HomeMy WebLinkAboutInformation Report 09-25 Statutory Public Meeting
Information Report
Report Number: 09-25
Date: September 8, 2025
From: Catherine Rose, MCIP, RPP
Chief Planner
Subject: Official Plan Amendment Application OPA 25-001/P
Zoning By-law Amendment Application A 06/25
Seaton Commercial Developments Inc.
South of Taunton Road, between Burkholder Drive and Peter Matthews Drive
1. Purpose of this Report
The purpose of this report is to provide preliminary information regarding applications for
an Official Plan Amendment and a Zoning By-law Amendment, submitted by Seaton
Commercial Developments Inc., to facilitate the development of a commercial plaza on
the western part of the site.
This report is for information purposes only, and no decision on these applications will be
made at this time. A recommendation report will be presented to the Planning &
Development Committee for their consideration once staff have completed a
comprehensive evaluation of the proposal.
2. Property Location and Description
The subject lands consist of two parcels located on the south side of Taunton Road,
between Burkholder Drive and Peter Matthews Drive in the Lamoreaux Neighbourhood
of the Seaton Community (see Location Map, Attachment 1). The lands have a
combined area of approximately 11 hectares with frontages along Taunton Road,
Burkholder Drive, Peter Matthews Drive, and Marathon Avenue. The lands are generally
rectangular in shape with a downward grade change from west to east. Currently, the
lands are vacant and contain an easement along the south property line, approximately
17.6 metres wide, in favour of Trans-Northern Pipelines Inc. (TNPI) (see Air Photo Map,
Attachment 2).
Surrounding land uses include:
North: To the north, across Taunton Road, are lands owned by Taccgate
Developments Inc., which are subject to a site plan application, under review
with the City, to allow a phased, residential, common element condominium
development with 389 townhouse dwellings.
Information Report 09-25 Page 2
East: To the east, across Peter Matthews Drive, are vacant lands owned by Taccgate
Developments Inc., zoned to permit various townhouse dwellings, an apartment
building, and commercial uses. Further east are lands owned by Infrastructure
Ontario (IO), designated as Seaton Natural Heritage System.
South: To the south, across Marathon Avenue, is a recently constructed residential
subdivision, consisting of detached and townhouse dwellings.
West: To the west, across Burkholder Drive, is the Mattamy Homes sales office, and
further west is a residential condominium development consisting of block and
stacked townhouse dwellings.
3. Background
On March 25, 2024, Council approved a Zoning By-law Amendment application (File
A 06/23), submitted by Taccgate Developments Inc., for the westerly portion of the site.
This approval:
• added “Street Townhouses” as a permitted dwelling type
• removed the requirement for townhouses to be built in conjunction with an apartment
building
• introduced zoning exceptions to enable a residential common element condominium
with freehold lots, and
• permitted private parks as part of the development
For the easterly portion of the site, in April 2023, Seaton Commercial Developments Ltd.
(Fieldgate) submitted a Site Plan Approval application to develop a commercial plaza.
Based on feedback received during the circulation and review process, several site-
specific zoning by-law amendments were required. In October 2024, Fieldgate submitted
a Zoning By-law Amendment application to:
• increase the maximum front yard setback for commercial buildings along Taunton
Road and remove the minimum flankage yard setback from side streets
• remove limits on the maximum gross floor area and minimum width of retail units
• remove the requirement for primary building entrances to face a public street, and
• remove the requirement that commercial walls facing a public street must contain
openings (i.e., windows, doors and entrances)
On February 3, 2025, the Planning & Development Committee held an Electronic
Statutory Public meeting to gather public feedback on the rezoning application. At the
meeting, the applicant responded to several concerns, including a comment from the
Durham Regional Works Department that a signalized intersection at Taunton Road and
the extension of Hibiscus Drive would create traffic and safety issues, and could not be
supported. The applicant emphasized that the intersection was critical to the success of
the commercial plaza and agreed to work with the Region to find a solution. However,
despite follow-up discussions, the parties were unable to resolve the issue.
