HomeMy WebLinkAbout2014 Capital Budget
2014
Capital
Budget
As Approved by Council February 24, 2014
City of Pickering
2014 Capital Budget
Table of Contents
Department Page
Budget Summaries 1
Mayor and Council 8
Office of the CAO 15
Customer Care Centre 5129 16
Fire Services 5340 18
Corporate Services 20
Finance & Taxation 5203 21
Information Technology 5206 23
Clerks 5215 25
By-law Services 5220 27
Engineering & Public Works
Operations & Fleet Services 28
Property Maintenance 5311 31
Operations Centre – Municipal Garage 5315 39
Roads 5320 42
Parks 5780 62
Engineering Services 75
Streetlights & Signalization 5325 76
Stormwater Management 5410 80
Development Control 5613 83
Development Projects - (DC Funded) 5321 85
Culture & Recreation 94
Civic Complex 5700 95
Senior Citizens Centre 5701 97
Dunbarton Pool 5713 100
Don Beer Arena 5715 101
Community Centres 5719 103
Recreation Complex - Central Core 5731 107
Recreation Complex - Pool 5733 110
Recreation Complex - Arenas 5735 112
Museum 5744 115
City Development
City Development – Admin 5610 117
Library 5800 119
Common Budget Terms
Assessment Growth
The additional taxation revenue the City receives from new homes and businesses that
are built each year. This revenue is used to cover the cost of providing services to the
new residents/businesses and for long term f inancial planning .
Budget Levy
Sometimes referred to as the "Tax Levy", the budget levy is the total of all expenditures
funded by property tax es.
Capital Budget
One time expenditures for major projects (often referred to as "infrastructure") such as
roads , vehicles/~quipment, parks, sidewalks, trails, streetlights, storm sewers,
playgrounds and buildings . It includes both the development of new, and the
maintenance/rehabilitation of e xisting infrastructure.
Current Budget
The expenditures (e.g ., wages/benefits , supplies, contracted services, utilities , etc.)
required to deliver the day to day City services. It also includes the revenues that the
C ity receives (e .g ., user fees , interest income, building permit fees , etc.).
Debt
A type of long term loan used as partial financing for major capital projects . The debt,
including interest, is repayable over 5 to 25 years . Debenture debt spreads the project
cost and related tax rate increase over a number of years and ensures that future
ta xpayers pay the ir fair share of capital projects being completed today.
Development Charges
A charge paid by developers to partially pay for the cost of new capital projects required
as a result of growth (e .g., new roads, parks, trails, community centres, fire stations,
etc.). Development charges do not cover the entire cost of a capital project, as
legislation requires municipalities to f und a portion of most projects . In addition , certain
expenditures are exempt from development charges and must be paid entirely by the
municipality.
Reserves/Reserve Funds
Dollars set aside for specific purposes , both current and capital budget items . There
are two main types of reserves/reserve funds :
Common Budget Terms
Statutory/Obligatory-municipalities are required by legislation to establish
certain reserve funds (e.g., Development Charges, Parkland)
Discretionary -can be established by Council for specific purpose (e.g., Vehicle
Replacement, Rate Stabilization)
2013
Budge t
$464,000
791.~50
14,134,783
7,717,777
1,081,468
$24,189,278
2013
Budget
$1,335,569
1,100,000
333,396
205,250
70,000
29,021
1,205,000
1 ,658,124
4,875,000
872,000
200,000
40,000
70,000
625,000
2,136,503
9,000
100,000
125,000
40,000
35,000
200,000
170,000
3,145,000
4 ,107,397
30,000
1 ,210,000
263 018
$24,189,278
City Of Pic ke ring
2014 Approved Capital Budget
Expenditure S ummary
De partment
.Mayor, Cou n cil & Cou ncil Support
Office of the CAO {Includes Fire Services Division)
Corporate Services
Engineering and Public Works
Culture and Recreati on
City Deve lopment
Libraries
Total
Financing Summary
2823 Capita l Paid from Property Taxes
1592 Donations
15Q5 Sale of Land -Duffin Heights
1610 Federal Grants
1623A Provincial Grants-Investing in Ontario
1623E Provincia l G rants-T ransportation In itiatives
1623G Provincial G rants -Municipal Rd & Infrastructure
1623H Provincial Grants -ODRAP
1631 Durham Region Grant
1701 Debt Financ ing -5 Year
1702 Debt Financing -10 Year
1703 Debt Financing-15 Year
1704 Debt Financin g -20 year
1711 Internal Loan -5 YE)ar
1712 Internal Loan-10 Year
7001 R -Capital Equipment
7020 Se lf-Insurance Reserve
7021 Rate Stabilization Reserve
7022 DC -City's Share Reserve
7032 Dunbarton Pool Surcharge Reserve
7033 Do n Beer Arena Reserve
7034 Rec Co m plex Core Reserve
7035 Rec Complex Pool Surcharge Reserve
7036 Rec Complex Arena Reserve
7040 Vehicle Replacem ent Reserve
7042 Provi si on for Eastern Branch Library
7043 Move Ontario Reserve
7049 Reserve -Financial Systems
7501 RF Third Party' Contribution
7502 RF Parkl and
7505 Federal Gas Tax Reserve Fund
7605 RF DC-Fire
7610 RF DC -Roads & Related
7611 RF DC -Storm Water Management
7612 RF DC -Operation Centre
7620 RF DC -Park land Development & T rails.
7621 RF DC -Recreation Facilities
7701 RF -Capital Works
9960 Other Reven ue-York Regio n Project
9990 Other Revenue
1. '
2014
Budget
. $1,591 ,000
358,000
40,463,635
9,652,605
20,000
785,200
$ 52,8 70 ,440
2014
Budget
$1,095,301
383,000
1,518,000
1,800,000
1,175,000
3 ,734,000
1 1,000,000
192,000
790,000
278,500
3,933,992
897,960
110,000
81,000
60,000
30,000
508,000
50,000
125,000
232,735
410,875
6,095,000
1,425,000
2,217,160
131,780
8 ,861 ,508
397,125
3 ,412,504
140,000
1,785,000
$52 ,870,440
$55,000;0 00
$50,000,000
$45,000,000
$40,00 0,000
$35,000,000
$30,000,000
$25,000,000
$20,000,000
$15,000,000
$10,0 00,000
$5,000,000
2004
Capital Bu .dget Summary
2004 to 2014
New Operations Centre
2096 2008 2010 2012
2
2014
2014 Capital Budget by Financing Sourc·e
($52.87 Millions)
DC Funded\
32% \
ODRAP *
4%
12%
York Region
Agreement
4%.
Reserve
.Funds
4%
* Ontario Disaster Relief Assistance Program
** Federal Gas Tax
3
2%
Debt
Rate
Stabilization
Reserve
7 %
2014 Vehicle Expenditures Summary
Number Cost
Type of Vehicle of $
Vehicles
By-Law Services Rep lacement Vehicle 1 $35,000
Fire Pumper Rescue 1 800,000
Roads 4 Ton Dump Truck with Plow 1 195,000
Operation Centre 1/2 Ton Pick-up Truck 1 28,000
Development Midsize Vehicle 1 35,000
Control
Parks 1 Ton Pick-ups with Plow & Salters 2 100,000
Community Centres Ful l Size Cargo Van 1 35,000
TOTAL 8 $1,228,000
Vehicle ·Expenditures 2008-2014
1,500,000
1,000,000
500,000
2008 2009 2010 2011 2012 2013 2014
• Light Duty Vehicles • 4 or 5 ton Dump Trucks (Includes Graders) • Large Fire Vehicles
2008 2009 2010 2011 2012 2013 2014
Light Duty Vehicles
Dump Tru cks
Large Fire Vehicles
10 3
1
1
5
2
1
4
8
1
5
1
1
7
1
6
1
1
Annu a l Deb t C h arges for De bt Fin a nced 2 01 4 · Ca pt ia l
Proj ect s
Project# Description Annua l 2014
Charges BUDGET
10 Yea r Deb t
5320.14 06 Salem Road H a r~ ~urf~cing .. $69,000 $575 ,000
5320.14 17 Du nba rt on Roa d Cul ve rt Rep lacement 72,000 600,000
Total Cost of 10 Year Debt $141 ,000 $1 ,1 75,000
15 Ye ar Debt
5719.1401 Indoor Socce r F_acil ity & Land (Debt Share on ly) $336,000 $3,734,000
· (The Picke ri ng Soccer Club will be reimbursing the City for these
debt costs.)
Total Cost of 15 Year Debt $336,000 $3,734,000
20 Year Debt
5315.1401 New Opera ti ons Cen tre (Pr!)perty Tax Base Funded) $809,000 $11,000,000
,. (q_C Res!'lNe f und Fin ancec;J) 639,000 8,686,000
Tot al Cost of 20 Y ear Debt $1,448,000 $19,686 ,000
,
Inte rn al Lo an -5 Y ear ··-5800.1406 Brickcladdi ng and Masonry Repairs -Library $42,000 $192,000
Total Cost of Inte rn al L o a n-5 Year $42 ,000 $192,000
Internal Loan -10 Y ea r .. -.. ·-----·---5320.1407 Wi lso n Brid g~ Replaceme nt -·· $30,000 $250 ,000
5701.1403 East Shq re HVAC & Sprink ler Upgrades .. 17 ,00 0 140,000
5744.1402 Odd fell ows Hall 48,000 400,000
Total Cost of Internal Loan -10 Yea r $95,000 $790 ,000
Grand Total $2,os2,ooo II $25,577,000
5
2014 Debt Borrowing Summary
Property Tax Base Funded
Salem Road Hard Surfacing
Dunbarton Road Cu lvert Replacement
New Operations Ce ntre
Brickcladding and Masonry Repairs-Library
Wilson Bridge Replacement
East Shore HVAC & Sprinkler Upgrades
Oddfellows Hall
Development Charge Funded Debt (Operations Centre)
Community Group (PSC for Indoor Soccer Dome)
Total Debt
6
$575,0 00
600,000
1 1 ,000,000
192 ,000
250,000
140 ,000
400,000 $13,157,000
8,686,000
3,734,000
$25,577,000
City of Pickering
2014
Accessibility Capital Projects Forecast
2014 to 2018
Project Description
2014
Claremont Community Centre Washroom Renovations
Kinsmen Park Pathway
. Recreation Complex Reception Counter Replacement (design only)
2015
Accessibility to Sports Fields (Pathways)
2016
City Hall Upgrades
Recreation Complex Reception and Registration/Permit Counter Replacement
Accessibility Upgrades to Greenwood Community Centre (Ramps, Washrooms,
Entrances)
Delaney Rink Mechanical, Boards & Floor (gross cost= $1 ,500,000)
Accessibility to Sports Fields (Pathways)
2017
Don Beer Arena New Reception Area
Elevator at Greenwood Community Centre
Accessibility to Sports Fields (Pathways)
Accessibility Upgrades (Washrooms, Entrances, Counters)
2018.
Redesign of Recreation Complex Arena Office
Accessibility to Sports Fields (Pathways)
$90,000
50,000
35,000
$175,000
$100,000
$100,000
$650,000
250,000
120,000
100,000
100,000
$1,220,000
$250,000
120,000
100,000
45,000
$515,000
$250,000
150,000
$400,000
Grand Total =~$2~,4,;,1;;;0;!;;, 0;;;0~0
In addition to the above expenditures the City plans on investing an additional $1.3 million on
sidewalks to meet accessibility requirements. The City's five year Accessibility Plan (2012-2016)
identified the need to spend $1.2 million on sidewalks for the years 2014 to 2016.
7
City of Pickering
2011-2014
Capital Budget
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
provided for computer hardware, software and telecommunication
equipment per term·. As per the policy these funds can only be spent
during the first three years of office.
8
City of Pickering
2011-2014
Capital Budget
2011 2011
Budget YTD
Actuals
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
provided for computer hardware, software and telecommunication
equipment per term. As per the policy these funds can only be spent
during the first three years of office. ·
9
2012 I
YTD I Actuals
..... I
$6741
$6741
I
I
I
2013 2014
YTD Budget
Actuals
I
$371 $0
$01 $0
I
I
I
City of Pickering .
2011-2014
Capital Budget
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
· provided for computer hardware, .software and telecommunication
equipment per term. As per the policy these funds can only be spent
during the first three years of office.
10
2014 .
Eludget
City of Pickering
2011-2014
Capital Budget
' . 2011
BUDGET
2011
YTD
Actuals
$2,6011
$2,6011
($10,000)
Total Financing ($10,000)1 -·-·--. ---------------------.. ----~---------~-----"'""fl---'-'-'-=~
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
provided for computer hardware, software and telecommunication
equipment per term. As per the policy these futids can only be spent
during the first three years of office.
1 1
I
I
'. 2014 2012 2013 '
YTD YTD Budget
Actuals Actuals
I I
$9881 $01 $0
$9881 $01 $0
I I I
I .
I I
I I
City of Pickering
2011-2014
Capital Budget
2011
BUDGET
2011
YTD
Actuals
$2,6751
$2,675j
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
· provided for computer hardware, software and telecommunication
equipment per term. As per the policy these funds can only be spent
during the first three years of office:
12
J
I
2012
YTD I
Actuals
I
$3541
. $354j
I
I
I
I
2013 I I YTD I
2014 .
Budget
Actuals I
.... I
$Oj
$Oj
I
I
I ...
City of Pickering
2011-2014
Capital Budget
2011 2011
BUDGET YTD
2012 2013
1
.
YTD YTD
-...
