HomeMy WebLinkAboutCS 30-12 cis _ Report to
Executive Committee
PICKERING Report Number: CS 30-12
Date: July 3,2012
6 4
From: Everett Buntsma
Director, Community Services
Subject: Tender No. T-13-2012
- Tender for Roof Replacement at East Shore Community Centre
- File: A-1440
Recommendation:
1. That Report CS 30-12 of the Director, Community Services regarding the Roof
Replacement at East Shore Community Centre be received;
2. That Tender No. T-13-2012 submitted by Triumph Aluminum and Sheet Metal
Inc. in the amount of $154,737.68 (HST included) and a net cost of$139,346.07
(net of HST rebate) be accepted;
3. That the total gross project cost of$171,688 (HST included), including the tender
amount and other associated costs, and the total net project cost of$154,610
(net of HST rebate), be approved;
4. That Council authorize the Director, Corporate Services & Treasurer to finance
the project by transferring $154,610 from the Federal Gas Tax Reserve Fund;
and
5. That the appropriate City of Pickering officials be authorized to take necessary
action to give effect thereto.
Executive Summary: The Roof Replacement at East Shore Community Centre
was approved in the 2012 Capital Budget ($156,000).
The steel roof is past its life expectancy and is showing signs of deterioration and
corrosion. Persistent leaks are staining and affecting the integrity of the tectum decking.
Moisture is entering the roof system and building and causing damage to the insulation
and reducing its insulating properties. The replacement of the existing steel roof section
will eliminate leaking and increase energy efficiency and improve insulation.
The low bid submitted by Triumph Aluminum and Sheet Metal Inc. in the amount of
$154,737.68 (HST included) is recommended for approval. The total gross project cost
is estimated at $171,688 and the total net project cost is estimated at $154,610 (net of
HST rebate).
Report CS 30-12 July 3, 2012
Subject: Tender for Roof Replacement at
East Shore Community Centre Page 2
Financial Implications:
1. Tender Amount
Tender No. T-13-2012 $136,936.00
HST 13% 17,801.68
Sub-Total $154,737.68
HST Rebate — (11.24%) ($15,391.61)
Total $139,346.07
2. Approved Source of Funds
Senior Centre Capital Budget
Location Project Code Source of Budget Required
•
Funds
•
Roof 5701.1202.6181 Federal Gas Tax $156,000.00 $ 154,610.00
Replacement
— remaining flat
roof portion
(Phase 4) and
Roof Drains
— lower flat roof
Total Funds $156,000.00 $154,610.00
C0RP0227-07/01 revised
Report CS 30-12 July 3, 2012
Subject: Tender for Roof Replacement at
East Shore Community Centre Page 3
3. Estimated Project Costing Summary
Tender No. T-13-2012 for Roof Replacement $136,936.00
at East Shore Community Centre
Miscellaneous Costs $ 2,000.00
Construction Contingency $ 13,000.00
Total Project Costs $151,936.00
HST (13%) 19,752.00
Total Gross Project Cost $171,688.00
HST Rebate (11.24%) (17,078.00)
Total Net Project Cost $154,610.00
Project Cost under (over) approved funds by $1,390.00
Discussion: The roof replacement for the East Shore Community Centre
was split into segments, budgeted, and phased out over a three year period (20.10-
2012). The roof replacement at the East Shore Community Centre project approved in
the 2012 Capital Budget at $156,000 was intended to be the final phase of the entire
roof replacement project. The various segments of the roof replacement project are
being treated as one complete project with the Federal Gas Tax reporting requirement.
The existing west sloping metal roof over the Seniors Activity Centre at East Shore
Community Centre is experiencing deterioration and corrosion. Persistent leaks are
compromising the integrity of the tectum decking. The company will install a pre-
formed metal roofing system complete with clips, perimeter and penetration flashing,
and closures. The work will also include the installation of four roof drains. The
replacement of the existing steel roof will eliminate leaking, improve roof efficiency and
reduce energy costs in the building.
