Loading...
HomeMy WebLinkAboutOES 16-09 City REPORT TO COUNCIL Report Number: OES 16-09 165 Date: May 19, 2009 From: Everett Buntsma Director, Operations & Emergency Services Subject: Tender No.T-6-2009 -Tender for Waterfront Trail - Western Gateway Project -File: A-1440 Recommendation: 1. That Report OES 16-09 of the Director, Operations & Emergency Services regarding the Waterfront Trail - Western Gateway Project be received; 2. That Tender T-6-2009 submitted by Pacific Paving for the Waterfront Trail- Western Gateway Project in the amount of $836,653.12 (GST included) be accepted; 3. That the total gross project cost of $1,061,550 (GST included) including the tender amount and other associated costs and the total net project cost of $1,011,000, which includes prior years design cost of $86,000, be approved; 4. That Council authorize the Director, Corporate Services & Treasurer to finance the project as follows: a) the sum of up to $500,000 by a contribution from the Waterfront Toronto; b) the sum of $85,000 to be funded from property taxes; c) the sum of $340,000 to be funded from a transfer from the Federal Gas Tax Reserve Fund; d) any unfunded balance be financed from current funds; 5. That Council authorize the Director, Corporate Services & Treasurer to take any actions necessary in order to effect the foregoing; and 6. That the appropriate City of Pickering officials be authorized to take necessary action to give effect hereto. Executive Summary: As part of the 2009 Parks Capital Budget, Waterfront Trail - Western Gateway Project was approved as a construction project. Tender T-6-2009 was issued on Friday, March 20, 2009 and closed on Wednesday April 15, 2009 with six Report OES 16-09 May 19, 2009 Subject: Tender for Waterfront Trail - WesteMj Gateway Project Page 2166 bidders responding. The total net project cost is estimated to be $1,011,000 to the City (net of GST rebate) inclusive of the $86,000 spent in 2002 on the design. The City's purchasing policy requires staff to Report to Council on results of the tender and financing in order to proceed with this project in a timely manner. Financial Implications: 1. TENDER AMOUNT T-6-2009 $796,812.50 GST 39.840.62 Sub-Total 836,653.12 GST Rebate (39,840.62) Total $196,812.50 2. APPROVED SOURCE OF FUNDS Parks Capital Budget Location Proiect Code Source of Funds Budget Required Waterfront 5780.0902.1640 Revenue Other Trail- Western Municipalhty $500,000 $500,000 Gateway 5780.0902.2823 Property Taxes 85,000 85,000 Project 5780.0902.7505. Federal Gas Tax 340,000 340,000 5780.0209.1700 Debt 10Year 60,000 60,000 5780.0209.2823 Current Funds Prior 26,000 26.000 Years FUNDS AVAILABLE $1,011,000 $1,011,000 3. ESTIMATED PROJECT COSTING SUMMARY T-6-2009 - Tender for Waterfront Trail. - Western Gateway Project 5780.0902.6129 $796,813 Associated Costs Consultant Fees - Detail Design Budgeted & Undertaken in 86,000 2002 Materials Testing 10,000 Consultant Fees - Contract Administration 30,000 Miscellaneous Costs 1,500 Contingency 86 687 CORP0227-07/01 revised i Report OES 16-09 May 19, 2009 ect: Tender for Waterfront Trail - Western Gateway Project Page 3 Total $1,011,000 GST 50.550 Total Gross Project Cost $1,061,550 GST Rebate (50,550) Total Net Project Cost $1,011,000 The financial contribution from the Waterfront Toronto will be 50% of the costs, to a maximum of up to $500,000. Further background information on this project has been provided for under Report to Council OES-12-09. The Director, Corporate Services & Treasurer has reviewed the budgetary implications and the financing of the expenditures contained in this report and concurs. Sustainability Implications: The construction of the Western Gateway Project will provide improved accessibility to the waterfront trail system and will encourage and promote walking and cycling activities along the Pickering waterfront. The tree, shrub and ground cover plantings proposed will provide additional stability of the east bank of the Rouge River, provide a buffer between the waterfront trail and the CN Rail lines and increase the urban forest cover in the Rosebank Neighbourhood. Background: In 2002 the City approved funds for the Detail Design of the Western Gateway Project which has since been completed. As part of the Parks Capital Budget 2009, Waterfront Trail - Western Gateway Project was identified as a construction project. Tender T-6-2009 was issued on Friday, March 20, 2009 and closed on Wednesday, April 15, 2009 with six bidders responding. The total gross project cost is estimated to be $1,061,550 for an estimated net cost to the City of $1,011,000 (net of GST rebate). References for Pacific Paving have been checked and are deemed acceptable by the Supervisor, Engineering & Capital Works. The Health & Safety Policy, current WSIB Council Amendmenjt