HomeMy WebLinkAboutPLN 11-13Report to
Planning & Development Committee
PICKERING Report Number: PLN 11 -13
Date: May 6, 2013
From: Thomas Melymuk
Director, City Development
Subject: Duffins Precinct — Southern Lands Environmental Servicing Plan Update
and
Draft Plan of Subdivision Application SP- 2011 -04
Zoning By -law Amendment Application A 17/11
Kindwin (Brock) Development Corporation
Part of Lot 18, Concession 2
(2077 & 2095 Brock Road)
Recommendation:
1. That Council endorse the recommendations of the Duffins Precinct Southern Lands
Environmental Servicing Plan Update, Final Report dated November 2012, prepared
by Sernas Associates (now GHD), summarized in Attachment #3 to Report PLN 11 -13;
2. (a) That Draft Plan of Subdivision SP- 2011 -04 submitted by Kindwin (Brock)
Development Corporation, on lands being Part of Lot 18, Concession 2, to
permit a residential plan of subdivision for 154 dwelling units, and blocks for
park, stormwater, open space and road widening uses, as shown on the Staff
Recommended Plan on Attachment #6 to Report PLN 11 -13, and the
implementing conditions of approval as set out in Appendix I, be endorsed; and
(b) That Zoning By -law Application A 17/11 submitted by Kindwin (Brock)
Development Corporation, to implement Draft Plan of Subdivision SP- 2011 -04,
as outlined in Appendix II to Report PLN 11 -13, be endorsed, and that staff be
authorized to finalize and forward an implementing zoning by -law to Council for
enactment;
3. That Council authorize staff to initiate an amendment to the Pickering Official Plan
and revisions to the Duffins Precinct Development Guidelines to reflect updated
information and implement land use, transportation and environmental
recommendations of the Duffins Precinct Southern Lands Environmental Servicing
Plan Update, including the recommendations outlined in section 2.3 of Report
PLN 11 -13; and
4. Further, that a copy of Report PLN 11 -13 and Council's resolution be forwarded to
the Region of Durham, Toronto and Region Conservation Authority, Durham School
Boards and the Duffins Precinct Landowners Group for information.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 2
Executive Summary: Kindwin (Brock) Development Corporation ( Kindwin), as one of
the largest land owners in the southern part of Duffins Precinct, front ended the
preparation of an update that was required to the 1999 Environmental Master Servicing
Plan (EMSP) for the Duffins Precinct (see Duffins Precinct Location Map,
Attachment #1, and Duffins Precinct Southern Lands - Landowners Map, Attachment #2).
In October 2011, Sernas (now GHD) submitted the Duffins Precinct Southern Lands
Environmental Servicing Plan Update (ESP Update). In response to comments issued
by the City and Toronto Region Conservation Authority (TRCA) in January 2012, GHD
submitted a final ESP Update dated November 2012, addressing City and TRCA
comments.
It is recommended that Council endorse the recommendations of the ESP Update to
serve as the basis for the technical review of all development applications in the
southern portion of Duffins Precinct. And further, Council is requested to authorize staff
to initiate an amendment to the City's Official Plan and revisions to the Duffins Precinct
Development Guidelines to implement land use, transportation and environmental
recommendations of the ESP Update.
In November 2011, shortly after the submission of the ESP Update, Kindwin submitted
draft plan of subdivision and zoning by -law amendment applications that proposed a
residential subdivision of up to 166 dwellings, consisting of detached, semi - detached,
street and lane townhouse units. Also proposed were blocks for a park, stormwater
management pond, and open space (see Location Map, and Applicant's Submitted
Plan, Attachments #4 and #5).
These applications were circulated for comment while the ESP Update was also under
review. Now that the ESP Update is finalized and ready for Council endorsement, staff
recommend that the Kindwin applications also be approved. The applications do not
require prior approval of the official plan and development guideline amendments
referenced above.
Minor revisions have been made including increasing the size of the park block and
relocating it further south towards the Islamic Centre (see Staff Recommended Plan,
Attachment #6). In addition, the stormwater pond block is slightly larger, and while the
total maximum number of units is reduced to 154, the plan retains the proposed mix of
singles, semi detached, street and lane townhomes. The proposed road pattern
provides access to the proposed development to the south and will allow a connection
to the north. Technical matters will be dealt with through conditions of draft approval. It
is recommended that Council endorse the staff recommended plan subject to the
conditions outlined in Appendix I.
The recommended zoning performance standards will implement the draft plan,
allowing flexibility for single, semi detached and townhome units on Blocks 2 to 6.
Council is requested to endorse the zoning standards set out in Appendix II. Staff will
finalize the By -law and it bring it back to Council for adoption.
Report.PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 3
Financial Implications: No direct costs are anticipated as a result of the
recommendations of this report.
1. Duffins Precinct Southern Lands Environmental Servicing Plan Update
1.1 Development in the southern part of the Duffins Precinct could not proceed
without an update to the 1999 Environmental Master Servicing Plan
The Duffins Precinct development area is located north of Finch Avenue and east
of Brock Road. Within Duffins Precinct, the area generally south of Dellbrook
Avenue is referred to as the southern lands (see Location Map - Duffins Precinct,
Attachment #1).
In 1999, the Duffins Precinct Environmental Master Servicing Plan (EMSP) was
prepared by The Greer Galloway Group Inc., establishing a servicing
management plan for the Duffins Precinct. Since 2005, several landowners in
the southern lands of Duffins Precinct submitted development applications to the
City. The City and the Toronto and Region Conservation Authority (TRCA)
determined that an update to the EMSP for the southern lands was warranted
due to the time lapse between the EMSP and the submission of development
applications.
1.2 The final servicing plan for the Duffins Precinct Southern Lands is
recommended to Council for endorsement
In October 2011, Sernas (now GHD) submitted the Duffins Precinct Southern
Lands Environmental Servicing Plan Update (ESP Update) on behalf of the
Duffins Precinct Landowner Group (DPLG) (see Duffins Precinct Southern Lands
— Land Owners, Attachment #2). The City and TRCA issued comments in
January 2012, and in December 2012, GHD submitted a final ESP Update
addressing City and TRCA comments. A Summary of the Duffins Precinct
Southern Lands Environmental Servicing Plan Update is provided as Attachment
#3.
The ESP Update defines current development practices, development
boundaries, buffers and protection requirements for the natural features, outlines
servicing requirements and phasing, and confirms the location of municipal
infrastructure including stormwater management facilities, and roads.
More specifically, the ESP Update recommends detailed technical strategies to
address water resource issues including protection of wetland features,
hydrogeology and water balance, erosion sensitivity, aquatic habitat and
headwater conditions, stormwater management strategies, phasing of
stormwater facilities if required, preliminary costing for facilities, and required
monitoring.
Report PLN 11 -13
May 6, 201.3
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 4
The recommendations address both area wide strategies applying to all
landowners, as well as property specific recommendations that will inform both
development design, as well as detailed engineering. The endorsed ESP Update
will serve as the basis for the technical review of development applications in the
southern portion of Duffins Precinct. Staff recommend that Council endorse the
ESP Update as summarized in Attachment #3 to this Report.
A cost sharing agreement will be required to cover the cost of the ESP Update
and to cover the construction of stormwater facilities shared between
landowners. The agreement will be required through conditions of approval and
amendments to the policy documents for these lands.
2. Kindwin draft plan of subdivision and zoning by -law amendment
applications
2.1 The original applications were submitted in November 2011
Kindwin (Brock) Development Corporation ( Kindwin) submitted applications for
approval of a draft plan of subdivision, and an amendment to the zoning by -law to
implement the proposed residential development on approximately 8.02 hectares
located on the east side of Brock Road, south of Major Oaks Road and north of
Finch Avenue (see Kindwin Lands Location Map, Attachment #4). The initial
development proposed a maximum of 166 units consisting of detached, semi-
detached, street and lane townhouse dwelling units (see Applicant's Submitted
Plan November 2011, Attachment #5). Also proposed were blocks for a park,
stormwater management pond, open space and road widening uses.
