Loading...
HomeMy WebLinkAbout2025 Draft Capital Budget & 2026-2029 Forecast Senior Staff Recommended Draft 2025 Capital Budget & 2026-2029 Forecast Southcott Park Playground Reconstruction October 25, 2024 -Qq;of- P](KERJNG City of Pickering Senior Staff Draft Recommended 2025 Capital Budget & 2026-2029 Forecast Table of Contents Department Page Capital Budget Summaries 1 Capital Budget Analysis 5 Mayor & Council 21 Office of the CAO Corporate Projects 10000 28 Community Services 33 Dunbarton Pool 10210 34 Don Beer Arena 10215 37 Community Centres 10220 40 Recreation Complex-Central Core 10225 44 Recreation Complex-Pool 10230 48 Recreation Complex-Arenas 10235 49 Civic Complex 10240 52 Museum 10250 56 Seaton Recreation Complex 10260 59 Operations 60 Public Works Admin 10300 62 Property Maintenance 10305 65 Fleet Services 10310 70 Roads Equipment 10315 77 Parks 10320 80 Operations Services 10325 88 Corporate Services 89 Information Technology 10405 90 Engineering Services 93 Water Resources & Development Services 10510 94 Sidewalks 10515 97 Streetlights & Signalization 10520 101 Stormwater Management 10525 104 Roads Projects 10570 108 Parks Projects 10572 131 Development Projects - (DC Funded) 10575 147 Finance 150 Finance 10600 151 City of Pickering Senior Staff Draft Recommended 2025 Capital Budget & 2026-2029 Forecast Table of Contents Fire Services 152 Fire Protection 10700 153 Libraries 158 Library 10900 159 Seaton Library 10905 163 2026 – 2029 Forecast 164 Draft 2025 Capital Budget Proposed Investments In December 2023, City Council endorsed Pickering’s first Corporate Strategic Plan, which sets forth a vision, goals and key actions for 2024-2028. The Draft 2025 Capital Budget proposes numerous investments to realize the City's envisioned future. Below are just some of the projects budgeted for 2025 that align with the Corporate Strategic Plan and target its main priority areas. • $1.635 million for design of Civic Complex interior renovations to include a centralized customer service experience. •$235,000 for renovations to the first floor washrooms at the Pickering Public Library Central Branch. •$885,000 for reconstruction of Civic Complex South Esplanade parking lot. •$1.85 million for the design and construction of Dunbarton pool roof & structural replacement. • $2.71 million in construction costs including accessibility and enhanced technology upgrades for the Council Chamber renovations. •$1.03 million for artificial turf replacement at Beverley Morgan Park. • $3.5 million for land acquisition and design costs to replace Fire Station #5 on Bayly. • $600,000 for playground equipment replacement, meeting AODA accessibility requirements. • $4.6 million for replacement of a pumper rescue and aerial ladder in fire truck. Priority 3: Advance Innovation & Responsible Planning to Support a Connected, Well-Serviced Community •$9.70 million for land acquisition and site servicing for lands in Seaton for future municipal operations, including a Northern Operations Facility, Fire Station #3, Animal Shelter, and stormwater management facilities. •$5.27 million for asphalt resurfacing. • $3.05 million in bridge replacements. •$1.347 million for construction of a park in Duffin Heights. •$1.0 million for the construction of six dedicated pickleball courts in Diana Princess of Wales Park. Priority 4: Lead & Advocate for Environmental Stewardship, Innovation & Resiliency • $1.265 million for rooftop solar panel at Operations Centre. • $2.01 million in design, construction, and shoreline stabilization for the Waterfront Trail (between Marksbury Road and West Shore Boulevard). •$120,000 for pond cleanouts. Priority 2: Advocate for an Inclusive, Welcoming, Safe & Healthy Community Corporate Key: Good Governance/Customer Service Excellence City of Pickering 2025 Project Classification Draft Budget Infrastructure Renewal $40,233,850 Growth 24,975,700 Other 930,000 $66,139,550 2025 Financing Summary Draft Budget Capital Paid from Property Taxes $918,350 Provincial Grants 2,400,000 Other Grants & Contributions 400,000 Debt 3,000,000 Development Charges - Debt 4,251,900 Rate Stabilization Reserve 8,840,000 Third Party Contributions 200,000 Canada Community-Building Fund 5,655,000 Building Faster Fund 6,925,000 Development Charges - Reserve Fund 9,750,400 Roads & Bridges Reserve Fund 240,000 Casino Reserve 10,165,000 Other Discretionary Reserves & Reserve Funds 13,393,900 Total $66,139,550 2025 Total Senior Staff Recommended Draft Capital Budget Financing Overview 1 2025 Infrastructure Renewal by Cost Centre Draft Budget 10210 Dunbarton Pool $1,850,000 10215 Don Beer Arena 288,000 10220 Community Centres 832,350 10225 Rec. Complex - Central Core 3,699,000 10235 Rec. Complex - Arenas 50,000 10240 Civic Complex 8,125,000 10250 Museum 78,000 10300 Public Works Admin.45,000 10305 Property Maintenance 1,270,000 10310 Fleet Services 6,410,000 10315 Roads Equipment 620,000 10320 Parks 1,897,000 10405 Information Technology 158,000 10520 Streetlights & Signalization 35,000 10525 Stormwater Management 422,500 10570 Roads Projects 8,507,000 10572 Parks Projects 850,000 10700 Fire Protection 3,980,000 10900 Library 1,117,000 Total $40,233,850 City of Pickering Senior Staff Recommended Draft Capital Budget Infrastructure Renewal 2025 2 Budgeted Project Cost 2023 Capital Asset Investments Satellite Office Leasehold Improvements 1,100,000 Bay Ridges Kinsman Park - Soccer Artificial Turf Replacement 770,000 Beverley Morgan Park - Track Replacement 770,000 Accessible Pedestrian Signals - 4 locations 400,000 George Ashe Library & Community Centre Renovation 330,000 Council Chamber Renovation 250,000 Fire Station #6 - Kitchen Retrofit and Improvements 122,000 Chestnut Hill Development Recreation Complex (CHDRC) - Condenser Pad and Tank Replacement 88,000 Outdoor Rink Lighting 82,000 Civic Complex - Server Room System Replacement 77,000 Fire Station #2 - Renovations and Improvements 77,000 Dunmoore Park - Parking Lot Reconstruction & Lighting 75,000 Museum - New Security Cameras 62,500 New Brush Trimming Equipment 55,000 CHDRC - Life Safety Upgrades 50,000 Civic Complex - Parking Garage Sprinkler System Replacement 46,200 Pedestrian Countdown Signals - 5 locations 45,000 CHDRC Arena - Gas Monitor Sensor System Replacement 34,000 Security Camera Program (Parks)33,000 Traffic Signals / Controllers Replacement 25,000 Fire Station #5 - Exterior Security Camera System 22,000 Rodd Avenue - New Streetlights 20,000 Total 2023 Capital Investments 4,533,700$ 2024 Capital Asset Investments Beachfront Park Master Plan 5,050,000 CHDRC - Tennis Court Flooring Replacement 2,210,000 City Centre Phase 1 - City Centre Park - Design 750,000 Brockridge Community Park - Parking Lot Improvements - Design 550,000 Pickering Heritage Community Centre 866,676 Accessible Pedestrian Signals 400,000 Claremont Memorial Park - Playground Reconstruction 400,000 Diana Princess of Wales Park - Playground Replacement 200,000 Ernie L. Stroud Park - New Multi-Use Court 156,000 Outdoor Pickelball Court Complex - Design 150,000 Beachlawn Park - New Multi-Use Court 100,000 Total 2024 Capital Investments 10,832,676$ CASINO-FUNDED CAPITAL INVESTMENTS 3 Budgeted Project Cost CASINO-FUNDED CAPITAL INVESTMENTS 2025 Capital Asset Investments Civic Centre - Generator Replacement 1,850,000 Dunbarton Pool Roof and Structure Replacement 1,850,000 Civic Complex Interior Renovations - Design 1,635,000 Pickering Heritage Community Centre - Furniture, Fixtures & Equipment 1,160,000 Outdoor Pickleball Court Complex - Construction 1,000,000 Pedestrian Bridge 9 - Bridge Replacement 500,000 Civic Complex - Building Envelope & Parking Garage Retrofit - Design 480,000 Brockridge Community Park - Parking Lot Improvements - Construction 345,000 Community Improvement Initiatives 300,000 Fire Station #5 Replacement - Additional Design Costs 280,000 Central Library - Building Envelope Retrofit - Design 260,000 Rouge Valley Park - Resurface & Line Paint Basketball Court 250,000 Central Library - Lobby & Washrooms Retrofit 235,000 BRC Park Baseball Light Replacement & New Scoreboard - Kirkey Field - Design 20,000 Total 2025 Capital Investments 10,165,000$ Total Casino-Funded Capital Investments 25,531,376$ 4 5 2025 Draft Capital Budget Forecast & Analysis & Summary One of the City’s responsibilities is to ensure municipal infrastructure meets the needs of the community and is well maintained. The capital budget is the City’s plan to purchase, build, maintain, repair and replace assets and includes the infrastructure required to support the delivery of services to residents, businesses and visitors. Capital assets also impact the City’s current budget as funds are needed to cover day-to-day operating expenses associated with the asset and may also include debt payments. The City’s infrastructure includes a transportation network of roads, bridges, bike lanes and sidewalks. Playgrounds are community gathering places where people learn, play, stay healthy and interact with one another. Fire trucks and snow plows are required to provide critical services and keep our City accessible all year long. The capital budget not only includes renewing existing assets to maximize their useful life, but also includes new projects that help achieve the City’s strategic goals and support growth. In 2025, the City is investing a total of $66.1 million in capital projects. The capital budget ensures that the residents, families, and businesses that call Pickering home have safe roads, sidewalks, recreational facilities, expansive parks and trails. As the population grows, and infrastructure ages, it is critical that the City plans for today and for the future to ensure that we meet the needs of our residents. Year-to-year capital financial requirements can change dramatically depending on capital needs. This may put pressure on the tax base if the City does not have other alternative funding sources that it can utilize such as government grants, reserves, long- term borrowing and development charges. Capital budgets are supported by various funding sources (see Chart One). Many capital projects take more that a single year to plan, design and construct with the associated capital funding approved in the first year of the project. 6 Chart One Financing Summary The draft 2025 Capital Budget includes costs for repairs, replacements and growth. Repairs and replacement costs ensure our infrastructure is maintained, safe and performing satisfactorily. Other Res & RF, 20.60% Grants, 4.50% Rate Stabiliztion Res., 14.10% 2025 Total Capital Investment $66.1 million Debt, 11.00% Growth DC RF, 14.70% Casino Res., 14.60% Gov't Funding, 19.10% 7 Chart Two Infrastructure Renewal Investments As Chart Two above indicates, Council is spending more for the renewal of its existing assets in the current term of office than in the previous term. The total investment last term (while recognizing this time period included COVID) was $92.7 million, and the three year total for this current term is projected to be $99.3 million, which represents an increase of 7.12% over the previous term with one more year to make additional investments. During this current term of office, Council has made a substantial financial commitment in investing in the City’s roads infrastructure as shown below (see Chart Three). $45,000,000 $40,000,000 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 I Year1 Year2 Year3 Year4 ■ 2019 to 2022 ■ 2023 to 2025 8 Chart Three Budget Funding For Roads Projects Roads projects includes activity related to the following activities: asphalt resurfacing, road reconstruction and drainage improvements. In the prior term, the City invested $19.7 million for roads related projects. The projection for this term is $37.2 million – an increase of 88.5% over the previous term. The draft 2025 Capital Budget includes funding ($6.925 million) from the Provincial Building Faster Fund (BFF). On March 13, 2024, Premier Doug Ford announced that the City of Pickering would be receiving $5.2 million in funding for exceeding its 2023 housing target through the Province’s BFF, which incentivizes municipalities to tackle housing supply issues by providing performance-based funding for housing and community infrastructure. (Pickering was the only municipality in Durham Region to receive this funding in 2024.) Staff’s preliminary estimate, based on 2024 housing construction activity, indicates that the City would be entitled to receive approximately $4.0 million in 2025. Therefore, staff have applied these dollars in developing the 2025 roads capital budget. If the actual amount is less than the City’s preliminary funding estimate, the City would then use alternative funding sources such as the Roads & Bridges Reserve Fund or the Casino Reserve to address any funding shortfall. 2019 - 2022 2023 - 2026 $1,000,000 $3,000,000 $5,000,000 $7,000,000 $9,000,000 $11,000,000 $13,000,000 Year 1 Year 2 Year 3 Year 4 2019 - 2022 2023 - 2026■ ■ 9 Chart Four provides a financial comparison between the previous and current term as it relates to funding for the City’s parks. Chart Four Parks Funding In the previous council term, the City employed one cost centre to capture both replacement and new capital investments for parks. For the current term, and starting in 2024, the City introduced two cost centres to separate the expenditures basically into replacements/renewals and new investments. In the previous term, the City budgeted $23.4 million for replacement and new park investments. For the current term, the forecasted expenditures is $75.1million – an increase of 220.33%. Major park investments this term including planned investments in 2026, includes the following: $10,000,000 $20,000,000 $30,000,000 $40,000,000 $50,000,000 $60,000,000 $70,000,000 $80,000,000 2019 - 2022 2023 - 2026 Combined Replacement New Projects Beachfront Park Master Plan: 2024 - Phase 1 $10.1 million 2026 – Phase 2 5.0 million City Centre Park (2026) 14.3 million Claremont Neighbourhood Park 2.3 million y ......... .., ..,.., .... ••••••••••• ••••••••••• ••••••••••• ••••••••••• ••••••••••• ••• • ••• ■ ■ 10 Capital Forecast, Financial Challenges & Warning Signs The draft 2025 Capital Budget provides a financial plan that is financially sustainable. The draft 2025 Capital Budget continues to invest in infrastructure renewal which is important to preserve these critical assets. Pickering is currently in a growth building phase due to Seaton that in-turn puts pressure on the City to provide services. In addition, the City now has to invest significant capital dollars to replace existing aging infrastructure. The City also has to take into consideration, the current high construction cost of capital infrastructure and replacements. A perfect financial storm of new and old. The City’s draft total capital program (2025 to 2034) has an estimated dollar cost of $1.1 Billion. This dollar amount excludes any capital infrastructure investments required for Northeast Pickering. Chart Five below outlines the capital expenditures by major funding source for the draft 2025 Capital Budget plus the capital forecast period. Chart Five Capital Expenditures By Major Funding Source (2025-2034) The debt component consists of both Development Charges (DC) and taxpayer funded debt. As the above graph indicates, debt is a key financing tool for the City’s draft capital program. $355,000,000 $305,000,000 $255,000,000 $205,000,000 $155,000,000 $105,000,000 $55,000,000 D ~ ~ ~ ~ ~ $5,000,000 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 ■ Debt ■ DC Reserves Res & RF ■ Taxes & Other 11 Chart Six Funding Sources for Draft Capital Program (2025-2034) As the above chart indicates, the ten-year capital program is relying on debt (DC & taxpayer) for 50.6% of the capital funding strategy. Report FIN 09-24 presented the financial position of the DC Reserve Fund (December 31, 2023) by the various funding components of which four out of eight are already in a deficit position. With the City moving from a moderate to higher growth scenario and in conjunction with the higher cost of capital construction, the City hasn’t had the luxury of time to build up its DC reserve fund balances. The City’s draft capital forecast (2026 to 2034) is not financially sustainable as it relies on an excessive amount of debt to fund these projects. This high level of debt will have an impact on the City’s debt capacity as measured by the Annual Repayment Limit or ARL. Debt is one of the several capital funding tools available to municipalities. When used responsibly, it can be a powerful tool to help finance long-term capital needs. Debt is an important part of the City’s strategy for investment in assets that have a long-term useful life. It is important to note that while debt is a funding source for capital, the amount owing, plus the related interest must be paid in future years from operating funds. Debt is a 18.95% 3.58% 26.38% 50.64% DC Reserves Taxes & Other Res & RF Debt (DC & Taxpayer)• • • • 12 trade-off between increased fiscal flexibility in the short-term versus reduced fiscal flexibility over the payment term. Please find below in Table One an estimated financial snapshot of the City’s debt picture as of December 31, 2026. By the end of 2026, the City’s debt obligations would have increased by approximately 500%. Table One City’s Estimated Debt Summary as of December 31, 2026 Several of the above listed capital projects, are not at the tender stage and therefore, the cost used in the above analysis is a projection. There is a financial risk that, once these projects are tendered, the tendered cost may exceed the budget resulting in additional financial pressure. Report FIN 03-24 outlined the debt strategy for the Pickering Heritage & Community Centre (PHCC) whereby the City would delay the issuance of external debt until the last quarter of 2025 where it is anticipated that the interest rates would have decreased from Taxpayer Growth Debt DC (Debt)Total Current Debt Issued as of December 31, 2024 38,402,116$ 17,218,000$ 55,620,116$ PHCC (Est.)8,367,000 16,522,000 24,889,000 Prior Commitments (With Additional Funding) Fire Station 5 11,300,000 11,300,000 Animal Shelter 10,265,000 10,265,000 Draft Capital Budget 2025 Fire Station 5 Land Purchase 3,000,000 3,000,000 Municipal Land commitments 3,588,900 3,588,900 Northern Satellite Facility 663,000 663,000 Draft Forecast 2026 Capital Budget Seaton Rec Complex & Lib 214,060,500 214,060,500 City Hall Tower Retro Fit 3,930,000 3,930,000 Fire Pumper 2,242,500 2,242,500 Municipal Land commitments 2,966,500 2,966,500 Vehicles - 710,000 710,000 Total 64,999,116$ 268,236,400$ 333,235,516$ Increase over 2024 (December 31)69.26% 1457.88%499.13% 13 their 2024 peak. At this current time, PHCC project is being cash flowed from existing reserves and reserve funds. The Municipal Act through Regulation 403/02 permits a maximum of 25 percent of net operating revenues to be used to fund principal and interest charges for debt. This is called the Annual Repayment Limit or ARL. For Pickering, the net operating revenues consists of the following major items: •Property tax revenue •User fees and charges •Fines, penalties and interest on taxes •License fees, permit fees and rent •Gaming and casino revenues Every year, as the budget levy increases, the City’s net operating revenues increase and that in-turn results in a higher ARL. Over the last seven years, the City has maintained a steady course as it relates to debt use and has maintained its debt level below 5 percent of the maximum allowed of 25 percent. The financial strategy of being prudent and cautious has served the City well as it relates to its management of debt. With the addition of a new revenue source (casino revenue), the City can now proceed to consider, to a certain degree, to expand its use of debt. Ontario Regulation 403/02 does permit municipalities to appeal to the Ontario Land Tribunal (OLT) to exceed the 25 percent limit. The use of this path by municipalities is rare. Staff are aware of two situations whereby municipalities requested an exemption to exceed the limit to borrow funds to install water and sewer infrastructure. On other words, the higher capital costs were directly funded by corresponding water and sewer rates and this revenue stream has a low risk of default and or failure. Chart Seven below presents a projection of the City’s ARL based on the draft 2025 Capital Budget and nine-year Capital Forecast. The City’s (Council endorsed) debt guideline is 17.5% which the City will exceed by the end of 2027. It should be noted that the Senior & Youth Centre & Central Library renovation were originally deferred to 2028 by Council (Resolution #379/24). However, in order to present a preliminary draft financial plan that has the City’s debt utilization below the 25% maximum, this project was deferred to 2032 for the next term of Council. 14 Chart Seven ARL Estimated Projection As Chart Seven above indicates, the City is projected to exceed the Provincial ARL limit at around 2031. As shown above, the capital forecast (2026 – 2034) is not financially sustainable and the Treasurer does not support an ARL above 17.5%. The purpose of presenting this financial forecast is to communicate that from a short and medium term perspective, the City’s capital plan has to be reviewed and revised. Usually this means that capital projects (2027 to 2034) will have to be deferred, revised and reduced in size to meet the financial budget. For the next term of Council, the City will find itself in an “challenging financial position” from 2027 up to and including 2030 due to the increased reliance on debt. It is staff’s understanding that, starting in the next term of council, Pickering will probably have one of the highest debt per capita among all the municipalities in Ontario. During the next term, to provide financial breathing room, the City should adopt a “cash only financial” policy to bring the ARL back to the target of 17.5% and this strategy is reflected in Chart Seven under the title of “Debt Pause.” A debt pause strategy would apply to capital projects that are funded by taxpayer debt and DC debt. In the past, many municipalities adopted this capital expenditure philosophy as a “Pay as You Go” approach. The direct benefit of this philosophy is that you eliminate the interest cost associated with debt financed capital projects that in-turn results in an overall lower project cost. If the new Council would like to fast track previously debt funded projects – the new Council would have to increase the property tax levy to generate the cash. 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 ARL Council Guideline ARL Province Current Draft Plan Debt Pause 15 It is important for the City to preserve its debt capacity to fund unanticipated expenditures or to have the debt capacity to take advantage of potential senior government grant funding opportunities. To increase the City’s funding capacity, it is very important that the City increase its current investment in asset management by increasing the annual contribution to its reserve and reserve funds. Many municipalities have adopted the funding strategy that asset replacements will only be funded by reserve or reserve funds and not debt. Chart Eight Estimated Debt Payments & Financial Obligations $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 $35,000,000 $40,000,000 $45,000,000 $50,000,000 $55,000,000 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Taxpayer Debt DC Debt As Chart Eight above indicates, the City’s 2025 current estimated annual debt charges of $6.1 million will increase to $26.5 million by 2027 – 334.4 percent increase in two years. The majority of the increase is due to the Seaton Recreation Complex & Library. To meet this dramatic increase in DC debt payments, Finance staff are currently revising the Development Charge Background Study. (The current work plan is to have the new DC Study adopted by Council on or before June 30, 2025 with the corresponding fee increase effective July 1, 2025.) The Seaton Recreation Complex & Library cost will have a significant impact on the proposed new DC fees. Staff’s preliminary estimated calculation shows that the current DC Parks Recreation fee (single detached unit) will increase from $15,591 to $23,234 which represents an increase of 49.02 percent. It should be noted that the preliminary analysis indicates that the other DC components will also increase. - I ■ ■ 16 Pickering is the guarantor of DC debt payments. In other words, if there was a shortfall in DC fees collected that resulted in insufficient funds to meet the DC debt payments – the City would still be responsible for paying the full cost of the DC debt bill. If there was a development slow down due to uncontrollable events such as higher interest rates or a recession, that in-turn would probably cause a shortfall in DC fees collected. (The 2008 recession lasted approximately 30 months). The City would try to fund this shortfall from existing reserves or reserve funds with the Casino Reserve being the first source of funding to be considered. (With the City being near its debt capacity limit, the City may find it difficult to borrow on a short-term basis to fund any large DC fee shortfall). The financial challenge or risk for the City is what happens if the development slows down for more than one year? Does the City have the financial strength to ride out a two-year development slowdown period? A prudent financial strategy would be to re- allocate the casino dollars in a special reserve with goal of reaching the DC debt obligation of $20.0 million over the next eight years. The first casino contribution of $2.5 million would be required in 2027 and transferred to the (ballon payment reserve). This rainy day fund would act as an insurance policy to protect the City from uncontrollable, unpredictable and negative financial events. $20,000,000 $30,000,000 $40,000,000 $50,000,000 $60,000,000 $70,000,000 $80,000,000 $90,000,000 Seaton Community Centre & Library Design Animal Shelter Beachfront Park Master Plan City of Pickering Staff Recommended Draft Capital Budget Summary 2022 to 2025 17 Project# C10700.2510 C10000.2501 C10000.2502 C10300.2404 City of Pickering 2025 Staff Recommended Draft Capital Projects Annual Debt Charges Description Annual Charges Property Tax Debt Debt -10 Year FS #5 Land Acquisition $384,000 1, Total Cost of Debt -10 Year $384,000 DC Debt DC Debt-10 Year Seaton Muncipal Land Acquisition $425,000 Seaton Muncipal Land -Site Servicing 35,000 Total Cost of DC Debt -10 Year $460,000 DC Debt -20 Year Northern Operations Facility -Design $53,000 Total Cost of DC Debt-20 Year $53,000 Grand Total $897,000 18 2025 Project Debt Amount $3,000,000 $3,000,000 $3,318,900 270,000 $3,588,900 $663,000 $663,000 $7,251,900 Seaton Recreation Complex & Library Design Cost As- Awarded 2026 Forecast 2027/2028 Forecast Total Project Cost C10260.2101 Seaton Rec. Complex Design & related costs $7,075,300 $ - $ - $7,075,300 Construction - 183,750,000 - $183,750,000 Furniture, fixtures & equipment - - 3,675,000 $3,675,000 C10905.2101 Seaton Library Design & related $1,945,800 - - $1,945,800 Construction - 35,800,000 - $35,800,000 Furniture, fixtures & equipment - - 6,642,000 $6,642,000 $9,021,000 $219,550,000 $10,317,000 $238,888,100 Funding Seaton FIA Reserve $225,500 $5,489,500 $258,100 $5,973,100 DC Parks & Rec. 6,898,430 - 3,583,000 10,481,430 DC Library 1,897,070 - 6,475,900 8,372,970 DC Debt - 214,060,500 - 214,060,500 $9,021,000 $219,550,000 $10,317,000 $238,888,000 Total projected Development Charge (DC) funded debt to be issued $214,060,500 Projected annual DC debt payments $17,000,000 (principle & interest) = 70% of projected annual DC-P&R revenues (after estimated DC rate increase) = 84% of projected annual DC-Library revenues (after estimated DC rate increase) Supporting this level of debt repayments requires an update to the DC rates (planned for 2025) and is likely to also require deferral and ongoing staggering of DC-Parks & Recreation funded projects currently scheduled in the 2027-2034 time frame. 19 Animal Shelter Previously Approved 2025 Budget 2026 Forecast Total Project Cost C10000.2501 – Seaton Municipal Land Acquisition – Animal Shelter Portion Land Acquisition $ - $1,227,100 $ - $1,227,100 C10430.2101 – Animal Shelter Design & related costs 909,000 - - $909,000 Construction 8,830,000 - 4,261,000 $13,091,000 Furniture, fixtures & equipment - - 460,000 $460,000 $9,739,000 $1,227,100 $4,721,000 $15,687,100 Funding Animal Shelter Reserve Fund $1,491,400 $607,100 - $2,098,500 City Share DC Reserve 1,626,000 - - $1,626,000 Development Charges (DC) 617,600 620,000 - $1,237,600 DC Debt 6,004,000 - 4,261,000 $10,265,000 Community Benefit Charges RF - - 460,000 $460,000 $9,739,000 $1,227,100 $4,721,000 $15,687,000 A second floor with municipal administrative office space was added to the original scope of the project to accommodate future growth. The total project cost for the construction of the new Animal Shelter is now $14,460,000. 19A Fire Station #5-Relocation & Construction Previously 2025 2026/2028 Total Approved Budget Forecast Project Cost C10700.251 0 -FS #5 Land Acquisition Land Acquisition $-$3,000,000 $-$3,000,000 C10700.2009 -FS #5 Replacement Legal, design & related 465,000 500,000 -$965,000 Construction --11,300,000 $11,300,000 Furniture, fixtures & equipment --350,000 $350,000 C10700.2705 -FS #5 Decommissioning & Demolition Decommissioning & Demolition --1,040,000 $1,040,000 $465,000 $3,500,000 $12,690,000 $16,655,000 Funding Internal Loan - 5 Year $465,000 $-$-$465,000 Debt -10 Year -3,000,000 -$3,000,000 Debt -20 Year -11,300,000 $11,300,000 Casino Reserve -280,000 -$280,000 Facilities Reserve -220,000 350,000 $570,000 Sale of Land --985,000 $985,000 Property Taxes --55,000 $55,000 $465,000 $3,500,000 $12,690,000 $16,655,000 The total project cost for relocation and construction of Fire Station #5 is $16,655,000. 20 City of Pickering 2025 Staff Recommended Draft Capital Budget . -------2023 2023 2024 2025 Approved YTD YTD Balance Mayor Ashe Budget Actuals Actuals Remaining - I I I I Expenditures I 502730 _Hardwar~ _R_E!place_me~!s $15,000 $4,9321 $4,5031 $5,565 - Total Expenditures $15,000 $4,932/ $4,503 j $5,565 ---- Financing --·- 408900 Property Tax Funded I ($15,000) .. -Tot~I Financing I ($15,000) I I As per Council Compensation & Communication Policy, $15,000 is provided for computer hardware/software, television (to be located in their City provided office), telecommunications equipment and home security (for their primary Pickering residence) per term. As per the policy, these funds can only be spent during the first 40 months of office. Approximately, $5,565 is remaining to be spent this term. 21 City of Pickering 2025 Staff Recommended Draft Capital Budget _M: ~r~t:-i!!~~! R~_g. Coun._W_a_!"~ -~ _ Expenditures ··--· .. ... ·-- _59?_!3_q -~ardwc1re ~epl~c~1:1e~t.:' _ _ ------I 2023 Approved Budget I $15,oooj --- 2023 i YTD I Actuals l --I t $3,4741 1· 2024 t YTD i I Actuals I i -· --1-$5,936 f 2025 Balance Remaining ---· $5,590 _Total Expend it~ re~f----'----+------'--'----'--------'--+---$_5_:_, 5_90 $15,oool $3,474 1 $5,936 j I· Financing I I ---------·--.. ---·-.. ---- i q~~9~ P~operty _Tax Fu_n_ded _ I ($15,000) I --l ($15,000) I I I i ---i I t - Total Financing I - -----.. --. . '---I _ ___, As per Council Compensation & Communication Policy, $15 ,000 is provided for computer hardware/software, television (to be located in their City provided office), telecommunications equipment and home security (for their primary Pickering residence) per term. As per the policy, these funds can only be spent during the first 40 months of office. Approximately, $5,590 is remaining to be spent this term. 22 City of Pickering 2025 Staff Recommended Draft Capital Budget -. . 2023 2023 Approved YTD L. Cook, R_eg. Co1:1n. Ward 2 Budget Actuals I Exp~~~!tur~~-___ --··· . . . _ ____ _ _ __ . i 502730 Hardware Replacements I I ; f15,000 1 ·- $6,415 ~ ---·_ ~ _ ----• --_ ---• -----Tot~_I-Exp~~~it~r~~-1 $15,000 1 $6,415; Fin~nc!~~--. __ . __ 40~~00 _P!~p~r!}'. T~~ Fu_nde_d _ .. ·-... -· -· ~- I I I ($15,ooo)I I . -I "f.9ta~ F!nan_c:!~9 ($15,000)! I .. I I I I I -.. 2024 2025 YTD Balance Actuals Remaining I $2471 $8,337 $247 1 $8,337 I I --I I As per Council Compensation & Communication Policy, $15,000 is provided for computer hardware/software, television (to be located in their City provided office), telecommunications equipment and home security (for their primary Pickering residence) per term. As per the policy, these funds can only be spent during the first 40 months of office. Approximately, $8,337 is remaining to be spent this term. 23 City of Pickering 2025 Staff Recommended Draft Capital Budget 2023 2023 ; 2024 Approved YTD I YTD 1· fY!.: N_c!9Y~ C_ity Coun. W1:1_r_d~ _ _ _ .. ___ _ Budget Actuals Actuals 2025 Balance Remaining ~xp~n9it~_re~ _ . ____ . _ . _ _ __ I . _ I / _ _ 50~7~g H~r~wa!e_ Replacemen~~ _ _ _ $15,000 $7,811 ! $DI $7 ,189 _ _ .. _ _-r 9tal Ex~e~ditur~s ,____$_1 _5,_0_00-;....-__ $7_,_81_1~I ____ $_0~i __ $_7_, 1_8-<9 I : I Fjn_a~~in~ _ . _ . -. --- 4g~900 Pro_e~_rty Tax Fun_ded ---. I _ Tot~I F_inancing / -· ($15,000) ($15,000) I I . -I I As per Council Compensation & Communication Policy, $15,000 is provided for computer hardware/software, television (to be located in their City provided office), telecommunications equipment and home security (for their primary Pickering residence) per term. As per the policy, these funds can only be spent during the first 40 months of office. Approximately, $7,189 is remaining to be spent this term. 26 City of Pickering 2025 Staff Recommended Draft Capital Budget i 2023 2023 YTD 2024 2025 YTD ' Balance i Approved S. Butt, ~ity ~oun. Ward 3 _ . _ 1 Budget Actuals : Actuals 1 , Remaining Expenditures I I i 502739_ ~~r9~are Rep~a~e_me.~t~-• -• $15,oool $4,364 : $15 / $10,620 $10,620 Total Expenditures $15,000I $4,364: $15 j 1---------+-I --~,------'-1 ----I Fin~n_cing ____ _ _ _ _ _. _ ($15,000)/ ! ($15,ooo)J I 4089_~0 Pr?.P_~rty ~ax F~_~de9 ____ J Total -Fi~anci~g l I : I . . . I I As per Council Compensation & Communication Policy, $15,000 is provided for computer hardware/software, television (to be located in their City provided office), telecommunications equipment and home security (for their primary Pickering residence) per term. As per the policy, these funds can only be spent during the first 40 months of office. Approximately, $10,620 is remaining to be spent this term. 27 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Office of the CAO Dept Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504000 Capital Land -9,157,000 504001 Capital Consulting -550,000 504500 Capital Construction -300,000 Total Expenditures -10,007,000 Financing 406500 Donations -(2,400,000) 4067 42 DC-DebtFinancng-1 0YR -(3,588,900) 408037 Trf fr Casino Res -(300,000) 408606 Trf fr DC-P&R OB RF -(1,947,000) 408703 Trf fr Animal Sit RF -(657,100) 408707 Trf fr SWM RF -(1,114,000) Total Financing -(10,007,000) 28 Corporate Projects City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504000 Capital Land -9,157,000 504001 Capital Consulting -550,000 504500 Capital Construction -300,000 Total Expenditures -10,007,000 Financing 406500 Donations -(2,400,000) 4067 42 DC-DebtFinancng-1 0YR -(3,588,900) 408037 Trf fr Casino Res -(300,000) 408606 Trf fr DC-P&R OB RF -(1,947,000) 408703 Trf fr Animal Sit RF -(657,100) 408707 Trf fr SWM RF -(1,114,000) Total Financing -(10,007,000) 29 10000 Corporate Projects Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10000.2501 Seaton Muncipal Land Aquisition C10000.2502 Seaton Muncipal Land -Site Servicing C10000.2503 Community Improvement lnitiaitives Total 30 Run Date: Oct 11, 2024 2025 Draft Budget 9,157,000 550,000 300,000 10,007,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10000 Corporate Projects C10000.2501 Seaton Muncipal Land Aquisition 01 Capital 504000 Capital Land Acquisition of lands in Seaton to be used for future municipal operations including: a Northern Operations Facility, Fire Station #3, an animal shelter and stormwater management facilities. 80 Funding 406500 Donations 4067 42 DC-DebtFinancng-1 OYR 408606 Trf fr DC-P&R OB RF 408703 Trf fr Animal Sit RF 408707 Trf fr SWM RF Total C10000.2501 Seaton Muncipal Land Aquisition C10000.2502 Seaton Muncipal Land -Site Servicing 01 Capital 504001 Capital Consulting Site servicing for lands in Seaton to be used for future municipal operations including: a Northern Operations Facility, Fire Station #3, an animal shelter and stormwater management facilities -Design. 80 Funding 4067 42 DC-DebtFinancng-1 OYR 408606 Trf fr DC-P&R 08 RF 408703 Trf fr Animal Sit RF 408707 Trf fr SWM RF Total C10000.2502 Seaton Muncipal Land -Site Servicing C10000.2503 Community Improvement lnitiaitives 01 Capital 504500 Capital Construction Construction of community improvement initiatives to be selected through the City's participatory budgeting process for Ward 1 ($100,000), Ward 2 ($100,000), and Ward 3 ($100,000). Projects will be selected by the public from the following options: dog park enhancements, outdoor fitness equipment, shade structure with picnic area, or urban street furniture. The community may also vote not to undertake any projects, and save the funds. 80 Funding 408037 Trf fr Casino Res Total C10000.2503 Community Improvement lnitiaitives Total 10000 Corporate Projects 31 Run Date: Oct 11, 2024 Funding Expense 9,157,000 (2,400,000) (3,318,900) (1,800,000) (607,100) (1,031,000) (9,157,000) 9,157,000 550,000 (270,000) (147,000) (50,000) (83,000) (550,000) 550,000 300,000 (300,000) (300,000) 300,000 (10,007,000) 10,007,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Community Services Dept Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502230 Consult&Prof Fees -78,000 502340 Building Rpr & Mntc 880,000 160,000 504001 Capital Consulting 18,471,500 2,912,000 504100 Capital Buildings 25,713,000 11,517,350 504200 Capital Machinery & Equipment 65,000 55,000 504950 Cap Furniture&Fix 533,500 1,110,000 Total Expenditures 45,663,000 15,832,350 Financing 402500 Federal Grants (880,000) - 406702 Debt Financing-10Year -- 406744 DC-DebtFinancng-20YR (14,134,152) - 408007 Trf fr Rate Stabilization Res -(3,990,000) 408021 Trf fr Senior Ctr Res (4,900,000) - 408026 Trf fr Facilities Res (1,521,500) (1,192,000) 408031 Trf fr Tennis Res (432,000) - 408032 Trf fr Equipment Res (128,000) (55,000) 408036 Trf fr Library Bldg Res (470,000) - 408037 Trf fr Casino Res (2,951,676) (6,725,000) 408502 Trf fr CCBF (FGT) Oblg RF (225,000) (3,850,000) 408505 Trf fr CBC Oblig RF (148,274) - 408606 Trf fr DC-P&R OB RF (17,622,209) - 408607 Trf fr DC-Library OB RF (1,491,898) - 408705 Trf fr OPs Center RF (235,000) - 408710 Trf fr Seaton FIA RF (377,791) - 408900 Property Tax Funded (145,500) (20,350) Total Financing (45,663,000) (15,832,350) 33 Dunbarton Pool City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting -150,000 504100 Capital Buildings -1,700,000 504950 Cap Furniture&Fix 42,000 - Total Expenditures 42,000 1,850,000 Financing 408032 Trf fr Equipment Res (42,000) - 408037 Trf fr Casino Res -(1,850,000) Total Financing (42,000) (1,850,000) 34 10210 Dunbarton Pool Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10210.2501 Pool Roof & Structure Replacement Total 35 Run Date: Oct 11, 2024 2025 Draft Budget 1,850,000 1,850,000 10210 Dunbarton Pool City of Pickering 2025 Staff Recommended Draft Capital Budget C10210.2501 Pool Roof & Structure Replacement 01 Capital 504001 Capital Consulting Design costs to replace the Dunbarton flat roof, roof structure and other related components. 504100 Capital Buildings Construction costs to replace the Dunbarton flat roof, roof structure and other related components. 80 Funding 408037 Trf fr Casino Res Total C10210.2501 Pool Roof & Structure Replacement Total 10210 Dunbarton Pool 36 Run Date: Oct 17, 2024 Funding Expense 150,000 1,700,000 (1,850,000) (1,850,000) 1,850,000 (1,850,000) 1,850,000 Don Beer Arena City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504100 Capital Buildings 166,000 288,000 Total Expenditures 166,000 288,000 Financing 408026 Trf fr Facilities Res (166,000) (138,000) 408037 Trf fr Casino Res -- 408502 Trf fr CCBF (FGT) Oblg RF -(150,000) Total Financing (166,000) (288,000) 37 10215 Don Beer Arena Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10215.2501 Fire Alarm System Upgrade C 10215.2503 Rinks 1, 2 & 3 Lighting Replacement Total 38 Run Date: Oct 11, 2024 2025 Draft Budget 138,000 150,000 288,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10215 Don Beer Arena C10215.2501 Fire Alarm System Upgrade 01 Capital 504100 Capital Buildings Lifecycle replacement of the main facility fire alarm system and related work. The existing system was installed in 2014. 