Call oo REPORT TO
COUNCIL
r
Avg
I CKERIN Report Number: OES 47-09
276 Date: September 21, 2009
From: Everett Buntsma
Director, Operations & Emergency Services
Subject: Tender T-19-2009
- Toy Avenue Road Reconstruction and Toy Avenue Bayly Street
- Intersection Improvements
- File: A-1440
Recommendations:
1. That Report OES 47 09 regarding the Toy Avenue Road Reconstruction and
Storm Sewer Works, Region Road, Watermain and Traffic Signal Underground
Construction be received;
2. That Tender T-19-2009 submitted by Ron Robinson Limited for the Toy Avenue
Road Reconstruction and Storm Sewer Works, Region Road, Watermain and
Traffic Signal Underground Construction at a cost of $1,507,841.88 (GST
included) and a net cost of $1,436,039.88 be accepted;
3. That the total gross project cost of $1,683,528 (GST included) including the
tender amount, the Region of Durham's portion and other associated costs and
the total net project cost of $1,603,360 be approved;
4. That Council authorize the Director, Corporate Services & Treasurer to finance
the project as follows:
a) that the sum of $700,000 be funded by the Building Canada Fund Communities
Component (BCF - CC) - Intake 2 Grant with breakdown as follows;
i) $350,000 from the Federal Government
ii) $350,000 from the Provincial Government
b) that the sum of $175,000 be funded from the Federal Gas Tax Reserve Fund;
c) that the sum of $175,000 be funded from the Move Ontario Reserve;
d) that the sum of $508,770 be funded by the Regional Municipality of Durham;
Report OES 47-09 September 21, 2009
Subject: Tender T-19-2009 277
Toy Avenue Road Reconstruction and Toy Avenue Bayly Street
Intersection Improvements Page 2
e) that the additional sum of $44,590 be funded equally from the Federal Gas Tax
Reserve Fund ($22,295) and Move Ontario Reserve ($22,295);
f) the Treasurer is authorized to take any actions necessary in order to effect the
foregoing; and
5. That the appropriate City of Pickering officials be authorized to take necessary
action to give effect thereto..
Executive Summary: As part of the 2009 Roads Capital Budget, Toy Avenue,
Road Reconstruction and Storm Sewer Works was approved as a construction project.
Tender T-19-2009 was issued on Friday, August 21, 2009 and closed on Wednesday,
September 9, 2009 with three (3) bidders responding. This project also includes
Region Road, Watermain and Traffic Signal Underground Construction. The total gross
project cost is estimated to be $1,683,528 and an estimated total net project cost
$1,603,360 (net of GST rebate). The portion related to the Region to be recovered
from the Region of Durham in the amount of $508,770 reduces the City's share to
$1,094,590 (net of GST rebate).
The City's purchasing policy requires staff to report to Council on results of the tender
and financing in order to proceed with this project in a timely manner.
Financial Implications:
1.
TENDER AMOUNT
T-19-2009 $1,436,039.88
GST 71,802.00
Sub-Total 1,507,841.88
GST Rebate (71,802.00)
Total $1,436,039.88
2.
APPROVED SOURCE OF FUNDS
Roads Capital Budget
Location Project Code Source of Funds Budge t Required
Toy Ave. 5320.0910.1610 Federal Grants 350,000 350,000
Toy Ave. 5320.0910.1623 Prov. Grants 350,000 350,000
Toy Ave. 5320.0910.7505 Fed. Gas Tax 175,000 175,000
5320.0910.7043 Move Ont Reserve 175,000 175,000
FUNDS AVAILABLE 1,050,000 1,050,000
Report OES 47-09 September 21, 2009
Subject: Tender T-19-2009
2/8 8 Toy Avenue Road Reconstruction and Toy Avenue Bayly Street
Intersection Improvements Page 3
3.
ESTIMATED PROJECT COSTING SUMMARY
T-19-2009- Tender for Toy Avenue Reconstruction and
Storm Sewer Works, Region Road,
Watermain & Traffic Signal Underground Constructions
City of Pickering Portion 5320.0910.6250
Section 1, City Excavation, Removals, Storm Sewer and
Road Building $850,253
Section 2, Storm Water Treatment Unit 77,017
Sub Total City of Pickering Portion $927,270
Region of Durham Portion 3290.0001.0000
Section 3, Road, Watermain and Traffic Signals 508,770
Total T-19-2009R $1,436,040
GST 71,802
Total Gross Tender Cost 1,507,842
Associated Costs
Materials Testing 25,000
Utility Relocations 20,000
Consultant Fees 21,700
Miscellaneous Costs 5,620
Construction Contingency 95,000
Sub Total - Associated Costs $167,320
GST - Associated Costs 8,366
Total Gross Associated Costs $175,686
Total Gross Project Cost $1,683,528
GST Rebate (80,168)
Total Net Project Costs $1,603,360
Less Region of Durham Portion 508,770
Total Net City Portion Costs 1,094,590
Net Project Costs (over) under Approved Funds (44,590)
Report OES 47-09 September 21, 2009
Subject: Tender T-19-2009 279
Toy Avenue Road Reconstruction and Toy Avenue Bayly Street
Intersection Improvements Page 4
The increase in costs in the amount of $44,590 will be absorbed by the City as it is the
City's share of the costs that have increased. As the contribution from the BCF-CC
Intake 2 Grant is fixed, the additional costs will be funded equally. by the Federal Gas
Tax Reserve Fund ($22,29) and Move Ontario Reserve ($22,295) based on the same
funding formula on City's share for this.project as was provided for in the 2009 Capital
Budget.