Information Report 09-25 Page 3
Following this, the applicant negotiated a land exchange agreement with Taccgate
Developments Inc. The commercial plaza would relocate to the westerly portion of the
site, where access to a full-move, signalized intersection at Burkholder Drive and
Taunton Road is available. In return, the approved zoning on Taccgate’s lands would be
reapplied to the eastern portion of the site, permitting street townhouses and slightly
modifying zoning standards for individually owned lots within a common element
condominium. Currently, no development is proposed for the eastern portion.
To allow for the relocation of the commercial plaza on the west side, applications for an
Official Plan Amendment and a Zoning By-law Amendment are required.
4. Applicant’s Proposal
Seaton Commercial Developments Ltd. has submitted applications for:
• Official Plan Amendment – to remove the “Pedestrian Predominant Street”
designation from the proposed extension of Hibiscus Drive, allowing greater flexibility
in the siting and design of buildings along this extension.
• Zoning By-law Amendment – to:
• remove the “Seaton Community Node – Pedestrian Predominant Area (SCNPP-1)”
zone category
• add site-specific zoning exceptions for the westerly portion of the site to facilitate
the proposed commercial development
• extend the zoning permissions for freehold street townhouses to the eastern
portion of the site, consistent with the zoning previously approved for the westerly
portion, to facilitate the land exchange
Further details of these amendments are summarized in Section 5.5 of this report.
The proposed commercial development includes seven buildings with a total gross floor
area of approximately 13,000 square metres. It is intended to serve the growing Seaton
Community with uses such as a pharmacy, a daycare, banks, restaurants, personal
service uses, and other service-related uses (see Coloured Site Plan, Attachment 3).
Buildings ‘B’, ‘D’, and ‘G’ will be single-tenant buildings, while the other buildings will
have multiple units. Tenants are still being finalized.
All buildings will be single-storey, ranging from 7.0 metres to 10.5 metres in height.
Primary pedestrian entrances will face the interior of the site, oriented toward the parking
areas. Except for Building ‘A’, all buildings will feature enhanced façades along the street
edges, including glazing and secondary doors that could serve as additional public
access points.
Information Report 09-25 Page 4
A summary of the key components of the proposal is provided in the table below:
Provision Proposal
Net Developable Area 4.65 hectares
Gross Floor Area •Building A – 7,359.1 square metres
•Building B – 743.2 square metres
•Building C – 1,440.0 square metres
•Building D – 1,038.7 square metres
•Building E – 650.3 square metres
•Building F – 864.0 square metres
•Building G – 557.4 square metres
Total: 13,007.6 square metres
Vehicular Parking •A total of 717 parking spaces are provided on-site
(a surplus of 132 spaces), including 24 barrier-
free spaces (10 barrier-free spaces over the
minimum required)
Bicycle Parking •40 bicycle parking spaces
The proposed commercial development will have four vehicular access points:
•a right-in/right-out access from Taunton Road
•a full-move access from the future extension of Hibiscus Drive, and
•two full-move accesses from Burkholder Drive
As part of the proposal, Hibiscus Drive will be extended north to connect with Taunton
Road via the right-in/right-out access.
The proposed pedestrian network is designed to safely link the site to surrounding streets
through existing and new sidewalks, with north-south and east-west internal walkways
connecting key buildings and access points. The network will be complemented with
landscape enhancements, including a northwest gateway feature, street and on-site tree
plantings, patios near Buildings E and F, and a landscaped buffer along the south to
screen Building A’s loading areas.
Detailed design elements will be reviewed in a forthcoming Site Plan Approval
application.
5.Policy Framework
5.1 Provincial Planning Statement (2024)
On October 20, 2024, the Ministry of Municipal Affairs and Housing (MMAH) issued a
new Provincial Planning Statement (PPS), replacing both the Provincial Policy Statement
(2020), and A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2019).
Information Report 09-25 Page 5
The updated PPS directs planning authorities to promote economic development and
provide for a diverse mix of land uses to meet the long-term needs of the community.
The PPS encourages a mix of residential and commercial developments to support the
creation of complete communities.
The applicant’s proposal conforms to the new PPS by contributing to economic
development and providing local retail and personal services to the Seaton Community.