80 Funding 408026 Trf fr Facilities Res Total C10215.2501 Fire Alarm System Upgrade C10215.2503 Rinks 1, 2 & 3 Lighting Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing lighting systems in rinks 1, 2 and 3, converting to LED for energy efficiency and reduced costs. Includes design, construction. and related costs. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10215.2503 Rinks 1, 2 & 3 Lighting Replacement Total 10215 Don Beer Arena 39 Run Date: Oct 11, 2024 Funding Expense 138,000 (138,000) (138,000) 138,000 150,000 (150,000) (150,000) 150,000 (288,000) 288,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Community Centres Expenditures 502340 Building Rpr & Mntc 504001 Capital Consulting 504100 Capital Buildings 504950 Cap Furniture&Fix Total Expenditures Financing 406744 DC-DebtFinancng-20YR 408021 Trf fr Senior Ctr Res 408026 Trf fr Facilities Res 408036 Trf fr Library Bldg Res 408037 Trf fr Casino Res 408502 Trf fr CCBF (FGT) Oblg RF 408505 Trf fr CBC Oblig RF 408607 Trf fr DC-Library OB RF 408900 Property Tax Funded Total Financing Abbreviations PHCC ESCC GWCC Pickering Heritage & Community Centre East Shore Community Centre Greenwood Community Centre 40 Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget -160,000 -152,000 21,889,000 520,350 345,000 910,000 22,234,000 1,742,350 (14,134,152) - (4,900,000) - (80,000) (812,000) (470,000) - (741,676) (910,000) (150,000) - (148,274) - (1,491,898) - (118,000) (20,350) (22,234,000) (1,742,350) City of Pickering 2025 Staff Recommended Draft Project Listing 10220 Community Centres Project Name C10220.2011 PHCC -Construction C10220.2501 Northern Community Centres Restoration C10220.2502 ESCC Security Camera Upgrades C 10220.2503 ESCC Structural Repairs C10220.2504 ESCC Roof Replacement & Repairs C10220.2506 GWCC Remediation and Demolition Total 41 Run Date: Oct 11, 2024 2025 Draft Budget 910,000 200,000 20,350 160,000 300,000 152,000 1,742,350 City of Pickering 2025 Staff Recommended Draft Capital Budget 10220 Community Centres C10220.2011 PHCC -Construction 01 Capital 504950 Cap Furniture&Fix Furniture, fixtures and equipment for the new Pickering Heritage & Community Centre. Additional FF&E budget for this project appears in 10900. Includes furniture, security, IT hardware, cabling, NV, appliances, program and facility equipment, fixtures, signage, wayfinding, moving, installation and related costs. 80 Funding 408037 Trf fr Casino Res Total C10220.2011 PHCC -Construction C10220.2501 Northern Community Centres Restoration 01 Capital 504100 Capital Buildings Funding to address age-related deterioration of existing facility comporients and systems. 80 Funding 408026 Trf fr Facilities Res Total C10220.2501 Northern Community Centres Restoration C10220.2502 ESCC Security Camera Upgrades 01 Capital 504100 Capital Buildings Lifecycle replacement of existing interior analog cameras including cabling and related equipment. 80 Funding 408900 Property Tax Funded Total C10220.2502 ESCC Security Camera Upgrades C10220.2503 ESCC Structural Repairs 90 Expense 502340 Building Rpr & Mntc Localized repairs to existing structural elements throughout the building based on the facility's age. 80 Funding 408026 Trf fr Facilities Res Total C10220.2503 ESCC Structural Repairs C10220.2504 ESCC Roof Replacement & Repairs 01 Capital 504100 Capital Buildings 42 Run Date: Oct 11, 2024 Funding Expense 910,000 (910,000) (910,000) 910,000 200,000 (200,000) (200,000) 200,000 20,350 (20,350) (20,350) 20,350 160,000 (160,000) (160,000) 160,000 300,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10220 Community Centres Lifecycle replacement of existing flat roofs over the main mechanical room (roof 5), adjacent storage areas (roof 6) and surrounding related roofs. The existing roofs were installed in 1997 and 1999. 80 Funding 408026 Trf fr Facilities Res Total C10220.2504 ESCC Roof Replacement & Repairs C10220.2506 GWCC Remediation and Demolition 01 Capital 504001 Capital Consulting Greenwood Community Centre demolition & remediation plan. Demolition design and testing only. 80 Funding 408026 Trf fr Facilities Res Total C10220.2506 GWCC Remediation and Demolition Total 10220 Community Centres 43 Run Date: Oct 11, 2024 Funding Expense (300,000) (300,000) 300,000 152,000 (152,000) (152,000) 152,000 (1,742,350) 1,742,350 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Rec. Complex -Central Core Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 433,000 50,000 504100 Capital Buildings 2,842,000 3,594,000 504200 Capital Machinery & Equipment 65,000 55,000 Total Expenditures 3,340,000 3,699,000 Financing 406702 Debt Financing-1 0Year -- 408026 Trf fr Facilities Res (558,000) (114,000) 408031 Trf fr Tennis Res (432,000) - 408032 Trf fr Equipment Res (65,000) (55,000) 408037 Trf fr Casino Res (2,210,000) - 408502 Trf fr CCBF (FGT) Oblg RF (75,000) (3,530,000) Total Financing (3,340,000) (3,699,000) Abbreviations ·cHDRC Chestnut Hill Developments Recreation Complex 44 City of Pickering 2025 Staff Recommended Draft Project Listing 10225 Rec. Complex -Central Core Project Name C10225.2404 Chiller & Cooling Tower Replacement C10225.2406 Roof & Skylight Replacement (D, D1 & 14) C10225.2501 Roof Replacement (J & 13) C10225.2502 CHDRC Steam Sauna Retrofit C10225.2507 Health Club Equipment Replacement Total 45 Run Date: Oct 11, 2024 2025 Draft Budget 930,000 2,600,000 50,000 64,000 55,000 3,699,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10225 Rec. Complex -Central Core C10225.2404 Chiller & Cooling Tower Replacement 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of existing chiller and cooling tower both installed in 2005. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10225.2404 Chiller & Cooling Tower Replacement C10225.2406 Roof & Skylight Replacement (D, D1 & 14) 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of roofs D & 01 (core area over space frame), 14 and related work. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10225.2406 Roof & Skylight Replacement (D, D1 & 14) C10225.2501 Roof Replacement (J & 13) 01 Capital 504001 Capital Consulting Lifecycle replacement of roof J (squash courts) and 13 (loading dock and exit corridor). Design and related costs only. 80 Funding 408026 Trf fr Facilities Res Total C10225.2501 Roof Replacement (J & 13) C10225.2502 CHDRC Steam Sauna Retrofit 01 Capital 504100 Capital Buildings Retrofit of the steam sauna to address performance and maintenance concerns. 80 Funding 408026 Trf fr Facilities Res Total C10225.2502 CHDRC Steam Sauna Retrofit C10225.2507 Health Club Equipment Replacement 01 Capital 504200 Capital Machinery & Equipment 46 Run Date: Oct 11, 2024 Funding Expense 930,000 (930,000) (930,000) 930,000 2,600,000 (2,600,000) (2,600,000) 2,600,000 50,000 (50,000) (50,000) 50,000 64,000 (64,000) (64,000) 64,000 55,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10225 Rec. Complex -Central Core Fitness Equipment Replacement: Plate Loaded Leg Press (1), Smith Machine (1), Functional Training Cable System (1), and Plate Loaded Calf Raise Machine (1). Fitness Equipment New: Squat Half Rack Machine (1), and Selectorized Strength Machine (1). 80 Funding 408032 Trf fr Equipment Res Total C10225.2507 Health Club Equipment Replacement Total 10225 Rec. Complex -Central Core 47 Run Date: Oct 11, 2024 Funding Expense (55,000) (55,000) 55,000 (3,699,000) 3,699,000 Rec. Complex -Pool City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504100 Capital Buildings -- 504950 Cap Furniture&Fix 31,000 - Total Expenditures 31,000 - Financing 408026 Trf fr Facilities Res (31,000) - 408037 Trf fr Casino Res -- Total Financing (31,000) - 48 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Rec Complex -Arenas Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting -50,000 504100 Capital Buildings 420,000 - Total Expenditures 420,000 50,000 Financing 408026 Trf fr Facilities Res (185,000) (50,000) 408705 Trf fr OPs Center RF (235,000) - Total Financing (420,000) (50,000) 49 City of Pickering 2025 Staff Recommended Draft Project Listing 10235 Rec Complex -Arenas Project Name C10235.2501 Delaney Arena Roof Replacement Total 50 Run Date: Oct 11, 2024 2025 Draft Budget 50,000 50,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10235 Rec Complex -Arenas C10235.2501 Delaney Arena Roof Replacement 01 Capital 504001 Capital Consulting Lifecycle replacement of the Delaney Arena roof. The existing roof was installed in 2003. Design and related costs only. 80 Funding 408026 Trf fr Facilities Res Total C10235.2501 Delaney Arena Roof Replacement Total 10235 Rec Complex -Arenas 51 Run Date: Oct 11, 2024 Funding Expense 50,000 (50,000) (50,000) 50,000 (50,000) 50,000 Civic Complex City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 38,500 2,510,000 504100 Capital Buildings 396,000 5,415,000 504950 Cap Furniture&Fix 27,500 200,000 Total Expenditures 462,000 8,125,000 Financing 408007 Trf fr Rate Stabilization Res -(3,990,000) 408026 Trf fr Facilities Res (413,500) - 408032 Trf fr Equipment Res (21,000) - 408037 Trf fr Casino Res -(3,965,000) 408502 Trf fr CCBF (FGT) Oblg RF -(170,000) 408900 Property Tax Funded (27,500) - Total Financing (462,000) (8,125,000) 52 10240 Civic Complex Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10240.1901 Generator Replacement C10240.2302 Council Chamber Renovation C10240.2402 Air Handling Units -SF3 + RF3 Replacement C 10240.2501 Civic Complex Interior Renovations C10240.2502 South Parking Lot Replacement C10240.2503 Building Envelope & Parking Garage Retrofit C10240.2508 City Hall Tower Retrofit • Total 53 Run Date: Oct 11, 2024 2025 Draft Budget 1,850,000 2,710,000 170,000 1,635,000 885,000 480,000 395,000 8,125,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10240 Civic Complex C10240.1901 Generator Replacement 01 Capital 504100 Capital Buildings Construction costs for the replacement of the existing backup power generator and related systems. Includes increasing the capacity of the existing and expanding backup power coverage throughout the Civic Complex. 80 Funding 408037 Trf fr Casino Res Total C10240.1901 Generator Replacement C10240.2302 Council Chamber Renovation 01 Capital 504100 Capital Buildings Construction costs for renovations to the Council Chamber, Main Committee Room and connecting spaces. Includes furniture, fixture and equipment costs. 504950 Cap Furniture&Fix 80 Funding 408007 Trf fr Rate Stabilization Res Total C10240.2302 Council Chamber Renovation C10240.2402 Air Handling Units -SF3 + RF3 Replacement 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of supply fan SF-3 and return fan RF-3 serving the council chambers in city hall, including controls upgrade. Both are original equipment installed in 1990. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10240.2402 Air Handling Units -SF3 + RF3 Replacement C10240.2501 Civic Complex Interior Renovations 01 Capital 504001 Capital Consulting Interior renovation of the existing City Hall areas within the Civic Complex to consolidate customer service counters on the ground floor, and retrofit staff and support spaces for greater efficiency. The Civic Complex opened in 1990 and is due for finish and infrastructure upgrades. Consulting and related costs only. 80 Funding 408037 Trf fr Casino Res 54 Run Date: Oct 11, 2024 Funding Expense 1,850,000 (1,850,000) (1,850,000) 1,850,000 2,510,000 200,000 (2,710,000) (2,710,000) 2,710,000 170,000 (170,000) (170,000) 170,000 1,635,000 (1,635,000) City of Pickering 2025 Staff Recommended Draft Capital Budget 10240 Civic Complex Total C10240.2501 Civic Complex Interior Renovations C10240.2502 South Parking Lot Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the South Parking lot including, paving, localized curb repairs, lighting, EV charging stations and related works. 80 Funding 408007 Trf fr Rate Stabilization Res Total C10240.2502 South Parking Lot Replacement C10240.2503 Building Envelope & Parking Garage Retrofit 01 Capital 504001 Capital Consulting Lifecycle replacement to the existing building envelope and parking garage including glazing systems, skylights, metal roofs, localized brick repairs, parking garage waterproofing and its aging interior. All components are original from 1990. Consulting and related costs only. 80 Funding 408037 Trf fr Casino Res Total C10240.2503 Building Envelope & Parking Garage Retrofit C10240.2508 City Hall Tower Retrofit 01 Capital 504001 Capital Consulting Lifecycle Replacement of the existing City Hall Tower including balcony repairs, tower structural steel coating, louvres, metal roofing system, clocks, localized brick repairs and glazing system. All components are original from 1990. Consulting and related costs only. 80 Funding 408007 Trf fr Rate Stabilization Res Total C10240.2508 City Hall Tower Retrofit Total 10240 Civic Complex 55 Run Date: Oct 11, 2024 Funding Expense (1,635,000) 1,635,000 885,000 (885,000) (885,000) 885,000 480,000 (480,000) (480,000) 480,000 395,000 (395,000) (395,000) 395,000 (8,125,000) 8,125,000 Museum City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502230 Consult&Prof Fees -78,000 502340 Building Rpr & Mntc 880,000 - 504950 Cap Furniture&Fix 88,000 - Total Expenditures 968,000 78,000 Financing 402500 Federal Grants (880,000) - 408026 Trf fr Facilities Res (88,000) (78,000) Total Financing (968,000) (78,000) 56 City of Pickering 2025 Staff Recommended Draft Project Listing 10250 Museum Project Name C10250.2503 Harvey House Restoration Total 57 Run Date: Oct 11, 2024 2025 Draft Budget 78,000 78,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10250 Museum C10250.2503 Harvey House Restoration 90 Expense 502230 Consult&Prof Fees Harvey House has been relocated and set upon a full basement and foundation as part of the Pickering Heritage & Community Centre (PHCC) project, including provision of electrical service, heating and cooling systems to allow it to be utilized year-round. Full restoration of the building was not included in the PHCC project, but will be required before ii can be used to deliver any programming. The building's exterior requires a new porch and finishes, and its interior is currently bare framing the requires renovation and finishing to accommodate public use. It is proposed that previously approved contingency for the PHCC project, per report FIN 03-24 (Council resolution #398/24) be used to undertake this project, if available. Design and related costs only. 80 Funding 408026 Trf fr Facilities Res Total C10250.2503 Harvey House Restoration Total 10250 Museum 58 Run Date: Oct 11, 2024 Funding Expense 78,000 (78,000) (78,000) 78,000 (78,000) 78,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Seaton Recreation Complex Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 18,000,000 - 504950 Cap Furniture&Fix -- Total Expenditures 18,000,000 - Financing 408606 Trf fr DC-P&R OB RF (17,622,209) - 408710 Trf fr Seaton FIA RF (377,791) - Total Financing (18,000,000) - 59 Expenditures Other Fixed Assets502760 200,000 310,000 Capital Consulting504001 1,096,000 1,275,000 Capital Buildings504100 2,562,500 1,265,000 Capital Machinery & Equipment504200 1,580,000 2,617,800 Capital Vehicles504300 4,945,000 6,975,000 Capital Roads504400 100,000 - Cap Bridges & Culverts504420 - 500,000 Capital Sidewalks504600 - 75,000 Capital Parks504700 1,466,500 1,617,000 Cap Furniture&Fix504950 53,000 - Total Expenditures 12,003,000 14,634,800 Financing Debt Financing-5-Year406701 - - Debt Financing-10Year406702 - - DC-DebtFinancing-5YR406741 (1,240,000) - DC-DebtFinancng-20YR406744 - (663,000) Trf fr Rate Stabilization Res408007 (675,000)(4,750,000) Trf fr DC City Share Res408008 - - Trf fr Vehicle Rpl. Res408016 (2,785,000)(2,830,000) Trf fr Sustainable Initiatives Res408024 (185,000) - Trf fr Fence Res408028 (550,000)(310,000) Trf fr Tennis Res408031 (295,000)(190,000) Trf fr Equipment Res408032 (905,000)(1,185,000) Trf fr Casino Res408037 (706,000)(865,000) Trf fr Parks Infr. Repl. Res408041 (238,500) - Trf fr Parkland Oblg RF408501 (41,000) - Trf fr CCBF (FGT) Oblg RF408502 (202,000)(1,105,000) Trf fr Building Permit Oblg RF408503 - (60,000) Trf fr DC-Other Hwy ORF408603 (693,000)(233,800) Trf fr DC-P&R OB RF408606 (752,000)(817,000) Trf fr DC-Bylaw ES RF408608 - - Trf fr OPs Center RF408705 (2,495,500)(1,265,000) Trf fr Rds & Bridges RF408706 (100,000) - Property Tax Funded408900 (140,000)(361,000) 2024 Approved Budget 2025 Draft Budget City of Pickering Operations Dept Run Date: Oct 23, 2024 Staff Recommended Draft Capital Budget Summary 2025 60 Total Financing (12,003,000)(14,634,800) 2024 Approved Budget 2025 Draft Budget City of Pickering Operations Dept Run Date: Oct 23, 2024 Staff Recommended Draft Capital Budget Summary 2025 61 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Public Works Admin. Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 880,000 1,105,000 504100 Capital Buildings 2,377,500 1,265,000 504200 Capital Machinery & Equipment -85,000 504950 Cap Furniture&Fix 53,000 - Total Expenditures 3,310,500 2,455,000 Financing 406744 DC-DebtFinancng-20YR -(663,000) 408032 Trf fr Equipment Res -(45,000) 408603 Trf fr DC-Other Hwy ORF (528,000) - 408606 Trf fr DC-P&R OB RF (352,000) (442,000) 408705 Trf fr OPs Center RF (2,430,500) (1,265,000) 408900 Property Tax Funded -(40,000) Total Financing (3,310,500) (2,455,000) 62 City of Pickering 2025 Staff Recommended Draft Project Listing 10300 Public Works Admin. Project Name C10300.2404 Northern Operations Facility C10300.2501 Tire Machine and Wheel Balancer C 10300.2502 Rooftop Solar Panel System C10300.2503 Hoist-New Total 63 Run Date: Oct 11, 2024 2025 Draft Budget 1,105,000 45,000 1,265,000 40,000 2,455,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10300 Public Works Admin. C10300.2404 Northern Operations Facility 01 Capital 504001 Capital Consulting Additional funding for design and related costs for a new Northern Operations Facility. 80 Funding 4067 44 DC-DebtFinancng-20YR 408606 Trf fr DC-P&R OB RF Total C10300.2404 Northern Operations Facility C10300.2501 Tire Machine and Wheel Balancer 01 Capital 504200 Capital Machinery & Equipment Tire Machine and Wheel Balancer -Replacement. 80 Funding 408032 Trf fr Equipment Res Total C10300.2501 Tire Machine and Wheel Balancer C10300.2502 Rooftop Solar Panel System 01 Capital 504100 Capital Buildings Construction costs for the installation of rooftop photovoltaic panels and related work. Provision for future installation of solar panels was incorporated into the original design of the Operations Centre. 80 Funding 408705 Trf fr OPs Center RF Total C10300.2502 Rooftop Solar Panel System C10300.2503 Hoist -New 01 Capital 504200 Capital Machinery & Equipment Hoist purchase and installation -New. 80 Funding 408900 Property Tax Funded Total C10300.2503 Hoist -New Total 10300 Public Works Admin. 64 Run Date: Oct 11, 2024 Funding Expense 1,105,000 (663,000) (442,000) (1,105,000) 1,105,000 45,000 (45,000) (45,000) 45,000 1,265,000 (1,265,000) (1,265,000) 1,265,000 40,000 (40,000) (40,000) 40,000 (2,455,000) 2,455,000 Expenditures Other Fixed Assets502760 200,000 200,000 Capital Consulting504001 100,000 150,000 Capital Machinery & Equipment504200 795,000 803,800 Capital Roads504400 100,000 - Cap Bridges & Culverts504420 - 500,000 Capital Sidewalks504600 - 75,000 Total Expenditures 1,195,000 1,728,800 Financing DC-DebtFinancing-5YR406741 (275,000) - Trf fr Rate Stabilization Res408007 (100,000)(150,000) Trf fr Fence Res408028 (200,000)(200,000) Trf fr Equipment Res408032 (520,000)(345,000) Trf fr Casino Res408037 - (500,000) Trf fr CCBF (FGT) Oblg RF408502 - (75,000) Trf fr DC-Other Hwy ORF408603 - (233,800) Trf fr DC-P&R OB RF408606 - (225,000) Trf fr Rds & Bridges RF408706 (100,000) - Total Financing (1,195,000)(1,728,800) 2024 Approved Budget 2025 Draft Budget City of Pickering Property Maintenance Run Date: Oct 23, 2024 Staff Recommended Draft Capital Budget Summary 2025 65 City of Pickering 2025 Staff Recommended Draft Project Listing 10305 Property Maintenance Project Name C 10305.1505 Property Line Fence Replacement C10305.2409 Pedestrian Bridge 9 -Bridge Replacement C10305.2501 Zero Turn -Replacement (4) C 10305.2502 Sidewalk Sweeper with Attachments -New C10305.2503 Wide Area Mower-Replacement C10305.2504 Walkway Reconstruction: Rosebank -Lightfoot C10305.2506 Wide Area Mower-New Total 66 Run Date: Oct 11, 2024 2025 Draft Budget 200,000 650,000 120,000 233,800 225,000 75,000 225,000 1,728,800 Property Line Fence ReplacementC10305.1505 Expense90 Other Fixed Assets502760 200,000 Property Line Fencing Replacement. Funding80 Trf fr Fence Res408028 (200,000) Total C10305.1505 Property Line Fence Replacement (200,000)200,000 Pedestrian Bridge 9 - Bridge ReplacementC10305.2409 Capital01 Capital Consulting504001 150,000 Additional Funds - Design cost for Pickering Museum Village (PB 09) Replacement Construction. Cap Bridges & Culverts504420 500,000 Construction costs for Pickering Museum Village pedestrian bridge (PB 09) replacement. Funding80 Trf fr Rate Stabilization Res408007 (150,000) Trf fr Casino Res408037 (500,000) Total C10305.2409 Pedestrian Bridge 9 - Bridge Replacement (650,000)650,000 Zero Turn - Replacement (4)C10305.2501 Capital01 Capital Machinery & Equipment504200 120,000 Electric Zero Turn Mowers - Replacement of gas units #570, #571, #572 & #573 (2018). Funding80 Trf fr Equipment Res408032 (120,000) Total C10305.2501 Zero Turn - Replacement (4)(120,000)120,000 Sidewalk Sweeper with Attachments - NewC10305.2502 Capital01 Capital Machinery & Equipment504200 233,800 Sidewalk Sweeper with Attachments - New. Funding80 Trf fr DC-Other Hwy ORF408603 (233,800) Total C10305.2502 Sidewalk Sweeper with Attachments - New (233,800)233,800 Wide Area Mower - ReplacementC10305.2503 Capital01 Capital Machinery & Equipment504200 225,000 Funding Expense City of Pickering Staff Recommended Draft Capital Budget 10305 Property Maintenance Run Date: Oct 23, 2024 2025 67 Wide Area Mower replace unit #788. Funding80 Trf fr Equipment Res408032 (225,000) Total C10305.2503 Wide Area Mower - Replacement (225,000)225,000 Walkway Reconstruction: Rosebank - LightfootC10305.2504 Capital01 Capital Sidewalks504600 75,000 Reconstruct walkway between Rosebank Road and Lightfoot Place. Funding80 Trf fr CCBF (FGT) Oblg RF408502 (75,000) Total C10305.2504 Walkway Reconstruction: Rosebank - Lightfoot (75,000)75,000 Wide Area Mower - NewC10305.2506 Capital01 Capital Machinery & Equipment504200 225,000 Wide Area Mower - New. Funding80 Trf fr DC-P&R OB RF408606 (225,000) Total C10305.2506 Wide Area Mower - New (225,000)225,000 Total 10305 Property Maintenance (1,728,800)1,728,800 Funding Expense City of Pickering Staff Recommended Draft Capital Budget 10305 Property Maintenance Run Date: Oct 23, 2024 2025 68 Sixth Concession Road Trimble ' s Lan e Hig h way 7 Gr e enwo o d R oad 2025 Staff Recommended Draft Budget Location and Proposed Construction: Pedestrian Bridge 9 - Bridge Replacement $150,000 $650,000 Budget Amount: C10305.2409 Financing Sources: 408007 Trf fr RateStblz Res Additional design funding and construction costs for the replacement of the Pickering Museum Village Pedestrian Bridge 408037 Trf fr Casino Res $500,000 $650,000 69 ~ -~7 \ I I ' • I G City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Fleet Services Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504200 Capital Machinery & Equipment 65,000 690,000 504300 Capital Vehicles 4,945,000 6,975,000 Total Expenditures 5,010,000 7,665,000 Financing 406701 Debt Financing-5-Year -- 406702 Debt Financing-10Year -- 4067 41 DC-DebtFinancing-5YR (965,000) - 408007 Trf fr Rate Stabilization Res (450,000) (4,600,000) 408008 Trf fr DC City Share Res -- 408016 Trf fr Vehicle Rpl. Res (2,535,000) (2,830,000) 408028 Trf fr Fence Res (350,000) - 408032 Trf fr Equipment Res (80,000) (25,000) 408503 Trf fr Building Permit Oblg RF -(60,000) 408603 Trf fr DC-Other Hwy ORF (165,000) - 408606 Trf fr DC-P&R OB RF (400,000) (150,000) 408608 Trf fr DC-Bylaw ES RF -- 408705 Trf fr OPs Center RF (65,000) - 408900 Property Tax Funded -- Total Financing (5,010,000) (7,665,000) 70 City of Pickering 2025 Staff Recommended Draft Project Listing 10310 Fleet Services Run Date: Oct 11, 2024 Project Name C10110.2501 Electric Vehicle -Replacement C 10305.2505 1 Ton Boom Truck with Bucket -Replacement C10315.2504 4 Ton Dump Truck with Snow Plow and Wing -New C10315.2505 4 Ton Dump Truck with Snow Plow and Wing -Replacement (2) C10315.2506 1 Ton Truck with Aluminum Dump Body & Tailgate Lift Replacement C10315.2507 5 Ton Water Tanker -New C10315.2509 3/4 Ton Pickup Truck with Slide in Salter and Plow (2) -New C10320.2516 1 Ton Dump Truck with Aluminum Body and Lift Gate -Repl. (4) C10320.2517 Enclosed Trailer Replacement C10320.2518 1 Ton Dump Truck with Tailgate Lift-New C10425.2501 Midsize Pickup 4x4 Full Four Door -New C10700.2501 Fire Truck -Pumper Rescue Replacement C10700.2508 Fire Truck -Aerial Ladder Replacement C10700.2509 1/2 Ton Pickup Truck-Replacement Total 71 2025 Draft Budget 60,000 150,000 450,000 900,000 110,000 390,000 200,000 500,000 25,000 150,000 65,000 2,100,000 2,500,000 65,000 7,665,000 -....I N 2025 Staff Recommended Draft Vehicle Acquisition List (New & Replacement) Description of Existing Plans for Vehicle New or Expected Vehicle Replacement Vehicle Requested Vehicle: Year, Make, Costs Primary User being Replacement Unit# Replaced Reserve Replacement Electric Vehicle 2018 Chevy Bolt, #651 $60,000 Building SeNices Sale $60,000 Replacement 1 Ton Boom Truck with Bucket 2013 Ford, #794 150,000 Property Maintenance Sale 150,000 Replacement 4 Ton Dump Truck with Snow Plow and Wing (2) 2016 Mack, #043, #044 900,000 Roads Equipment Sale 900,000 Replacement 1 Ton Truck with Aluminum Dump Body & 2018 Dodge Ram, #768 110,000 Roads Equipment Sale 110,000 Tailgate Lift Replacement 1 Ton Dump Truck with Aluminum Body & Lift 2016,2017,2018,2019 500,000 Parks Sale 500,000 Gate (4) Dodge Ram, #769, #777, #763,#764 Replacement 1/2 Ton Pickup Truck 2017 Ford, #586 65,000 Fire Sale 65,000 Replacement Fire Truck -Pumper Rescue 2010 Smeal, #543 2,100,000 Fire Sale - Replacement Fire Truck -Aerial Ladder 2013 Smeal, #545 2,500,000 Fire Sale - New (Growth) Midsize Pickup 4x4 Full Door N/A 65,000 Bylaw 65,000 New (Growth) 4 Ton Dump Truck with Snow Plow and Wing N/A 450,000 Roads Equipment 450,000 New (Growth) 5 Ton Water Tanker NIA 390,000 Roads Equipment 390,000 New (Growth) 3/4 Ton Pickup Truck with Slide in Slater and N/A 200,000 Roads Equipment 200,000 Plow(2) New (Growth) 1 Ton Dump Truck with Tailgate Lift N/A 150,000 Parks - Total 18 $7,640,000 $2,890,000 Other Funding Source - - - - - - 2,100,000 2,500,000 - - - - 150,000 $4,750,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10310 Fleet Services C10110.2501 Electric Vehicle -Replacement 01 Capital 504300 Capital Vehicles Electric Vehicle -replace unit #651 (2018 Chevy Bolt) (Building Services). 80 Funding 408503 Trf fr Building Permit Oblg RF Total C10110.2501 Electric Vehicle -Replacement C10305.2505 1 Ton Boom Truck with Bucket -Replacement 01 Capital 504300 Capital Vehicles 1 Ton Boom Truck with Bucket -replace unit #794 (2013 Ford) (Property Maintenance). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10305.25051 Ton Boom Truck with Bucket -Replacement C10315.2504 4 Ton Dump Truck with Snow Plow and Wing -New 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow and Wing -New -(Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2504 4 Ton Dump Truck with Snow Plow and Wing -New C10315.2505 4 Ton Dump Truck with Snow Plow and Wing -Replacement (2) 01 Capital 504300 Capital Vehicles Two 4 Ton Dump Trucks with Snow Plow and Wing -replace two units #043 & #044 (2016 Mack) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2505 4 Ton Dump Truck with Snow Plow and Wing -Replacem1 C10315.2506 1 Ton Truck with Aluminum Dump Body & Tailgate Lift Replacem 01 Capital 504300 Capital Vehicles 1 Ton Truck with Aluminum Dump Body and Tailgate Lift -replace unit #768 (2018 Dodge Ram) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res 74 Run Date: Oct 11, 2024 Funding Expense 60,000 (60,000) (60,000) 60,000 150,000 (150,000) (150,000) 150,000 450,000 (450,000) (450,000) 450,000 900,000 (900,000) (900,000) 900,000 110,000 (110,000) City of Pickering 2025 Staff Recommended Draft Capital Budget 1031 0 Fleet Services Total C10315.2506 1 Ton Truck with Aluminum Dump Body & Tailgate Lift RE C10315.2507 5 Ton Water Tanker -New 01 Capital 504300 Capital Vehicles 5 Ton Water Tanker Truck -New (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2507 5 Ton Water Tanker -New C10315.2509 3/4 Ton Pickup Truck with Slide in Salter and Plow (2) -New 01 Capital 504300 Capital Vehicles 3/4 Ton Pickup Truck with Slide in Salter and Plow (2) -New (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2509 3/4 Ton Pickup Truck with Slide in Salter and Plow (2) -N1 C10320.2516 1 Ton Dump Truck with Aluminum Body and Lift Gate -Repl. (4) 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck -replace units #769 (2017 Dodge Ram), #777 (2016 Dodge Ram), #763 (2018 Dodge Ram) and #764 (2019 Dodge Ram) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.2516 1 Ton Dump Truck with Aluminum Body and Lift Gate - R C10320.2517 Enclosed Trailer Replacement 01 Capital 504300 Capital Vehicles Replace unit #705 (2019 Miska) (Parks). 80 Funding 408032 Trf fr Equipment Res Total C10320.2517 Enclosed Trailer Replacement C10320.2518 1 Ton Dump Truck with Tailgate Lift -New 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF 75 Run Date: Oct 11, 2024 Funding Expense (110,000) 110,000 390,000 (390,000) (390,000) 390,000 200,000 (200,000) (200,000) 200,000 500,000 (500,000) (500,000) 500,000 25,000 (25,000) (25,000) 25,000 150,000 (150,000) City of Pickering 2025 Staff Recommended Draft Capital Budget 1031 0 Fleet Services Total C10320.2518 1 Ton Dump Truck with Tailgate Lift -New C10425.2501 Midsize Pickup 4x4 Full Four Door -New 01 Capital 504300 Capital Vehicles Midsize Pickup 4x4 Full Four Door -New (MLES). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10425.2501 Midsize Pickup 4x4 Full Four Door -New C10700.2501 Fire Truck -Pumper Rescue Replacement 01 Capital 504200 Capital Machinery & Equipment 504300 Capital Vehicles Fire Truck -Pumper Rescue Replacement -replace unit #543 (2010 Smeal Pumper) (Fire Services). 80 Funding 408007 Trf fr Rate Stabilization Res Total C10700.2501 Fire Truck -Pumper Rescue Replacement C10700.2508 Fire Truck -Aerial Ladder Replacement 01 Capital 504200 Capital Machinery & Equipment 504300 Capital Vehicles Fire Truck -Rescue -replace unit #545 (2013 Smeal) (Fire Services). 80 Funding 408007 Trf fr Rate Stabilization Res Total C10700.2508 Fire Truck -Aerial Ladder Replacement C10700.2509 1/2 Ton Pickup Truck -Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #586 (2017 Ford) (Fire Services). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10700.2509 1/2 Ton Pickup Truck -Replacement Total 10310 Fleet Services 76 Run Date: Oct 11, 2024 Funding Expense (150,000) 150,000 65,000 (65,000) (65,000) 65,000 315,000 1,785,000 (2,100,000) (2,100,000) 2,100,000 375,000 2,125,000 (2,500,000) (2,500,000) 2,500,000 65,000 (65,000) (65,000) 65,000 (7,665,000) 7,665,000 Roads Equipment City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504200 Capital Machinery & Equipment 400,000 764,000 Total Expenditures 400,000 764,000 Financing 408016 Trf fr Vehicle Rpl. Res (250,000) - 408032 Trf fr Equipment Res (85,000) (620,000) 408900 Property Tax Funded (65,000) (144,000) Total Financing (400,000) (764,000) 77 10315 Roads Equipment Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10315.2503 Street Sweeper-Replacement C10315.2510 Grader Plow (2) -New C10315.2511 Grader Roller (2) -New Total 78 Run Date: Oct 11, 2024 2025 Draft Budget 620,000 74,000 70,000 764,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10315 Roads Equipment C10315.2503 Street Sweeper -Replacement 01 Capital 504200 Capital Machinery & Equipment Street Sweeper -replace unit #150 (2015). 80 Funding 408032 Trf fr Equipment Res Total C10315.2503 Street Sweeper -Replacement C10315.2510 Grader Plow (2) -New 01 Capital 504200 Capital Machinery & Equipment Grader Plow (2) -New (Roads Equipment). 80 Funding 408900 Property Tax Funded Total C10315.2510 Grader Plow (2) -New C10315.2511 Grader Roller (2) -New 01 Capital 504200 Capital Machinery & Equipment Grader Roller (2) -New (Roads Equipment). 80 Funding 408900 Property Tax Funded Total C10315.2511 Grader Roller (2) -New Total 10315 Roads Equipment 79 Run Date: Oct 11, 2024 Funding Expense 620,000 (620,000) (620,000) 620,000 74,000 (74,000) (74,000) 74,000 70,000 (70,000) (70,000) 70,000 (764,000) 764,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Parks Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502760 other Fixed Assets -110,000 504001 Capital Consulting 116,000 20,000 .504200 Capital Machinery & Equipment 320,000 275,000 504700 Capital Parks 1,466,500 1,617,000 Total Expenditures 1,902,500 2,022,000 Financing 408007 Trf fr Rate Stabilization Res (125,000) - 408028 Trf fr Fence Res -(110,000) 408031 Trf fr Tennis Res (295,000) (190,000) 408032 Trf fr Equipment Res (220,000) (150,000) 408037 Trf fr Casino Res (706,000) (365,000) 408041 Trf fr Parks lnfr. Repl. Res (238,500) - 408501 Trffr Parkland Oblg RF (41,000) - 408502 Trf fr CCBF (FGT) Oblg RF (202,000) (1,030,000) 408606 Trf fr DC-P&R OB RF -- 408900 Property Tax Funded (75,000) (177,000) Total Financing {1,902,500) (2,022,000) Abbreviations BRC Brock Ridge Community Park BM Beverly Morgan Park 80 City of Pickering 2025 Staff Recommended Draft Project Listing 10320 Parks Run Date: Oct 11, 2024 Project Name C10320.2108 Parks Property Line Fence Replacement C10320.2403 BRC Park Baseball Light Replacement & New Scoreboard -Kirkey Fiel C10320.2407 BRC Park Parking Lot Improvements -Construction C10320.2433 BM Park-Artificial Turf Replacement C10320.2435 St. Mary Long Jump Replacement C10320.2501 Water Trailer-Replacement C 10320.2502 Utility Tractor Replacement -Electric C10320.2503 Tractor -Replacement C10320.2506 Glendale Tennis Courts Resurfacing C10320.2508 Park Security Cameras Total 81 2025 Draft Budget 110,000 20,000 345,000 1,030,000 52,000 25,000 35,000 90,000 190,000 125,000 2,022,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10320 Parks C10320.2108 Parks Property Line Fence Replacement 90 Expense 502760 Other Fixed Assets Property Line Fence Replacement. 80 Funding 408028 Trf fr Fence Res Total C10320.2108 Parks Property Line Fence Replacement C10320.2403 BRC Park Baseball Light Replacement & New Scoreboard -Kirke 01 Capital 504001 Capital Consulting Design and related costs for a new scoreboard at Kirkey Field Baseball Diamond 80 Funding 408037 Trf fr Casino Res Total C10320.2403 BRC Park Baseball Light Replacement & New Scoreboarc C10320.2407 BRC Park Parking Lot Improvements -Construction 01 Capital 504700 Capital Parks Additional funding for construction of Brockridge Community Park Parking Lot improvements. Existing gravel parking lot to be regraded and paved. Existing swale between east and west parking lots to have new box culvert installed for improved safety and access. 80 Funding 408037 Trf fr Casino Res Total C10320.2407 BRC Park Parking Lot Improvements -Construction C10320.2433 BM Park -Artificial Turf Replacement 01 Capital 504700 Capital Parks Beverley Morgan Park -Artificial Turf Replacement -Construction. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10320.2433 BM Park -Artificial Turf Replacement C10320.2435 St. Mary Long Jump Replacement 01 Capital 504700 Capital Parks Additional funds for the replacement of the Long Jump at St. Mary Park, including paving, base, sand pit and rubber track materials. 80 Funding 82 Run Date: Oct 11, 2024 Funding Expense 110,000 (110,000) (110,000) 110,000 20,000 (20,000) (20,000) 20,000 345,000 (345,000) (345,000) 345,000 1,030,000 (1,030,000) (1,030,000) 1,030,000 52,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10320 Parks 408900 Property Tax Funded Total C10320.2435 St. Mary Long Jump Replacement C10320.2501 Water Trailer -Replacement 01 Capital 504200 Capital Machinery & Equipment Water Trailer -replace unit #701 (2015). 80 Funding 408032 Trf fr Equipment Res Total C10320.2501 Water Trailer -Replacement C10320.2502 Utility Tractor Replacement -Electric 01 Capital 504200 Capital Machinery & Equipment Tractor -replace unit #732 (2015 John Deere Gator). 80 Funding 408032 Trf fr Equipment Res Total C10320.2502 Utility Tractor Replacement -Electric C10320.2503 Tractor -Replacement 01 Capital 504200 Capital Machinery & Equipment Tractor -replace unit #713 (2015 John Deere). 80 Funding 408032 Trf fr Equipment Res Total C10320.2503 Tractor -Replacement C10320.2506 Glendale Tennis Courts Resurfacing 01 Capital 504700 Capital Parks Glendale Tennis Courts Resurfacing at David Farr Memorial Park. 80 Funding 408031 Trf fr Tennis Res Total C10320.2506 Glendale Tennis Courts Resurfacing C10320.2508 Park Security Cameras 01 Capital 504200 Capital Machinery & Equipment Park security camera installations at various parks. 80 Funding 408900 Property Tax Funded Total C10320.2508 Park Security Cameras 83 Run Date: Oct 11, 2024 Funding Expense (52,000) (52,000) 52,000 25,000 (25,000) (25,000) 25,000 35,000 (35,000) (35,000) 35,000 90,000 (90,000) (90,000) 90,000 190,000 (190,000) (190,000) 190,000 125,000 (125,000) (125,000) 125,000 10320 Parks Total 10320 Parks City of Pickering 2025 Staff Recommended Draft Capital Budget 84 Run Date: Oct 11, 2024 Funding Expense (2,022,000) 2,022,000 Operations Services City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504100 Capital Buildings 185,000 - Total Expenditures 185,000 - Financing 408024 Trf fr Sustainable Initiatives Res (185,000) - Total Financing (185,000) - 88 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Corporate Services Dept Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502340 Building Rpr & Mntc -- 502720 System&Sftwr Upgrade 77,000 - 504800 Cap Information Tech 268,000 473,000 Total Expenditures 345,000 473,000 Financing 408001 Trf fr IT Res (345,000) (408,000) 408900 Property Tax Funded -(65,000) Total Financing (345,000) (473,000) 89 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Information Technology Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502340 Building Rpr & Mntc -- 502720 System&Sftwr Upgrade 77,000 - 504800 Cap Information Tech 268,000 473,000 Total Expenditures 345,000 473,000 Financing 408001 Trf fr IT Res (345,000) (408,000) 408900 Property Tax Funded -(65,000) Total Financing (345,000) (473,000) 90 City of Pickering 2025 Staff Recommended Draft Project Listing 10405 Information Technology Project Name C10405.2501 Corporate Network Monitoring Solution C10405.2502 Technology Services Upgrades C 10405.2503 End of Life Endpoint and Peripheral Replacement Total 91 Run Date: Oct 11, 2024 2025 Draft Budget 65,000 250,000 158,000 473,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10405 Information Technology C10405.2501 Corporate Network Monitoring Solution 01 Capital 504800 Cap Information Tech Corporate network monitoring solution to improve network efficiency and reduce downtime. 80 Funding 408900 Property Tax Funded Total C10405.2501 Corporate Network Monitoring Solution C10405.2502 Technology Services Upgrades 01 Capital 504800 Cap Information Tech Enterprise backup solution for on-premises and cloud-based solutions containing municipal data, with immutable backup capability for improved data security. 80 Funding 408001 Trf fr IT Res Total C10405.2502 Technology Services Upgrades C10405.2503 End of Life Endpoint and Peripheral Replacement 01 Capital 504800 Cap Information Tech Replacement of End User Computing Devices. 