e``y REPORT TO
' EXECUTIVE COMMITTEE
Report Number: OES 40-09
Date: July 6, 2009
1 286
From: Everett Buntsma
Director, Operations & Emergency Services
Subject: Southeast Collector Trunk Sewer
- Haul Roads
- File: A-1440
Recommendation:
1. That Report OES 40-09 of the Director, Operations & Emergency Services
regarding the Southeast Collector Trunk Sewer associated haul routes be
.received;
2. That the City of Pickering approves of the use of Scarborough-Pickering
Townline Road, Rosebank Road, Fairport Road, Dixie Road and Third
Concession Road as described in and subject to the conditions outlined in Report
OES 40-09 as haul routes for the construction of the Southeast Collector Trunk
Sewer; and
3. That a copy of Report OES 40-09 be sent to the Region of York and the Region
of Durham.
Executive Summary: Through the process of determining a preferred route for the
new southeast collector trunk sewer, the Region of York has hired a consultant to
assess the conditions of existing surrounding roads to determine proposed haul routes.
Haul routes are to be utilized during the construction of the southeast collector trunk
sewer to provide access to and from the construction activity sites (shafts), to transport
equipment and materials, and to remove surplus excavated material from the tunneling
activities.
Haul routes have been proposed by York's consultant and consist of the following roads
in the City of Pickering
Scarborough-Pickering Townline Road (north of Third Concession Road)
Rosebank Road (north of the hydro corridor)
Fairport Road (north of the hydro corridor)
Dixie Road (north of the hydro corridor)
Third Concession Road (Whites Road to Dixie Road, and in Cherrywood)
Report IDES 40-09 July 6 12009
Subject: Southeast Collector Trunk Sewer
2 8 7 Haul Roads
Page 2
Brock Road (from Hwy 401 to Hwy 407)
Taunton Road (from Brock Road to York Durham Townline Road)
Finch Avenue (from Valley Farm Road to Brock Road)
York-Durham Townline Road (from Taunton Road to Hwy 407)
The Region, through the consultant's report, is recommending approximately
$1,639,000 in upgrades to the haul routes that are under the jurisdiction of the City of
Pickering in order to bring them up to a standard to withstand the projected loads during
construction of the new southeast collector trunk sewer.
Staff is recommending that Council approve the use of the proposed haul routes subject
to the conditions as set out in this report.
Financial Implications: Approval of the haul; routes and the completion of the
proposed upgrades by the Region of York will have a financial benefit to the City in that
approximately $1,639,000 of future rehabilitation/reconstruction needs will be
addressed.
Sustainability Implications: The improvements to the surface of the haul roads will
result in a better and safer driving surface, thus reducing maintenance costs and
reducing liability and meets the economic and social lenses of sustainability. The
rehabilitation methods proposed are designed to reuse existing road materials and
therefore meets the environmental lens of sustaiinability.
Background: The Regions of York and Durham have submitted the Individual
Environmental Assessment to the Ministry of the Environment for the proposed
Southeast Collector (SEC) sanitary trunk sewer, part of the York Durham Sewer System
(YDSS), on November 28, 2008.
The proposed route of the new SEC trunk sewer is along 14th Avenue, Townline Road,
the hydro corridor, Liverpool Road, and Finch Avenue to Valley Farm Road. During
construction of the new SEC, there will be a requirement for Regional and City roads to
be used as haul routes to provide access to and from the various construction
compounds. These compounds are required where maintenance shafts and
construction shafts are located.
Haul routes will be designated roads used to supply material, such as equipment and
tunnel segment liners to the compounds, as well as remove surplus excavated material
during the construction of shafts and the sewer tunnel. Haul routes must be able to
handle heavy equipment and loads during all mgnths of the year, including when load
restrictions are imposed during March and April.' It is anticipated that the haul routes will
CORP0227-07/01 revised
Report OES 40-09
July 6, 12009
Subject: Southeast Collector Trunk Sewer
Haul Roads
Page 3 288
be required for a period of three years (2010-2012) as the new SEC is being
constructed.
The process of determining haul routes by the proponents commenced early during the
evaluation of the short listed five sewer routes back in November 2006. City staff
conducted a preliminary review of haul routes but did not provide detailed comments on
all five sewer routes and decided to wait until a preferred sewer route was chosen.