2.2 A revised proposal reflects a revised development limit and park location
The draft plan of subdivision and by -law amendment applications were circulated
for comment while the ESP Update was under review. In response to City staff
comments and identification of an updated limit of development (confirmed by a
scoped environmental impact statement), a revised draft plan of subdivision was
submitted (Staff Recommended Plan, see Attachment #6). The plan reflects the
updated limit of development, an increase in size and shifting of the park (village
green) block south to the east of the Pickering Islamic Centre, an increase in the
size of the stormwater and open space blocks, and an increase in the width of
the proposed lane.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 5
The following chart outlines details of the staff recommended plan of subdivision:
........................ . ......... .............. ....................... ..... ................................. __................_........... ........................... __ ................... . ................
_. ...................................... _ .................... _...............................................................................
Land Area (ha)
Units
............. _............... _ ... ........................... ..................................._....._..............._........................................_. ............................ _.....................................................
Block 18 ( Pa rk)
. ..................... _.................
0.33
....... ........................................__.......... ............................ _
.................. _ ..................................... __ .............. _ ............... _ ....................... _ .............. _ ...................... _. .................................. _ ...................... ................
Block 19 (Stormwater Management
............... ................................. ......._...._ _............._................_..;.........................................................
0.48
.........._...................;
Pond)
_........... ... ..................................._............................_........................................... ....._......................._.
2
Block 0 (Open Space)
1.24
.................................... .......... ....... _. ........................... ......... _ ..... ............... _ .................. ......... ............................... _ ..................... ,................
Blocks 21 & 22 (Future Development)
__ .......... ............... ................. ........._.......... .... .... ..... .............._.
0.05
:,................_............ _......_ .................. _ ..... .... ....;
...... .............. . .............._ ..........._...................................._......................_......................................................_......................;......................................_.............................................
Block 2 3 (Road Widening)
.............._................
0.13
............. _.. ................... .......__............................... ...............
........................................................... _ ..... ................ ... ............... _ ........................ .......................................................................... __ .................... . ...................
Municipal Roads and Lane
_ ............................... ................ ......... _ .................................. ....._
2.26
..................... ........................... .. .............. ....................... ............. ;
--
.............._................ ....... ................. .. ...... ......... _ ................... ...................... _ ...................... ............ ................ ......._........................................ _..........
Detached (9.1 -10.5 m frontage) &
. .............................................. _................................ ....................
2.01
... ..................................... ......................................... __ ................. _
68 (minimum)
Semi - Detached ............................................................................................................................
..................._.........74
(maximum)...'
Street Townhouse (7.5 m frontage)
1.22
58
....................................... ................................................ _......... ..................... .................................... ........................ .................. ......;
Lane Townhouse (5.0 m frontage)
0.30
22
............... _ .................. __ ............. __ ..................................................................... ...... ................................ _... ................................. _._
Total
8.02
.............. .
148 (minimum)
................ _._. ............... _ .............................................................. _ ..... ............ __ ..................................... _. ............... .._ ......... ............................... _..........
............... .......................................... ... ................................... .. ........ _ ........
154 (maximum)
:............................ ........ .............. .................... ................... ..........
2.3 City Departments & Agency Comments
Region of Durham . subject lands are within the "Living Areas" and "Major
Open Space" designations in the Durham Region Official
Plan and front Regional Road 1 (Brock Road) which is
designated as a "Regional Corridor'
• the Region of Durham Planning Department has advised
that this application complies with the policies of the
Regional Official Plan
• available water capacity is available in the existing 300m
watermain on Brock Road and available sanitary sewer
capacity is available in the existing 200mm sanitary
sewer on Brock Road
• a road widening across the frontage of Brock Road is
required
• the Region has no objection to the applications and has
provided conditions of approval
Toronto and prior to grading of the site and registration of the draft
Region plan of subdivision, the owner shall submit a revised
Conservation functional site servicing report consistent with the Duffins
Authority (TRCA) Precinct Southern Lands ESP Update
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 6
TRCA (continued) the owner shall enter into an agreement with the City
committing to undertake the monitoring program as
required in the Duffins Precinct Southern Lands ESP
Update and provide a letter of credit for the full cost of
the implementation of the monitoring program
• a restrictive covenant shall be placed over the rear yards
of all lots created adjacent to the open space block
having the effect of prohibiting the removal of fences
along the lot line and prohibition of the installation of
gates or other access
• the draft plan of subdivision shall be red -line revised to
reflect an adjustment to the boundary of the development
lots and the open space block further west for the
purpose of maximizing compensatory plantings
• the open space block as revised shall be conveyed to the
TRCA for a nominal sum
Engineering & . a subdivision agreement and a construction management
Public Works plan will be required
• the subdivision agreement will address, but not be limited
to: road construction, easements, fencing, traffic
management, and cost sharing
• servicing requirements need to be in accordance with the
Duffins Precinct Southern Lands ESP Update and an
approved FSSR
Durham District . staff has determined that sufficient space will be
School Board available within existing schools to accommodate the
proposed development in the Brock Ridge neigbourhood
• elementary school students will be bused to attend Valley
Farm Public School located on Pepperwood Gate in the
Brock Ridge neighbourhood
Durham Catholic elementary school students will be bused to attend
District Board St. Wilfrid Catholic School located on Southcross Road in
the Brock Ridge neighbourhood
No other agency that provided comment had any objection to the subject
applications. Technical issues and requirements can be addressed during the
subdivision agreement process, if this application is approved.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 7
2.4 Planning Analysis
2.4.1 The proposal conforms to the Pickering Official Plan
The subject property is designated "Urban Residential Areas — Medium Density
Areas" which requires a residential density range of over 30 dwellings per net
hectare and up to and including 80 dwellings per net hectare. The density of this
proposed development at 41.9 to 43.6 dwellings units per net hectare conforms.
Technical and other housekeeping amendments to the Pickering Official Plan
and Duffins Precinct Development Guidelines to implement the ESP Update are
discussed in section 3. of this Report. Approval of these amendments is not
required prior to the approval of the draft plan and zoning by -law.
2.4.2 Street A provides access to the subject property at a signalized intersection
Access to the proposed development will be from Brock Road. One access road
is proposed opposite the existing signalized T- intersection with Major Oaks Road,
and the other access is proposed directly south of the Pickering Islamic Centre.
The proposed north -south Street A connects the two access roads for circulation
within the proposed plan.
An existing development agreement with the Pickering Islamic Centre requires
that upon construction of Street A, the existing driveway access to the Centre be
relocated from Brock Road to Street A. The relocated access to Street A will
assist in improving vehicular access to the Centre.
Staff has also had recent preliminary discussions with the Pickering Islamic
Centre about their plans to build an addition to the Centre as well as a parking
structure. Residents on the west side of Brock Road expressed concern
regarding the incidence of overflow parking on local residential streets, and the
safety concerns of people crossing Brock Road. A parking structure would assist
in addressing this concern. Within the subdivision, sidewalks will be required on
both sides of each street except Streets D and Street E, where sidewalks will be
only on one side. An enhanced sidewalk along the east side of Brock Road with
a landscape buffer separating it from the road edge will be required in keeping
with the Duffins Precinct Development Guidelines.
Resident and landowner concerns were expressed about the need for this draft
plan to provide access for future development to both the north and south of the
Kindwin lands. The applicant has demonstrated that Street A will provide the
necessary access.
2.4.3 The revised location of the village green (park) is desirable, and children
will be accommodated at existing schools
To address an improved interface with the existing Pickering Islamic Centre
adjacent the subject property, the draft plan was revised shifting Block 18 (Park)
to the south opposite the Pickering Islamic Centre.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 8
The park will serve a village green function, as opposed to having active play
fields. The City will receive the Planning Act five percent parkland requirement
through a combination of the dedication to the City of the 0.33 hectare Block 18
(Park) and the remainder as cash -in -lieu of parkland.