2014
Budget
Q,J:lif::J<_<>r~_n,_ Cl!Y Co11_n_: W~~~-_:!. Actuals Actuals Actuals i
E_x~f~~it6t~:ifix~d Assets ··--------~f----'$'-'1-=o"',o..::oo"'lf-_.c$=2"',6-'-74'-!l ___ -.c$..::36"'~'--.c$c:.1"',o"-96"'1 ___ -"'$0=-i
· -------------·-· r0i81E:xii8Jici;iuresl $1o,oool $2,6741 $ol $ol $o
f;~~~~n~~:~~~ p;;~;~~~-~o~~~~~~~~~~~"-''_·-_c~=T+ !---_ -($-'-1-'-o"'.o:::o:.:ii)+l----"=-'+J -_-_ ---= __ +~-------"'+---~
=-------------==--------~==-=-=-~!;;if'in~~~i~gi ($1o.ooo)l _ j +
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
provided for computer hardware, software and telecommunication
equipment per term. As per the policy these funds can only be spent
during the first three years of office.
13
City of Pickering
2011-2014
Capital Budget
1:). Pickles,_ ~ityCoun.Ward3
~penditures ." .. -----· -~
6181 Other Fixed Assets
I
I
-----·-" .'f~j~IE~pe~~~~~~_;~~~
.~l':~_n_~i!'_~ . ---·· . -· ·-----·--·--I
2823 Capital Paid from Property Taxes I "-
" .. ~i:~t~IFi~a~~~~9\
I
2011 2011
BUDGET YTD
Actuals
----
I
$HJ,oool
$10,0001
($10,000)1
($10,000)1
As per Council Compensation Policy, (Subsection 12.01) $10,000 is
provided for computer hardware, software and telecommUiiication
equipment per term. As per the policy these funds can only be spent
during the first three yt;lars of office.
14
I "" ." """""
2012 2013
I
2014
YTD YTD Budget
Actuals Actuals
$ol" I I ..
. $3561 $01 $0
$01 $3561 $01 $0
I I ·l I
L I
I I I
City of Pickering
2014
' Approved Capital Budget
Office of the CAO Summary
I 2013 ! 2014
I Budget I Budget
' i --. ----·~··-~---~~---~---~ ! I
EXPENDITURES .· ' '
6157 Vehicles-Under $100,000 I $35,ooo I
6158 Vehicles-Over $100,000 I I $800,000 I -~~-~--
6173 Furniture & Fixtures I 14,0001 i
6174 System & Software Upgrade ' I 56,000 ---~
I I
6178 Miscellaneous Equipment ! i 35,000 ' ...
' 140,000j 6181 Other Fixed Assets I
6185 Fire Dispatch Communication System I 275,0001 700,000
Total EXPENDITURES . I $464,ooo I $1,591,000
FINANCING. ! I
1702 Debt-10 Year ' I ! ____ .. --·--
($275,000)1 1711 Internal Loan-5 Year I '
2823 Paid from Property Taxes I (14,000)j ($131 ,000) '
7022 R -DC City's Share I I (35,000) I
7605 RF DC-Fire I (175,oi:lol I (1 ,425,000) '
Total FINANCING I ($464,000)! ($1 ,591 ,000)
15
City of Pickering
2014
c
Approved Capital Budget
5129 Customer Care Centre
I 2013 I 2014 I
··-~
I
·---'
Budget ' J:?udr;tet ~·--I
---··~-----' I I I
EXPENDITURES. ... . I I I
6174 System & Software Upgrade I ' $56,000 . I
6265 Land Acquisition I . I ·-·
Total EXPENDITURES ! $01 $56,000
FINANCING . ·.
. i ' i
2823 Paid from Property Taxes . . ' .
I ($56,000) I
7049 Reserve -Financial Systems I I
Total FINANCING I $01 ($56,000)
1 6
City of Pickering
2014
Approved Capital Budget
5129 Customer Care Centre
5129.1401 Customer Relationship Management System
2823 Paid From Property Taxes
6174 System & Software Upgrade
· Customer Relationship Management System (CRMS) -Application
Software Annual Support and Professional Services. To replace the
existing aging tracking system (developed in house) which is no
longer capable of supporting the City's service needs and the ability
to expand upon.
The CRMS will seamlessly integratewith the existing property
system permitting all property-related activities to be stored in one
database. This not only allows us to quickly ascertain all activities
to an issue/property, but will create efficiencies and continuity of
information, particularily during an emergency or under special
circumstances.
Total 5129.1401 Customer Relationship Management System
Total5129 Customer Care Centre
17
Run Date: 9-Apr-2014
Funding Expense
(56,000)
56,000
(56,000) 56,000
(56,000) 56,000
City of Pickering
2014
Approved Capital Budget
5340 Fire Services
I 2013 I 2014 -·-·
i Budget i Budget
I I
I
EXPENDITURES ' . -. · -.. ·. -... . i j
6157 Vehicles-Under $100,000 ! $35,000 •
6158 Vehicles-Over $100,000 i I $800,000
6173 Furniture & Fixtures I 14,000 i
6178 Miscellaneous Equipment I ! 35,000
6181 Other Fixed Assets \ 140,000 !
6185 FireDis(Jatch Communication System_ l 275 000 i ' '
700,000
Total EXPENDITURES I $464,ooo I $1,535,000
FINANCING . . ' i -I ' 1702 Debt -1 0 year -I I
1711 Internal Loan-5 Year I ($275,000)1
2823 Paid from Properli'_ Taxes i ~14,000)! ($75,000)
7022 R -DC City's Share I . i (35,000 '
7505 RF-Federal Gas Tax I (175,000)!
7605 RF DC-Fire i ! (1 ,425,000
Total FINANCING I ($464,000) I ($1 ,535,000
18
City of Pickering
2014
Approved Capital Budget
5340 Fire Services
5340.1401 Diesel Generator
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
·Diesel generator for fire station #2
Total 5340.1401 Diesel Generator
5340.1404 Regional Radio Project -Phase II
6185 Fire Communication System
Regional Radio Project-Phase II
7022 R -DC's City's Share
7605 DC-Fire Res. Fund .
Total 5340.1404 Regional Radio Project-Phase II
5340.1407 Pumper Rescue (Growth Related)
2823 Paid From Property Taxes
6158 Vehicles-Over $100,000
' Pumper/Rescue-Replace a 1994 unit #515. This vehicle was
indentified in the previous DC study arid is a result of the grqwth
related to Duffin Heights development.
7605 DC-Fire Res. Fund
Total 5340.1407 Pumper Rescue (Growth Related)
Total 5340 Fire Services
1 9
Run Date: 9-Apr-2014
Funding Expense
.
(35,000)
35,000
(35,000) 35,000
700,000
(35,000)
(665,000)
(700,000) 700,000
(40,000)
800,000
(760,000)
(800,000) 800,000
(.1 ,535,000) 1,535,000
City of Pickering
2014
Approved Capital Budget
Como rate Services Summarv
20
2QJA
BLtdget
($358,000)
City of Pickering
2014
Approved Capital Budget
5203 Finance and Taxation
~. 2013 I 2014
~-~~---·.
-r~-~~~-,.-·~---·-•~---~·~'
Budget Budget
I
EXPENDITURES .· 'l . .. I ... ·.· . .
.· .... •
6174 System & Software Upgrade $35,0001 $125,000 [----.
I 600,000] 6265 Land Acquisition
Total EXPENDITURES I $635,0001 $125,000
FINANCING . . I '•-.. -.. -. .. .. . ·.· . ..
1595 Sale of Land-Duffin Heights I ($600,000) .
7049 Reserve -Financial Systems -----I (35,000) ($125,000)
Total FINANCING I ($635,000)1 ($125,000)
21
5203 Finance and Taxation
City of Pickering
2014
Approved Capital Budget
5203.1401 System Software Upgrade
617 4 System & Software Upgrade
New Oracle software ($115k) is required in order to run the new
Property Tax (TXM) system. This oracle software may also be used
to run the upgraded version of the Amanda property system. There
is a requirement to purchase new cash modules $10k.
7049 Reserve Financial Systems
Total 5203.1401 System Software Upgrade
Total 5203 Finance and Taxation
22
Run Date: 9-Apr-2014
Funding Expense
.
125,000
(125,000)
(125,000) 125,000
(125,000) 125,000
City of Pickering
2014
Approved Capital Budget
5206 Information Technology
l 2o13 .. I 2o14 ~~~~~~~~~~~~:! ~~~ Budget ~~~~~~~~BudgeT·~~····
I ~~·~·~~·-···~~:·-~~~ ~~~-~·-·
EXPENDITURES I '
. --·~~-------~~-~~~----~--·----~--_;_ __ .~--~---~~-------~~---~------~~:~--~~~--~~-~-· ··--"~"~-~
6174System & Software U~grade I. . . . i
6175Hardware Replacements .. . n •• ~~-~~=Its,ofio[~_:==~· $47,000~
61771T_Infrastructure --·-·--·~· --~-~~------40,0001 .. 7Q,QQQ _
__ 6190 New QQI]:lorate PrCJjects .~ 38,2501 17,000
Total EXPENDITURES ------~-----~I $156,250[ $134,000
FINANCING . . . . . I . i
--T623A-ProvTrlcTaf8ranis-~ -lrivestiri9Trl or1tarro~-----~-~--l$ToTI5olr--~-~----------
2823 Paid from PropertyTaxes · 1.~·· ·--. • . J ____{$17;000)
7001 R-Capital Equipment I (40,000) I (117,000)
7021 Rate Stabilization Reserve [-_---·If5~0o)T ~---···==
7505 RF-Federal Gas Tax I f -~--~-----+----~----~ Total FINANCING I ($156,250) I ($134,000)
23
City of Pickering
2014
Approved Capital Budget
5206 Information Technology
.
.
5206.1401 Servers & Related Software
6175. Hardware Replacements
To replace (4) network blade servers which have reached the end
oftheir useful lives.
7001 R-Capital Equipment
Total 5206.1401 Servers & Related Software
5206.1402 Repl~cement Plotter
6175 Hardware Replacements
To replace (1) plotter which is used by City Development staff to
print large scale drawings or maps. The plotter has reached the
end of its useful life and replacement parts are difficult to source.
7001 R -Capital Equipment
Total 5206.1402 Replacement Plotter .
5206.1403 Civic Complex Wi-Fi Capability
2823 Paid From Property Taxes
6190 New Corporate Projects
Adding Wi-Fi capability to the Civic Centre will enable the Municipal
Emergency Operations Centre (MEOC) to be set up anywhere in the
. building and also give MEOC staff the flexibility to work in different
locations.
Total 5206.1403 Civic Complex Wi-Fi Capability
5206.1404 SAN Disk
6177 IT Infrastructure
SAN Disk
To replace and purchase additional disk drives for the Storage Area
Network (SAN) in order to enhance the City's central storage of
data.
'
7001 R -Capital Equipment
Total 5206.1404SAN Disk
Total 5206 Information Technology
24
Run Date: 22-Apr-2014
Funding Expense
40,000
(40,000)
(40,000) . 40,000
.
7,000
(7,000)
(7,000) 7,000
(17,000)
17,000
(17,000) 17,000
70,000
(70,000)
(70,000) 70,000
(134,000) 134,000
City of Pickering
2014
Approved Capital Budget
5215 Clerks
i 2013 i 2014 I
I Budget .. ' Budget i
I I
EXPENDITURES I
I
6178 Miscellaneous Equipment I I $9,000
6181 Other Fixed Assets I I
Total EXPENDITURES . I $0 I $9,000
FINANCING . I i
7001 R -Capital Equipment I I ($9,000)
Total FINANCING . ·. I $0 I . ($9,000)
25
5215 Clerks
City of Pickering
2014
Approved Capital Budget
.
5215.1401 Commerci~l Grade Paper Folding Machine
6178 Miscellaneous Equipment
Commercial grade paper folding machine for Print Shop -
replacement
7001 R-Capital Equipment
Total 5215.1401 Commercial Grade Paper Folding Machine
Total 5215 Clerks
26
Run Date: 9-Apr-2014
Funding Expense
9,000
(9,000)
(9,000) 9,000
(9,000) 9,000
City of Pickering
2014
Approved Capital Budget
5220 Bv-Law Services
-··
NDITURES . EXPE
6157
6174
Tota
Vehicles-Under $100,000
S:t:stem & Software Upgrade
I EXPENDITURES -"
CING "--"-
R -Capital Equipment
FINAN
7001
7040
Tota
Vehicle Ret>lacement Reserve
I FINANCING
-
I 2013 2014
i Budget Budget
I
I ! !
I
'
$35,000 I
'
I 55,000
! $0 $90,000
I I
I ($55,000)
I (35,000 -I $0 ($90,000
'
27
City of Pickering
2014
Approved Capital Budget
5220 By-Law Services
5220.1401 Replacement Vehicle
6157 Vehicles -under $1 00,000
Replacement Vehicle: Replacing 1999 Chevy Lumina (#415)
7040 R -Vehicle Replacement
:rotal 5220.1401 Replacement Vehicle
5220.1402 System & Software Upgrade
617 4 System & Software Upgrade
Ticket Processor Software Replacement. Existing software
purchased in 2001, and no upgrades in past 6 years.
7001 R -Capital Equipment
Total 5220.1402 System & Software Upgrade
Total 5220 By-Law Services
28
Run Date: 9-Apr-2014
Funding Expense
35,000
(35,000)
(35,000) . 35,000
55,000
(55,000)
(55,000) 55,000
(90,000) 90,000
City of Pickering
2014
Approved Capital Budget
Operations & Fleet Services Summary
~-······ .. ··-~ .. ·-·---~.-·~-----------·--------------~ .• :Z01} .. ' t .... :2()14 . · I Budget · I Budget · · · ··· r-·----·--r----------~~~
EXPENDITURES . . i . . I
_ _213j_street Tree RePlacement --~=:~:=--=-==-=~=[-.~ ----~---~-$1.5QQ,OQO
6132 Parks Tree Replacement I I 300,000
6130 Parks-Landscape-Refurb. r--=:··$:1)99,3831 1 ,960,000
6157 Vehicles-Under $100,000 I ··-305,0001 _128,000
6158 Vehicles-Over $100,000 I 2t5,oool:-·-·· ~-.· 1~5&00
-6173 Furniture & Fixtures --···------·~. ~-=--T------~~-1·.
