HomeMy WebLinkAboutJanuary 25, 2017-Cd:Jof-
PJCKERJNG
Present
Tom Copeland-Vice-Chair
David Johnson -Chair
Eric Newton
Sean Wiley
Also Present
Ross Pym, Principal Planner-Strategic Initiatives
Lesley Dunne, Assistant Secretary-Treasurer
Absent
Denise Rundle
(I) Adoption of Agenda
Moved by Eric Newton
Seconded by Tom Copeland
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
That the agenda for the Wednesday, January 25, 2017 meeting be adopted.
(II) Adoption of Minutes
Moved by Eric Newton
Seconded by Tom Copeland
Carried Unanimously
That the minutes of the 15th meeting of the Committee of Adjustment held Wednesday,
December 7, 2016 be adopted.
Carried Unanimously
Page 1 of 12
-C~of
PJCKERJNG
(Ill) Reports .
1. PICA 53/16
B. Bremmers
2057 Blue Ridge Crescent
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
The applicant requests relief from Zoning By-law 3036, as amended by By-law 2015/85:
• to permit a minimum rear yard depth of 7.1 metres, whereas the by-law requires a
minimum rear yard depth of 7.5 metres
• to permit a minimum east side yard width of 0.0 metres, whereas the by-law requires
a minimum interior side yard width of 1.2 metres
• to permit a maximum lot coverage of 41 percent, whereas the by-law permits a
maximum lot coverage of 40 percent
The applicant requests approval of these variances in order to obtain a building permit
to construct a single-storey addition in the rear yard.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending refusal. The Principal Planner-
Strategic Initiatives also outlined if the applicant were to amend the application to allow
an east side yard width of 0.6 metres, staff recommendation would be approval subject
to conditions. Written comments were received from the City's Engineering Services
Department expressing no comments on the application. Written comments were also
received from the residents at 1510 Bentley Lane in objection to the application,
expressing concerns with the obstruction of view, noise pollution and a decrease in
property value.
Bart Bremmers, applicant, was present to represent the application. No further
representation was present in favour of or in objection to the application.
Bart Bremmers stated there are other properties in the surrounding neighbourhood that
have 0.0 metre setbacks to the property line. He stated by amending the east side yard
width to 0.6 metres would not, in his opinion, have any benefit for maintenance, lot
grading and drainage. Bart Bremmers stated the 0.0 metre setback is preferred,
however, he would amend the application to 0.6 metres in order to receive an approval.
In response to a question from a Committee Member, the Principal Planner-Strategic
Initiatives provided the intent of the minimum side yard width within the Zoning By-law.
Page 2 of 12
-C~o~
PJCKERJNG
Moved by Sean Wiley
Seconded by Eric Newton
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
That application PICA 53116 by B. Bremmers, be Approved on the grounds that the
minimum rear yard depth of 7.1 metres, a minimum east side yard width of 0.6 metres,
and a maximum lot coverage of 41 percent are minor in nature, desirable for the
appropriate development of the land, and in keeping with the general intent and purpose
of the Official Plan and the Zoning By-law, subject to the following condition:
1. That the applicant obtain a building permit for the proposed construction by
January 25, 2018, or this decision shall become null and void.
2. PICA 01117
M. Amire
661 Pleasant Street
Carried Unanimously
The applicant requests relief from Zoning By-law 2511, as amended, to permit
uncovered steps and a platform (deck) not exceeding 1.2 metres in height above grade
to project a maximum of 1.8 metres into the required rear yard, whereas the by-law
does not permit uncovered steps or platforms to project into the required rear yard.
The applicant requests approval of this variance in order to obtain a building permit to
construct a deck in the rear yard.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending approval subject to conditions. Written
comments were also received from the City's Engineering Services Department
expressing no comments on the application.
Peter Jaruczik, agent, was present to represent the application. No further
representation was present in favour of or in objection to the application.
Moved by Tom Copeland
Seconded by Eric Newton
That application PICA 01117 by M. Amire, be Approved on the grounds that the
uncovered steps and a platform (deck) not exceeding 1.2 metres in height above grade
projecting a maximum of 1.8 metres into the required rear yard is minor in nature,
desirable for the appropriate development of the land, and in keeping with the general
intent and purpose of the Official Plan and the Zoning By-law, subject to the following
conditions:
Page 3 of 12
-C~o~
PJCKERJNG
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
1. That this variance apply only to the proposed uncovered steps and platform (deck),
as generally sited and outlined on the applicant's submitted plans.
2. That the applicant obtain a building permit for the proposed construction by
January 25, 2018, or this decision shall become null and void.