Bids have been received to the tendering call, which closed on Wednesday, May 9,
2012 for the Roof Replacement at East Shore Community Centre. A mandatory site
visit was held on Thursday, April 26, 2012 at 10:00 a.m. and 12 bidders attended of
which 4 bidders submitted a tender for this project.
The low bid was submitted by Triumph Aluminum and Sheet Metal Inc. This company's
references have been checked and are deemed acceptable.
The Health and Safety Policy, a current WSIB Workplace Injury Summary Report,
Clearance Certificate issued by Workplace Safety and Insurance Board (WSIB) as
submitted by Triumph Aluminum and Sheet Metal Inc. have been reviewed by the
CORP0227-07/01 revised
Report CS 30-12 July 3, 2012
% f!
Subject: Tender for Roof Replacement at
East Shore Community Centre Page 4
Coordinator, Health & Safety and deemed acceptable. In conjunction with staffs review
of the contractor's previous work experience, check of references and bonding available
on this project, the tender is deemed acceptable.
Upon careful examination of all tenders and relevant documents received, the
Community Services Department, Culture & Recreation Division recommends the
acceptance of the low bid submitted by Triumph Aluminum and Sheet Metal Inc. for
Tender No. T-13-2012 in the amount of$154,737.68 (HST included) and that the total
net project cost of$154,610 be approved.
Attachments:
1. Location Map
2. Supply & Services Memorandum dated May 11, 2012
• Prepared By: Approved / dorsed ':y:
Marisa e.rpino Everett nts
Manager, Culture & ecreation Director, Community Services
C)'
Vera A. Felg- acher Gillis Paterson, CMA
C.P.P., CPP•, CPPB, C.P.M., CMM III Director, Corporate Services & Treasurer
Manager, Supply & Services
Caryn Kong, CGA Stephen Reynerds
Senior Financial Analyst-Capital & Division Head, Culture & Recreation
Debt Management
SR:Ig
Recommended for the consideration
of Pickering City =uncil
/ /1/ I ?, ZCIZ
Tony Prevedel, P.Eng.
Chief Administrative Officer
CORP0227-07/01 revised
liACHNL-.\11 ;4_1 _IC)REPORT i' --.
-Of1
1
—1 1
1 0
< 1
. 0
cC ,
TATRA DRIVE
I I
Pr
>
UJ
SUBJECT
r E D
0
A 51 p i CO
w
17 >
(...)
0
, ce.
<
z
_ -
RADOM STREET li
_ 1
COMMUNITY SERVICES ATTACHMENT FOR COMMUNITY
DEPARTMENT
ENGINEERING DIVISION SERVICES REPORT CS 30-12
TENDER T-13-2012 ROOF REPLACEMENT
SCALE DATE
N.T.S May 23/2012 EAST SHORE COMMUNITY CENTRE liONNEINiel
2
P Cs �c7
��y
co
y � iZ
C . •
DICKERING Memo
To: Stephen Reynolds June 13, 2012
Division Head, Culture & Recreation REVISED
From: Vera A. Felgemacher
Manager, Supply & Services
Copy: Manager, Culture & Recreation
Supervisor, Facilities Operations
Subject: Tender No. T-13-2012
Tender for Roof Replacement at East Shore Community Centre
- File: F-5400-001 •
Tenders have been received for the above project. An advertisement was placed in the Daily
Commercial News and on the City's website inviting companies to download the tendering
documents for the above mentioned tender. A mandatory site visit was held on Thursday, April 26,
2012 and twelve (12) bidders attended of which four (4) bidders responded and submitted a tender
for this project.
•
A copy of the Record of Tenders Opened and Checked used at the public tender opening is
attached. Tenders shall be irrevocable for 60 days after the official closing date and time.
Purchasing Procedure No. PUR 010-001, Item 13.03 (r) provides checking tendered unit
prices and extensions unit prices shall govern and extensions will be corrected accordingly,
which has been done.