~_6178 MiscellaneousEqui~Jment . . 1.. 650,5001
6181 Other Fixed Assets ...... 1. 811,0001_.
... 920,500
362,735
.. 6183Accessibility -~~------~_--il . ..... ·I
6185 Fire Dispatch Communication System :----:cc:-:::-:-::-::c::-::-l
6250 Construction Costs I 3,100,0001 31,610,000
6251 Road Improvements I .. mum • r
62_59 Cons:tr!Jc!ioll_9osts -~y_grk Ref!l9!1..:.. _______ ~ .. ··· !: ..... ~--~·~-..
Total Cost EXPENDITURES $6,380,8831 $36,976,235 --~----. ~-·--~---f----"-=-'-=-.:.c:..c::.,=-=t---"-'::..=..!C::..:....::=.::--=-j Fl1~~~~~~tions ............ ~~~-.-· -----:1---~-----l
~ ~;~ ~=~ee~!/~;a~;~.uffin H . .:..ei_g_h·t,-s-=--------=------_-.. _· +-I ~------~~(~~O_Q_LQ_OQ)F~_-•. ~. .·· ----·
1623A Provincial Grants -Invest In Ontario I . (60,000),.L.___($103,000)_
1623E Provincial Grants-T.l. Grant I ____ ~_(ZO,OOO}[ .... =~--····· -·-
1623G f"rovincial Grants-MuniciQ.~_Rd. & Infrastructure _ _ ____ _]_ J!,51.1J.,QOO)
1623H Provincial Orants -ODRAP _l I (1 ,800,000)
1631Durham RegionGrants I · · (29,021)1____ •
1701Debt= 5 year .... . .... . . . l n .(515,000)1 ·--.. nm _ m •
• 1702Debt-10 yeai __ ~~---·-· ________ .. __ . 1. _(550,0QQ)J ___ j1,1?5,000}
1704 Debt-20Year L J (11,000,000)
· 1711 Internal L.oan~ 5 Year · · · · ·· l_ .... =_--j13_Q,OQQTI . . ..
1712 Internal Loan-10 Year I {200,000)J . -·· __ {250,000)
-~~~it:~:~p~~~~prt~~~~-~---·-----~--l-· .. (~9:3.~441F <~~i:~~~}
7020Self-lnsurance Reserve I (70,066)1 · ·· · ·· .... · -
7001 R~Capital Equipment L . . . l (60 0002
7021 Rate Stabilization Reserve I (420,506)1 · ·· · (3,743~992\
29
City of Pickering
2014
Approved Capital Budget
Operations & Fleet Services Summary
~" ~-~~-~~~-------·--··---"-~'"' ----~~~-1 2013 .I ..... 2014 --------------------~ .. -----------
__ _!l.udget ~J .Budget
I I
7022 DC~City's Share Reserve L L (.19,50Q)
:JQ40 Vehicle Replacement ReseJ:Y_.~----·--~~-~--~ .. ·· (1 00,000}1 (4!)3,QQ_O)
7041 Easement Settlement Reserve I . . I
7043 R -Move Ontario I ----· (4o,ooo)l-~----~.· ··-·.-· -·
7501 RF ~Third PartyContribution r · -·--·----·---T~-----(32~ 73s)
7502 RF-Parkland 1.. :~~i1?0LQ06IC~=-~(LI1QJl7.§l
--~---. ·-· --·-· -· -~~-~~~--.-~---~~-~~ 1 ..... (1,685,000)1. ~4,965,000) 7505 RF ~ Federal Gas Tax ' . 7610 DC-Roads & Relatd Res. Fund L_ . _ . _ L (21o,ooo2
7612 RF DC-OperationCentre ,--------1 (8,861,508)
~7620 .QC ~ Pa_r~_<mdj)_evelopment & Trail . ····--1 . .··.·· .. 1 ....... Q~t. 1?§)
7701 RF -Ca[Jital Works I (140,0001
9960 Other Revenue York Region Enhancement I ·---({21o,ooo)f · (1 ,645,000)
I -·
(238,018)1 9990 Other Revenue
Total Cost FINANCING I ($6,380,883)1 ($36,976,235)
30
City of Pickering
2014
Approved Capital Budget
5311 Property Maintenance
I 2013 I 2014
I Budget I Budget
I I
EXPENDITURES . . I . I ... · .. · .
6131 Street Tree Replacement I I $1,500,000
..
... 6132 Parks Tree Replacement I I 300,000
6178 Miscellaneous Egui12ment I $55,0001 45,000
6181 Other Fixed Assets I 280,0001 169,735
··~
Total EXPENDITURES I $335,ooo I $2,014,735
FINANCING I . t ...
. I
1623H Provincial Grants-ODRAP I ($1 ,800,000)
1631 Durham Region Grants -. I ($29,021)
1701 Debt-5 year I I
1711 Internal Loan-5 Year I (130,000)1 I
2823 Paid from Property Taxes I (120,979}1 (137,000)
7001 R-Capital Equipment I I (45,000)_ J
7021 Rate Stabilization Reserve I (55,500)1
7022 R DC-City's Share I I
7501 RF -Third Part)IContributions I I (32,735
Total FINANCING I · ($335,500) I ($2,014, 735 1
The 2014 Property Maintenance Capital Budget includes $1.8 million for the Tree Canopy
Replacement Program (5311.1407) due to the ice storm. The amount budgeted matches the
City's funding application to ODRAP for ice storm recovery costs. ·
31
---"----~~-"---~"--------------------------o------------__ ------~ _ _ ___ -------~ "---"---~ -~O"-----~ __ ---~"''---"----~~---=-~------
City of Pickering
2014
Approved Capital Budget
5311 Property Maintenance
5311.1401 Outfront Mowers
6178 Miscellaneous Equipment
(4) Outfront Mowers (Replacements)
7001 R -Capital Equipment
Total 5311.1401 Outfront Mowers
5311.1402 Village East Neighbourhood -Walkway Lighting
2823 Paid From Property Taxes
6181 Other Fixed Assets
Additional Funds Required for Walkway Lighting -Jaywin to Alwin &
Dreyber to Portland (project 5311.1201)
Total 5311.1402 Village East Neighbourhood-Walkway Lighting
5311.1403 Creekside Park Parking Lot Paving
2823 Paid From Property Taxes
6181 Other Fixed Assets
Paving of joint use parking Jot on Ontario Infrastructure Lands
Corporation (OJLC) lands north of Creekside Park (Duffin Heights)
7501 RF -Third Party Contribution
Total 5311.1403 Creekside Park Parking Lot Paving
5311.1404 Rosefield Road -Walkway Lighting
2823 Paid From Property Taxes
6181 Other Fixed Assets
Walkway Lighting -Rosefield Road
Total 5311.1404 Rosefield Road-Walkway Lighting
5311.1405 Benton Crescent-Walkway Lighting
2823 Paid From Property Taxes
6181 Other Fixed Assets
Walkway Lighting -Benton Crescent to Dixie Road
Total 5311.1405 Benton Crescent-Walkway Lighting
5311.1406 ·Pedestrian Bridge over Amberlea Creek
2823 Paid From Property Taxes
6181 Other Fixed Assets
Replacement of Pedestrian Bridge over Amberlea Creek -
additional funding required for project 5311.1306 (T-21-2013)
Total 5311.1406 Pedestrian Bridge over Amberlea Creek
5311.1407 Tree Canopy Replacement Program
32
Run Date: 9-Apr-2014
Funding Expense
.
45,000
(45,000)
(45,000) 45,000
(22,000)
22,000
(22,000) 22,000
(20,000)
52,735
(32,735)
(52, 735) 52,735
(10,000) .
10,000
(10,000) 10,000
(25,000)
25,000
(25,000) 25,000
(60,000)
60,000
(60,000) 60,000
City of Pickering
2014
Approved Capital Budget
5311 Property Maintenance
'
1623 Prov Grant
Grant funding related to ice storm recovery costs-ODRAP
6131 Street Tree Replacement
6132 Parks Tree Replacement
Ice Storm Recovery-Stump removal and tree replacement
Total 53.11.1407 Tree Canopy Replacement Program
Total 5311 Property Maintenance
33
Run Date: 9-Apr-2014
Funding Expense
(1 ,800,000)
1,500,000
300,000
(1 ,800,000) 1,800,000
. (2,014,735) 2,014,735
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5311.1402 Jaywin Circle and Dreyber Court-Walkway Lighting $22,000
Financing Sources:
2823 Paid From Property Taxes· $22,000
Location and Construction:
Jaywin Circle and Dreyber Court-The first location is the pedestrian walkway between
Jaywin Circle and Alwin Circle. The second location is the pedestrian walkway
between Dreyber Court and Portland Court: The proposed work to include installation
of walkway lighting.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5311.1403 .Creekside Park-Parking Lot Asphalt Paving
Financing Sources:
2823 Paid From Property Taxes
7501 RF-Third Party Contribution
Location and Construction:.
$52,735
$20,000
32,735
$52,735
Creekside Park-This is located on Ontario Infrastructure Lands Corporation (OILC)
lands north of Creekside Park (Duffin Heights). The proposed work to include asphalt
paving of the parking lot.
City of Pickering E;ngineering & Public Works Department
2014 Budget
Budget Amount:
5311.1404 Rosefield Road-Walkway Lighting $10,000
Financing Sources:
2823 Paid From Property Taxes $10,000
Location and Construction:
Rosefield Road -the walkway is located between Rosefield Road and Glengrove Park.
The proposed work to include installation of walkway lighting.
REDBIRD
City of Pickering Engineering & Public Works Department
2014 Budget
Proposed Amount:
5311.1405 Benton Crescent-W?Ikway Lighting $25,000
\
Financing Sources:
2823 Paid From Property Taxes $25,000
Location and Construction:
Benton Crescent-the walkway is located between Benton Crescent and Dixie Road.
The proposed work to include installation of walkway lighting.
o"' IX
VI STU LA
,____c_S .UBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Proposed Amount:
5311.1406 Amberlea Creek Pedestrian Bridge -Replacement $60,000
Financing Sources:
2823 Paid From Property Taxes $60,000
Location and Construction:
Amberlea Creek Pedestrian Bridge -the pedestrian bridge is located south of the West
Shore Community Centre. The proposed work to include the replacement of the
existing pedestrian bridge.
This is additional funding for project 5311.1306.
City of Pickerin~
2014
Approved Capital Budget
5315 Operations Centre-Municipal Garage
I 2013 I 2014
I Budget I Budget
I I
EXPENDITURES ! . <I .. .
6157 Vehicle" Under $100.000 I I $28,000
6178 Miscellaneous Equipment I $7o,ooo I 18,000
6181 Other Fixed Assets . I I ----c ..
500,0001 6250 Construction Costs 27,000,000
Total EXPENDITURES I $57o,ooo I $27,046,000
FINANCING . . I . ·· . I ..
1595 Sale of Land -Duffin Heights ($500,000)1
1623A Provincial Grants-Invest in Ontario I . ($18,000\
1704 Debt -20 year . -I (11 ,000,000)
7020 Self-Insurance Reserve (70,000)1
7021 Rate Stabilization Reserve I I (3,313,992
7040 Vehicle Replacement Reserve I .. ~ . (28,000
7505 RF-Federal Gas Tax I I (4,000,000.}
I ..
I (8,686,008 7612 RF DC-Operation Centre
Total FINANCING ($570,000)1 ($27 ,046,000)
39
City of Pickering
2014
Approved Capital Budget
5315 Operations Centre-Municipal Garage
5315.1401 New Operations Centre
1704 Debt -20 year
6250 Construction Costs
Build New Operations Centre and ancillary buildings at 1'955
Clements Road.
7021 Rate Stabilization Reserve
7505 RF-Federal Gas Tax
7612 RF DC -Operations Services
The 2013 DC Background Study identified this project to be partially
funded from development charges. As the new DC rate became
effective, January 1, 2014, there is currently insufficient funds in the
Operations DC Reserve Fund component to meet this obligation.
The DC Reserve Fund will have to borrow external funds to meet
this obligation. The borrowing costs were included in the new DC
rate calculation. The borrowing term will be for 20 years.
Total 5315.1401 New Operations Centre
5315.1402 1/2 Ton Pick-up
6157 Vehicles-under $100,000
Replace #205-2002 F150 with 1/2 Ton Pick-up
7040 R -Vehicle Replacement
Total 5315.1402 1/2 Ton Pick-up·
5315.1403 Small Equipme~t Hoist
1623 Prov Grant
Invest in Ontario
6178 Miscellaneous Equipment
New Small Equipment Hoist-Safety Related Item
Total 5315.1403 Small Equipment Hoist
Total 5315 Operations Centre-Municipal Garage
40
Run Date: 9-Apr-2014
Funding Expense
(11 ,000,000)
27,000,000
(3,313,992)
(4,000,000)
(8,686,008)
(27,000,000) 27,000,000
28,000
(28,000)
(28,000) 28,000
(18,000)
18,000
(18,000) 18,000
(27,046,000) 27,046,000
PROPOSED
OPERATIONS
CENTRE
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5315.1401 New Operations Centre-Design and Construction
Financing Sources:
1704 Debt -20 year
7021 Rate Stabilization Reserve
7505 RF-Federal Gas Tax
7612 RF DC-Operations Services
Location and Construction:
$27,000,000
$11,000,000
3,313,992
4,000,000
8,686,008
.$27.000.000
New Operations Centre-The proposed worl<s to include the building of a new two
storey Operations Centre, located at 1955 Clements Road. Proposed gross floor area
of new construction is 11 ,543m2 (124,249 ff) consisting of an Operations Building with
a gross floor area of 6,705m 2 (72, 173 ff) and ancillary structures with a total gross floor
area of 4,838m 2 (52,076 ft\ Construction also includes site servicing, site works, ·
paving and landscaping. The facility is to be built to LEED Silver certification.