Residents expressed concerns regarding the accommodation of children at
elementary schools. The Durham District Public Board of Education has
confirmed that it does not require a school site in Duffins Precinct, and has
advised that children will be accommodated at Valley Farm Public Elementary
School. The Durham Catholic District School Board has advised that children will
be accommodated at St. Wilfrid Catholic Elementary School.
2.4.4 Duffins Precinct Development Guidelines are addressed by the staff
recommended plan and conditions of draft approval ,
The Duffins Precinct Development Guidelines provide the following design
objectives for the neighbourhood, being the provision of:
• a range of housing types including detached, semi - detached, townhomes,
and multi -unit dwellings
• community and cultural facilities creating focal points within the Precinct,
through building siting and architectural design
• building form adjacent to Brock Road that is sensitive to the potential impacts
of the road, but does not turn its back on it
• streetscape and architectural designs that are aesthetically pleasing, diverse,
encourages social interaction within a neighbourhood, and supports safe
environments; and
• development that embraces the natural environment
The staff recommended plan achieves these design objectives. The lane
townhouses will contribute to the urban aesthetic of the streetscape of
Brock Road, and will be required to be a minimum of three storeys. The plan
proposes a variety of dwelling types consisting of detached, semi - detached, and
street and lane townhouses. The proposed development accommodates the
open space block providing an opportunity for views into the natural environment.
The Development Guidelines require that all developments submit a Siting and
Architectural Design Statement. The Statement is to reflect the principles of the
Guidelines, provide direction on the design of all dwelling models and elevations,
and become a schedule to the subdivision agreement. The siting, massing, and
fagade design of all townhouse units will be coordinated. A signature townhome
design will be required at the north end of the lane townhomes to create a focal
point at the southeast corner of the intersection of the Brock Road, and the
northerly end of Street A. Particular attention will be required to the elevation
details of the lane townhouse units proposed to front onto Brock Road as well as
to the deck/garage condition at the rear lane.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 9
2.4.5 Duffins Precinct Southern Lands ESP Update requirements will be satisfied
as conditions of draft approval
The Duffins Precinct Southern Lands ESP Update was completed as discussed
earlier in section 1. of this report and sets out certain requirements that must be
satisfied prior to development. These include, but are not limited to: completion
of a Functional Servicing & Stormwater Report, a monitoring report, and provision
of a watershed system monitoring and management fund contribution. The
required reports will be reviewed for acceptance by the City and /or TRCA as part
of the final subdivision approval process. The required monetary contributions
will be secured through the recommended conditions of draft approval.
2.4.6 A cost sharing agreement is required
Prior to the registration of the draft plan of subdivision, the City will require that
the landowners' cost sharing agreement has been finalized and confirmation from
the trustee, Bratty and Associates, that all of Kindwin's financial contribution has
been provided.
2:4.7 Street names have been selected
At the request of the Pickering Islamic Centre, the name `Usman' was proposed
for Street A that will abut the Pickering Islamic Centre on its south side and circle
back to Brock Road at the signalized intersection with Major Oaks Road. The
background of the proposed name provided by the Pickering Islamic Centre is
that `Usman' is the name of third Caliph, one of the most revered figures in
Muslim history. The name has been cleared by the Region and has been placed
on the reserved street name list for Pickering. Names for the remaining streets
will be selected from this list.
2.4.8. The proposal achieves a Level 1 sustainability rating
The applicant submitted a Sustainability Report that is based on the City's Draft
Sustainability Guidelines. Staff have reviewed the report and rated the draft plan
as achieving a Level 1 score. The proposed draft plan incorporated many of the
elements set out in the Guidelines such as efficient use of land, increased
residential density, environmental protection, native species planting, stormwater
quality and quantity control, and community connections. Additional
opportunities for element of sustainable development are available at the site
plan application and building permit stage.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 10
2.4.9 Technical matters to be addressed as conditions of subdivision approval
To ensure appropriate development, City, Regional and agency requirements will
be imposed as conditions of approval for the subdivision application. These
conditions will address, matters such as but not limited to, on -site grading,
landscaping, tree preservation, fencing, stormwater management and
construction management. Council is requested to endorse the conditions of
approval as set out in Appendix I to this Report.
2.4.10 Following the approval of draft plan of subdivision conditions, the
site - specific zoning by -law will be finalized and forwarded to Council for
enactment
Staff supports the rezoning application and recommends that the site specific
implementing by -law containing the standards attached as Appendix II to this
report be brought before Council for enactment following approval by the
Director, City Development, of the draft plan of subdivision conditions.
The intention of the proposed zoning provisions and categories is to provide
some flexibility, in particular areas of the subdivision, permitting a range of
dwelling types while ensuring the minimum permitted density of 30 dwellings per
net hectare of the "Medium Density Areas" designation is maintained. A range of
detached, semi - detached, and street townhouse units will be permitted in Blocks
2 to 6. The zoning of Blocks 7 to 14 will permit street townhouse units only.
Block 11 will be zoned to permit street townhouse units with a minimum
7.5 metre frontage to limit the number of driveways accessing Street A in close
proximity to the Brock Road intersection. Blocks 15 to 17, which front onto
Brock Road, will be zoned to permit lane townhouses.
The proposed zoning provisions address building location performance
standards to ensure an appropriate design for the neighbourhood including
requiring a minimum of three storeys on Brock Road. The recommendations
also contain zoning standards permitting a maximum number of model homes,
regulating walk -out unit/deck designs, and to ensure that all dwellings have a
minimum of two functional parking spaces per unit on private property and that
the internal garage space is functional. Standards related to minimum front yard
landscaped area are included to ensure a minimum amount of any front yard
remains landscaped and will also control the maximum size of a driveway
indirectly providing on- street parking opportunities where appropriate.
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 11
3. Official Plan Amendment and Development Guideline revisions
3.1 Revisions to the Regulatory Floodline necessitate changes to the Duffins
Precinct development limits and the proposed new road connections
Following completion of the 1999 EMSP, the TRCA completed updated
hydrological and hydraulic modeling for Duffins Creek and issued new floodplain
mapping in 2004.. This new floodplain mapping extended the Regulatory
Floodline west almost to Brock Road approximately opposite Dellbrook Avenue,
separating the developable land within Duffins Precinct into north and south
areas, and making the north -south road connection proposed by Map 23
Neighbourhood 13: Brock Ridge of the Official Plan impractical.
Public roads and access easements over private drive aisles will be required
through zoning and site plan approval to connect properties in Duffins Precinct
instead of the proposed north -south road network. Limited direct vehicular
access to Brock Road for the most restricted properties north of Major Oaks
Road will be considered by the Region.
3.2 The proposed public elementary school site is not needed
The Durham Public School Board has completed an enrolment and school
capacity analysis for the neighbourhood to determine the future needs of the
Brock Ridge neighbourhood and has determined that sufficient space will be
available within existing schools to accommodate the development in the Brock
Ridge neighbourhood. Staff recommend the elimination of the Proposed Public
Elementary School symbol from Map 23 of the Brock Ridge Neighbourhood
policies.
3.3 Official Plan Amendment and revisions to the Duffins Precinct
Development Guidelines are required to implement the ESP Update
Council endorsement of the ESP Update allows staff to prepare the necessary
amendments to the City's Official Plan and revisions to the Duffins Precinct'
Development Guidelines.