80 Funding 408001 Trf fr IT Res Total C10405.2503 End of Life Endpoint and Peripheral Replacement Total 10405 Information Technology 92 Run Date: Oct 11, 2024 Funding Expense 65,000 (65,000) (65,000) 65,000 250,000 (250,000) (250,000) 250,000 158,000 (158,000) (158,000) 158,000 (473,000) 473,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Engineering Services Dept Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502230 Consult&Prof Fees -- 502390 Grounds Upkeep -- 504000 Capital Land 15,000 - 504001 Capital Consulting 2,511,300 702,500 504400 Capital Roads 9,200,000 5,570,000 504420 Cap Bridges & Culverts 825,000 2,697,000 504450 Cap Traffic Signals 540,200 60,000 504520 Capital Development Construction 200,000 200,000 504550 Capital Storm System 1,600,000 575,600 504600 Capital Sidewalks 689,100 174,500 504620 Capital Streetlights 600,000 - 504700 Capital Parks 23,149,300 8,555,800 Total Expenditures 39,329,900 18,535,400 Financing 406702 Debt Financing-10Year -- 4067 42 DC-DebtFinancng-1 0YR -- 408007 Trf fr Rate Stabilization Res (840,000) - 408008 Trf fr DC City Share Res (845,600) (2,744,000) 408024 Trf fr Sustainable Initiatives Res (100,000) - 408037 Trf fr Casino Res (7,050,000) (1,250,000) 408041 Trf fr Parks lnfr. Repl. Res -(650,000) 408200 Trf fr 3rdPtyOblg RF (200,000) (200,000) 408501 Trf fr Parkland Oblg RF (360,000) - 408502 Trf fr CCBF (FGT) Oblg RF (2,185,000) (380,000) 408506 Trf fr Building Faster Fund (BFF) RF -(6,925,000) 408602 Trf fr DC-Transportation ORF (649,100) (717,500) 408604 Trf fr DC-SWM OB RF (60,400) (153,000) 408606 Trf fr DC-P&R OB RF (17,441,400) (4,653,600) 408706 Trf fr Rds & Bridges RF (3,680,000) (240,000) 408707 Trf fr SWM RF (1,750,000) (170,000) 408708 Trf fr OCIF Grant (3,885,000) (400,000) 408710 Trf fr Seaton FIA RF (230,900) (52,300) 408900 Property Tax Funded (52,500) - Total Financing (39,329,900) (18,535,400) 93 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Water Resources & Dev. Services Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504520 Capital Development Construction 200,000 200,000 Total Expenditures 200,000 200,000 Financing 408200 Trf fr 3rdPtyOblg RF (200,000) (200,000) Total Financing (200,000) (200,000) 94 City of Pickering 2025 Staff Recommended Draft Project Listing 10510 Water Resources & Dev. Services Project Name C10510.2501 Various Construction Projects Total 95 Run Date: Oct 11, 2024 2025 Draft Budget 200,000 200,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10510 Water Resources & Dev. Services C10510.2501 Various Construction Projects 01 Capital 504520 Capital Development Construction Various Construction Projects Related to Development (funded from Third Party Contributions). 80 Funding 408200 Tri fr 3rdPtyOblg RF Total C10510.2501 Various Construction Projects Total 10510 Water Resources & Dev. Services 96 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 (200,000) 200,000 Sidewalks City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504600 Capital Sidewalks 489,100 148,500 Total Expenditures 489,100 148,500 Financing 408008 Trf fr DC City Share Res (310,600) (74,200) 408502 Trf fr CCBF (FGT) Oblg RF (75,000) - 408602 Trf fr DC-Transportation ORF (103,500) (74,300) Total Financing (489,100) (148,500) 97 10515 Sidewalks Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10515.2503 W5 -Whites Road -New Sidewalk Installation Total 98 Run Date: Oct 11, 2024 2025 Draft Budget 148,500 148,500 City of Pickering 2025 Staff Recommended Draft Capital Budget 10515 Sidewalks C10515.2503 W5 -Whites Road -New Sidewalk Installation 01 Capital 504600 Capital Sidewalks Proposed 1.8m concrete sidewalk Granite Court to Bayly Street (west side). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10515.2503 W5 -Whites Road -New Sidewalk Installation Total 10515 Sidewalks 99 Run Date: Oct 11, 2024 Funding Expense 148,500 (74,200) (74,300) (148,500) 148,500 (148,500) 148,500 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Streetlights & Signalization Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 200,400 - 504450 Cap Traffic Signals 540,200 60,000 504620 Capital Streetlights 400,000 - Total Expenditures 1,140,600 60,000 Financing 408008 Trf fr DC City Share Res (105,000) (2,500) 408037 Trf fr Casino Res (400,000) - 408502 Trf fr CCBF (FGT) Oblg RF (15,000) (35,000) 408602 Trf fr DC-Transportation ORF (345,600) (22,500) 408706 Trf fr Rds & Bridges RF (275,000) - 408900 Property Tax Funded -- Total Financing (1,140,600) (60,000) 101 City of Pickering 2025 Staff Recommended Draft Project Listing 10520 Streetlights & Signalization Run Date: Oct 11, 2024 Project Name C10520.2102 LED Signal Head Replacement Program C10520.2302 A-9 Pedestrian Signalization -Rosebank Rd. at Chardwood / WoodsmE C10520.2303 BR-16 Pedestrian Signalization -Major Oaks Rd. at Wildwood Crs. Total 102 2025 Draft Budget 35,000 20,000 5,000 60,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10520 Streetlights & Signalization C10520.2102 LED Signal Head Replacement Program 01 Capital 504450 Cap Traffic Signals Replacement of LED signal heads. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10520.2102 LED Signal Head Replacement Program C10520.2302 A-9 Pedestrian Signalization -Rosebank Rd. at Chardwood / Woe 01 Capital 504450 Cap Traffic Signals Pedestrian Cross Over. A-9 Pedestrian Signalization -Rosebank Road at Charnwood/Woodsmere -Additional Funds. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2302 A-9 Pedestrian Signalization -Rosebank Rd. at Chardwoc C10520.2303 BR-16 Pedestrian Signalization -Major Oaks Rd. at Wildwood Cr~ 01 Capital 504450 Cap Traffic Signals Pedestrian Cross Over. BR-16 Pedestrian Signalization -Major Oaks Road at Wildwood Crescent -Additional Funds. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2303 BR-16 Pedestrian Signalization -Major Oaks Rd. at Wildw Total 10520 Streetlights & Signalization 103 Run Date: Oct 11, 2024 Funding Expense 35,000 (35,000) (35,000) 35,000 20,000 (2,000) (18,000) (20,000) 20,000 5,000 (500) (4,500) (5,000) 5,000 (60,000) 60,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Stormwater Management Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502230 Consult&Prof Fees -- 502390 Grounds Upkeep -- 504001 Capital Consulting 150,000 302,500 504550 Capital Storm System 1,600,000 170,000 Total Expenditures 1,750,000 472,500 Financing 406702 Debt Financing-10Year -- 408008 Trf fr DC City Share Res -(264,500) 408604 Trf fr DC-SWM OB RF -(38,000) 408707 Trf fr SWM RF (1,750,000) (170,000) Total Financing (1,750,000) (472,500) 104 City of Pickering 2025 Staff Recommended Draft Project Listing 10525 Stormwater Management Project Name C10525.2501 Chickadee SWM Pond (C1-05-PT) Cleanout C10525.2502 Dixie Estates 2 SWM Pond (C2-03-PC) Cleanout C 10525.2503 Pine Creek Restoration Site #22 Culvert Replacement C10525.2505 Pike Court Storm Sewer Works Total 105 Run Date: Oct 11, 2024 2025 Draft Budget 60,000 60,000 302,500 50,000 472,500 City of Pickering 2025 Staff Recommended Draft Capital Budget 10525 Stormwater Management C10525.2501 Chickadee SWM Pond (C1-05-PT) Cleanout 01 Capital 504550 Capital Storm System Chickadee SWM Pond on Chickadee Court east of Altona Road -SWM Pond Cleanout as per SWM Facilities Asset Management Plan -Design. 80 Funding 408707 Trf fr SWM RF Total C10525.2501 Chickadee SWM Pond (C1-05-PT) Cleanout C10525.2502 Dixie Estates 2 SWM Pond (C2-03-PC) Cleanout 01 Capital 504550 Capital Storm System Dixie Estates 2 SWM Pond -Pine Glen Drive (east of Dixie Road) -SWM Pond Cleanout as per SWM Facilities Asset Management Plan -Design. 80 Funding 408707 Trf fr SWM RF Total C10525.2502 Dixie Estates 2 SWM Pond (C2-03-PC) Cleanout C10525.2503 Pine Creek Restoration Site #22 Culvert Replacement 01 Capital 504001 Capital Consulting Culvert Replacement at Lynn Heights Drive -Detailed Design. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 408008 Trf fr DC City Share Res 408604 Trf fr DC-SWM OB RF Total C10525.2503 Pine Creek Restoration Site #22 Culvert Replacement C10525.2505 Pike Court Storm Sewer Works 01 Capital 504550 Capital Storm System Install rear yard basin and maintenance hole to relieve ponding south of Pike Court (Rosebank Rd). 80 Funding 408707 Trf fr SWM RF Total C10525.2505 Pike Court Storm Sewer Works Total 10525 Stormwater Management 106 Run Date: Oct 11, 2024 Funding Expense 60,000 (60,000) (60,000) 60,000 60,000 (60,000) (60,000) 60,000 302,500 (264,500) (38,000) (302,500) 302,500 50,000 (50,000) (50,000) 50,000 (472,500) 472,500 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Roads Projects Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504000 Capital Land 15,000 - 504001 Capital Consulting 200,000 400,000 504400 Capital Roads 9,200,000 5,410,000 504420 Cap Bridges & Culverts 825,000 2,697,000 Total Expenditures 10,240,000 8,507,000 Financing 406702 Debt Financing-10Year -- 408007 Trf fr Rate Stabilization Res (840,000) - 408008 Trf fr DC City Share Res -(149,300) 408502 Trf fr CCBF (FGT) Oblg RF (2,095,000) (345,000) 408506 Trf fr Building Faster Fund (BFF) RF -(6,925,000) 408602 Trf fr DC-Transportation ORF -(447,700) 408706 Trf fr Rds & Bridges RF (3,405,000) (240,000) 408708 Trffr OCIF Grant (3,885,000) (400,000) 408900 Property Tax Funded (15,000) - Total Financing (10,240,000) (8,507,000) 108 10570 Roads Projects Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10570.1505 Wilson Bridge Replacement C10570.1804 Michell Bridge Replacement C10570.2501 L-13d Third Concession Road Culvert Replacement C10570.2502 Old Brock Road -Speed Hump Paving C10570.2503 Dunn Crescent Reconstruction C10570.2504 Nighswander Bridge (9002) Guide Rails C10570.2505 Creekview Circle -Asphalt Resurfacing C10570.2506 Rosebank Road -Asphalt Resurfacing C10570.2507 Douglas Avenue -Asphalt Resurfacing C10570.2508 Sunrise Avenue -Asphalt Resurfacing C 10570.2509 Storrington Street -Asphalt Resurfacing C 10570.2511 Echo Point Court -Asphalt Resurfacing C10570.2512 Greenburn Place -Asphalt Resurfacing C 10570.2513 Linwood Street -Asphalt Resurfacing C10570.2514 Lodge Road -Asphalt Resurfacing C10570.2515 Fairview Avenue -Reconstruction C10570.2516 Vistula Drive -Asphalt Resurfacing C10570.2517 Garvolin Avenue -Asphalt Resurfacing C10570.2518 The Esplanade South -Asphalt Resurfacing Total 109 Run Date: Oct 11, 2024 2025 Draft Budget 2,000,000 400,000 597,000 60,000 80,000 100,000 510,000 460,000 320,000 490,000 350,000 210,000 600,000 435,000 570,000 75,000 430,000 475,000 345,000 8,507,000 City of Pickering 2025. Staff Recommended Draft Capital Budget 10570 Roads Projects C10570.1505 Wilson Bridge Replacement 01 Capital 504420 Cap Bridges & Culverts Wilson Bridge (7002) Replacement -Construction. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.1505 Wilson Bridge Replacement C10570.1804 Michell Bridge Replacement 01 Capital 504001 Capital Consulting Michell Bridge (7001) -Seventh Concession Road east of York Durham Line. Design costs for bridge replacement as per the Municipal Bridge & Culvert Inspections Report. Additional funds required due to change in scope from rehabilitation to replacement as per Assessment. 80 Funding 408708 Trf fr OCIF Grant Total C10570.1804 Michell Bridge Replacement C10570.2501 L-13d Third Concession Road Culvert Replacement 01 Capital 504420 Cap Bridges & Culverts Third Concession Road west of Rosebank Road culvert replacement - Design and construction. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10570.2501 L-13d Third Concession Road Culvert Replacement C10570.2502 Old Brock Road -Speed Hump Paving 01 Capital 504400 Capital Roads Replacement of the temporary rubber speed humps on Old Brock Road with permanent asphalt speed humps (end of pilot project). 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2502 Old Brock Road -Speed Hump Paving C10570.2503 Dunn Crescent Reconstruction 01 Capital 504400 Capital Roads Dunn Crescent -reconstruction of end of road cul de sac. 110 Run Date: Oct 11, 2024 Funding Expense 2,000,000 (2,000,000) (2,000,000) 2,000,000 400,000 (400,000) (400,000) 400,000 597,000 (149,300) (447,700) (597,000) 597,000 60,000 (60,000) (60,000) 60,000 80,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10570 Roads Projects 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2503 Dunn Crescent Reconstruction C10570.2504 Nighswander Bridge (9002) Guide Rails 01 Capital 504420 Cap Bridges & Culverts Nighswander Bridge (9002) -Replacement of Guide Rails. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2504 Nighswander Bridge (9002) Guide Rails C10570.2505 Creekview Circle -Asphalt Resurfacing 01 Capital 504400 Capital Roads Creekview Crescent -Asphalt Resurfacing -Downland Drive to Petticoat Lane. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2505 Creekview Circle -Asphalt Resurfacing C10570.2506 Rosebank Road -Asphalt Resurfacing 01 Capital 504400 Capital Roads Rosebank Road -Asphalt Resurfacing -Gillmoss Road to Dahlia Crescent. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2506 Rosebank Road -Asphalt Resurfacing C10570.2507 Douglas Avenue -Asphalt Resurfacing 01 Capital 504400 Capital Roads Douglas Avenue -Asphalt Resurfacing -Radom Street to 230m south of Radom Street. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2507 Douglas Avenue -Asphalt Resurfacing C10570.2508 Sunrise Avenue -Asphalt Resurfacing 01 Capital 504400 Capital Roads 1 1 1 Run Date: Oct 11, 2024 Funding Expense (80,000) (80,000) 80,000 100,000 (100,000) (100,000) 100,000 510,000 (510,000) (510,000) 510,000 460,000 (460,000) (460,000) 460,000 320,000 (320,000) (320,000) 320,000 490,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10570 Roads Projects Sunrise Avenue -Asphalt Resurfacing -West Shore Boulevard to Breezy Drive. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2508 Sunrise Avenue -Asphalt Resurfacing C10570.2509 Storrington Street -Asphalt Resurfacing 01 Capital 504400 Capital Roads Storrington Street -Asphalt Resurfacing -Walnut Lane to Listowell Crescent. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2509 Storrington Street -Asphalt Resurfacing C10570.2511 Echo Point Court -Asphalt Resurfacing 01 Capital 504400 Capital Roads Echo Point Court -Asphalt Resurfacing -Glenanna Road to North Terminus. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2511 Echo Point Court -Asphalt Resurfacing C10570.2512 Greenburn Place -Asphalt Resurfacing 01 Capital 504400 Capital Roads Greenburn Place -Asphalt Resurfacing -Fifth Concession Road to North Terminus. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2512 Greenburn Place -Asphalt Resurfacing C10570.2513 Linwood Street -Asphalt Resurfacing 01 Capital 504400 Capital Roads Linwood Street -Asphalt Resurfacing -Bridle Path (west leg) to Parkdale Street. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2513 Linwood Street -Asphalt Resurfacing C10570.2514 Lodge Road -Asphalt Resurfacing 112 Run Date: Oct 11, 2024 Funding Expense (490,000) (490,000) 490,000 350,000 (350,000) (350,000) 350,000 210,000 (210,000) (210,000) 210,000 600,000 (600,000) (600,000) 600,000 435,000 (435,000) (435,000) 435,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10570 Roads Projects 01 Capital 504400 Capital Roads Lodge Road -Asphalt Resurfacing -Fieldlight Blvd. to Poppy Lane. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2514 Lodge Road -Asphalt Resurfacing C10570.2515 Fairview Avenue -Reconstruction 01 Capital 504400 Capital Roads Fairview Avenue -Reconstruction. The work will include complete top asphalt installation and line painting. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2515 Fairview Avenue -Reconstruction C10570.2516 Vistula Drive -Asphalt Resurfacing 01 Capital 504400 Capital Roads Vistula Drive -Asphalt Resurfacing -Batory Avenue to Elvira Court. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2516 Vistula Drive -Asphalt Resurfacing C10570.2517 Garvolin Avenue -Asphalt Resurfacing 01 Capital 504400 Capital Roads Garvolin Avenue -Asphalt Resurfacing -Modlin Road to Krosno Boulevard. 80 Funding 408506 Trf fr Building Faster Fund (BFF) RF Total C10570.2517 Garvolin Avenue -Asphalt Resurfacing C10570.2518 The Esplanade South -Asphalt Resurfacing 01 Capital 504400 Capital Roads The Esplanade South -Asphalt Resurfacing -Glenanna Road to Valley Farm Road. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10570.2518 The Esplanade South -Asphalt Resurfacing 113 Run Date: Oct 11, 2024 Funding Expense 570,000 (570,000) (570,000) 570,000 75,000 (75,000) (75,000) 75,000 430,000 (430,000) (430,000) 430,000 475,000 (475,000) (475,000) 475,000 345,000 (345,000) (345,000) 345,000 10570 Roads Projects Total 10570 Roads Projects City of Pickering 2025 Staff Recommended Draft Capital Budget 114 Run Date: Oct 11, 2024 Funding Expense (8,507,000) 8,507,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Parks Projects Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 1,835,000 - 504700 Capital Parks 23,149,300 8,555,800 Total Expenditures 24,984,300 8,555,800 Financing 408008 Trf fr DC City Share Res (164,500) (1,949,900) . 408024 Trf fr Sustainable Initiatives Res (100,000) - 408037 Trf fr Casino Res (6,650,000) (1,250,000) 408041 Trf fr Parks lnfr. Repl. Res -(650,000) 408501 Trf fr Parkland Oblg RF (360,000) - 408606 Trf fr DC-P&R OB RF (17,441,400) (4,653,600) 408710 Trf fr Seaton FIA RF (230,900) (52,300) 408900 Property Tax Funded (37,500) - Total Financing (24,984,300) (8,555,800) 131 City of Pickering 2025 Staff Recommended Draft Project Listing 10572 Parks Projects Run Date: Oct 11, 2024 Project Name C10320.1808 Neighbourhood Park -Dersan St./Tillings Rd. C10320.2225 Rouge Valley Park -Resurface & Line Paint Basketball Court C 10320.2332 Park Block at Old Operations Centre Site C 10572.2404 Waterfront Trail -West Shore Boulevard to Marksbury Road -ShorelinE C 10572.2419 Outdoor Pickleball Court Complex C10572.2501 Community Park -Greenwood Conservation Lands C 10572.2502 Neighbourhood Park -Seaton P-128 C10572.2504 Park Gateway Feature -Seaton C10572.2505 Sound Dampening Measures -Shadybrook Park Pickleball/Tennis Cou C 10572.2508 Playground Replacement -Bayshore Tot Lot Park P-035 C10572.2509 Playground Replacement-Lynn Heights Park P-050 C10572.2510 Playground Replacement-Bonita Park P-038 Total 132 2025 Draft Budget 700,000 250,000 1,347,500 2,017,200 1,000,000 500,000 1,691,100 400,000 50,000 200,000 200,000 200,000 8,555,800 City of Pickering 2025 Staff Recommended Draft Capital Budget 10572 Parks Projects C10320.1808 Neighbourhood Park -Dersan St./Tillings Rd. 01 Capital 504700 Capital Parks New neighbourhood park in Duffin Heights in the vicinity of Tillings Road and Dersan Street (hydro corridor and woodlot adjacent to Stonepay Development). Additional costs for easement from Infrastructure Ontario. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R 08 RF Total C10320.1808 Neighbourhood Park -Dersan St./Tillings Rd. C10320.2225 Rouge Valley Park -Resurface & Line Paint Basketball Court 01 Capital 504700 Capital Parks Replace half-court with multi-use court, accessible pathway, shade structure, and miscellaneous park improvements. 80 Funding 408037 Trf fr Casino Res Total C10320.2225 Rouge Valley Park -Resurface & Line Paint Basketball Cc C10320.2332 Park Block at Old Operations Centre Site 01 Capital 504700 Capital Parks Construction of new park adjacent to future Creekwood School site in Duffin Heights. Park block at Old Operations Centre site. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R 08 RF Total C10320.2332 Park Block at Old Operations Centre Site C10572.2404 Waterfront Trail -West Shore Boulevard to Marksbury Road -She 01 Capital 504700 Capital Parks Waterfront Trail -West Shore Boulevard to Marksbury Road -Shoreline stabilization and trail construction. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2404 Waterfront Trail -West Shore Boulevard to Marksbury Ro, C10572.2419 Outdoor Pickleball Court Complex 01 Capital 133 Run Date: Oct 11, 2024 Funding Expense 700,000 (17,500) (682,500) (700,000) 700,000 250,000 (250,000) (250,000) 250,000 1,347,500 (673,800) (673,700) (1,347,500) 1,347,500 2,017,200 (1,008,600) (1,008,600) (2,017,200) 2,017,200 City of Pickering 2025 Staff Recommended Draft Capital Budget 10572 Parks Projects 504700 Capital Parks Construction of a 6-court, dedicated, outdoor pickleball complex in Diana, Princess of Wales Park (subject to Hydro One Network Inc. approval). 80 Funding 408037 Trf fr Casino Res Total C10572.2419 Outdoor Pickleball Court Complex C10572.2501 Community Park -Greenwood Conservation Lands 01 Capital 504700 Capital Parks Installation of water and sanitary sewer services with the reconstruction of Sideline 16, to provide services for future community park washroom on the Greenwood Conservation Lands site -Phase 1. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2501 Community Park -Greenwood Conservation Lands C10572.2502 Neighbourhood Park -Seaton P-128 01 Capital 504700 Capital Parks New neighbourhood park in the Thompson's Corners neighbourhood. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2502 Neighbourhood Park -Seaton P-128 C10572.2504 Park Gateway Feature -Seaton 01 Capital 504700 Capital Parks Landscape features including shade structure/seating and children's play feature in vista block offTACCGATE parcel 8 development as eastern gateway into the Seaton Recreation Complex & Library. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2504 Park Gateway Feature -Seaton C10572.2505 Sound Dampening Measures -Shadybrook Park Pickleball/Tenni1 01 Capital 504700 Capital Parks 134 Run Date: Oct 11, 2024 Funding Expense 1,000,000 (1,000,000) (1,000,000) 1,000,000 500,000 (250,000) (250,000) (500,000) 500,000 1,691,100 (1,648,800) (42,300) (1,691,100) 1,691,100 400,000 (390,000) (10,000) (400,000) 400,000 50,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10572 Parks Projects Supply and installation of sound dampening materials on the pickleball/tennis court fencing. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2505 Sound Dampening Measures -Shadybrook Park Pickleba C10572.2508 Playground Replacement -Bayshore Tot Lot Park P-035 01 Capital 504700 Capital Parks Replacement of playground in Bayshore Park with accessibility options added, including new safety surfacing, pathway to park entrance for accessibility and site furniture. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2508 Playground Replacement -Bayshore Tot Lot Park P-035 C10572.2509 Playground Replacement -Lynn Heights Park P-050 01 Capital 504700 Capital Parks Replacement of playground in Lynn Heights Park with accessibility options added, new safety surfacing, and curbing and drainage around swing area. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2509 Playground Replacement -Lynn Heights Park P-050 C10572.2510 Playground Replacement -Bonita Park P-038 01 Capital 504700 Capital Parks Replacement of playground and safety surfacing in Bonita Park with accessibility options added. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2510 Playground Replacement -Bonita Park P-038 Total 10572 Parks Projects 135 Run Date: Oct 11, 2024 Funding Expense (50,000) (50,000) 50,000 200,000 (200,000) (200,000) 200,000 200,000 (200,000) (200,000) 200,000 200,000 (200,000) (200,000) 200,000 (8,555,800) 8,555,800 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Development Projects (DC Funded) Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 125,900 - 504400 Capital Roads -160,000 504520 Capital Development Construction -- 504550 Capital Storm System -405,600 504600 Capital Sidewalks 200,000 26,000 504620 Capital Streetlights 200,000 - Total Expenditures 525,900 591,600 Financing 406702 Debt Financing-10Year -- 4067 42 DC-DebtFinancng-1 OYR -- 408008 Trf fr DC City Share Res (265,500) (303,600) 408602 Trf fr DC-Transportation ORF (200,000) (173,000) 408604 Trf fr DC-SWM OB RF (60,400) (115,000) 408706 Trf fr Rds & Bridges RF -- Total Financing (525,900) (591,600) 147 City of Pickering 2025 Staff Recommended Draft Project Listing 10575 Development Projects (DC Funded) Run Date: Oct 11, 2024 Project Name C10575.2501 Installation of Oil Grit Separators C10575.2502 81-1 Bayly Street-New Sidewalk and Streetlight Installation (both side~ C 10575.2503 Sideline 16 South of Fifth Concession C10575.2504 Sideline 16 North of Fifth Concession Total 148 2025 Draft Budget 405,600 26,000 75,000 85,000 591,600 City of Pickering 2025 Staff Recommended Draft Capital Budget 10575 Development Projects (DC Funded) C10575.2501 Installation of Oil Grit Separators 01 Capital 504550 Capital Storm System Installation of Oil Grit Separators -Frenchman's Bay Watershed. 80 Funding 408008 Trf fr DC City Share Res 408604 Trf fr DC-SWM OB RF Total C10575.2501 Installation of Oil Grit Separators C10575.2502 81-1 Bayly Street-New Sidewalk and Streetlight Installation (bott 01 Capital 504600 Capital Sidewalks Bl-1 Bayly Street New Sidewalk south side (from 105m west of Salk Rd to 105m east of Salk Rd). The balance of the sidewalk, and the streetlight component is in the Capital Forecast for 2033. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2502 81-1 Bayly Street -New Sidewalk and Streetlight lnstallatil C10575.2503 Sideline 16 South of Fifth Concession 01 Capital 504400 Capital Roads Urbanization of Sideline 16 from Fifth Concession to south end of development (City Share). 80 Funding 408602 Trf fr DC-Transportation ORF Total C10575.2503 Sideline 16 South of Fifth Concession C10575.2504 Sideline 16 North of Fifth Concession 01 Capital 504400 Capital Roads Urbanization of Sideline 16 from Fifth Concession to North to intersection of Street 14, Phase 2 of development (City Share). 80 Funding 408602 Trf fr DC-Transportation ORF Total C10575.2504 Sideline 16 North of Fifth Concession Total 10575 Development Projects (DC Funded) 149 Run Date: Oct 11, 2024 Funding Expense 405,600 (290,600) (115,000) (405,600) 405,600 26,000 (13,000) (13,000) (26,000) 26,000 75,000 (75,000) (75,000) 75,000 85,000 (85,000) (85,000) 85,000 (591,600) 591,600 Finance Dept City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504950 Cap Furniture&Fix 25,000 - Total Expenditures 25,000 - Financing 408007 Trf fr Rate Stabilization Res (25,000) - Total Financing (25,000) - 150 Finance City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504950 Cap Furniture&Fix 25,000 - Total Expenditures 25,000 - Financing 408007 Trf fr Rate Stabilization Res (25,000) - Total Financing (25,000) - 151 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Fire Services Dept Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502340 Building Rpr & Mntc 25,000 - 504000 Capttalland 4,500,000 3,000,000 504001 Capital Consulting 100,000 1,760,000 504100 Capital Buildings 876,000 410,000 504200 Capital Machinery & Equipment -120,000 504800 Cap Information Tech 50,000 - 504950 Cap Furniture&Fix 60,000 - Total Expenditures 5,611,000 5,290,000 Financing 406601 Misc. Sale of Land (4,500,000) - 406702 Debt Financing-10Year -(3,000,000) 408007 Trf fr Rate Stabilization Res (100,000) - 408026 Trf fr Facilities Res (901,000) (260,000) 408032 Trf fr Equipment Res (50,000) (120,000) 408037 Trf fr Casino Res -(280,000) 408502 Trf fr CCBF (FGT) Oblg RF -(320,000) 408601 Trf fr DC-Protectection ORF -(1,228,500) 408710 Trf fr Seaton FIA RF -(31,500) 408900 Property Tax Funded (60,000) (50,000) Total Financing (5,611,000) (5,290,000) 152 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Fire Protection Expenditures 502340 Building Rpr & Mntc 504000 Capital Land 504001 Capital Consulting 504100 Capital Buildings 504200 Capital Machinery & Equipment 504800 Cap Information Tech 504950 Cap Furniture&Fix Total Expenditures Financing 406601 Misc. Sale of Land 406702 Debt Financing-10Year 408007 Trf fr Rate Stabilization Res 408026 Trf fr Facilities Res 408032 Trf fr Equipment Res 408037 Trf fr Casino Res 408502 Trf fr CCBF (FGT) Oblg RF 408601 Trf fr DC-Protectection ORF 408710 Trf fr Seaton FIA RF 408900 Property Tax Funded Total Financing Abbreviations FS#1 FS#3 FS#4 FS#5 FS#6 Fire Station #1, 1700 Zents Drive Fire Station #3, New Fire Station (Seaton) Fire Station #4, 4941 Old Brock Road Fire Station #5, 1616 Bayly Street Fire Station #6, 1115 Finch Avenue 153 Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget 25,000 - 4,500,000 3,000,000 100,000 1,760,000 876,000 410,000 -120,000 50,000 - 60,000 - 5,611,000 5,290,000 (4,500,000) - -(3,000,000) (100,000) - (901,000) (260,000) (50,000) (120,000) -(280,000) -(320,000) -(1,228,500) -(31,500) (60,000) (50,000) (5,611,000) (5,290,000) City of Pickering 2025 Staff Recommended Draft Project Listing 10700 Fire Protection Project Name C10700.2009 FS #5 Replacement C10700.2502 FS #3 New Fire Station (Seaton) C10700.2503 FS #4 Generator Replacement C10700.2504 FS #6 Hot Water Tank Replacement C10700.2505 FS #1 Hose Tower Hoist C10700.2506 Firefighting Nozzle Replacements C10700.251 0 FS #5 Land Aquisition (replaces 10700.2401) Total 154 Run Date: Oct 17, 2024 2025 Draft Budget 500,000 1,260,000 320,000 40,000 50,000 120,000 3,000,000 5,290,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10700 Fire Protection C10700.2009 FS #5 Replacement 01 Capital 504001 Capital Consulting Additional design costs for the replacement of Fire Station #5, which was originally constructed in 1969 and is at the end of its serviceable life. Costs have been updated to reflect current costs for consulting, construction and other related project costs. Fire Station #5 will be constructed on a new site. 80 Funding 408026 Trf fr Facilities Res 408037 Trf fr Casino Res Total C10700.2009 FS #5 Replacement C10700.2502 FS #3 New Fire Station (Seaton) 01 Capital 504001 Capital Consulting Design consulting services for new fire station on north Seaton lands. Includes testing and inspection costs, and investigations on new site. 80 Funding 408601 Trf fr DC-Protectection ORF 408710 Trf fr Seaton FIA RF Total C10700.2502 FS #3 New Fire Station (Seaton) C10700.2503 FS #4 Generator Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the existing generator. Original unit installed in 1996. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10700.2503 FS #4 Generator Replacement C10700.2504 FS #6 Hot Water Tank Replacement 01 Capital 504100 Capital Buildings Lifecycle Replacement of the existing hot water tank with a high-efficiency direct vent condensing gas water heater tank. The original tank was installed in 2008. 80 Funding 408026 Trf fr Facilities Res Total C10700.2504 FS #6 Hot Water Tank Replacement 155 Run Date: Oct 17, 2024 Funding Expense 500,000 (220,000) (280,000) (500,000) 500,000 1,260,000 (1,228,500) (31,500) (1,260,000) 1,260,000 320,000 (320,000) (320,000) 320,000 40,000 (40,000) (40,000) 40,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10700 Fire Protection C10700.2505 FS #1 Hose Tower Hoist 01 Capital 504100 Capital Buildings New equipment, structural supports and related costs for a new hoist at the top of the hose tower required to facilitate hose drying. 80 Funding 408900 Property Tax Funded Total C10700.2505 FS #1 Hose Tower Hoist C10700.2506 Firefighting Nozzle Replacements 01 Capital 504200 Capital Machinery & Equipment Replacement of department's stock of firefighting nozzles to meet new flow standards under NFPA 1964 standard for interior fire attack. 80 Funding 408032 Trf fr Equipment Res Total C10700.2506 Firefighting Nozzle Replacements C10700.2510 FS #5 Land Aquisition (replaces 10700.2401) 01 Capital 504000 Capital Land Land purchase for the relocation of Fire Station #5. Replaces projects C10700.2308 and C10700.2401 80 Funding 406702 Debt Financing-10Year Total C10700.2510 FS #5 Land Aquisition (replaces 10700.2401) Total 10700 Fire Protection 156 Run Date: Oct 17, 2024 Funding Expense 50,000 (50,000) (50,000) 50,000 120,000 (120,000) (120,000) 120,000 3,000,000 (3,000,000) (3,000,000) 3,000,000 (5,290,000) 5,290,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Library Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 502100 Advertising 2,000 - 504001 Capital Consulting 4,950,000 260,000 504100 Capital Buildings -235,000 504200 Capital Machinery & Equipment 20,000 - 504800 Cap Information Tech 46,000 25,000 504900 Cap Library Coll Mat 312,000 382,000 504950 Cap Furniture&Fix 290,000 465,000 Total Expenditures 5,620,000 1,367,000 Financing 402500 Federal Grants (97,000) - 408007 Trf fr Rate Stabilization Res (76,000) (100,000) 408032 Trf fr Equipment Res (20,000) - 408036 Trf fr Library Bldg Res -(100,000) 408037 Trf fr Casino Res (125,000) (745,000) 408607 Trf fr DC-Library OB RF (4,854,760) - 408710 Trffr Seaton FIA RF (95,240) - 408900 Property Tax Funded (352,000) (422,000) Total Financing (5,620,000) (1,367,000) 158 Library City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Run Date: Oct 11, 2024 2024 2025 Approved Draft Expenditures 502100 Advertising 504001 Capital Consulting 504100 Capital Buildings 504200 Capital Machinery & Equipment 504800 Cap Information Tech 504900 Cap Library Coll Mat 504950 Cap Furniture&Fix Total Expenditures Financing 402500 Federal Grants 408007 Trf fr Rate Stabilization Res 408032 Trf fr Equipment Res 408036 Trf fr Library Bldg Res 408037 Trf fr Casino Res 408900 Property Tax Funded ' . Total Financing Abbreviations GAL PHCC PCL George Ashe Library, 470 Kingston Road Pickering Heritage Community Centre Pickering Central Library, One The Esplanade 159 Budget Budget 2,000 - -260,000 -235,000 20,000 - 46,000 25,000 312,000 382,000 290,000 465,000 670,000 1,367,000 (97,000) - (76,000) (100,000) (20,000) - -(100,000) (125,000) (745,000) (352,000) (422,000) (670,000) (1,367,000) 10900 Library Project Name City of Pickering 2025 Staff Recommended Draft Project Listing C10900.2307 Public Telework at the Library spaces -George Ashe C 10900.2405 PHCC -Archives and Library Space -FF&E C10900.2501 Collection Materials C10900.2502 PCL Computers Replacement C10900.2504 PHCC -Collection Materials C 10900.2505 Building Envelope Retrofit -Central Library C 10900.2507 Lobby & Washrooms Retrofit C10900.2511 Central Library Shelving Replacement Total 160 Run Date: Oct 11, 2024 2025 Draft Budget 15,000 250,000 332,000 25,000 50,000 260,000 235,000 200,000 1,367,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10900 Library C10900.2307 Public Telework at the Library spaces -George Ashe 01 Capital 504950 Cap Furniture&Fix Additional funding for client workpods. 80 Funding 408900 Property Tax Funded Total C10900.2307 Public Telework at the Library spaces -George Ashe C10900.2405 PHCC -Archives and Library Space -FF&E 01 Capital 504950 Cap Furniture&Fix Furniture, fixtures and equipment needed for library area of the Pickering Heritage & Community Centre project. Includes furniture, security, IT hardware, cabling, AN, appliances, program and facility equipment, fixtures and artwork, signage, wayfinding, moving, installation and related costs. Additional FF&E funds for this project appear in 10220. Year 2 of 2. 80 Funding 408037 Trf fr Casino Res Total C10900.2405 PHCC -Archives and Library Space -FF&E C10900.2501 Collection Materials 01 Capital 504900 Cap Library Coll Mat Collection Materials include: Books, audio books, movies and other types of physical materials along with their processing and packaging. Additional funds to support Outreach vehicle collection. 80 Funding 408900 Property Tax Funded Total C10900.2501 Collection Materials C10900.2502 PCL Computers Replacement 01 Capital 504800 Cap Information Tech Replacement of public and staff computers at the Pickering Central Library that are at least 5 years old. 80 Funding 408900 Property Tax Funded Total C10900.2502 PCL Computers Replacement C10900.2504 PHCC -Collection Materials 01 Capital 504900 Cap Library Coll Mat 161 Run Date: Oct 11, 2024 Funding Expense 15,000 (15,000) (15,000) 15,000 250,000 (250,000) (250,000) 250,000 332,000 (332,000) (332,000) 332,000 25,000 (25,000) (25,000) 25,000 50,000 City of Pickering 2025 Staff Recommended Draft Capital Budget 10900 Library Collection Materials include: Books, audio books, movies, and other types of physical materials along with their processing and packaging. Create new collection for PHCC site. 80 Funding 408900 Property Tax Funded Total C10900.2504 PHCC -Collection Materials C10900.2505 Building Envelope Retrofit -Central Library 01 Capital 504001 Capital Consulting Consulting and related costs for lifecycle replacement to the existing building envelope including glazing systems, skylights, metal roofs, flat roof repairs and localized brick repairs. All components are original from 1990. 80 Funding 408037 Trf fr Casino Res Total C10900.2505 Building Envelope Retrofit -Central Library C10900.2507 Lobby & Washrooms Retrofit 01 Capital 504100 Capital Buildings Replacing aging fixtures, partitions, counters and finishes in the ground floor washrooms at the Central Library. A majority of these components are original from 1990. 80 Funding 408037 Trf fr Casino Res Total C10900.2507 Lobby & Washrooms Retrofit C10900.2511 Central Library Shelving Replacement 01 Capital 504950 Cap Furniture&Fix Replace aging furniture and shelving at Central Library. 80 Funding 408007 Trf fr Rate Stabilization Res 408036 Trf fr Library Bldg Res Total C10900.2511 Central Library Shelving Replacement Total 10900 Library 162 Run Date: Oct 11, 2024 Funding Expense (50,000) (50,000) 50,000 260,000 (260,000) (260,000) 260,000 235,000 (235,000) (235,000) 235,000 200,000 (100,000) (100,000) (200,000) 200,000 (1,367,000) 1,367,000 City of Pickering 2025 Staff Recommended Draft Capital Budget Summary Seaton Library Run Date: Oct 11, 2024 2024 2025 Approved Draft Budget Budget Expenditures 504001 Capital Consulting 4,950,000 - Total Expenditures 4,950,000 - Financing 408607 Trf fr DC-Library OB RF (4,854,760) - 408710 Trf fr Seaton FIA RF (95,240) - Total Financing (4,950,000) - 163 2027 & Beyond -Debt Picture The scope and timing of debt-funded capital projects (including both property tax and development charge funded debt) planned for the 2027 and future years will be subject to the approval of the newly elected city council. The new Council, when considering the 2027 Capital Budget and corresponding forecast, will have to review the City's current debt load, debt capacity and Annual Repayment Limit (ARL) at that time, to ensure that the proposed capital plan aligns with the City's long-term financial health and financial sustainability objectives. 164 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Capital Projects Org Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502230 Consult&Prof Fees 201,700 101,800 100,000 100,000 502340 Building Rpr & Mntc 140,000 1,824,000 263,000 221,000 502390 Grounds Upkeep --2,007,100 1,412,000 502720 System&Sftwr Upgrade 65,000 1,057,000 -- 502730 HardwareReplacements -105,000 -- 502760 Other Fixed Assets 200,000 200,000 -- 504000 Capital Land -2,042,000 -- 504001 Capital Consulting 2,231,220 2,935,000 65,000 85,000 504100 Capital Buildings 243,173,000 30,556,000 23,525,000 11,174,000 504200 Capital Machinery & Equipment 1,945,600 2,895,000 1,660,000 1,758,000 504300 Capital Vehicles 3,795,000 3,050,000 3,800,000 7,463,000 504400 Capital Roads 9,185,000 22,379,420 18,549,080 18,366,100 504420 Cap Bridges & Culverts 5,545,600 9,288,900 4,696,880 750,000 504450 Cap Traffic Signals 1,120,000 1,413,200 991,600 541,600 504500 Capital Construction 5,500,000 --- 504520 Capital Development Construction 200,000 200,000 200,000 621,600 504550 Capital Storm System 3,075,000 3,774,900 550,000 600,000 504600 Capital Sidewalks 141,500 2,790,800 2,326,100 2,888,600 504620 Capital Streetlights -601,000 2,050,900 3,286,200 504700 Capital Parks 29,379,200 35,273,000 10,442,100 8,225,600 504800 Cap Information Tech 730,500 2,666,000 2,581,500 2,748,000 504900 Cap Library Coll Mat 432,000 2,350,500 2,350,500 592,000 504950 Cap Furniture&Fix 1,037,500 3,222,500 6,177,500 1,602,500 Total Expenditures 308,097,820 128,726,020 82,336,260 62,435,200 Financing 402500 Federal Grants -(2,030,000) (845,000) - 406500 Donations -(250,000) -- 406601 Misc. Sale of Land --(985,000) - 406701 Debt Financing-5-Year -(770,000) (620,000) (1,000,000) 406702 Debt Financing-10Year -(7,496,700) (4,554,800) (12,370,500) 406703 Debt Financing-15Year -(19,520,100) (17,770,000) - 406704 Debt Financing-20Year (15,230,000) (8,045,000) -- 406713 Internal Loan-5Year -(532,000) -- 4067 41 DC-DebtFinancing-5YR (710,000) (1,100,000) (500,000) (1,550,000) 165 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Capital Projects Org Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast 4067 42 DC-DebtFinancng-1 0YR (5,209,000) (3,696,700) (3,838,000) (5,933,100) 4067 43 DC-DebtFinancng-15YR (4,261,000) --- 406744 DC-DebtFinancng-20YR (214,060,500) --- 408001 Trf fr IT Res (696,000) (635,000) (2,103,000) (2,893,000) 408007 Trf fr Rate Stabilization Res -(3,020,515) (350,000) - 408008 Trf fr DC City Share Res (9,116,610) (8,125,310) (5,567,000) (2,388,675) 408016 Trffr Vehicle Rpl. Res (1,060,000) (1,725,000) (2,750,000) (2,600,000) 408026 Trf fr Facilities Res (3,956,000) (4,686,000) (2,154,000) (933,000) 408028 Trf fr Fence Res (200,000) (200,000) -- 408031 Trf fr Tennis Res (145,000) (210,000) -(315,000) 408032 Trf fr Equipment Res (539,000) (1,675,000) (790,000) (693,000) 408036 Trf fr Library Bldg Res (100,000) --- 408037 Trf fr Casino Res (6,946,600) (8,207,000) (6,454,000) (9,565,000) 408041 Trf fr Parks lnfr. Repl. Res (139,000) (406,000) (1,125,000) (1,140,000) 408200 Trf fr 3rdPtyOblg RF (200,000) (200,000) (200,000) (200,000) 408502 Trf fr CCBF (FGT) Oblg RF (3,655,000) (3,220,000) (3,125,000) (3,390,000) 408505 Trf fr CBC Oblig RF (460,000) (37,485) -- 408602 Trf fr DC-Transportation ORF (4,759,310) (9,633,310) (8,781,780) (5,777,100) 408603 Trf fr DC-Other Hwy ORF (433,800) (460,000) (220,000) - 408604 Trf fr DC-SWM OB RF (243,300) (937,100) -- 408606 Trf fr DC-P&R OB RF (17,623,200) (22,923,100) (7,637,400) (5,087,000) 408607 Trf fr DC-Library OB RF -(2,982,000) (3,493,900) - 408608 Trf fr DC-Bylaw ES RF ---(2,125) 408703 Trf fr Animal Sit RF (549,500) --- 408705 Trf fr OPs Center RF (35,000) --- 408706 Trf fr Rds & Bridges RF (4,515,000) (3,900,000) (4,710,080) (4,739,500) 408707 Trf fr SWM RF (2,013,000) (3,065,000) (650,000) (700,000) 408708 Trf fr OCIF Grant (4,596,700) (1,100,000) -- 408710 Trf fr Seaton FIA RF (5,691,300) (491,200) (499,300) (93,700) 408900 Property Tax Funded (954,000) (801,500) (613,000) (1,064,500) 499999 Unfunded Capital Projects -(6,645,000) (2,000,000) - Total Financing (308,097,820) (128,726,020) (82,336,260) (62,435,200) 166 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Mayor Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502730 HardwareReplacements -15,000 - Total Expenditures -15,000 - Financing 408900 Property Tax Funded -(15,000) - Total Financing -(15,000) - 167 - - - - City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Mayor Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502730 HardwareReplacements -15,000 - Total Expenditures -15,000 - Financing 408900 Property Tax Funded -(15,000) - Total Financing -(15,000) - 168 - - - - 11000 Mayor Project Name C11000.2701 Total City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 2026 2027 Draft Draft Forecast Forecast Computer Equipment Mayor 15,000 15 000 169 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast City of Pickering 2027 Staff Recommended Draft Capital Forecast 11000 Mayor C11000.2701 Computer Equipment Mayor 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 408900 Property Tax Funded Total C11000.2701 Computer Equipment Mayor Total 11000 Mayor 170 Run Date: Oct 11, 2024 Funding Expense 15,000 (15,000) (15,000) 15,000 (15,000) 15,000 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 11005 Councillors 2026 2027 Project Name Draft Draft Forecast Forecast C11005.2701 Computer Equip Reg. Coun. Ward 1 15,000 C11005.2702 Computer Equip Reg. Coun. Ward 2 15,000 C11005.2703 Computer Equip Reg. Coun. Ward 3 15,000 C11005.2704 Computer Equip City Coun. Ward 1 15,000 C11005.2705 Computer Equip City Coun. Ward 2 15,000 C11005.2706 Computer Equip City Coun. Ward 3 15,000 Total 90 000 171 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast City of Pickering 2027 Staff Recommended Draft Capital Forecast 11005 Councillors C11005.2701 Computer Equip Reg. Coun. Ward 1 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 408900 Property Tax Funded Total C11005.2701 Computer Equip Reg. Coun. Ward 1 C11005.2702 Computer Equip Reg. Coun. Ward 2 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 408900 Property Tax Funded Total C11005.2702 Computer Equip Reg. Coun. Ward 2 C11005.2703 Computer Equip Reg. Coun. Ward 3 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 408900 Property Tax Funded Total C11005.2703 Computer Equip Reg. Coun. Ward 3 C11005.2704 Computer Equip City Coun. Ward 1 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 408900 Property Tax Funded Total C11005.2704 Computer Equip City Coun. Ward 1 C11005.2705 Computer Equip City Coun. Ward 2 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 172 Run Date: Oct 11, 2024 Funding Expense 15,000 (15,000) (15,000) 15,000 15,000 (15,000) (15,000) 15,000 15,000 (15,000) (15,000) 15,000 15,000 (15,000) (15,000) 15,000 15,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 11005 Councillors 408900 Property Tax Funded Total C11005.2705 Computer Equip City Coun. Ward 2 C11005.2706 Computer Equip City Coun. Ward 3 90 Expense 502730 HardwareReplacements As per the Council Compensation & Communication Policy, these funds can only be spent during the first 40 months of office. 