
(920,000)
(855,000)
{2,090,000)
260
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
325,000 734,000 445,000
540,000 285,000 525,000
900,000 900,000 900,000
33,333
1 765 000 1 952 333 1,870 000
(900,000) (900,000) (900,000)
(65,000)
(833) (25,000)
(865,000) (954,000) (720,000)
(32,500)
(225,000)
{1 ,765,000) {1 ,952,333) (1 ,870,000)
City of Pickering
2017
Capital Forecast
5990 Fleet Vehicles
5335.1701 (2) Midsize SUV Replacement
6157 Vehicles-under $100,000
(2 units) Midsize SUVs -Replace unit #641 (2008 Ford Escape)
(5335 Engineering Services Admin) and Replace unit #636 (2008
Ford Escape) (5335 Engineering Services -Admin)
7040 R -Vehicle Replacement
Total 5335.1701 (2) Midsize SUV Replacement
5340.1705 Fire Utility Vehicle Replacement
6157 Vehicles -under $100,000
Pick up truck-Replace unit #535 (2003 Chev) Training Vehicle
(5340 Fire Services)
7040 R-Vehicle Replacement
Total 5340.1705 Fire Utility Vehicle Replacement
5340.1707 Pumper Rescue (Seaton Fire Station A) (New)
6458 Vehicles-Over $100,000-Seaton
Pumper Rescue -Seaton Fire Station A (5340 Fire Services)
7021 R-Rate Stabilization
7605 RF DC -Fire
Total 5340.1707 Pumper Rescue (Seaton Fire Station A) (New)
5613.1702 Midsize SUV Replacement
6157 Vehicles-under $100,000
Midsize SUV-Replace unit #638 (2009 Ford Escape) (5613
Development Services)
7040 R -Vehicle Replacement
Total 5613.1702 Midsize SUV Replacement
5780.1719 (4) One Ton Trucks with Aluminum Dump Body Replace!
6157 Vehicles-under $100,000
(4 units) -One Ton Trucks with Aluminum Dump Body-Replace
unit #702 (201 0 Dodge Ram) (5780 Parks), Replace unit #771
(2008 Ford) (5780 Parks), Replace unit #773 (2008 Ford) (5780
· Parks), Replace unit #774 (2008 Ford) (5780 Parks)
7040 R -Vehicle Replacement
Total 5780.1719 (4) One Ton Trucks with Aluminum Dump Body R1
5780.1720 Dump Truck. with Chipper Replacement
6158 Vehicles -Over $1 00,000
261
Run Date: Apr 6, 2016.
Funding Expense
60,000
(60,000)
(60,000) 60,000
35,000
(35,000)
(35,000) 35,000
900,000
(45,000)
(855,000)
(900,000) 900,000
35,000
(35,000)
(35,000) 35,000
240,000
(240,000)
(240,000) 240,000
110,000
5990 Fleet Vehicles
5219.1701 Van Replacement
6157 Vehicles -under $100,000
City of Pickering
2017
Capital Forecast
Replace unit #800 (2006 Chev) (5219 Animal Services)
7040 R -Vehicle Replacement
Total 5219.1701 Van Replacement
5220.1701 Replacement Vehicle -Midsize SUV
6157 Vehicles-under $100,000
Replace unit #41 0 (2006 Chevy Malibu) with Mid-size SUV (5220 .