To reflect the new information on the location of floodlines, that a school site is no
longer required, and implement the ESP Update, staff recommend the following
changes to the Official Plan:
• Schedule I — Land Use Structure
- revise "Natural Areas" designation to reflect an enlarged natural heritage
system and revised limits of development;
Report PLN 11 -13
May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 12
• Schedule I I -Transportation System
- revise the "Future Collector Road" to reflect a realignment to the west of
the southern portion of the road and a deletion of the collector road in the
north
Brock Ridge Neighbourhood Policies
- add monitoring, adaptive management and cost sharing (studies and
stormwater management facilities) policies; and
- revise Map 23 deleting the "Proposed Park ", "Proposed Public Elementary
School" and revise the "New Road Connections (Proposed)" to reflect a
realignment to the west of the proposed collector road
For the same reasons as above, changes to the Duffins Precinct Development
Guidelines are required as follows:
• insert reference to the ESP Update for the southern lands
• delete reference to "school" and revise "park" to "village green"
• revise the Net Developable Area, Minimum Permitted Units, and Maximum
Permitted Units for Areas 3, 4 and 5
• permit the consideration of permanent vehicular access points to Brock Road
subject to approval by the Region of Durham for properties north of
Major Oaks Road
• introduce "Terminal View" to section M1.4.6 Views and Vistas
• revise section M1.4.7 School and Park Sites to address "Village Greens" and
access to trail system
• remove references to "`school" and "park" on Tertiary Plan
• adjust the road network, "Development Areas ", "Top of Bank ", "Major Spink
ESA Boundary", "Forested Area ", "Regional Flood Line ", and "Potential Storm
Water Management Pond" on Tertiary Plan
• revise "Building Focal Point" in Area 4 to "Terminal View" on Tertiary Plan;
and
• other minor revisions
4.0 Applicant's Comments
The applicant is aware of the recommendations of this report and concurs.
Report PLN 11 -13 May 6, 2013
Subject: Kindwin (Brock) Development Corporation
(SP- 2011 -04, A 17/11) Page 13
Appendices
Appendix I Recommended Conditions of Approval
Appendix II Recommended Zoning By -law Provisions
Attachments
1. Location Map — Duffins Precinct
2. Duffins Precinct Southern Lands — Land Owners
3. Summary of the Duffins Precinct Southern Lands Environmental Servicing Plan
Update
4. Location Map — Kindwin (Brock) Development Corporation
5. Applicant's Submitted Plan November 2011
6. Staff Recommended Plan
Prepared By:
1
Deborah Wylie, YVICIP, RPP
Senio Planner — Policy
Nilesh Surti, MCIP, RPP
Manager, Development Review
& Urban Design
DW:jf
Recommended for the consideration
of Pickering City,Council _
Tony Prevedel, P.Eng.
Chief Administrative Officer
Approved /Endorsed By:
Catherine Rose, M61 p, RPP
(Acting) Chief Planner
Thomas Melymuk� VICIP`,F
Director, City Development
z4, Zoi3
Appendix I to
Report PLN 11 -13
Recommended Conditions of Approval for
Draft Plan of Subdivision SP- 2011 -04
Recommended Conditions of Approval
Draft Plan of Subdivision SP- 2011 -04
Part of Lot 18, Concession 2, City of Pickering
Kindwin (Brock) Development Corporation
General Conditions
The Owner shall prepare the final plan generally on the basis of the draft plan of
subdivision prepared by GHD, dated April 2013, Project No. 02112, to permit a
residential subdivision consisting of 22 lane townhouses fronting onto Brock Road,
58 street townhouses, a range of 68 to 74 single detached and semi detached
dwellings, a park block, a stormwater management facility block, an open space
block, two future development blocks, and roadways, and that incorporates the
following revisions and bearing the City's recommendation stamp:
• 0.3 metre reserve across the entire frontage of Brock Road; and
• red -line revisions required to accommodate recommendations resulting from
technical studies required as conditions of approval.
Financial
2. That the Owner implements appropriate measures and financial agreements, such
as front - ending agreements, cost sharing agreements and /or development charges
to ensure that the approval and development of the plan of subdivision does not
cause a financial burden on the City of Pickering.
3. Cost sharing for the construction of the required stormwater management facility
and portions of Street A is required and will be addressed in the subdivision
agreement.
Subdivision Agreement
4. That the Owner enters into a subdivision agreement with and to the satisfaction of
the City of Pickering to ensure the fulfillment of the City's requirements, financial and
otherwise, which shall include, but not necessarily be limited to the conditions
outlined in this document.
Zoning
5. That the implementing by -law for Zoning By -law Amendment Application A 17/11
becomes final and binding.
Street Names
6. That street names and signage to be provided to the satisfaction of the Region and
the City.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 2
Development Charges & Fees
7. That the Owner satisfies the City financially with respect to the Development
Charges Act.
8. That the Owner satisfies the City for contributions for development review and
inspection fees.
Phasing and Development Coordination
9. That if this subdivision is to be developed by more than one registration, the Owner
will be required to submit a plan showing the proposed phasing, all to the
satisfaction of the Region of Durham and the City.
10. That the Owner satisfies the City with respect to the disposition of future
development Blocks 21 and 22 which are to be developed in conjunction with
abutting lands and that these blocks will be maintained to the satisfaction of the City
until such time they are disposed of to the satisfaction of the City.
11. That the Owner satisfy the City with respect to arrangements necessary to provide
for coordination of services and roads with adjacent lands and any phasing of
development that may be required.
Dedications /Transfers /Conveyances
12. That the Owner conveys to the City, at no cost:
(i) Block 18 for park purposes; and
(ii) the dedication of all road allowances with the proper corner roundings and
sight triangles to the City.
13. That Block 20 (open space) be conveyed to the Toronto and Region Conservation
Authority (TRCA) for the nominal sum prior to the registration of the subdivision.
14. That the Owner conveys to the Region of Durham, at no cost:
(i) Block 23 for road widening purposes (Brock Road); and
(ii) 0.3 metre reserve across the entire frontage of the draft along Brock Road.
Siting and Architectural Design
15. That the Owner, prior to the preparation of the subdivision agreement, shall engage
a control architect, to the satisfaction of the Director, City Development, who will
prepare a siting and architectural design statement reflecting the principles of
section 4.5 of the Duffins Precinct Development Guidelines to the City's satisfaction,
approve all models offered for sale and certify that all building permit plans comply
with the City's approved statement. The siting and architectural design statement
will become a schedule to the subdivision agreement.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 3
Parks and Village Greens
16. That the Owner convey to the City, Block 18 (park) at no cost and in a physical
condition acceptable to the City for parkland dedication, in combination of the
payment to the City of cash -in -lieu to the satisfaction of the Director, City
Development, in order to satisfy Section 42(1) of the Planning Act.
17. That prior to the City accepting any park block, the Owner shall submit a facility fit
plan with full grading information that demonstrates the park block will function to
the satisfaction of the City.
Sidewalks
18. Construction of the sidewalk on Brock Road adjacent to the site will be required.
The City will contribute to this cost and it will be addressed in the subdivision
agreement.
19. That the Owner agrees to install, to the satisfaction of the City, sidewalks on both
sides of each street except Streets D and E, where sidewalks will be only on one
side.
Fencing
20. That the Owner satisfies the City with respect to the provision of temporary fencing
around the entire perimeter of the subject lands during construction, prior to the
commencement of any works.
21. That the Owner agrees to install, to the satisfaction of the City, the following fencing:
(i) rear and south side of Lot 1 (Single Detached);
(i) north side and rear of Block 2 (Single Detached /Semi - Detached);
(ii) north and east sides of Block 5 (Single Detached /Semi- Detached);
(iii) rear and east side of Block 6 (Single Detached /Semi - Detached);
(iv) south side of Block 15 (Lane Townhouses).
(v) south sides of Blocks 7 and 8 adjacent to Block 18 (Park);
(vi) adjacent to and along the north and south edges of Block 19 (stormwater
management pond); and
(vii) adjacent to Block 20 (Open Space);
22. That the Owner satisfy the City respecting the provision of appropriate aesthetic
details and design of all boundary fencing.
23. That the Owner provides a fixed payment satisfactory to the City to provide for the
long term maintenance and repairs of items such as enhancements to fences,
entrance feature walls, medians that exceed the City's normal standards and which
are requested by the subdivider.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 4
Noise Attenuation
24. That the Owner agrees in the subdivision agreement to implement noise control
measures and warning clauses as recommended in the report, Environmental Noise
Assessment, prepared by YCA Engineering dated November 2011.
