2015 – 2018
Capital Forecast
City of Pickering
2015-2018 Capital Forecast
Table of Contents
Page
Expenditure Forecast 1
Financing Forecast 2
Major Capital Projects 4
Capital Forecast
Fire Services 5
Corporate Services 6
Operations & Fleet Services 7-13
Engineering Services 14-17
Culture & Recreation 18-24
Pickering Public Library 25
2014 2015 2016 2017 2018 Total
Mayor & Council $70,000 $70,000
Office of the CAO
Fire Protection $1,535,000 1,435,000 $380,000 $835,000 $720,000 4,905,000
Customer Care Centre 56,000 56,000
Corporate Services
Finance & Taxation 125,000 3,000,000 3,125,000
Information Technology 134,000 150,000 150,000 150,000 102,750 686,750
Clerks & Legal 99,000 76,000 35,000 80,000 40,000 330,000
Engineering and Public Works
Operations & Fleet Services 36,976,235 10,158,500 7,867,500 10,235,500 4,385,000 69,622,735
Engineering Services 3,487,400 8,712,654 5,090,000 4,670,000 22,560,208 44,520,262
Culture & Recreation 9,652,605 1,542,000 4,194,000 3,814,000 1,796,000 20,998,605
City Development 20,000 20,000
Pickering Public Library 785,200 853,075 673,680 1,064,564 1,461,500 4,838,019
Total $52,870,440 $22,997,229 $18,390,180 $23,849,064 $31,065,458 $149,172,371
Expenditure Summary
2014 Capital Budget and Four Year Forecast
The above forecast excludes 2015 - 2018 major capital projects
1
2014 2015 2016 2017 2018 Total
1592 Donations $250,000 $250,000
1595 Sale of Land $2,000,000 2,000,000
1610 Federal Grants
1623 Provincial Grants $3,701,000 105,000 3,806,000
1700 Debt 15,909,000 6,103,111 6,078,000 $8,260,000 $6,078,957 42,429,068
1710 Internal Loan 982,000 1,805,000 1,240,000 1,220,000 1,605,000 6,852,000
2823 Paid from Property Taxes 1,095,301 1,418,575 1,490,180 1,387,564 1,192,500 6,584,120
7021-Rate Stabilization Reserve 3,933,992 150,000 230,000 200,000 4,513,992
7022 R - DC City's Share 897,960 2,055,109 1,221,270 1,311,700 1,643,502 7,129,541
Reserves 1,242,500 916,000 795,000 554,500 538,750 4,046,750
7501 RF 3rd Party Contrib.232,735 200,000 200,000 200,000 832,735
7502 RF - Parkland 410,875 110,000 300,000 250,000 1,070,875
7505 RF - Federal Gas Tax 6,095,000 2,095,000 1,905,000 4,980,000 1,715,000 16,790,000
7605 RF - DC Fire Protection 1,425,000 32,500 1,457,500
7610 RF - DC Roads & Related 2,217,160 2,070,708 1,230,000 2,647,500 12,285,000 20,450,368
7611 RF- DC Storm Water 131,780 1,444,051 876,000 19,800 3,870,249 6,341,880
7612 RF - DC Operation Centre 8,861,508 142,175 166,500 207,000 436,500 9,813,683
7620 RF DC Parkland Development 397,125 90,000 718,230 1,611,000 2,816,355
7621 RF DC Recreation Facilities 3,412,504 3,412,504
7701 RF - Capital Works 140,000 140,000
7800 RF - Road & Bridges Levy 550,000 1,000,000 1,700,000 3,250,000
9940 Other Revenue - Seaton Landowners Contributions 650,000 650,000
9960 Other Revenue-York Region Enhancements 1,785,000 2,260,000 490,000 4,535,000
9990 Other Revenue
Total $52,870,440 22,997,229 $18,390,180 23,849,064 31,065,458 149,172,371
Financing Summary
2014 Capital Budget and Four Year Forecast
2
Draft Capital Forecast Financing
By Source
$
3
Major Capital Projects
2015 to 2018
For Future Council Consideration
(Alphabetical Order)
Construction
Cost Operating
Description (Millions)DC's Debt Grants Other Cost
Community Park - Greenwood $6.50 $6.50
Library Expansion 15.00 $5.30 9.70 TBD
Museum Visitor Centre 7.25 1.20 $4.80 $1.25 TBD
Seaton Fire Station & Equip.6.83 6.60 0.23 TBD
Senior Centre 18.78 15.20 3.30 0.28 TBD
Total $54.36 $27.10 $20.70 $4.80 $1.76
Comments
The capital projects listed above were presented to Council through the following documents: Report #CAO 06-13,
the Seaton FIS, 2013 Development Charge Background Study or last year's multi-year capital forecast.