The Director, Corporate Services & Treasurer has reviewed the budgetary implications
and the financing of the expenditures contained in this report and concurs.
Sustainability Implications: This project will allow for the urbanization of the
roadway improving the geometrics and vehicular flow in this area. It will also provide for
the necessary platform width required to construct concrete sidewalks for the safe and
efficient passage for pedestrians in the area. The new road works will reduce
maintenance costs for the next several years.
Background: In April of this year Municipal Property & Engineering applied to
Intake Two of BCF-CC in which municipalities submitted 420 project applications and
183 projects were approved. The City's application was successful in obtaining
$700,000 of funding towards this project. This additional funding will allow the project
to move forward without having to resort to debt financing. As part of the Roads Capital
2009 Budget, Toy Avenue, Road Reconstruction and Storm Sewer Works was
identified as a construction project. Tender T-19-2009 was issued on Friday, August
21, 2009 and closed on Wednesday, September 9, 2009 with three (3) bidders
responding. The total gross project cost is estimated to be $1,683,528 for an estimated
net cost to the City of $1,094,590 (net of GST rebate). Ron Robinson Limited has
previously worked for the City on Tender T-04-2000, The Realignment of Pickering
Parkway, a reference check has been completed and is deemed acceptable by the
Supervisor, Engineering & Capital Works. The Health & Safety Policy, Confined Space
Awareness Training and list of employees trained, current WSIB Council Amendment to
Draft #7 (CAD-7), Certificate of Clearance issued by Workplace Safety & Insurance
Board and Certificate of Insurance as submitted by Ron Robinson Limited have been
reviewed by the (Acting) Coordinator, Health & Safety and deemed acceptable. In
conjunction with staffs review of the contractor's previous work experience check of
references submitted and the bonding available on this project, the tender is deemed
acceptable.
Upon careful examination of all tenders and relevant documents received, the
Operations & Emergency Services Department, Municipal Property & Engineering
Division recommends the acceptance of the low bid submitted by Ron Robinson
Report OES 47-09 September 21, 2009
Subject: Tender T-19-2009
2 8 0Toy Avenue Road Reconstruction and Toy Avenue.Bayly Street
Intersection Improvements Page 5
Limited for Tender T-19 -2009 in the amount of $1,507,841.88 (GST included) and that
the total net project cost of $1,603,360 be approved.
This report has been prepared in conjunction with the Manager, Supply & Services who
concurs with the foregoing.
Attachments:
1. Location Map
2. Supply & Services Memorandum dated September 10, 2009
Prepared By: Approved / Endorsed By:
I ~
Darrell B. Selsky, Everett Buntsma
Supe isor, Engineering & 4/pital Works Director, Operations & Emergency Services
Vera A. F O emacher Gillis A. Paterson
C.P.P., CPPO, CPPB, C.P.M., CMM III Director, Corporate Services & Treasurer
Manager, Supply & Services
0
Ri and W. H orn, P. Eng.
Division Head
Municipal Property & Engineering
DS:nw
Attachments '
Report OES 47-09 September 21, 2009
Subject: Tender T-19-2009 281
Toy Avenue Road Reconstruction and Toy Avenue Bayly Street
Intersection Improvements Page 6
Copy: Chief Administrative Officer
(Acting) Chief Administrative Officer
Recommended for the consideration of
Pickerin City Council
Thomas J. uinn DMR., MM III
Chief Administrative Officer
I
i
i
L
ATTACHMENT# 1 TO REPORT# QE5
-pig.