Construction Management Plan
25. That the Owner make satisfactory arrangements with the City respecting a
construction management plan, such Plan to contain, among other things:
(i) details of erosion and sedimentation controls during all phases of construction
and provide maintenance requirements to maintain these controls as per the
Erosion & Sediment Control Guideline for Urban Construction;
(ii) addressing the parking of vehicles and the storage of construction and building
materials during servicing and house construction, and ensuring that such
locations will not impede the flow of traffic or emergency vehicles on either
existing streets or the proposed public street;
(iii) assurance that the City's Noise By -law will be adhered to and that all
contractors, trades and suppliers are advised of this By -law;
(iv) the provision of mud and dust control on all roads within and adjacent to the
site;
(v) type and timing of construction fencing;
(vi) location of construction trailers; and
(vii) details of the temporary construction access.
Landscaping
26. That the Owner submits a street tree planting plan to the satisfaction of the City.
27. That the Owner satisfy the Director, City Development with the submission of a tree
preservation plan which will illustrate the protection of trees and other natural
features where appropriate, with specific attention to preservation in all pubic open
spaces prior to the approval of a preliminary grading plan.
Engineering Plans
28. That the Owner ensure that the engineering plans be coordinated with the
streetscape /siting and architectural design statement and further that the
engineering plans coordinate the driveway, street hardware and street trees to
ensure that conflicts do not exist, asphalt is minimized and all objectives of the
streetscape/ siting and architectural design statement can be achieved.
29. That the Owner satisfy the City respecting the submission of appropriate
engineering drawings that detail, among other things, City services, roads, storm
sewers, sidewalks, lot grading, streetlights, fencing and tree planting, and
financially- secure such works.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 5
30. That the engineering plans be coordinated with the architectural design objectives.
Easement
31. That the Owner convey to the City, at no cost, any easements as required; and,
any reserves as required by the City.
32. That the Owner conveys any easement to any utility to facilitate the installation of
their services in a location(s) to the satisfaction of the City and the utility.
33. That the Owner arrange at no costs to the City any easements required on third
party lands for servicing and such easements shall be in a location as determined
by the City and /or the Region and are to be granted upon request at any time after
the draft approval.
34. That the Owner satisfy to the satisfaction of the Director, Engineering and Public
Works Department any required easement for works, facilities or use rights that are
required by the City of Pickering.
Stormwater
35. That the Owner satisfy the Director, Engineering and Public Works Department
respecting a stormwater drainage and management system to service all the lands
in the subdivision, and any provisions regarding easements.
36. That the Owner satisfies the Director, Engineering and Public Works Department for
contributions for downstream stormwater management.
37. That the Owner satisfies the Director, Engineering and Public Works Department for
acquisition of land, design and implementation of stormwater facility and easements
for outfalls and access to the outfalls.
Grading
38. That the Owner satisfies the Director, Engineering and Public Works Department
respecting submission and approval of a grading and control plan.
39. That the Owner satisfies the Director, Engineering and Public Works Department
respecting the submission and approval of a geotechnical soils analysis.
40. That the Owner satisfies the Director, Engineering and Public Works Department
respecting the authorization from abutting land owners for all off -site grading.
Fill & Topsoil By -law
41. The City's Fill & Topsoil By -law prohibits soil disturbance, removal or importation to
the site unless a permit has been issued. No on -site works prior to draft plan
approval is permitted. A Fill and Topsoil Permit will be required should grading
works proceed prior to a subdivision agreement.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 6
Services
42. That the Owner satisfy the Director, Engineering and Public Works Department
respecting construction of roads with curbs, storm sewers, sidewalks and boulevard
designs through the submission and approval of a site servicing plan.
43. That the Owner satisfies the City respecting arrangements for the provision of all
services required by the City.
44. That the Owner satisfy the appropriate authorities respecting arrangements for the
provision of underground wiring, street lighting, cable television, natural gas and
other similar services.
45. That the cost of any relocation, extension, alteration or extraordinary maintenance of
existing services .necessitated by this development shall be the responsibility of the
subdivider.
46. The Owner shall provide for the extension of such sanitary sewer and water supply
facilities which are external to, as well as within, the limits of this plan that are
required to service this plan. In addition, the Owner shall provide for the extension
of sanitary sewer and water supply facilities within the limits of the plan which are
required to service other developments external to this subdivision. Such sanitary
sewer and water supply facilities are to be designed and constructed according to
the standards and requirements of the Region of Durham. All arrangements,
financial and otherwise for said extensions are to be made to the satisfaction of the
Region and are to be completed prior to final approval of this plan.
Environmental
47. That the Owner submits a reliance letter pertaining to the Phase 1 Environmental
Site Assessment prepared by Soil Engineers Ltd., to the Region of Durham, or
submit a Record of Site Condition to the Ministry of Environment.
Other Approvals
48. That any approvals which are required from the Region of Durham, the TRCA,
Ministry of Natural Resources, Ministry of the Environment or any utility for the
development of this plan be obtained by the subdivider, and upon request written
confirmation be provided to the City as verification of these approvals.
Duffins Precinct Southern Lands ESP Update & FSSR
49. That the Owner satisfies the City regarding all matters required by the final Duffins
Precinct. Southern Lands Environmental Servicing Plan Update ( Duffins Precinct
Southern Lands ESP Update) (Final version, November 2012).
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 7
50. That the Owner shall enter into an agreement with the City committing to undertake
the monitoring program as required by the Duffins Precinct Southern Lands ESP
Update and provide a letter of credit to the City for the full cost of the implementation
of the monitoring program.
51. That the Owner shall agree to achieve the water balance targets, through the
implementation of appropriate infiltration measures as identified in the final and
approved version of Functional Site Servicing Report (FSSR).
Traffic - Roads
52. That the Owner satisfies the City that appropriate arrangements have been
established for the installation of traffic control signals, including all costs, in a time
frame acceptable to the City, which includes installation of signals in advance of
warrants.
Model Homes
53. That the Owner enters into a model home agreement with the City, if applicable for
this draft plan. All model homes must satisfy all requirements of the siting and
architectural design statement.
Fire
54. That the Owner agrees that no development will proceed on any land until adequate
services are available including adequate water pressure to the satisfaction of the
City's Fire Services Division.
55. That the Owner provides a fire break plan and other fire prevention measures to the
satisfaction of the City of Pickering.
Development Blocks
56. That the Owner satisfies the City with respect to the disposition of future
development blocks and acquisition of abutting severed parcels prior to draft plan
approval. This may require properties merging on title and that no building permit
shall be requested until any land assembling has been completed to the satisfaction
of the City.
Canada Post
57. That the Owner, through the approval of a Utility Coordination Plan for the
location(s), is to enter into an agreement with Canada Post Corporation for the
provision of a Community Mailbox(es) including technical specifications, notice
requirements and financial terms.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 8
58. That the Owner agrees to determine and provide a suitable temporary Community
Mailbox location, if required, to the satisfaction of the City.
Plan Revisions
59. The Owner acknowledges and agrees that the draft plan of subdivision and
associated conditions of approval may require revisions, to the satisfaction of the
City to implement or integrate any recommendation resulting from studies required
as conditions of approval.
60. That the Owner revise the draft plan, as necessary to the satisfaction of the City to
accommodate any technical engineering issues which arise during the review of the
final engineering drawings. Required revisions may include revising the number of
residential building lots or reconfiguring the roads or lots to the City's satisfaction.
61. That the Owner agrees to implement the requirements of all studies that are
required by the City for the development of this draft plan of subdivision to the
satisfaction of the City.
Timing
62. That the owner, agree in the subdivision agreement that it will not commence any
construction works (including site servicing, topsoil stripping and grading) on the
subject property until the works required for the construction of the regional services
to service the subdivision have commenced.
Endangered Species Act
63. That the owner satisfy the Endangered Species Act prior to any site alteration and
the City be provided by the Owner with confirmation from the Ministry of Natural
Resources of their approval.
Agreement Clauses
64. The subdivision agreement between the Owner and the City shall contain, among
other matters, the following provisions:
(i) That the Owner agrees to include provisions whereby all offers of purchase
and sale shall include information that satisfies Subsection 59(4) of the
Development Charges Act, 1997.
(ii) That the Owner agree not to initiate a marketing campaign or take any offers of
sale and purchases or take any reservations of lots until the final Duffins
Precinct Southern Lands ESP Update and the FSSR have been approved by
the City and the land needs for the stormwater management facilities have
been accepted by the City.