The preliminary financing strategy for the major capital projects may change depending upon the availability of
senior government grant funding.
During the remainder of the year, staff will develop a preliminary operating cost estimate for the various capital
projects listed above.
Staff will present to the new Council a full cost estimate with a preliminary suggestion regarding project
sequence and or priority.
Financing Strategy
(Millions)
Preliminary
4
2015 2016 2017 2018
5340 Fire Protection
Aerial Ladder Truck $1,400,000
Fire Utility Vehicles $35,000 each 35,000 $105,000 $35,000 $70,000
Command Vehicle 70,000
1/2 Ton Pick-up Truck 35,000
Renovation Station #5 170,000
Pumper Rescue 800,000
Tanker 650,000
Total $1,435,000 $380,000 $835,000 $720,000
Fire Services Capital Summary
5
2015 2016 2017 2018
5203 Finance
New Financial System $3,000,000
Total Finance $3,000,000
5206 Information Technology
Hardware and Software $105,000 $105,000 102,750 $102,750
Storage Area Network Disk 45,000 45,000 47,250
Total IT $150,000 $150,000 $150,000 $102,750
5215 Clerks
Paper Cutter 9,000
Total Clerks $9,000
5219 Animal Services
Adopt a Friend Shelter & Licensing Software 15,000
Van - Replacement 45,000
$15,000 $45,000
5220 By-Law
Replacement Vehicles 35,000 35,000 35,000 40,000
Handheld Parking Ticket Units 17,000
$52,000 $35,000 $35,000 $40,000
Total Corporate Services $226,000 $185,000 $3,230,000 $142,750
Corporate Services Capital Summary
6
Forecast
2015 Capital Projects
5311 Property Maintenance
(4) Outfront Mowers - Replacements $55,000
(1)Trailer enclosed for trim crew 12,000
Sidewalk plow with attachments - Replacement 160,000
Additional Sidewalk Plow 155,000
Property Fence Line Replacement 150,000
5315 Operations Centre - Municipal Garage
Furniture & Fixtures for New Operations Centre 250,000
Demolition and Remediation of old Operations Centre Site 2,000,000
5320 Roads
Pick-up with Plow - Replace Unit #055 65,000
Tandem Axle 5 Ton with Plow - Replace unit #052 270,000
Sideline 14 Resurfacing 575,000
Palmer Bridge Deck Replacement - Construction 1,900,000
Altona Bridge (10002) Replacement - Design 150,000
West Shore Boulevard - Final Lift of Asphalt 50,000
Toynevale Road - Final Lift of Asphalt 115,000
1 Ton Pick-Up with Plow 60,000
Southview Drive - Construction 500,000
Kinsale Road Hard Surfacing 375,000
Browning Avenue - Final Lift of Asphalt 15,000
Operations & Fleet Services Capital Summary
7
Forecast
Operations & Fleet Services Capital Summary
(2015 Cont'd)
(1) Replacement Loader 150,000
Brush Cutter - Hydraulic Attachment 35,000
Resurfacing Projects 900,000
Sixth Concession Road Reconstruction 600,000
5780 Parks
Replace Unit # 703 & 706 1/2 Ton Pick-ups (2)55,000
1 Ton Dump Truck - Replace Unit #763 (2006)60,000
1 Ton Dump Truck with Plow 85,000
Replace Unit #741 Garbage Truck with Larger unit 130,000
Mitchell Park Baseball (north and south)50,000
Dunmoore Tennis - Resurface 4 Tennis Courts 55,000
Rosebank Tennis - Resurface 2 tennis courts 25,000
Inground Garbage/Recycle Units 30,000
Spray/Splash Pad - Amberlea Park 200,000
(1) Enclosed Trailer for Equipment 11,500
Accessible Pathways to Sportsfields 100,000
(1) Cargo Van - Replace Unit #707 (2006) 50,000
Property Line Fence Replacement in Parks 100,000