City of Pickering
2014
Approved Capital Budget
5320 Roads r 2013 I 2014
. I Budget I Budget
! I
EXPENDITURES I i
' 6157 Vehicles -Under $100,000 I $170,000 .
6158 Vehicles-Over $100,000 I 215,000 : 195,000
6178 Miscellaneous Eql!.ipment ----I 410,000 i 465,000
6250 Construction Costs I 2,600,000! 4,610,000
6251 Road Improvements I !
Total EXPENDITURES I $3,395,ooo I $5,270,000
FINANCING l i
..
1623A Provincial Grants -Invest In Ontario I ($6o,ooo) I
1623E Provincial Grants-T.L Grant I (70,000) I
1623G Provincial Grants~ Municipal Rd. & Infrastructure I I ($1 ,518,000) I
f-_1]01 Debt-5 year I (515,000):
. 1702 Debt -10 year I (550,000)'1 (1,175,000)
1712 Internal Loan-10 year I I (250,000)
2823 Paid from Propertx Taxes I (50,000): (27,000)
7001 R-Capital Egui[>ment ' ! (15,000) .
7021 Rate Stabilization Reserve I (35,000)i (430,000
7022 R -DC City's Share I 119,500)
7040 Vehicle Replacement Reserve I (100,000)'
7043 R -Move Ontario I (40,000)'
7505 RF-Federal Gas Tax I (1 ,525,000)1 (965,000)
7610 RF DC-Roads & Related I I (270,000)_
7612 RF DC -O[>eration Centre I (175,500) I I
r--1701 RF -Capital Works I I (140,000)
9960 Other Revenue-York Region Enhancement I (450,000) i (285,000)
Total FINANCING I ($3,395,000)1, ($5,270,000) I
42
City of Pickering
2014
Approved Capital Budget
5320 Roads
5320.1401 Southview Drive ~ Engineering Design
2823 Paid Frpm Property Taxes
6250 Construction Costs
Southview Drive -Preliminary Engineering & Design
Total 5320.1401 Southview Drive-Engineering Design
5320.1402 4 Ton Dump Truck with Plow
6158 Vehicles-Over $100,000
(1) Single axle 4 Ton Dump Truck with Plow-New
7022 R -DC's City's Share
7612 RF DC -Operations Services
Total 5320.1402 4 Ton Dump Truck with Plow
5320.1403 Street Sweeper
6178 Miscellaneous Equipment
( 1) New Street Sweeper
7021 Rate Stabilization Reserve
761 0 RF DC-Roads & Related
Total 5320.1403 Street Sweeper ·
5320.1404 Radio System Upgrade
6178 .Miscellaneous Equipment
.
Addition of "public works grade" mobile radios (60 @ $2,500 ea) to
the NexGen radio system. This system is Durham Region's new
interoperable radio system that will be utlized by Durham Regional
Police (DRPS), all 8 Region Fire Services including Pickering Fire
Services (PFS), and Regional Works. It will also be utilized by
several municipal works/parks departments and likely Durham
Transit in the future. This interoperable radio system would allow
our Engineering and Public Works staff to communicate with
Regional Works staff and allow DRPS and PFS staff to initiate
contact with our Engineering and Public works staff. This
interoperable feature becomes invaluable in emergency situations
like the ice storm we experienced late in 2013.
7021 Rate Stabilization Reserve
Total 5320.1404 Radio System Upgrade
5320.1405 Asphalt Heater
6178 Miscellaneous.Equipment
Asphalt Heater
7001 R -Capital Equipment
43
Run Date: Apr 15, 2014
Funding Expense
-
(25,000)
25,000
(25,000) 25,000
195,000
(19,500)
(175,500)
(195,000) 195,000
300,000
(30,000)
(270,000)
(300,000) 300,000
'
150,000
(150,000)
(150,000) 150,000
15,000
(15,000)
City of Pickering
2014
Approved Capital Budget
5320 Roads
Total 5320.1405 Asphalt Heater
5320.1406 Salem Road Hard Surfacing
1702 Debt-10Year
6250 Construction Costs ·
Salem Road Hwy 7 to Seventh Concession Road upgrade to hard
surface (2300m)
Total 5320.1406 Salem Road Hard Surfacing
5320.1407 Wilson Bridge Replacement
1623 Prov Grant
Future Provincial Grant-Roads and Related
1712 Intermit Loan-10 Year
6250 Construction Costs
Wilson Bridge ( 7002) Replacement (design/approvals cost is
$250,000 and construction cost is $1 ,000,000). Bridge construction
is subje-ct to receiving a Provincial Grant.
Total 5320.1407 Wilson Bridge Replacement
5320.1408 Palmer Bridge Replacement-Engineering ·Design
6250 Construction Costs
Palmer Bridge (Bridge 2006) Replacement Design/approvals
(funded by SEC enhancements)
9960 Other Rev. York Reg. Project
Total 5320.1408 Palmer Bridge Replacement-Engineering Design
5320.1409 Sideline 12 Bridge Guiderail & Channel Improvements
6250 Construction Costs
Lot 12/13, Sideline 12 Bridge -(7005) Guiderail, Channel
Improvements
7021 Rate Stabilization Reserve
Total 5320.1409 Sideline 12 Bridge Guiderail & Channellmprovem
5320.1410 Whitevale Bridge
6250 Construction Costs
Addition'al funds required for Whitevale Bridge Replacement
(project 5320.1212) for additional consultant design and approvals
costs and to cover additional future Contract Admin/lnspection fees.
7021 Rate Stabilization Reserve
7505 RF-Federal Gas Tax
44
Run Date: Apr 15, 2014
Funding Expense
(15,000) 15,000
(575,000)
575,000
(575,000) . 575,000
(1,000,000)
(250,000)
1,250,000
(1 ,250,000) 1,250,000
285,000
(285,000)
(285,000) 285,000
150,000
(150,000)
(150,000) 150,000
200,000
(100,000)
(100,000)
City of Pickering
2014
Approved Capital Budget
5320 Roads
Total 5320.1410 Whitevale Bridge
5320.1411 Fifth Concession Road Erosion COntrol
1623 Prov Grant
Municipal Roads & Infrastructure
6250 Construction Costs
Replace 1/2 culvert Fifth Concession Road west of Greenwood
Road (Erosion Control)
Total 5320.1411 Fifth Concession Road Erosion Control
5320.1413 Pickering Parkway-Top Lift of Asphalt
6250 Construction Costs
Pickering Parkway-Liverpool to Glenanna Road-Top Lift of
Asphalt to complete reconstruction project
7505 RF-Federal Gas Tax
Total 5320.1413 Pickering Parkway-Top Lift of Asphalt
5320.1414 Liverpool Road -Final Lift of Asphalt
6250 Construction Costs
Liverpool Road -Wharf Stre~t to Krosno Boulevard -Final Lift of
Asphalt
7701 Capital Works Reserve Fund
Total 5320.1414 Liverpool Road-Final Lift of Asphalt
5320.1415 Michell Bridge Rehabilitation
1623 Prov Grant
Provincial Grant-Small, Rural and Northern Municipal
Infrastructure Fund ·
2823 Paid From Property Taxes
6250 Construction Costs
Michell Bridge (7001) Structure Repairs Overlay & Concrete
Repairs. Project to Proceed only if Grant funding is received.
Total 5320.1415 Michell Bridge Rehabilitation
5320.1417 Dtmbarton Road Culvert Replacement
1702 Debt-10 Year '
6250 Construction Costs
Dunbarton Road Culvert (Culvert 1 007) Replacement
Total 5320.1417 Dunbarton Road Culvert Replacement
5320.1418 Bowler Drive Resurfacing
45
Run Date: Apr 15, 2014
Funding Expense
(200,000) 200,000
(50,000)
' 50,000
(50,000) 50,000
215,000
(215,000)
(215,000) 215,000
140,000
(140,000)
(140,000) 140,000
(468,000)
.
(2,000)
410,000
(470,000) 470,000
(600,000)
600,000
(600,000) 600,000
City of Pickering
2014
Approved Capital Budget
5320 Roads
6250 Construction Costs I
Bowler Drive -Kitley Avenue to Finch Avenue
7505 RF-Federal Gas Tax
Total 5320.1418 Bowler Drive Resurfacing
5320.1419 West Shore Neighbourhood-Road Restoration
6250 Construction Costs
Cost sharing with the Region of Durham sanitary sewer
replacement project for road reconstruction on Greycoat Lane, .
Sanok Drive, Vicki Drive, West Shore Boulevard, Vistula Drive,
Essa Crescent and Breezy Drive
7505 RF-Federal Gas Tax
Total 5320.1419 West Shore Neighbourhood-Road Restoration
5320.1420 Glengrove Road Resurfacing
6250 Construction Costs
Glengrove Road-Kingston Road to Glenview Road
7505 RF-Federal Gas Tax
Total 5320.1420 Glengrove Road Resurfacing
5320.1421 Victoria Street Resurfacing
6250 Construction Costs
Victoria Street-Southern Terminus to Wellington Street
7505 RF-Federal Gas Tax
Total 5320.1421 Victoria Street Resurfacing
5320.1422 Wellington Street Resurfacing
6250 Construction Costs
Wellington Street-Victoria Street to Old Brock Road
7505 RF-Federal Gas Tax
Total 5320.1422 Wellington Street Resurfacing
Total 5320 Roads
46
Run Date: Apr 15, 2014 ·
Funding Expense
235,000
(235,000)
(235,000) 235,000
205,000
(205,000)
(205,000) 205,000
155,000
(155,000)
(155,000) 155,000
30,000
(30,000)
(30,000) 30,000
25,000
(25,000)
(25,000) 25,000
(5,270,000) 5,270,000
City of Pickering Engineering & Pllblic Works Department
2014 Budget
Budget Amount:
5320.1401 Southview Drive-Engineering Design $25,000
Financing Sources:
2823 Paid From Property Taxes $25,000
.Location and Construction:
Southview Drive-from Kingston Road (Highway No. 2) south to the terminus. The
proposed works to include preliminary engineering design only.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320:1406 Salem Road-Hard Surfacing $575,000
Financing Sources:
1702 Debt-10 Year $575,000
Location and Construction:
Salem Road-From Highway No. 7 north to the Seventh Concession Road. The
proposed works to include upgrading the existing gravel surface to hard surface.
Works in conjunction with the proposed Highway No. 407 underpass.
SUBJECT
BRIDGE
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1407 Wilson Bridge Replacement
-Engineering Design & Construction
Financing Sources:
1623 Provincial Grant
1712 Internal Loan -10 Year
Location and Construction:
$1,250,000
$1,000,000
250,000
$1.250.000
Wilson Bridge (7002) -located on the Seventh Concession Road at West Duffin
Creek tributary road crossing. The proposed budget amount is for bridge design work
and all required approvals ($250,000). The project will include structure replacement
(construction costs is $1 ,000,000) subject to receiving a Provincial Grant.
[!]
~
I
{f)
ll:
0
0 -
ll:
ll: [!] 0 u
PARKDALE J
0::
[] 0 0
EVERTON <( <(
0 0 STREET 0:: 0::
0
>-0 >-ll: _j
trw w w 0 _j
Oz G: >-_j 0 ~ D _j >-_j
~:'i w [)_ ~ {f) [)_ I ::J 0
2 0 0 (.) 0::
0:: [)_
BLVD.
ROSEFIELD
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1408 Palmer Bridge Replacement-Engineering Design $285,000
Financing Sources:
9960 Other Revenue-York Reg. Project $285,000
Location and Construction·:
Palmer Bridge (2006)-located on Valley Farm Road at the West Duffin Creek road
crossing. The proposed budget amount is for bridge design work and all required
approvals and permits for future replacement.
This bridge design and future replacement is funded by York Region-South East
Collector (SEC) enhancements.
'City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.140.9 Sideline 12 Bridge-Repairs $150,000
Financing Sources:·
7021 Rate Stabilization Reserve $150,000
Location and Construction:
Sideline 12 Bridge (7005)-located on Sideline 12 at the Michell Creek road crossing.
The proposed budget amount is for the installation of a new guiderail and channel
improvements.
I
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1411 Fifth Concession Road-Erosion Control $50,000
Financing Sources:
1623 Provincial Grant $50,000
Location and Construction:
Fifth Concession Road-the subject area is located on the north side of the road,
between Church Street and Greenwood Road. The proposed works to include
replacement (or suitable alternative) to the existing half pipe culvert, which mitigates
erosion from the slope runoff.
City of Pickering
Budget Amount:
5320.1413 Pickering Parkway
Financing Sources:
7505 RF-Federal Gas Tax
Location and Construction:
SUBJECT
AREA
Engineering & Public Works Department
2014 Budget
$215,000
$215,000
Pickering Parkway-Glenanna Road to Liverpool Road. Proposed works to include the
final lift of asphalt.
FAIRVIEW
AVENUE
w
::J z w > <>:
PROGRESS
FRENCHMAN'S
BAY EAST
PARK
Ul
:5
(')
::J
0
0
SUBJECT
AREA
AVENUE
AVENUE
MONICA COOK
PLACE
PARK
efito
:<\'K ~
U1
i-1> 0
"' 0~ ~ LUNA 1-o
COURT
0 FOXGLOVE
~ AVE. ill oc w
HOLY Z > 6~4~~ff ~ ~
w
I CO~E
5a:J STREET
BROADVIEW
STREET
STREET
STREET
0
City of Pickering Engineering & Public Works Department
2014 Budget
Bud~et Amount:
5320.1414 Liverpool Road-Top Asphalt Resurfacing $140,000
Financing Sources:
7701 Capital Works Reserve Fund $140,000
Location and Construction:
Liverpool Road-from Wharf Street north to Krosno Boulevard. The proposed works
to include installation of the final lift of asphalt.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1415 Michell Bridge-Rehabilitation
Financing Sources:
1623 Provincial Grant
2823 Paid From Property Taxes
Location and Construction:
$470,000
$468,000
$2,000
$470.000
Michell Bridge (7001) -located on the Seventh Concession Road at the Reesor Creek
road crossing. Proposed work to include structure concrete repairs, deck replacement
and asphalt resurfacing.