Conditions of Approval Draft Plan of Subdivision SP- 2011 -04 Page 9
(iii) That the Owner agrees to implement those noise control measures
recommended in the noise report required in condition 23.
(iv) That the Owner agrees, in wording acceptable to the TRCA, to:
(a) carry out, or cause to be carried out, to the satisfaction of the TRCA, the
recommendations of the technical reports including a revised FSSR;
(b) agree to, and implement, the requirements of the TRCA's conditions in
wording acceptable to the TRCA;
(c) design and implement on site erosion and sediment control;
(d) obtain all necessary permits pursuant to Ontario Regulation 166/06, as
amended, from the TRCA;
(e) erect a permanent fence, to the satisfaction of the City and TRCA, along
the boundary of the development blocks and Block 20 (Open Space);
(f) implement all water balance /infiltration measures identified in the approved
FSSR;
(g) commit to provide appropriate information to all perspective buyers of lots
adjacent to Block 20 (Open Space) through all agreements for purchase
and sale, sales information, and community maps to ensure that the land
owners are well informed that private use and /or access to the open space
blocks shall not be permitted, and reflect the intent of the following:
"The open space adjacent to the subject property is considered to be part
of the publicly owned natural heritage system and will be maintained for
environmental protection, and public use purposes. Please note that uses
such as private picnics, barbeque or garden areas; and /or the dumping of
refuse (e.g. grass /garden clippings household compostable goods,
garbage etc.) are not permitted on these lands. In addition, access to the
valley corridor such as private rear yard gates and /or ladders is prohibited."
(v) That the Owner agrees to, and implements, the requirements of the Region of
Durham conditions in wording acceptable to the Region.
(vi) That the Owner agrees to maintain all stormwater management and erosion
and sedimentation control structures operating and in good repair during the
construction period, in a manner satisfactory to the City, TRCA and /or the
Ministry of Natural Resources.
(vii) That the Owner agrees to include provisions whereby all offers of purchase
and sale shall include information that for all dwelling units with a single car
garage that the City's by -laws require two parking spaces for the dwelling
which have been provided, one in the garage and one in the driveway and
that the City's by -law restricts the width of the driveway to a maximum size
width which does not allow two cars parked side by side.
J: \Documents \Development \D -3200 Draft Plans of Subdivision (SP Applications)\2011 \SP- 2011 -04, A 17 -11 Kindwin (Brock) Development Corporation 2095 Brock
Rd\Conditions \Conditions. doc
Appendix II to
Report PLN 11 -13
Recommended Zoning By -law Provisions for
Zoning By -law Amendment Application A 17/11
r
r
4- a
CO
O'4
.y M
O
L Q
as
t
C
._ E
O
N C
� O
O E
�a
E m
E
V m
C
.O
N
a)
O
t
C
O
a)
U
(0
a)
.a
1
E
co
a)
CD
U =
O
a) •�5
O
C a
C
O
4-- c
O
� O
E a)
L a)
-0 =
c
cn
O U
� (a
._ 'a
E O
a) U
CL m
�O cn
O O
C �
C =_
N a]
:_ a)
C cn
m �
O
E�
a) c
E O
a)
CU
CU -0
cu
V-
O m
(�
pr C: c 0
N
O O Q
O
a)
O
C
U U� — O
O
X O
t
=
E
a) — ca ca
— cn CU N
3
to
L
cn
a)
ui a) O to
m�— -ate"=
a
H
a)
s
O
a)
a) O m a) c
a)
N
d
E
cn
LO
0
E >, ' -O
It
E
J
O
O
N E 0 c
LO
N
co
m U to
N
O c6
'L L
W
N
O
7
N
a% O (6 0� C
O
U �� O O O
N
— cn CU
co
C6
N
cn
O
cn 0 O U m:
_
a) �
U
a)
L
r
�
+�
a)
�+
.L. O = L
O
+�
E
N
E
a)
E
E( E >,.L O
E
O
O
—_
N E ��
d
LO
N
co
-0 Om
�— 2i f0 U cn
N
cu L
r- a)
a)
Q O N U
.a
V N O C cu a)
tn— >,(p co
CD,
c^n,,
N o a) �
c^^n,,
^v^i,
.�
E
cn
co
�
M
_a O O0 0
N
co
ca U -0
N
(D
Q) ) C
cn •— O O
O
a) c
0 L a " a)
0 a E ca c
a=
p U) 3 N
L
ca
`�
cn
a)
cn cn -0 o
a) E a) ca a)
cn
m
a)
a-
a)
m .� m a)
a)
ca
E
N
E
E
E° a) E
E
(D
O
N
In
O
c�'a
N C y� a) N a)
O
N
N
co
M O .Q M
N
O
a)
N
E
E
E
E
E
OL. E
L E
d
E
O E
�+ s
Y
J�
J�
J�
O
U-
L.
L
cu
L
O
3
E
O
E—
L
am
E
ai
m
E
O
o
m
Cs
cn
Jo
cli
cn
vi
CD
co
Z
�
a
cn
O
N
a)
E
E
cn
cn
3
H
*+
a)
N
E
O
m
:3
Q�
E
a) n
U)
s.
CO V/
O
r—
co
r
I
0
Ln
LO
r
cb
a)
E
cn
E
v
a)
1
ai
N
E
U
L
m
•�
E
E
a) a
vii
Q
N
O
M
O
O
LO
�
Ln
cn
N
O
O
CD
E
CD
E
N
O
EL
O
O
Q
cn
C
O
a)
r
1
L
Sri
LO
r
-
0
d
Y aL-.
U O
CU
CL
c
tm
:tf
E
c
O
a_
O
of
C D _
c0
4)
> C t
C
s_
�� K
�•�
C
X
.E
K
2i
U -c
o) -c
a)
O
N
•> M
_
J 0Qm,.
L.
L
cu
cu
m
o
vi
�
a
0)
E
3
0
L
Q�
cu
E
O
E
cu
v
E
Q
X
f6
CL
E
C
O
�
Ln
N
O
CL
E
O
O
C
O
a)
N
D
>
-
0
Y aL-.
U O
CU
CL
c
E
:tf
E
c
O
C
O
C
C O
CAS
C
O
CU 0
O
O
2i
U -c
o) -c
a)
O
N
Oc
3: C
cu
C CA
3
t0 cm
C
N
-0
L
N
N
co
O
O
U
_Q -o
to
CL
C
0 >
U
C
•E
C
N
N
U
m
CA
N
ON-O
.L
��
OO
U
CA
C
O
m L
�Y
�_
O
C cu
O
E
a)
�,
C
L
Q
CA
"
E L
a)
Q
(D 0
-
N
Q O
v E
E
E
Y
N
cu
U
0EEE
-�
U -
C
C
cu
E
E
E
a
• •
•
•
~ >,
N
M
L.
PARK
C C�IIIII�
"RO
CORRIDOR
A7, MMEMT- TO
REpOr;" -AX Av //-/3
LOCATION MAP
DUFFINS PRECINCT
T
0
U
III M II0
[-,..
U P5�
0
a
LANDS
I
I
i
THIS WP WAS PRODUCED BY THE CITY OF PICKERING
PUNNING & DEVEAOPA/£NT DEPARTMENT,
INFORAUTiON & SUPPORT SERVICES
APR 73, 7013.
ROAD
•
I
U
O
m
m
,T, ?,CHME aT #— '-2—To
ic-p8w* 3, 4 A,' 1-3
DUFFINS PRECINCT
SOUTHERN LANDS
LAND OWNERS MAP
ANSAR MEDICAL
2185
2143087 ONTARIO LIMITED
2055
Q
Q
I a
FE
i
(i
/ I \
T
FULL SCALE COP /£S OF TH£ APPLICANTS
SUBMITTED PLAN ARE AVAILABLE FOR VIEWING AT
THE CITY OF PICKERING PLANNING & DEVELOPMENT DEPARTMENT.