5.2 Durham Regional Official Plan
Durham Region adopted the Official Plan “Envision Durham” in May 2023. MMAH approved
the Official Plan in part on September 3, 2024. On December 13, 2024, MMAH approved
the remaining part of the Plan.
On January 1, 2025, Durham Region became an upper-tier municipality without land use
planning responsibilities. Pursuant to subsection 70.13(2) of the Planning Act, the
Region of Durham Official Plan is deemed to constitute an official plan of the City of
Pickering in respect of any area in the City to which it applies, and will remain in effect
until the City revokes or amends it.
The new Regional Official Plan (ROP) designates the subject site as a “Community
Area” located along a “Regional Corridor” (Taunton Road). These areas are intended to
provide a complete living environment, including housing, commercial uses, offices,
institutional uses, community uses, public service facilities, and a variety of cultural and
recreational uses. The new ROP also recognizes that the Seaton Urban Area will be
developed in accordance with the City of Pickering's Official Plan and associated
neighbourhood plans.
The applicant’s proposed development conforms to the policies and provisions of the
ROP.
5.3 Pickering Official Plan
The Official Plan designates the subject property as a “Community Node”. Schedule VIII
–Neighbourhood 16: Lamoreaux Neighbourhood identifies the future extension of
Hibiscus Drive as a “Pedestrian Predominant Street”, while the southerly portion, which
is encumbered by the easement for Trans-Northern Pipelines Inc., is identified as a
“Potential Multi-Use Area”.
Community Nodes are intended to provide a range of uses that intensify over time.
These nodes are intended to support the surrounding neighbourhoods and permit a wide
range of uses, such as residential, retail, commercial, business, office, service,
recreational, community and cultural uses.
The Lamoreaux Neighbourhood includes specific policies to enhance the public realm
and promote active, pedestrian-friendly uses at the street level. The Community Node on
Taunton Road is planned to be the heart of the neighbourhood as a compact, walkable
area, with a mix of commercial and residential uses that intensify over time. This node is
intended to serve the day-to-day commercial needs of nearby residents and travellers
who pass along Taunton Road and any intersecting roads.
Information Report 09-25 Page 6
The Official Plan states that each Community Node in Seaton shall contain a Pedestrian
Predominant Street, to achieve a strong street presence, to be intensified and fully
realized over time, and should have storefronts facing onto the street with a public
entrance and substantial fenestration facing the street.
The applicant is requesting a site-specific Official Plan Amendment to remove the
“Pedestrian Predominant Street” designation from the subject site and update
Schedule VIII accordingly. Through the design and review of previous applications
(Files S 06/23 and A 04/24), the applicant has advised that the land has a grade change,
sloping from west to east. Hibiscus Drive sits lower than the west parcel and higher than
the east parcel, and is therefore not at grade level with either side. As a result, the road
requires unique stormwater management measures, including swales and elevated road
segments, making it challenging to accommodate the intended pedestrian-focused
design features.
Specifically, these conditions limit the ability to align commercial building grades with
Hibiscus Drive, preventing direct pedestrian access, walk-out entrances, and orienting
storefronts toward the street. In addition, the proposed grocery store requires grading,
which is higher than the elevation of the Hibiscus Drive extension. For these reasons, the
applicant is seeking to remove the “Pedestrian Predominant Street” designation.
The proposed request will be assessed against the policies and provisions of the Seaton
Urban Area Policies during the further processing of this application.
5.4 Seaton Sustainable Place-Making Guidelines
The Seaton Sustainable Place-Making Guidelines build on the Vision for the Seaton
Neighbourhood as outlined in Section 2.1.2 of the Official Plan. They expand on the key
urban design elements for subdivisions and site plans to ensure the desired future
character and function of public spaces, including streets, parks, and civic areas, align
with the vision. The Guidelines also provide direction on designing the public realm,
buildings and green infrastructure.
The guidelines state that commercial buildings along Pedestrian Predominant streets are
encouraged to include retail uses that promote animated spaces and should have
primary entrances oriented towards these streets to encourage pedestrian activity.