Carried Unanimously
3. PICA 02117
P. & L. Gonsalves
970 Rambleberry Avenue
The applicant requests relief from Zoning By-law 3036, as amended by By-law 1998185
to recognize an existing second-storey uncovered balcony and associated steps not
exceeding 2.5 metres in height above grade to project 4.5 metres into the required rear
yard and to permit a platform (deck) not exceeding 0.8 of a metre in height of above
grade to project a maximum of 6.1 metres into the required rear yard, whereas the
by-law permits, uncovered steps or platforms not exceeding 1.0 metre in height to
project a maximum of 1.5 metres into the required rear yard.
The applicant requests approval of these variances in order to permit a second-storey
uncovered balcony in the rear yard, and obtain a building permit for a deck in the rear
yard.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending refusal for the proposed platform (deck)
and recommending approval for the existing second-storey balcony and associated
steps subject to conditions. Written comments were also received from the City's
Engineering Services Department expressing no comments on the application.
Peter Gonsalves, applicant, was present to represent the application. No further
representation was present in favour of or in objection to the application.
Peter Gonsalves stated a gabion wall was installed by the builder approximately six feet
away from the property line. He also provided pictures for the Committee Members to
review and stated the deck will allow better use of the rear yard. In response to a
question from a Committee Member, Peter Gonsalves stated the deck extends further
into the rear yard beyond the gabion wall.
Moved by Tom Copeland
Seconded by Eric Newton
That application PICA 02117 by P. & L. Gonsalves, be Deferred to the next Committee
of Adjustment meeting to allow the Committee Members to visit the subject property.
Carried Unanimously
Page 4 of 12
-C~of
PJCKERJNG
4. PICA 03117
Ansar Medical Services Inc.
2177 & 2185 Brock Road
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
The applicant requests relief from Zoning By-law 3036, as amended by By-law 7124111,
to permit balconies to project a maximum of 1 .5 metres beyond the south and west
limits of the building envelope as illustrated on Schedule II to By-law 7124111; whereas
the by-law requires that all buildings and structures be located entirely within the
building envelope as illustrated on Schedule II to By-law 7124111.
The applicant requests approval of this variance in order to obtain Site Plan Approval for
a 5-storey mixed-use building, including ground floor commercial uses and 48 residential
units.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending approval subject to conditions. Written
comments were received from the City's Engineering Services Department expressing
no comments on the application. Written comments were received from the City's Site
Plan Committee expressing no objections to the application. Written comments were
also received from Toronto and Region Conservation Authority expressing no objections
to the application.
Mohammed Jalaluddin, applicant, was present to represent the application. No further
representation was present in favour of or in objection to the application.
Mohammed Jalaluddin agrees with staff recommendations. In response to a question
from a Committee Member, Mohammed Jalaluddin stated the balconies are for
residential units and will be fully functional.
Moved by Eric Newton
Seconded by Tom Copeland
· That application PICA 03117 by Ansar Medical Services Inc., be Approved on the
grounds that the balconies projecting a maximum of 1.5 metres beyond the south and
west limits of the building envelope as illustrated on Schedule II to By-law 7124111, is
minor in nature, desirable for the appropriate development of the land, and in keeping
with the general intent and purpose of the Official Plan and the Zoning By-law, subject
to the following conditions:
1. That this variance apply only to the proposed building, as generally sited and
outlined on the applicant's submitted plans.
2. That the applicant obtain a building permit for the proposed construction by
January 25, 2018, or this decision shall become null and void.
Carried Unanimously
Page 5 of 12
-Cr0of-
PJCKERJNG
5. PICA 04117
S. & M. Shipton
3305 Eighth Concession Road
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
The applicant requests relief from the following provisions of Zoning By-law 3037, as
amended by By-lavit 6577105:
• to permit an agricultural-related machine shop use accessory to an agricultural
operation; whereas the by-law does not permit an agricultural-related machine shop
• to recognize a minimum lot frontage of 142.7 metres; whereas the by-law requires a
minimum lot frontage of 150 metres
The applicant requests approval of these variances in order to permit an existing
agricultural-related machine shop for the repair of agricultural equipment and
agricultural related vehicles.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending approval subject to conditions. Written
comments were received from the City's Engineering Services Department expressing
no comments on the application.
Written comments were also received from Central Lake Ontario Conservation Authority
(CLOCA) indicating no objections to the requested variance, the lands are subject to
Ontario Regulation 42106, and written permission from the Authority is required prior to
any new development on the site.
Stephen Shipton, applicant, was present to represent the application. No further
representation was present in favour of or in objection to the application.
Stephen Shipton agrees with staff recommendations. In response to questions from
Committee Members, Stephen Shipton stated the machine shop is to repair equipment
for local farmers and has been operating since 2010.