Project to proceed only if provincial grant funding is received.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:·
5320.1417 Dunbarton Road Culvert -Replacement $600,000
Financing Sources:
1702 Debt-10 Year $600,000
Location and Construction:
Dunbarton Road Culvert (1007) -located on Dunbarton Road at a Dunbarton Creek
road crossing. The proposed works to include the replacement of existing culvert.
FINCH .A. AVENUE KIN+t,OM
HALL
0
<(
0
0:':
w
X
0
w >
a:
0
Fl '£HALL
0. 6
u
(f)
w
0:': u
<(
0
>:J
GLOUCESTER
[SQUARE I
w >
0:':
0
MULMUR
TOT
LOT
RTH
f--z w u
[!) w
0:':
u
w >
0:':
0
SUBJE
MALDEN · ARE ~~~~~~----~
__]
__]
<(
(f)
z w
I
f--
0:':
::J
0 u
0
;u
[Tl
(f)
0
[Tl z
--1
w
_j
<(
0 z w
_j
(')
0
<(
0
(}"
GLENDALE _
w w
_j
~
ANTON
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1418 Bowler Drive-Asphalt. Resurfacing $235,000
Financing Sources:
7505 RF-Federal Gas Tax $235,000
Location and Construction:
Bowler Drive-from Kitley Avenue north to Finch Avenue. The proposed work to
include asphalt resurfacing.
BREEzy
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1419 West Shore Neighbourhood-Road Restoration $205,000
Financing Sources:
7505 RF -Federal Gas Tax $205,000
Location and Construction:
Parts ofVistula Drive, Essa Crescent, Breezy Drive, West Shore Boulevard, Sanok
Drive, Greycoat Lane and Vicki Drive -The proposed City works to include road
reconstruction and road resurfacing.
This project is in conjunction with the Durham Region sanitary sewer reconstruction.
Durham Region is sharing the cost of the project as part of their restoration
responsibility.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1420 Glengrove Road-Asphalt Resurfacing· $155,000
Financing Sources:
7505 RF-Federal Gas Tax $155,000.
Location and Construction:
Glengrove Road-from Kingston Road (Highway No. 2) to Glenview Road. The
proposed works to include asphalt resurfacing.
lt w
1-
z ~ l)1 :J
lt 0
<( 0
0
0
<(
0
lt
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5320.1421 Victoria Street-Asphalt Resurfacing $30,000
Financing Sources:
7505 RF-Federal Gas Tax $30,000
Location and Construction:
Victoria Street-from Wellington Street south to terminus. The proposed works to
include asphalt resurfacing. ·
0: w
f-z w
Q_
0:
5
f-a:
:J
0
0
City of Pickering
Budget Amount:
Engineering & Public Works Department
2014 Budget
5320.1422 Wellington Street-Asphalt Resurfacing $25,000
Financing Sources:
7505 RF-Federal Gas Tax $25,000
Location and Construction:
Wellington Street-Victoria Street to Old Brock Road. Proposed works to include .
asphalt resurfacing.
City of Pickering
2014
Approved Capital Budget
5780 Parks
I 2013 i 2014
I Budget ! Budget I
' I
EXPENDITURES i : ' 6129 Parks c Landsca[Je-Refurb I $1,299,383 i $1,960,000
6157 Vehicles -Under $100,000 I 135,000 : 100,000
6178 Miscellaneous Eguipment I 115,ooo I 392,500
6181 Other Fixed Assets I 531,ooo I 193,000
6250 Construction Costs I I
Total EXPENDITURES I $2,080,383 I $2,645,500
FINANCING . I I
' '.
1592 Donations ' ! I
1610 Federal Grants I I
1623A Provincial Grants -Invest In Ontario I I ~_($8~00Ql
1623F Provincial Grants~ Frenchman's Bay Harbour ' I i
1701 Debt-5 year I 'i ' 1702 Debt -10 year I I '
1712 Internal Loan-10 Year ' ($200,000)[ I
2823 Paid from Property Taxes ! ~2.365)i
7001 R-Ca[Jital Egui[Jment i I (17,500) I
7021 Rate Stabilization Reserve i (330,000}1 I --I I 7022 R -DC City's Share I ' ' 7040 Vehicle ReRiacement I i (375,000)
7502 RF -Parkland I (170,000)\ (410,875) '
7505 RF -Federal Gas Tax I (160,000)!
7620 DC -Parkland Development & Trail '· (397, 1251 i
. 9960 Other Revenue-York Region Enhancement I (760,000)1 (1,360,000)
9990 Other Revenue ' (238,018)! I
Total FINANCING I ($2,080,383) I ($2,645,5001 I
62
City of Pickering
2014
Approved Capital Budget .
5780 Parks
.
5780.1401 Amberlea Park Hardball Diamond Improvements
6181 Other Fixed Assets
Amberlea Park Hardball Diamond -remove/replace backstop
(requires new posts, rails, hardware and fencing). Add length to
current dugouts. Replace player benches, remove/replace outfield
fence and cap with "0" pipe for safety. Additional $40,000 (based on
quote) to ex1end taller fence along the 1st baseline (to prevent foul
balls going over into yards on Foxwood Trail-safety issue)
7502 Parkland Reserve Fund
Total 5780.1401 Amberlea Park Hardball Diamond Improvements
5780.1403 Turf Roller
6178 Miscellaneous Equipment
Turf Roller (New)
7001 R -Capital Equipment
Total 5780.1403 Turf Roller
5780.1408 Kinsmen Park Sportsfield Lighting
6181 other Fixed Assets
Additional funds required to complete project 5780.1202 to replace
lighting at baseball diamond #1
7502 Parkland Reserve Fund
Total 5780.1408 Kinsmen Park Sportsfield Lighting
5780.1409 Area Mower
6178 Miscellaneous Equipment
Replacement-16 Foot Wide Area Mower (Unit# 732)
7502 Parkland Reserve Fund
Total 5780.1409 Area Mower
5780.1410 1 Ton Pick-ups with Plow & Salters
6157 Vehicles-under $100,000
(2) 1 Ton Pick-ups with Plow & Salters (Replacing Unit #305 and
#789)
7040 R -Vehicle Replacement ·~
Total 5780.14101 Ton Pick-ups with Plow & Salters
5780.1411 Sidewalk plow with attachments
6178 Miscellaneous Equipment
Replacement -Sidewalk Plow with attachments(Unit #733)
7040 R -Vehicle Replacement
63
Run Date: 9-Apr-2014
Funding Expense
135,000
(135,000)
(135,000) 135,000
6,500
(6,500)
(6,500) 6,500
23,000
(23,000)
(23,000) 23,000
100,000
(100,000)
(100,000) 100,000
100,000
(100,000)
(100,000) 100,000
160,000
(160,000)
City of Pickering
2014
Approved Capital Budget
5780 Parks
Total 5780.1411 Sidewalk plow with attachments
5780.1412 Enclosed Trailer for Equipment
6178 Miscellaneous Equipment
(1) Enclosed Trailer for Equipment
7001 R -Capital Equipment
Total 5780.1412 Enclosed Trailer for Equipment
5780.1413 Backhoe with attachments
6178 Miscellaneous Equipment .
Replace #731 1999 Case Backhoe
7040 · R -Vehicle Replacement
Total 5780.1413 Backhoe with attachments
5780.1415 Maple Ridge Park -Naturalization Improvements
6129 Parks-Landscape Refurbishment
Naturalization of Maple Ridge Park (Pine Creek) (SEC)
9960 Other Rev. York Reg. Project
Total 5780.1415 Maple Ridge Park-Naturalization Improvements
5780.1416 Beverley Morgan Park Artificial Turf Field & Site Improve
6129 Parks -Landscape Refurbishment .
Soccer/Football Field upgrade to aiiificial turf at Beverly Morgan
Park and Electronic Scoreboard (funded by York Region SEC
enhancements)
9960 Other Rev. York Reg. Project
Total 5780.1416 Beverley Morgan Park Artificial Turf Field & Site lr
5780.1419 Duffin Heights -Village Green (West) Construction
6129 Parks -Landscape Refurbishment
Duffin Heights -Village Green West Construction
7502 Parkland Reserve Fund
7620 RF DC -Parkland Development & Trails
Total 5780.1419 Duffin Heights-Village Green (West) Constructi01
5780.1420 Duffin Heights -Village Green (East) Construction
6129 Parks-Landscape Refurbishment
Duffin Heights -Village Green (East) Construction
7502 Parkland Reserve Fund
7620 RF DC-Parkland Development & Trails
Total 5780.1420 Duffin Heights-Village Green· (East) Construction
64
Run Date: 9-Apr-2014
Funding Expense
(160,000) 160,000
11,000
(11 ,000)
(11 ,000) 11,000
115,000
(115,000)
(115,000) 115,000
25,000
(25,000)
(25,000) 25,000
1,335,000
(1 ,335,000)
(1 ,335,000) 1,335,000
200,000
(24,500)
(175,500)
(200,000) 200,000
150,000
. .
(18,375)
(131 ,625)
(150,000) 150,000
City of Pickering
2014
. Approved Capital Budget
5780 Parks
5780;1421 East Woodlands Park-Skateboard Park Facility
6129 Parks -Landscape Refurbishment .
New Skateboard Facility-Petticoat Creek Community Centre
Library/ East Woodlands Park
7502 Parkland Reserve Fund
7620 RF DC-Parkland Development & Trails
Total 5780.1421 East Woodlands Park-Skateboard Park Facility
5780.1424 Kinsmen Park Pathway Construction
1623 Prov Grant
Invest in Ontario
6129 Parks -Landscape Refurbishment
Kinsmen Park -pathway from baseball tower to artificial turf field -
provides accessibility for spectators
Total 5780.1424 Kinsmen Park Pathway Construction
5780.1427 Grand Valley Park -Parking lot Lighting
1623 Prov Grant
Invest in Ontario
6181 Other Fixed Assets
Grandvalley Park (off-leash park)-install parking lot lighting.
Total 5780.1427 Grand Valley Park-Parking lot Lighting
Total 5780 Parks
65
Run Date: 9-Apr-2014
Funding Expense
200,000
(110,000)
(90,000)
(200,000) 200,000
(50,000)
50,000
(50,000) 50,000
(35,000)
35,000
(35,000) 35,000
(2,645,500) 2,645,500
6
STROUDS
w >
~
0
~
<(
0 w
0
w
t:
I :s
LANE
AUTUMN
~
0
w
_j
(L
<(
2
~ w
::J
If)
0
<1:
0
~
'{
z
<(
OJ w
If)
0
~
DENCOURT FERNAM STROUDS
STREE~T-=~~~~
~2
'{
<1:
0
0
<1:
0
~
OJ
SUBJECT
PARK
LAURIER
..
D
1-z w
0
If) w
~
0
LANE
\~:
0 _j
<( ~
FLAVELLE ~ ~
1-
~
0
IRCHWOO
SQUARE
~
0
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1401 Amberlea Park-Hardball Diamond Improvements . $135,000
Financing Sources:
7502 Parkland Reserve Fund $135,000
Location and Construction:
Amberlea Park-located at the Hardball Diamond. Th~J proposed works to include
removal and replacement of backstop (requires new posts, rails, hardware and
fencing), additional length to be added to current dugouts, replacement of player
benches, remove/replace outfield fence and cap with "0" pipe for safety, extend taller
fence along the 1st baseline (to prevent foul balls going over into yards on Foxl(llciod
Trail -safety issue).
ALEX
ROBERTSON
PARK
0
<:
0
0::
I
0
<: w rn
>-o z
<:
lfl
MONTGOMERY
0::
0
0
0::
0
0 u
SUBJECT
PARK
0
0::
0 >-I
PARK
FELDSPAR
COURT
ROAD·
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1408 Kinsmen Park-Sportsfield Lighting $23;000
Financing Sources:
7502 Parkland Reserve Fund $23,000
Location and Construction:
Kinsmen Park-located at baseball diamond #1. Proposed works to include new
sportsfield lighting for the baseball diamond.
Additional funds required to complete project, original project under 5780.1202.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1415 Maple Ridge Park-Naturalization Improvement $25,000
Financing Sources:
9960 Other Revenue-York Reg. Project $25,000
Location and Construction:
Maple Ridge Park-located along Pine Creek. The proposed works to include
additional plantings along the creek bank
This project is funded by York Region-South East Collector (SEC) enhancements.
SUBJECT
PARK
City of Pickering Engineering & Public Works Department
2014Budget
Budget Amount:
5780.1416 Beverley Morgan Park
· -Artificial Turf and Site. Improvements $1,335,000
Financing Sources:
9960 OtherRevenue-York Reg. Project $1,335,000
Location and Construction:
Beverley Morgan Park-located at the soccer I football field. The proposed works to
include installation of an artificial turf field, fencing replacement, pathway replacement
and new electronic scoreboard.
This project is funded by York Region-South East Collector (SEC) enhancements.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1419 Duffin Heights Village Green (West)-Construction
Financing Sources:
7502 Parkland Reserve Fund
7620 RF DC-Parkland Dev. & Trls
Location and Construction:
$200,000
$24,500
175,500
$200,000
Duffin Heights Village Green (West) -located in the new Lebovic West development.
The proposed works to include a children's play area, seating area, walkways, lighting
and associated landscaping.
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1420 Duffin Heights Village Green (East) -Construction
Financing Sources:
7502 Parkland Reserve Fund
7620 RF DC-Parkland Dev. & Trls
Location and Construction:
$150,000
$18,375
131,625
$150,000
Duffin Heights Village Green (East) -located in the new Lebovic Bradshaw
development. The proposed works to include a children's play area, seating area,
multi-use trail, lighting and associated landscaping.