Once the preferred route was selected for the new SEC, further discussions took place
regarding the proposed haul routes for the preferred sewer route. Over a period of
approximately one year (November 2006 to November 2007), certain City and Regional
roads were added and deleted to the proposed!haul routes, including connection points
to Hwy 401 and Hwy 407, as the preliminary design of the trunk sewer was being
refined.
The proponents initiated a haul route condition survey and assessment using the
consulting firm of Conestoga-Rovers & Associates (CRA). A preliminary meeting was
held October 17, 2007 with affected municipalities and the consultants to discuss the
survey and assessment process. The work plan was to conduct a visual survey in the
fall of 2007 and physical assessments in spring; 2008, with a report to follow. A draft
report was prepared in September 2008. A copy was not sent to the City until January
2009 upon request. A set of draft haul route upgrade drawings was received in
December 2008 for review and comment.
In Report OES 05-09 dated January 12, 2009 regarding comments of the Final EA
Report, November 2008, staff indicated that sufficient information had not been received
in order to accept the EA Report's recommendajtion on the use of haul routes. Council
approved the recommendation that endorsemeh, t of the preferred alternative is subject
to receiving more information on the haul roads ',under the jurisdiction of the City of
Pickering and approval of those haul roads by the City of Pickering.
City staff received the final report on the Haul Route Condition Assessment dated April
2009 on May 20, 2009 and commenced a detailed review in conjunction with the 70%
design haul routes drawings.
Haul Route Condition Assessment:
The haul route condition assessment report pre~ared by CRA was completed for the
following purposes:
• evaluate the existing condition of the proposed haul routes
• document the locations with major deficiencies
• assess the capability of each section of the haul routes to sustain the existing
and future projected vehicle loadings
CORP0227-07/01 revised
j
Report OES 40-09 July 6, 12009
Subject: Southeast Collector Trunk Sewer
2 $ 9 Haul Roads
. Page 4
• evaluate the capability of each section of the haul routes to carry additional truck
loading during the construction period
• provide maintenance/rehabilitation recommendations to improve the road
conditions, and
• provide design recommendations to increase the capability of the haul routes to
carry projected construction and design loads
The report recommends the following roads to be used as haul routes:
Provincial Roads H 401, H 407 and H 7
York Region Roads York-Durham Townlinee Road, 14 Avenue
Durham Region Taunton Road, Brock !Road, Whites Road, Altona Road, Finch
Roads Avenue
Markham Roads 9 Line, Box Grove B -Pass
Pickering Roads Scarborough-Pickering Townline Road, Rosebank Road, Fairport
Road, Dixie Road, Third Concession Road
The pattern of the haul routes is illustrated in the attached figure (Attachment #1).
It is recommended in the haul route condition assessment report that prior to
commencement of the sewer tunnel construction, certain roads be upgraded to provide
suitable strength to meet the loading requirements. Also, when construction is
completed, the roads will be re-assessed as they are to be left in or re-instated to an
acceptable condition to allow for general use by the public. It is important to note that
the required upgrades to the haul routes before'and after construction of the tunnel are
a requirement for mitigation and are not considered enhancements related to the
proposed enhancement plan.
Haul Route Upgrades
All of the recommended haul roads under the jurisdiction of the City of Pickering require
upgrades prior to being used as part of the haul route system. The following upgrades
have been recommended in the report by CRA:
Road Limits Upgrades
Scarborough-Pickering Third Concession Road to Pulverize, remix, add 25mm
Townline Road Taunton Road Granular A, repave base and
to as halt
Rosebank Road SEC to south of Third Pulverize, remix, add 25mm
Concession Road Granular A, surface treatment
Rosebank Road North of Third Concession Remove and replace 50mm
Road to Taunton Road Granular A, surface treatment
Rosebank Road South of Third Concession Cold plane 40mm asphalt and
Road to north of Thi replace
CORP0227-07/01 revised
i
Report OES 40-09 July 6, 2009
Subject: Southeast Collector Trunk Sewer 290
Haul Roads
Page 5
Road Lim #s Upgrades
Concession Road (Hamlet of
Cher ood
Third Concession Road Between Rosebankl Road and Cold plane 40mm asphalt and
Rosebank Road (Hamlet of replace
Cher ood
Fairport Road SEC to Third Concession Full reconstruction (granular
Road and asphalt)
Dixie Road SEC to Gossamer Drive Remove 90mm asphalt and
replace
Dixie Road Gossamer Drive to third Pulverize, remix, add 25mm
Concession Road Granular A, repave base and
to as halt
Third Concession Road Whites Road to Fairport Road Pulverize, remix, add 25mm
Granular A, repave base and
to as halt
Third Concession Road Fairport Road to Dixie Road Pulverize; remix, add 25mm
Granular A, repave base and
to asphalt
The Region's consultant has estimated that the;value of the proposed upgrades is
approximately $1,639,000, including a 10% contingency. City staff do not concur with
the recommendation for the upgrade to Rosebank Road in the context of allowing full
load vehicles during load restrictions (March and April annually).