Moved by Sean Wiley
Seconded by Tom Copeland
That application PICA 04117 by S. & M. Shipton, be Approved on the grounds that the
requested variances are minor in nature, desirable for the appropriate development of
the lands, and in keeping with the general intent and purpose of the Official Plan and
the Zoning By-law, subject to the following condition:
1. That only one agricultural-related machine shop accessory to an agricultural
operation shall be permitted within a wholly enclosed building having a total gross
floor area of 190 square metres.
Carried Unanimously
Page 6 of 12
-C~o~
PJCKERJNG
6. PICA 05117
R. Moore & B. Silver
860 Vicki Drive
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
The applicant requests relief from Zoning By-law 2520, as amended, to permit uncovered
steps and a platform (deck) not exceeding 0.7 metres in height above grade to project a
maximum of 3.3 metres into the required rear yard; whereas the by-law does not permit
uncovered steps or platforms to project into the required rear yard.
The applicant requests approval of this variance in order to obtain a building permit to
construct a deck in the rear yard.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending approval subject to conditions. Written
comments were also received from the City's Engineering Services Department
expressing no comments on the application.
Randy Moore, applicant, was present to represent the application. No further
representation was present in favour of or in objection to the application.
A Committee Member provided clarification to the applicant on the maximum projection
of 3.3 metres into the required rear yard even though the deck will be 3.6 metres.
Moved by Tom Copeland
Seconded by Eric Newton
That application PICA 05117 by R. Moore & B. Silver, be Approved on the grounds that
the uncovered steps and a platform (deck) not exceeding 0.7 metres in height above
grade projecting a maximum of 3.3 metres into the required rear yard, is minor in
nature, desirable for the appropriate development of the land, and in keeping with the
general intent and purpose of the Official Plan and the Zoning By-law, subject to the
following conditions:
1. That this variance apply only to the proposed uncovered steps and platform (deck),
as generally sited and outlined on the applicant's submitted plans.
2. That the applicant obtain a building permit for the proposed construction by
January 25, 2018, or this decision shall become null and void.
Carried Unanimously
Page 7 of 12
-C~o~
PJCKERJNG
7. PICA 07117
C. Rudderham & K. Sutherland
937 Duncannon Drive
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
The applicant requests relief from Zoning By-law 3036, as amended by By-law 2917188,
to permit uncovered steps and a platform (deck) not exceeding 2.6 metres in height
above grade to project a maximum of 2.7 metres into the required rear yard; whereas
the by-law permits uncovered steps and platforms not exceeding 1.0 metre in height
above grade to project a maximum of 1.5 metres into the required rear yard.
The applicant requests approval of this variance in order to obtain a building permit to
construct a deck in the rear yard.
The Principal Planner-Strategic Initiatives outlined the staff recommendation from the
City Development Department recommending approval subject to conditions. Written
comments were also received from the City's Engineering Services Department
expressing no comments on the application.
Cory Rudderham and Karen Sutherland, applicants, were present to represent the
application. No further representation was present in favour of or in objection to the
application.
Moved by Eric Newton
Seconded by Sean Wiley
That application PICA 07117 by C. Rudderham & K. Sutherland, be Approved on the
grounds that the uncovered steps and a platform (deck) not exceeding 2.6 metres in
height above grade projecting a maximum of 2.7 metres into the required rear yard, to
be minor in nature, desirable for the appropriate development of the land, and in
keeping with the general intent and purpose of the Official Plan and the Zoning By-law,
subject to the following conditions:
1. That this variance apply only to the proposed uncovered steps and platform (deck),
as generally sited and outlined on the applicant's submitted plans.
2. That the applicant obtain a building permit for the proposed construction by
January 25, 2018, or this decision shall become null and void.
Carried Unanimously
Page 8 of 12
-Cfit;of-
PJCKERJNG
8. PICA 06117, PICA 08117, and PICA 09117
Pickering Developments (Squires) Inc.
17 40 Fairport Road
Proposed Lots 1, 2 & 3
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
The applicant requests relief from Zoning By-law 3036, as amended:
• to permit a minimum lot frontage of 15.0 metres, whereas the by-law requires a
minimum lot frontage of 18.0 metres
• to permit a minimum side yard width of 1.5 metres, whereas the by-law requires a
minimum side yard width of 1.8 metres
• to permit a maximum lot coverage of 35 percent, whereas the by-law permits a
maximum lot coverage of 33 percent
The applicant requests approval of these variances in order to facilitate the creation of
two additional lots through the Region of Durham's Land Division Committee, and
obtain building permits for the construction of three single detached dwellings.
The Principal Planner-Strategic Initiatives advised the Committee Members and the
public that the applicant has withdrawn Minor Variance Application PICA 10117 and that
a revised staff recommendation report was provided to the Committee Members prior to
the meeting for their review. The Principal Planner-Strategic Initiatives then outlined
the staff recommendation from the City Development Department recommending
approval subject to conditions.