The proposal will be reviewed against the policies and requirements of the Seaton
Sustainable Place-Making Guidelines as part of the further processing of this Official
Plan and Zoning By-law Amendment application and the related site plan application.
5.5 Consolidated Zoning By-law 8149/24
The subject property is within three zoning categories under the Consolidated Zoning
By-law 8149/24, as illustrated in Figure 1 below:
Information Report 09-25 Page 7
Figure 1: Current Zoning
The Seaton Community Node (“SCN-1” and “SCN-4”) zones permit a variety of residential
and commercial uses, including apartments, certain forms of townhouse dwellings,
supermarkets, daycares, retail stores, banks, restaurants and various personal service
uses. Any commercial uses in these zones must be oriented toward Taunton Road to
help create a lively, pedestrian-friendly streetscape. The SCN-4 zone additionally permits
street townhouse units, private parks, and site-specific standards for freehold common
element condominium townhouse lots.
The Seaton Community – Pedestrian Predominant Areas (“SCNPP-1”) zone permits
small-scale commercial buildings that are compatible with adjacent residential uses.
Additionally, it permits apartment buildings and live-work townhouse units, provided
commercial uses are located on the first floor. The SCNPP-1 zone features design
requirements to make Hibiscus Drive more walkable, including placing buildings close to
the street, ensuring main entrances face the street, and incorporating patios,
landscaping, and pedestrian amenities.
To support the proposed relocation of the commercial plaza and the land exchange with
Taccgate Developments Inc., the applicant proposes to remove the SCNPP-1 zone
category and rezone the lands, as shown in Figure 2 below:
Information Report 09-25 Page 8
Figure 2: Proposed Zoning
6. Comments Received
6.1 Public Comments
The Notice of the Electronic Statutory Public Meeting was provided through mailings to all
properties within 150 metres of the subject property. Additionally, three Public Meeting
notice signs were posted on the property on August 8, 2025.
As of the writing of this report, the City has received two written comments from the
public. One public member expressed the urgent need for commercial services to come
to the Seaton Community, and that this application be expedited to prevent any further
delays. Another public member requested that electric vehicle charging stations be
incorporated into the development.
6.2 City Department and Agency Comments
The applications have been circulated to all City Departments and various external
agencies, including utility providers, school boards, the Region of Durham and the
Toronto and Region Conservation Authority. At the time of writing this report, the City
Development Department is still awaiting feedback on the applications.
7. Planning & Design Section Comments
The following is a summary of key concerns/issues or matters of importance that have
been identified by staff for further review and consideration. These matters, and others
identified through the circulation and detailed review of the applications, are required to
be addressed by the applicant before a final recommendation report to the Planning &
Development Committee:
Information Report 09-25 Page 9
• despite the proposed elimination of the “Pedestrian Predominant Street” designation,
ensure that the proposed right-of-way design for the Hibiscus Drive extension
provides a pedestrian-friendly streetscape that reflects the guiding principles of the
“Pedestrian Predominant Street” designation, including sidewalks on both sides,
streetscape furniture, boulevard trees, and high-quality architectural design and
detailing where buildings abut the street
• assess the proposed building setbacks to ensure sufficient space is provided for
projections, encroachments, soft landscaping, pedestrian walkways, and grading,
while supporting a high-quality public realm in the final built form
• evaluate the pedestrian connections to ensure convenient and safe connections
between the buildings within the site and connections to adjacent roads, and planned
transit stops
• assess the vehicular access points to ensure they connect appropriately with the
surrounding road network, particularly from Burkholder Drive
• identify opportunities for patios and other streetscape improvements that could
enhance the development
Further issues may be identified following receipt and review of comments from the
circulated departments, agencies and the public. The City Development Department will
conclude its position on the applications after it has received and assessed comments
from the circulated department, agencies and the public.