80 Funding 408900 Property Tax Funded Total C11005.2706 Computer Equip City Coun. Ward 3 Total 11005 Councillors 173 Run Date: Oct 11, 2024 Funding Expense (15,000) (15,000) 15,000 15,000 (15,000) (15,000) 15,000 (90,000) 90,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Office of the CAO Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 550,000 -- 504500 Capital Construction 5,500,000 -- Total Expenditures 6,050,000 -- Financing 4067 42 DC-DebtFinancng-1 0YR (2,966,500) -- 408606 Trf fr DC-P&R OB RF (1,611,000) -- 408703 Trf fr Animal Sit RF (549,500) -- 408707 Trf fr SWM RF (923,000) -- Total Financing (6,050,000) -- 174 - - - - - - - - City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Corporate Projects Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 550,000 -- 504500 Capital Construction 5,500,000 -- Total Expenditures 6,050,000 -- Financing 4067 42 DC-DebtFinancng-1 0YR (2,966,500) -- 408606 Trf fr DC-P&R OB RF (1,611,000) -- 408703 Trf fr Animal Sit RF (549,500) -- 408707 Trf fr SWM RF (923,000) -- Total Financing (6,050,000) . . 175 - - . - - - - - City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10000 Corporate Projects 2026 2027 Project Name Draft Draft Forecast Forecast C10000.2502 Seaton Muncipal Land -Site Servicing 6,050,000 Total 6.050 000 176 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast City of Pickering 2026 Staff Recommended Draft Capital Forecast 10000 Corporate Projects C10000.2502 Seaton Muncipal Land -Site Servicing 01 Capital 504001 Capital Consulting Site servicing for lands in Seaton to be used for future municipal operations including: a Northern Operations Facility, Fire Station #3, an animal shelter and stormwater management facilities -Contract Administration and Inspections. 504500 Capital Construction Site servicing for lands in Seaton to be used for future municipal operations including: a Northern Operations Facility, Fire Station #3, an animal shelter and stormwater management facilities -Construction. 80 Funding 406742 DC-DebtFinancng-10YR 408606 Trf fr DC-P&R OB RF 408703 Trf fr Animal Sit RF 408707 Trf fr SWM RF Total C10000.2502 Seaton Muncipal Land -Site Servicing Total 10000 Corporate Projects 177 Run Date: Oct 11, 2024 Funding Expense 550,000 5,500,000 (2,966,500) (1,611,000) (549,500) (923,000) (6,050,000) 6,050,000 (6,050,000) 6,050,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Community Services Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502340 Building Rpr & Mntc 140,000 1,824,000 263,000 46,000 504001 Capital Consulting 758,000 1,535,000 65,000 85,000 504100 Capital Buildings 191,312,000 23,996,000 18,875,000 11,174,000 504200 Capital Machinery & Equipment 50,000 65,000 100,000 50,000 504950 Cap Furniture&Fix 27,500 1,202,500 2,677,500 1,602,500 Total Expenditures 192,287,500 28,622,500 21,980,500 12,957,500 Financing 402500 Federal Grants -(2,030,000) (845,000) - 406500 Donations -(250,000) -- 406702 Debt Financing-10Year ---(2,215,000) 406703 Debt Financing-15Year -(9,415,000) (14,940,000) - 406704 Debt Financing-20Year (3,930,000) (8,045,000) -- 406713 Internal Loan-5Year -(532,000) -- 406744 DC-DebtFinancng-20YR (179,155,500) --- 408026 Trf fr Facilities Res (3,236,000) (4,336,000) (1,319,000) (933,000) 408032 Trf fr Equipment Res (114,000) (65,000) (100,000) (50,000) 408037 Trf fr Casino Res (1,230,000) (1,825,000) (3,634,000) (7,810,000) 408502 Trf fr CCBF (FGT) Oblg RF ---(305,000) 408606 Trf fr DC-P&R OB RF -(1,023,700) (1,023,700) (1,535,600) 408710 Trffr Seaton FIA RF (4,594,500) (26,300) (26,300) (39,400) 408900 Property Tax Funded (27,500) (69,500) (92,500) (69,500) 499999 Unfunded Capital Projects -(1,005,000) -- Total Financing (192,287,500) (28,622,500) (21,980,500) (12,957,500) 178 Don Beer Arena Expenditures 504001 Capital Consulting 504100 Capital Buildings Total Expenditures Financing 408026 Trf fr Facilities Res 408037 Trf fr Casino Res Total Financing City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast 48,000 608,000 -- -377,000 2,184,000 2,535,000 48,000 985,000 2,184,000 2,535,000 (48,000) (670,000) (150,000) - -(315,000) (2,034,000) (2,535,000) (48,000) (985,000) (2,184,000) (2,535,000) 179 City of Pickering 2026 -2029 Staff Recommended Draft Mu lit-Year Capital Forecast Project Listing 10215 Don Beer Arena 2026 2027 Project Name Draft Draft Forecast Forecast C10215.2603 Rink 3 Flat Roof Replacement 48,000 377,000 C10215.2701 Rink 3 Retrofit 315,000 C10215.2702 Rink 3 Refrigeration Plant Upgrades 42,000 C10215.2703 Rink 1 Retrofit 251,000 Total 48 000 985 000 180 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 2,535,000 150,000 2,034,000 2.184 000 2 535 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10215 Don Beer Arena C10215.2603 Rink 3 Flat Roof Replacement 01 Capital 504001 Capital Consulting Design and related costs for lifecycle replacement of Rink 3 and surrounding related roofs. The existing roofs were installed in 2001. 80 Funding 408026 Trf fr Facilities Res Total C10215.2603 Rink 3 Flat Roof Replacement Total 10215 Don Beer Arena 181 Run Date: Oct 11, 2024 Funding Expense 48,000 (48,000) (48,000) 48,000 (48,000) 48,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10215 Don Beer Arena C10215.2603 Rink 3 Flat Roof Replacement 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of rink #3 and surrounding related roofs. The existing roofs were installed in 2001. 80 Funding 408026 Trf fr Facilities Res Total C10215.2603 Rink 3 Flat Roof Replacement C10215.2701 Rink 3 Retrofit 01 Capital 504001 Capital Consulting Lifecycle replacement of existing rink slab, dasher boards, seating, refrigeration lines and related components for Rink #3. Design and related costs only. 80 Funding 408037 Trf fr Casino Res Total C10215.2701 Rink 3 Retrofit C10215.2702 Rink 3 Refrigeration Plant Upgrades 01 Capital 504001 Capital Consulting Design costs for required lifecycle replacements to the Rink 3 refrigeration plant. The plant was originally installed in 2002, and major components are at end of life. Includes related upgrades for regulatory compliance. 80 Funding 408026 Trf fr Facilities Res Total C10215.2702 Rink 3 Refrigeration Plant Upgrades C10215.2703 Rink 1 Retrofit 01 Capital 504001 Capital Consulting Lifecycle replacement of existing rink slab, dasher boards, seating, refrigeration lines and related components for Rink #1. Design and related costs only. 80 Funding 408026 Trf fr Facilities Res Total C10215.2703 Rink 1 Retrofit Total 10215 Don Beer Arena 182 Run Date: Oct 11, 2024 Funding Expense 377,000 (377,000) (377,000) 377,000 315,000 (315,000) (315,000) 315,000 42,000 (42,000) (42,000) 42,000 251,000 (251,000) (251,000) 251,000 (985,000) 985,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10215 Don Beer Arena C10215.2702 Rink 3 Refrigeration Plant Upgrades 01 Capital 504100 Capital Buildings Construction costs for required lifecycle replacements to the Rink 3 refrigeration plant. The plant was originally installed in 2002, and major components are at end of life. Includes related upgrades for regulatory compliance. 80 Funding 408026 Trf fr Facilities Res Total C10215.2702 Rink 3 Refrigeration Plant Upgrades C10215.2703 Rink 1 Retrofit 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of existing rink slab, dasher boards, seating, refrigeration lines and related components for rink #1. 80 Funding 408037 Trf fr Casino Res Total C10215.2703 Rink 1 Retrofit Total 10215 Don Beer Arena 183 Run Date: Oct 11, 2024 Funding Expense 150,000 (150,000) (150,000) 150,000 2,034,000 (2,034,000) (2,034,000) 2,034,000 (2,184,000) 2,184,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10215 Don Beer Arena C10215.2701 Rink 3 Retrofit 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of existing rink slab, dasher boards, seating, refrigeration lines and related components for rink #3. Includes coating application on metal roof to extend its serviceable life. 80 Funding 408037 Tri fr Casino Res Total C10215.2701 Rink 3 Retrofit Total 10215 Don Beer Arena 184 Run Date: Oct 11, 2024 Funding Expense 2,535,000 (2,535,000) (2,535,000) 2,535,000 (2,535,000) 2,535,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Community Centres Run Date: Oct 11, 2024 2026 2027 2028 Draft Draft Draft Forecast Forecast Forecast Expenditures 502340 Building Rpr & Mntc 140,000 -- 504001 Capital Consulting -' 352,000 - 504100 Capital Buildings 1,107,000 3,807,000 421,000 504950 Cap Furniture&Fix -125,000 - Total Expenditures 1,247,000 4,284,000 421,000 Financing 406703 Debt Financing-15Year -(3,625,000) - 408026 Trf fr Facilities Res (1,183,000) (224,000) (421,000) 408032 Trf fr Equipment Res (64,000) -- 408037 Trf fr Casino Res -(435,000) - 408502 Trf fr CCBF (FGT) Oblg RF --- 408900 Property Tax Funded --- Total Financing (1,247,000) (4,284,000) (421,000) Abbreviations GALCC TCC GWCC GRCC ESCC wscc PSC George Ashe Library and Community Centre, 470 Kingston Rd. , Dr. Nelson F. Tomlinson Community Centre, 4941 Old Brock Rd. Greenwood Community Centre, 3551 Greenwood Rd. Green River Community Centre, 190 Highway 7 East Shore Community Centre, 910 Liverpool Rd. West Shore Community Centre, 1011-1015 Bayly St. Pickering Soccer Centre, 1975 Clements Rd. 185 2029 Draft Forecast - 45,000 234,000 - 279,000 - (192,000) - - (45,000) (42,000) (279,000) City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10220 Community Centres 2026 2027 Project Name Draft Draft Forecast Forecast C10220.2301 GALCC Renovation 3,750,000 C10220.2303 TCC Septic System Upgrades & Replacement 200,000 C 10220.2501 Northern Community Centres Restoration 100,000 C10220.2506 GWCC Remediation and Demolition 843,000 C10220.2601 GRCC Building Envelope Repairs 140,000 C10220.2605 GALCC Alarm System Upgrades 64,000 C10220.2701 ESCC Lifecycle Retrofits 310,000 C10220.2702 ESCC AC #1, #3 & #4 Replacement 82,000 C10220.2703 TCC Windows Replacement 42,000 C10220.2802 TCC Kitchen Retrofit C10220.2901 WSCC Roofing Replacement C10220.2902 WSCC Exterior Painting C10220.2903 PSC HVAC Replacements C10220.2904 TCC Front Entrance Lobby Retrofit C10220.2905 TCC Fire Alarm System Upgrades Total 1 247 000 4 284 000 186 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 100,000 191,000 130,000 45,000 42,000 45,000 100,000 47,000 421 000 279 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10220 Community Centres C10220.2303 TCC Septic System Upgrades & Replacement 01 Capital 504100 Capital Buildings Lifecycle and upgrades to existing septic system at Tomlinson Community Centre and Fire Station #4. The existing system is original, installed in 1997. 80 Funding 408026 Trf fr Facilities Res Total C10220.2303 TCC Septic System Upgrades & Replacement C10220.2506 GWCC Remediation and Demolition 01 Capital 504100 Capital Buildings Construction cost for Greenwood Community Centre demolition & remediation. 80 Funding 408026 Trf fr Facilities Res Total C10220.2506 GWCC Remediation and Demolition C10220.2601 GRCC Building Envelope Repairs 90 Expense 502340 Building Rpr & Mntc Lifecycle replacement of building envelope components such as windows, exterior doors, localized brick and foundation repairs. 80 Funding 408026 Trf fr Facilities Res Total C10220.2601 GRCC Building Envelope Repairs C10220.2605 GALCC Alarm System Upgrades 01 Capital 504100 Capital Buildings Lifecycle upgrades to existing fire and security alarm system hardware at the George Ashe Library and Community Centre. The existing system was installed in 2000. 80 Funding 408032 Trf fr Equipment Res Total C10220.2605 GALCC Alarm System Upgrades Total 10220 Community Centres 187 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 843,000 (843,000) (843,000) 843,000 140,000 (140,000) (140,000) 140,000 64,000 (64,000) (64,000) 64,000 (1,247,000) 1,247,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10220 Community Centres C10220.2301 GALCC Renovation 01 Capital 504100 Capital Buildings Construction costs for renovations to George Ashe Community Centre, including circulation counter modifications, replacement of book stacks, modifications to quiet room and children's areas. GAL originally opened in 2001. Library share of project costs and funding is listed separately in the 10900 cost centre. 504950 Cap Furniture&Fix 80 Funding 406703 Debt Financing-15Year 408037 Trf fr Casino Res Total C10220.2301 GALCC Renovation C10220.2501 Northern Community Centres Restoration 01 Capital 504100 Capital Buildings Funding to address age-related deterioration of existing facility components and systems. 80 Funding 408026 Trf fr Facilities Res Total C10220.2501 Northern Community Centres Restoration C10220.2701 ESCC Lifecycle Retrofits 01 Capital 504001 Capital Consulting Selective lifecycle replacements and retrofits intended to extend the serviceable life of the East Shore Community Centre -Design only. 80 Funding 408037 Trf fr Casino Res Total C10220.2701 ESCC Lifecycle Retrofits C10220.2702 ESCC AC #1, #3 & #4 Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of air conditioning condensers #1, #3 and #4, serving meeting rooms #2, #4 and #7, respectively. The existing units were installed in 2015. 80 Funding 408026 Trf fr Facilities Res Total C10220.2702 ESCC AC #1, #3 & #4 Replacement C10220.2703 TCC Windows Replacement 188 Run Date: Oct 11, 2024 Funding Expense 3,625,000 125,000 (3,625,000) (125,000) (3,750,000) 3,750,000 100,000 (100,000) (100,000) 100,000 310,000 (310,000) (310,000) 310,000 82,000 (82,000) (82,000) 82,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10220 Community Centres 01 Capital 504001 Capital Consulting Lifecycle replacement of existing exterior windows at the Dr. Nelson F. Tomlinson Community Centre and Library. Design and related costs only. 80 Funding 408026 Trf fr Facilities Res Total C10220.2703 TCC Windows Replacement Total 10220 Community Centres 189 Run Date: Oct 11, 2024 Funding Expense 42,000 (42,000) (42,000) 42,000 (4,284,000) 4,284,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10220 Community Centres C10220.2501 Northern Community Centres Restoration 01 Capital 504100 Capital Buildings Funding to address age-related deterioration of existing facility components and systems. 80 Funding 408026 Trf fr Facilities Res Total C10220.2501 Northern Community Centres Restoration C10220.2703 TCC Windows Replacement 01 Capital 504100 Capital Buildings Construction costs for the lifecycle replacement of existing exterior windows. All are original, installed in 1997. 80 Funding 408026 Trf fr Facilities Res Total C10220.2703 TCC Windows Replacement C10220.2802 TCC Kitchen Retrofit 01 Capital 504100 Capital Buildings Lifecycle replacement of existing kitchen counters, flooring and appliances, including upgrades to exhaust systems. Originally installed in 1997. 80 Funding 408026 Trf fr Facilities Res Total C10220.2802 TCC Kitchen Retrofit Total 10220 Community Centres 190 Run Date: Oct 11, 2024 Funding Expense 100,000 (100,000) (100,000) 100,000 191,000 (191,000) (191,000) 191,000 130,000 (130,000) (130,000) 130,000 (421,000) 421,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10220 Community Centres C10220.2901 WSCC Roofing Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing roof at the Westshore Community Centre. 80 Funding 408026 Trf fr Facilities Res Total C10220.2901 WSCC Roofing Replacement C10220.2902 WSCC Exterior Painting 01 Capital 504100 Capital Buildings Refinishing of exterior paint to protect underlying structure, and to maintain the appearance of the building for the Westshore Community Centre. 80 Funding 408900 Property Tax Funded Total C10220.2902 WSCC Exterior Painting C10220.2903 PSC HVAC Replacements 01 Capital 504001 Capital Consulting Design and related costs for lifecycle replacement of various HVAC units at the Pickering Soccer Center that were installed in 2014. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10220.2903 PSC HVAC Replacements C10220.2904 TCC Front Entrance Lobby Retrofit 01 Capital 504100 Capital Buildings Retrofit and replacement of existing doors, windows, various finishes and other building systems at the main entrance and lobby of the Dr. Nelson F. Tomlinson Community Centre. The Facilities opened in 1997. 80 Funding 408026 Trf fr Facilities Res Total C10220.2904 TCC Front Entrance Lobby Retrofit C10220.2905 TCC Fire Alarm System Upgrades 01 Capital 504100 Capital Buildings Lifecycle upgrades to the existing fire alarm system at Dr. Nelson F. Tomlinson Community Centre & Library. 80 Funding 191 Run Date: Oct 11, 2024 Funding Expense 45,000 (45,000) (45,000) 45,000 42,000 (42,000) (42,000) 42,000 45,000 (45,000) (45,000) 45,000 100,000 (100,000) (100,000) 100,000 47,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10220 Community Centres 408026 Trf fr Facilities Res Total C10220.2905 TCC Fire Alarm System Upgrades Total 10220 Community Centres 192 Run Date: Oct 11, 2024 Funding Expense (47,000) (47,000) 47,000 (279,000) 279,000 City of Pickering 2026 • 2029 Staff Recommended Draft Multi-Year Capital Forecast Rec. Complex -Central Core Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting --65,000 - 504100 Capital Buildings 765,000 4,515,000 170,000 3,130,000 504200 Capital Machinery & Equipment 50,000 65,000 100,000 50,000 Total Expenditures 815,000 4,580,000 335,000 3,180,000 Financing 406702 Debt Financing-10Year ---(2,215,000) 406704 Debt Financing-20Year -(1,480,000) -- 408026 Trffr Facilities Res (765,000) (2,485,000) (170,000) (655,000) 408032 Trf fr Equipment Res (50,000) (65,000) (100,000) (50,000) 408037 Trf fr Casino Res -(550,000) -- 408502 Trf fr CCBF (FGT) Oblg RF ---(260,000) 408900 Property Tax Funded --(65,000) - Total Financing (815,000) (4,580,000) (335,000) (3,180,000) 193 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10225 Rec. Complex -Central Core 2026 2027 Project Name Draft Draft Forecast Forecast C10225.2203 BAS & Control Systems Upgrade 425,000 C10225.2304 Aquatic and Family Change Rooms Renovation 550,000 C10225.2307 Life Safety Upgrades 250,000 C10225.2401 Curtain Wall & Window Replacement 1,480,000 C10225.2411 Loading Dock Retrofit 345,000 C10225.2501 Roof Replacement (J & 13) 515,000 C10225.2507 Health Club Equipment Replacement 50,000 65,000 C10225.2701 Racquet Ball, Squash Courts & Fitness Studio Floor Refinisr 160,000 C10225.2702 Lobby Steel Deck Remediation & Painting 870,000 C10225.2703 Banquet Hall Digital Display Monitors 550,000 C10225.2704 Banquet Hall Lighting Replacement 135,000 C 10225.2801 Athletic Flooring Replacement C10225.2802 RF-15 Replacement C10225.2803 Parking Lot Resurfacing C10225.2901 Tennis Court Flat Roof Repairs C10225.2902 Fitness Studio Roof & Skylight Replacement C 10225.2903 Fitness Room Lighting Replacement C10225.2904 Supply Fan 9 and Return Fan 9 Replacement C 10225.2905 Fire Alarm System Upgrades C10225.2906 Staff Room Renovation C10225.2907 Convert Exterior and Parking Lot Lighting to LED Total 815 000 4.580 000 194 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 100,000 50,000 100,000 70,000 65,000 2,215,000 100,000 45,000 130,000 130,000 85,000 110,000 315,000 335.000 3 180 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core C10225.2307 Life Safety Upgrades 01 Capital 504100 Capital Buildings Construction costs for various life safety upgrades, including sprinklers, fire separations, fire alarm and related building system and component upgrades. 80 Funding 408026 Trf fr Facilities Res Total C10225.2307 Life Safety Upgrades C10225.2501 Roof Replacement (J & 13) 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of roof J (squash courts) and 13 (loading dock and exit corridor). 80 Funding 408026 Trf fr Facilities Res Total C10225.2501 Roof Replacement (J & 13) C10225.2507 Health Club Equipment Replacement 01 Capital 504200 Capital Machinery & Equipment Fitness Equipment Replacement: Pilates Reformer Machine (9). 80 Funding 408032 Trf fr Equipment Res Total C10225.2507 Health Club Equipment Replacement Total 10225 Rec. Complex -Central Core 195 Run Date: Oct 11, 2024 Funding Expense 250,000 (250,000) (250,000) 250,000 515,000 (515,000) (515,000) 515,000 50,000 (50,000) (50,000) 50,000 (815,000) 815,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core C10225.2203 BAS & Control Systems Upgrade 01 Capital 504100 Capital Buildings Implementation costs for lifecycle upgrade to the CHDRC's existing building automation system (BAS). The existing system has been expanded gradually over the last 20 years and is nearing the end of viability of its software and hardware components and requires a general overhaul and upgrade. The existing BAS needs to have planned upgrades every 10 years to keep up with technology. This systems serves as a hub for automation controls for all city facilities. 80 Funding 408026 Trf fr Facilities Res Total C10225.2203 BAS & Control Systems Upgrade C10225.2304 Aquatic and Family Change Rooms Renovation 01 Capital 504100 Capital Buildings Construction costs for renovation of existing family and aquatics staff change rooms to match others updated during recent renovations. These rooms were not part of the previous project. 80 Funding 408026 Trf fr Facilities Res Total C10225.2304 Aquatic and Family Change Rooms Renovation C10225.2401 Curtain Wall & Window Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of original aluminum windows at tenant suites on south side of core area, north entrance and main entrance curtain wall - construction costs. 80 Funding 406704 Debt Financing-20Year Total C10225.2401 Curtain Wall & Window Replacement C10225.2411 Loading Dock Retrofit 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of the CHDRC loading dock area to provide an adjustable dock, new bumpers and safety rails, replacement doors, paving, new concrete pad and related work equipment. 80 Funding 408026 Trf fr Facilities Res Total C10225.2411 Loading Dock Retrofit 196 Run Date: Oct 11, 2024 Funding Expense 425,000 (425,000) (425,000) 425,000 550,000 (550,000) (550,000) 550,000 1,480,000 (1,480,000) (1,480,000) 1,480,000 345,000 (345,000) (345,000) 345,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core C10225.2507 Health Club Equipment Replacement 01 Capital 504200 Capital Machinery & Equipment Replace: Multi-Station Full Body Workout Machine (1), Functional Training Cable System (2). New: Functional Training Synergy System (1). 80 Funding 408032 Trf fr Equipment Res Total C10225.2507 Health Club Equipment Replacement C10225.2701 Racquet Ball, Squash Courts & Fitness Studio Floor Refinishing 01 Capital 504100 Capital Buildings Refinishing and re-lining of existing racquet courts, fitness studios, squash courts and other related work. 80 Funding 408026 Trf fr Facilities Res Total C10225.2701 Racquet Ball, Squash Courts & Fitness Studio Floor Refir C10225.2702 Lobby Steel Deck Remediation & Painting 01 Capital 504100 Capital Buildings Removal and replacement of existing paint on the exposed underside of the steel deck throughout the core areas supported by the existing space frame. 80 Funding 408026 Trf fr Facilities Res Total C10225.2702 Lobby Steel Deck Remediation & Painting C10225.2703 Banquet Hall Digital Display Monitors 01 Capital 504100 Capital Buildings New digital display monitors and controls to replace existing projectors and screens in both ends of the banquet hall. 80 Funding 408037 Trf fr Casino Res Total C10225.2703 Banquet Hall Digital Display Monitors C10225.2704 Banquet Hall Lighting Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing lighting, controls and related work in the banquet hall. Includes consulting fees. 197 Run Date: Oct 11, 2024 Funding Expense 65,000 (65,000) (65,000) 65,000 160,000 (160,000) (160,000) 160,000 870,000 (870,000) (870,000) 870,000 550,000 (550,000) (550,000) 550,000 135,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core 80 Funding 408026 Trf fr Facilities Res Total C10225.2704 Banquet Hall Lighting Replacement Total 10225 Rec. Complex -Central Core 198 Run Date: Oct 11, 2024 Funding Expense (135,000) (135,000) 135,000 (4,580,000) 4,580,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core C10225.2507 Health Club Equipment Replacement 01 Capital 504200 Capital Machinery & Equipment 80 Funding 408032 Trf fr Equipment Res Total C10225.2507 Health Club Equipment Replacement C10225.2801 Athletic Flooring Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the existing rubber flooring in the upper level fitness area at CHDRC. The existing floor was installed in 2002. 80 Funding 408026 Trf fr Facilities Res Total C10225.2801 Athletic Flooring Replacement C10225.2802 RF-15 Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of RF-15 serving fitness/atrium areas, including controls. This equipment was originally installed in 1983. 80 Funding 408026 Trf fr Facilities Res Total C10225.2802 RF-15 Replacement C10225.2803 Parking Lot Resurfacing 01 Capital 504001 Capital Consulting Design costs for lifecycle replacement of asphalt, and selective curb and catch basin repairs for the north public parking lot and south staff lot. Excludes the main entrance turning circle. 80 Funding 408900 Property Tax Funded Total C10225.2803 Parking Lot Resurfacing Total 10225 Rec. Complex -Central Core 199 Run Date: Oct 11, 2024 Funding Expense 100,000 (100,000) (100,000) 100,000 100,000 (100,000) (100,000) 100,000 70,000 (70,000) (70,000) 70,000 65,000 (65,000) (65,000) 65,000 (335,000) 335,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core C10225.2507 Health Club Equipment Replacement 01 Capital 504200 Capital Machinery & Equipment Lifecycle replacement of existing equipment or provision of new equipment to meet changing demand. 80 Funding 408032 Trf fr Equipment Res Total C10225.2507 Health Club Equipment Replacement C10225.2803 Parking Lot Resurfacing 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of top asphalt, and selective curb and catch basin repairs for the north public parking lot and south staff lot. Excludes the main entrance turning circle. 80 Funding 406702 Debt Financing-10Year Total C10225.2803 Parking Lot Resurfacing C10225.2901 Tennis Court Flat Roof Repairs 01 Capital 504100 Capital Buildings Repairs to extend the life of the flat roof. 80 Funding 408026 Trf fr Facilities Res Total C10225.2901 Tennis Court Flat Roof Repairs C10225.2902 Fitness Studio Roof & Skylight Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing green roof and skylights, including related roof assembly repairs. 80 Funding 408026 Trf fr Facilities Res Total C10225.2902 Fitness Studio Roof & Skylight Replacement C10225.2903 Fitness Room Lighting Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing equipment or provision of new equipment to meet changing demand. 80 Funding 200 Run Date: Oct 11, 2024 Funding Expense 50,000 (50,000) (50,000) 50,000 2,215,000 (2,215,000) (2,215,000) 2,215,000 100,000 (100,000) (100,000) 100,000 45,000 (45,000) (45,000) 45,000 130,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10225 Rec. Complex -Central Core 408502 Trf fr CCBF (FGT) Oblg RF Total C10225.2903 Fitness Room Lighting Replacement C10225.2904 Supply Fan 9 and Return Fan 9 Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing supply fan (SF9) and return fan (RF9), including controls. These units were installed in 2009 and service the squash area. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10225.2904 Supply Fan 9 and Return Fan 9 Replacement C10225.2905 Fire Alarm System Upgrades 01 Capital 504100 Capital Buildings Lifecycle upgrades to CHDRC fire alarm system. The system was retrofit in 2019, but is expected to require full replacement due to its age. 80 Funding 408026 Trf fr Facilities Res Total C10225.2905 Fire Alarm System Upgrades C10225.2906 Staff Room Renovation 01 Capital 504100 Capital Buildings Lifecycle replacement of existing millwork and fixtures in the staff lunch, locker rooms and adjoining washroom. Includes design and construction costs. 80 Funding 408026 Trf fr Facilities Res Total C10225.2906 Staff Room Renovation C10225.2907 Convert Exterior and Parking Lot Lighting to LED 01 Capital 504100 Capital Buildings Convert existing parking lot light fixtures and wall-mounted exterior light fixtures to LED. Existing poles and bases will be retained. 80 Funding 408026 Trf fr Facilities Res Total C10225.2907 Convert Exterior and Parking Lot Lighting to LED Total 10225 Rec. Complex -Central Core 201 Run Date: Oct 11, 2024 Funding Expense (130,000) (130,000) 130,000 130,000 (130,000) (130,000) 130,000 85,000 (85,000) (85,000) 85,000 110,000 (110,000) (110,000) 110,000 315,000 (315,000) (315,000) 315,000 (3,180,000) 3,180,000 Rec. Complex -Pool Expenditures 504001 Capital Consulting 504100 Capital Buildings Total Expenditures Financing 408037 Trf fr Casino Res Total Financing City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast -525,000 -- ---5,275,000 -525,000 -5,275,000 -(525,000) -(5,275,000) -(525,000) -(5,275,000) 202 10230 Rec. Complex -Pool Project Name City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 2026 2027 Draft Draft Forecast Forecast C10230.2701 CHDRC Pool Renovations 525,000 Total 525.000 203 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 5,275,000 5.275 000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10230 Rec. Complex -Pool C10230.2701 CHDRC Pool Renovations 01 Capital 504001 Capital Consulting Renovations to the tot and main pools, deck and related areas. Design and related costs only. 80 Funding 408037 Trf fr Casino Res Total C10230.2701 CHDRC Pool Renovations Total 10230 Rec. Complex -Pool 204 Run Date: Oct 11, 2024 Funding Expense 525,000 (525,000) (525,000) 525,000 (525,000) 525,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10230 Rec. Complex -Pool C10230.2701 CHDRC Pool Renovations 01 Capital 504100 Capital Buildings Construction costs for major renovation of the existing pool, including tanks, water supply, drains, filtration systems, deck, all related finishes and support spaces. 80 Funding 408037 Trf fr Casino Res Total C10230.2701 CHDRC Pool Renovations Total 10230 Rec. Complex -Pool 205 Run Date: Oct 11, 2024 Funding Expense 5,275,000 (5,275,000) (5,275,000) 5,275,000 (5,275,000) 5,275,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Rec Complex -Arenas Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 710,000 50,000 -40,000 504100 Capital Buildings 1,240,000 9,465,000 315,000 - Total Expenditures 1,950,000 9,515,000 315,000 40,000 Financing 402500 Federal Grants -(2,030,000) -- 406704 Debt Financing-20Year -(6,565,000) -- 408026 Trf fr Facilities Res (1,240,000) (920,000) (315,000) (40,000) 408037 Trf fr Casino Res (710,000) --- Total Financing (1,950,000) (9,515,000) (315,000) (40,000) 206 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10235 Rec Complex -Arenas 2026 2027 Project Name Draft Draft Forecast Forecast C10235.2501 Delaney Arena Roof Replacement 1,190,000 C10235.2601 Delaney Arena Skate Tile Replacement 50,000 C10235.2602 O'Brien Arena Renovation 710,000 6,565,000 C10235.2701 Delaney Arena Mechanical Replacements 50,000 C10235.2702 O'Brien Arena Roof & Cladding Replacement 2,900,000 C10235.2801 Delaney Arena Fire Alarm Panel Replacement C10235.2901 Delaney Arena Lighting Replacement Total 1 950 000 9 515 000 207 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 250,000 65,000 40,000 315 000 40 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10235 Rec Complex -Arenas C10235.2501 Delaney Arena Roof Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the Delaney Arena roof. The existing roof was installed in 2003. 80 Funding 408026 Trf fr Facilities Res Total C10235.2501 Delaney Arena Roof Replacement C10235.2601 Delaney Arena Skate Tile Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing skate tile flooring in Delaney Arena. The existing skate tile to be replaced was installed in 2005. 80 Funding 408026 Trf fr Facilities Res Total C10235.2601 Delaney Arena Skate Tile Replacement C10235.2602 O'Brien Arena Renovation 01 Capital 504001 Capital Consulting Design and related costs for major renovation of O'Brien Arena, meeting and dressing rooms, including related spaces. Includes structural repairs, building envelope, interior finishes, rink slab and dashboard, structural coating, parking lot asphalt and lighting, exterior patios, and other related systems. 80 Funding 408037 Trf fr Casino Res Total C10235.2602 O'Brien Arena Renovation Total 10235 Rec Complex -Arenas 208 Run Date: Oct 11, 2024 Funding Expense 1,190,000 (1,190,000) (1,190,000) 1,190,000 50,000 (50,000) (50,000) 50,000 710,000 (710,000) (710,000) 710,000 (1,950,000) 1,950,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10235 Rec Complex -Arenas C10235.2602 O'Brien Arena Renovation 01 Capital 504100 Capital Buildings Construction costs for major renovation of the interior spaces in O'Brien Arena, including: structural repairs, building envelope, interior finishes, rink slab and dashboard, structural coating, parking lot asphalt and lighting, exterior patios, and other related systems. 80 Funding 406704 Debt Financing-20Year Total C10235.2602 O'Brien Arena Renovation C10235.2701 Delaney Arena Mechanical Replacements 01 Capital 504001 Capital Consulting Design and testing for Delaney Arena mechanical replacements. 80 Funding 408026 Trf fr Facilities Res Total C10235.2701 Delaney Arena Mechanical Replacements C10235.2702 O'Brien Arena Roof & Cladding Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the O'Brien Arena roof and wall cladding. Both are original from 1992. Air tightness and insulation will be improved for better energy performance. 80 Funding 402500 Federal Grants 408026 Trf fr Facilities Res Total C10235.2702 O'Brien Arena Roof & Cladding Replacement Total 10235 Rec Complex -Arenas 209 Run Date: Oct 11, 2024 Funding Expense 6,565,000 (6,565,000) (6,565,000) 6,565,000 50,000 (50,000) (50,000) 50,000 2,900,000 (2,030,000) (870,000) (2,900,000) 2,900,000 (9,515,000) 9,515,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10235 Rec Complex -Arenas C10235.2701 Delaney Arena Mechanical Replacements 01 Capital 504100 Capital Buildings Lifecycle replacement of existing mechanical equipment in Delaney arena, including pumps, heat exchangers, compressors and related equipment. 80 Funding 408026 Trf fr Facilities Res Total C10235.2701 Delaney Arena Mechanical Replacements C10235.2801 Delaney Arena Fire Alarm Panel Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the main facility fire alarm system. The existing system was installed in 2015. 80 Funding 408026 Trf fr Facilities Res Total C10235.2801 Delaney Arena Fire Alarm Panel Replacement Total 10235 Rec Complex -Arenas 210 Run Date: Oct 11, 2024 Funding Expense 250,000 (250,000) (250,000) 250,000 65,000 (65,000) (65,000) 65,000 (315,000) 315,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10235 Rec Complex -Arenas C10235.2901 Delaney Arena Lighting Replacement 01 Capital 504001 Capital Consulting Lifecycle replacement of existing lighting systems in Delaney Arena, installed in 2016. Consulting costs only. 80 Funding 408026 Trf fr Facilities Res Total C10235.2901 Delaney Arena Lighting Replacement Total 10235 Rec Complex -Arenas 211 Run Date: Oct 11, 2024 Funding Expense 40,000 (40,000) (40,000) 40,000 (40,000) 40,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Civic Complex Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504100 Capital Buildings 4,450,000 5,832,000 14,940,000 - 504950 Cap Furniture&Fix 27,500 27,500 1,627,500 27,500 Total Expenditures 4,477,500 5,859,500 16,567,500 27,500 Financing 406703 Debt Financing-15Year -(5,790,000) (14,940,000) - 406704 Debt Financing-20Year (3,930,000) --- 408037 Trf fr Casino Res (520,000) -(1,600,000) - 408900 Property Tax Funded (27,500) (69,500) (27,500) (27,500) Total Financing (4,477,500) (5,859,500) (16,567,500) (27,500) 212 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10240 Civic Complex 2026 2027 Project Name Draft Draft Forecast Forecast C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retro 27,500 27,500 C10240.2501 Civic Complex Interior Renovations 520,000 3,000,000 C10240.2503 Building Envelope & Parking Garage Retrofit 2,790,000 C10240.2508 City Hall Tower Retrofit 3,930,000 C10240.2702 Air Controls Compressor & Dryer Fan Replacement 42,000 Total 4 477 500 5 859 500 213 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 27,500 27,500 13,750,000 2,790,000 16 567 500 27 500 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10240 Civic Complex C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retrofit 01 Capital 504950 Cap Furniture&Fix Replacement of original and worn furniture, some nearly 30 years old. Spare parts are no longer available as original furniture manufacturer is no longer in business. Includes replacement of existing furniture in poor repair. 80 Funding 408900 Property Tax Funded Total C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Re· C10240.2501 Civic Complex Interior Renovations 01 Capital 504100 Capital Buildings Creation or retrofit of temporary office space lo enable the relocation of staff and services from the Civic Complex during renovation of that facility. Includes FF&E and moving costs. 80 Funding 408037 Trf fr Casino Res Total C10240.2501 Civic Complex Interior Renovations C10240.2508 City Hall Tower Retrofit 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of the existing City Hall Tower including balcony repairs, tower structural steel coaling, louvres, metal roofing system, clocks, localized brick repairs and glazing system. All components are original from 1990. 