Kinsmen Park Driveway Paving 100,000
Automatic Rotary Blade Sharpener 20,000
Replace Unit #734 - 2000 GMC Dump Truck with 3 Ton Dump Truck 110,000
Village East Park - Parking Lot Expansion (Granular)100,000
8
Forecast
Operations & Fleet Services Capital Summary
(2015 Cont'd)
Large Tractor (New)70,000
Claremont Park Baseball Fencing Replacement 135,000
Amberlea Tennis - resurface 2 tennis courts 130,000
Sub Total - 2015 10,158,500$
2016 Capital Projects
5311 Property Maintenance
(4) Outfront Mowers - Replacements $60,000
(3) One-Ton Enclosed Trailers for Equipment 12,500
(1) Additional Sidewalk Plow 160,000
(1) Replacement 16' Area Mower 100,000
Property Fence Line Replacement 200,000
5315 Operations Centre - Municipal Garage
Replace Unit #206 3/4Ton 4 x 4 Pick-up 40,000
5320 Roads
(2) Ford Escape SUV - Replacement 80,000
(2) Single Axle 4 Ton with Plow - Replace unit #053 & #054 400,000
(1) Single axle 4 Ton Dump Truck with Plow - New 185,000
Hoover Bridge (7004) Replacement (design only)250,000
9
Forecast
Operations & Fleet Services Capital Summary
(2016 Cont'd)
Sandy Beach Road Reconstruction - Phase 1 1,000,000
Third Concession Road Reconstruction 490,000
Altona Bridge (10002) Replacement - Construction 550,000
Bridge Repairs - Greenwood Bridge (6001)500,000
Resurfacing Projects TBD 1,300,000
Sixth Concession Road - East of Bridge - Final Lift of Asphalt 60,000
5780 Parks
Replace (3) One Ton Dump Trucks 185,000
Inground Garbage/Recycle Units for Various Parks 35,000
Village East Tennis - resurface two tennis courts 30,000
Property Line Fencing 100,000
Accessible Pathways to Sportsfields 100,000
Centennial Park Parking Lot 80,000
Douglas Park - Parking lot 75,000
St. Mary's East Soccer Field 200,000
Village East Parking Lot and Driveway-Asphalt Surfacing 150,000
Rotary Frenchmans Bay West - Washrooms/ Changerooms 375,000
Mapleridge Park Master Plan & Implementation 250,000
Frenchmans Bay Waterfront Master Plan (Phase 1) Implementation 900,000
Sub Total - 2016 7,867,500$
10
Forecast
Operations & Fleet Services Capital Summary
2017 Capital Projects
5311 Property Maintenance
(4) Outfront mowers $60,000
(3) One-Ton enclosed Trailers for Equipment 12,500
Additional Sidewalk Plow 160,000
(1) Replacement 16' Area Mower 100,000
Property Line Fence Replacement 200,000
5315 Operations Centre - Municipal Garage
Replace Unit #206 - 2006 Ford F250 4WD R 45,000
Replace Unit #207 - Lift Rite Tow Motor 40,000
5320 Roads
Two (2) - Vehicles (Foreperson's)80,000
One (1) - 5 Ton Dump Truck with Plow 250,000
Hoover Bridge (7004) Replacement 650,000
Sandy Beach Road Reconstruction (Phase II)1,000,000
One (1) - 1 Ton Pick-up with Plow 60,000
Resurfacing Projects 2,000,000
5780 Parks
Maple Ridge Tennis Courts - Resurfacing 31,000
Greenwood Parking Lot and Driveway - Resurfacing 250,000
Multi-purpose trail - Duffin Heights (Mattamy) south to Ajax 500,000
Multi- purpose trail through Hydro Corridor 860,000
11
Forecast
Operations & Fleet Services Capital Summary
(2017 Cont'd)
Frenchmans Bay Waterfront Master Plan (Phase 2)1,850,000
Glengrove Park Reconstruction 250,000
Village Greens 750,000
Trail Heads/ Primary Network 717,000
Accessibility to Sportsfields/Pathway Construction - various parks 100,000
