Loading...
HomeMy WebLinkAboutBy-law 7388/14 The Corporation of the City of Pickering By-law No. 7388/14 Being a by-law to amend Schedules "A" and "B" of By-law 7362/14 appointing the Chief Building Official, Deputy Chief Building Official and Inspectors and fees payable respectively. Whereas, pursuant to the provisions of subsection 3(1) of the Building Code Act, 1992, S.O. 1992, chapter 23, provides that the Council of The Corporation of the City of Pickering is responsible for the enforcement of the Act within the City of Pickering; Whereas, pursuant to By-law 7362/14, Council appointed a Chief Building Official and such Inspectors as are necessary for the enforcement of the Act within the City of Pickering; Whereas, as a result of a staff change, the By-law to appoint these individuals must be amended to reflect the appointment of a new inspector; and Whereas, as a result of fee amendments, the By-law to identify fees payable for Building Permits must be amended to reflect the new fees. Now therefore the Council of The Corporation of the City of Pickering hereby enacts as follows: 1. Schedule "A" of By-law 7362/14, as amended, is hereby deleted and replaced with Schedule "A" attached hereto; 2. Schedule "B"-Part B, Fees Payable for Building Permits of By-law 7362/14, as amended, is hereby deleted and replaced with Schedule "B" attached hereto. By-law passed this 15th day of December, 2014 David Rya a € . Debbie Shields, City Clerk I Schedule "A" Appointments Item I Column 1 Column 2 1. Chief Building Official Kyle Bentley 2. Deputy Chief Building Official/Inspector Brenda Yarush 3. Inspector Toby Hill 4. Inspector Ian McKinlay 5. Inspector Albert Alvero 6. Inspector Andy Westcott 7. Inspector Paul Nishikawa , 8. Inspector Andras Szonyi 9. Inspector Vacant 10. Inspector Carl Kolbe 11. Inspector Vacant 12. Inspector Brian Holmes 13. Inspector Robert Watson Schedule B— Part B Fees Payable forBuilding Permits Item gU Class Of Permits Reference x f Fee Payable 1. Building Permit 6(3) As calculated based on occupancy in Part B (minimum $100.00) $10 for each 100 square metres of 2. Demolition Permit 6(4) floor area or part thereof, minimum $100.00 Conditional Building 10% of applicable building permit fee 3, 6(5) to a maximum of$2500.00, in Permit addition to applicable fee 4. Change of Use Permit 6(7) $250.00 5 Occupancy Permit for 6(8) $275.00 Unfinished Building - Schedule B- Part B Fees Payable for Building Permits Other Fees Item Type of Fee Reference Fee Payable 1. Alternative Solution 8 $100.00/hr, minimum 4 hrs ($400.00) Application/Evaluation Resubmission of 2. application found to be 9(5) 25% of application fee incomplete 3. (a) Revision to permit 12 $100.00 (houses) Revision to permit 10% of applicable permit fee to a max 3. (b) (all other building 12 of$1000.00 types) 4.. Transfer of permit 13 $100.00 Re-examination $300.00 plus the fee prescribed in 5. (a) - Change in house 15(5) Part B as a result of any additional model area ) Re-examination 10% of applicable permit fee to a ( 5. b - other than 5(a) 15(5) maximum of$1000.00 Certification of House $5 for each square metre of floor area 6' Models 15(6) or part thereof Re-certification of 7 $250.00 House Models 8 Reactivation of 15(8) $100.00 Dormant File Building Permit 25% of application fee, minimum 9. Surcharge 15(9) $100.00 • 10. Additional Inspection 15(11) $100.00 Recovery of costs for $2,100.00 per investigation 11. Grow-Op (minimum) Investigations Administrative Fee for 12. Processing Grow-Op $500.00 Investigations Request for Building 13. and/or Planning $50.00/hour Records 14. Solar Collector for $150.00 Single Dwelling Unit 15. Solar Collector for All $150.00/10 panels Building Types 16. Wind Turbines $10.50 for each $1,000.00 of construction value 17. After Hours 15(11) $125.00/hour (4 hour minimum) Inspections Grading & Final Inspection 18. $2,000.00 Performance Deposit (Subdivision) Schedule B— Part B Fees Payable for Building Permits Item Nevi:Bwldmgs and Additions Fee Payable } 1. Assembly Occupancies $13.50.for each square metre of floor area or part thereof. 2. Institutional Occupancies $16.00 for each square metre of floor area or part thereof. 