• REPORT TO COUNCIL �
FROM: Thomm J. Quinn DATE: October 19, 1999
Chief Administrative 0(ficer
REPORT NUMBER: CAO 12-99
SUBJECT: Ontario Power Genemtion — Pickering Nucleur Genernting 5tation
- Environmental Assessment Peer Review Team - Terms of Reference
- File: UT 3510
RECOMMENDAT'ION:
I. Thnt Report to Council CAO 12-99, regnrding the Tetms of Reference from the University of
Toronto / McMaster Peer Revicw Tenm, be receivcd.
2. 'fhat the Terms of Refercnre attached to Report to Council CAO 12-99, bc nccepted by
Council nnd that the Ontario Powcr Gencration be requcsted to confirm it agrces to fund the
proposnl as set out in ►he Terms of Refercnce.
3. That the appropriata officials of the Town oC Pickcring be authorized to enter into any
required agreements wilh the Ontario Power Gcneration and Ihc Pecr Revicw Tcam.
4. That n copy of this Report be fonvurded to thc Onmrio Pa�r•cr Gcneralion, lhc Pcer Revie�v
Tenm and thc Atomic Encrgy Control Doard.
ORIGIN: Resolution fl178/99, Item H4, Council Meeting of Scptember 21, 1999.
"Thaf On�ario Power Genera�lon and lhe Universlry oJTorw��o /,b1aLlasler Teum n�uline rlre
Terms ojRejerence, defermine �heir tivork plan and reporl back �o Cou�icil jar ca f rmutlon. "
AUTHORITY: Municipal Act, R.S.O. 1990
• �INANCIAL IMPLICATIONS:
There nre no financial implicutions to the Town with the ucceptunce of this Report.
The Ontario Power Genemtion hns indicated it is prepnred to reimburse the Town for the
rensor.��le cost of a Peer Review Tenm. The attached Tertns of Reference indicates the cost of a
Peer Review Team to be npproximetely b93,600 plus disbursements of S5,000. We understand
that OPG believes these cosis to be reasonable.
EXECUTIVE SUMMARY;
On Oc►ober 14, 1999, Town staff inet with OP(3 smft; Dr. Duncan Moffett of aolder Associates
Ltd. (lead EA wnsultant to OPG) and Drs. Nick nn1� Cerolyn Eyles of the University of
Toronto / McMester Peer Review Teum, Tho purpose of lhc mceting was to devclop n Tertns of
Reference for the Peer Rev3ew as dirccted by Council Resolutioh k 178/99.
. The atmched Terms of Refercnce wero prcpared following the October 14 meeting, und are
provided for Council's considerntion.
;,
, :
'� Report to Council CAO 12•99 • Date; Octolxr 19, 1999
5ubject: Ontario Po���er Genemtion - Pickedng Nucicor Genernting Station
- Environmental Assessment Peer Revlew Tcam - Tcrms oF Refercncc
. File; UT 3510 Paga 2
BACKGROUND:
Council accepted nn offer made on July 20, 1999, from Mr. Carl Andognini, Chiaf Nuclear
Officer, OPG, to consider u proposal from the Town to hire a Peer Review Tenm for the
Environntentnl Assessment to be conducted prior to the restnrt of PNGS -"A". On September
21, 1999, through Resolution #178/99, Council recommended n proposul from ihe University of
Toronto / McMnster Temm �nd asked that a meeting bc held benveen thut team and OPG, to
outline the Tertns of Reference nnd u work plun.
In a subsequent letter from Mr. Carl Andagnini, OPO ncknowledged the selection made by
Council nnd ugreed to n mceting with the Town nnd Peer Review Team to finaliu the T'erms of
Reference, The meeting wns held on October 14, 1999.
At the October 14 mecting, agreement was reached on the Terms of Refcrence (sce
Atlachment ki). The Tertns of Reference for the Peer Review Tenm, divides the �eork into six
primary tusks, These tnsks, timelines und responsibilities are summarized below:
TASK DETAIL RESPONSIDILITY
Taek ql 1. Golder Associates to bricf the Peer Review Team / OPG
(Within I to 2 weeks of the Pcer Pcer Revicw Team on a�ork done (Goldcr Associates Ltd.) / To«n.
ReviewTeamhiring) todute.
2. Peer Review Team to revicw
nnd comment an OPG's public �
Consultalion Plan.
3. Peer Rcview Team to review
issues and commcnt to thc Town
and OPG on OPG's approach to
the Community Working
Group's 160+issues.
Ta�k k2 Peer Review Team to revicw and Peer Revicw Tcam / Town,
(Oclober und November 1999� comment lo the Town on
AECB's dralt Scoping
Document.
