Loading...
HomeMy WebLinkAboutCR 10-15 cif,, 00 Report to Executive Committee PICKERING Report Number: CR 10-15 Date: July 6, 2015 From: Marisa Carpino - Director, Culture & Recreation Subject: Tender for Replacement of Air Handling Units and Return,Fans at Pickering Recreation Complex - Tender No. T-12-2015 - File: A-1440 Recommendation: - 1. That Report CR 10-15 of the Director, Culture & Recreation regarding the Replacement of Air Handling Units and Return Fans at Pickering Recreation Complex be received; 2. That Tender No. T-12-2015 submitted by Mapleridge Mechanical in the amount of$179,828.20 (HST,included) be accepted; 3. That the total gross project cost of$272,488.00 (HST included), including the amount of the tender and other associated costs, and the total net project cost of $245,384.00 (net of HST rebate), be approved; 4. That Council authorize the Division Head, Finance & Treasurer to finance the project, as provided for in the 2015 and 2014 Pickering Recreation Complex Capital Budgets, in the amount of$245,384.00 from the Federal Gas Tax Reserve Fund; and - 5. That the appropriate City of Pickering officials be authorized to take the necessary action to give effect hereto. Executive Summary: Air handling units and return air fans are located in Mechanical Room No. 4, on the second floor above the banquet hall washrooms at the Pickering Recreation Complex. These units provide supply and return air to heat and cool the banquet halls, reception area and front lobby. All of these units are original to the construction of the Pickering Recreation Complex in 1983, have been maintained at an increasing annual cost and are at the end of their economic life cycle. The complete removal and replacement of these old and inefficient units will reduce the potential for maintenance issues and service disruptions, improve energy efficiencies and reduce annual operating costs. The new equipment will include upgrades to .existing controls and integration into the building automation system. To that end, Tender No. T-12-2015 was prepared and advertised on the City's website. 1 Report CR 10-15 July 6, 2015 Subject: Tender for Replacement of Air Handling Units and Page 2 Return Fans at Pickering Recreation Complex The low bid submitted by Mapleridge Mechanical in the amount of$179,828.20 (HST included) is recommended for approval. The total gross project cost is estimated to be $272,488.00 and the total net project cost is estimated at$245,384.00 (net of HST rebate). Financial Implications: 1. Tender Amount Tender No. T-12-2015 V $159,140.00 HST (13%) 20,688.20 Total Gross Tender Cost $179,828.20 2. Estimated Project Costing Summary Tender No. T-12-2015 V $159,140.00 Consulting Costs 14,000.00 Integration of Controls 45,000.00 Installation of Pipe Insulation 5,000.00 Contingency $18,000.00 Total Cost $241,140.00 HST (13%) 31,348.00 Total Gross Project Costs' $272,488.00 HST Rebate (11.24%) ( 27,104.00) Total Net Project Costs $245,384.00 3. Approved Source of Funds Pickering Recreation Complex - Core Approved Code Source of Funds Budget Required 5731.1403.6181 Federal Gas Tax $120,000.00 $ 80,977.00 5731.1405.6250 Federal Gas Tax 75,000.00 49,077.00 5731.1503.6181 Federal Gas Tax $170,000.00 $115,330.00 Total Funds $365,000.00 $245.384.00 • Project Cost under (over) approved funds by $119,616.00 2 Report CR 10-15 July 6, 2015 Subject: Tender for Replacement of Air Handling Units and Page 3 Return Fans at Pickering Recreation Complex • Discussion: The existing air handling units have reached the end of their useful life cycle and if not replaced, would result in excessive annual maintenance costs. Replacement will allow the selection of units with higher efficiency and lower operating cost in keeping with the Corporate Energy Management Plan. Francis Sims P. Eng. was retained by the City of.Pickering to complete the design and specifications for removal and replacement of all three air handling units. The new units will have