-------------
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
. 5780.1421 East Woodlands Park-Skateboard Park Facility
Financing Sources:
7502 Parkland Reserve Fund
7620 RF DC-Parkland Dev. & Trls
Location and Construction:
$200,000
$110,000
90,000
$200,000
East Woodlands Park -located adjacent to the Petticoat Creek Community Centre.
The proposed works to include the installation of a concrete pad and pre"fabricated
skateboard components.
CRESCENT
PARKETTE
ALEX
0
<(
0
0::
I u
<( w rn
ROBERTSON
PARK r ·o z
<(
Ul
MONTGOMERY
ll:
0
0
ll:
0
0 u
FELDSPAR
COURT
SUBJECT.
PARK
0
ll:
0 >-I
PARK ROAD
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1424 Kinsmen Park-New Pathway Installation $50,000
Financing Sources:
1623 Provincial Grant $50,000
Location and Construction:
Kinsmen Park -located between the baseball tower and the artificial turf field. The
proposed work to include the installation of a hard surface pathway to provide better
accessibility for spectators.
SUBJECT
PARK
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5780.1427 Grand Valley Park-Parking Lot Lighting $35,000
Financing Sources:
1623 Provincial Grant $35,000
Location and Construction:
Grand Valley Park-located in the parking lot for the Leash Free Dog Park. The
proposed work to include the installation of lighting.
City of Pickering
2014
Approved Capital Budget
Engineering Services Summary
--·-···---···--·-------------·---------·--··· ····· ·---·--·--·-·L ··--·· ~Q13 .. I _?014. !---~~-~---~------------+--_ Budg~--~---_§udget
EXPENDITURES j I
.=§15?\iei-\iCies-~ Under $1 OO,OOQ _________ --~ ~---~--r -=~--~-==-~~---_ ·. $:3Kco~()~
6181 Other Fixed Assets J $1,190,000 I _ 490,000
6182 French111ans Bayc.cR..::e::.c.h=ab=---------------:1. _____ ~---L ___ ~---·-·--
6250 Construction Costs .. .. ... . _j . . . . . . . . L n
_ §?_5lR<?.~Q.lfi!provements --~ ______ ______ _ __J __ . 5Jf2:3,40Q L_ .. 1,.§92"QQQ
6252 Streetlights& Sidewalks · · I ____ 780,500 I 574,400
6253 Storm Water ·· · --· __ 11~_---. 3
2
o
9
o
0
.,o
0
o
0
g_
0
j_ _ 456,000_
6254 Traffic Signals 01-40,000
Total Cost EXPENDITURES J $7,753,9001 $3,487,400
FI1N6~~;1~r~vincial Grants-Invest In Ontario~~==-~ 1-----~-~J
1701 Debt-5year -· I ($440,00d)J·-~--
__ 1702 Qebt: 1 Oy~<OIL ___________ ~---------·-·------~-J _ (5§Q,QQ_Q}r-I-----J
1711 Internal Loan-5 Year I (150,000)1 ·
2823 Paid from PropertyTaxes --J (140,000)j:---.-... ---(=$4~0~,~00~0~)1
7021 Rate Stabilization Reserve .... --n .. . . L_ . . .. 1. .. (150,000)
.. 7022 R-DC City's Share -----------···-·-·--------l_-_(2_,fl()J§Q3)[. (§:4;3c1.2Q)
7040 Vehicle Replacement Reserve . ___ . ___ .. . .. · I ._ . __________ L____ (35,000)
7501 Third Party Contributions _ ·1 ____ (200,000).1 (200,000)
7505 RF-Federal Gas Tax . I _. ··--~--L
_]61QJ3F :Roads & Related --~----__ ........... J __ (<L1Ql~flZ)_I_-__ -(:-:-L~,9-:'!_=7~_-:1(3::-:Q:c:-)1
7611 RF DC-Roads & Related . J (30,000)L_ (131 ,780)
99600therRevenue ~York Region Project... 1
1
............. lL (140,000)
9990 Other Revenue
Total Cost FINANCING I ($7,753,900)1 ($3,487,400)
75
City of Pickering
2014
Approved Capital Budget
5325 Streetlights & Signalization
Total FINANCING I ($730,000)1 ($190,000'
Council deferred the two traffic signal controllers to 2015 (Fieldlight Blvd and
Glenanna Road) at the February 24th , 2014 meeting.
76
City of Pickering
2014
Approved Capital Budget
5325 Streetlights & Signalization
5325.1401 Kingston Road (Liverpool Road Intersection) Streetlight
6181 Other Fixed Assets
Kingston Road -Liverpool Road Section (Pine Creek to Glenanna
Road) related to Durham Transit BRT project
7021 Rate Stabilization Reserve
Total 5325.1401 Kingston Road (Liverpool Road lntersection).Stm
5325.1402 Rosebank Road (Strouds ·Lane Intersection) Traffic Con!··
2823 Paid From Property Taxes
6254 Traffic Signals
Rosebank Road @ Strouds Lane Traffic Signal/Controllers
Replacement
Total 5325.1402 Rosebank Road (Strouds Lane Intersection) Traffi
Total5325 Streetlights & Sign'!lization
77
Run Date: 9-Apr-2014
Funding Expense
..
150,000
(150,000)
(150,000) 150,000
(40,000)
40,000
(40,000) 40,000
(190,000) 190,000
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5325.1401 Kingston Road (at Liverpool Road Intersection)
-Street Light Upgrade
Financing Sources:
7021 Rate Stabilization Reserve
Location and Construction:
$150,000
$150,000
Kingston 'Road (Highway No. 2) -located at the Liverpool Road intersection, from Pine
Creek east to Glenanna Road on both sides. There are existing Street Lights in this
location. The project would add to or upgrade the existing infrastructure.
Project to be completed to facilitate Durham Region Transit's new bus rapid transit
service "DRT Pulse".
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5325.1402 Rosebank Road (at Strouds Lane intersection)
-Replacement of Traffic Signal I Controller
Financing Sources:
2823 Paid From Property Taxes
Location and Construction:
$40,000
$40,000
Rosebank Road -located at the at Strouds Lane intersection. The proposed work
includes replacement of the existing traffic signal I controller.
City of Pickering
2014
Approved Capital Budget
5410 Stormwater Management
I 2013 I 2014
Budget Budget
EXPENDITURES · ... I
$550,0001
.
6181 Other Fixed Assets $140,000
6182 Frenchmans Bay Rehab I
6250 Construction Costs
Total EXPENDITURES $55o,ooo I $140,000 ---· FINANCING · .. ....... ·.· ·.· ! .. • .
1623A Provincial Grants-Invest In Ontario I
1702 Debt -10 year I ($550,000
2823 Paid from Property Taxes
9960 Other Revenue York Region· Enhancement . ($140,000) Total FINANCING . .. . ............. I ($550,000)1 ($140,000)
80
City of Pickering
2014
Approved Capital Budget
5410 Stormwater Management
5410.1401 Pine Creek Outfall and Channel -Engineering Design
6181 Other Fixed .Assets
Pine Creek Outfall and Channel Reconstruction -Design (funded
by SEC enhancements)
9960 other Rev. York Reg. Project
Total 5410.1401 Pine Creek Outfall and Channel-Engineering Des
Total5410 Stormwater Management
81
··-···········------
Run Date: 9-Apr-2014
Funding Expense
.
140,000
(140,000)
(140,000) 140,000
(140,000) 140,000
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5410.1401 Pine Creek Outfall and Channel-Engineering Design $140,000
Financing Sources:
9960 Other Revenue-York Region Project $140,000
Location and Construction:
Pine Creek Outfall and Channel-located in the Open Space south of Mountcastle
Crescent. The proposed works to include the engineering design for the future
reconstruction of the storm sewer outfall and stream channel.
This project is funded by York Region-South East Collector (SEC) enhancements.
City of Pickering
2014
Approved Capital Budget
5613 Development Control
I 2013 ' 2014 I
i Budget ' Budget I -\. I
' EXPENDITURES I l -...
' 6157 Vehicles -Under $100,000 t I $35,000 I
6178 Mis2~11a':!eo~_s Equipment ! I I
6181 Other Fixed Assets \ $200,0001 200,000
Total EXPENDITURES ' $200,0001 $235,000 ' I.
FINANCING. I ! . .
_ 7040 Vehicle Replacement Reserve I I ($35,000)
7501 Third Partv Contributions r-----,($200, ooo) 1 (200,000)
7505 RF-Federal Gas Tax ' I I
Total FINANCING ' ($200,000)1 ($235,000) I
83
5613 Development Control
5613.1401 Construction Projects
6181 Other Fixed Assets
City of Pickering
2014
Approved Capital Budget
Various Construction Projects Related to Development (Funded
from Third Party Contributions)
7501 RF-Third Party Contribution
Total 5613.1401 Construction Projects
5613.1402 Midsize Vehicle
6157 Vehicles -under $100,000
· Replace Unit #628 (1999)
7040 R-Vehicle Replacement
Total 5613.1402 Midsize Vehicle
Total5613 Development Control
84
Run Date: 9-Apr-2014
Funding Expense
-
200,000
(200,000)
(200,000) 200,000
35,000
(35,000)
(35,000) 35,000
(235,000) 235,000
City of Pickering
2014
Approved Capital Budget
5321 Development Projects (DC Funded)
I 2013 I 2014
I Budget I Budqet
I I
· EXPENDITURES ! !
i
6250 Construction Costs !
i
6251 Road Improvements I $5,193,400 $1,892,000
.. 6252 Streetlights &Sidewalks I 780,500 574,400
6253 Storm Water I 3oo,ooo I 456,000 I
6254 Traffic Signals I I ..
Total EXPENDITURES I $6,273,900 I $2,922,400
FINANCING i i
I
1702 Debt -10 year I I I ·.
1703 Debt Financing -15 Year I I
7022 R -DC City's Share I ($2, 136,503 ($843,460)
7610 RF-Roads & Related I (4, 107,397 (1,947,160)
----7611 RF DC-Roads & Related I (30,0001 (131 ,780)
Total FINANCING I ($6,273,900)1 ($2,922,400)
85
City of Pickering
2014
Approved Capital Budget
5321 Development Projects-(DC Funded)
5321.1401 Finch Ave (Townline to Altona)
• 6251 Road Improvements
Finch Ave-Townline to Altona. Roadworks includes.storm sewers,
sidewalks, boulevards and street lights across SP 2002-02
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1401 Finch Ave (Townline to Altona)
5321.1402 William Jackson Drive Urbanization
6251 Road Improvements
DH-13 William Jackson Drive (Old Taunton Road) (90/10%)-
East of Brock to Taunton Rd. (Urbanization) (Design
20 14/Construction 2015)
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1402 William Jackson Drive Urbanization
5321.1403 Kingston Road (Dixie Rd. to Glendale Drive)
6252 Streetlights & Sidewalks
TC-9 Kingston Road-North Side (50/50). Dixie Rd. to Glendale
Drive. Project to be completed due to Durham Region Transit's new
bus rapid transit service "DRT Pulse".
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1403 Kingston Road (Dixie Rd. to Glendale Drive)
5321.1404 Kingston Road (Dixie Rd. to Liverpool Rd.)
6252 Streetlights & Sidewalks .
TC-12 Kingston Road-South Side (50/50). Dixie Rd. to
Liverpool Rd. Project to be completed due to Durham Region
Transit's new bus rapid transit service "DRT Pulse".
7022 R -DC's City's Share
7610 RF DC-Roads & Related
Total 5321.1404 Kingston Road (Dixie Rd. to Liverpool Rd.)
5321.1405 Pine Creek Stormwater Management Facility -Design
6253 Storm Water
Pine Creek-South of Mountcastle (19/81%). SWM Facility-Outfall
to Pine Creek (design only).
86
Run.Date: 9-Apr-2014
Funding ·Expense
'•
285,600
.
(71 ,400)
(214,200)
(285,600) 285,600
1,606,400
(160,640)
(1 ,445,760)
(1 ,606,400) 1,606,400
215,400
(107,700)
(107,700)
(215,400) 215,400
359,000
(179,500)
(179,500)
(359,000) 359,000
70,000
City of Pickering
2014
Approved Capital Budget
5321 Development Projects-(DC Funded)
.
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1405 Pine Creek Stormwater Management Facility-De•
5321.1406 Krosno Creek ~ Erosion Control
6253 Storm Water
Erosion Control (Reytan Blvd to Parkham Cres). Krosno Creek
Erosion Control (44/46) Reytan Blvd to Sandy Beach Road. Krosno
Creek Erosion Control (EA/Design/Approvals). Additional Funds
Required for project 5321.1205
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1406 Krosno Creek-Erosion Control .
5321.1408 Oil Grit Separators
6253 Storm Water
Installation of 2 Oil Grit Separators (28/72) Frenchman's Bay Area
7022 R -DC's City's Share
7611 RF DC -Storm Water Mgmt
Total 5321.1408 Oil Grit Separators
Total 5321 Development Projects-(DC Funded)
87
Run Date: 9-Apr-2014
Funding Expense
(56,700)
(13,300)
(70,000) 70,000
65,000
(36,400)
(28,600)
(65,000) 65,000
321,000
(231,120)
(89,880)
(321 ,000) 321,000
(2,922,400) 2,922,400
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5321.1401 Finch Avenue (Townline to Altona Road) .
(Development ChargeProject RP-4)
Funding Ratio is 75% (DC Recoverable) /25% (City Portion)
Financing Sources:
7022 Reserve ~ DC's City's Share
7610 Reserve Funds DC-R.oads & Related
Location and Construction:
$285,600
$71,400
214,200
$285.600
Finch Avenue-from Woodview Avenue to the east limit of the subdivision
(SP-2013-03). The proposed works to include full road .urbanization to the existing rural
road.