By-Law Services)
7040 R-Vehicle Replacement
Total 5220.1701 Replacement Vehicle -Midsize SUV
5315.1703 Half Ton Pickup Truck Replacement
6157 Vehicles-under $100,000
Half Ton Pickup Truck-Replace unit #206 (2006 Ford) (5315
Municipal Garage)
7040 R -Vehicle Replacement
Total 5315.1703 Half Ton Pickup Truck Replacement
5320.1720 One Ton Truck with Aluminum Dump Body Replacemen1
6157 Vehicles-under $100,000
One Ton Truck with Aluminum Dump Body-Replace unit #039
(201 0 Dodge Ram) (5320 Roads)
7040 R-Vehicle Replacement
Total 5320.1720 One Ton Truck with Aluminum Dump Body Repla1
5320.1721 Five Ton Dump Truck with Snow Plow Replacement
6158 Vehicles-Over $100,000
Five Ton Dump Truck with Snow Plow-Replace unit #56 _(2008
Sterling) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1721 Fi~e Ton Dump Truck with Snow Plow Replaceme
5320.1722 Four Ton Dump Truck with Snow Plow Replacement
1711 Internal Loan - 5 Year
6158 Vehicles " Over $100,000
Four Ton Dump Truck with Snow Plow-Replace unit #60 (2007
International) (5320 Roads)
Total 5320.1722 Four Ton Dump Truck with Snow Plow Replacem1
262
Run Date: Apr 6, 2016
Funding Expense
40,000
(40,000)
(40,000) 40,000
30,000
(30,000)
(30,000) 30,000
30,000
(30,000)
(30,000) 30,000
60,000
(60,000)
(60,000) 60,000
280,000
(280,000)
(280,000) . 280,000
(270,000)
270,000
(270,000) 270,000
5990 Fleet Vehicles
City of Pickering
2017
Capital Forecast
Dump Truck with Chipper-Replace unit #744 (2008 Ford) (5780
Parks)
7040 R -Vehicle Replacement
Total 5780.1720 Dump Truck with Chipper Replacement
Total 5990 Fleet Vehicles
263
Run Date: Apr 6, 2016
Funding Expense
(11 0,000)
(110,000) 110,000
(2,090,000) 2,090,000
City of Pickering
2018
Capital Forecast
5990 Fleet Vehicles
~
5220.1801 Half Ton Pickup Truck Replacement .
6157 Vehicles-under $100,000
Replacing 2006 Chevy Colorado Pickup Truck unit #41.1 (2006
Chev) with Half Ton Pickup Truck (5220 By-Law Services)
7040 R -Vehicle Replacement
Total 5220.1801 Half Ton Pickup Truck Replacement
5320.1812 (2) Four Ton Dump Trucks with Snow Plow Replacemen
6158 Vehicles-Over $100,000
(2 units) -Four Ton Dump Trucks with Snow Plow-Replace unit
#061 (201 0 International) (5320 Roads) and Replace unit #57
(2009 International) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1812 (2) Four Ton Dump Trucks with Snow Plow Repla
5320.1814 (2) One Ton Trucks with Aluminum Dump Body Replace!
6157 Vehicles -under $1 00,000
(2 units) -Replace unit #62 (2011 Dodge) (5320 Roads) and
Replace unit #63 (2011 Dodge) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1814 (2) One Ton Trucks with Aluminum Dump Body R1
5320.1815 One Ton Truck with Utility Body (Sign Truck) Replaceme
6157 Vehicles-under $100,000
One Ton Truck with Utility Body (Sign Truck) -Replace unit #58
(2009 Ford) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1815 One Ton Truck with Utility Body (Sign Truck) Repl
5335.1801 Midsize SUV Replacement
6157 Vehicles-under $100,000
Vehicle -Replace unit #639 (2011 Ford Escape) (5335 Engineering
Services -Admin)
7040 R -Vehicle Replacement
Total 5335.~1801 Midsize SUV Replacement
5340.1805 Pumper Tankers Replacement
1702 Debt -10 Year
6159 Fire Veh-Over $100,000
264
Run Date: Apr 6, 2016
Funding Expense
32,000
(32,000)
(32,000) 32,000
540,000
(540,000)
(540,000) 540,000
125,000
(125,000)
(125,000) 125,000
95,000
(95,000)
(95,000) 95,000
33,000
(33,000)
(33,000) 33,000
(900,000)
900,000
5990 Fleet Vehicles
City of Pickering
2018
Capital Forecast
One Pumper Tanker to replace unit #;502 (2002 GMC), unit #518
(1999 Freightliner) and unit #519 (1999 Freightliner) (5340 Fire
Services)
Total 5340.1805 Pumper Tankers Replacement
5780.1820 One Ton Crew Cab Pickup Truck Replacement
6157 Vehicles-under $100,000
One Ton Crew Cab Pickup Truck-Replace unit #754 (2011 Ford)
(5780 Parks)
7040 R -Vehicle Replacement
Total 5780.1820 One Ton Crew Cab Pickup Truck Replacement
Total 5990 Fleet Vehicles
265
Run Date: Apr 6, 2016
Funding Expense
(900,000) .900,000
40,000
(40,000)
(40,000) 40,000
(1 '765,000) 1,765,000
5990 Fleet Vehicles
City of Pickering
2019
Capital Forecast
5315.1902 One Ton Truck with Service Body Replacement
6157 Vehicles-under $100,000
One Ton Truck with Service Body-Replace unit #208 (201 0 Ford)
(5315 Operations Centre-Municipal garage)
7040 R-Vehicle Replacement
Total 5315.1902 One Ton Truck with Service Body Replacement
5320.1908 One Ton Truck with Aluminum Dump Body Replacemen1
6157 Vehicles-under $100,000
One Ton Truck with Aluminum Dump Body-Replace unit #065
(2012 Dodge) (5320 Roads)
7040 R-Vehicle Replacement
Total 5320.1908 One Ton Truck with Aluminum Dump Body Replat
5320.1909 4x4 Pi.ckup Truck Replacement with Plow
6157 Vehicles-under $100,000
4x4 Pick up Truck with Snow Plow-Replace unit #64 (2012 Ford)
(5320 Roads)
7040 R-Vehicle Replacement
Total 5320.1909 4x4 Pickup Truck Replacement with Plow
5320.1912 Five Ton Dump Truck with Snow Plow Replacement
6158 Vehicles-Over $100,000
5 Ton Dump Truck with Plow-Replace unit #49 (2012
International) (5320 Roads).