80 Funding 406704 Debt Financing-20Year Total C10240.2508 City Hall Tower Retrofit Total 10240 Civic Complex 214 Run Date: Oct 11, 2024 Funding Expense 27,500 (27,500) (27,500) 27,500 520,000 (520,000) (520,000) 520,000 3,930,000 (3,930,000) (3,930,000) 3,930,000 (4,477,500) 4,477,500 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10240 Civic Complex C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retrofit 01 Capital 504950 Cap Furniture&Fix Replacement of original and worn furniture, some nearly 30 years old. Spare parts are no longer available as original furniture manufacturer is no longer in business. Includes replacement of existing furniture in poor repair. 80 Funding 408900 Property Tax Funded Total C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Re· C10240.2501 Civic Complex Interior Renovations 01 Capital 504100 Capital Buildings Construction costs (Phase 1) for interior renovation of the existing City Hall areas within the Civic Complex to consolidate customer service counters on the ground floor, and retrofit staff and support spaces for greater efficiency. The Civic Complex opened in 1990 and is due for finish and infrastructure upgrades. 80 Funding 406703 Debt Financing-15Year Total C10240.2501 Civic Complex Interior Renovations C10240.2503 Building Envelope & Parking Garage Retrofit 01 Capital 504100 Capital Buildings Construction costs (Phase 1) for lifecycle replacements to the existing parking garage including: waterproofing, sprinkler repairs and related components. All components are original from 1990. 80 Funding 406703 Debt Financing-15Year Total C10240.2503 Building Envelope & Parking Garage Retrofit C10240.2702 Air Controls Compressor & Dryer Fan Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of existing air controls compressor and dryer fan. Units are original, installed in 1990. 80 Funding 408900 Property Tax Funded Total C10240.2702 Air Controls Compressor & Dryer Fan Replacement Total 10240 Civic Complex 215 Run Date: Oct 11, 2024 Funding Expense 27,500 (27,500) (27,500) 27,500 3,000,000 (3,000,000) (3,000,000) 3,000,000 2,790,000 (2,790,000) (2,790,000) 2,790,000 42,000 (42,000) (42,000) 42,000 (5,859,500) 5,859,500 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10240 Civic Complex C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retrofit 01 Capital 504950 Cap Furniture&Fix Replacement of original and worn furniture, some over 25 years old. Spare parts are no longer available as original furniture manufacturer is no longer in business. Includes replacement of existing furniture in poor repair. 80 Funding 408900 Property Tax Funded Total C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Re- C10240.2501 Civic Complex Interior Renovations 01 Capital 504100 Capital Buildings Construction Costs (Phase 2) for interior renovation of the existing City Hall areas within the Civic Complex to consolidate customer service counters on the ground floor, and retrofit staff and support spaces for greater efficiency. The Civic Complex opened in 1990 and is due for finish and infrastructure upgrades. 504950 Cap Furniture&Fix Furniture, fixtures and equipment al City Hall. Includes furniture, security, IT hardware, cabling, A/V, appliances, program and facility equipment, fixtures and artwork, signage, wayfinding, moving, installation and related costs. 80 Funding 406703 Debt Financing-15Year 408037 Trf fr Casino Res Total C10240.2501 Civic Complex Interior Renovations C10240.2503 Building Envelope & Parking Garage Retrofit 01 Capital 504100 Capital Buildings Construction costs (Phase 2) for lifecycle replacements lo the existing building envelope including: glazing systems, skylights, metal roofs, localized brick repairs and related components. All components are original from 1990. 80 Funding 406703 Debt Financing-15Year Total C10240.2503 Building Envelope & Parking Garage Retrofit Total 10240 Civic Complex 216 Run Date: Oct 11, 2024 Funding Expense 27,500 (27,500) (27,500) 27,500 12,150,000 1,600,000 (12,150,000) (1,600,000) (13,750,000) 13,750,000 2,790,000 (2,790,000) (2,790,000) 2,790,000 (16,567,500) 16,567,500 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10240 Civic Complex C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retrofit 01 Capital 504950 Cap Furniture&Fix Replacement of original and worn furniture, some over 25 years old. Spare parts are no longer available as original furniture manufacturer is no longer in business. Includes replacement of existing furniture in poor repair. 80 Funding 408900 Property Tax Funded Total C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Re· Total 10240 Civic Complex 217 Run Date: Oct 11, 2024 Funding Expense 27,500 (27,500) (27,500) 27,500 (27,500) 27,500 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Museum Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502340 Building Rpr & Mntc -1,824,000 263,000 46,000 504100 Capital Buildings --845,000 - Total Expenditures -1,824,000 1,108,000 46,000 Financing 402500 Federal Grants --(845,000) - 406500 Donations -(250,000) -- 406713 Internal Loan-5Year -(532,000) -- 408026 Trf fr Facilities Res -(37,000) (263,000) (46,000) 499999 Unfunded Capital Projects -(1,005,000) -- Total Financing -(1,824,000) (1,108,000) (46,000) 218 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10250 Museum 2026 2027 Project Name Draft Draft Forecast Forecast C10250.2301 Brougham Temperance House Restoration C10250.2304 Miller Cole House Restoration 1,005,000 C10250.2503 Harvey House Restoration 782,000 C 10250.2703 General Store Restoration 37,000 C 10250.2901 Chapel & Drive Shed Restoration Total 1 824.000 219 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 845,000 263,000 46,000 1 108 000 46 000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10250 Museum C10250.2304 Miller Cole House Restoration 90 Expense 502340 Building Rpr & Mntc 80 Funding 499999 Unfunded Capital Projects Total C10250.2304 Miller Cole House Restoration C10250.2503 Harvey House Restoration 90 Expense 502340 Building Rpr & Mntc Harvey House has been relocated and set upon a full basement and foundation as part of the Pickering Heritage & Community Centre (PHCC) project, including provision of electrical service, heating and cooling systems to allow it to be utilized year-round. Full restoration of the building was not included in the PHCC project, but will be required before it can be used to deliver any programming. The building's exterior requires a new porch and finishes, and its interior is currently bare framing the requires renovation and finishing to accommodate public use. It is proposed that previously approved contingency for the PHCC project, per report FIN 03-24 (Council resolution #398/24) be used to undertake this project, if available. Construction and related costs. This budget excludes exhibit costs. 80 Funding 406500 Donations 406713 Internal Loan-5Year Total C10250.2503 Harvey House Restoration C10250.2703 General Store Restoration 01 Capital 502340 Building Rpr & Mntc Roofing, cladding, porch and ramp repairs and interior finish replacement. Design and testing only. 80 Funding 408026 Trf fr Facilities Res Total C10250.2703 General Store Restoration Total 10250 Museum 220 Run Date: Oct 11, 2024 Funding Expense 1,005,000 (1,005,000) (1,005,000) 1,005,000 782,000 (250,000) (532,000) (782,000) 782,000 37,000 (37,000) (37,000) 37,000 (1,824,000) 1,824,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10250 Museum C10250.2301 Brougham Temperance House Restoration 01 Capital 504100 Capital Buildings Construction costs for various restoration work including: structural, ramp and porch repairs, roofing and cladding replacement, interior framing and finish work at the Brougham Temperance House (built ~1835), including restoration of existing wood frame window and doors. Project will only proceed if future grant funding is available. 80 Funding 402500 Federal Grants Total C10250.2301 Brougham Temperance House Restoration C10250.2703 General Store Restoration 90 Expense 502340 Building Rpr & Mntc Roofing, cladding, porch and ramp repairs and interior finish replacement. 80 Funding 408026 Tri fr Facilities Res Total C10250.2703 General Store Restoration Total 10250 Museum 221 Run Date: Oct 11, 2024 Funding Expense 845,000 (845,000) (845,000) 845,000 263,000 (263,000) (263,000) 263,000 (1,108,000) 1,108,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10250 Museum C10250.2901 Chapel & Drive Shed Restoration 90 Expense 502340 Building Rpr & Mntc Structural, roofing and cladding repairs, waterproofing and interior finish work. Design and testing only. 80 Funding 408026 Trf fr Facilities Res Total C10250.2901 Chapel & Drive Shed Restoration Total 10250 Museum 222 Run Date: Oct 11, 2024 Funding Expense 46,000 (46,000) (46,000) 46,000 (46,000) 46,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Seaton Recreation Complex Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504100 Capital Buildings 183,750,000 --- 504950 Cap Furniture&Fix -1,050,000 1,050,000 1,575,000 Total Expenditures 183,750,000 1,050,000 1,050,000 1,575,000 Financing 406744 DC-DebtFinancng-20YR (179,155,500) --- 408606 Trf fr DC-P&R OB RF -(1,023,700) (1,023,700) (1,535,600) 408710 Trf fr Seaton FIA RF (4,594,500) (26,300) (26,300) (39,400) Total Financing (183,750,000) (1,050,000) (1,050,000) (1,575,000) 223 10260 Seaton Recreation Complex Project Name City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 2026 2027 Draft Draft Forecast Forecast C10260.2101 Seaton Recreation Complex 183,750,000 1,050,000 Total 183 750 000 1 050 000 224 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 1,050,000 1,575,000 1 050 000 1575000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10260 Seaton Recreation Complex C10260.2101 Seaton Recreation Complex 01 Capital 504100 Capital Buildings Construction costs for the Seaton Recreation Complex. Proposed amenities include and Aquatics Centre (with 25-metre pool and separate warm water leisure pool), Triple Gymnasium & Walking Traci<, Fitness Centre, 2-Pad Arena, and Multi-purpose Program Rooms. Additional funding for the library components to this project are shown in the 10905 cost centre. 80 Funding 406744 DC-DebtFinancng-20YR 408710 Trf fr Seaton FIA RF Total C10260.2101 Seaton Recreation Complex Total 10260 Seaton Recreation Complex 225 Run Date: Oct 11, 2024 Funding Expense 183,750,000 (179,155,500) (4,594,500) (183,750,000) 183,750,000 (183,750,000) 183,750,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10260 Seaton Recreation Complex C10260.2101 Seaton Recreation Complex 01 Capital 504950 Cap Furniture&Fix Phase 1 of 3. Furniture, fixtures and equipment (FF&E) required for the Seaton Recreation Complex. FF&E costs have been spread over 3 years to allow for early purchase of long lead items while avoiding full commitment of FF&E funding within a single year. Additional FF&E funding for the library components to this project are shown in the 10905 cost centre. 80 Funding 408606 Trf fr DC-P&R 08 RF 408710 Trf fr Seaton FIA RF Total C10260.2101 Seaton Recreation Complex Total 10260 Seaton Recreation Complex 226 Run Date: Oct 11, 2024 Funding Expense 1,050,000 (1,023,700) (26,300) (1,050,000) 1,050,000 (1,050,000) 1,050,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10260 Seaton Recreation Complex C10260.2101 Seaton Recreation Complex 01 Capital 504950 Cap Furniture&Fix Phase 2 of 3. Furniture, fixtures and equipment (FF&E) required for the Seaton Recreation Complex. FF&E costs have been spread over 3 years to allow for early purchase of long lead items while avoiding full commitment of FF&E funding within a single year. Additional FF&E funding for the library components to this project are shown in the 10905 cost centre. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10260.2101 Seaton Recreation Complex Total 10260 Seaton Recreation Complex 227 Run Date: Oct 11, 2024 Funding Expense 1,050,000 (1,023,700) (26,300) (1,050,000) 1,050,000 (1,050,000) 1,050,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10260 Seaton Recreation Complex C10260.2101 Seaton Recreation Complex 01 Capital 504950 Cap Furniture&Fix Phase 3 of 3. Furniture, fixtures and equipment (FF&E) required for the Seaton Recreation Complex. FF&E costs have been spread over 3 years to allow for early purchase of long lead items while avoiding full commitment of FF&E funding within a single year. Additional FF&E funding for the library components to this project are shown in the 10905 cost centre. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10260.2101 Seaton Recreation Complex Total 10260 Seaton Recreation Complex 228 Run Date: Oct 11, 2024 Funding Expense 1,575,000 (1,535,600) (39,400) (1,575,000) 1,575,000 (1,575,000) 1,575,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Operations Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502760 Other Fixed Assets 200,000 200,000 -- 504001 Capital Consulting 134,000 215,000 -- 504100 Capital Buildings 35,000 --- 504200 Capital Machinery & Equipment 1,635,600 2,830,000 1,560,000 1,708,000 504300 Capital Vehicles 3,795,000 3,050,000 3,800,000 7,463,000 504600 Capital Sidewalks -375,000 275,000 250,000 504700 Capital Parks 1,900,000 1,578,000 2,725,000 2,675,000 Total Expenditures 7,699,600 8,248,000 8,360,000 12,096,000 Financing 406701 Debt Financing-5-Year -(770,000) (620,000) (1,000,000) 406702 Debt Financing-10Year ---(2,800,000) 4067 41 DC-DebtFinancing-5YR (710,000) (1,100,000) (500,000) (1,550,000) 4067 42 DC-DebtFinancng-1 0YR (2,242,500) --- 408008 Trf fr DC City Share Res ---(82,875) 408016 Trf fr Vehicle Rpl. Res (1,060,000) (1,725,000) (2,750,000) (2,600,000) 408028 Trf fr Fence Res (200,000) (200,000) -- 408031 Trf fr Tennis Res (145,000) (210,000) -(315,000) 408032 Trf fr Equipment Res (425,000) (1,610,000) (690,000) (643,000) 408037 Trf fr Casino Res (950,000) (937,000) (1,970,000) (1,755,000) 408041 Trf fr Parks lnfr. Rep!. Res (139,000) (206,000) (425,000) (290,000) 408502 Trf fr CCBF (FGT) Oblg RF (800,000) (700,000) (605,000) (565,000) 408602 Trf fr DC-Transportation ORF (70,000) (180,000) -- 408603 Trf fr DC-Other Hwy ORF (433,800) (460,000) (220,000) - 408606 Trf fr DC-P&R OB RF (381,800) -(330,000) (170,000) 408608 Trf fr DC-Bylaw ES RF ---(2,125) 408705 Trf fr OPs Center RF (35,000) --- 408707 Trf fr SWM RF (15,000) --- 408710 Trf fr Seaton FIA RF (57,500) -(225,000) - 408900 Property Tax Funded (35,000) (150,000) (25,000) (323,000) Total Financing (7,699,600) (8,248,000) (8,360,000) (12,096,000) 229 Public Works Admin. Expenditures 504100 Capital Buildings Total Expenditures Financing 408705 Trf fr OPs Center RF Total Financing City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast 35,000 -- 35,000 - - (35,000) -- (35,000) - - 230 - - - - City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10300 Public Works Admin. 2026 2027 Project Name Draft Draft Forecast Forecast C10300.2601 Gas Monitor Sensor System Replacement 35,000 Total 35.000 231 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast City of Pickering 2026 Staff Recommended Draft Capital Forecast 10300 Public Works Admin. C10300.2601 Gas Monitor Sensor System Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of carbon monoxide detection systems. The original units were installed in 2019. 80 Funding 408705 Trf fr OPs Center RF Total C10300.2601 Gas Monitor Sensor System Replacement Total 10300 Public Works Admin. 232 Run Date: Oct 11, 2024 Funding Expense 35,000 (35,000) (35,000) 35,000 (35,000) 35,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Property Maintenance Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502760 Other Fixed Assets 200,000 200,000 -- 504200 Capital Machinery & Equipment 385,600 1,200,000 825,000 525,000 504600 Capital Sidewalks -375,000 275,000 250,000 504 700 Capital Parks -260,000 -- Total Expenditures ·5a5,soo 2,035,000 1,100,000 775,000 Financing 4067 41 DC-DebtFinancing-5YR -(600,000) -- 408028 Trf fr Fence Res (200,000) (200,000) -- 408032 Trf fr Equipment Res -(600,000) (600,000) (525,000) 408037 Trf fr Casino Res -(260,000) -- 408502 Trf fr CCBF (FGT) Oblg RF -(375,000) (275,000) (250,000) 408602 Trf fr DC-Transportation ORF (70,000) --- 408603 Trf fr DC-Other Hwy ORF (233,800) --- 408606 Trf fr DC-P&R OB RF (66,800) --- 408707 Trf fr SWM RF (15,000) --- 408710 Trffr Seaton FIA RF --(225,000) - Total Financing (585,600) (2,035,000) (1,100,000) (775,000) 233 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10305 Property Maintenance 2026 2027 Project Name Draft Draft Forecast Forecast C10305.1505 Property Line Fence Replacement 200,000 200,000 C10305.2601 Sidewalk Plow with Attachments -New 233,800 C10305.2603 Litter Vacuum -New 66,800 C10305.2604 Utility Boat and Trailer -New 15,000 C10305.2605 Zero Turn Mower (2) -New 70,000 C10305.2701 Walkway Reconstruction: Strouds -Sultana 125,000 C10305.2702 Walkway Reconstruction: Charnwood -Greenvale 125,000 C 10305.2703 Sidewalk Plow with Attachments (2) -Replacement 600,000 C10305.2704 Sidewalk Plow with Attachments (2) -New 600,000 C10305.2705 Walkway Reconstruction: Graceland -St. Mary Park 125,000 C10305.2708 Hwy. 401 Brock Road On/Off Ramp Landscape & New Sign, 260,000 C10305.2801 Walkway Reconstruction: Cattail -Dunbarton H.S. C10305.2802 Walkway Reconstruction: Tanzer -Bayshore Tot Lot C 10305.2803 Sidewalk Plow with Attachments (2) -Replacement C10305.2804 Wide Area Mower -New C 10305.2901 Sidewalk Plow with Attachments C10305.2902 Wide Area Mower -Replacement C10305.2905 Walkway Reconstruction: Whites -Cognac C10305.2906 Walkway Reconstruction: Foxwood -Beckworth Total 585 600 2 035 000 234 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 125,000 150,000 600,000 225,000 300,000 225,000 125,000 125,000 1100 000 775 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10305 Property Maintenance C10305.1505 Property Line Fence Replacement 90 Expense 502760 Other Fixed Assets Property Line Fencing Replacement. 80 Funding 408028 Trf fr Fence Res Total C10305.1505 Property Line Fence Replacement C10305.2601 Sidewalk Plow with Attachments -New 01 Capital 504200 Capital Machinery & Equipment Sidewalk Plow with attachments -New. 80 Funding 408603 Trf fr DC-Other Hwy ORF Total C10305.2601 Sidewalk Plow with Attachments -New C10305.2603 Litter Vacuum -New 01 Capital 504200 Capital Machinery & Equipment Litter Vacuum -New. 80 Funding 408606 Trf fr DC-P&R OB RF Total C10305.2603 Litter Vacuum -New C10305.2604 Utility Boat and Trailer -New 01 Capital 504200 Capital Machinery & Equipment Utility Boal and Trailer -New. For use in the maintenance of stormwater management ponds. 80 Funding 408707 Trf fr SWM RF Total C10305.2604 Utility Boat and Trailer -New C10305.2605 Zero Turn Mower (2) -New 01 Capital 504200 Capital Machinery & Equipment Zero Turn Mower (2) -New. 80 Funding 408602 Trf fr DC-Transportation ORF Total C10305.2605 Zero Turn Mower (2) -New Total 10305 Property Maintenance 235 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 233,800 (233,800) (233,800) 233,800 66,800 (66,800) (66,800) 66,800 15,000 (15,000) (15,000) 15,000 70,000 (70,000) (70,000) 70,000 (585,600) 585,600 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10305 Property Maintenance C10305.1505 Property Line Fence Replacement 90 Expense 502760 Other Fixed Assets Property Line Fencing Replacement. 80 Funding 408028 Trf fr Fence Res Total C10305.1505 Property Line Fence Replacement C10305.2701 Walkway Reconstruction: Strouds -Sultana 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Strouds Lane and Sultana Square including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2701 Walkway Reconstruction: Strouds -Sultana C10305.2702 Walkway Reconstruction: Charnwood -Greenvale 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Charnwood Court and Greenvale Crescent including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2702 Walkway Reconstruction: Charnwood -Greenvale C10305.2703 Sidewalk Plow with Attachments (2) -Replacement 01 Capital 504200 Capital Machinery & Equipment Sidewalk Plow with Attachments (2) -Replace two units #736 & #737 (2019 Trackless). 80 Funding 408032 Trf fr Equipment Res Total C10305.2703 Sidewalk Plow with Attachments (2) -Replacement C10305.2704 Sidewalk Plow with Attachments (2) -New 01 Capital 504200 Capital Machinery & Equipment Sidewalk Plow with Attachments (2) -New. 80 Funding 406741 DC-DebtFinancing-5YR Total C10305.2704 Sidewalk Plow with Attachments (2) -New 236 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 125,000 (125,000) (125,000) 125,000 125,000 (125,000) (125,000) 125,000 600,000 (600,000) (600,000) 600,000 600,000 (600,000) (600,000) 600,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10305 Property Maintenance C10305.2705 Walkway Reconstruction: Graceland -St. Mary Park 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Graceland Court and St. Mary Park including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2705 Walkway Reconstruction: Graceland -St. Mary Park C10305.2708 Hwy. 401 Brock Road On/Off Ramp Landscape & New Signage 01 Capital 504700 Capital Parks 80 Funding 408037 Trf fr Casino Res Total C10305.2708 Hwy. 401 Brock Road On/Off Ramp Landscape & New Sig Total 10305 Property Maintenance 237 Run Date: Oct 11, 2024 Funding Expense 125,000 (125,000) (125,000) 125,000 260,000 (260,000) (260,000) 260,000 (2,035,000) 2,035,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10305 Property Maintenance C10305.2801 Walkway Reconstruction: Cattail -Dunbarton H.S. 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Cattail Court and Dunbarton High School including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2801 Walkway Reconstruction: Cattail -Dunbarton H.S. C10305.2802 Walkway Reconstruction: Tanzer -Bayshore Tot Lot 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Tanzer Court and Bayshore Tot Lot including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2802 Walkway Reconstruction: Tanzer -Bayshore Tot Lot C10305.2803 Sidewalk Plow with Attachments (2) -Replacement 01 Capital 504200 Capital Machinery & Equipment Sidewalk Plow with Attachments (2) -Replace two units 771/772 (2020 Trackless). 80 Funding 408032 Trf fr Equipment Res Total C10305.2803 Sidewalk Plow with Attachments (2) -Replacement C10305.2804 Wide Area Mower -New 01 Capital 504200 Capital Machinery & Equipment Wide Area Mower -New. 80 Funding 408710 Trf fr Seaton FIA RF Total C10305.2804 Wide Area Mower -New Total 10305 Property Maintenance 238 Run Date: Oct 11, 2024 Funding Expense 125,000 (125,000) (125,000) 125,000 150,000 (150,000) (150,000) 150,000 600,000 (600,000) (600,000) 600,000 225,000 (225,000) (225,000) 225,000 (1,100,000) 1,100,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10305 Property Maintenance C10305.2901 Sidewalk Plow with Attachments 01 Capital 504200 Capital Machinery & Equipment Sidewalk Plow with Attachments -Replace unit 702 (2020 Trackless). 80 Funding 408032 Trf fr Equipment Res Total C10305.2901 Sidewalk Plow with Attachments C10305.2902 Wide Area Mower -Replacement 01 Capital 504200 Capital Machinery & Equipment Wide Area Mower -Replacement. 80 Funding 408032 Trf fr Equipment Res Total C10305.2902 Wide Area Mower -Replacement C10305.2905 Walkway Reconstruction: Whites -Cognac 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Whites Road and Cognac Crescent including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2905 Walkway Reconstruction: Whites -Cognac C10305.2906 Walkway Reconstruction: Foxwood -Beckworth 01 Capital 504600 Capital Sidewalks Reconstruct walkway between Foxwood Trail and Beckworth Square including new fence and concrete walkway. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10305.2906 Walkway Reconstruction: Foxwood -Beckworth Total 10305 Property Maintenance 239 Run Date: Oct 11, 2024 Funding Expense 300,000 (300,000) (300,000) 300,000 225,000 (225,000) (225,000) 225,000 125,000 (125,000) (125,000) 125,000 125,000 (125,000) (125,000) 125,000 (775,000) 775,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Fleet Services Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504200 Capital Machinery & Equipment 345,000 25,000 -420,000 504300 Capital Vehicles 3,795,000 2,685,000 3,800,000 7,463,000 Total Expenditures 4,140,000 2,710,000 3,800,000 7,883,000 Financing 406701 Debt Financing-5-Year ---(1,000,000) 406702 Debt Financing-10Year ---(2,800,000) 4067 41 DC-DebtFinancing-5YR (710,000) (500,000) (500,000) (1,550,000) 4067 42 DC-DebtFinancng-1 0YR (2,242,500) --- 408008 Trf fr DC City Share Res ---(82,875) 408016 Trf fr Vehicle Rpl. Res (840,000) (1,725,000) (2,750,000) (1,980,000) 408032 Trf fr Equipment Res -(25,000) -- 408603 Trf fr DC-Other Hwy ORF -(460,000) (220,000) - 408606 Trf fr DC-P&R OB RF (290,000) -(330,000) (145,000) 408608 Trf fr DC-Bylaw ES RF ---(2,125) 408710 Trffr Seaton FIA RF (57,500) --- 408900 Property Tax Funded ---(323,000) Total Financing (4,140,000) (2,710,000) (3,800,000) (7,883,000) 240 City of Pickering 2026 • 2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10310 Fleet Services 2026 2027 Project Name Draft Draft Forecast Forecast C10110.2901 Midsize 4 Wheel Drive Vehicle -New C10200.2901 Midsize 4 Wheel Drive Vehicle -New C10220.2604 1/2 Ton Pickup Truck Replacement 65,000 C10220.2801 Ice Resurfacer -Replacement C10300.2602 1/2 Ton Pickup Truck Replacement 65,000 C10315.2604 1 Ton Dump Truck with Tailgate Lift-Replacement 110,000 C10315.2605 1 Ton Dump Truck with Tailgate Lift -New 110,000 C10315.2609 4 Ton Dump Truck with Snow Plow and Wing -New 450,000 C10315.2610 1 Ton Dump Truck with Tailgate Lift-New 150,000 C10315.2701 3/4 Ton Pickup Truck with Plow and Salter-Replacement (2 130,000 C10315.2702 Street Sweeper-Replacement 620,000 C10315.2703 Low Deck Trailer -Replacement (2) 25,000 C10315.2704 Road Grader-Replacement 650,000 C10315.2705 4 Ton Dump Truck with Snow Plow and Wing-New 500,000 C10315.2706 1 Ton Dump Truck with Tailgate Lift -New 110,000 C10315.2710 4 Ton Dump Truck with Snow Plow, Wing & Brine Tank -Ne 350,000 C10315.2801 1 Ton Dump Truck with Tailgate Lift -Replacement (3) C10315.2802 1 Ton Dump Truck with Tailgate Lift-Replacement C10315.2803 5 Ton Dump Truck with Snow Plow and Wing -Replacemen1 C 10315.2804 4 Ton Dump Truck with Snow Plow and Wing -Replacemen1 C10315.2805 1 Ton Dump Truck with Tailgate Lift-New (2) C10315.2806 4 Ton Dump Truck with Snow Plow and Wing -New C10315.2903 1 Ton Truck Sign Body-Replacement C10315.2904 1 Ton Dump Truck with Aluminum Body (2) -Replacement C10315.2905 4 Ton Dump Truck with Snow Plow and Wing (2) -Replacerr C10315.2906 5 Ton Dump Truck with Snow Plow and Wing -New C10315.2907 4 Ton Dump Truck with Snow Plow, Wing and Brine Tank (2 C10315.2908 3/4 Ton Pickup Truck -New C10320.2612 1 Ton Pickup Truck with Tow Package -New 100,000 C10320.2621 1 Ton Dump Truck with Tailgate Lift -New 110,000 C10320.2622 1 Ton Dump Truck with Tailgate Lift -Replacement (2) 220,000 C10320.2623 1/2 Ton Pickup Truck Replacement 65,000 C10320.2624 3/4 Ton Pickup Truck with Tow Package -New 80,000 C10320.2721 3/4 Ton Pickup Truck with Plow and Salter-Replacement (2 130,000 C10320.2722 1/2 Ton Pickup Truck -Replacement 65,000 C10320.2809 1 Ton Dump Truck with Tailgate Lift-Replacement C10320.2810 1 Ton Dump Truck with Tailgate Lift -New (2) C10320.2811 3/4 Ton Pickup Truck with Tow Package -New C10320.2901 Chipper Truck -Replacement C10320.2902 1 Ton Dump Truck with Aluminum Body (2) -Replacement C10320.2903 3/4 Ton Pickup Truck with Plow and Salter -New C10320.2904 Utility Vehicle -New 241 Run Dale: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 85,000 85,000 150,000 330,000 110,000 550,000 1,500,000 220,000 500,000 330,000 660,000 1,000,000 550,000 1,000,000 100,000 110,000 220,000 110,000 330,000 660,000 110,000 35,000 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10310 Fleet Services 2026 2027 Project Name Draft Draft Forecast Forecast C10405.2905 Transport Vehicle -New C10425.2601 1/2 Ton Pickup Truck Replacement 65,000 C10425.2701 1/2 Ton Pickup Truck -Replacement 65,000 C10425.2901 Midsize 4 Wheel Drive Vehicle -New C10700.2604 Fire Pumper Rescue Seaton -New 2,300,000 C10700.2606 Midsize SUV -Replacement (2) 150,000 C10700.2607 Command Vehicle Replacement 100,000 C10700.2702 1/2 Ton Pickup Truck -Replacement 65,000 C10700.2902 Fire Pumper Rescue -Replacement Total 4140 000 2 710 000 242 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 53,000 85,000 2,800,000 3 800 000 7 883 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10310 Fleet Services C10220.2604 1/2 Ton Pickup Truck Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #787 (2017 Dodge Ram) (Community Centres). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10220.26041/2 Ton Pickup Truck Replacement C10300.2602 1/2 Ton Pickup Truck Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #211 (2017 Dodge Ram) (Public Works Admin). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10300.2602 1/2 Ton Pickup Truck Replacement C10315.2604 1 Ton Dump Truck with Tailgate Lift-Replacement 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck -replace unit #769 (2017 Dodge Ram) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.26041 Ton Dump Truck with Tailgate Lift -Replacement C10315.2605 1 Ton Dump Truck with Tailgate Lift -New 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2605 1 Ton Dump Truck with Tailgate Lift -New C10315.2609 4 Ton Dump Truck with Snow Plow and Wing -New 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow and Wing -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2609 4 Ton Dump Truck with Snow Plow and Wing -New 243 Run Date: Oct 11, 2024 Funding Expense 65,000 (65,000) (65,000) 65,000 65,000 (65,000) (65,000) 65,000 110,000 (110,000) (110,000) 110,000 110,000 (110,000) (110,000) 110,000 450,000 (450,000) (450,000) 450,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 1031 0 Fleet Services C10315.2610 1 Ton Dump Truck with Tailgate Lift -New 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2610 1 Ton Dump Truck with Tailgate Lift -New C10320.2612 1 Ton Pickup Truck with Tow Package -New 01 Capital 504300 Capital Vehicles 1 Ton Pickup Truck with Tow Package -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2612 1 Ton Pickup Truck with Tow Package -New C10320.2621 1 Ton Oum p Truck with Tailgate Lift -New 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.26211 Ton Dump Truck with Tailgate Lift -New C10320.2622 1 Ton Dump Truck with Tailgate Lift -Replacement (2) 01 Capital 504300 Capital Vehicles 1 Ton Dump Trucks (2) -replace two units #747 (2016 Dodge Ram) and #738 (2017 Dodge) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.26221 Ton Dump Truck with Tailgate Lift -Replacement (2) C10320.2623 1/2 Ton Pickup Truck Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #734 (2017 Dodge Ram) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.2623 1/2 Ton Pickup Truck Replacement C10320.2624 3/4 Ton Pickup Truck with Tow Package -New 244 Run Date: Oct 11, 2024 Funding Expense 150,000 (150,000) (150,000) 150,000 100,000 (100,000) (100,000) 100,000 110,000 (110,000) (110,000) 110,000 220,000 (220,000) (220,000) 220,000 65,000 (65,000) (65,000) 65,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10310 Fleet Services 01 Capital 504300 Capital Vehicles 3/4 Ton Pickup Truck with Tow Package -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2624 3/4 Ton Pickup Truck with Tow Package -New C10425.2601 1/2 Ton Pickup Truck Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #424 (2019 Dodge Ram) (By-Law). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10425.26011/2 Ton Pickup Truck Replacement C10700.2604 Fire Pumper Rescue Seaton -New 01 Capital 504200 Capital Machinery & Equipment 504300 Capital Vehicles Fire Pumper Rescue new for new Seaton Fire Station #3 (Fire Services). 80 Funding 4067 42 DC-DebtFinancng-1 0YR 408710 Trf fr Seaton FIA RF Total C10700.2604 Fire Pumper Rescue Seaton -New C10700.2606 Midsize SUV -Replacement (2) 01 Capital 504300 Capital Vehicles Midsize SUV -Replacement (2) -replace two units #587 and #588 (2020 Dodge Ram) (Fire Services). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10700.2606 Midsize SUV -Replacement (2) C10700.2607 Command Vehicle Replacement 01 Capital 504300 Capital Vehicles Command Vehicle -replace unit #576 (2017 Chevrolet) (Fire Services). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10700.2607 Command Vehicle Replacement 245 Run Date: Oct 11, 2024 Funding Expense 80,000 (80,000) (80,000) 80,000 65,000 (65,000) (65,000) 65,000 345,000 1,955,000 (2,242,500) (57,500) (2,300,000) 2,300,000 150,000 (150,000) (150,000) 150,000 100,000 (100,000) (100,000) 100,000 1031 0 Fleet Services Total 10310 Fleet Services City of Pickering 2026 Staff Recommended Draft Capital Forecast 246 Run Date: Oct 11, 2024 Funding Expense (4,140,000) 4,140,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10310 Fleet Services C10315.2701 3/4 Ton Pickup Truck with Plow and Salter -Replacement (2) 01 Capital 504300 Capital Vehicles Two 3/4 Ton Pickup Trucks with Snow Plow and Salter -replace two units #018 (2020 Ford) and #019 (2020 Ford) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2701 3/4 Ton Pickup Truck with Plow and Salter -Replacement C10315.2702 Street Sweeper -Replacement 01 Capital 504300 Capital Vehicles Street Sweeper -replace unit #152 (2019 Elgin Whirlwind) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2702 Street Sweeper -Replacement C10315.2703 Low Deck Trailer -Replacement (2) 01 Capital 504200 Capital Machinery & Equipment Two Low Deck Trailers -replace units #778 (2019 Miska) and #779 (2019 Miska) (Roads Equipment). 80 Funding 408032 Trf fr Equipment Res Total C10315.2703 Low Deck Trailer -Replacement (2) C10315.2704 Road Grader -Replacement 01 Capital 504300 Capital Vehicles Road Grader -replace unit #140 (2019 Caterpillar) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2704 Road Grader -Replacement C10315.2705 4 Ton Dump Truck with Snow Plow and Wing -New 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow and Wing -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2705 4 Ton Dump Truck with Snow Plow and Wing -New 247 Run Date: Oct 11, 2024 Funding Expense 130,000 (130,000) (130,000) 130,000 620,000 (620,000) (620,000) 620,000 25,000 (25,000) (25,000) 25,000 650,000 (650,000) (650,000) 650,000 500,000 (500,000) (500,000) 500,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 1031 0 Fleet Services C10315.2706 1 Ton Dump Truck with Tailgate Lift -New 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift -New (Roads Equipment). 80 Funding 408603 Trf fr DC-Other Hwy ORF Total C10315.2706 1 Ton Dump Truck with Tailgate Lift -New C10315.2710 4 Ton Dump Truck with Snow Plow, Wing & Brine Tank -New 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow, Wing and Brine Tank -New (Roads Equipment). 80 Funding 408603 Trf fr DC-Other Hwy ORF Total C10315.2710 4 Ton Dump Truck with Snow Plow, Wing & Brine Tank -1 C10320.2721 3/4 Ton Pickup Truck with Plow and Salter -Replacement (2) 01 Capital 504300 Capital Vehicles 3/4 Ton Pickup Trucks with Snow Plow and Salter (2) -replace two units #724 (2020 Chevrolet) and #725 (2020 Chevrolet) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.2721 3/4 Ton Pickup Truck with Plow and Salter -Replacement C10320.2722 1/2 Ton Pickup Truck -Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #791 (2020 Chevrolet) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.27221/2 Ton Pickup Truck -Replacement C10425.2701 1/2 Ton Pickup Truck -Replacement 01 Capital 504300 Capital Vehicles 1/2 Ton Pickup Truck -replace unit #654 (2020 Dodge Ram) (By-Law). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10425.27011/2 Ton Pickup Truck -Replacement C10700.2702 1/2 Ton Pickup Truck -Replacement 248 Run Date: Oct 11, 2024 Funding Expense 110,000 (110,000) (110,000) 110,000 350,000 (350,000) (350,000) 350,000 130,000 (130,000) (130,000) 130,000 65,000 (65,000) (65,000) 65,000 65,000 (65,000) (65,000) 65,000 10310 Fleet Services 01 Capital 504300 Capital Vehicles City of Pickering 2027 Staff Recommended Draft Capital Forecast 1/2 Ton Pickup Truck -replace unit #589 (2020 Dodge Ram) (Fire Services). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10700.2702 1/2 Ton Pickup Truck -Replacement Total 10310 Fleet Services 249 Run Date: Oct 11, 2024 Funding Expense 65,000 (65,000) (65,000) 65,000 (2,710,000) 2,710,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 1031 0 Fleet Services C10220.2801 Ice Resurfacer -Replacement 01 Capital 504300 Capital Vehicles Ice Resurfacer -Replace unit #793 (2020 Olympia) (Community Centres). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10220.2801 Ice Resurfacer -Replacement C10315.2801 1 Ton Dump Truck with Tailgate Lift -Replacement (3) 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift -Replacement (3) -Replace three units #006/#007/#008 (2019 Ford) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2801 1 Ton Dump Truck with Tailgate Lift -Replacement (3) C10315.2802 1 Ton Dump Truck with Tailgate Lift -Replacement 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift -Replace unit #001 (2020 Ford) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2802 1 Ton Dump Truck with Tailgate Lift -Replacement C10315.2803 5 Ton Dump Truck with Snow Plow and Wing -Replacement 01 Capital 504300 Capital Vehicles 5 Ton Dump Truck with Snow Plow and Wing -Replace unit #51 (2019 International) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2803 5 Ton Dump Truck with Snow Plow and Wing -Replacem1 C10315.2804 4 Ton Dump Truck with Snow Plow and Wing -Replacement (3) 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow and Wing -Replacement (3) -Replace three units #53/#54/#55 (2019 International) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res 250 Run Date: Oct 11, 2024 Funding Expense 150,000 (150,000) (150,000) 150,000 330,000 (330,000) (330,000) 330,000 110,000 (110,000) (110,000) 110,000 550,000 (550,000) (550,000) 550,000 1,500,000 (1,500,000) City of Pickering 2028 Staff Recommended Draft Capital Forecast 1031 0 Fleet Services Total C10315.2804 4 Ton Dump Truck with Snow Plow and Wing -Replacem1 C10315.2805 1 Ton Dump Truck with Tailgate Lift -New (2) 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift (2) -New (Roads Equipment). 80 Funding 408603 Trf fr DC-Other Hwy ORF Total C10315.2805 1 Ton Dump Truck with Tailgate Lift -New (2) C10315.2806 4 Ton Dump Truck with Snow Plow and Wing -New 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow and Wing -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2806 4 Ton Dump Truck with Snow Plow and Wing -New C10320.2809 1 Ton Dump Truck with Tailgate Lift -Replacement 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift -Replace unit #765 (2019 Ford) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.28091 Ton Dump Truck with Tailgate Lift -Replacement C10320.2810 1 Ton Dump Truck with Tailgate Lift -New (2) 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Tailgate Lift (2) -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2810 1 Ton Dump Truck with Tailgate Lift -New (2) C10320.2811 3/4 Ton Pickup Truck with Tow Package -New 01 Capital 504300 Capital Vehicles 3/4 Ton Pickup Truck with Tow Package -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2811 3/4 Ton Pickup Truck with Tow Package -New 251 Run Date: Oct 11, 2024 Funding Expense (1,500,000) 1,500,000 220,000 (220,000) (220,000) 220,000 500,000 (500,000) (500,000) 500,000 110,000 (110,000) (110,000) 110,000 220,000 (220,000) (220,000) 220,000 110,000 (110,000) (110,000) 110,000 10310 Fleet Services Total 10310 Fleet Services City of Pickering 2028 Staff Recommended Draft Capital Forecast 252 Run Date: Oct 11, 2024 Funding Expense (3,800,000) 3,800,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10310 Fleet Services C10110.2901 Midsize 4 Wheel Drive Vehicle -New 01 Capital 504300 Capital Vehicles Midsize 4 Wheel Drive Vehicle -New (Building Services). 80 Funding 408900 Property Tax Funded Total C10110.2901 Midsize 4 Wheel Drive Vehicle -New C10200.2901 Midsize 4 Wheel Drive Vehicle -New 01 Capital 504300 Capital Vehicles Midsize 4 Wheel Drive Vehicle -New (Corporate Security). 80 Funding 408900 Property Tax Funded Total C10200.2901 Midsize 4 Wheel Drive Vehicle -New C10315.2903 1 Ton Truck Sign Body -Replacement 01 Capital 504300 Capital Vehicles 1 Ton Truck Sign Body-Replace unit #21 (2020 Ford) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res . Total C10315.2903 1 Ton Truck Sign Body -Replacement C10315.2904 1 Ton Dump Truck with Aluminum Body (2) -Replacement 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Aluminum Body (2) -Replace two units #729/#730 (2020 Ford) (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.29041 Ton Dump Truck with Aluminum Body (2) -Replacemen C10315.2905 4 Ton Dump Truck with Snow Plow and Wing (2) -Replacement 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snowplow and Wing (2) -Replace two units #71/#72 (2020 International) (Roads Equipment). 