THIS MAP WAS PRODUCED BY THE CITY OF PICKERING
PLANNING & DEVELOPMENT DEPARTMENT,
INFORMATION & SUPPORT SERVICES,
APRIL 17, 2013.
ANSAR MEDICAL
2177
MATTACCHIONE VINCENZA I T
2165 �
' E
BAPTIST CONVENTION 2
ERP RISES B
KINDWIND DEV. CORP.
2095, 2077
PICKERING
ISLAMIC CENTER
2109
PICKER!
ISLAMIC CENTER
I I
2143087 ONTARIO LIMITED
2055
Q
Q
I a
FE
i
(i
/ I \
T
FULL SCALE COP /£S OF TH£ APPLICANTS
SUBMITTED PLAN ARE AVAILABLE FOR VIEWING AT
THE CITY OF PICKERING PLANNING & DEVELOPMENT DEPARTMENT.
THIS MAP WAS PRODUCED BY THE CITY OF PICKERING
PLANNING & DEVELOPMENT DEPARTMENT,
INFORMATION & SUPPORT SERVICES,
APRIL 17, 2013.
AT �'I ME T #-a__ -__TO
Duffins Precinct — Southern Lands — Final November 2011
Environmental Servicing Plan Update Summary
1.0 New development limits established by individual environmental impact
studies
Natural heritage conditions were documented in the 1999 EMSP. Individual
scoped Environmental Impact Studies (EIS) completed for individual
development applications will update the natural heritage conditions, define the
development limits for each property and provide recommendations on the
protection and enhancement of the natural heritage system. The results of the
EISs will be incorporated into the ESP Update.
Natural heritage features, associated buffers and development limits were
established in the individual EISs for 2177 and 2185 Brock Road (Ansar), 2077
and 2095 Brock Road (Kindwin) and 2055 Brock Road (2143087 Ontario Ltd.).
2.0 Approval of appropriate stormwater management strategies required to
address water balance
Scoped EISs for development applications identified two features that will be
impacted by development: a draw feature on 2177 and 2185 Brock Road (Ansar)
and a wetland of approximately 0.74 hectares consisting of two hydraulically
connected wetlands (a smaller bulrush mineral marsh and a larger treed swamp)
located within the Phase 2 lands at the east property limit of 2055 Brock Road
(2143087 Ontario Ltd.). It is recommended that the wetland be retained with a
buffer of 15 metres and a 10 metre setback from the Regional floodline. A water
balance analysis has identified an infiltration deficit for this wetland which will be
mitigated by augmenting the wetland with approximately 1.3 hectares of clean
roof runoff from 2055 and 2077 Brock Road. Mitigation of a wetland identified by
TRCA at 2095, Brock Road (Kindwin) is not required as the wetland will not be
impacted by development.
The remaining parcels within the southern lands will be required to complete a
scoped EIS and confirm or re- establish the limit of development including top -of-
bank, floodlines, erosion setbacks, feature limits and appropriate buffers in
support of a development application.
3.0 The stormwater management strategy includes a wet pond providing
quality and erosion control for the entire Duffins Precinct southern lands
development area
Minor and major flows for 2177 and 2185 Brock Road (Ansar) will be handled by
on -site stormwater management controls and low impact development measures
that meet the quality and erosion control criteria and discharged easterly to the
existing Duffins Creek tributary.
ANT #....1._ -70
Re�ORi'* PL. N
IL-1 3
Storm sewers for the remaining properties will direct minor system flows to a
proposed wet stormwater management pond (SWMP) providing quality and
erosion control recommended to be located at 2077 Brock Road ( Kindwin)
discharging east to Duffins Creek. It is recommended that this facility be
constructed at the time of providing underground services to a registered plan of
subdivision and be functional prior to the construction of residential dwelling
units. ** *The location of this facility was considered in the context of maximizing
the limited amount of developable lands and by making use of the natural
heritage buffers and corridors, where possible. * ** Major flows up to the 100 year
event may be directed to Duffins Creek via internal road systems as overland
flow. It is recommended to co- locate minor and major systems together beyond
the development limits where grading, permits in order to minimize environmental
impacts.
The detailed design of the proposed SWMP and local storm sewer systems will
be implemented through subsequent functional stormwater and servicing reports
that are required in support of development applications. Quality, erosion,
quantity controls and water balance criteria will be applied to all developments
within the southern lands. Costs for stormwater management facilities will be
included in the landowners' cost sharing agreement.
4.0 A cost sharing agreement will ensure up front infrastructure costs are
equitably shared
The major land owners in Duffins Precinct are required to enter into a cost
sharing agreement covering studies, roads, oversizing of services and a
stormwater management pond. Presently five landowners (Mattachione, Baptist
Convention, Kindwin Development Corporation, Pickering Islamic Centre and
2143087 Ontario Limited) are contributing members to a draft cost sharing
agreement. As Ansar's servicing and stormwater will be handle by on -site
stormwater management controls and low impact development measures, Ansar
is participating in the landowners' agreement to address the required studies.
The agreement will be administrated by a trustee (Bratty and Associates), to
ensure all landowners pay their proportional share of the cost to develop the
neighbourhood. Prior to the registration of any draft plan of subdivision or
zoning /site plan approval, the City will require that the cost sharing agreement
has been finalized and that confirmation has been received from the trustee that
all of a developer's financial contribution has been provided.
Page 2
ATT�T'HMENT - TO
RI`PDXI-1 ', PL N //-/3
5.0 Primary access will be from Brock Road at the existing signalized
intersection opposite Major Oaks Drive
Primary access to the southern Duffins Precinct lands will be from Brock Road, a
Type A arterial, at the existing signalized T- intersection opposite Major Oaks
Drive. A secondary STOP controlled access will be provided approximately 225
metres to the south of the Major Oaks Drive intersection. Access to adjacent
developments within the southern lands will be provided by an extension of a
north -south collector road or private easements.
6.0 Most of the development will be within a 400m walk of transit stops
Duffins Precinct will be served by existing Durham Region Transit Routes 112,
122, and Claremont Community Bus operating on Brock Road by providing
transit stops at the two proposed accesses. Most of the development will be
within a 400m walk of these proposed transit stops. Currently, there are existing
transit stops on Brock Road at Major Oaks Drive and at Brockridge Community
Park. Brock Road will become a higher -order transit corridor including bus rapid
transit.
7.0 Monitoring is to be divided into a watershed system monitoring and
management program, and a mitigation measures and best management
practices monitoring program
To assess the effectiveness of the stormwater management measures
recommended by the ESP Update and to provide further recommendations for
adjustments to the measures proposed, the ESP Update recommends that the
Duffins Precinct monitoring program be comprised of the following:
• a watershed system monitoring and management program undertaken by
TRCA; and
• a mitigation measures and best management practices monitoring program
undertaken by the landowners and /or the City.
7.1 Watershed system monitoring and management program
A single monitoring program for the complete Duffins Creek Watershed is being
undertaken by the TRCA, in consultation with the City of Pickering and the Town
of Ajax. An overall monitoring and management program is to be developed for
each community, with input from the respective ESPs. Once the program has
been established and the required funding calculated, a per hectare cost for the
monitoring program will be applied as a condition of subdivision or site plan
approval on a development parcel basis for all of the lands to be developed in
Duffins Precinct.
Page 3
ATMOMENTO =TO
REPOR ii O , , P4 Al &/3
7.2 Adaptive management framework
A one -time financial contribution by the Duffins Precinct landowners to a `Duffins
Watershed Adaptive Management Fund' is recommended to be maintained by
the City and used in consultation with TRCA to identify the need for changes to
the watershed management system. The amount of the contribution is to be
determined through further consultation between the Duffins Precinct
Landowners Group, the City and TRCA. As the watershed program is fully
developed, additional funding will be assessed to other benefitting development
interests within the Duffins Watershed including Duffins Precinct.
7.3 Mitigation measures and best management practices
The purpose of this monitoring program is to demonstrate to the satisfaction of
the City that the stormwater management works, including low impact
development measures have been constructed and are operating as per the
approved engineering design and the Ministry of the Environment Certificate of
Approval.