7040 R -Vehicle Replacement
Total 5320.1912 Five Ton Dump Truck with Snow Plow Replaceme
5320.1913 Four Ton Dump Truck with Snow Plow Replacement
6157 Vehicles -under $1 00,000
Four Ton Dump Truck with Snow Plow-Replace unit #059 (2011
International) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.1913 Four Ton Dump Truck with Snow Plow Replacemt
5335.1901 Midsize SUV Replacement
6157 Vehicles -under $100,000
Vehicle -Replace unit #639 (2011 Ford Escape) (5335 Engineering
Services -Admin)
7040 R -Vehicle Replacement
266
Run Date: Apr 6, 2016
Funding Expense
80,000
(80,000)
(80,000) 80,000
65,000
(65,000)
(65,000) 65,000
45,000
(45,000)
(45,000) 45,000
285,000
(285,000)
(285,000) 285,000
270,000
(270,000)
(270,000) 270,000
34,000
(34,000)
City of Pickering
2019
Capital Forecast
5990 Fleet Vehicles
Total 5335.1901 Midsize SUV Replacement
5340.1903 Pumper Rescue Replacement
1702 Debt-10 Year
6159 Fire Veh-Over $100,000
Pumper Rescue-Replace unit#520 (2000) (5340 Fire Services)
Total 5340.1903 Pumper Rescue Replacement
5340.1904 Small Vehicle (Seaton Fire Station A) (New)
6457 Vehicles -Under $1 00,000 -Seaton
Small Vehicle for Seaton Fire Station A (98/02) (5340 Fire Services)
7022 R-DC's City's Share
7605 RF DC -Fire
Total 5340.1904 Small Vehicle (Seaton Fire Station A) (New)
5340.1905 (2) Deputy Fire Chief Cars Replacement
1711 Internal Loan-5 Year
6157 Vehicles-under $100,000
(2 units) -Deputy Fire Chief Cars-Replace unit #561 (2012 Dodge)
and Replace unit #562 (2012 Dodge) (5340 Fire Services)
Total 5340.1905 (2) Deputy Fire Chief Cars Replacement
5613.1902 Half Ton Crew Cab Pickup Truck Replacement
6157 Vehicles-under $100,000
HalfTon Crew Cab Pickup Truck -Replace unit #600 (2012 Chev)
(5613 Development Services)
7040 R-Vehicle Replacement
. Total 5613.1902 Half Ton Crew Cab Pickup Truck Replacement
5780.1924 Garbage Packer Replacement
6157 Vehicles-under $100,000
Garbage Packer-Replace unit #762 (2012 Ford/Haulall) (5780
Parks)
7040 R -Vehicle Replacement
Total 5780.1924 Garbage Packer Replacement
Total 5990 Fleet Vehicles
267
Run Date: Apr 6, 2016
Funding Expense
(34,000) 34,000
(900,000)
900,000
(900,000) 900,000
33,333
(833)
(32,500)
(33,333) 33,333
(65,000)
65,000
(65,000) 65,000
35,000
(35,000)
(35,000) 35,000
140,000
(140,000)
(140,000) 140,000
(1 ,952,333) 1,952,333
City of Pickering
2020
Capital Forecast
5990 Fleet Vehicles
5320.2005. (2) Half Ton Truck Pickup Trucks Replacement
6157 Vehicles-under $100,000
(2 units) HalfTon Pickup Trucks-Replace unit #47 (2013 Ford)
(5320 Roads) and Replace unit #66 (2013 Ford) (5320 Roads)
7040 R -Vehicle Replacement
Total 5320.2005 (2) Half Ton Truck Pickup Trucks Replacement
5320.2006 One Ton Truck with Utility Body Replacement
6157 Vehicles-under $100,000
One Ton Truck with Utility Body-Replace unit #24 (2012 Ford)
(5320 Roads)
7040 R -Vehicle Replacement
Total 5320.2006 One To·n Truck with Utility Body Replacement