Written comments were received from the City's Engineering Services Department
indicating the applicant is to provide a preliminary grading plan that shows this
development can be constructed without adversely affecting adjacent properties as well
as demonstrate that grading for proposed Lot 4 will not have any impacts on proposed
Lots 1 to 3. The applicant will need to demonstrate that gravity connection for both
sanitary and storm services can be provided from Fairport Road. The Engineering
Services Department also indicated the following Stormwater Management criteria
would need to be met for any redevelopment of the property; provide enhanced level of
quality control (80% TSS); retain a rainfall depth of 5mm across all impervious surfaces
on-site and control post-development flows to pre-development levels for all storms
from 2 year up to and including 100 year event.
Correspondence received from Edyta Dhillon of 17 46 Fairport Road expressed several
concerns such as an increase in lot coverage from 33% to 35%; reduced side yard
width from 1.8 metres to 1.5 metres due to drainage, privacy and vegetation
disturbance; to reduce the lot frontage from 18.0 metres to 4.5 metres for Lot 4
(PICA 1 0117), which would be 25% of the current lot frontage requirement, which is not
true frontage of a property but a driveway to a lot that does not face Fairport Road.
Page 9 of 12
-C~o~
PJCKERJNG
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
Correspondence received from the residents of 17 48 Fairport Road expressed several
concerns such as the requested variance does not reflect the current characteristics of
Fairport Road, particularly Lot 4 to be accessed by a private driveway; Lot 4 (PICA 1 0117)
would not enhance or be a part of the community, and questioned how emergency
services would access the dwelling.
Correspondence received from the residents of 1727, 1731 and 1725 Spruce Hill Road
expressed several concerns such as the rear yard depth; loss of privacy; potential
shadowing; impact on views; lot coverage not compatible with surrounding properties;
Lot 4 (PICA 1 0117) would result in an increase in noise level, which will affect the
enjoyment of property; and the loss of mature trees.
Thomas Melymuk, agent, was present to represent the application. Edyta Dhillon of
1746 Fairport Road, Penelope Lee of 1731 Spruce Hill and Aby Siva of 1727 Spruce Hill
Road were present in objection to the applications.
Thomas Melymuk stated that application PICA 10117 (proposed Lot 4) has been
withdrawn and there will only be three lots fronting Fairport Road instead of four. In
response to a question from a Committee Member, Thomas Melymuk stated the
applicant may distribute the 4.5 metres lot frontage from the withdrawn application to
the other three lots, making lot frontages of approximately 16.6 metres.
Edyta Dhillon expressed a concern with the loss of mature trees, loss of privacy and
drainage. Edyta Dhillon also spoke to the correspondence that was previously
submitted in opposition to the application.
Penelope Lee and Aby Siva both stated since the application for the proposed Lot 4
(PICA 1 0117) has been withdrawn there are no further concerns.
Moved by Sean Wiley
Seconded by Eric Newton
That application PICA 06117 by Pickering Developments (Squires) Inc., be Approved
on the grounds that the requested variances are minor in nature, desirable for the
appropriate development of the land, and in keeping with the general intent and purpose
of the Official Plan and the Zoning By-law, subject to the following conditions:
1. That the applicant obtains final clearance for future land severance applications by
January 25, 2018, or this decision shall become null and void.
2. That the applicant obtain a building permit for the proposed dwellings by
January 25, 2019, or this decision shall become null and void.
Page 10 of 12
-Cfit;of-
PJCKERJNG
Committee of Adjustment
Meeting Minutes
Wednesday, January 25, 2017
7:00pm
Main Committee Room
That application PICA 08117 by Pickering Developments (Squires) Inc., be Approved
on the grounds that the requested variances are minor in nature, desirable for the
appropriate development of the land, and in keeping with the general intent and purpose
of the Official Plan and the Zoning By-law, subject to the following conditions:
1. That the applicant obtains final clearance for future land severance applications by
January 25, 2018, or this decision shall become null and void.
2. That the applicant obtain a building permit for the proposed dwellings by
January 25, 2019, or this decision shall become null and void.
That application PICA 09117 by Pickering Developments (Squires) Inc., be Approved
on the grounds that the requested variances are minor in nature, desirable for the
appropriate development of the land, and in keeping with the general intent and purpose
of the Official Plan and the Zoning By-law, subject to the following conditions:
1. That the applicant obtains final clearance for future land severance applications by
January 25, 2018, or this decision shall become null and void.
2. That the applicant obtain a building permit for the proposed dwellings by
January 25, 2019, or this decision shall become null and void.
(IV) Appointment of Secretary-Treasurer
Moved by David Johnson
Seconded by Eric Newton
Carried Unanimously
That Ross Pym be appointed as Secretary-Treasurer.
Carried Unanimously
Page 11 of 12