The Region of York is requesting approval for the use of the above noted City roads as
haul routes. In order to start construction of the new SEC in 2010 (subject to approval
of the Individual Environmental Assessment) haul route upgrades must commence in
summer 2009 and York Region is committed to undertaking the upgrades prior to EA
approval. A tender package has been prepared and is scheduled to be out for bidding
in July 2009 with an award in August 2009. HaWl Route construction will be complete in
spring 2010.
Conditions of Haul Route Approval
City staff recommend approval of the aforementloned roads to be used as haul routes
for the construction of the new SEC with the following conditions:
1. The Region's contractor apply for Road Qccupancy Permits prior to
commencement of construction of the upgrades.
2. The Region be responsible for all costs associated with the upgrades regardless
of whether the IEA for the new SEC sewer is approved or not.
CORP0227-07/01 revised
i
i
Report OES 40-09. July 6, 2009
Subject: Southeast Collector Trunk Sewer
291 Haul Roads
Page 6
3. The Region guarantee workmanship of the upgrades for a period of two years
following completion of all works and reqtification of any deficiencies.
4. The works include the removal and replacement of all entrance culverts and
cross road culverts deemed deficient in the opinion of City of Pickering staff.
5. That all haul routes be upgraded to a full load standards such that reduced loads
do not have to be imposed during the period that such restrictions are normally
imposed (March and April annually).
6. The Region acknowledge that the recommended upgrades to Rosebank Road
(surface treatment) do not constitute the standards for full load road and that load
restrictions will be imposed on Rosebank Road during the period that such
restrictions are normally imposed (March and April annually) or alternatively the
Region substitute the surface treatment with base and top asphalt.
7. That approval of the upgrades to and the use of the haul routes, prior to the
acceptance of the proposed enhancement plan, does not negate the possibility of
incorporating enhancements into these roads as a component of the
enhancement plan.
8. The Region provide full-time inspection services during the construction of the
upgrades as well as regular monitoring and compliance control during
construction of the New SEC for speed adherence and designated haul route
adherence.
9. Should the location of the approved site to receive the surplus excavated
material require additional City of Pickering roads to be used as haul roads, a
similar condition assessment and approval process be followed for the additional
haul routes.
Attachments:
1. SEC alignment and associated haul routes diagram
Prepared By: Approved/Endo Y:
Ric rd W. Holb rn, P. Eng. ~ireett sm
Difision Head Director, Operations & Emergency Services
Municipal Property & Engineering
CORP0227-07/01 revised
Report DES 40-09 July 6,12009
Subject: Southeast Collector Trunk Sewer 9 2
Haul Roads
Page 7
RH:ds
Copy: Chief Administrative Officer
(Acting) Chief Administrative Officer
Recommended for the consideration
of Pickering City Council
v
Tho s Quinn, R R, c III
Chief Administrative fficer
i
CORP0227-07/01 revised
i
IN v W~W7'
- - / J 'I
% r~ ? III _
J-`Ji J~--r___~
I F__
- r_•j-i I IH 't ' f L I
I, 4--J E
_ - _I
r~l ~f al r I p •'l~ ~ I ~,,`.~~ii,,, r _ I I YZ f _-1'~ ~ -
-l: i _L~ { - I y (r_ __J } '''t ~ % ~ I T- _----'I I ~C'~r•- i-1 I i_-- r1 ,
- ~ - ✓`'-1 / ~ •l-:,~_~I, 71x11 I lrl~f ~L=tC?l, ~1y'-,,., fr ~-1 iZ'-ter 4--I_~~-,.-`_.I-1_~_ -_-_~i I ~ r--•-
~ ' III , ' ti\ t!? I r-~ I I ' - L_- ~ , ~ r-.. `i ~J r ; ~J1 ~'~"L--t ~ I i
I i
I~ rL--i
- I I } -
! E / h +I IIll~~[ I~ _
~r ~ T-T~,~~•~~~~~t / ~J1J ~ f`-' 'y.,,. ~ ` I ~ ~ r. ~ ~ I 1 ~I• ~-fJ-rLl I Y.'j ~ / .