variable frequency drives, on demand ventilation and current technology control package. The units will be fully integrated into the Building Automation System allowing for remote monitoring and control. The replacement of three air handling and return air fans (SF-17, SF-18, SF-19, RF-17 and RF-18)were approved in the 2014 & 2015 Capital Budgets as three separate projects. Staff determined that there would be cost savings and less service disruption if the projects were combined into one tender. Bids were received to the tendering call, which closed on June 3, 2015 for the supply and installation of a Replacement of Air Handling Units and Return Fans at Pickering Recreation Complex. A mandatory site visit was held on Thursday, May 21, 2015 and six bidders attended, of which five bidders submitted a tender for this project. The low bidder, Mapleridge Mechanical, has submitted a copy of the Health & Safety Policy, the current WSIB Workplace Injury Summary Report and Clearance Certificate, confirmation of Ministry of Labour Health and Safety Awareness Training for every worker and supervisor on this project, proof of compliance with amended Confined Space Entry Regulations (September 30, 2006), along with copies of certification and all are acceptable to the (Acting) Coordinator, Health & Safety. Certificate of Insurance is deemed acceptable to Manager, Budgets & Internal Audit. The project engineers, Francis Sims P. Eng. have reviewed the tender submitted by Mapleridge Mechanical and has deemed it acceptable. In conjunction with the foregoing approvals, staff have reviewed the previous work experience of Mapleridge Mechanical, the references provided and the bonding available on this project and the bid is deemed acceptable. Upon careful examination of all tenders and relevant documents received, the Culture & Recreation Department recommends the acceptance of the low bid submitted by Mapleridge Mechanical for Tender No. T-12-2015 in the amount of$179,828.20 (HST included) and that the total net project cost of$245,384.00 be approved. Attachments: 1. Supply & Services Memorandum dated June 5, 2015. 3 Report CR 10-15 July 6, 2015 Subject: Tender for Replacement of Air Handling Units and Page 4 Return Fans at Pickering Recreation Complex Prepared By: Approved/Endorsed By: F` / ) Marc. Moreira Marisa Carpino Supervisor, Facilities Operations Director, Culture & Recreation Brian J. . 11 -field Stan Karwowski, CPA, CMA, MBA Manager, Facilities Operations Division Head, Finance & Treasurer.. Vera A. r elgemacher C.P.P., CPPO, CPPB, C.P.M., CMM Ill Manager, Supply & Services Caryn Kong, CPA, CGA . Senior Financial Analyst-Capital & Debt Management MM:mc Recommended for the consideration of Pickerin ity Council j ZZ N 2v/ 5 Tony P evedel, P.Eng. Chief Administrative Officer • 4 ATTACHMENT# TO REPORT#C 4o-1-S City 4 ( ctfc2,__ PICKERING Memo To: Marisa Carpino June 5, 2015 Director, Culture & Recreation From: Vera A. Felgemacher Manager, Supply & Services Copy: Manager, Facilities Operations Supervisor, Facilities Operations Subject: Tender No.. T-12-2015 Tender for Replacement of Air Handling Units and Return Fans at Pickering Recreation Complex File: F-5400-001 Tenders have been received for the above project. An advertisement was placed on the City's website inviting companies to download the tendering documents. One addendum was issued and 5 bids were received. A copy of the Record of Tenders Opened and Checked used at the public tender opening is attached. Tenders shall be irrevocable for 60 days after the official closing date and time. Purchasing Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit prices and extensions unit prices shall govern and extensions will be corrected accordingly, which has been done: All deposits other than the deposits of at least the low three bidders may be returned to the applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item 13.03(w). However, deposits of the three bidders will