Brockridge Park Parking Lot - Paving Gravel 100,000
Tractor / Mower / Trailer 170,000
Sub Total - 2017 10,235,500$
2018 Capital Projects
5311 Property Maintenance
Property Line Fence Replacement $200,000
5320 Roads
Roads Resurfacing Projects 2,700,000
4 Ton Dump Truck - Replacement 200,000
5780 Parks
Pathway construction (accessibility to sports fields)150,000
Sidewalk plow with attachments (new)155,000
Tractor / Mower / Trailer 170,000
12
Forecast
Operations & Fleet Services Capital Summary
(2018 Cont'd)
Bleachers, soccer goals, picnic tables 50,000
Litter Picker 30,000
Garbage Packer 130,000
Property Line Fencing 100,000
Frenchman's Bay Waterfront Master Plan (Phase III)500,000
Sub Total - 2018 4,385,000$
13
Forecast
2015 Capital Projects
5325 Streetlights & Signalization
Kingston Road - Whites Road Section $350,000
Streetlight Replacements (Bay Ridges) Phase 1 500,000
Glenanna Road (Fieldlight Blvd Intersection) Traffic Controller 40,000
Glenanna Road (William Dunbar School) Traffic Controller 40,000
5323 Sidewalks
Kingston Road - Whites Road Section 200,000
5410 Storm Water Management
Pine Creek Outfall Reconstruction 360,000
Kitley Avenue Culvert - Inlet Channel Improvements 40,000
5613 Development Control
Various Construction Projects 200,000
5321 Development Projects DC Funded
BI-18 Squires Beach Road 1,606,400
D-1 Kingston Road - North Side 323,100
D-2 Kingston Road - South Side 394,900
Installation of Oil Grit Separators (28/72) Frenchman's Bay 321,000
Engineering Services Capital Summary
14
Forecast
Engineering Services Capital Summary
(2015 Cont'd)
Pine Creek - South of Mountcastle SWM Facility 538,478
Krosno Creek - Flow Diversion - 3 Culvert Replacements 2,000,000
Krosno Creek Erosion Control - Construction 823,100
WO-8 Rosebank Rd at Sheppard Ave-2014 Design/2015 Construction 367,676
608,000
Sub Total - 2015 $8,712,654
2016 Capital Projects
5325 Streetlights & Signalization
Streetlight Replacements (Bay Ridges) Phase 2 $500,000
Traffic Signals/Controllers - Glenanna @ Walnut 40,000
5323 Sidewalks
Finch Avenue TBD 200,000
5410 Storm Water Management
Abbott Crescent SWM Pond Cleanout - Design & Construction 750,000
5613 Development Control
Various Construction Projects 200,000
(10a) Sidewalks/Streetlights at Brock Rd - 5th Concession Rd to Hghwy
407
15
Forecast
Engineering Services Capital Summary
(2016 Cont'd)
5321 Development Projects DC Funded
DH-1 Valley Farm Road (Partial) - Design 500,000
B-20 Krosno Creek SWM Facility @ Sandy Beach Rd. - Design 500,000
B-30 Krosno Creek SWM Facility K19 Hydro Corridor - Design 1,300,000
Oil Grit Separators Frenchman's Bay 300,000
Valley Farm Road Intersection Improvements 800,000
Sub Total - 2016 $5,090,000
2017 Capital Projects
5325 Streetlights & Signalization
Streetlight Replacements (Location TBD)$500,000
Sandy Beach Road @ OPG Parking Lot Controller 40,000
Valley Farm Road @ Fieldlight Controller 40,000
5323 Sidewalks
Finch Avenue TBD 200,000
5613 Development Control
Various Construction Projects 200,000
16
Forecast
Engineering Services Capital Summary
(2017 Cont'd)
5321 Development Projects DC Funded
DH-2 Valley Farm/Tillings Bridge (Partial)1,500,000
RU-4 Audley Road 2,145,000
B-19 Krosno Creek SWM Facility K16@ Wharf Street - Design 45,000
Sub Total - 2017 $4,670,000