80 Funding 406701 Debt Financing-5-Year Total C10315.2905 4 Ton Dump Truck with Snow Plow and Wing (2) -Replac, C10315.2906 5 Ton Dump Truck with Snow Plow and Wing -New 253 Run Date: Oct 11, 2024 Funding Expense 85,000 (85,000) (85,000) 85,000 85,000 (85,000) (85,000) 85,000 330,000 (330,000) (330,000) 330,000 660,000 (660,000) (660,000) 660,000 1,000,000 (1,000,000) (1,000,000) 1,000,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10310 Fleet Services 01 Capital 504300 Capital Vehicles 5 Ton Dump Truck with Snow Plow and Wing -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2906 5 Ton Dump Truck with Snow Plow and Wing -New C10315.2907 4 Ton Dump Truck with Snow Plow, Wing and Brine Tank (2) -Ne 01 Capital 504300 Capital Vehicles 4 Ton Dump Truck with Snow Plow, Wing and Brine Tank (2) -New (Roads Equipment). 80 Funding 406741 DC-DebtFinancing-5YR Total C10315.2907 4 Ton Dump Truck with Snow Plow, Wing and Brine Tank C10315.2908 3/4 Ton Pickup Truck -New 01 Capital 504300 Capital Vehicles 3/4 Ton Pickup Truck -New (Roads Equipment). 80 Funding 408900 Property Tax Funded Total C10315.2908 3/4 Ton Pickup Truck -New C10320.2901 Chipper Truck -Replacement 01 Capital 504300 Capital Vehicles Chipper Truck -Replace unit #751 (2020 International) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.2901 Chipper Truck -Replacement C10320.2902 1 Ton Dump Truck with Aluminum Body (2) -Replacement 01 Capital 504300 Capital Vehicles 1 Ton Dump Truck with Aluminum Body (2) -Replace two units #9 and #11 (2020 Ford) (Parks). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10320.2902 1 Ton Dump Truck with Aluminum Body (2) -Replacemen C10320.2903 3/4 Ton Pickup Truck with Plow and Salter -New 01 Capital 254 Run Date: Oct 11, 2024 Funding Expense 550,000 (550,000) (550,000) 550,000 1,000,000 (1,000,000) (1,000,000) 1,000,000 100,000 (100,000) (100,000) 100,000 330,000 (330,000) (330,000) 330,000 660,000 (660,000) (660,000) 660,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 1031 0 Fleet Services 504300 Capital Vehicles 3/4 Ton Pickup Truck with Plow and Salter -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2903 3/4 Ton Pickup Truck with Plow and Salter -New C10320.2904 Utility Vehicle -New 01 Capital 504300 Capital Vehicles Utility Vehicle -New (Parks). 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2904 Utility Vehicle -New C10405.2905 Transport Vehicle -New 01 Capital 504300 Capital Vehicles Transport Vehicle -New (Information Technology). 80 Funding 408900 Property Tax Funded Total C10405.2905 Transport Vehicle -New C10425.2901 Midsize 4 Wheel Drive Vehicle -New 01 Capital 504300 Capital Vehicles Midsize 4 Wheel Drive Vehicle -New (By-Law). 80 Funding 408008 Trf fr DC City Share Res 408608 Trf fr DC-Bylaw ES RF Total C10425.2901 Midsize 4 Wheel Drive Vehicle -New C10700.2902 Fire Pumper Rescue -Replacement 01 Capital 504200 Capital Machinery & Equipment 504300 Capital Vehicles Fire Pumper Rescue -Replace unit #546 (2015 Smeal). 80 Funding 406702 Debt Financing-10Year Total C10700.2902 Fire Pumper Rescue -Replacement Total 10310 Fleet Services 255 Run Date: Oct 11, 2024 Funding Expense 110,000 (110,000) (110,000) 110,000 35,000 (35,000) (35,000) 35,000 53,000 (53,000) (53,000) 53,000 85,000 (82,875) (2,125) (85,000) 85,000 420,000 2,380,000 (2,800,000) (2,800,000) 2,800,000 (7,883,000) 7,883,000 City of Pickering 2026 • 2029 Staff Recommended Draft Multi-Year Capital Forecast Roads Equipment Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504200 Capital Machinery & Equipment 705,000 1,570,000 620,000 638,000 Total Expenditures 705,000 1,570,000 620,000 638,000 Financing 406701 Debt Financing-5-Year -(770,000) (620,000) - 408016 Trf fr Vehicle Rpl. Res (220,000) --(620,000) 408032 Trf fr Equipment Res (250,000) (620,000) -(18,000) 408602 Trf fr DC-Transportation ORF -(180,000) -- 408603 Trf fr DC-Other Hwy ORF (200,000) --- 408900 Property Tax Funded (35,000) --- Total Financing (705,000) (1,570,000) (620,000) (638,000) 256 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10315 Roads Equipment 2026 2027 Project Name Draft Draft Forecast Forecast C10315.2601 Front End Loader with Attachments -Replacement 250,000 C10315.2602 Asphalt Infrared Heater-New 35,000 C10315.2607 Asphalt Recycler -New 220,000 C10315.2608 Tractor Snow Blower -New 200,000 C10315.2707 Flail Mower-New 180,000 C10315.2708 Street Sweeper-Replacement 620,000 C10315.2709 Hydroscopic Excavator-Replacement 770,000 C10315.2807 Street Sweeper -Replacement C10315.2902 Flat Deck Trailer-Replacement C10315.2909 Street Sweeper -New Total 705 000 1 570 000 257 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 620,000 18,000 620,000 620 000 638 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10315 Roads Equipment C10315.2601 Front End Loader with Attachments -Replacement 01 Capital 504200 Capital Machinery & Equipment Front End Loader with Attachments -replace unit #118 (2016). 80 Funding 408032 Trf fr Equipment Res Total C10315.2601 Front End Loader with Attachments -Replacement C10315.2602 Asphalt Infrared Heater -New 01 Capital 504200 Capital Machinery & Equipment Asphalt Infrared Heater -New (Roads Equipment). 80 Funding 408900 Property Tax Funded Total C10315.2602 Asphalt Infrared Heater -New C10315.2607 Asphalt Recycler -New 01 Capital 504200 Capital Machinery & Equipment Asphalt Recycler -New (Roads Equipment). 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2607 Asphalt Recycler -New C10315.2608 Tractor Snow Blower -New 01 Capital 504200 Capital Machinery & Equipment Tractor Snow Blower -New (Roads Equipment). 80 Funding 408603 Trf fr DC-Other Hwy ORF Total C10315.2608 Tractor Snow Blower -New Total 10315 Roads Equipment 258 Run Date: Oct 11, 2024 Funding Expense 250,000 (250,000) (250,000) 250,000 35,000 (35,000) (35,000) 35,000 220,000 (220,000) (220,000) 220,000 200,000 (200,000) (200,000) 200,000 (705,000) 705,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10315 Roads Equipment C10315.2707 Flail Mower -New 01 Capital 504200 Capital Machinery & Equipment Flail Mower -New. 80 Funding 408602 Trf fr DC-Transportation ORF Total C10315.2707 Flail Mower -New C10315.2708 Street Sweeper -Replacement 01 Capital 504200 Capital Machinery & Equipment Street Sweeper -replace unit #151 (2015). 80 Funding 408032 Trf fr Equipment Res Total C10315.2708 Street Sweeper -Replacement C10315.2709 Hydroscopic Excavator -Replacement 01 Capital 504200 Capital Machinery & Equipment Hydroscopic Excavator -replace unit #117 (2012). 80 Funding 406701 Debt Financing-5-Year Total C10315.2709 Hydroscopic Excavator -Replacement Total 10315 Roads Equipment 259 Run Date: Oct 11, 2024 Funding Expense 180,000 (180,000) (180,000) 180,000 620,000 (620,000) (620,000) 620,000 770,000 (770,000) (770,000) 770,000 (1,570,000) 1,570,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10315 Roads Equipment C10315.2807 Street Sweeper -Replacement 01 Capital 504200 Capital Machinery & Equipment Street Sweeper -Replace unit #152 (2017). 80 Funding 406701 Debt Financing-5-Year Total C10315.2807 Street Sweeper -Replacement Total 10315 Roads Equipment 260 Run Date: Oct 11, 2024 Funding Expense 620,000 (620,000) (620,000) 620,000 (620,000) 620,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10315 Roads Equipment C10315.2902 Flat Deck Trailer -Replacement 01 Capital 504200 Capital Machinery & Equipment Flat Deck Trailer -Replace unit #103 (2021 Miska). 80 Funding 408032 Trf fr Equipment Res Total C10315.2902 Flat Deck Trailer -Replacement C10315.2909 Street Sweeper -New 01 Capital 504200 Capital Machinery & Equipment Street Sweeper -New. 80 Funding 408016 Trf fr Vehicle Rpl. Res Total C10315.2909 Street Sweeper -New Total 10315 Roads Equipment 261 Run Date: Oct 11, 2024 Funding Expense 18,000 (18,000) (18,000) 18,000 620,000 (620,000) (620,000) 620,000 (638,000) 638,000 . City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Parks Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 134,000 215,000 -- 504200 Capital Machinery & Equipment 200,000 35,000 115,000 125,000 504300 Capital Vehicles -365,000 -- 504700 Capital Parks 1,900,000 1,318,000 2,725,000 2,675,000 Total Expenditures 2,234,000 1,933,000 2,840,000 2,800,000 Financing 408031 Trf fr Tennis Res (145,000) (210,000) -(315,000) 408032 Trf fr Equipment Res (175,000) (365,000) (90,000) (100,000) 408037 Trf fr Casino Res (950,000) (677,000) (1,970,000) (1,755,000) 408041 Trf fr Parks lnfr. Repl. Res (139,000) (206,000) (425,000) (290,000) 408502 Trf fr CCBF (FGT) Oblg RF (800,000) (325,000) (330,000) (315,000) 408606 Trf fr DC-P&R OB RF (25,000) --(25,000) 408900 Property Tax Funded -(150,000) (25,000) - Total Financing (2,234,000) (1,933,000) (2,840,000) (2,800,000) 262 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10320 Parks 2026 2027 Project Name Draft Draft Forecast Forecast C10320.2327 Pathway Reconstruction (Accessibility to Parks) 485,000 C10320.2403 BRC Park Baseball Light Replacement & New Scoreboard -650,000 C10320.2414 St. Mary Park -Soccer Field Irrigation 100,000 C10320.2601 Electric UV -Replacement 35,000 C10320.2602 Enclosed Trailer -Replacement (2) 50,000 C10320.2603 Tractor -Replacement 90,000 C10320.2604 Enclosed Trailer -New 25,000 C10320.2605 Shadybrook Park -Tennis Court Resurfacing 100,000 C10320.2606 Amberlea Park Hardball Diamond Outfield Fence & Regradir 300,000 C10320.2607 Pathway Reconstruction & Lighting Rep!. (Accessibility to Pa 315,000 C10320.2608 Glengrove Park -Softball Diamond Renewal 39,000 206,000 C10320.2631 Village East Park -Tennis Court LED Lighting 45,000 210,000 C10320.2701 Dunmoore Park -Parking Lot Reconstruction & New Lightin~ 462,000 C10320.2702 Pathway Reconstruction & Lighting Rep!. (Accessibility to Pa 325,000 C10320.2703 Lawn Roller -Replacement 35,000 C10320.2704 Dunmoore Park -Washroom Building Renovation 35,000 C10320.2705 David Farr Park -Removal of Existing Wading Pool 115,000 C10320.2707 BRK Park -Parking Lots 75,000 C10320.2708 Forestbrook Park -Softball Diamond Renewal (2) 60,000 C10320.2712 Lookout Point Park -Softball Diamond Renewal 45,000 C10320.2723 Tractor -Replacement 65,000 C10320.2724 Sidewalk Tractor-Replacement 300,000 C10320.2812 Utility Tractor-Replacement C10320.2813 Enclosed Trailer-New C 10320.2814 Pathway Reconstruction & Lighting Replacement (Accessibil C10320.2816 St. Mary Park -Resurface & Line Paint Basketball Court C10320.2818 Tile Drainage Sport Fields C10320.2905 Enclosed Trailer (4) -Replacement C10320.2906 Enclosed Trailer-New C10320.2907 Beverley Morgan Park -Softball Diamond Renewal C10320.2908 Rick Hull Park -Tennis Court Resurfacing C10320.2910 Shadybrook Park Tennis Court Lighting Replacement C10320.2911 Pathway Reconstruction (Accessibility to Parks) C10320.2912 Amberlea Park Multi-purpose Asphalt Court Reconstruction C10320.2913 BRK Park-South Parking Loi Paving Total 2 234 000 1.933 000 Abbreviations BRC Brock Ridge Community Park LED Light-Emitting Diode BRK Bay Ridges Kinsmen Park 263 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 285,000 1,385,000 390,000 300,000 90,000 25,000 330,000 110,000 315,000 100,000 25,000 290,000 100,000 215,000 315,000 185,000 1,180,000 2 840 000 2 800 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10320 Parks C10320.2327 Pathway Reconstruction (Accessibility to Parks) 01 Capital 504001 Capital Consulting Design of Pathways within City Parks. 504700 Capital Parks Reconstruction of pathways within City Parks. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10320.2327 Pathway Reconstruction (Accessibility to Parks) C10320.2403 BRC Park Baseball Light Replacement & New Scoreboard -Kirke 01 Capital 504700 Capital Parks Construction costs for Brockridge Community Park -Baseball Light Replacement and New Scoreboard -Kirkey Field -Replace existing lights with LED. 80 Funding 408037 Trf fr Casino Res Total C10320.2403 BRC Park Baseball Light Replacement & New Scoreboarc C10320.2414 St. Mary Park -Soccer Field Irrigation 01 Capital 504700 Capital Parks Construction costs for St. Mary's East Soccer Field rehabilitation and new irrigation system. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10320.2414 St. Mary Park -Soccer Field Irrigation C10320.2601 Electric UV -Replacement 01 Capital 504200 Capital Machinery & Equipment Electric UV -replace gas powered unit #707 (2016 John Deere Gator). 80 Funding 408032 Trf fr Equipment Res Total C10320.2601 Electric UV -Replacement C10320.2602 Enclosed Trailer -Replacement (2) 01 Capital 504200 Capital Machinery & Equipment Two Enclosed Trailers -replace units #778 and #779 (2018 CAN Trailers). 80 Funding 264 Run Date: Oct 11, 2024 Funding Expense 50,000 435,000 (485,000) (485,000) 485,000 650,000 (650,000) (650,000) 650,000 100,000 (100,000) (100,000) 100,000 35,000 (35,000) (35,000) 35,000 50,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10320 Parks 408032 Trf fr Equipment Res Total C10320.2602 Enclosed Trailer -Replacement (2) C10320.2603 Tractor -Replacement 01 Capital 504200 Capital Machinery & Equipment Tractor -replace unit #761 (2017 John Deere Tractor). 80 Funding 408032 Trf fr Equipment Res Total C10320.2603 Tractor -Replacement C10320.2604 Enclosed Trailer -New 01 Capital 504200 Capital Machinery & Equipment Enclosed Trailer for Seaton. 80 Funding 408606 Trf fr DC-P&R OB RF Total C10320.2604 Enclosed Trailer -New C10320.2605 Shadybrook Park -Tennis Court Resurfacing 01 Capital 504700 Capital Parks Resurface the tennis courts at Shadybrook Park. 80 Funding 408031 Trf fr Tennis Res Total C10320.2605 Shadybrook Park -Tennis Court Resurfacing C10320.2606 Amberlea Park Hardball Diamond Outfield Fence & Regrading 01 Capital 504700 Capital Parks Amberlea Park Hardball Diamond Outfield Fence & Regrading - Construction. 80 Funding 408037 Trf fr Casino Res Total C10320.2606 Amberlea Park Hardball Diamond Outfield Fence & Regra C10320.2607 Pathway Reconstruction & Lighting Repl. (Accessibility to Parks) 01 Capital 504700 Capital Parks Design & reconstruction of pathways within City Parks -Phase 3. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF 265 Run Date: Oct 11, 2024 Funding Expense (50,000) (50,000) 50,000 90,000 (90,000) (90,000) 90,000 25,000 (25,000) (25,000) 25,000 100,000 (100,000) (100,000) 100,000 300,000 (300,000) (300,000) 300,000 315,000 (315,000) City of Pickering 2026 Staff Recommended Draft Capital Forecast 10320 Parks Total C10320.2607 Pathway Reconstruction & Lighting Repl. (Accessibility tc C10320.2608 Glengrove Park -Softball Diamond Renewal 01 Capital 504001 Capital Consulting Design and related costs for renewal of Glengrove Park softball diamond. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10320.2608 Glengrove Park -Softball Diamond Renewal C10320.2631 Village East Park -Tennis Court LED Lighting 01 Capital 504001 Capital Consulting Village East Park -Tennis Court LED Lighting -Design. 80 Funding 408031 Trf fr Tennis Res Total C10320.2631 Village East Park -Tennis Court LED Lighting Total 10320 Parks 266 Run Date: Oct 11, 2024 Funding Expense (315,000) 315,000 39,000 (39,000) (39,000) 39,000 45,000 (45,000) (45,000) 45,000 (2,234,000) 2,234,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10320 Parks C10320.2608 Glengrove Park -Softball Diamond Renewal 01 Capital 504700 Capital Parks Construction costs for renewal of Glengrove Park softball diamond. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10320.2608 Glengrove Park -Softball Diamond Renewal C10320.2631 Village East Park -Tennis Court LED Lighting 01 Capital 504700 Capital Parks Construction cost for Village East Park -Tennis Court LED Lighting. 80 Funding 408031 Trf fr Tennis Res Total C10320.2631 Village East Park -Tennis Court LED Lighting C10320.2701 Dunmoore Park -Parking Lot Reconstruction & New Lighting 01 Capital 504700 Capital Parks Pave & Curb Dunmoore Park Gravel Parking Lot & Driveway to Leash Free area and Tennis Courts. 80 Funding 408037 Trf fr Casino Res Total C10320.2701 Dunmoore Park -Parking Lot Reconstruction & New Ligh C10320.2702 Pathway Reconstruction & Lighting Repl. (Accessibility to Parks) 01 Capital 504700 Capital Parks Pathway Reconstruction & Lighting Replacement (Accessibility to Parks) Locations TBD -Phase 5. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10320.2702 Pathway Reconstruction & Lighting Repl. (Accessibility tc C10320.2703 Lawn Roller -Replacement 01 Capital 504200 Capital Machinery & Equipment Lawn Roller -Replace unit #S602 (2015 John Deere). 80 Funding 408900 Property Tax Funded Total C10320.2703 Lawn Roller -Replacement C10320.2704 Dunmoore Park -Washroom Building Renovation 267 Run Date: Oct 11, 2024 Funding Expense 206,000 (206,000) (206,000) 206,000 210,000 (210,000) (210,000) 210,000 462,000 (462,000) (462,000) 462,000 325,000 (325,000) (325,000) 325,000 35,000 (35,000) (35,000) 35,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10320 Parks 01 Capital 504001 Capital Consulting Design costs for Dunmoore Park -Washroom Building Renovation. 80 Funding 408037 Trf fr Casino Res Total C10320.2704 Dunmoore Park -Washroom Building Renovation C10320.2705 David Farr Park -Removal of Existing Wading Pool 01 Capital 504700 Capital Parks David Farr Park -Removal of Existing Wading Pool. 80 Funding 408900 Property Tax Funded Total C10320.2705 David Farr Park -Removal of Existing Wading Pool C10320.2707 BRK Park -Parking Lots 01 Capital 504001 Capital Consulting Bay Ridges Kinsmen Park -Paving & Line Painting of Kinsmen North Parking Lot (pending OPG approval) -Design only. 80 Funding 408037 Trf fr Casino Res Total C10320.2707 BRK Park -Parking Lots C10320.2708 Forestbrook Park -Softball Diamond Renewal (2) 01 Capital 504001 Capital Consulting Design costs for Forestbrook Park -Softball Diamond Renewal (2) -Design. 80 Funding 408037 Trf fr Casino Res Total C10320.2708 Forestbrook Park -Softball Diamond Renewal (2) C10320.2712 Lookout Point Park -Softball Diamond Renewal 01 Capital 504001 Capital Consulting Design costs for Lookout Point -Softball Diamond Renewal. 80 Funding 408037 Trf fr Casino Res Total C10320.2712 Lookout Point Park -Softball Diamond Renewal C10320.2723 Tractor -Replacement 268 Run Date: Oct 11, 2024 Funding Expense 35,000 (35,000) (35,000) 35,000 115,000 (115,000) (115,000) 115,000 75,000 (75,000) (75,000) 75,000 60,000 (60,000) (60,000) 60,000 45,000 (45,000) (45,000) 45,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10320 Parks 01 Capital 504300 Capital Vehicles Tractor -replace unit #761 (2017 John Deere) (Parks). 80 Funding 408032 Trf fr Equipment Res Total C10320.2723 Tractor -Replacement C10320.2724 Sidewalk Tractor -Replacement 01 Capital 504300 Capital Vehicles Sidewalk Tractor -replace unit #702 (2019 Trackless) (Parks). 80 Funding 408032 Trf fr Equipment Res Total C10320.2724 Sidewalk Tractor -Replacement Total 10320 Parks 269 Run Date: Oct 11, 2024 Funding Expense 65,000 (65,000) (65,000) 65,000 300,000 (300,000) (300,000) 300,000 (1,933,000) 1,933,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10320 Parks C10320.2704 Dunmoore Park -Washroom Building Renovation 01 Capital 504700 Capital Parks Dunmoore Park -Washroom Building Renovation -Construction. 80 Funding 408037 Trf fr Casino Res Total C10320.2704 Dunmoore Park -Washroom Building Renovation C10320.2707 BRK Park -Parking Lots 01 Capital 504700 Capital Parks Bay Ridges Kinsmen Park -Paving & Line Painting of Kinsmen North Parking Lot (pending OPG approval) -Construction. 80 Funding 408037 Trf fr Casino Res Total C10320.2707 BRK Park -Parking Lots C10320.2712 Lookout Point Park -Softball Diamond Renewal 01 Capital 504700 Capital Parks Lookout Point Park -Softball Diamond Renewal -Construction. 80 Funding 408037 Trf fr Casino Res Total C10320.2712 Lookout Point Park -Softball Diamond Renewal C10320.2812 Utility Tractor -Replacement 01 Capital 504200 Capital Machinery & Equipment Utility Tractor -Replace unit #758 (2019 John Deere). 80 Funding 408032 Trf fr Equipment Res Total C10320.2812 Utility Tractor -Replacement C10320.2813 Enclosed Trailer -New 01 Capital 504200 Capital Machinery & Equipment Enclosed Trailer -New. 80 Funding 408900 Property Tax Funded Total C10320.2813 Enclosed Trailer -New C10320.2814 Pathway Reconstruction & Lighting Replacement (Accessibility ti 270 Run Date: Oct 11, 2024 Funding Expense 285,000 (285,000) (285,000) 285,000 1,385,000 (1,385,000) (1,385,000) 1,385,000 300,000 (300,000) (300,000) 300,000 90,000 (90,000) (90,000) 90,000 25,000 (25,000) (25,000) 25,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10320 Parks 01 Capital 504700 Capital Parks Design & reconstruction of pathways within City parks. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10320.2814 Pathway Reconstruction & Lighting Replacement (Acces~ C10320.2816 St. Mary Park -Resurface & Line Paint Basketball Court 01 Capital 504700 Capital Parks Resurface and line paint the basketball court at St. Mary Park 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10320.2816 St. Mary Park -Resurface & Line Paint Basketball Court C10320.2818 Tile Drainage Sport Fields 01 Capital 504700 Capital Parks Bay Ridges Kinsmen Park -Tile drainage installation at the football field and 2 baseball diamonds. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10320.2818 Tile Drainage Sport Fields Total 10320 Parks 271 Run Date: Oct 11, 2024 Funding Expense 330,000 (330,000) (330,000) 330,000 110,000 (110,000) (110,000) 110,000 315,000 (315,000) (315,000) 315,000 (2,840,000) 2,840,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10320 Parks C10320.2708 Forestbrook Park -Softball Diamond Renewal (2) 01 Capital 504700 Capital Parks Forestbrook Park -Softball Diamond Renewal (2) -Construction. 80 Funding 408037 Trf fr Casino Res Total C10320.2708 Forestbrook Park -Softball Diamond Renewal (2) C10320.2905 Enclosed Trailer (4) -Replacement 01 Capital 504200 Capital Machinery & Equipment Enclosed Trailer (4) -Replacement -replace four units #708/#712/#723/#789 (2019). 80 Funding 408032 Trf fr Equipment Res Total C10320.2905 Enclosed Trailer (4) -Replacement C10320.2906 Enclosed Trailer -New 01 Capital 504200 Capital Machinery & Equipment Enclosed Trailer -New. 80 Funding 408606 Trf fr DC-P&R 08 RF Total C10320.2906 Enclosed Trailer -New - C10320.2907 Beverley Morgan Park -Softball Diamond Renewal 01 Capital 504700 Capital Parks Lookout Point Park -Softball diamond renewal -Design and construction. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10320.2907 Beverley Morgan Park -Softball Diamond Renewal C10320.2908 Rick Hull Park -Tennis Court Resurfacing 01 Capital 504700 Capital Parks Resurface the tennis courts at Rick Hull Park. 80 Funding 408031 Trf fr Tennis Res Total C10320.2908 Rick Hull Park -Tennis Court Resurfacing C10320.2910 Shadybrook Park Tennis Court Lighting Replacement 272 Run Date: Oct 11, 2024 Funding Expense 390,000 (390,000) (390,000) 390,000 100,000 (100,000) (100,000) 100,000 25,000 (25,000) (25,000) 25,000 290,000 (290,000) (290,000) 290,000 100,000 (100,000) (100,000) 100,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10320 Parks 01 Capital 504700 Capital Parks Replacement of tennis court lighting to LED, wiring & poles at Shadybrook Park. 80 Funding 408031 Trf fr Tennis Res Total C10320.2910 Shadybrook Park Tennis Court Lighting Replacement C10320.2911 Pathway Reconstruction (Accessibility to Parks) 01 Capital 504700 Capital Parks Design & reconstruction of pathways within City parks. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10320.2911 Pathway Reconstruction (Accessibility to Parks) C10320.2912 Amberlea Park Multi-purpose Asphalt Court Reconstruction 01 Capital 504700 Capital Parks Amberlea Park Multi-purpose Asphalt Court Reconstruction. 80 Funding 408037 Trf fr Casino Res Total C10320.2912 Amberlea Park Multi-purpose Asphalt Court Reconstructi C10320.2913 BRK Park -South Parking Lot Paving 01 Capital 504700 Capital Parks Bay Ridges Kinsmen Park -Pave Kinsmen South Parking Lot -Construction -pending OPG approval. 80 Funding 408037 Trf fr Casino Res Total C10320.2913 BRK Park -South Parking Lot Paving Total 10320 Parks 273 Run Date: Oct 11, 2024 Funding Expense 215,000 (215,000) (215,000) 215,000 315,000 (315,000) (315,000) 315,000 185,000 (185,000) (185,000) 185,000 1,180,000 (1,180,000) (1,180,000) 1,180,000 (2,800,000) 2,800,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Corporate Services Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502340 Building Rpr & Mntc ---175,000 502720 System&Sftwr Upgrade 65,000 457,000 -- 504100 Capital Buildings 4,261,000 --- 504800 Cap Information Tech 677,000 2,636,000 2,103,000 2,718,000 504950 Cap Furniture&Fix 460,000 --- Total Expenditures 5,463,000 3,093,000 2,103,000 2,893,000 Financing 4067 43 DC-DebtFinancng-15YR (4,261,000) --- 408001 Trf fr IT Res (696,000) (635,000) (2,103,000) (2,893,000) 408007 Trf fr Rate Stabilization Res -(2,458,000) -- 408505 Trf fr CBC Oblig RF (460,000) --- 408900 Property Tax Funded (46,000) --- Total Financing (5,463,000) (3,093,000) (2,103,000) (2,893,000) 274 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Information Technology Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502340 Building Rpr & Mntc ---175,000 502720 System&Sftwr Upgrade 65,000 457,000 -- 504800 Cap Information Tech 677,000 2,636,000 2,103,000 2,718,000 Total Expenditures 742,000 3,093,000 2,103,000 2,893,000 Financing 408001 Trf fr IT Res (696,000) (635,000) (2,103,000) (2,893,000) 408007 Trf fr Rate Stabilization Res -(2,458,000) -- 408900 Property Tax Funded (46,000) --- Total Financing (742,000) (3,093,000) (2,103,000) (2,893,000) 275 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10405 Information Technology 2026 2027 Project Name Draft Draft Forecast Forecast C 10405.2601 Technology Infrastructure Upgrades 128,000 C10405.2602 End of Life Endpoint and Peripheral Replacement 158,000 C10405.2603 Internet Services Technology Upgrades 110,000 C10405.2604 Telecommunications Services Technology Upgrades 46,000 C10405.2605 Technology Infrastructure Upgrades 65,000 C 10405.2606 Digital Strategy Initiatives 235,000 1,073,000 C 10405.2701 · Technology Infrastructure Upgrades 249,000 C10405.2702 End of Life Endpoint and Peripheral Replacement 208,000 C 10405.2703 Cloud Infrastructure Services 178,000 C 10405.2704 Digital Strategy Initiatives 1,385,000 C10405.2801 End of life Endpoint and Peripheral Replacement C10405.2802 Core Switch Replacement C 10405.2803 Digital Strategy Initiatives C10405.2901 End of Life Endpoint and Peripheral Replacement C10405.2902 Server Infrastructure Replacement C10405.2903 Disaster Recovery Datacenter Relocation C10405.2904 IT Security Network and System Upgrades C 10405.2906 Digital Strategy Initiatives Total 742 000 3 093 000 276 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 248,000 400,000 1,455,000 288,000 500,000 175,000 175,000 1,755,000 2 103 000 2 893 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10405 Information Technology C10405.2601 Technology Infrastructure Upgrades 01 Capital 504800 Cap Information Tech Upgrades to server, network and storage infrastructure due to City and staff growth. 80 Funding 408001 Trf fr IT Res Total C10405.2601 Technology Infrastructure Upgrades C10405.2602 End of Life Endpoint and Peripheral Replacement 01 Capital 504800 Cap Information Tech Replacement of End User Computing Devices. 80 Funding 408001 Trf fr IT Res Total C10405.2602 End of Life Endpoint and Peripheral Replacement C10405.2603 Internet Services Technology Upgrades 01 Capital 504800 Cap Information Tech Network switch and bandwidth capacity upgrades for City facilities. 80 Funding 408001 Trf fr IT Res Total C10405.2603 Internet Services Technology Upgrades C10405.2604 Telecommunications Services Technology Upgrades 01 Capital 504800 Cap Information Tech Deployment of Cloud based Data and Voice Communications Systems with full integration into Microsoft 365 and on premises communications systems. 80 Funding 408900 Property Tax Funded Total C10405.2604 Telecommunications Services Technology Upgrades C10405.2605 Technology Infrastructure Upgrades 90 Expense 502720 System&Sftwr Upgrade 277 Run Date: Oct 11, 2024 Funding Expense 128,000 (128,000) (128,000) 128,000 158,000 (158,000) (158,000) 158,000 110,000 (110,000) (110,000) 110,000 46,000 (46,000) (46,000) 46,000 65,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10405 Information Technology New Service Desk Management Software. Modern software can streamline ticket management, automate workflows, provide robust reporting and analytics, integrate with other IT systems seamlessly, and support enhanced communication channels, all of which contribute to quicker issue resolution, better resource allocation, and overall operational effectiveness in supporting municipal staff. 80 Funding 408001 Trf fr IT Res Total C10405.2605 Technology Infrastructure Upgrades C10405.2606 Digital Strategy Initiatives 01 Capital 504800 Cap Information Tech Digital Strategy Year 2 Initiatives (part 1) -Cybersecurity enhancements, online portal development, and ecommerce platform. 80 Funding 408001 Trf fr IT Res Total C10405.2606 Digital Strategy Initiatives Total 10405 Information Technology 278 Run Date: Oct 11, 2024 Funding Expense (65,000) (65,000) 65,000 235,000 (235,000) (235,000) 235,000 (742,000) 742,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10405 Information Technology C10405.2606 Digital Strategy Initiatives 01 Capital 504800 Cap Information Tech Digital Strategy Year 2 Initiatives (part 2) -Cybersecurity enhancements, online portal development, and ecommerce platform. 80 Funding 408007 Trf fr Rate Stabilization Res Total C10405.2606 Digital Strategy Initiatives C10405.2701 Technology Infrastructure Upgrades 90 Expense 502720 System&Sftwr Upgrade Project to replace aging Virtual Desktop Infrastructure to allow for hybrid access to City applications and data. 80 Funding 408001 Trf fr IT Res Total C10405.2701 Technology Infrastructure Upgrades C10405.2702 End of Life Endpoint and Peripheral Replacement 90 Expense 502720 System&Sftwr Upgrade Replacement of End User Computing Devices. 80 Funding 408001 Trf fr IT Res Total C10405.2702 End of Life Endpoint and Peripheral Replacement C10405.2703 Cloud Infrastructure Services 01 Capital 504800 Cap Information Tech Required to support the move to Cloud Services Providers. A robust internet infrastructure with diverse and redundant network connectivity will be required to support Cloud Services. 80 Funding 408001 Trf fr IT Res Total C10405.2703 Cloud Infrastructure Services C10405.2704 Digital Strategy Initiatives 01 Capital 504800 Cap Information Tech Year 3 Digital Services Initiatives -eCommerce, chatbot and multi-channel communications for customer service. 80 Funding 279 Run Date: Oct 11, 2024 Funding Expense 1,073,000 (1,073,000) (1,073,000) 1,073,000 249,000 (249,000) (249,000) 249,000 208,000 (208,000) (208,000) 208,000 178,000 (178,000) (178,000) 178,000 1,385,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10405 Information Technology 408007 Trf fr Rate Stabilization Res Total C10405.2704 Digital Strategy Initiatives Total 10405 Information Technology 280 Run Date: Oct 11, 2024 Funding Expense (1,385,000) (1,385,000) 1,385,000 (3,093,000) 3,093,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10405 Information Technology C10405.2801 End of life Endpoint and Peripheral Replacement 01 Capital 504800 Cap Information Tech The City operates on a 5 year endpoint replacement lifecycle for desktops, laptops and peripherals. LED displays have a longer lifecycle and they are replaced as needed or with new hardware purchases. 80 Funding 408001 Trf fr IT Res Total C10405.2801 End of life Endpoint and Peripheral Replacement C10405.2802 Core Switch Replacement 01 Capital 504800 Cap Information Tech The Core switch used for the primary datacenter is end of life and needs to be replaced. 80 Funding 408001 Trf fr IT Res Total C10405.2802 Core Switch Replacement C10405.2803 Digital Strategy Initiatives 01 Capital 504800 Cap Information Tech Year 4 Digital Services Initiatives -Digitization of corporate records, implementation of workflow management capabilities. Develop data inventory and gap analysis. Create open data citizen advisory committee. 80 Funding 408001 Trf fr IT Res Total C10405.2803 Digital Strategy Initiatives Total 10405 Information Technology 281 Run Date: Oct 11, 2024 Funding Expense 248,000 (248,000) (248,000) 248,000 400,000 (400,000) (400,000) 400,000 1,455,000 (1,455,000) (1,455,000) 1,455,000 (2,103,000) 2,103,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10405 Information Technology C10405.2901 End of Life Endpoint and Peripheral Replacement 01 Capital 504800 Cap Information Tech The City operates on a 5 year endpoint replacement lifecycle for desktops, laptops and peripherals. LED displays have a longer lifecycle and they are replaced as needed or with new hardware purchases. 80 Funding 408001 Trf fr IT Res Total C10405.2901 End of Life Endpoint and Peripheral Replacement C10405.2902 Server Infrastructure Replacement 01 Capital 504800 Cap Information Tech Servers that run City applications will be end of life and in need of replacement. 80 Funding 408001 Trf fr IT Res Total C10405.2902 Server Infrastructure Replacement C10405.2903 Disaster Recovery Data center Relocation 90 Expense 502340 Building Rpr & Mntc The current disaster recovery site will need to be relocated to the Seaton Area to establish a greater distance between our primary and backup datacenters. 80 Funding 408001 Trf fr IT Res Total C10405.2903 Disaster Recovery Datacenter Relocation C10405.2904 IT Security Network and System Upgrades 01 Capital 504800 Cap Information Tech Enhanced Security Infrastructure firewalls to monitor internal network traffic will be required to combat cyber security threats. 80 Funding 408001 Trf fr IT Res Total C10405.2904 IT Security Network and System Upgrades C10405.2906 Digital Strategy Initiatives 01 Capital 504800 Cap Information Tech 282 Run Date: Oct 11, 2024 Funding Expense 288,000 (288,000) (288,000) 288,000 500,000 (500,000) (500,000) 500,000 175,000 (175,000) (175,000) 175,000 175,000 (175,000) (175,000) 175,000 1,755,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10405 Information Technology Year 5 Digital Services Initiatives -Data Literacy, streamline business application and functionality. Grow data partnerships. 80 Funding 408001 Trf fr IT Res Total C10405.2906 Digital Strategy Initiatives Total 10405 Information Technology 283 Run Date: Oct 11, 2024 Funding Expense (1,755,000) (1,755,000) 1,755,000 (2,893,000) 2,893,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Animal Services Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504100 Capital Buildings 4,261,000 -- 504950 Cap Furniture&Fix 460,000 -- Total Expenditures 4,721,000 -- Financing 4067 43 DC-DebtFinancng-15YR (4,261,000) -- 408505 Trf fr CBC Oblig RF (460,000) -- Total Financing (4,721,000) -- 284 - - - - - - 10430 Animal Services Project Name C10430.2101 Animal Shelter Total City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 2026 2027 Draft Draft Forecast Forecast 4,721,000 4 721 000 285 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast City of Pickering 2026 Staff Recommended Draft Capital Forecast 10430 Animal Services C10430.2101 Animal Shelter 01 Capital 504100 Capital Buildings Additional funding for construction and related costs for the new Animal Shelter. The total project cost, including land aquisition, design, construction and furniture, fixtures and equipment is $15,687,000. 504950 Cap Furniture&Fix Furniture, fixtures and equipment for the new Animal Shelter. Includes furniture, security, IT hardware, cabling, AN, appliances, program and facility equipment, fixtures and artwork, signage, wayfinding, moving, installation and related costs. 80 Funding 4067 43 DC-DebtFinancng-15YR 408505 Trf fr CBC Oblig RF Total C10430.2101 Animal Shelter Total 10430 Animal Services 286 Run Date: Oct 11, 2024 Funding Expense 4,261,000 460,000 (4,261,000) (460,000) (4,721,000) 4,721,000 (4,721,000) 4,721,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Engineering Services Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502230 Consult&Prof Fees 201,700 101,800 100,000 100,000 502390 Grounds Upkeep --2,007,100 1,412,000 504000 Capital Land -2,042,000 -- 504001 Capital Consulting 724,220 550,000 -- 504400 Capital Roads 9,185,000 22,379,420 18,549,080 18,366,100 504420 Cap Bridges & Culverts 5,545,600 9,288,900 4,696,880 750,000 504450 Cap Traffic Signals 1,120,000 1,413,200 991,600 541,600 504520 Capital Development Construction 200,000 200,000 200,000 621,600 504550 Capital Storm System 3,075,000 3,774,900 550,000 600,000 504600 Capital Sidewalks 141,500 2,415,800 2,051,100 2,638,600 504620 Capital Streetlights -601,000 2,050,900 3,286,200 504700 Capital Parks 27,479,200 33,695,000 7,717,100 5,550,600 Total Expenditures 47,672,220 76,462,020 38,913,760 33,866,700 Financing 406702 Debt Financing-10Year -(7,496,700) (4,554,800) (7,355,500) 406703 Debt Financing-15Year -(10,105,100) -- 406742 DC-DebtFinancng-10YR -(3,696,700) (3,838,000) (5,933,100) 408008 Trf fr DC City Share Res (9,116,610) (8,125,310) (5,567,000) (2,305,800) 408037 Trf fr Casino Res (4,606,600) (3,375,000) (850,000) - 408041 Trf fr Parks lnfr. Repl. Res -(200,000) (700,000) (850,000) 408200 Trf fr 3rdPtyOblg RF (200,000) (200,000) (200,000) (200,000) 408502 Trf fr CCBF (FGT) Oblg RF (2,855,000) (2,520,000) (2,520,000) (2,520,000) 408602 Trf fr DC-Transportation ORF (4,689,310) (9,453,310) (8,781,780) (5,777,100) 408604 Trf fr DC-SWM OB RF (243,300) (937,100) -- 408606 Trf fr DC-P&R OB RF (15,630,400) (21,899,400) (6,283,700) (3,381,400) 408706 Trf fr Rds & Bridges RF (4,515,000) (3,900,000) (4,710,080) (4,739,500) 408707 Trffr SWM RF (1,075,000) (3,065,000) (650,000) (700,000) 408708 Trf fr OCIF Grant (4,596,700) (1,100,000) -- 408710 Trffr Seaton FIA RF (144,300) (388,400) (158,400) (54,300) 408900 Property Tax Funded --(100,000) (50,000) Total Financing (47,672,220) (76,462,020) (38,913,760) (33,866,700) 287 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Water Resources & Dev. Services Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504520 Capital Development Construction 200,000 200,000 200,000 200,000 Total Expenditures 200,000 200,000 200,000 200,000 Financing 408200 Trf fr 3rdPtyOblg RF (200,000) (200,000) (200,000) (200,000) Total Financing (200,000) (200,000) (200,000) (200,000) 288 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10510 Water Resources & Dev. Services 2026 2027 Project Name Draft Draft Forecast Forecast C10510.2601 Various Construction Projects 200,000 C10510.2701 Various Construction Projects 200,000 C10510.2801 Various Construction Projects C10510.2901 Various Construction Projects Total 200 000 200 000 289 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 200,000 200,000 200 000 200 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10510 Water Resources & Dev. Services C10510.2601 Various Construction Projects 01 Capital 504520 Capital Development Construction Various Construction Projects Related to Development (funded from Third Party Contributions). 80 Funding 408200 Trf fr 3rdPtyOblg RF Total C10510.2601 Various Construction Projects Total 10510 Water Resources & Dev. Services 290 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 (200,000) 200,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10510 Water Resources & Dev. Services C10510.2701 Various Construction Projects 01 Capital 504520 Capital Development Construction Various Construction Projects Related to Development (funded from Third Party Contributions). 80 Funding 408200 Trf fr 3rdPtyOblg RF Total C10510.2701 Various Construction Projects Total 10510 Water Resources & Dev. Services 291 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 (200,000) 200,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10510 Water Resources & Dev. Services C10510.2801 Various Construction Projects 01 Capital 504520 Capital Development Construction Various Construction Projects Related to Development (funded from Third Party Contributions). 80 Funding 408200 Trf fr 3rdPtyOblg RF Total C10510.2801 Various Construction Projects Total 10510 Water Resources & Dev. Services 292 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 (200,000) 200,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10510 Water Resources & Dev. Services C10510.2901 Various Construction Projects 01 Capital 504520 Capital Development Construction Various Construction Projects Related to Development (funded from Third Party Contributions). 