be retained at this time. Copies of tenders are attached for your review. Summary Harmonized Sales Tax Included Bidder Total Tendered Amount After Calculation Check Mapleridge Mechanical $175,278.20 $179,828.20 Climate Controls $244,916.00 $244,916.00 Automatic rejection —Surety's corporate seal missing from Bid Bond and Agreement to Bond. Reference: Purchasing Plan Group Policy No. PUR 010, Item 23.02 — 10 (a), Information to Bidders Items 9, 11, 12, 24, 26, 27, Tendering Specifications Item 7. Automatic rejection —Agreement to Bond not included. B&B Mechanical Services Inc. Reference: Purchasing Policy No. PUR 010, Item 23.02 10(c), Information to Bidders Items 9, 12, 24, 26, 27, 40, 5 41, 42, Addendum No. 1 Automatic rejection — addenda not acknowledged. Canadian Tech Air Systems Inc. Reference: Purchasing Policy No. PUR 010, Item 23.02 (11), Information to Bidders Items 9, 13, 22, 24, 26, 27, 40, 41,42, Addendum No. 1 Pursuant to Information to Bidders Item 28 and Tendering Specifications Item 20, the following documentation will be requested of the low bidder for your review during the evaluation stage of this tender call. Please advise if we are to proceed with this task. (a) a copy of the Health & Safety Policy to be used on this project; (b) a copy of the current Workplace Injury Summary Report issued by Workplace Safety & Insurance Board (in lieu of the Workplace Injury Summary Report document, a copy of the current CAD 7, NEER, or MAP reports may be submitted); (c) a copy of the current Certificate of Clearance issued by Workplace Safety & Insurance Board; (d) the City's certificate of insurance shall be completed by the bidder's agent, broker or insurer; and (e) Waste Management Plan. In accordance with Purchasing Policy Item 06.12 (a) where the compliant quotation or tender meeting specifications and offering best value to the City is acceptable and the estimated total purchase price is over$125,000, the Manager may approve the award, subject to approval of the Director, CAO and Council. In accordance with Purchasing Policy Item 06.04, the authority,for this dollar limit excludes HST. Please include the following items in your Report to Council: 1. if Items (a) through (d) noted above are acceptable to the Employment & Compensation Specialist; . 2. if the Certificate of Insurance is acceptable to the Manager, Budgets & Internal Audit; 3. if the list of subcontractors is acceptable; 4. any past work experience with the low bidder Mapleridge Mechanical including work location; 5. without past work experience, if reference information is acceptable; 6. the appropriate account number(s) to which this work is to be charged; 7. the budget amount(s) assigned thereto; 8. Treasurer's confirmation of funding; 9. related departmental approvals; and 10. related comments specific to the project. After receiving Council's approval, an approved "on-line" requisition will be required to proceed. Enquiries can be directed to the City's website for the unofficial bid results as read out at the public tender opening or to Supply &Services. Bidders will be advised of the outcome in due co rse. If y u require further information, please feel free to contact me or a member of Supply & Services. At VAF rr . . Attachments . June 5, 2015 6 Tender No. T-12-2015 Page 2 Dr�r,lnr•omon+ r.f Air l-1 rir1Iir ri I Ini+e nr,rl Di •Lrcririn P ron+ir r, (`r mnIov -1 0 --1 p --1 -1 O a 2) v (D v = R s sl) cD CD O CD o - CD c n (Q n 0 D n 0 aD 0 E. Z '(D D SU a \� a a) C a CC -o G cD N (�D (�D (�D CAD N N SU O 0 Ii Al CD. v> V� ca Cl) cD Q. X N O c0D C co N —1 3 W O '< CD CD k< CY1 m �— D a. °-/ --/r Z a. o w -z < 11 d 6 T '''' c ' "' -..c4:. (7D3 t7 -- Cp p co 0 Q 1111. C s a =0 a:c U O. 7 N OA off- • - co O VI q 2 o 2 .:,.. (i) -I, o � -z Eft Eft Eft Eft Eft o = co-, (A - ) ,__L-- A 51) ef;P:2 0 ; CD. a r..., , :......_ 5 c ri. ct. su co 01'.,..,._ m 0. \--..1 1 o o C n �' . c '� °a C r* iD 3 i 2 0.o CO O Cn a CD = n q . F o' n n o 3 3 •D N