to Draft #7 (CAD-7), Certificate of Clearance issued by Workplace Safety & Insurance Board and Certificate of Insurance as submitted by Pacific Paving have been reviewed by the Coordinator, Health & Safety and are deemed acceptable. In conjunction with staffs review of the contractor's previous work experience check of references submitted and the bonding available on this project, the tender is deemed acceptable. CORP0227-07/01 revised i Report OES 16-09 May 19, 2009 Subject: Tender for Waterfront Trail - Western Gateway Project Page 4 168 Upon careful examination of all tenders and relevant documents received, the Operations & Emergency Services Department, Municipal Property & Engineering Division recommends the acceptance of the low bid submitted by Pacific Paving for Tender T-6-2009 in the amount of $836,653.12 (GST included) and that the total net project cost of $1,011,000 be approved inclusive of the $86,000 approved in 2002 for the detailed design. This report has been prepared in conjunction with the Manager, Supply & Services who concurs with the foregoing. Attachments: 1. Location Map. 2. Supply & Services Memorandum dated April 17, 2009. 3. Correspondence from the Toronto & Region Conservation Authority dated May 5, 2009 4. Correspondence Johnson Sustronk & Weinstein Letter of Recommendation for the low bid dated May 5, 2009. Prepared By: Approved/Endorsed B Arnold Mostert, Coordinator (Everett Buntsma, irector Landscape & Parks Development Operations & Emergency Services Darrell Selsky, Supervisor is rd Holbor , Division Head Engineering & Capital Works icipal Property & Engineering LI Vera A. Fe emacher Gillis A. Paterson, Director C.P.P., CPPO, CPPB, C.P.M., CMM III Corporate Services & Treasurer Manager, Supply & Services DS:nw CORP0227-07/01 revised, Report OES 16-09 May 19, 2009 Subject: Tender for Waterfront Trail - Western Gateway Project Page 5 169 Copy: (Acting) Chief Administrative Officer Chief Administrative Officer Recommended for the consideration of Pickering City Council r?+ Thomas J. ui RD MM III Chief Adminis tive Officer CORP0227-07/01 revised Call 00 ATTACHMENT# TOREPORT#=16-01 of 170 MUNICIPAL PROPERTY & ENGINEERING Attachment for Tender T-06-2009 WESTERN GATEWAY CONSTRUCTION =DRIVE KIMTON COURT ~P j Q N MA U~ BOO O 0 R~AD 22~~ P Z J Y PETTICOAT CREEK now QZ CONSERVATION AREA 0 • M o ~P o o O ` RODD AVENUE 4 • Pc' SU ECT ~PO j O G eE4~ ~O VISTA O 1i LAKE ONTARIO LOCATION MAP PROPOSED CONSTRUCTION INCLUDES: The installation includes the replacement of the ;pathway stairs, construction of a pedestrian bridge with lookout, asphalt waterfront trail and parking lot on Bella Vista Drive. ATTACH MENT# Z._ TOREPORT#5, a 171 1 a, o~ Cal PICK., RI MEMO To: Richard Holborn April 17, 2009 Division Head, Municipal Property & Engineering From: Vera A. Felgemacher Manager, Supply & Services Copy: Supervisor, Engineering & Capital Works Subject: Tender No. T-6-2009 Tender for Waterfront Trial - Western Gateway Project Closing: April.15 2009 Tenders have been received for the 'above project. Eight (8) companies were invited to participate. An advertisement was placed in the Daily Commercial News and on the City's Website. A mandatory site visit was held on Monday, April 6, 2009, Nineteen (19) bidders attended of which six (6) bidders responded and submitted a tender for this project. A copy of.the Record of Tenders Opened and Checked used at the public tender opening is attached. Tenders shall be irrevocable for 90 days after the official closing date and time. Purchasing Procedure No. PUR 010-001,. Item 10.03 (r) provides checking tendered unit prices and extensions; unit prices shall govern and extensions will be corrected accordingly, which has been done. All deposits other than the low three bidders may be returned to the applicable bidders as provided for by Purchasing Procedure No. PUR 010-001, Item 10.03(w). Three (3) bids have been retained for review at this time. SUMMARY PST & GST included Bidder Total Tendered iAmount $ After Calculation Check $ Pacific Paving $836,653.12 $836,653.12 Rutherford Contracting Ltd. $850,66737 $850,667.37 Maram Building Corp. $894,600,00 $894,575.62 Di =Con International Ltd. $1,018,981.86 $1,018,981.86 Elirpa Construction & Materials $1,316,86$.89 $1,316,865.89 Ltd. Civil Underground & Excavating $1,374,840.29 $1,374,840.29 Company Ltd. ATTACH, MEN T4--2,*' ► O REPORT# oeS i c6-oq of172 Pursuant to Information to Bidders Item 21, the following will be requested of the low bidder for your review during the evaluation stage of this tender call. Please advise when you wish us to proceed with this task.' (a) a copy of the current and dated Health and Safety Policy to be used on this project; (b) a copy of the current Workplace Injury Summary Report issued by Workplace Safety & Insurance Board (in lieu of the Workplace Injury Summary Report document, a copy of the current CAD 7, NEER, or MAP reports may be submitted); (c) a copy of the current Clearance Certificate issued by Workplace Safety & Insurance Board; (d) the City's Certificate of Insurance shall be completed by the bidder's agent, broker or insurer; Include the following items in your Reportto Council: (a) if items (a) through (d) noted above, are acceptable to the Co-ordinator, Health & Safety .