2018 Capital Projects
5321 Development Projects DC Funded
B-20 Krosno Creek SWM Facility K20 @ Sandy Beach - Construction $1,147,666
B-30 Krosno Creek SWM Facility K19Hydro Corridor - Construction 7,441,542
Oil Grit Separators Frenchman's Bay 321,000
DH-1 Valley Farm Road - Construction (North of Third)2,650,000
DH-2 Valley Farm/Tillings Bridge - Construction 11,000,000
Sub Total - 2018 $22,560,208
17
Forecast
2015 Capital Projects
5701 Senior Citizens Centre
Boiler & Controls - Replacement $100,000
5713 Dunbarton Pool
Pool Vacuum - Replacement 10,000
5715 Don Beer Arena
Ice Resurfacer - Replacement 90,000
Roof Top Unit (RTU-3) Lobby Area - Replacement 35,000
5731 Rec Complex - Core
Health Club Equipment Replacement 56,000
Isolation Valves on Supply and Return Heating (New)135,000
Banquet Hall Supply Fan 18 - Replacement 120,000
Roof Replacement (inverted section)155,000
Skylight Replacement 80,000
Replacement of Chiller 400,000
5733 Recreation Complex - Pool
Lighting Grid Replacement & Upgrade 50,000
Culture & Recreation Capital Summary
18
Forecast
Culture & Recreation Capital Summary
(2015 Cont'd)
5735 Recreation Complex - Arenas
Delaney Lighting Upgrades (energy efficiency)40,000
Heater and Recirculation System for O'Brien Change Rooms 40,000
Delaney Seating Replacements - Completion of Replacements 55,000
Ice Controller System Replacement & Upgrade 120,000
Rooftop Unit Replacement - RTU-3 25,000
5744 Museum
Barn Siding and Shingling 25,000
School House resealing of logs 6,000
Sub Total - 2015 $1,542,000
2016 Capital Projects
5700 Civic Complex
Axial Fan - Replacement (SF1 & RF1)$120,000
Commemorative Wall listing names of Councillors 15,000
City Hall Upgrades - Accessibility 650,000
5701 Senior Citizens Centre
Boiler Plant Replacement 100,000
19
Forecast
Culture & Recreation Capital Summary
(2016 Cont'd)
5715 Don Beer Arena
Rubber Floor (Rink 1 & 2) - Replacement 85,000
Roof Replacement (West Section)420,000
Ammonia Compressor - Replacement 32,000
5719 Community Centres
Floor Machines for East Shore and Petticoat - Replacement 40,000
HVAC Replacement at Claremont CC 10,000
Accessibility Upgrades for Northern Facilities 120,000
5731 Rec Complex - Core
Exterior Message Boards Replacement 25,000
Replace Reception Counter at the Rec. Complex 250,000
Health Club Equipment Replacement 82,000
HVAC RF-19 - Replacement 80,000
Design Domestic Water System Complex 15,000
Isolation Valves 50,000
5735 Recreation Complex-Arenas
Plumbing upgrades 35,000
Replace Carbon Monoxide Detectors 30,000
Water Filter & Pump Replacement at Delaney Rink 15,000
Delaney Arena Improvements 1,500,000
20
Forecast
Culture & Recreation Capital Summary
(2016 Cont'd)
5744 Museum
Move Gas & Steam Barn to Upper Site 500,000
Corrective Drainage Measures 20,000
Sub Total - 2016 $4,194,000
2017 Capital Projects
5700 Civic Complex
Replace Air Handling Unit $160,000
Axial Fan Replacement - SF2 + RF2 120,000
Roof Replacement (inverted sections)420,000
5701 Senior Citizens Centre
Replace Boiler #2 100,000
Replace Air Handling Unit in Gym 125,000
5715 Don Beer Arena
Desiccant Dehumidification Rink 1, 2 & 3 400,000
New Ice Resurfacer Room & Entrance 250,000
New Reception Area – accessible counter & new furnishings 250,000