TAUNTON
FORBROCK
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5321.1402 William Jackson Drive-Road Reconstruction
(Development Charge Project DH-13)
Funding Ratio is 90% (DC Recoverable) /10% (City Portion)
Financing Sources:
7022 Reserve -DC's City's Share
7610 Reserve Funds DC-Roads & Related
Location and Construction:
$1,606,400
$160,640
1,445,760
$1,606.400
William Jackson Drive (Old Taunton Road)-from 100m east of Urfe Creek to Taunton
Road (Regional Road #4). The proposed works to include full road urbanization to the
existing rural road. Engineering design in 2014 and construction in 2015.
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
· 2014 Budget
Budget Amount:
5321.1403 Kingston Road-Sidewalk and Street Light Installation
(Development Charge Project TC-9)
Funding Ratio is 50% (DC Recoverable) I 50% (City Portion)
Financing Sources:
7022 Reserve -DC's City's Share
7610 Reserve Funds DC-Roads & Related
Location ard Construction:
$215,400
$107,700
107.700
$215.400
Kingston Road (Highway No. 2)-on the north side, from Walnut Lane east to Glendale
Drive. The proposed works to include the installation of streetlights and sidewalks.
Project to be completed to facilitate Durham Region Transit's new bus rapid transit
service "DRT Pulse".
~. SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5321.1404 Kingston Road-Sidewalk and Street Light Installation
(Development Charge Project TC-12)
Funding Ratio is 50% (DC Recoverable) /50% (City Portion).
Financing Sources:
7022 Reserve -DC's City's Share
7610 Reserve Funds DC-Roads & Related
Location and Construction:
$359,000
$179,500
179,500
$359,000
Kingston Road (Highway No. 2) -on the south side, from Walnut Lane east to
Glendale Drive. The proposed works to include the installation of streetlights and
sidewalks.
Project to be completed to facilitate Durham Region Transit's new bus rapid transit
service "DRT Pulse".
CRESCENT
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5321.1405 Pine Creek Stormwater Management Facility
-Engineering Design
(Development Charge Project L-19)
Funding Ratio is 19% (DC Recoverable) I 81% (City Portion)
Financing Sources:
7022 Reserve -DC's City's Share
7611 RF DC -Storm Water Mgmt
Location and Construction:
$70,000
$56,700
13.300
$70.000
Pine Creek Stormwater Management Facility-located in the Open Space south of
Mountcastle Crescent. The proposed works to include the engineering design of a
Stormwater Management Facility to mitigate the erosion from the existing stormwater
outfall.
SUBJECT
AREA
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5321.1406 Krosno Creek-Erosion Control
(Development Charge Project B-15)
Funding Ratio is 44% (DC Recoverable) I 56% (City Portion)
Financing Sources:
· 7022 Reserve -DC's City's Share
7611 RF DC-Storm Water Mgmt
Location and Construction:
$65,000
$36,400
28,600
$65,000
Krosno Creek-from Reytan Boulevard south to Parkham Crescent. Additional Funds
are required for project 5321.1205. The proposed works include engineering design
only, complete with an Environmental Assessment and required approvals.
-~--~-~----
City of Pickering
2014
Approved Capital Budget
Cui & Rec. Services Summary
EXPENDITURES
94
2013 I 2o14
__ Budget -~ I _Budget
(121 ,757)[
~ (189)500)1 -~
(54(),000)
__ (2_~(),j01)
(40,000)
~---~--~ ~--~ ~ -~---c··
I (11Q,()OO)
--.. I (81 ,QOQ) •
.. (~,000)1 ~ ~ ~ ... (?0,000)
_ {~{)1()0_0)
-.. -... --... --~-~ __ .~.1 (35 000) ~~~ ~~~~ ~~ -~ -~------J~~
_ (995,000)1 _(L110_,_Q_OO)
---
(~.jj2,5Q4)
City of Pickering
2014
Approved Capital Budget
5700 Civic Complex
EXPENDITURES
6250 Construction Costs
~~~=~•-'"'•'•-••••-----~~~~r~-•-o•~-~ ""-''> •• • .. "'''"~~~~~=~-"~~~-----"
Total EXPENDITURES
FINANCING.
95
2o13 I 2014 ...
Budget. ·I E3udget .
$70,000
I $39o,ooo I $70,000
J~YQ,QOO)
City of Pickering
2014
Approved Capital Budget
5700 c ivic Complex
1 Brick Cladding Repairs
rov Grant
st in Ontario
onstruction Costs
5700.140
1623 p
lnve
6250 c
Brick
Total
Total 57
Cladding Rep.airs-Civic Complex Tower: includes new crest
5700.1401 Brick Cladding Repairs
00 Civic Complex
'
96
o•
Run Date: 22-Apr-2014
Funding Expense
(70,000)
70,000
(70,000) 70,000
(70,000) 70,000
City of Pickering
2014
Approved Capital Budget
5701 Senior Citizens Centre
! 2013 I 2014 ..
! Budget I Budget I !
' ' ' . I
EXPENDITURES .
6173 Furniture & Fixtures I ' I
' 6181 Other Fixed Assets I $1oo,ooo I $240,000
6250 Construction Costs I I
Total EXPENDITURES I $1oo,ooo I $240,000
FINANCING i
1623A Provincial Grants -Invest in Ontario I i ($70,000
1701 Debt-Syear I I
1712 Internal Loan -1 0 year
-·--~-I (140,000
7505 RF-Federal Gas Tax I ($1 00,000) (30,000)
7700 RF-Community Facilities I
Total FINANCING I ($1 00,000) ($240,000
97
City of Pickering
2014
Approved Capital Budget
5701 Senior Citizens Centre
5701-1401 East Shore Community Centre-Final Lift of Asphalt
1623 Prov Grant
Invest in Ontario
6181 Other Fixed Assets
East Shore Community Centre -Final lifting of asphalt pavement
and line for new parking lot to the north of centre
Total 5701.1401 East Shore Community Centre-Final Lift of As ph
5701.1402 Gymnasium HVAC Unit
6181 Other Fixed Assets
Gymnasium HVAC Unit Replacement
7505 RF-Federal Gas Tax
Total 5701.1402 Gymnasium HVAC Unit
5701.1403 East Shore HVAC & Sprinkler Upgrades
1712 Internal Loan-10Year
6181 Other Fixed Assets
Reroute HVAC & Sprinkler System to permanently close crawlspace
for Health and Safety
Total 5701.1403 East Shore HVAC & Sprinkler Upgrades
Total 5701 Senior Citizens Centre
98
Run Date: 9-Apr-2014
Funding Expense
(70,000)
70,000
(70,000) 70,000
30,000
(30,000)
(30,000) 30,000
(140,000)
140,000
(140,000) 140,000
(240,000) 240,000
.
0
('L
CLOUDBE RY
CRT.
&J
_j
G w
[]
City of Pickering
Budget Amount:
1
EAST S VR£ ,
COMMUNITY CENTRE
A V
SENIOR' COMPLEX
L__~ 1>"1 ~;;,.,;;;;,.;;.~
<lo
STREET
0
<(
D
('L
PAT
LAN
ST EET
POPRAD AVENUE
SANGRO
LANE DRIVE
FOR DON
0
('L
~ f--w w
_j cr:
::) f--
0 (f)
[] 0
RE 0 ~
[] z
0
f--
I z u <(
0
('L
<( \)) z r1 -,;;:
Engineering & Public Works Department
2014 Budget
, 5701.1401 East Shore Community Centre-Parking Lot Resuliacing $70,000
Financing Sources:
1623 Provincial Grant $70,000
Location and Construction:
East Shore Community Centre -located at 910 Liverpool Road. The proposed works
to include the final lift of asphalt for the existing parking lots.
City of Pickering
2014
Approved Capital Sudget
5713 Dunbarton Pool
I 2013 i 2014 --·--I -! Budget I Budget
I I
EXPENDITURES .•. ! .
6178 Miscellaneous Egui12ment
6181 Other Fixed Assets I $35,ooo I
Total EXPENDITURES I $35,ooo I $0
FINANCING I ,.
I .
1711 Internal Loan -5 Year I
. 2823 Paid from Properl'L Taxes
7021 Rate Stabilization Reserve ($35,000\
7032 Dunbarton Pool Surcharge Reserve I
7505 RF-Federal Gas Tax -I
Total FINANCING -I {$35,000)1 $0
100
City of Pickering
2014
Approved Capital Budget .
5715 Don Beer Arena .
I . 2013 I 2014
I Budget i Budget :
I I
EXPENDITURES . I . ·.· I.
.
.. ·· .
I
6178 Miscellaneous Egui12ment I $48,5oo 1 $140,000
6181 Other Fixed Assets I I 35,000
6183 Accessibility. . I 8,ooo I
Total EXPENDITURES I $56,5oo I $175,000
FINANCING . I I
1623A Provincial Grants-Invest In Ontario I I
1702 Debt -10 Year I I
2823 Paid from Property Taxes I I ($30,000)
7021 Rate Stabilization Reserve I ($56,500)1
7033 R-Don Beer Arena I I (11 0,000)
7505 RF-Federal Gas Tax 1 I (35,000) I
Total FINANCING I ($56,500)! ($175,000)
1 01
City of Pickering
2014
Approved Capital Budget
5715 Don Beer Arena
5715.1401 Desiccant Dehumidificat,ion System Design
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Design for Desiccant Dehumidification system
Total 5715.1401 Desiccant Dehumidification System Design
5715.1402 Boiler System and Holding Tanks
6178 Miscellaneous Equipment
Boiler and Holding Tanks-Rink 2 (Replacement)
7033 R-Don Beer Arena
Total 5715.1402 Boiler System and Holding Tanks
5715.1403 RoofTop Unit
6181 Other Fixed Assets
RTU-2 Replacement in change rooms
7505 RF-Federal Gas Tax
Total 5715.1403 Roof Top Unit
Total5715 Don Beer Arena
102
Run Date: 9-Apr-2014 ·
Funding Expense
(30,000)
30,000
(30,000) 30,000
110,000
(110,000)
(110,000) 110,000
35,000
(35,000)
. (35,000) 35,000
(175,000) 175,000
City of Pickering
2014
Approved Capital Budget
5719 Community Centres
! 2013 I 2014
I Budget I Budget
I I I
EXPENDITURES . '
..
6157 Vehicles-Under $100,000 I $3o,ooo I $35,000
6173 Furniture & Fixtures I I
6178 Miscellaneous Equi12ment i 48,ooo I
6181 Other Fixed Assets I 345,ooo I I
6183 Accessibility I 354,344 I 90,000
..
6250 Construction Costs I 4,876,090 l 7,201,605
-~-----
Total EXPENDITURES I $5,653,434 I $7,326,605
FINANCING . I i .
1610 Federal Grants I ($1 o4,677l I
1623A Provincial Grants -Invest In Ontario I I ($90,000) I
1703 Debt-15 Year I (4,875,000)[ (3, 734,000)
1711 Internal Loan-5 ·Year I (209,ooo) I
2823 Paid from Property Taxes I (71 ,757)1 (15, 101
7021 Rate Stabilization Reserve I (73,000)1 (40,000)
7040 Vehicle Re121acement Reserve
»-~---·· I I (35,00QL
7505 RF-Federal Gas Tax I (320,000)1 -_, ' 7621 RF DC-Recreation Facilities I I . (3,412,504
Total FINANCING I ($5,653,434)1 ($7,326,605
103
City of Pickering
2014
Approved Capital Budget
5719 Community Centres
5719.1401 Indoor Soccer Facility and Land
1703 Debt-15 Year
2823 Paid From Property Taxes
6250 Construction Costs
Design & Construction of Indoor Soccer Facility
7621 RF DC-Recreation Facilities
Total 5719.1401 Indoor Soccer Facility and Land
5719.1403 Claremont Community Centre -Final Lift of Asphalt
6250 Construction Costs
Claremont Community Centre Parking Lot-Final lift of asphalt
pavement and lines
7021 Rate Stabilization Reserve
Total 5719.1403 Claremont Community Centre-Final Lift of Aspha
5719.1404 Kitchen Renovations & Upgrades
2823 Paid From Property Taxes
6250 Construction Costs
Greenwood Community Centre-Kitchen Renovations & Upgrades
Total 5719.1404 Kitchen Renovations & Upgrades
5719.1405 Accessibility Upgrades
1623 Prov Grant
Invest in. Ontario
6183 Accessibility
Claremont Community Centre Washroom Upgrades (as per
2012-2016 Accessibility Plan)
Total 5719.1405 Accessibility Upgrades
5719.1406 Full size Cargo Van
6157 Vehicles-under $100,000
Replace Unit #713 (vehicle out of serilice) with a full size Cargo Van
7040 R -Vehicle Replacement
Total 5719.1406 full size Cargo Van
Total5719 Community Centres
104
Run Date: 9-Apr-2014
Funding Expense
(3,734,000)
(101)
7,146,605
(3,412,504)
(7, 146,605) 7,146,605
40,000
(40,000)
(40,000) 40,000
(15,000)
15,000
(15,000) 15,000
(90,000)
90,000
(90,000) 90,000
' 35,000
(35,000)
(35,000) 35,000
(7 ,326,605) . 7,326,605
.
PROPOSED
INDOOR
SOCCER
FACILITY
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5719.1401 Indoor Soccer Facility-Design and Construction
Financing Sources:
1703 Debt-15 Year
2823 Paid From Property Taxes
7621 RF DC-Recreation Facilities
· Location and Construction:
$7,146,605
$3,734,000
$101
3,412.504
$7,146,605
Indoor Soccer Facility-The proposed works to include the design and construction of
a new indoor soccer facility, located at 1975 Clements Road.
------------------------------·-··------------------------------------~--------,
CENTRAL
~r-
0
0
Ill z
<(
0
ACORN
0
<{
0
0:::
LANE
SUBJECT
AREA
:'<':
0
0
0::: m
z
0
f-
Ill
(j z > :J
TRANS CANADA
PIPELINE
City of Pickering Engineering & Public Works Department
2014 Budget
Budget Amount:
5719.1403 Claremont Community Centre-Parking Lot Resurfacing $40,000
Financing Sources:
7021 Rate Stabilization Reserve $40,000
Location and Construction:
Claremont Community Centre-located at 4941 Old Brock Road. The proposed works
to include the final lift of asphalt for the existing parking lot.