Further discussions between the City and the Duffins Precinct Landowners
Group, in consultation with TRCA, are recommended to establish the scope of
monitoring taking into consideration the monitoring programs implemented for
Duffin Heights and Seaton, who will be responsible for the monitoring, the
funding mechanism, frequency /period, and reporting requirements.
Based on recommendations of TRCA, a specific monitoring program commenced
in September 2012, for the wetland located at the south limit of the study area
and will continue through the construction period. The monitoring data will be
presented to TRCA.
8.0 Capacity exists for sanitary and watermain services
The Region of Durham has confirmed that there is water capacity available on
Brock Road. An existing 300mm diameter PVC watermain runs along the east
side of Brock Road and continues south to Kingston Road.
An existing 200mm diameter sanitary sewer runs south along the Brock Road
right -of -way. The Region of Durham has indicated that there is available capacity
in the existing 200mm sanitary sewer for the Duffins Precinct southern lands.
J: \Documents \Development \D -3200 Draft Plans of Subdivision (SP Applications)\2011 \SP- 2011-04, A 17 -11 Kindwin (Brock) Development Corporation 2095 Brock
RMRecommendation report\ESPUpdate summary.doc
Page 4
ATTACHMENT # L
REPatN0 PG Al
Mon ►I \�
�� •• 111 ��
7
I�1e j
a
~
CHURCH
....
........ ...............................
. . . .. ... .
. . ..... . . . .. . . . . .. . . .. . . .. .
... . . .... :. . ;
. . . . .....
. .. . . . . . . . . . . . . . . .
go 40
.. . . . . . . . ... ....
... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . : . . .
:.........
........
.........
..........
. ........
........
.........
.......
IWOR
.:.:.;
I�
KIM
.. ,.
000
INFORMATION COMPILED FROM APPLICANT'S
SUBMITTED PLAN ATTAUNW0 —TO
KINDWIN (BROCK) DEVELOPMENT CORP.
SP- 2011 -04 & A 17/11
SUBMITTED NOVEMBER 2011
FUT. DEVELOPMENT
BLOCK 24
(n03 n,)
R/R1E
30 �
1o,65 R SrREETA c
9.1 m(MIN) Single Detached / 8.7 m Semi - Detached
R
6
o.y.
14 Min. Units /15 Max. Units
/
ea
° o.
lo, 7.5 JSI JS1 zs zsl zs
,s5
ae
BLOCK 6
SWM
BLOCK 21
n
I B 4OCKLL 1
ho - ae e<)
>5 2io
i, SYREtT T.FL P ,ae
° STREETS
'.
o.
u Z
=
13 Oq 1� 1 -1 ,a.fi
-_ 3e,
29.9 =
''—
I SITRE,ET T.7.
36.3
'p
10.35 75 JS 7.5 7.5 >.5 7.5 I
°
n
Ile
— e
Ly
w
�^
a STREET E
u
�j
R•
o
I
o
�
i.�
,n35 Is 7.s J.sI 5I .5 7,5 ,o.35
I I
5J0
.=
o
B�1IoCJ14>
e1 h S 'I T ITA 16
=
o
I
n
y
PARK
E
E
I
3J7
m
N
By °C�
BLOCK 20
U
m o
ro
m
t
^
fly
ul I
T7T IT.I{.
� S R
7.5 J.5 5 J.5 ta.
10.35 7.
U ..
\ m x
U ._
W
;
'E x
fi0
O <
.5 .s
m
o STREET D
R° °
- Ile9
28.6 F-
p
O
m U
MO
y �t,.t
F—
LLW
N
N N
-E m
��
i
n FUT. DEVELOPMENT
'70
— a3—N36
,�N
'5,
3
BLOCK 25
m
E
E
N a
3
°.°
I 8404 I I°
III
-1.
{II
E
p�
71
]SIRS SIT 5199
T. DEVELOPMENT
R.
° STREET B
o
BLOCK 26
a
2 56.2
o n )
9.1m(MIN)
Single Detached/ e.7 msemi- Detach,
OPEN SPACE
1
° STREET A
10 Min. Units / 11 . units
BLOCK 23
BLOCK 7 0
(0.,o he -
0.3
i
i
i
OPEN SPACE G
BLOCK 22
0.09 ha - 2.7 aa)
70
■
■ 0
F_
i
FUT. DEVELOPMENT (
I BLOCK 27
(a03 ha)
■
1
UMIT OF COMMERCM
- - — - - — - - FOCUS ADVISORY
RME1
T
FULL SCALE COPIES OF THE APPLICANTS
SUBM/7TED PLAN ARE AVAILABLE FOR KEWING AT
THE C17Y OF PICKERING PLANNING & DEVELOPMENT DEPARTMENT.
THIS MAP WAS PRODUCED BY THE CITY OF PICKERING
PLANNING & DEVELOPMENT DEPARTMENT,
INFORMATION & SUPPORT SERVICES,
FEB 1, 2012.
ATT&C" MI EW % TO
STAFF RECOMMENDED PLAN
KINDWIN (BROCK) DEVELOPMENT CORP.
SP- 2011 -04 & A 17/11
SUBMITTED APRIL 2013
too 1 "; R. OPEN SPACE
zs 2iO tao uI a6 S RE T .HIH Ita25 _ A °' Sq STREET B BLOCK ; 9
BLOCK 20
U Z .
v o � 2].0 2].0 � 2J0 3t.0 IJ
la: 11 S-rEfT f.NJe I o
=
J.5 J.5 J.5 .5 1S5 1J0 '
m� u STREET E
a �.o R4 o o
1-1-1-1-17.51T517.5 7-116 In In L L
E E I
nT NI BB 1 J.
-
ROAD WIDENING
BLOCK 23
TRC
S ET T.
Q
i
E
FUT. DEVELOPMENT
2
o
BLOCK 21
w
\
W
�
�
F
Y w cYS�
Q �
-1os -o rs °1120
n x
m(MIN) Single Detached / 8,7 m Semi - Detached
1 59.1
STREEfA o
[9.1
13 Units
R`o
° BLOCK 5
yo
R`o
1Q0 a
¢ 7.51765 ].5 ].5 J.5 J.5
BL C 1
,Jqt
SWM
too 1 "; R. OPEN SPACE
zs 2iO tao uI a6 S RE T .HIH Ita25 _ A °' Sq STREET B BLOCK ; 9
BLOCK 20
U Z .
v o � 2].0 2].0 � 2J0 3t.0 IJ
la: 11 S-rEfT f.NJe I o
=
J.5 J.5 J.5 .5 1S5 1J0 '
m� u STREET E
a �.o R4 o o
1-1-1-1-17.51T517.5 7-116 In In L L
E E I
nT NI BB 1 J.
-
TRC
S ET T.
Q
i
E
o
I
24.
s-
tao —I
o 6BL C 1 °
StREVT IT.q N
W
�
�
F
Y w cYS�
Q �
x
m�
W
n x
1 59.1
Y
F
u STREET D
-
261 27.0
°n N o
■
m
z
d
�
I
(�j
zoo
PARK
6
0 FUT.
DEVELOPMENTR
BLOCK 18
E
m
f+
C
4J
BLOCK 22
10.51 n. - ae ac.)
m
EASnNG
YOSWE
A 56n
0
—
54.5
J.0
STREET B
0 '1,'
'C5
92
P4
.2
_
BLOCK 6
N
o
STREETA
9.-( —) Single
e.7 S1,n- Detum<d
Oet,,h,d/
�.
10 Units
J
s
I I i
I
Z
L0
T z
O`
1
FULL SCALE COPIES OF THE APPLICANT'S
SUBM PL
ITTED AN ARE AVAILABLE FOR VIEWING AT
THE CITY OF PICKERING PLANNING & DEVELOPMENT DEPARTMENT.
THIS MAP WAS PRODUCED BY THE CITY OF PICKERING
PLANNING & DEVELOPMENT DEPARTMENT,
INFORMATION & SUPPORT SERVICES,
APRIL 17. 2013.