5320.2007 Four Ton Dump Truck with Snow Plow Replacement
6158 Vehicles-Over $100,000
Four Ton Dump Truck-Replace unit #42 (2013 International) (5320
Roads)
7040 R -Vehicle Replacement
Total 5320.2007 Four Ton Dump Truck with Snow Plow Replacem•
5320.2008 Five Ton Dump Truck With Plow & Wing (New)
6158 Vehicles -Over $1 00,000
Five Ton Dump Truck with Plow & Wing (New) (90/10). Project to be
included in the 2018 DC study (5320 Roads)
7022 R -DC's City's Share
7612 RF DC -Operations Services
Total 5320.2008 Five Ton' Dump Truck With Plow & Wing (New)
5320.2010 Four Ton Dump Truck Replacement
6157 Vehicles-under $100,000
Four Ton Dump Truck-Replace unit #48 (2012 International) (5320
Roads)
7040 R -Vehicle Replacement
Total 5320.2010 Four Ton Dump Truck Replacement
5340.2002 Pumper Rescue Replacement
1702 Debt-10 Year
6159 Fire Veh -Over $100,000
Pumper Rescue -Replace unit #540 (2006) (5340 Fire Services)
268
Run Date: Apr 6, 2016
Funding Expense
80,000
(80,000)
(80,000) 80,000
90,000
(90,000)
(90,000) 90,000
275,000
(275,000)
(275,000) 275,000
250,000
(25,000)
(225,000)
(250,000) 250,000
275,000
(275,000)
(275,000) 275,000
(900,000)
900,000
5990 Fleet Vehicles
City of Pickering
2020
Capital Forecast
Total 5340.2002 Pumper Rescue Repiacement
Total 5990 Fleet Vehicles
269
Run Date: Apr 6, 2016
Funding Expense
(900,000) 900,000
(1,870,000) 1,870,000
5340 Fire Services
Expenditures
6178 Miscellaneous Equipment
6181 Other Fixed Assets
6183 Accessibility
6250 Construction Costs
6450 Construction Costs -Seaton
Total Expenditures
Financing
1592 Donations
1701 Debt-5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
7605 RF DC -Fire
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
800,000
100,000
55,000
955 000
(200,000)
(600,000)
(155,000)
(955,000)
270
Run Date: Apr 6, 2016
2018 2019 2020
Forecast Forecast Forecast
70,000 20,000 20,000
30,000 35,000
5,190,000
5 290 000 55 000 20,000
(129,750)
(100,000) (55,000) (20,000)
(5,060,250)
(5,290,000) (55,000) (20,000)
5340 Fire Services
City of Pickering
2017
Capital Forecast
5340.1701 SCBA Replacement -Breathing Apparatus
1592 Donations
OPG Donation
1701 Debt-5 Year
6178 Miscellaneous Equipment
SCBA Replacement-New 2013 NFPA compliant breathing
apparatus
Total 5340.1701 SCBA Replacement-Breathing Apparatus
5340.1702 Renovations to Station #4 -Kitchen Upgrade
2823 Paid From Property Taxes
6250 'Construction Costs
Renovations to Station# 4-Kitchen Upgrade
Total 5340.1702 Renovations to Station #4-Kitch~n Upgrade
5340.1703 Fire Halls #2 & #6 -Roof Access Ladders
2823 Paid From Property Taxes
6250 Construction Costs
Permanent Roof Access Ladder at Fire Halls# 2 and # 6
Total 5340.1703 Fire Halls #2 & #6-Roof Access Ladders
5340.1704 Renovations to Station #2 -Accessibility Upgrades
2823 Paid From Property Taxes
6183 Accessibility
Accessibility Upgrades. Construction work for an accessible and
gender specific additional washroom at Station #2 (built in the
1970s).