Twk q3 Peer Review Team to review and Peer Review Tcam / OPG
(Late October, 1999 to Janunry, comment on OPG's Working / Town.
2000) Drafls and Final EA Screening
Re rt.
Task q4 Pcer Review Team to revie�v :md Peer Review Team / Town.
(Mnrch 2000 to April 2000) comment to the Town on the
�nal EA Report rcleased by
AECB steff:
Ta�k NS Peer Review Team to assist the Peer Review Peam / Town.
(Midyear2000) Town with e submission on thc
EA to the AECB Board.
TwkN6 I. Peer Review Team to Peer Review Team / OPO
(Ongoingactivirythroughoutthe participata in rcgular update /Town.
EA procese) meotings with OPG and the
Town.
2, Peer Rev(ew Tenm to monitor
OPa ongoing public evenb
/ consullation proceas,
3. Peer Review Teem to provide
� monthly statu� rcports to the
Town.
ona
� � � , . ' .. . . . � . .
�Q(�� RepOrttoCouncil CA012-99 Dute: October19.1999
Subjectt Ontario Power arnemtion — Pickering Nucleur (3cnemQng Station
• Environmentul Assessment Peer Rcview Team • Terms oF Reference
_ • File; UT 3510 Pagc 3
ATTACHMENT:
.1. Tenns of Referencc, submitted by University of Toronto / McMaster Peer Review Teum
nnd duted October 18, 1999.
Prepnred By:
Approved / Endorsed By:
C/(/ � �
,.%
Gordo eidt Th J, Q�fnn
Profe Co•ordinntor ChicfAdministrativcOfficer
�
Thomns E. e y k
Director, Corpo te Projecls an icy
lGRygr
Attachment
Copy: .Director, Corpomte Projects und Policy
Project Co-ardinator
Recammended for ihc consideration of Pickering
Town Council
.
'� � ..
i � .y�'
" ns J. Q' n, Chi Admin tive Ofiic r
y*'
iit
t-'
i. � . ., � . . . . . . . . . .. . . . . ' . . � . . � .
�
;� ,
-,�
,•�
� � � p�5
�� �� � � �
A1TACiN'16�ITM'sT0 �OIITM�D iL _ y'�
Ftom; Dr. N. Eyles
?i 4993 Canso Drive
� Claremont ON L1Y lA8 :
Tel/Fax;905-649-2544
eyles�scar.utoronto,ca
October 20,1999
Attention: Gordon Reidt / Tom Melymuk
The CorporaHon of the Town of Pickering
. Fax:905-420•7G18
Duncan Moffat
Golder Assaiates
Kurt Johaneen
Ontado Power Generation •
Subject: Federal Environmental Assessment-Pickering "A" Return
to Service
Request (or Proposal•Independent Review Team
File: UT 3000
Proposed Work Program for Peer Revtew Team and Schedule.
Following consultaHon with and ad��ice received in a joint meeting with representaHves of
the Town of Pickering, OI'G and Colder Associales, we have identified 6 major Tasks for
the Peer Revicw Team. The Hming and reporting deadlines for cach task are driven by the
EA Process timetable being established by the AECB and is thus subject to possible
change. The tasks are outlined in chronological order below with the excepNon of Task 6
which idenHfies regular ongoing acti��iNes throughout the duraHon of the EA.
Task ]: FarrttirarlseNon Worlshop. An immediate need is to familiarise Pcer Revicw
Team members with the work of the Consultants hired by OI'C to conduct the EA. Tlils is
best achieved at a one day workshop where individual consultants responsible for each
sub-discipline within the EA (e.g., hydrogeology, aquatic enviroiunent, radiation
environment etc.,) will review their tivork and progress to date for the information of the
Peer Review Team. TliLs workshop should be convened as early as possible in October
>
;
'�
, ,
�, , o��
,
1999. As part of thts iniHal task, the Peer Review Team will provide written comments on;
a) the Draft Plan for Public and Stakeholder ConsultaHon and Communication
prepared by OPG's F.A Team and;
b) the praess by H�hich the more than 160 issues identified during the eadier
Pickering Environmental Review, are to be addressed In detaU by OI'G's EA Team. These
commenLs will be provided to the Town of Pickedng with a copy to OPG.
Task 2 Revtew of AECB's Draft Scope of EA when released as cunendy expected in late
October 1999, and submission of wriHen comments to Towr..
Task 3: Revtew OPG's working drafts and Final Report of the Pickering A Retum to
Service EA Screening Report faussing on scope, praess, thoroughrtess and quality of
methods and praedures, and the soundness conclusions with regud to the (ollowing
areas; a) the Project Description, b) DescripHon of ExisHng Em•ironmental CondiHons,
and c) PotenHal Environmental Effects and MitigaHon.