I,,y "j,
.r---I• . ';`J 1)• 1I-~ -1'.I~ = i:. ~ I ~ L.U - I- J_~ ( rlTl ~'I '
_L--- . i- i'IJ ~r L~ i ~i•r; \ U'~,,-„~-'F91'--lr f-(j u y 7/ ' . ` _ f f T~T"I 'y~l i IJ I --J I I I ,I I I~J j , f L=':-r
t`
r --II
~J I I ' LJ If :~,'"~I ~7yfi i)/ Tf:~ _ BTH LINE i f ~1 _I % -fl , I _ n• /
M LH_I
I IF
iC - i-/ I LI `Il jj n r \ 4 ,,ti rr~s - \pr rl~ .o i.• F ~I 17 J I'• ~~e " 1t ^ {
T t~7ll 41ll-1T~;~ i(/' i tJl -
•I -11 J - ° - 5 F _ ~IH9YPeygS_r
I
-ssS.G. O 9 J_ -
r-j =h- _ ,6 '~I kEESOwY' / L
- - =I-;- Ifil-- _ -
I REESORq iO
I _ _ - - ~I r~ Sts
O
J D i 1
_ Q ilp x
L ' - - .-M1 :~yRTI ^ 6 BEpRE ROM Ip '11A~ 'Si _ O C C -
17
I~ ,
1 tTHCONCEe9)CWR
m 9III
- ti
hG S OROUGHBCKER O OW U1jF~ NARp1MVPICI~WNG TOWNLWE YORIWURHPM LINE
Fix-
_ z 33 I' I I
L." 77
I s II,~ ~
1 $ =
_I fl r I 1 -J _.I
"ALTONA ROAD
",IALTONAROAO
_.I I';+I I
~I '1 ,.._f_ ' I rr v 'I•l,- 1 D I I / I ` l _ 4 / - NORTN ROM ' I~~ -
77
' ~..I_ % ~j~~. I `-~I•--ti'~"-iY- U Iys.R~EBANNROM,`~ -`r '--I til4 - _ -I
- I f - . ~ ~I •I ~ i
L J -'~yl I~ - 1„ ~I,`, t ~111~ - M it _ I I
a S
- l~ WHfiE9
IF
1 I i X11 J I1 1 I- _ -
T 7-
r
f I I
aRrGR~1kGAOl } slGeuNEm z I-- - -
--,-f 1 I I / h
i ~ nf= 1' t~ I ~ t ~ - I \ _J ) g• - r f sIGEUNE ie -i _
, x ~,~L fir! r1, SCI-I y`,~~_ I U I~ GaleT+o`AG V .,1, a ~ Z p -i'•.-- I
I(VID
I J ' i. 7'r-III & l r- _ -n _I A 1 1 _ ~I i~ a y' ~I - i IT SIOpJJ E 19
05
ROAD
I J• \ lg :Y; v t, .\@ -`1~' rJ J J j r~
T I ~I .'I ~ ti~~f , L. ✓ I J f \ I°~ I ~ l' t.• ,'C'-- ~y v` - - ~ ._-~V
I Iry I- Iy~..°e~` V/ALL~FARN ROEO+ `'~,n„ , y , J~
{ FFF-- .J W
± i r r ✓ NULBERRV LNIE~
~ 'll t- A U
II - _r API yt - _ _ BR=ROAO
- r. - _ - _
BROCKROAO
- -.-~-I- I it
1-7
I I I I I LI I I I I LP if I' -~I-^-'I. -
--I-' r I
I __j
> IM a i[f
~I
-I`~_ f~ n_,-j LI ~,~J - ---i--r-f - =-I -
r _rr
~ `t`I~}•i I~I T7 i~] ~ ~I.,!IF'I- r~i~',~U ~ln' 'I If I
I I f- ~ ~C I l,y
f-~-J
Frr
711
o
IT
a A m
m
e n i0 m T
s' a ° D D Tn
Z r- C a0 00
n m Q
m cn pg n~
1~-i
- In
a q ym TC III,
.my 3 Z O N Q O 3 n A •
p i z may, m9 '
cn O o 0 r = :Ll o yay
V P: m O D Z r D T~ < ;J':
R c m Cn G p o
100 0 0 m j ;o M
E
00 m G)
A
' DD GQ n o a o r
o c U) Z Z Z Z y z
S D = m A o g ; o
to U)
y c ccn co
0Z
.S IV z H (n
W
W