Total 5340.1704 Renovations to Station #2-Accessibility Upgrade
5340.1708 Fire Hall #2 -Accessible Washroom -Design
2823 Paid From Property Taxes
6183 Accessibility
Total 5340.1708 Fire Hall #2 -Accessible Washroom -Design
Total 5340 Fire Services
271
Run Date: Apr 6, 2016
Funding Expense
(200,000)
(600,000)
800,000
(800,000) 800,000
(25,000)
25,000
(25,000) 25,000
(30,000)
30,000
(30,000) 30,000
(75,000)
75,000
(75,000) 75,000
(25,000)
25,000
(25,000) 25,000
(~55,000) 955,000
5340 Fire Services
City of Pickering
2018
Capital Forecast
5340.1801 New Fire Hall to service Seaton -Construction
1712 Internal Loan-10 Year
6450 Construction Costs -Seaton
Construction costs for new Seaton Fire Hall.
7605 RF DC -Fire
Total 5340.1801 New Fire Hall to service Seaton-Construction
5340.1802 Lighting Upgrades (Fire Halls #2, #5 and #6)
2823 Paid From Property Taxes
6181 Other Fixed Assets
Upgrades to lighting at Fire Station #2, #5 and #6 for energy
efficiency
Total 5340.1802 Lighting Upgrades (Fire Halls #2, #5 and #6)
5340.1803 Renovations to Station #5 (Upstairs Window Replaceme1
2823 Paid From Property Taxes
6250 Construction Costs
Replacement of windows located in upstairs of Fire Station #5.
Total 5340.1803 Renovations to Station #5 (Upstairs Window Repl'
Total 5340 Fire Services
272
Run Date:. Apr 6, 2016
Funding Expense
(129,750)
5,190,000
(5,060,250)
(5, 190,000) 5,190,000
(70,000)
70,000
(70,000) 70,000
(30,000)
30,000
(30,000) 30,000
(5,290,000) 5,290,000
New Seaton Fire Hall
Capital and Operating Costs Forecast
Capital Expenditures (2016 to 2019)
Design $ 356,500
Site Preparation 422,500
Construction 4,951,000
Pumper Rescue Truck 900,000
Vehicle 33,300
Total $ 6,663,300
Funding Sources
Internal Loan -10 year $ 189,081
DC-Fire 6,474,249
Total $ 6,663,330
Annual Operating Expenditures (Full Year Costs)
Salaries & Benefits $ 2,059,050
Firefighter equipment 82,650
Utilities 25,000
Fuel 18,000
Other 125,000
Total $ 2,309,700
Funding Sources
Seaton Property Taxes $ 2,309,700
Total $ 2,309,700
The opening of the fire hall is related to the development
of Seaton.
J7;2. OL)
5340 Fire Services
City of Pickering
2019
Capital Forecast
5340.1901 Renovation Station #2 -Window Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Renovation -Window Replacement Station #2
Total 5340.1901 Renovation Station #2-Window Replacement
5340.1902 Renovation Station #5 -Roof Repairs
2823. Paid From Property Taxes
6250 Construction Costs
Renovation -Roof Repairs Station #5
Total 5340.1902 Renovation Station #5-Roof Repairs
Total 5340 Fire Services
273
Run Date: Apr 6, 2016
Funding Expense
(20,000)
20,000
(20,000) 20,000 .
(35,000)
35,000
(35,000) 35,000
(55,000) 55,000
5340 Fire Services
City of Pickering
2020
Capital Forecast
5340.2001 HVAC Balancing-Fire Hall #5
2823 Paid From Property Taxes
6181 Other Fixed Assets
HVAC Balancing-Hall #5
Total 5340.2001 HVAC Balancing-Fire Hall #5
Total 5340 Fire Services
274
Run Date: Apr 6, 2016
Funding Expense
(20,000)
20,000
(20,000) 20,000
{20,000) 20,000
5800 Library
Expenditures
6179 Book Collection Material
6181 Other Fixed Assets
6250 Construction Costs
Total Expenditures
Financing
1711 Internal Loan - 5 Year
1712 Internal Loan-10 Year
2823 Paid From Property Taxes
Total Financing
City of Pickering
Multi-Year Capital Forecast
2017-2020
2017
Forecast
445,000
48,000
493 000
(493,000)
(493,000)
275
Run Date: Apr 6, 2016
2018 2019 2020·
Forecast Forecast Forecast
459,000 509,000 515,000
30,000
305,000 443,000
764 000 952 000 545 000
(120,000)
(443,000)
(644,000) (509,000) (545,000)
(764,000) (952,000) (545,000)
5800 Library
5800.1701 Collection Materials
2823 Paid Frorn Property Taxes
6179 Book Collection Material
City of Pickering
2017
Capital Forecast
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
This budget is based on a formula which includes community
demand, material costs and industry norms.