3. Residential Occupancies apartment buildings, hotels, motels, $11.25 for each square metre of floor detached, semi-detached and area or part thereof. townhouse dwellings, & other residential occupancies • 4. Business and Personal Service & Mercantile Occupancies $8.75 for each square metre of floor single storey buildings area or part thereof. multiple storey buildings $11.25 for each square metre of floor area or part thereof. 5. Industrial Occupancies farm buildings, unserviced storage ' $4.00 for each square metre of floor buildings, unfinished basements area or part thereof. Parking garages and other industrial $6.75 for each square metre of floor buildings area or part thereof. l-AStlt�eucrattorenss Rea pairs and -Fr., Other _ 6. Interior Partitioning and Finishing, $2.15 for each square metre of floor including area or part thereof. tenant alterations apartment in houses 7. Minor Residential Structures and " $125.00. . Alterations, including decks, gazebos (each) incidental partitioning of a basement fireplace, wood stove (each) garage, carport, storage shed (each 50m2) water and sewer connection other similar minor projects associated with a residential use Schedule B- Part B Fees Payable for Building Permits Item New Bwldings and Additions ay e 8. Minor Non-Residential Structures, $225.00 including school portables (each) temporary prefabricated trailers (each) temporary tent (each) other similar minor structures associated with a non-residential use 9. Temporary Sales Centres $1050.00 10. Alterations, buildings and structures $10.50 for each $1,000 of construction not provided for in Items 1 to 8 value or part thereof. For the proper interpretation and application of this Schedule, see Notes following: Schedule B-Part B Fees Payable for Building Permits Notes: 1. The following guidelines for calculating floor areas and fees apply to the specific building types and construction indicated. In order to determine the applicable occupancy, recourse shall be had to the building code and its appendices. 2. Floor area shall be measured to the outer face of exterior walls and to the centerline of party walls or demising walls. No deductions shall be made for openings within the floor area (e.g., stairs and stair openings, ducts, elevators, escalators). Floor area shall include all habitable areas, including mezzanines, finished attics and enclosed balconies. (a) Assembly Occupancies: The "Assembly Occupancies" rate shall apply to the total floor area of floors which are principally of assembly use. Other rates shall be applied to other floors based on the principal use of that floor area. (b) Institutional Occupancies: The "Institutional Occupancies" rate shall apply to the floor areas of floors which are principally of institutional use. Other rates shall be applied to other floors based on the principal use of that floor area. (c) Residential Occupancies: For detached, semi-detached and townhouse dwellings, the floor areas of unfinished basements, attached garages, porches and decks shall not be included in the area calculations, but the fee is inclusive of these areas. For the other residential occupancies, the "Residential Occupancies" rate shall apply to the floor areas of floors which are principally of residential use. Other rates shall be applied to other floors based on the principal use of that floor area. (d) Business and Personal Services & Mercantile Occupancies: The "Business and Personal Services & Mercantile Occupancies" rate shall apply to the floor areas of floors which are principally of business and personal service or mercantile use. Other rates shall be applied to other floors based on the principal use of that floor area. (e) Industrial Occupancies: Each "Industrial Occupancies" rate includes subsidiary incidental finished office space to a maximum of 10% of the total floor area. The "Interior Partitioning and Finishing" rate shall be applied where additional finished space is provided. Other rates shall be applied to other floors based on the principal use of the total floor area. 3. "Construction value", as used in Item 10 of Schedule B— Part B, means the value of the proposed construction as determined by the Chief Building Official, whose determination of that value shall be final.