Rubber Flooring replacement (Rink 3)55,000
21
Forecast
Culture & Recreation Capital Summary
(2017 Cont'd)
5719 Community Centres
Replace Front Entrance & Windows (Claremont Community Centre)40,000
Kitchen Upgrades (WSCC)15000
Accessibility Upgrades 45,000
Accessibility Upgrades - Elevator at Greenwood Community Centre 120,000
5731 Rec Complex - Core
Fitness Equipment Replacement 44,500
Diesel Back Up Generator - Replacement 70,000
Air Handling Unit Heating/Cooling - Replacement 120,000
Curb, Sidewalk and Pathway Repairs 250,000
Roof Replacement - inverted and metal roof sections 580,000
Floor Replacement Lower Cardio Annex 15,500
5733 Recreation Complex - Pool
Replace Filter Elements & Covers 26,000
Complex Pool Grout & Tiling Repair 35,000
Prep. and Paint Exterior Stucco Walls 60,000
5735 Recreation Complex-Arenas
Evaporator Condenser Tower Replacement 50,000
Changeroom & Washroom Renovations - O'Brien Arena 300,000
Roof Top Unit - 3 (Replacement - O'Brien Lobby)25,000
Roof Top Unit - 4 (Replacement - Changerooms)30,000
22
Forecast
Culture & Recreation Capital Summary
(2017 Cont'd)
5744 Museum
Re-Shingling of the Log House Roof 8,000
Full Drainage Work on the Lower Museum Site 100,000
Sub Total - 2017 $3,814,000
2018 Capital Projects
5700 Civic Complex
Air Handling Units - SF3 + RF3 - Replacement $160,000
Air Handling Units - SF4 + RF4 - Replacement 120,000
Elevator Replacement 110,000
5719 Community Centres
Septic Tank & Bed (Greenwood Community Centre)25,000
5731 Rec Complex - Core
Health Club Equipment - Replacement 46,000
Air Handling Units - RF13 + RF10 - Replacement 80,000
Main Entrance Brick/Concrete - Replacement 160,000
5733 Recreation Complex-Pool
Pool Beams (Inspection, Painting & Minor Repairs)120,000
Pool Bleachers - Replacement 80,000
23
Forecast
Culture & Recreation Capital Summary
(2018 Cont'd)
5735 Recreation Complex-Arenas
Tables & Chairs - Replacement 15,000
Ammonia Shell & Tube Chiller (O'Brien) C1 to C4 (inclusive)355,000
Brine Pump Replacement (O'Brien)15,000
Condenser Pump 10,000
Condenser Water Tank (O'Brien)25,000
Ammonia Compressors - 3 (O'Brien Rink)119,000
Sub Floor Pump Replacement 15,000
Hammer Motor Control Centre (O'Brien Rink)60,000
Rubber Flooring Replacement (Delaney Rink)25,000
Re-design and Build Arena Office Space 250,000
5744 Museum
Re-Shingling of the Puterbaugh School House Roof 6,000
Sub Total - 2018 $1,796,000
24
2015 2016 2017 2018
5800 Library
New Van $40,000
New Integrated System - Library Management 90,000
Skylights 150,000
Petticoat Creek - Quiet Study Room Improvem 25,000
Petticoat Creek carpet replacement 36,000 $36,000
Petticoat Creek outdoor reading area / programming space 100,000
Central - Window Replacements (if no expansion)$500,000
Book Materials Collections 512,075 537,680 564,564 $581,500
Central - Modify Lobby Flooring (if renovation is postponed)40,000
Central- Refinish Interior Walls (if renovation is postponed)80,000
Central- Relocate Study Room (if renovation is postponed)120,000
Central - Ceiling Tiles / Baffles (if renovation is postponed)125,000
Petticoat Creek drywall and interior replacement / repairs 65,000
Petticoat Creek- Replace East Exterior wall. Include for new east entry vestibule 450,000
Total $853,075 $673,680 $1,064,564 $1,461,500