Copies of the tenders are attached for your review along with the summary of costs.
SUMMARY
HST Included
Bidder . Total Tendered Amount After Calculation Check
Triumph Aluminum and Sheet Metal $154,737.68 $154,737.68 •
Inc. •
Crawford Roofing Corp. $163,850.00 $163,850.00
Rus Can General Contracting Inc. $228,260.00 $228,260.00
Automatic rejection —Surety's Corporate Seal is
• missing from Agreement to Bond submitted with the
A and M Construction and Design Ltd. tender. Reference: Purchasing Policy No. PUR 010,
Procedure 23.02, Item 10(a); Information to Bidders —
Item 9, 12, 25, 27, 28, and Tendering Specifications,
Item 7.
•
2- cyt-
Pursuant to Information to Bidders Item 29, the following will be requested of the low bidder for
your review during the evaluation stage of this tender call. Please advise when you wish us to 7 0
proceed with this task.
(a) a copy of the Health & Safety Policy to be used on this project;
(b) a copy of the current Workplace Injury Summary Report issued by Workplace Safety
& Insurance Board (in lieu of the Workplace Injury Summary Report document, a
copy of the current CAD 7, NEER, or MAP reports may be submitted);
(c) a copy of the current Certificate of Clearance issued by Workplace Safety &
Insurance Board;
(d) the City's certificate of insurance shall be completed by the bidder's agent,
broker or insurer;
(e) list of Sub-Contractors in accordance with General Conditions Item 31;
(f) Waste Management Plan to be used on this project in accordance with Tendering
Specifications Item 19.
Please include the following items in your Report to Council:
(a) if items (a) through (c) noted above, are acceptable to the Co-ordinator, Health &
Safety;
(b) if item (d) — Insurance.— is acceptable to the Manager, Finance & Taxation;
(c) any past work experience with the low bidder Triumph Aluminum and Sheet Metal Inc.
including work location;
(d) without past work experience, if reference information is acceptable;
(e) the appropriate account number(s)to which this work is to be charged;
(f) the budget amount(s) assigned thereto;
(g) Treasurer's confirmation of funding;
(h) related departmental approvals; and
(i) related comments specific to the project.
Please do nof disclose any information to enquiries except you can direct them to the City's
website for the unofficial bid results as read out at the public tender opening: Bidders will be
advised of the outcome in due course.
If u require further information, please feel free to contact me or a member of Supply &
Se ices.
•
VAF/fig
Attachments
• June 13, 2012
Tender No. T-13-2012 Page 2
Tender for Roof Replacement at East Shore
Community Centre
�.� ,A irA . hi'ic.1- e J-_.� _ 1 „, ,, .y-giii� 1-;-_,._�� t� (Z
t — 3 r- D (D p -.
3
0
m -ti a '- P m 07
c m c n> 3
7 3 n o m
co E- co O °.
0
3
v co
' a o
0 c
-. InNi -c CD -H
ti) m Z Ps
liii _a
mt ca I N
fA 3 > N
d p'
I
N 7 '" O '
N1• CD CD C m CI) Cd n N O CL
`� �'' o m m
b yea m o
m S O
m o a �- ` �j
cp
O d s p my p :, O
CD \� o 0 o W va o -n
Q XYC.0 CD
-a y
co \ k" 17
3 mm
0' m C ' m
O m :),3- > 0
o c�+ kA k cfl o c Z
o v. ti N N _ _
U \4 m o H z- m
(V D °1 00 iii T.
o
m 1\i‘,), ".' CI." 3 a m
o v c 0 0
o
ca G O .• P. 3
3
cn >
o
V
o -
z _
a - to c --I x m
3 1:.
cn
w
_ _ Q 0 ,
3 _ W a 3
Q b c
r
y 1� 0
Le M
M
Z m
v �•t z
v cn C
co
t
T