City of Pickering
2014
Approved Capital Budget
5731 Rec. Complex Core
EXPENDITURES
6173 Furniture & Fixtures i
6178 Miscellaneous Equiflment~ .. ~~-------~---==::-::-:~~;;· --~~~-====c:-$;::9~6'::;. 0~0~0-11 6181 Other Fixed Assets • $876,000 I 370,000
6183 Accessibility 466,843 : 35,000
6250 Construction Costs ; . . I 75,000
Total EXPENDITURES $1,342,843 I $576,000
FINANCING i
1610 Federal Grants ($228,719)1
1623A Provincial Grants-Invest In Ontario I ($50,000)_ ~~~~~~~~~=-~~~~-~~-----~---·-7-~~~~· ~1~70~2~De~b~t~-~1~0~Y~ea~r~~~----~---------(558,~1~24~lT:--~~~I
2823 Paid from Property'=T~a:::cx:.=e:::.s -------------c'-----,----'-'('4"'"0'"",0""'040
7021 Rate Stabilization Reserve ' . (6,000)1 .
Total FINANCING ' ($1 ,342,843)! ($576,000
107
City of Pickering
2014
Approved Capital Budget
5731 Rec.Complex-Core
5731.1401 Health Club Equipment Replacement.
6178 Miscellaneous Equipment
Health Club Equipment Replacement: Smith Machine, Strength
Heavy Duty Half Rack, Floor Replacement Lower Cardia Annex, 5
Upright Bikes, 3 Stair Climbers, 1 Stairmill and 1 Bench
7034 Recreation Complex Core Surcharge Reserve
Total 5731.1401 Health Club Equipment Replacement
5731.1402 Stage Replacement .
6178 Miscellaneous Equipment
Stage Replacement-Health & Safety
7034 Recreatron Complex Core Surcharge Reserve
Total 5731.1402 Stage Replacement
5731.1403 Air Handling Units -SF17 & RF17
6181 other Fixed Assets
Replace Air Handling Units and Return fans -Supply Fan 17 and
Return Fan 17 for West Banquet Hall
7505 RF-Federal· Gas Tax
Total 5731.1403 Air Handling Units-SF17 & RF17
5731.1404 Scissor Lift
1623 Prov Grant
Invest in Ontario
6178 Miscellaneous Equipment
Scissor Lift -New
Total 5731.1404 Scissor Lift
5731.1405 Air Handling Unit-SF19
6250 Construction Costs
Air Handling Units (Replacement of Supply Fan-19) for Rec.
Complex Main Lobby
7505 RF-Federal Gas Tax
Total 5731.1405 Air Handling Unit-SF19
5731.1406 Reception Counter (Design only)
1623 Prov Grant
Invest in Ontario
6183 Accessibility
Architectural Design of Accessible Reception Counter
108
Run Date: 9-Apr-2014
Funding Expense
61,000
(61,000)
(61 ,000) 61,000
20,000
(20,000)
(20,000) 20,000
120,000
'
(120,000)
(120,000) 120,000
(15,000)
15,000
(15,000) 15,000
75,000
(75,000)
(75,000) 75,000
(35,000)
35,000
.
5731 Rec.Complex-Core
City of Pickering
2014
Approved Capital Budget
Total 5731.1406 Reception Counter (Design only)
5731.1407 Addition of HVAC to Emergency Generator
2823 Paid From Property Taxes
6181 Other Fixed Assets
Add HVAC at Recreation Complex to emergency generator: The
complex serves as an emerQency war.ming and cooling center.
Total 5731.1407 Addition of HVAC to Emergency Generator
5731.1408 Domestic Hot Water Tanks (x2) plus Heat Exchangers
6181 Other Fixed Assets
Domestic Hot Water Tanks (x2) plus heat exchangers replacement
7505 RF-Federal Gas Tax
Total 5731.1408 Domestic Hot Water Tanks (x2) plus Heat Exchan!
Total 5731 Rec.Complex-Core
109
Run Date: 9-Apr-2014
Funding Expense
(35,000) 35,000
(40,000)
40,000
(40,000) 40,000
210,000
(210,000)
(210,000) 210,000
(576,000) 576,000
-----------------
City of Pickering
2014
Approved Capital Budget
5733 Rec. Complex Pool
2013 2014
---I Budget Budget
! '
EXPENDITURES ' ! i i
6173 Furniture & Fixtures I I $60,000
6178 Miscellaneous Equipment ! $9,066!
' 6181 Other Fixed Assets ' 360,000 ' I
Total EXPENDITURES
'
$9,000 i $420,000
FINANCING-' ' 1592 Donations I I
2823 Paid from Property Taxes
I
I
7035 Rec Com[>l PoQLSu!charge Reserve ($9,000)1 ($60,000)
7505 RF-Federal Gas Tax ! I 1360,000
Total FINANCING i ($9,000)i ($420,000
11 0
City of Pickering
2014
Approved Capital Budget
5733 Rec. Complex-Pool
5733.1401 Dehumidification Units
6181 other Fixed Assets
. Replacement of Dehumidification Units (2)
7505 RF -Federal Gas Tax
Total 5733.1401 Dehumidification Units
5733.1402 Axial High Speed Flow Fan
6173 Furniture & Fixtures
Axial High Speed Flow Fan-(Replacement)
7035 Rec Comp Pool Surcharge
Total 5733.1402 Axial High Speed Flow Fan
Total 5733 Rec. Complex-Pool
111
Run Date: 9-Apr-2014
Funding Expense
360,000
(360,000)
(360,000) 360,000
60,000
(60,000) .
(60,000) 60,000
(420,000) 420,000
City of Pickering
2014
Approved Capital Budget
· 5735 Rec. Complex Arenas
2013 I 2014
'
--! Budget
'
.Budg~l_ __ ..
' '
EXPENDITURES '
6173 Furniture & Fixtures I ! $40,000
6178 Miscellaneous Equipment I 60,000 ' ' 6181 Other Fixed Assets I $43,000' 115,000
6250 Construction Costs ' 195,000 ' I
Total EXPENDITURES $43,000 i $410,000
FINANCING I :: ! ' 1623A Provincial Grants -Invest In Ontario I I
2823 Paid from Prof2erly Taxes I ($18,000)1 ($1 00,000)
7036 Rec. Complex Arena Surcharge Reserve I' I (30,000)
7505 RF -Federal Gas Tax I (25,000)i (280,000)
Total FINANCING I ($43,000)1 ($41 0,000)
112
'
City of Pickering
2014
Approved Capital Budget
5735 Rec.Comph~x-Arenas
.
5735.1401 Custodial Equipment
2823 Paid From Property Taxes
6178 Miscellaneous Equipment
Custodial Floor Cleaning Equipment over $5,000
Total 5735.1401 Custodial Equipment
5735.1402 Sound System Upgrades
2823 Paid From Property Taxes
6178 Miscellaneous.Equipment
Sound System Upgrades
Total 5735.1402 Sound System Upgrades
5735.1403 Delaney Hot Wa,ter Tanks
6181 Other Fixed Assets
Delaney Hot Water Tanks replacements
7505 RF-Federal Gas Tax
Total 5735.1403 Delaney Hot Water Tanks
5735.1404 HVAC Units
6181 Other Fixed Assets
O'Brien meeting rooms, A & B HVAC Units
7505 RF-Federal Gas Tax
Total 5735.1404-HVAC Units
5735.1405 Lighting Upgrades
6173 Furniture & Fixtures
. O'Brien Meeting Room Lighting Upgrades (Energy Efficiency)
7505 RF-Federal Gas Tax
Total 5735.1405 Lighting ·upgrades
5735.1406 Public Washrooms
2823 Paid From Property Taxes
6250 Construction Costs
Partitions in Delaney public washrooms
Total 5735.1406 Public Washrooms
5735.1407 Roof Replacement -O'Brien Arena .
6250 Construction Costs ·
Roof Replacement-O'Brien Arena
7505 RF-Federal Gas Tax
113
Run Date: 9-Apr-2014
Funding Expense
(20,000) .
20,000
(20,000) 20,000
(40,000)
40,000
(40,000) 40,000
25,000
(25,000)
(25,000) 25,000
60,000
(60,000)
(60,000) 60,000
40,000
(40,000) .
(40,000) 40,000
(40,000)
40,000
(40,000) 40,000
155,000
(155,000)
5735 Rec.Complex-Arenas
City of Pickering
2014
Approved Capital Budget
Total 5735.1407 Roof Replacement-O'Brien Arena
5735.1408 O'Brien Machine Gate
6181 Other Fixed Assets
O'Brien Machine Gate -Replacement (Health & Safety Hazard)
7036 R/Cmplx Arena Surcharge
Total 5735.1408 O'Brien Machine Gate
Total 5735 Rec.Complex-Arenas
114
Run Date: 9-Apr-2014
Funding Expense
(155,000) 155,000
30,000
.
(30,000)
. (30,000) 30,000
(410,000) 410,000
5744 Museum
-------------------------------.
City of Pickering
2014
Approved Capital Budget
115
2014
Budget
$435,000
($4_00,200)
(35,000)
City of Pickering
2014
Approved Capital Budget
5744 Museum
5744.1401 Craftsman Cottage
2823 Paid From Property Taxes
6149 Restoration-Museum Bldg
Heating/electrical-services & repairs/restorations
Total 5744.1401 Craftsman Cottage
5744.1402 Oddfellows Hall
1712 Internal Loan-10 Year
6149 Restoration-Museum Bldg
Oddfellows Hall (foundation, heating/cooling system, plastering,
painting and turning of the building)
Total 5744.1402 Oddfellows Hall
Total 5744!\lluseum
116
Run Date: 9-Apr-2014
Funding Expense
.
(35,000)
35,000
(35,000) 35,000
(400,000)
400,000
(400,000) 400,000
(435,000) 435,000
City of Pickering
2014
Approved Capital Budget ·
5610 City Development -Admin
I 2013 I 2014
Budget. I Budget
i
EXPENDITURES . I . I
6173 Furniture & Fixtures I I $20,000
6181 Other Fixed Assets r I
Total EXPENDITURES $01 $20,000
..
FINANCING I I I I
2823 Paidfrom Proper!)' Taxes I I
. 7001 R -Capital Eguipment I ($20,000)
7505 RF-Federal Gas Tax I
Total FINANCING $o I ($20,000)
117
City of Pickering
2014
Approved Capital Budget
5610 City Development-Admin
5610.1401 Workstations, Partitions, Tables, Shelving
6173 Furniture & Fixtures
Workstations, partitions, tables, and shelving units
7001 R -.Capital Equipment
Total 5610.1401 Workstations, Partitions, Tables, Shelving
Total 5610 City Development-Admin
118
Run Date: 9-Apr-2014
Funding Expense
.
20,000
(20,000)
(20,000) 20,000
(20,000) 20,000
City of Pickering
2014
Approved Capital Budget
5800 Library
I 2013 I 2014
I Budget ' Budget I
I I
EXPENDITURES i .
.. ·
6173 Furniture & Fixtures I ...... $26,000 i
6176 Office Machines& Eguip. I
6179 Book Collection Material I 640,4681 $453,200
6181 Other Fixed Assets I 415,ooo I 332,000
Total EXPENDITURES I $1,081,468 I $785,200
FINANCING . I I
1623A Provincial Grants -Invest In Ontario I
1711 Internal Loan -5 year I ($1 92,000)
2823 Paid from Propert~ Taxes . I . ($666,468) (523,200).
7021 Rate Stabilization Reserve I I
7042 Provision for Eastern Branch Library I (125,000) (50,000)
7505 RF -Federal Gas Tax I (290,000)1 (20,000\
Total FINANCING . ,
I ($1 ,081 ,468)1 ($785,200\
119
City of Pickering
2014
Approved Capital Budget
5800 Library
5800.1401 Book Collections
2823 Paid From Property Taxes
6179 Book Collection Materials
Library materials cover the following: Books, movies, music and
other types of materials along with their processing and packaging.
This budget is based on a formula which includes community
demand, material costs and industry norms.
Total 5800.1401 Book Collections
5800.1402 PC Staff Room Improvements
2823 Paid From Property Taxes
6181 Other Fixed Assets
Petticoat Creek Staff Room Repairs
Total 5800.1402 PC Staff Room Improvements
5800.1403 PC Lighting Replacements (2nd phase)
6181 Other Fixed Assets
PC Lighting Replacements (2nd phase)
7505 RF-Federal Gas Tax
Total 5800.1403 PC Lighting Replacements (2nd phase)
5800.1404 PC Wood Panelling Repair-Exterior
2823 Paid From Property Taxes
6181 Other Fixed Assets
PC Wood Panelling Repair-Exterior
Total 5800.1404 PC Wood Panelling Repair-Exterior
5800.1406 Brickcladding and Masonry repairs
1711 Internal Loan-5 Year
6181 Other Fixed Assets
Central Library -brickwork (phase 2 critical) and masonry repair
Total 5800.1406 Brickcladding and Masonry repairs
5800.1407 Central Library Carpet
6181 Other Fixed Assets
Central Library Carpet Replacement (phase 2)
7042 Provision for Library-Eastern Branch Reserve
Total 5800.1407 Central Library Carpet
Total 5800 Library
120
Run Date: 9-Apr-2014
Funding Expense
(453,200)
453,200
(453,200) 453,200
(40,000)
40,000
. (40,000) 40,000
20,000
(20,000)
(20,000) 20,000
(30,000)
30,000
(30,000) 30,000
(192,000)
192,000
(192,000) 192,000
50,000
(50,000)
(50,000) 50,000
(785,200) 785,200