This review will encompass criNcal consideraHon of the full range of
organic/inorganic and radiogenic contaminants produced by PNGS, their on site sources,
on site and offsite pathways through surrounding geological, hydrogeological and
aqueous/gaseous environments, the nature of receptors in those em�ironments and the
short term and long term cumulative cffects on receptors.
Written comments to be submitted to the Town of Pickering, with a copy to OPG.
Time frame for this Task is expected to be benveen late October 1999 to Januazy 2000.
Task 4: Revteru of Final EA Report when r�leased by AECB currently expected in late
March 2000 and provide written comments to Tuwn.
Task 5: Provide advtce anr! nsststnrrce regarding preparatiun of To���n's submission to an
AECB Board MeeHng expected In mid-2000.
Task 6. O�igoi�ig nctivtty. This task is multifaceted and extcnJs throughout the duraHon
of the EA. SpecUic acHviHes are;
-Attend regulaz mont}ily meeNngs behveen re�resentati�•es of the Town of
Pickering, OPG and their consultants, with the purpose of monitoring and commenHng on
the conduct of the EA and early reporNng of any issues of immediate concem. This
acHvity represents a key element of the work of the Peer Revie�r Team and is specffically
designed to allow scientific comment and input at an early stage of the Consultant's work
and EA praess.
-Monitor OCC's public consultallon praess by attending public evenb and
meeNngs and provide any requested advice to the Town for msponse to enquiries that the
',
-� ,
. �• _
� �y . . . � . � .
� . . .. . . . Ol1 I
: public may direct to the Town or I'eer Feview Team regazding the EA scope, praess and
� issues. . _
-Provide monfhly status reports on progress to the Town of Pickering.
Proposed Peer Revlew Procedure: It is anHcipated that the following rules of praedure
will apply:
-The Peer Review Praess will be managed by the Town of Pickering.
-The Town will be represented at alt meeHngs behveen the Peer Review Team and
OPG's EA Team.
-The primary contact for the Town of Pickering H111 be Gordon Reidt and Tom
Melymuk.
-7'he primary contact for the OPG/EA Team will be Kurt Johansen, OI'G Project
Manager of the Pickering'A' Environmental Assessment
Proposed Eees for Services, Peer Review Team members µ�ll be retained at standard
professional consulHng rates of 5100 per hour. A detailed log of hours expended on the
project will be maintained by all Team Members and fonvarded as a mont}ily invoice to
the Town of Pickering, A working day is taken as 8 hours.
EsHmnled msfs for ench Tnsk
Task 1; Peer Review Team (9 experts) for 1 da}' ��'orkshop 514,d00
and 1 day for review and comment (Task la,b);
Task 2: 1 day per membcr to re��iew and suUmit comment; 5 7,200
Task 3: d days review and prepuaHon of K�ritten comments; 528,800
Task 4: 2 days review and preparaHon of written comments; 51�1,400
Task 5: 1 day per member, S 7,200
Task 6: 0.5 day per member per month for 6 months; 521,600
Totnl:
593,600
Nole: All travelling expenses, report preparallon costs, photaopving, telephone and fax
clwrges on a rtessage basis or Nme-unit-basis appertaining to the Em�ironmental
Assessment will be charged as a separate item and included with monthly int�oices. These
costs are esHmated at 55000.
Total esHmated costs: 598,600
,:
�
i
� •
�f 7 i !
?c? .,. (.e . : .. .v., „.... , � ... . .. � . . � . �. �� .
� - . :, _.
` � �
s;.
` �,�g ry: r
,
:t
{ 2.
�� � ��
Nofe; It is emphasised that this is an advance esHmate only based on current identification
of tasks as of 19th October 1999, and is, therefore, subject to possible change. Any� further
techntcal assistance, review and advice sought from the Peer Review Team, if required
outside that identified above, or arising as a result of a changed time frame, scope of the
EA, or any unforeseen circurtutance, wili be identified immediately to the Town of
Pickering. '
N. Eyles Ph.D., D.Sc.
Team Leader
;: � � .
� - � r �•
? �: ,
�;. � ,
� �^1 �� a i ii -, ft i�`�� 'f i T . .
c iC
'F J f t t [
�` i (
{r �A I 1�• 5 * l .� _ - .
ess � t - ,� �.s'1 ,� .
a f t � � x N * '.
�').f F 2 ' j � J � -t t ( � _ i _. .
� t � 1 r t �
y?, � x� 3 � i: � �'-
t,.
FY 9 v� �v � t ai .
,�t �.�,..»e . �4n.r`+�:.,.. .,, i5�..c'ct' ..,-...� .,.. �,.. . , ., ..r , . , a , ... .. ..