8. Information Received
Copies of the plans and studies submitted in support of the applications are listed below
and available for viewing on the City’s website at pickering.ca/devapp or at the offices of
the City of Pickering, City Development Department:
• Site Plan, prepared by Petroff Architects, dated July 11, 2025
• Colored Concept Plan, prepared by Petroff Architects, dated July 11, 2025
• Draft Official Plan Amendment and Schedule, prepared by Korsiak Planning
• Draft Zoning By-law Amendment and Schedule, prepared by Korsiak Urban Planning
• Planning Rationale Report, Sustainability Brief, and Urban Design Brief, prepared by
Korsiak Urban Planning, dated July 16, 2025
• Survey, prepared by J.D. Barnes, dated May 7, 2020
9. Procedural Information
9.1 General
• written comments regarding this proposal should be directed to the City Development
Department
• all comments received will be noted and used as input to a Recommendation Report
prepared by the City Development Department for a subsequent meeting of Council
or a Committee of Council
• any member of the public who wishes to be notified of Council’s decision regarding
this proposal must request such in writing to the City Clerk
Information Report 09-25 Page 10
10.Owner/Applicant Information
The owner of the subject property is Seaton Commercial Developments Ltd., who is
being represented by Korsiak Urban Planning.
Attachments
1.Location Map
2.Air Photo Map
3. Coloured Site Plan
Prepared By:
Original Signed By
Liam Crawford
Planner II
Original Signed By
Nilesh Surti, MCIP, RPP
Division Head, Development Review
& Urban Design
Approved/Endorsed By:
Original Signed By
Catherine Rose, MCIP, RPP
Chief Planner
LC:ld
-04;6/-
PlCKERlNG
City Development
Department
Taunton Road
Location Ma
File: OPA 25-001/P and A 06/25
Applicant: Seaton Commercial Developments Ltd.
Legal Description: Block 76, 40M-2664, and Block 188, 40M-2671, Part of
Lots 23 & 24, Concession 3, City of Pickering Date: Aug. 11, 2025
:;~ o~:i~~:~;~~~m~~ 0
if~:~;~~gR:~~~~:~. ~~I ~~~lsu~eds:i:~s; ~;~ne~ :~:;~r:~~,~~'c
0;~~n;s ~~;~i~r~f ~l~~~~:tr::~:s:" :1~~~i~i;~~;~~;: A~i:e~:::z ~r~~fti~n and SCALE : 1 : 4,000
its SU hers . All r his reserved THIS IS NOT A PLAN OF SURVEY.
l:\PLANNING\01 -MapFiles\OPA\2025\OPA 25-001 P, A 06-25\OPA 25-001 P, A 06-25.aprx
Attachment 1 to Information Report 09-25
-04;6/-
PlCKERlNG
City Development
Department
Air Photo Ma
File: OPA 25-001/P and A 06/25
Applicant: Seaton Commercial Developments Ltd.
Legal Description: Block 76, 40M-2664, and Block 188, 40M-2671, Part of
Lots 23 & 24, Concession 3, City of Pickering Date: Aug. 06, 2025
:;~ o~:i~~:~;~~~m~~ 0
if~:~;~~gR:~~~~:~. ~~I ~~~lsu~eds:i:~s; ~;~ne~ :~:;~r:~~,~~'c
0;~~n;s ~~;~i~r~f ~l~~~~:tr::~:s:" :1~~~i~i;~~;~~;: A~i:e~:::z ~r~~fti~n and SCALE : 1 : 4,000
its SU hers . All r his reserved THIS IS NOT A PLAN OF SURVEY.
l:\PLANNING\01 -MapFiles\OPA\2025\OPA 25-001 P, A 06-25\OPA 25-001 P, A 06-25.aprx
Attachment 2 to Information Report 09-25
Attachment 3 to Information Report 09-25
Coloured Site Plan
File No: OPA 25-001/P and A 06/25
Applicant: Seaton Commercial Developments Ltd.
Legal Description: Block 76, 40M-2664 and Block 188, 40M-2671
Part of Lots 23 & 24, Concession 3, City of Pickering
FULL SCALE COPIES OF THIS PLAN ARE AVAILABLE FOR VIEWING AT THE CITY OF PICKERING
CITY DEVELOPMENT DEPARTMENT.Date: Jul. 24, 2025
FU
T
U
R
E
H
I
B
S
C
U
S
D
R
I
V
E
E
X
T
E
N
S
I
O
N