(b) any past work experience Pacific Paving Limited including work location; (c) without past work experience, if reference information is acceptable; (d) . the appropriate account number(s) to which this work is to be charged;. (e) the budget amount(s) assigned thereto; (f) Treasurer's confirmation of funding; (g) related departmental approvals; (h) any reason(s) why the low bid of Pacific Paving Limited is not acceptable; and (i)` related comments specific to the project. JSW & Associates as the consultant on this project will be reviewing submissions and making recommendations to you. The consultant should also review carefully all submittal information based on tendering instructions. If the consultant notices any infractions or information missing during the evaluation, please contact a member of Supply & Services as soon as possible. . Please do not disclose any information to enquiries except you can direct them to the City's website for the unofficial bid results as read out at the Public tender opening. Bidders will be advised of the outcome in due course. If y u require further information, please feel free to contact me or a member of Supply. & Serv es. Vera A. elgemacher VF/jg Attachments April 16, 2009 Tender No. T-6-2009 Page 2 Tender for Waterfront Trial = Western. Gateway Project TORONTO AND REGION )Conservation A i• ACHMENT#t._ 3._ i O REPORT# es I(,'~ for The Living City 173 May 5, 2009 Mr. Everett Buntsma . Director, Operations and Emergency Services !Department Municipal Engineering Division City of Pickering One the Esplanade Pickering, Ontario L1 V 61<7 Dear Mr. Buntsma: Re: Waterfront Trail, Western Gateway Project File: Tender No. T-6-2009 Thank you for your correspondence dated April! 27, 2009 regarding the tender summary for the Waterfront Trail -Western Gateway Project. TRCA has reviewed the tender summary provided for T-6-2009 Waterfront Trail, Western Gateway Project and the procurement practices of the City and find that they are in keeping with the requirements of the Toronto Waterfront Revitalization Corporation and the Toronto and Region Conservation Authority. Thank you for providing this information to us, We look forward to working with you and your selected contractor. If you have any questions or require additional information, please do not hesitate to call. Yours truly, Nancy Gaffney, B.Sc. Waterfront Specialist Watershed Management Division Tel: (416) 661 6600 ext. 5313 Fax: (416) 661 6898 Email: ncgaffnevCa~trca on ca cc: Arnold Mostert, OALA, Coordinator, Landscape and Parks Development Member of Conservation. Ontario 5 Shoreham Drive, Downsview, Ontario M3N 1S4 (416) 61-6600 FAX 661-6898 www.trca.on.ca t Aw'± ATTACHMENT#--- TOREPORT# DES ~(•-O`~ of I ` Consulting Engineers 1 7 4 Landscape Architects Planners Johnson Sustronk Weinstein + Associates 09-14 May 5, 2009 City of Pickering Operations and Emergency Services Department One The Esplanade Pickering, Ontario. L1 V 6K7 Attn: Mr. Arnold Mostert Co-ordinator, Landscape and Parks Department Municipal Property and Engineering Division Re: Letter of Recommendation - Waterfront Trail - Westgrn Gateway Project Tender No. T-6-2009 Dear Amold: The three lowest bids that have been provided by your office for this project were reviewed in detail. The three bidders are: 1. Pacific Paving S 836,653,12 2. Rutherford Contracting Limited S 850,667.37 3. Maram Building Corporation S 894,600,00 While irregularities were noticed in the Maram Building Corp. tender numbers, the two low bidders calculations appeared correct and in order.. The key element in this project package involves the construction of a significant structural pier and elevated walkway. Since no advice on the intended structural sub-contractor has been requested in the tender package request, we had advised the City in our tender analysis memo of April 22, 2009 to investigate both the structural capability of the primary contractor and his structural sub-contractor. If positive feedback has been provided to City staff in this regard, we would see no reason not to accept the low bidder, Pacific Paving, We trust this letter of recommendation is acceptable. Yours very truly, far A LA, MC11P, RPP Principal GLH/slv c.c. Ron Bemasch (JSW+) 20 Mural Street; Unit 10 • Richmond Hill, Ontario • 1461 K3 • T 1905-889-8100 • Fax 905-889-6616 • design@jsw.co