Total 5800.1701 Collection Materials
5800.1702 Petticoat Creek & Claremont Carpet Replacement
2823 Paid From Property Taxes
6181 Other Fixed Assets
Petticoat Creek & Claremont Carpet Replacement
Total 5800.1702 Petticoat Creek & Claremont Carpet Replacement
Total 5800 Library
276
Run Date: Apr 6, 2016
Funding Expense
(445,000)
445,000
(445,000) 445,000
(48,000)
48,000
(48,000) 48,000
(493,000) 493,000
City of Pickering
2018
Capital Forecast
5800 Library
5800.1801 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
Thjs budget is based on a formula which includes community
demand, material costs and industry norms.
Total 5800.1801 Collection Materials
5800.1802. Central Library Modify Lobby Flooring
2823 Paid From Property Taxes
6250 Construction Costs
Central -Modify Lobby Flooring (if renovation is postponed)
Total 5800.1802 Central Library Modify Lobby Flooring
5800.1803 Central Library Refinish Interior Walls
2823 Paid From Property Taxes
6250 Construction Costs
Central-Refinish Interior Walls (if renovation is postponed)
Total 5800.1803 Central Library Refinish Interior Walls
5800.1804 Central Library Relocate Study Room
1711 Internal Loan - 5 Year
6250 Construction Costs
Central Library -Relocate Study Room
Total 5800.1804 Central Library Relocate Study Room
5800.1806 Petticoat Creek Library Drywall and Interior Replaceinen
2823 Paid From Property Taxes .
6250 Construction Costs
Petticoat Creek Drywall and Interior Replacement I Repairs
Total 5800.1806 Petticoat Creek Library Drywall and Interior Repla
Total 5800 Library
277
Run Date: Apr 6, 2016
Funding Expense
(459,000)
459,000
(459,000) 459,000
(40,000)
40,000
(40,000) 40,000
(80,000)
80,000
(80,000) 80,000
(120,000)
120,000
(120,000) 120,000
(65,000)
65,000
(65,000) 65,000
(764,000) 764,000
5800 Library
5800.1901 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
City of Pickering
2019
Capital Forecast
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
This budget is based on a formula which includes community
demand; material costs and industry norms.
Total 5800.1901 Collection Materials
5800.1903 Central Library Renovations & Upgrades
1712 Internal Loan-10 Year
6250 Construction Costs
Central Library -Renovations & Upgrades. (Local History Room
Renovation and Expansion $250,000, Upstairs Carpet
Replacement $100,000, Auditorium Floor Replacement $16,000,
Outdoor LED Sign $37,000, Lighting Upgrades $40,000)
Total 5800.1903 Central Library Renovations & Upgrades
Total 5800 Library
278
Run Date: Apr 6, 2016
Funding Expense
(509,000)
509,000
(509,000) 509,000
(443,000)
443,000
(443,000) 443,000
(952,000) 952,000
5800 Library
5800.2001 Collection Materials
2823 Paid From Property Taxes
6179 Book Collection Material
City of Pickering
2020
Capital Forecast
Collection Materials. Library materials cover the following: Books,
movies, music and other types of materials along with their
processing and packaging. This budget is based on a formula
which includes community demand, material costs and industry
norms.
Total 5800.2001 Collection Materials
5800.2003 Central Library HVAC Balancing
2823 Paid From Property Taxes
6181 Other Fixed Assets
HVAC Balancing-Central Library
Total 5800.2003 Central Library HVAC Balancing
Total 5800 Library
279
Run Date: Apr 6, 2016
Funding Expense
(515,000)
515,000
(515,000) 515,000
(30,000)
30,000
(30,000) 30,000
(545,000) 545,000