282 MUNICIPAL PROPERTY & ENGINEERING
Attachment for Tender T-19-2009
TOY AVENUE AND TOY-BAYLY INTERSECTION
40~
N`GNW A 0 o
Q
0
oP~ 0 a a
Q Z 3 w
~1 a ~ m
PLUMMER QUARTZ
SUBJECT
m
STREET Y AREA STREET
U } 7,
Y
0 °
m BAYLY STREET
LOCATION MAP
PROPOSED CONSTRUCTION INCLUDES:
City of Pickering Portion
Complete Urbanization of Toy Avenue which includes;
• Installation of shallow storm sewer system for road and boulevard
drainage only, complete with an Oil-Grit Separator
• Installation of a new and wider road, complete with concrete curb and
gutter, new granular base (heavy duty) and base asphalt
• Installation of concrete sidewalk (west side)
Region of Durham Portion
Proposed Intersection Reconstruction (at Bayly Street and Toy Avenue);
• Installation of a wider road intersection, complete with concrete curb and
gutter, new granular base (heavy duty) and base asphalt
• Reconstruction of the raised centre medians
Installation of storm sewer basins for road drainage
• Installation of additional water services
Proposed Installation of traffic signal related bases, conduit, and other related
infrastructure
Page 1 of 2
ATTACHMENT#pl_;_ TOREPORT# CStS ~7-0/
L*tq 00 of 2 e
283
Proposed installation of a traffic control signal (following reconstruction - under
separate contract)
• Road line painting and intersection. marking
Replacement and extension of Regional Infrastructure (on Toy Avenue) which
includes;
• Replacement of the existing 200mm watermain (on the east side of the
road) with a new 300mm watermain including hydrants and domestic
services to property line
Complete boulevard restoration to all areas affected by construction (fine grading and
sodding where required)
i
Page 2 of 2
ATTACHMENT #Z-.- TOREPORT# bCs
of
ICI .
I I
PICKERING M E MO
284
To: Richard Holborn September 10, 2009
Division Head, Municipal Property & Engineering
From: Vera A. Felgemacher
Manager, Supply & Services
Subject: Tender No. T-19-2009
Tender for Tender for Toy Avenue Reconstruction and Toy Avenue - Bayly Street
Intersection Improvements
Closing Date: September 9, 2009, before 2:00pm (local time)
Tenders have been received for the above project. Thirteen (13) companies were invited to
participate. An advertisement was placed in the Daily Commercial News and on the City's
Website. Eight (8) bidders picked up tendering packages. A mandatory site visit was held on
Tuesday, August 11, 2009 and ten (ten) bidders attended of which three (3) bidders
submitted a tender for this project.
A copy of the Record of Tenders Opened and Checked used at the public tender opening is
attached. Tenders shall be irrevocable for 60 days after the official closing date and time.
Purchasing Procedure No. PUR 010-001, Item 10.03 (r) provides checking tendered unit
prices and extensions; unit prices shall govern and extensions will be corrected accordingly,
which has been done.
All deposits other than the low three.bidders may be returned to the applicable bidders as
provided for by Purchasing Procedure No. PUR 010-001, Item 10.03(w). The three (3) sole.
bids have been retained for review at this time - copies attached.
SUMMARY
PST & GST included
Bidder Total Tendered Amount $ After Calculation Check $
RON ROBINSON LIMITED 1,507,838.33 1,507,841.88
MIWEL CONSTRUCTION LTD 1,675,949.17 1,675,949.17
ELIRPA CONSTRUCTION & 1,759,630.09 1,759,630.09
MATERIALS LTD
BRY RON CONTRACTING UNABLE TO BID
I
ATTALHME~lT#? TOREPORT# G 4?-
a` o{
Pursuant to Information to Bidders Item 20, the following will be requested of the low bidder for
your review during the evaluation stage of this tender call. Please advise when you wish us to
proceed with this task. 285
a) Proof of compliance with amended Confined Space Entry Regulations (September 30,
2006). Copies of certified Training and Procedures to be used on this, project;
b) a list of employees trained in the confined space entry procedure who will be working
on this project;
c) a copy of the Health & Safety Policy to be used on this project; inclusive of the roles
and responsibilities of all persons involved in the project, or sign off on the City of
Pickering's Heath'and Safety Regulations;
d) a copy of the current Workplace Injury Summary Report issued by Workplace Safety &
Insurance Board (in lieu of the Workplace Injury Summary. Report document, a copy of
the current CAD 7, NEER, or MAP reports may be submitted);
e) a copy of the current Certificate of Clearance issued by Workplace Safety & Insurance
Board;
f) a certificate of insurance completed by the bidder's agent, broker or insurer (City form
is attached); ,
In addition, a. request to acknowledge by signature the City's Accessibility Regulations for
Contracted Services and Accessibility Training Policy (if available) and to provide their Waste
Management Plan for evaluation.
Include the following items in your Report to Council:
(a) if items (a) through (f) noted above, are acceptable to the Co-ordinator, Health & Safety
(b) any past work experience Ron Robinson Limited, including work location;
(c) without past work experience, if reference information is acceptable;
(d) the appropriate account number(s) to which this work is to be charged;
(e) the budget amount(s) assigned thereto;
(f) Treasurer's confirmation of funding;
(g) related departmental approvals;
(h) any reason(s) why the low bid of Ron Robinson Limited is not acceptable; and
(i) related comments specific to the project.
Please do not. disclose any information to enquiries except you can direct them to the City's
website for the unofficial bid results as read out at the Public tender opening. Bidders will be
advised of the outcome in due course.
If~you require further information, please feel free to contact me or a member of Supply &
S rvices.
F,
Attachments
September 10, 2009
Tender No. T-19-2009 Page 2
Tender for Toy Avenue Reconstruction
and Toy Avenue - Bayly Street Intersection
Improvements