80 Funding 408200 Trf fr 3rdPtyOblg RF Total C10510.2901 Various Construction Projects Total 10510 Water Resources & Dev. Services 293 Run Date: Oct 11, 2024 Funding Expense 200,000 (200,000) (200,000) 200,000 (200,000) 200,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Sidewalks Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504600 Capital Sidewalks -1,814,800 -617,300 Total Expenditures -1,814,800 -617,300 Financing 408008 Trf fr DC City Share Res -(1,002,800) -(463,000) 408602 Trf fr DC-Transportation ORF -(95,300) -(154,300) 408606 Trf fr DC-P&R OB RF -(716,700) -- Total Financing -(1,814,800) -(617,300) 294 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10515 Sidewalks 2026 2027 Project Name Draft Draft Forecast Forecast C10515.2701 WO-5 Sheppard Avenue -New Concrete Sidewalk 381,300 C10515.2702 Trail -Bayly Street from GO Station to Hydro Corridor 590,200 C10515.2703 Trail -Bayly Street -Waterfront Trail to GO Station 843,300 C10515.2901 WO-9 Sheppard Avenue -New Sidewalk Total 1 814.800 295 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 617,300 617 300 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10515 Sidewalks C10515.2701 WO-5 Sheppard Avenue -New Concrete Sidewalk 01 Capital 504600 Capital Sidewalks New concrete sidewalk -Whites Road to Rosebank Road (west jog, north side). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10515.2701 WO-5 Sheppard Avenue -New Concrete Sidewalk C10515.2702 Trail -Bayly Street from GO Station to Hydro Corridor 01 Capital 504600 Capital Sidewalks New Multi-Use Path along Bayly Street from GO Station to Hydro Corridor. (50/50) 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10515.2702 Trail -Bayly Street from GO Station to Hydro Corridor C10515.2703 Trail -Bayly Street -Waterfront Trail to GO Station 01 Capital 504600 Capital Sidewalks New Multi-Use Path along Bayly Street from Waterfront Trail to GO Station. (50/50) 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R 08 RF Total C10515.2703 Trail -Bayly Street -Waterfront Trail to GO Station Total 10515 Sidewalks 296 Run Date: Oct 11, 2024 Funding Expense 381,300 (286,000) (95,300) (381,300) 381,300 590,200 (295,100) (295,100) (590,200) 590,200 843,300 (421,700) (421,600) (843,300) 843,300 (1,814,800) 1,814,800 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10515 Sidewalks C10515.2901 WO-9 Sheppard Avenue -New Sidewalk 01 Capital 504600 Capital Sidewalks WO-9 Sheppard Avenue -New Sidewalk (Whites to Fairport) -north side. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10515.2901 WO-9 Sheppard Avenue -New Sidewalk Total 10515 Sidewalks 297 Run Date: Oct 11, 2024 Funding Expense 617,300 (463,000) (154,300) (617,300) 617,300 (617,300) 617,300 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Streetlights & Signalization Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504400 Capital Roads 1,116,100 --- 504450 Cap Traffic Signals 1,120,000 1,413,200 991,600 541,600 Total Expenditures 2,236,100 1,413,200 991,600 541,600 Financing 408008 Trf fr DC City Share Res (201,700) (94,400) (47,200) (47,200) 408037 Trf fr Casino Res (200,000) (450,000) (400,000) - 408502 Trf fr CCBF (FGT) Oblg RF (20,000) (20,000) (20,000) (20,000) 408602 Trf fr DC-Transportation ORF (1,814,400) (848,800) (424,400) (424,400) 408900 Property Tax Funded --(100,000) (50,000) Total Financing (2,236,100) (1,413,200) (991,600) (541,600) 298 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10520 Streetlights & Signalization 2026 2027 Project Name Draft Draft Forecast Forecast C10520.2102 LED Signal Head Replacement Program 20,000 20,000 C10520.2105 Accessible Pedestrian Signals -4 locations 400,000 C10520.2401 WO-8 Intersection Improvements -Rosebank Rd. at Sheppa 1,594,500 C10520.2606 Granite Court Intersection Pedestrian Signal 200,000 C10520.2607 TC-4 Traffic Signalization -Pickering Parkway at Glenanna F 421,600 C10520.2701 D-8 Traffic Signalization -Glenanna Road at Fairport Road 471,600 C10520.2703 W-9 Traffic Signalization -Oklahoma Drive at Eyer Drive 471,600 C10520.2704 Traffic Signals/Controllers Replacement 25,000 C 10520.2705 Traffic Signals/Controllers Replacement 25,000 C10520.2801 D-12 Traffic Signalization -Welrus Street at Fairport Road C 10520.2804 Traffic Signals/Controllers Replacement C 10520.2805 Traffic Signals/Controllers Replacement C10520.2806 Traffic Signals/Controllers Replacement C 10520.2807 Traffic Signals/Controllers Replacement C10520.2901 Traffic Signals/Controllers Replacement C 10520.2902 Traffic Signals/Controllers Replacement C10520.2903 RP-1 Traffic Signalization -Finch Avenue at Woodview Aver Total 2 236100 1 413 200 299 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 20,000 20,000 400,000 471,600 25,000 25,000 25,000 25,000 25,000 25,000 471,600 991 600 541 600 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10520 Streetlights & Signalization C10520.2102 LED Signal Head Replacement Program 01 Capital 504450 Cap Traffic Signals Replacement of LED signal heads. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10520.2102 LED Signal Head Replacement Program C10520.2401 WO-8 Intersection Improvements -Rosebank Rd. at Sheppard Av 01 Capital 504400 Capital Roads 504450 Cap Traffic Signals Intersection Improvements and signalization -Rosebank Road at Sheppard Avenue -Construction (90/10). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2401 WO-8 Intersection Improvements -Rosebank Rd. at Shep C10520.2606 Granite Court Intersection Pedestrian Signal 01 Capital 504450 Cap Traffic Signals Granite Court Intersection Pedestrian Signal. 80 Funding 408037 Trf fr Casino Res Total C10520.2606 Granite Court Intersection Pedestrian Signal C10520.2607 TC-4 Traffic Signalization -Pickering Parkway at Glenanna Rd. 01 Capital 504450 Cap Traffic Signals New traffic signals and intersection improvements -Pickering Parkway at Glenanna Road (90/10) Construction. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2607 TC-4 Traffic Signalization -Pickering Parkway at Glenann Total 10520 Streetlights & Signalization 300 Run Date: Oct 11, 2024 Funding Expense 20,000 (20,000) (20,000) 20,000 1,116,100 478,400 (159,500) (1,435,000) (1,594,500) 1,594,500 200,000 (200,000) (200,000) 200,000 421,600 (42,200) (379,400) (421,600) 421,600 (2,236,100) 2,236,100 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10520 Streetlights & Signalization C10520.2102 LED Signal Head Replacement Program 01 Capital 504450 Cap Traffic Signals Replacement of LED signal heads. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10520.2102 LED Signal Head Replacement Program C10520.2105 Accessible Pedestrian Signals -4 locations 01 Capital 504450 Cap Traffic Signals Equipping existing traffic signals with accessible pedestrian signals. In accordance with AODA 2005. Year 4 of 5 year program. 80 Funding 408037 Trf fr Casino Res Total C10520.2105 Accessible Pedestrian Signals -4 locations C10520.2701 D-8 Traffic Signalization -Glenanna Road at Fairport Road 01 Capital 504450 Cap Traffic Signals Full Traffic Signals -D-8 Traffic signalization Glenanna Road at Fairport Road. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2701 D-8 Traffic Signalization -Glenanna Road at Fairport Roa, C10520.2703 W-9 Traffic Signalization -Oklahoma Drive at Eyer Drive 01 Capital 504450 Cap Traffic Signals W-9 Traffic Signalization -Oklahoma Drive at Eyer Drive. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2703 W-9 Traffic Signalization -Oklahoma Drive at Eyer Drive C10520.2704 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Glenanna Road at Esplanade South. 80 Funding 301 Run Date: Oct 11, 2024 Funding Expense 20,000 (20,000) (20,000) 20,000 400,000 (400,000) (400,000) 400,000 471,600 (47,200) (424,400) (471,600) 471,600 471,600 (47,200) (424,400) (471,600) 471,600 25,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10520 Streetlights & Signalization 408037 Trf fr Casino Res Total C10520.2704 Traffic Signals/Controllers Replacement C10520.2705 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Finch Avenue at Spruce Hill Road (original install 2012). 80 Funding 408037 Trf fr Casino Res Total C10520.2705 Traffic Signals/Controllers Replacement Total 10520 Streetlights & Signalization 302 Run Date: Oct 11, 2024 Funding Expense (25,000) (25,000) 25,000 25,000 (25,000) (25,000) 25,000 (1,413,200) 1,413,200 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10520 Streetlights & Signalization C10520.2102 LED Signal Head Replacement Program 01 Capital 504450 Cap Traffic Signals LED Signal Head Replacement Program 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10520.2102 LED Signal Head Replacement Program C10520.2105 Accessible Pedestrian Signals -4 locations 01 Capital 504450 Cap Traffic Signals Equipping existing traffic signals with accessible pedestrian signals. In accordance with AODA 2005. Year 5 of 5 year program. 80 Funding 408037 Trf fr Casino Res Total C10520.2105 Accessible Pedestrian Signals -4 locations C10520.2801 D-12 Traffic Signalization -Welrus Street at Fairport Road 01 Capital 504450 Cap Traffic Signals Full Traffic Signals -D-12 Traffic signalization Welrus Street at Fairport Road. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2801 D-12 Traffic Signalization -Welrus Street at Fairport Road C10520.2804 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Liverpool Road at Tatra Drive (last replacement 2013). 80 Funding 408900 Property Tax Funded Total C10520.2804 Traffic Signals/Controllers Replacement C10520.2805 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Fairport Road at Strouds Lane (last replacement 2013). 80 Funding 303 Run Date: Oct 11, 2024 Funding Expense 20,000 (20,000) (20,000) 20,000 400,000 (400,000) (400,000) 400,000 471,600 (47,200) (424,400) (471,600) 471,600 25,000 (25,000) (25,000) 25,000 25,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10520 Streetlights & Signalization 408900 Property Tax Funded Total C10520.2805 Traffic Signals/Controllers Replacement C10520.2806 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Pickering Parkway at PTC/Picore Entrance (last replacement 2013). 80 Funding 408900 Property Tax Funded Total C10520.2806 Traffic Signals/Controllers Replacement C10520.2807 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Finch Avenue at Rosefield Road (last replacement 2013). 80 Funding 408900 Property Tax Funded Total C10520.2807 Traffic Signals/Controllers Replacement Total 10520 Streetlights & Signalization 304 Run Date: Oct 11, 2024 Funding Expense (25,000) (25,000) 25,000 25,000 (25,000) (25,000) 25,000 25,000 (25,000) (25,000) 25,000 (991,600) 991,600 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10520 Streetlights & Signalization C10520.2102 LED Signal Head Replacement Program 01 Capital 504450 Cap Traffic Signals LED Signal Head Replacement Program 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10520.2102 LED Signal Head Replacement Program C10520.2901 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Pickering Parkway at Canadian Tire Entrance (last replacement 2014). 80 Funding 408900 Property Tax Funded Total C10520.2901 Traffic Signals/Controllers Replacement C10520.2902 Traffic Signals/Controllers Replacement 01 Capital 504450 Cap Traffic Signals Traffic Signals/Controllers Replacement -Rosebank Road at Strouds Lane (last replacement 2014). 80 Funding 408900 Property Tax Funded Total C10520.2902 Traffic Signals/Controllers Replacement C10520.2903 RP-1 Traffic Signalization -Finch Avenue at Woodview Avenue 01 Capital 504450 Cap Traffic Signals RP-1 Traffic Signalization -Finch Avenue at Woodview Avenue. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10520.2903 RP-1 Traffic Signalization -Finch Avenue at Woodview A, Total 10520 Streetlights & Signalization 305 Run Date: Oct 11, 2024 Funding Expense 20,000 (20,000) (20,000) 20,000 25,000 (25,000) (25,000) 25,000 25,000 (25,000) (25,000) 25,000 471,600 (47,200) (424,400) (471,600) 471,600 (541,600) 541,600 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Stormwater Management Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502230 Consult&Prof Fees 201,700 101,800 100,000 100,000 502390 Grounds Upkeep --2,007,100 1,412,000 504001 Capital Consulting -550,000 -- 504420 Cap Bridges & Culverts -2,541,700 -- 504550 Capital Storm System 3,075,000 2,515,000 550,000 600,000 Total Expenditures 3,276,700 5,708,500 2,657,100 2,112,000 Financing 406702 Debt Financing-10Year --(1,754,800) (1,412,000) 408008 Trf fr DC City Share Res (176,300) (2,311,200) (252,300) - 408502 Trf fr CCBF (FGT) Oblg RF (2,000,000) --- 408604 Trf fr DC-SWM OB RF (25,400) (332,300) -- 408707 Trf fr SWM RF (1,075,000) (3,065,000) (650,000) (700,000) Total Financing (3,276,700} (5,708,500} (2,657,100) (2,112,000} 306 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10525 Stormwater Management 2026 2027 Project Name Draft Draft Forecast Forecast C10525.1902 Dyson Road Storm Sewer Outfall 2,000,000 C10525.2501 Chickadee SWM Pond (C1-05-PT) Cleanout 440,000 C10525.2502 Dixie Estates 2 SWM Pond (C2-03-PC) Cleanout 490,000 C10525.2503 Pine Creek Restoration Site #22 Culvert Replacement 2,541,700 C10525.2601 Cognac SWM Pond (C2-01-DN) Cleanout 75,000 635,000 C10525.2602 Valley Farm SWM Pond (C2-06-WD) Cleanout 70,000 480,000 C10525.2603 Pine Creek Restoration Site 25 201,700 C10525.2701 Durham Woods SWM Pond (R3-04-LD) Cleanout 1,400,000 C10525.2702 Claremont Drainage Plan Implementation 550,000 C10525.2703 Pine Creek Restoration Sites 13-16 101,800 C10525.2801 Calvington Trail Pond (C1-04-PT) Cleanout C10525.2802 Pine Creek Restoration Sites 9&10 C10525.2901 Bopa Pond (C1-02-PT) Cleanout C10525.2902 Pine Creek Restoration Site 12 Total 3 276.700 5.708 500 307 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 2,007,100 1,412,000 550,000 100,000 600,000 100,000 2 657100 2 112 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10525 Stormwater Management C10525.1902 Dyson Road Storm Sewer Outfall 01 Capital 504550 Capital Storm System Dyson Road Storm Sewer Outfall Construction. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10525.1902 Dyson Road Storm Sewer Outfall C10525.2501 Chickadee SWM Pond (C1-05-PT) Cleanout 01 Capital 504550 Capital Storm System Chickadee SWM Pond on Chickadee Court east of Altona Road -SWM Pond Cleanout as per SWM Facilities Asset Management Plan - Construction. 80 Funding 408707 Trf fr SWM RF Total C10525.2501 Chickadee SWM Pond (C1-05-PT) Cleanout C10525.2502 Dixie Estates 2 SWM Pond (C2-03-PC) Clean out 01 Capital 504550 Capital Storm System Dixie Estates 2 SWM Pond -on Pine Glen Drive east of Dixie Road -SWM Pond Cleanout as per SWM Facilities Asset Management Plan - Construction. 80 Funding 408707 Trf fr SWM RF Total C10525.2502 Dixie Estates 2 SWM Pond (C2-03-PC) Cleanout C10525.2601 Cognac SWM Pond (C2-01-DN) Clean out 01 Capital 504550 Capital Storm System Cognac SWM Pond on Cognac Crescent, north of Finch Avenue west of Whites Rd -SWM Pond Cleanout as per SWM Facilities Asset Management Plan -Design. 80 Funding 408707 Trf fr SWM RF Total C10525.2601 Cognac SWM Pond (C2-01-DN) Cleanout C10525.2602 Valley Farm SWM Pond (C2-06-WD) Cleanout 01 Capital 504550 Capital Storm System 308 Run Date: Oct 11, 2024 Funding Expense 2,000,000 (2,000,000) (2,000,000) 2,000,000 440,000 (440,000) (440,000) 440,000 490,000 (490,000) (490,000) 490,000 75,000 (75,000) (75,000) 75,000 70,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10525 Stormwater Management Valley Farm SWM Pond -within Hydro Corridor, north of Finch Avenue and east of Valley Farm Road -SWM Pond Cleanout as per SWM Facilities Asset Management Plan -Design. 80 Funding 408707 Trf fr SWM RF Total C10525.2602 Valley Farm SWM Pond (C2-06-WD) Cleanout C10525.2603 Pine Creek Restoration Site 25 90 Expense 502230 Consult&Prof Fees Restoration of Kitley Ravine. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA -Design. 80 Funding 408008 Trf fr DC City Share Res 408604 Trf fr DC-SWM OB RF Total C10525.2603 Pine Creek Restoration Site 25 Total 10525 Stormwater Management 309 Run Date: Oct 11, 2024 Funding Expense (70,000) (70,000) 70,000 201,700 (176,300) (25,400) (201,700) 201,700 (3,276,700) 3,276,700 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10525 Stormwater Management C10525.2503 Pine Creek Restoration Site #22 Culvert Replacement 01 Capital 504420 Cap Bridges & Culverts Culvert Replacement at Lynn Heights Drive -Construction. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 408008 Trf fr DC City Share Res 408604 Trf fr DC-SWM 08 RF Total C10525.2503 Pine Creek Restoration Site #22 Culvert Replacement C10525.2601 Cognac SWM Pond (C2-01-DN) Cleanout 01 Capital 504550 Capital Storm System Cognac SWM Pond on Cogn'ac Crescent, north of Finch Avenue and west of Whites Road -SWM Pond Cleanout as per SWM Facilities Asset Management Plan -Construction. 80 Funding 408707 Trf fr SWM RF Total C10525.2601 Cognac SWM Pond (C2-01-DN) Cleanout C10525.2602 Valley Farm SWM Pond (C2-06-WD) Clean out 01 Capital 504550 Capital Storm System Valley Farm SWM Pond -within Hydro Corridor, north of Finch Avenue and east of Valley Farm Road -SWM Pond Cleanout as per SWM Facilities Asset Management Plan -Construction. 80 Funding 408707 Trf fr SWM RF Total C10525.2602 Valley Farm SWM Pond (C2-06-WD) Cleanout C10525.2701 Durham Woods SWM Pond (R3-04-LD) Cleanout 01 Capital 504550 Capital Storm System Durham Woods SWM Pond on Clements Road, north of Clements Road west of Church Street -SWM Pond Cleanout as per SWM Facilities Asset Management Plan. 80 Funding 408707 Trf fr SWM RF Total C10525.2701 Durham Woods SWM Pond (R3-04-LD) Cleanout C10525.2702 Claremont Drainage Plan Implementation 01 Capital 310 Run Date: Oct 11, 2024 Funding Expense 2,541,700 (2,222,200) (319,500) (2,541,700) 2,541,700 635,000 (635,000) (635,000) 635,000 480,000 (480,000) (480,000) 480,000 1,400,000 (1,400,000) (1,400,000) 1,400,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10525 Stormwater Management 504001 Capital Consulting Claremont Drainage Plan Implementation (2027-2029). Detailed Design for storm sewer upgrades following recommendations provided in the Claremont Drainage Plan EA (endorsed in principle by Council June 6, 2022). The Detailed Design to be completed in two (2) years. 80 Funding 408707 Trf fr SWM RF Total C10525.2702 Claremont Drainage Plan Implementation C10525.2703 Pine Creek Restoration Sites 13-16 90 Expense 502230 Consult&Prof Fees Restoration of Pine Creek downstream of Finch Avenue -Detailed Design. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 408008 Trf fr DC City Share Res 408604 Trf fr DC-SWM 08 RF Total C10525.2703 Pine Creek Restoration Sites 13-16 Total 10525 Stormwater Management 311 Run Date: Oct 11, 2024 Funding Expense 550,000 (550,000) (550,000) 550,000 101,800 (89,000) (12,800) (101,800) 101,800 (5,708,500) 5,708,500 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10525 Stormwater Management C10525.2603 Pine Creek Restoration Site 25 90 Expense 502390 Grounds Upkeep Restoration of Kitley Ravine -Construction. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 406702 Debt Financing-10Year 408008 Trf fr DC City Share Res Total C10525.2603 Pine Creek Restoration Site 25 C10525.2801 Calvington Trail Pond (C1-04-PT) Cleanout 01 Capital 504550 Capital Storm System SWM Pond Cleanout project as per the SWMF AMP (2019). Resolution 111/19. 80 Funding 408707 Trf fr SWM RF Total C10525.2801 Calvington Trail Pond (C1-04-PT) Cleanout C10525.2802 Pine Creek Restoration Sites 9&10 90 Expense 502230 Consult&Prof Fees Restoration of Pine Creek downstream of Kitley Avenue -Detailed Design. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 408707 Trf fr SWM RF Total C10525.2802 Pine Creek Restoration Sites 9&10 Total 10525 Stormwater Management 312 Run Date: Oct 11, 2024 Funding Expense 2,007,100 (1,754,800) (252,300) (2,007,100) 2,007,100 550,000 (550,000) (550,000) 550,000 100,000 (100,000) (100,000) 100,000 (2,657,100) 2,657,100 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10525 Stormwater Management C10525.2703 Pine Creek Restoration Sites 13-16 90 Expense 502390 Grounds Upkeep Restoration of Pine Creek downstream of Finch Avenue -Construction. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 406702 Debt Financing-10Year Total C10525.2703 Pine Creek Restoration Sites 13-16 C10525.2901 Bopa Pond (C1-02-PT) Cleanout 01 Capital 504550 Capital Storm System Pond Cleanout project as per the SWM Facilities AMP (2019). Resolution 111/19. 80 Funding 408707 Trf fr SWM RF Total C10525.2901 Bopa Pond (C1-02-PT) Cleanout C10525.2902 Pine Creek Restoration Site 12 90 Expense 502230 Consult&Prof Fees Restoration of Pine Creek upstream of Dixie Rd -Detailed Design. Pine Creek restoration project following recommendations provided in the Pine Creek Erosion Assessment Municipal Class EA. 80 Funding 408707 Trf fr SWM RF Total C10525.2902 Pine Creek Restoration Site 12 Total 10525 Stormwater Management 313 Run Date: Oct 11, 2024 Funding Expense 1,412,000 (1,412,000) (1,412,000) 1,412,000 600,000 (600,000) (600,000) 600,000 100,000 (100,000) (100,000) 100,000 (2,112,000) 2,112,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Roads Projects Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 400,000 --- 504400 Capital Roads 8,068,900 13,427,700 15,462,500 6,500,000 504420 Cap Bridges & Culverts 4,564,600 5,399,700 3,400,000 750,000 Total Expenditures 13,033,500 18,827,400 18,862,500 7,250,000 Financing 406702 Debt Financing-10Year -(3,800,000) (2,800,000) (2,500,000) 4067 42 DC-DebtFinancng-1 0YR --(3,838,000) - 408008 Trf fr DC City Share Res (717,300) (1,072,000) (3,325,400) - 408502 Trf fr CCBF (FGT) Oblg RF (835,000) (2,500,000) (2,500,000) (2,500,000) 408602 Trf fr DC-Transportation ORF (2,151,600) (6,455,400) (2,899,100) - 408604 Trf fr DC-SWM OB RF (217,900) --- 408706 Trf fr Rds & Bridges RF (4,515,000) (3,900,000) (3,500,000) (2,250,000) 408708 Trf fr OCIF Grant (4,596,700) (1,100,000) -- Total Financing (13,033,500) (18,827,400) (18,862,500) (7,250,000) 314 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10570 Roads Projects 2026 2027 Project Name Draft Draft Forecast Forecast C 10570.1804 Michell Bridge Replacement 600,000 C10570.2004 Liverpool Bridge Replacement C10570.2105 Radom St. Culverts -Replacement 1,714,600 C10570.2306 DH-14 William Jackson Dr. -Culvert Replacement 5,399,700 C10570.2601 L-13c Third Concession Road (2001) -Road Reconstruction 2,868,900 C10570.2602 Creekview Circle -Asphalt Resurfacing 415,000 C10570.2603 Lot 2, Cone 7/8 Bridge Replacement 150,000 C 10570.2604 Lehman #2 Bridge -Bridge Replacement 2,500,000 C10570.2606 Mountcastle Crescent -Asphalt Resurfacing 475,000 C10570.2607 Fawndale Road -Asphalt Resurfacing 470,000 C10570.2608 Ariel Crescent -Asphalt Resurfacing 315,000 C 10570.2609 Oberon Court -Asphalt Resurfacing 110,000 C10570.2610 Charnwood Court -Asphalt Resurfacing 405,000 C10570.2611 Silverthorn Square -Asphalt Resurfacing 600,000 C10570.2612 Poprad Avenue -Asphalt Resurfacing 640,000 C10570.2613 Drava Street-Asphalt Resurfacing 235,000 C10570.2614 Waterford Gate -Asphalt Resurfacing 300,000 C10570.2615 Pine Grove Avenue -Asphalt Resurfacing 670,000 C10570.2616 Somergrove Crescent -Asphalt Resurfacing 565,000 C10570.2701 Dyson Rd. -Road Reconstruction 1,600,000 C10570.2702 Seventh Concession Rd. SL 32 to SL 26 -Hard Surfacing 3,800,000 C 10570.2703 Asphalt Resurfacing Projects (TBD) 4,000,000 C10570.2704 Kinsale Rd. -Hard Surfacing 1,900,000 C10570.2705 W-9 West Shore Boulevard -Road Reconstruction 2,127,700 C10570.2803 Sideline 14 -Hard Surfacing C10570.2804 DH-13 William Jackson Drive (Old Taunton Road) -Road RE C10570.2805 Bl-21 Montgomery Park Road -Road Reconstruction C10570.2806 Asphalt Resurfacing Projects (TBD) C10570.2901 Seventh Concession Rd. (SL 26 to SL 22) Hard Surfacing C10570.2902 Rosebank Road Bridge (2005) Replacement C 10570.2903 Asphalt Resurfacing Projects (TBD) Total 13 033.500 18 827 400 315 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 2,800,000 600,000 1,400,000 4,264,500 5,798,000 4,000,000 2,500,000 750,000 4,000,000 18 862 500 7 250 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10570 Roads Projects C10570.1804 Michell Bridge Replacement 01 Capital 504420 Cap Bridges & Culverts Additional funds required to change in scope from rehabilitation to replacement as per Assessment Study -Construction. 80 Funding 408708 Trf fr OCIF Grant Total C10570.1804 Michell Bridge Replacement C10570.2105 Radom St. Culverts -Replacement 01 Capital 504420 Cap Bridges & Culverts Radom Street Culverts (7) Replacement -Construction. 80 Funding 408604 Trf fr DC-SWM OB RF 408708 Trf fr OCIF Grant Total C10570.2105 Radom St. Culverts -Replacement C10570.2601 L-13c Third Concession Road (2001) -Road Reconstruction 01 Capital 504400 Capital Roads L-13c Third Concession Road -Road Reconstruction from Rosebank Road (west leg) to Altona Road. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10570.2601 L-13c Third Concession Road (2001) -Road Reconstructi, C10570.2602 Creekview Circle -Asphalt Resurfacing 01 Capital 504400 Capital Roads Asphalt Resurfacing -from Petticoat Lane to Broadgreen Street. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2602 Creekview Circle -Asphalt Resurfacing C10570.2603 Lot 2, Cone 7/8 Bridge Replacement 01 Capital 504001 Capital Consulting Eighth Cone. Road (east of Sideline 2) (8003) -Replacement -Design. 80 Funding 408706 Trf fr Rds & Bridges RF 316 Run Date: Oct 11, 2024 Funding Expense 600,000 (600,000) (600,000) 600,000 1,714,600 (217,900) (1,496,700) (1,714,600) 1,714,600 2,868,900 (717,300) (2,151,600) (2,868,900) 2,868,900 415,000 (415,000) (415,000) 415,000 150,000 (150,000) City of Pickering 2026 Staff Recommended Draft Capital Forecast 10570 Roads Projects Total C10570.2603 Lot 2, Cone 7/8 Bridge Replacement C10570.2604 Lehman #2 Bridge -Bridge Replacement 01 Capital 504001 Capital Consulting Lehman #2 Bridge -Eighth Concession Road (8001) -0.3 km E of York/Durham Townline Road -Replacement -Design. 504420 Cap Bridges & Culverts Lehman #2 Bridge -Eighth Concession Road (8001) -0.3 km E of York/Durham Townline Road -Replacement -Construction. 80 Funding 408708 Trf fr OCIF Grant Total C10570.2604 Lehman #2 Bridge -Bridge Replacement C10570.2606 Mountcastle Crescent -Asphalt Resurfacing 01 Capital 504400 Capital Roads Mountcastle Crescent -Asphalt Resurfacing -Huntsmill Drive (north leg) to 450m East of Huntsmill Drive. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2606 Mountcastle Crescent -Asphalt Resurfacing C10570.2607 Fawndale Road -Asphalt Resurfacing 01 Capital 504400 Capital Roads Fawndale Road -Asphalt Resurfacing -Riverview Crescent to Gwendolyn Street. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2607 Fawndale Road -Asphalt Resurfacing C10570.2608 Ariel Crescent -Asphalt Resurfacing 01 Capital 504400 Capital Roads Ariel Crescent -Asphalt Resurfacing -Amberlea Road to Highview Road. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2608 Ariel Crescent -Asphalt Resurfacing C10570.2609 Oberon Court -Asphalt Resurfacing 01 Capital 504400 Capital Roads 317 Run Date: Oct 11, 2024 Funding Expense (150,000) 150,000 250,000 2,250,000 (2,500,000) (2,500,000) 2,500,000 475,000 (475,000) (475,000) 475,000 470,000 (470,000) (470,000) 470,000 315,000 (315,000) (315,000) 315,000 110,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10570 Roads Projects Oberon Court -Asphalt Resurfacing -Ariel Crescent to North Terminus. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2609 Oberon Court -Asphalt Resurfacing C10570.2610 Charnwood Court -Asphalt Resurfacing 01 Capital 504400 Capital Roads Charnwood Court -Asphalt Resurfacing -from Rosebank Road to East Terminus. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2610 Charnwood Court -Asphalt Resurfacing C10570.2611 Silverthorn Square -Asphalt Resurfacing 01 Capital 504400 Capital Roads Silverthorn Square -Asphalt Resurfacing -Dixie Road to Deerbrook Drive. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10570.2611 Silverthorn Square -Asphalt Resurfacing C10570.2612 Poprad Avenue -Asphalt Resurfacing 01 Capital 504400 Capital Roads Poprad Avenue -Asphalt Resurfacing -Tatra Drive to West Terminus. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2612 Poprad Avenue -Asphalt Resurfacing C10570.2613 Drava Street -Asphalt Resurfacing 01 Capital 504400 Capital Roads Drava Street -Asphalt Resurfacing -Reytan Boulevard to Sandy Beach Road. 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF Total C10570.2613 Drava Street -Asphalt Resurfacing C10570.2614 Waterford Gate -Asphalt Resurfacing 01 Capital 504400 Capital Roads 318 Run Date: Oct 11, 2024 Funding Expense (110,000) (110,000) 110,000 405,000 (405,000) (405,000) 405,000 600,000 (600,000) (600,000) 600,000 640,000 (640,000) (640,000) 640,000 235,000 (235,000) (235,000) 235,000 300,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10570 Roads Projects Waterfrod Gate -Asphalt Resurfacing -210 m west of Altona Road to Altona Road. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2614 Waterford Gate -Asphalt Resurfacing C10570.2615 Pine Grove Avenue -Asphalt Resurfacing 01 Capital 504400 Capital Roads Pine Grove Avenue -Asphalt Resurfacing -Oakburn Street to Altona Road. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2615 Pine Grove Avenue -Asphalt Resurfacing C10570.2616 Somergrove Crescent -Asphalt Resurfacing 01 Capital 504400 Capital Roads Somergrove Crescent -Asphalt Resurfacing -Major Oaks Road to Major Oaks Road (Circular Road). 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2616 Somergrove Crescent -Asphalt Resurfacing Total 10570 Roads Projects 319 Run Date: Oct 11, 2024 Funding Expense (300,000) (300,000) 300,000 670,000 (670,000) (670,000) 670,000 565,000 (565,000) (565,000) 565,000 (13,033,500) 13,033,500 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10570 Roads Projects C10570.2306 DH-14 William Jackson Dr. -Culvert Replacement 01 Capital 504420 Cap Bridges & Culverts William Jackson Drive -Culvert Replacement -Construction. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10570.2306 DH-14 William Jackson Dr. -Culvert Replacement C10570.2701 Dyson Rd. -Road Reconstruction 01 Capital 504400 Capital Roads Dyson Road -Rodd Avenue to South Terminus -Construction. 80 Funding 408706 Trf fr Rds & Bridges RF 408708 Trf fr OCIF Grant Total C10570.2701 Dyson Rd.• Road Reconstruction C10570.2702 Seventh Concession Rd. SL 32 to SL 26 • Hard Surfacing 01 Capital 504400 Capital Roads Seventh Concession -Sideline Road 32 to Sideline Road 26 -upgrade to hard surface. Northern Roads Hard Surfacing Strategy. 80 Funding 406702 Debt Financing-10Year Total C10570.2702 Seventh Concession Rd. SL 32 to SL 26. Hard Surfacing C10570.2703 Asphalt Resurfacing Projects (TBD) 01 Capital 504400 Capital Roads Resurfacing Projects (TBD). 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF 408706 Trf fr Rds & Bridges RF Total C10570.2703 Asphalt Resurfacing Projects (TBD) C10570.2704 Kinsale Rd.• Hard Surfacing 01 Capital 504400 Capital Roads Kinsale Road -Hwy 407 to Seventh Concession Road -upgrade to hard surface (1300m). Northern Roads Hard Surfacing Strategy. 80 Funding 320 Run Date: Oct 11, 2024 Funding Expense 5,399,700 (540,000) (4,859,700) (5,399,700) 5,399,700 1,600,000 (500,000) (1,100,000) (1,600,000) 1,600,000 3,800,000 (3,800,000) (3,800,000) 3,800,000 4,000,000 (2,500,000) (1,500,000) (4,000,000) 4,000,000 1,900,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10570 Roads Projects 408706 Trf fr Rds & Bridges RF Total C10570.2704 Kinsale Rd. -Hard Surfacing C10570.2705 W-9 West Shore Boulevard -Road Reconstruction 01 Capital 504400 Capital Roads W-9 West Shore Boulevard -Road Reconstruction with on-street parking. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10570.2705 W-9 West Shore Boulevard -Road Reconstruction Total 10570 Roads Projects 321 Run Date: Oct 11, 2024 Funding Expense (1,900,000) (1,900,000) 1,900,000 2,127,700 (532,000) (1,595,700) (2,127,700) 2,127,700 (18,827,400) 18,827,400 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10570 Roads Projects C10570.2004 Liverpool Bridge Replacement 01 Capital 504420 Cap Bridges & Culverts Liverpool Bridge (3) Replacement -Construction. 80 Funding 406702 Debt Financing-10Year Total C10570.2004 Liverpool Bridge Replacement C10570.2603 Lot 2, Cone 7/8 Bridge Replacement 01 Capital 504420 Cap Bridges & Culverts Replace Bridge with Culvert Construction. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2603 Lot 2, Cone 7/8 Bridge Replacement C10570.2803 Sideline 14 -Hard Surfacing 01 Capital 504400 Capital Roads Sideline 14 -Hwy. 407 to Seventh Concession Road -Reconstruct granular base and hard surface. Northern Roads Hard Surfacing Strategy. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2803 Sideline 14 -Hard Surfacing C10570.2804 DH-13 William Jackson Drive (Old Taunton Road) -Road Recons1 01 Capital 504400 Capital Roads DH-13 William Jackson Drive (Old Taunton Road) -Road Reconstruction from Urfe Creek to Taunton Road. 80 Funding 4067 42 DC-DebtFinancng-1 0YR 408008 Trf fr DC City Share Res Total C10570.2804 DH-13 William Jackson Drive (Old Taunton Road) -Road I C10570.2805 81-21 Montgomery Park Road -Road Reconstruction 01 Capital 504400 Capital Roads Bl-21 Montgomery Park Road -Road Reconstruction from Sandy Beach Road to McKay Road. 80 Funding 408008 Trf fr DC City Share Res 322 Run Date: Oct 11, 2024 Funding Expense 2,800,000 (2,800,000) (2,800,000) 2,800,000 600,000 (600,000) (600,000) 600,000 1,400,000 (1,400,000) (1,400,000) 1,400,000 4,264,500 (3,838,000) (426,500) (4,264,500) 4,264,500 5,798,000 (2,898,900) City of Pickering 2028 Staff Recommended Draft Capital Forecast 10570 Roads Projects 408602 Trf fr DC-Transportation ORF Total C10570.2805 81-21 Montgomery Park Road -Road Reconstruction C10570.2806 Asphalt Resurfacing Projects (TBD) 01 Capital 504400 Capital Roads Asphalt Resurfacing Projects (TBD). 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF 408706 Trf fr Rds & Bridges RF Total C10570.2806 Asphalt Resurfacing Projects (TBD) Total 10570 Roads Projects 323 Run Date: Oct 11, 2024 Funding Expense (2,899,100) (5,798,000) 5,798,000 4,000,000 (2,500,000) (1,500,000) (4,000,000) 4,000,000 (18,862,500) 18,862,500 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10570 Roads Projects C10570.2901 Seventh Concession Rd. (SL 26 to SL 22) Hard Surfacing 01 Capital 504400 Capital Roads Seventh Concession Road (SL 26 to SL 22) upgrade to hard surface. Northern Roads Hard Surfacing Strategy. 80 Funding 406702 Debt Financing-10Year Total C10570.2901 Seventh Concession Rd. (SL 26 to SL 22) Hard Surfacing C10570.2902 Rose bank Road Bridge (2005) Replacement 01 Capital 504420 Cap Bridges & Culverts Replace Bridge with Culvert -South of Third Concession Road -Design & Construction. 80 Funding 408706 Trf fr Rds & Bridges RF Total C10570.2902 Rosebank Road Bridge (2005) Replacement C10570.2903 Asphalt Resurfacing Projects (TBD) 01 Capital 504400 Capital Roads Asphalt Resurfacing Projects (TBD). 80 Funding 408502 Trf fr CCBF (FGT) Oblg RF 408706 Trf fr Rds & Bridges RF Total C10570.2903 Asphalt Resurfacing Projects (TBD) Total 10570 Roads Projects 324 Run Date: Oct 11, 2024 Funding Expense 2,500,000 (2,500,000) (2,500,000) 2,500,000 750,000 (750,000) (750,000) 750,000 4,000,000 (2,500,000) (1,500,000) (4,000,000) 4,000,000 (7,250,000) 7,250,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Parks Projects Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504000 Capital Land -2,042,000 -- 504700 Capital Parks 27,479,200 33,695,000 7,717,100 5,550,600 Total Expenditures 27,479,200 35,737,000 7,717,100 5,550,600 Financing 406703 Debt Financing-15Year -(10,105,100) -- 408008 Trf fr DC City Share Res (7,297,900) (935,800) (125,000) (1,264,900) 408037 Trf fr Casino Res (4,406,600) (2,925,000) (450,000) - 408041 Trf fr Parks lnfr. Rep!. Res -(200,000) (700,000) (850,000) 408606 Trf fr DC-P&R OB RF (15,630,400) (21,182,700) (6,283,700) (3,381,400) 408710 Trffr Seaton FIA RF (144,300) (388,400) (158,400) (54,300) Total Financing (27,479,200) (35,737,000) (7,717,100) (5,550,600) 325 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10572 Parks Projects 2026 2027 Project Name Draft Draft Forecast Forecast C10320.2125 Mapleridge Park Master Plan 1,000,000 C10320.2206 Beachfront Park Master Plan 4,963,200 C10572.2407 Greenwood Park Master Plan 5,000,000 C10572.2409 City Centre Park 14,256,000 C10572.2501 Community Park -Greenwood Conservation Lands 10,210,200 C10572.2601 Waterfront Trail reconstruction -Alex Robertson Park 226,900 C10572.2602 Trail connection between parking lots -Alex Robertson Park 100,900 C10572.2603 Playground Replacement -Bay Ridges Kinsmen Park P-024 325,000 C10572.2604 Playground Replacement-Clearside Park P-041 150,000 C10572.2605 Playground Replacement -Glengrove Park P-009 200,000 C10572.2606 Playground Replacement -Pinegrove Park P-001 250,000 C10572.2607 Village Green -Seaton P-119 1,347,500 C10572.2609 Primary Trail Network -Seaton T-1 851,600 C10572.2610 Village Green -Seaton P-108 774,800 C10572.2611 Neighbourhood Park -Seaton P-109 1,584,700 C10572.2612 Village Green -Seaton P-110 801,800 C10572.2613 Village Green -Seaton P-111 411,000 C10572.2614 Village Green -Beachview Homes (Finch and Rosebank) 235,800 C10572.2701 Linear Park -Walnut Lane Extension 175,000 C10572.2702 Village Green, Seaton P-133 599,600 C10572.2703 Neighbourhood Park, Seaton P-135 1,595,500 C10572.2704 Village Green, Seaton P-136 671,100 C10572.2705 Skateboard Park -Dave Ryan Community Park 350,000 C10572.2706 Claremont Memorial Park -Master Plan Implementation 2,000,000 C10572.2707 Playground Replacement -Rouge Valley Park (P-065) 200,000 C10572.2708 Playground Replacement -Mitchell Park (P-005) 200,000 C10572.2709 Playground Replacement -Douglas Park (P-004) 200,000 C10572.2710 Neighbourhood Park -Seaton P-134 1,991,600 C 10572.2711 Neighbourhood Park -Seaton P-122 1,691,100 C10572.2712 Neighbourhood Park -Seaton P-120 1,435,100 C10572.2713 Trail -Hydro Corridor-Liverpool to Whites 1,534,800 C10572.2714 Skate Board Park -(skate spot) (Location TBD) 336,900 C10572.2715 Community Park -Seaton P-115 7,546,100 C10572.2801 Playground reconstruction -Glen Ravine Park, (P-070) C10572.2802 Playground replacement -S.M. Woodsmere Park, (P-0720 C10572.2803 Playground reconstruction -East Woodlands Park, (P-016) C10572.2804 Waterfront Trail reconstruction -Frisco Road to Montgomery C10572.2805 Primary Trail Network -Seaton T-4ff-5 C10572.2806 Primary Trail Network -Seaton T-2 C10572.2807 Primary Trail Network -Seaton T-9 C10572.2808 Primary Trail Network -Seaton T-10 C10572.2809 Village Green -Seaton P-116 326 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 200,000 250,000 250,000 450,000 2,028,000 520,100 283,000 613,100 660,300 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10572 Parks Projects 2026 2027 Project Name Draft Draft Forecast Forecast C10572.2810 Village Green-Seaton P-117 C10572.2811 Village Green -Seaton P-118 C10572.2812 Trail from Creekside Park to SWM Pond C 10572.2901 Village Green, Seaton (P-137) C10572.2902 Village Green, Seaton (P-138) C10572.2903 Village Green, Seaton (P-139) C10572.2904 Playground replacement -Woodview Tot Lot, (P-023) C10572.2905 Playground reconstruction -Brockridge Community Park, (P- C10572.2906 Playground reconstruction -Greenriver Park, (P-074) C10572.2907 Trail -Hydro Corridor (Whites to Townline) Total 27 479 200 35 737 000 327 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 1,552,300 660,300 250,000 653,500 652,200 865,100 250,000 350,000 250,000 2,529,800 7717100 5 550.600 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10572 Parks Projects C10320.2125 Mapleridge Park Master Plan 01 Capital 504700 Capital Parks Construction costs for Mapleridge Park Master Plan. To be in accordance with the Master Plan recommendations upon completion. Considerations include removal of the baseball diamond and replace with open recreation area, upgrades to tennis court and playground, pedestrian pathway repairs and upgrades, walkway lighting replacement, other amenities, and landscaping. 80 Funding 408037 Trf fr Casino Res Total C10320.2125 Mapleridge Park Master Plan C10320.2206 Beachfront Park Master Plan 01 Capital 504700 Capital Parks Construction costs for Beachfront Park Master Plan -Phase 2. Existing washroom renovations and expansion, and associated improvements to Millennium Square, Park improvements from Millennium Square to the Frenchman's Bay harbour entrance. 80 Funding 408037 Trf fr Casino Res 408606 Trf fr DC-P&R OB RF Total C10320.2206 Beachfront Park Master Plan C10572.2409 City Centre Park 01 Capital 504700 Capital Parks The City Centre Park is proposed to include an outdoor refrigerated skating rink, comfort station/concession/mechanical/maintenance building, shade structure/performance space, water feature, lighting, AV equipment, site furniture and general landscaping -Construction. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2409 City Centre Park C10572.2601 Waterfront Trail reconstruction -Alex Robertson Park 01 Capital 504700 Capital Parks Waterfront Trail will require reconstruction following it's use for construction access to Beachfront Park. 80 Funding 328 Run Date: Oct 11, 2024 Funding Expense 1,000,000 (1,000,000) (1,000,000) 1,000,000 4,963,200 (2,481,600) (2,481,600) (4,963,200) 4,963,200 14,256,000 (7,128,000) (7,128,000) (14,256,000) 14,256,000 226,900 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10572 Parks Projects 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2601 Waterfront Trail reconstruction -Alex Robertson Park C10572.2602 Trail connection between parking lots -Alex Robertson Park 01 Capital 504700 Capital Parks Asphalt trail connecting north gravel parking lot with new south parking lot, to waterfront trail. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2602 Trail connection between parking lots -Alex Robertson P C10572.2603 Playground Replacement -Bay Ridges Kinsmen Park P-024 01 Capital 504700 Capital Parks Reconstruction of playground in Bay Ridges Kinsmen Park to create accessible playground complete with rubber safety surfacing. 80 Funding 408037 Trf fr Casino Res Total C10572.2603 Playground Replacement -Bay Ridges Kinsmen Park P-O: C10572.2604 Playground Replacement -Clearside Park P-041 01 Capital 504700 Capital Parks Replacement of playground in Clearside Park JR Playground with accessibility options added. 80 Funding 408037 Trf fr Casino Res Total C10572.2604 Playground Replacement -Clearside Park P-041 C10572.2605 Playground Replacement -Glengrove Park P-009 01 Capital 504700 Capital Parks Replacement of playground and safety surfacing in Glengrove Park with accessibility options added. 80 Funding 408037 Trf fr Casino Res Total C10572.2605 Playground Replacement -Glengrove Park P-009 C10572.2606 Playground Replacement -Pinegrove Park P-001 01 Capital 329 Run Date: Oct 11, 2024 Funding Expense (113,500) (113,400) (226,900) 226,900 100,900 (50,500) (50,400) (100,900) 100,900 325,000 (325,000) (325,000) 325,000 150,000 (150,000) (150,000) 150,000 200,000 (200,000) (200,000) 200,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10572 Parks Projects 504700 Capital Parks Replacement of playground and safety surfacing in Pinegrove Park with accessibility options added. In addition to playground equipment, outdoor exercise equipment will be provided. 80 Funding 408037 Trf fr Casino Res Total C10572.2606 Playground Replacement-Pinegrove Park P-001 C10572.2607 Village Green -Seaton P-119 01 Capital 504700 Capital Parks Village Green Seaton P-119 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2607 Village Green -Seaton P-119 C10572.2609 Primary Trail Network -Seaton T-1 01 Capital 504700 Capital Parks Primary trail network Seaton T-1 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2609 Primary Trail Network -Seaton T-1 C10572.2610 Village Green -Seaton P-108 01 Capital 504700 Capital Parks Village Green (Seaton) P-108 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2610 Village Green -Seaton P-108 C10572.2611 Neighbourhood Park -Seaton P-109 01 Capital 504700 Capital Parks Neighbourhood Park (Seaton) P-109 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF 330 Run Date: Oct 11, 2024 Funding Expense 250,000 (250,000) (250,000) 250,000 1,347,500 (1,313,800) (33,700) (1,347,500) 1,347,500 851,600 (830,300) • (21,300) (851,600) 851,600 774,800 (755,400) (19,400) (774,800) 774,800 1,584,700 (1,545,100) (39,600) City of Pickering 2026 Staff Recommended Draft Capital Forecast 10572 Parks Projects Total C10572.2611 Neighbourhood Park -Seaton P-109 C10572.2612 Village Green -Seaton P-110 01 Capital 504700 Capital Parks Village Green (Seaton) P-110 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R 08 RF 408710 Trf fr Seaton FIA RF Total C10572.2612 Village Green -Seaton P-110 C10572.2613 Village Green -Seaton P-111 01 Capital 504700 Capital Parks Village Green (Seaton) P-111 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2613 Village Green -Seaton P-111 C10572.2614 Village Green -Beachview Homes (Finch and Rosebank) 01 Capital 504700 Capital Parks Construction of village green in association with Beachview Homes (at Finch and Rosebank). 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R 08 RF Total C10572.2614 Village Green -Beachview Homes (Finch and Rosebank) Total 10572 Parks Projects 331 Run Date: Oct 11, 2024 Funding Expense (1,584,700) 1,584,700 801,800 (781,700) (20,100) (801,800) 801,800 411,000 (400,800) (10,200) (411,000) 411,000 235,800 (5,900) (229,900) (235,800) 235,800 (27,479,200) 27,479,200 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10572 Parks Projects C10572.2407 Greenwood Park Master Plan 01 Capital 504700 Capital Parks Implementation of Greenwood Park Master Plan. 80 Funding 406703 Debt Financing-15Year Total C10572.2407 Greenwood Park Master Plan C10572.2501 Community Park -Greenwood Conservation Lands 01 Capital 504000 Capital Land 504700 Capital Parks Community Park -Greenwood Conservation Lands -Phase 1 construction. 80 Funding 406703 Debt Financing-15Year 408606 Trf fr DC-P&R OB RF Total C10572.2501 Community Park -Greenwood Conservation Lands C10572.2701 Linear Park -Walnut Lane Extension 01 Capital 504700 Capital Parks Construction of park enhancements in linear park on north side of Walnut Lane at Liverpool Road, including shade structure and seating. 80 Funding 408037 Trf fr Casino Res Total C10572.2701 Linear Park -Walnut Lane Extension C10572.2702 Village Green, Seaton P-133 01 Capital 504700 Capital Parks New village green in the Wilson Meadows neighbourhood. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2702 Village Green, Seaton P-133 C10572.2703 Neighbourhood Park, Seaton P-135 01 Capital 504700 Capital Parks New neighbourhood park in the Wilson Meadows neighbourhood. 80 Funding 332 Run Date: Oct 11, 2024 Funding Expense 5,000,000 (5,000,000) (5,000,000) 5,000,000 2,042,000 8,168,200 (5,105,100) (5,105,100) (10,210,200) 10,210,200 175,000 (175,000) (175,000) 175,000 599,600 (584,600) (15,000) (599,600) 599,600 1,595,500 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10572 Parks Projects 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2703 Neighbourhood Park, Seaton P-135 C10572.2704 Village Green, Seaton P-136 01 Capital 504700 Capital Parks New village green in the Wilson Meadows neighbourhood. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2704 Village Green, Seaton P-136 C10572.2705 Skateboard Park -Dave Ryan Community Park 01 Capital 504700 Capital Parks Design and construction of skateboard park in Dave Ryan Community Park. 80 Funding 408037 Trf fr Casino Res Total C10572.2705 Skateboard Park -Dave Ryan Community Park C10572.2706 Claremont Memorial Park -Master Plan Implementation 01 Capital 504700 Capital Parks Implementation of Claremont Memorial Park Master Plan -parking lot expansion and covered multi-use shelter. 80 Funding 408037 Trf fr Casino Res Total C10572.2706 Claremont Memorial Park -Master Plan Implementation C10572.2707 Playground Replacement -Rouge Valley Park (P-065) 01 Capital 504700 Capital Parks Playground and safety surfacing Replacement -Rouge Valley Park. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2707 Playground Replacement -Rouge Valley Park (P-065) C10572.2708 Playground Replacement -Mitchell Park (P-005) 01 Capital 504700 Capital Parks Playground and safety surfacing replacement -Mitchell Park. 333 Run Date: Oct 11, 2024 Funding Expense {1,555,600) (39,900) {1,595,500) 1,595,500 671,100 (654,300) (16,800) (671,100) 671,100 350,000 (350,000) (350,000) 350,000 2,000,000 {2,000,000) {2,000,000) 2,000,000 200,000 (200,000) (200,000) 200,000 200,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10572 Parks Projects 80 Funding 408037 Trf fr Casino Res Total C10572.2708 Playground Replacement -Mitchell Park (P-005) C10572.2709 Playground Replacement -Douglas Park (P-004) 01 Capital 504700 Capital Parks Playground and safety surfacing Replacement -Douglas Park. 80 Funding 408037 Trf fr Casino Res Total C10572.2709 Playground Replacement -Douglas Park (P-004) C10572.2710 Neighbourhood Park -Seaton P-134 01 Capital 504700 Capital Parks Neighbourhood Park (Seaton) P-134 located north of Whitevale Road , east of Sideline 24. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2710 Neighbourhood Park -Seaton P-134 C10572.2711 Neighbourhood Park -Seaton P-122 01 Capital 504700 Capital Parks Neighbourhood Park (Seaton) P-122 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2711 Neighbourhood Park -Seaton P-122 C10572.2712 Neighbourhood Park -Seaton P-120 01 Capital 504700 Capital Parks Neighbourhood Park (Seaton) P-120 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2712 Neighbourhood Park -Seaton P-120 C10572.2713 Trail -Hydro Corridor -Liverpool to Whites 01 Capital 334 Run Date: Oct 11, 2024 Funding Expense (200,000) (200,000) 200,000 200,000 (200,000) (200,000) 200,000 1,991,600 (1,941,700) (49,900) (1,991,600) 1,991,600 1,691,100 (1,648,800) (42,300) (1,691,100) 1,691,100 1,435,100 (1,399,300) (35,800) (1,435,100) 1,435,100 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10572 Parks Projects 504700 Capital Parks Multi Purpose Trail -Hydro Corridor (Liverpool Rd. to Whites Rd.) (50/50). 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2713 Trail -Hydro Corridor -Liverpool to Whites C10572.2714 Skate Board Park -(skate spot) (Location TBD) 01 Capital 504700 Capital Parks Skate Board Park -(skate spot) (Location TBD) (50/50). 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2714 Skate Board Park -(skate spot) (Location TBD) C10572.2715 Community Park -Seaton P-115 01 Capital 504700 Capital Parks Community Parks (Seaton) P-115 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2715 Community Park -Seaton P-115 Total 10572 Parks Projects 335 Run Date: Oct 11, 2024 Funding Expense 1,534,800 (767,400) (767,400) (1,534,800) 1,534,800 336,900 (168,400) (168,500) (336,900) 336,900 7,546,100 (7,357,400) (188,700) (7,546,100) 7,546,100 (35,737,000) 35,737,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10572 Parks Projects C10572.2801 Playground reconstruction -Glen Ravine Park, {P-070) 01 Capital 504700 Capital Parks Reconstruction of playground area including accessible pathway, curbing, drainage, play equipment (small unit), and safety surfacing. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2801 Playground reconstruction -Glen Ravine Park, (P-070) C10572.2802 Playground replacement -S.M. Woodsmere Park, {P-0720 01 Capital 504700 Capital Parks Replacement of existing playground equipment {large unit), and safety surfacing. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2802 Playground replacement -S.M. Woodsmere Park, {P-0720 C10572.2803 Playground reconstruction -East Woodlands Park, {P-016) 01 Capital 504700 Capital Parks Replacement of existing playground equipment and expansion of playground area including accessible pathway and site furniture. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2803 Playground reconstruction -East Woodlands Park, {P-01€ C10572.2804 Waterfront Trail reconstruction -Frisco Road to Montgomery Par 01 Capital 504700 Capital Parks Resurfacing of waterfront trail from Frisco Road to Montgomery Park Road including drainage improvements in low laying areas and TRCA approvals/permit. 80 Funding 408037 Trf fr Casino Res Total C10572.2804 Waterfront Trail reconstruction -Frisco Road to Montgom C10572.2805 Primary Trail Network -Seaton T-4/T-5 01 Capital 504700 Capital Parks Primary trail network Seaton T-4/T-5 (97.5/2.5). 80 Funding 336 Run Date: Oct 11, 2024 Fuhding Expense 200,000 {200,000} (200,000} 200,000 250,000 (250,000} (250,000} 250,000 250,000 (250,000} (250,000} 250,000 450,000 {450,000} (450,000} 450,000 2,028,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10572 Parks Projects 408606 Trf fr DC-P&R 08 RF 408710 Trf fr Seaton FIA RF Total C10572.2805 Primary Trail Network -Seaton T-4/T-5 C10572.2806 Primary Trail Network -Seaton T-2 01 Capital 504700 Capital Parks Primary Trail network Seaton T-2 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2806 Primary Trail Network -Seaton T-2 C10572.2807 Primary Trail Network -Seaton T-9 01 Capital 504700 Capital Parks Primary Trail Network -Seaton T-9 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R 08 RF 408710 Trf fr Seaton FIA RF Total C10572.2807 Primary Trail Network -Seaton T-9 C10572.2808 Primary Trail Network -Seaton T-10 01 Capital 504700 Capital Parks Primary Trail Network -Seaton T-10 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R 08 RF 408710 Trf fr Seaton FIA RF Total C10572.2808 Primary Trail Network -Seaton T-10 C10572.2809 Village Green -Seaton P-116 01 Capital 504700 Capital Parks Village Green Seaton P-116 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R 08 RF 408710 Trf fr Seaton FIA RF Total C10572.2809 Village Green -Seaton P-116 C10572.2810 Village Green -Seaton P-117 01 Capital 337 Run Date: Oct 11, 2024 Funding Expense (1,977,200) (50,800) (2,028,000) 2,028,000 520,100 (507,000) (13,100) (520,100) 520,100 283,000 (275,900) (7,100) (283,000) 283,000 613,100 (597,700) (15,400) (613,100) 613,100 660,300 (643,700) (16,600) (660,300) 660,300 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10572 Parks Projects 504700 Capital Parks Village Green Seaton P-117 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2810 Village Green -Seaton P-117 C10572.2811 Village Green -Seaton P-118 01 Capital 504700 Capital Parks Village Green Seaton P-118 (97.5/2.5). 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2811 Village Green -Seaton P-118 C10572.2812 Trail from Creekside Park to SWM Pond 01 Capital 504700 Capital Parks Trail from Creekside Park to SWM Pond. 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2812 Trail from Creekside Park to SWM Pond Total 10572 Parks Projects 338 Run Date: Oct 11, 2024 Funding Expense 1,552,300 (1,513,500) (38,800) (1,552,300) 1,552,300 660,300 (643,700) (16,600) (660,300) 660,300 250,000 (125,000) (125,000) (250,000) 250,000 (7,717,100) 7,717,100 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10572 Parks Projects C10572.2901 Village Green, Seaton (P-137) 01 Capital 504700 Capital Parks New village green in the Mount Pleasant neighbourhood. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2901 Village Green, Seaton (P-137) C10572.2902 Village Green, Seaton (P-138) 01 Capital 504700 Capital Parks New village green in the Mount Pleasant neighbourhood. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2902 Village Green, Seaton (P-138) C10572.2903 Village Green, Seaton (P-139) 01 Capital 504700 Capital Parks New village green in the Mount Pleasant neighbourhood. 80 Funding 408606 Trf fr DC-P&R OB RF 408710 Trf fr Seaton FIA RF Total C10572.2903 Village Green, Seaton (P-139) C10572.2904 Playground replacement -Woodview Tot Lot, (P-023) 01 Capital 504700 Capital Parks Replacement of existing playground equipment and safety surfacing. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2904 Playground replacement -Woodview Tot Lot, (P-023) C10572.2905 Playground reconstruction -Brockridge Community Park, (P-039) 01 Capital 504700 Capital Parks Replacement and expansion of existing playground area including rubberized surfacing for improved accessibility. 80 Funding 339 Run Date: Oct 11, 2024 Funding Expense 653,500 (637,200) (16,300) (653,500) 653,500 652,200 (635,900) (16,300) (652,200) 652,200 865,100 (843,400) (21,700) (865,100) 865,100 250,000 (250,000) (250,000) 250,000 350,000 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10572 Parks Projects 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2905 Playground reconstruction -Brockridge Community Park, C10572.2906 Playground reconstruction -Greenriver Park, (P-074) 01 Capital 504700 Capital Parks Reconstruction of playground area including accessible pathway, curbing, drainage, play equipment (small unit), and safety surfacing. 80 Funding 408041 Trf fr Parks lnfr. Repl. Res Total C10572.2906 Playground reconstruction -Greenriver Park, (P-074) C10572.2907 Trail -Hydro Corridor (Whites to Townline) 01 Capital 504700 Capital Parks Trail -Hydro Corridor (Whites to Townline). 80 Funding 408008 Trf fr DC City Share Res 408606 Trf fr DC-P&R OB RF Total C10572.2907 Trail -Hydro Corridor (Whites to Townline) Total 10572 Parks Projects 340 Run Date: Oct 11, 2024 Funding Expense (350,000) (350,000) 350,000 250,000 (250,000) (250,000) 250,000 2,529,800 (1,264,900) (1,264,900) (2,529,800) 2,529,800 (5,550,600) 5,550,600 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Development Projects (DC Funded) Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 324,220 --- 504400 Capital Roads -8,951,720 3,086,580 11,866,100 504420 Cap Bridges & Culverts 981,000 1,347,500 1,296,880 - 504520 Capital Development Construction ---421,600 504550 Capital Storm System -1,259,900 -- 504600 Capital Sidewalks 141,500 601,000 2,051,100 2,021,300 504620 Capital Streetlights -601,000 2,050,900 3,286,200 Total Expenditures 1,446,720 12,761,120 8,485,460 17,595,200 Financing 406702 Debt Financing-10Year -(3,696,700) -(3,443,500) 4067 42 DC-DebtFinancng-1 0YR -(3,696,700) -(5,933,100) 408008 Trf fr DC City Share Res (723,410) (2,709,110) (1,817,100) (530,700) 408602 Trf fr DC-Transportation ORF (723,310) (2,053,810) (5,458,280) (5, 198,400) 408604 Trf fr DC-SWM OB RF -(604,800) -- 408706 Trf fr Rds & Bridges RF --(1,210,080) (2,489,500) Total Financing (1,446,720) (12,761,120) (8,485,460) (17,595,200) 341 City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10575 Development Projects (DC Funded) 2026 2027 Project Name Draft Draft Forecast Forecast C10575.2404 B-19 D Krosno Creek -SWM Facility 1,259,900 C10575.2601 RP-2 Finch Ave. Culvert (2001) Replacement 324,220 C10575.2603 RU-4b Audley Road (Sideline 2) -Culvert Replacement 981,000 C10575.261 O BI-22 Squires Beach Road -New Sidewalk installation 141,500 C10575.2701 R-5b Rougemount Drive -Road Reconstruction 1,277,500 C10575.2702 RU-?b Scarborough/Pickering Townline Rd.-Culvert Replace 1,347,500 C10575.2703 R-4b Oakwood Drive -Road Reconstruction 280,820 C10575.2705 RU-?a Scarborough/Pickering Townline Road -Road Recon 7,393,400 C10575.2706 BRT-4 Kingston Road -New Sidewalk, Cycle Track, and Sin 1,202,000 C10575.2804 RP-4a Finch Ave. -Road Reconstruction C10575.2805 BRT-1 Kingston Road -New Sidewalk, Cycle Track, and Sin C10575.2810 RU-11 North Road -New Sidewalk and Streetlight lnstallatio C10575.2813 BRT-2a Kingston Road -New Sidewalk, Cycle Track, and St C10575.2814 BRT-2b Kingston Road -New Sidewalk, Cycle Track, and St C10575.2815 BRT-2c Kingston Road -New Sidewalk, Cycle Track, and St C10575.2816 BRT-6 Kingston Road -New Sidewalk, Cycle Track, and Sin C10575.2901 R-5a Rougemount Drive -Road Reconstruction C10575.2905 RU-4a Audley Rd. -Road Reconstruction C10575.2907 L-19 Whites Road -New Sidewalk, Multi-use Path, and StreE C10575.2908 RU-9 Whites Road -New Streetlights on structure C10575.2909 A-6 Whites Road at CPR Overpass C10575.2910 A-10 Whites Road -New Sidewalks, and Streetlight installati Total 1446720 12 761120 342 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 1,296,880 1,123,280 1,963,300 72,800 2,071,100 312,600 597,000 592,900 455,600 4,979,100 6,887,000 3,476,600 1,264,900 421,600 566,000 8.485 460 17 595 200 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) C10575.2601 RP-2 Finch Ave. Culvert (2001) Replacement 01 Capital 504001 Capital Consulting RP-2 Finch Ave West of Altona Road Culvert Replacement (50/50) -Design. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2601 RP-2 Finch Ave. Culvert (2001) Replacement C10575.2603 RU-4b Audley Road (Sideline 2) -Culvert Replacement 01 Capital 504420 Cap Bridges & Culverts RU-4b Audley Road (Sideline 2) -Culvert Replacement. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2603 RU-4b Audley Road (Sideline 2) -Culvert Replacement C10575.2610 81-22 Squires Beach Road -New Sidewalk installation 01 Capital 504600 Capital Sidewalks 81-22 Squires Beach Road -New Sidewalk installation -Bayly Street to 350m south. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2610 Bl-22 Squires Beach Road -New Sidewalk installation Total 10575 Development Projects (DC Funded) 343 Run Date: Oct 11, 2024 Funding Expense 324,220 (162,110) (162,110) (324,220) 324,220 981,000 (490,500) (490,500) (981,000) 981,000 141,500 (70,800) (70,700) (141,500) 141,500 (1,446,720) 1,446,720 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) C10575.2404 8-19 D Krosno Creek -SWM Facility 01 Capital 504550 Capital Storm System B-19 Krosno Creek SWM Facility K16. Construction (48/52). 80 Funding 408008 Trf fr DC City Share Res 408604 Trf fr DC-SWM OB RF Total C10575.2404 8-19 D Krosno Creek -SWM Facility C10575.2701 R-5b Rougemount Drive -Road Reconstruction 01 Capital 504400 Capital Roads R-5 Rougemount Drive -2 lane urban reconstruction & storm sewer install (Toynevale Road to 200m south) (50/50). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2701 R-5b Rougemount Drive -Road Reconstruction C10575.2702 RU-7b Scarborough/Pickering Townline Rd.-Culvert Replacemen1 01 Capital 504420 Cap Bridges & Culverts Scarborough/ Pickering Townline Culvert (2004) Replacement - Design/Approvals/Construction. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2702 RU-7b Scarborough/Pickering Townline Rd.-Culvert Repli C10575.2703 R-4b Oakwood Drive -Road Reconstruction 01 Capital 504400 Capital Roads R-4b Oakwood Drive -2 lane urban reconstruction & storm sewer install (Mountain Ash Drive to Toynevale Road) (50/50) -Design. 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2703 R-4b Oakwood Drive -Road Reconstruction C10575.2705 RU-7a Scarborough/Pickering Townline Road -Road Reconstruc· 01 Capital 504400 Capital Roads 344 Run Date: Oct 11, 2024 Funding Expense 1,259,900 (655,100) (604,800) (1,259,900) 1,259,900 1,277,500 (638,800) (638,700) (1,277,500) 1,277,500 1,347,500 (673,800) (673,700) (1,347,500) 1,347,500 280,820 (140,410) (140,410) (280,820) 280,820 7,393,400 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) RU-7a Scarborough/Pickering Townline Road -Reconstruction & widening (CPR to Third Concession Road) (50/50). 80 Funding 406702 Debt Financing-10Year 4067 42 DC-DebtFinancng-1 0YR Total C10575.2705 RU-7a Scarborough/Pickering Townline Road• Road Rec, C10575.2706 BRT-4 Kingston Road• New Sidewalk, Cycle Track, and Streetligl 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights BRT-4 Kingston Road -New Sidewalk, Cycle Track, and Streetlight installation (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2706 BRT-4 Kingston Road• New Sidewalk, Cycle Track, and S Total 10575 Development Projects (DC Funded) 345 Run Date: Oct 11, 2024 Funding Expense (3,696,700) (3,696,700) (7,393,400) 7,393,400 601,000 601,000 (601,000) (601,000) (1,202,000) 1,202,000 (12,761,120) 12,761,120 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) C10575.2601 RP-2 Finch Ave. Culvert (2001) Replacement 01 Capital 504420 Cap Bridges & Culverts Finch Ave West of Altona Road Culvert (2001) Replacement (50/50) - Construction. 80 Funding 408602 Trf fr DC-Transportation ORF 408706 Trf fr Rds & Bridges RF Total C10575.2601 RP-2 Finch Ave. Culvert (2001) Replacement C10575.2703 R-4b Oakwood Drive -Road Reconstruction 01 Capital 504400 Capital Roads 2 lane urban reconstruction & storm sewer install (Mountain Ash Drive to Toynevale Road) (50/50) -Construction. 80 Funding 408602 Trf fr DC-Transportation ORF 408706 Trf fr Rds & Bridges RF Total C10575.2703 R-4b Oakwood Drive -Road Reconstruction C10575.2804 RP-4a Finch Ave. -Road Reconstruction 01 Capital 504400 Capital Roads RP-4 Finch Avenue reconstruction, urbanization from Altona Road to Culvert Structure (75/25). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2804 RP-4a Finch Ave. -Road Reconstruction C10575.2805 BRT-1 Kingston Road -New Sidewalk, Cycle Track, and Streetligl 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights BRT-1 Kingston Road -New Sidewalk, Cycle Track, and Streetlight installation (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2805 BRT-1 Kingston Road -New Sidewalk, Cycle Track, and S C10575.2810 RU-11 North Road -New Sidewalk and Streetlight Installation (bo 346 Run Date: Oct 11, 2024 Funding Expense 1,296,880 (648,440) (648,440) (1,296,880) 1,296,880 1,123,280 (561,640) (561,640) (1,123,280) 1,123,280 1,963,300 (490,900) (1,472,400) (1,963,300) 1,963,300 36,400 36,400 (36,400) (36,400) (72,800) 72,800 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights RU-11 North Road -New Sidewalk and Streetlight Installation from Hwy 7 to 1.35km south (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2810 RU-11 North Road -New Sidewalk and Streetlight lnstalla C10575.2813 BRT-2a Kingston Road -New Sidewalk, Cycle Track, and Streetli! 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights BRT-2a Kingston Road -New Sidewalk, Cycle Track, and Streetlight installation (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2813 BRT-2a Kingston Road -New Sidewalk, Cycle Track, and C10575.2814 BRT-2b Kingston Road -New Sidewalk, Cycle Track, and Streetli! 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights BRT-2b Kingston Road -New Sidewalk, Cycle Track, and Streetlight installation from Rougemount Drive to Rosebank Road (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2814 BRT-2b Kingston Road -New Sidewalk, Cycle Track, and C10575.2815 BRT-2c Kingston Road -New Sidewalk, Cycle Track, and Streetli! 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights BRT-2c Kingston Road -New Sidewalk, Cycle Track, and Streetlight installation from Rosebank Road to Steeple Hill (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF 347 Run Date: Oct 11, 2024 Funding Expense 1,035,600 1,035,500 (310,700) (1,760,400) (2,071,100) 2,071,100 156,300 156,300 (156,300) (156,300) (312,600) 312,600 298,500 298,500 (298,500) (298,500) (597,000) 597,000 296,500 296,400 (296,500) (296,400) City of Pickering 2028 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) Total C10575.2815 BRT-2c Kingston Road -New Sidewalk, Cycle Track, and C10575.2816 BRT-6 Kingston Road -New Sidewalk, Cycle Track, and Streetligl 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights BRT-6 Kingston Road -New Sidewalk, Cycle Track, and Streetlight installation from Bainbridge Drive to Notion Road (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2816 BRT-6 Kingston Road -New Sidewalk, Cycle Track, and S Total 10575 Development Projects (DC Funded) 348 Run Date: Oct 11, 2024 Funding Expense (592,900) 592,900 227,800 227,800 (227,800) (227,800) (455,600) 455,600 (8,485,460) 8,485,460 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10575 Development Projects {DC Funded) C10575.2901 R-5a Rougemount Drive -Road Reconstruction 01 Capital 504400 Capital Roads R-5a Rougemount Drive -Road Reconstruction -from 200m south of Toynevale Road to Oakwood Drive. 80 Funding 4067 42 DC-DebtFinancng-1 0YR 408706 Trf fr Rds & Bridges RF Total C10575.2901 R-5a Rougemount Drive -Road Reconstruction C10575.2905 RU-4a Audley Rd. -Road Reconstruction 01 Capital 504400 Capital Roads RU-4 Audley Road (50/50) Fifth Concession to Hwy. #7 -Two Lane Rural Reconstruction. 80 Funding 406702 Debt Financing-10Year 4067 42 DC-DebtFinancng-1 0YR Total C10575.2905 RU-4a Audley Rd. -Road Reconstruction C10575.2907 L-19 Whites Road -New Sidewalk, Multi-use Path, and Streetlight 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights L-19 Whites Road -New Sidewalk, Multi-use Path, and Streetlight installation from Sunbird Trail/Craighurst Court to the Third Concession Road (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2907 L-19 Whites Road -New Sidewalk, Multi-use Path, and Str C10575.2908 RU-9 Whites Road -New Streetlights on structure 01 Capital 504620 Capital Streetlights RU-9 Whites Road -New Streetlights on Regional structure over West Duffins Creek (both sides). 80 Funding 408008 Trf fr DC City Share Res 408602 Trf fr DC-Transportation ORF Total C10575.2908 RU-9 Whites Road -New Streetlights on structure 349 Run Date: Oct 11, 2024 Funding Expense 4,979,100 {2,489,600) {2,489,500) {4,979,100) 4,979,100 6,887,000 {3,443,500) (3,443,500) (6,887,000) 6,887,000 1,738,300 1,738,300 (347,700) (3,128,900) (3,476,600) 3,476,600 1,264,900 (63,200) (1,201,700) (1,264,900) 1,264,900 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10575 Development Projects (DC Funded) C10575.2909 A-6 Whites Road at CPR Overpass 01 Capital 504520 Capital Development Construction A-6 Whites Road at CPR Overpass -Install new sidewalk (both sides), and streetlights on structure (one side). 80 Funding 408008 Ttf fr DC City Share Res 408602 Ttf fr DC-Transportation ORF Total C10575.2909 A-6 Whites Road at CPR Overpass C10575.2910 A-10 Whites Road -New Sidewalks, and Streetlight installation (b 01 Capital 504600 Capital Sidewalks 504620 Capital Streetlights A-10 Whites Road -New Sidewalks, and Streetlight installation from Finch Avenue to Sunbird Trail/ Craighurst Court (both sides). 80 Funding 408008 Ttf fr DC City Share Res 408602 Ttf fr DC-Transportation ORF Total C10575.2910 A-10 Whites Road -New Sidewalks, and Streetlight install Total 10575 Development Projects (DC Funded) 350 Run Date: Oct 11, 2024 Funding Expense 421,600 (63,200) (358,400) (421,600) 421,600 283,000 283,000 (56,600) (509,400) (566,000) 566,000 (17,595,200) 17,595,200 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Finance Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502720 System&Sftwr Upgrade -600,000 - Total Expenditures -600,000 - Financing 408007 Trf fr Rate Stabilization Res -(562,515) - 408505 Trf fr CBC Oblig RF -(37,485) - Total Financing -(600,000) - 351 - - - - - City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Finance Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 502720 System&Sftwr Upgrade -600,000 - Total Expenditures -600,000 - Financing 408007 Trf fr Rate Stabilization Res -(562,515) - 408505 Trf fr CBC Oblig RF -(37,485) - Total Financing -(600,000) - 352 - - - - - City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10600 Finance 2026 2027 Project Name Draft Draft Forecast Forecast C 10600.2701 SAP Budget & Salary Module 600,000 Total 600 000 353 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast City of Pickering 2027 Staff Recommended Draft Capital Forecast 10600 Finance C10600.2701 SAP Budget & Salary Module 90 Expense 502720 System&Sftwr Upgrade Integrate salaries and budget development module within existing core financial modules to provide an integrated information platform to facilitate business decision making. 80 Funding 408007 Trf fr Rate Stabilization Res 408505 Trf fr CBC Oblig RF Total C10600.2701 SAP Budget & Salary Module Total 10600 Finance 354 Run Date: Oct 11, 2024 Funding Expense 600,000 (562,515) (37,485) (600,000) 600,000 (600,000) 600,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Fire Services Dept Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting 65,000 105,000 - 504100 Capital Buildings 11,605,000 -1,820,000 504950 Cap Furniture&Fix 350,000 350,000 - Total Expenditures 12,020,000 455,000 1,820,000 Financing 406601 Misc. Sale of Land --(985,000) 406704 Debt Financing-20Year (11,300,000) -- 408026 Trf fr Facilities Res (720,000) (350,000) (835,000) 408900 Property Tax Funded -(105,000) - Total Financing (12,020,000) (455,000) (1,820,000) 355 - - - - - - - - - City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Fire Protection 2026 Draft Forecast Expenditures 504001 Capital Consulting 65,000 504100 Capital Buildings 11,605,000 504950 Cap Furniture&Fix 350,000 Total Expenditures 12,020,000 Financing 406601 Misc. Sale of Land - 406704 Debt Financing-20Year (11,300,000) 408026 Trffr Facilities Res (720,000) 408900 Property Tax Funded - Total Financing (12,020,000) Abbreviations FS#2 FS#4 FS#5 FS#6 Fire Station #2, 553 Kingston Road Fire Station #4, 4941 Old Brock Road Fire Station #5, 1616 Bayly Street Fire Station #6, 1115 Finch Avenue 356 Run Date: Oct 11, 2024 2027 2028 2029 Draft Draft Draft Forecast Forecast Forecast 105,000 - -1,820,000 350,000 - 455,000 1,820,000 -(985,000) -- (350,000) (835,000) (105,000) - (455,000) (1,820,000) - - - - - - - - - City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10700 Fire Protection 2026 2027 Project Name Draft Draft Forecast Forecast C10700.2009 FS #5 Replacement 11,300,000 350,000 C10700.2101 FS #2 Parking Lot Resurfacing 220,000 C10700.2401 FS #5 Replacement (closed -rebudgetted in 10700.2009) 350,000 C10700.2601 FS #4 Interior Renovation 65,000 C10700.2602 FS #4 Septic System Upgrades & Replacement 85,000 C10700.2704 FS #6 Renovation 50,000 C10700.2705 FS #5 Decommissioning & Demolition 55,000 C10700.2801 FS #2 Metal Siding Coating & Soffit Replacement Total 12 020 000 455 000 357 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 300,000 415,000 985,000 120,000 1 820.000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10700 Fire Protection C10700.2009 FS #5 Replacement 01 Capital 504100 Capital Buildings Construction costs for the replacement of Fire Station #5, which was origianally constructed in 1969 and is at the end of its serviceable life. Costs have been updated to reflect curent construction costs and related project costs. Fire Station #5 will be constructed on a new site. 80 Funding 406704 Debt Financing-20Year Total C10700.2009 FS #5 Replacement C10700.2101 FS #2 Parking Lot Resurfacing 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement of existing driveway and parking areas. Includes provision of new concrete apron in front of apparatus bay. 80 Funding 408026 Trf fr Facilities Res Total C10700.2101 FS #2 Parking Lot Resurfacing C10700.2401 FS #5 Replacement (closed -rebudgetted in 10700.2009) 01 Capital 504950 Cap Furniture&Fix Furniture, fixtures and equipment for the replacement of Fire Station #5. Includes furniture, security, IT hardware, cabling, AN, communications systems, appliances, facility equipment, fixtures and artwork, signage, wayfinding, moving, installation and related costs. 80 Funding 408026 Trf fr Facilities Res Total C10700.2401 FS #5 Replacement (closed -rebudgetted in 10700.2009) C10700.2601 FS #4 Interior Renovation 01 Capital 504001 Capital Consulting Design and related costs for the interior retrofit of the living quarters and related adjunct spaces at Fire Station #4, including apparatus bay coating and driveway replacement. These spaces were originally constructed in 1996. 80 Funding 408026 Trf fr Facilities Res Total C10700.2601 FS #4 Interior Renovation 358 Run Date: Oct 11, 2024 Funding Expense 11,300,000 (11,300,000) (11,300,000) 11,300,000 220,000 (220,000) (220,000) 220,000 350,000 (350,000) (350,000) 350,000 65,000 (65,000) (65,000) 65,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10700 Fire Protection C10700.2602 FS #4 Septic System Upgrades & Replacement 01 Capital 504100 Capital Buildings Lifecycle and upgrades to existing septic system at Tomlinson Community Centre and Fire Station #4. The existing system is original, installed in 1997. 80 Funding 408026 Trf fr Facilities Res Total C10700.2602 FS #4 Septic System Upgrades & Replacement Total 10700 Fire Protection 359 Run Date: Oct 11, 2024 Funding Expense 85,000 (85,000) (85,000) 85,000 (12,020,000) 12,020,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10700 Fire Protection C10700.2009 FS #5 Replacement 01 Capital 504950 Cap Furniture&Fix Furniture, fixtures and equipment for the replacement of Fire Station #5. Includes furniture, security, IT hardware, cabling, audio visual equipment, communications systems, appliances, facility equipment, fixtures, artwork, signage, wayfinding, moving, installation and related costs. 80 Funding 408026 Trf fr Facilities Res Total C10700.2009 FS #5 Replacement C10700.2704 FS #6 Renovation 01 Capital 504001 Capital Consulting Consolidated renovations to Fire Station #6, including washroom retrofits, office and living quarters upgrades, LED lighting conversion and related work. Building components are original from 1992. Design and related costs. 80 Funding 408900 Property Tax Funded Total C10700.2704 FS #6 Renovation C10700.2705 FS #5 Decommissioning & Demolition 01 Capital 504001 Capital Consulting Fire Station# 5 demolition & remediation plan. Design and related costs. This project is contingent upon construction of Fire Station # 5. 80 Funding 408900 Property Tax Funded Total C10700.2705 FS #5 Decommissioning & Demolition Total 10700 Fire Protection 360 Run Date: Oct 11, 2024 Funding Expense 350,000 (350,000) (350,000) 350,000 50,000 (50,000) (50,000) 50,000 55,000 (55,000) (55,000) 55,000 (455,000) 455,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10700 Fire Protection C10700.2601 FS #4 Interior Renovation 01 Capital 504100 Capital Buildings Construction costs for interior retrofit of the living quarters and related adjacent spaces at Fire Station #4 including apparatus bay coating and driveway replacement. These spaces were originally constructed in 1996. 80 Funding 408026 Trf fr Facilities Res Total C10700.2601 FS #4 Interior Renovation C10700.2704 FS #6 Renovation 01 Capital 504100 Capital Buildings Construction costs for interior retrofit of the existing living quarters and related adjunct spaces at Fire Station #6. These spaces were originally constructed in 1994. 80 Funding 408026 Trf fr Facilities Res Total C10700.2704 FS #6 Renovation C10700.2705 FS #5 Decommissioning & Demolition 01 Capital 504100 Capital Buildings Construction cost for Fire Station # 5 demolition & remediation. This project is contingent upon construction of a new Fire Station # 5. 80 Funding 406601 Misc. Sale of Land Total C10700.2705 FS #5 Decommissioning & Demolition C10700.2801 FS #2 Metal Siding Coating & Soffit Replacement 01 Capital 504100 Capital Buildings Lifecycle replacement of the exterior metal siding and soffit. These components are original from 1977. 80 Funding 408026 Trf fr Facilities Res Total C10700.2801 FS #2 Metal Siding Coating & Soffit Replacement Total 10700 Fire Protection 361 Run Date: Oct 11, 2024 Funding Expense 300,000 (300,000) (300,000) 300,000 415,000 (415,000) (415,000) 415,000 985,000 (985,000) (985,000) 985,000 120,000 (120,000) (120,000) 120,000 (1,820,000) 1,820,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Library Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504001 Capital Consulting -530,000 -- 504100 Capital Buildings 35,960,000 6,560,000 2,830,000 - 504200 Capital Machinery & Equipment 260,000 --- 504800 Cap Information Tech 53,500 30,000 478,500 30,000 504900 Cap Library Coll Mat 432,000 2,350,500 2,350,500 592,000 504950 Cap Furniture&Fix 200,000 1,670,000 3,500,000 - Total Expenditures 36,905,500 11,140,500 9,159,000 622,000 Financing 406703 Debt Financing-15Year --(2,830,000) - 406744 DC-DebtFinancng-20YR (34,905,000) --- 408007 Trf fr Rate Stabilization Res --(350,000) - 408036 Trf fr Library Bldg Res (100,000) --- 408037 Trf fr Casino Res (160,000) (2,070,000) -- 408607 Trf fr DC-Library OB RF -(2,982,000) (3,493,900) - 408710 Trf fr Seaton FIA RF (895,000) (76,500) (89,600) - 408900 Property Tax Funded (845,500) (372,000) (395,500) (622,000) 499999 Unfunded Capital Projects -(5,640,000) (2,000,000) - Total Financing (36,905,500) (11,140,500) (9,159,000) (622,000) 362 City of Pickering 2026 • 2029 Staff Recommended Draft Multi-Year Capital Forecast Library 2026 Draft Forecast Expenditures 504001 Capital Consulting - 504100 Capital Buildings 160,000 504200 Capital Machinery & Equipment 260,000 504800 Cap Information Tech 53,500 504900 Cap Library Coll Mat 432,000 504950 Cap Furniture&Fix 200,000 Total Expenditures 1,105,500 Financing 406703 Debt Financing-15Year - 408007 Trf fr Rate Stabilization Res - 408036 Trf fr Library Bldg Res (100,000) 408037 Trf fr Casino Res (160,000) 408900 Property Tax Funded (845,500) 499999 Unfunded Capital Projects - Total Financing (1,105,500) Abbreviations George Ashe Library, 470 Kingston Road Information Technology Pickering Heritage Community Centre Radio Frequency Identification 2027 Draft Forecast 530,000 6,560,000 - 30,000 342,000 620,000 8,082,000 - - - (2,070,000) (372,000) (5,640,000) (8,082,000) GAL IT PHCC RFID PCL FF&E Pickering Central Library, One The Esplanade Furniture, Fixtures & Equipment 363 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast -- 2,830,000 - -- 53,500 30,000 342,000 592,000 2,350,000 - 5,575,500 622,000 (2,830,000) - (350,000) - -- -- (395,500) (622,000) (2,000,000) - (5,575,500) (622,000) City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 10900 Library 2026 2027 Project Name Draft Draft Forecast Forecast C10900.2303 GAL Renovation 2,070,000 C 10900.2505 Building Envelope Retrofit -Central Library C10900.2507 Lobby & Washrooms Retrofit 80,000 C10900.2511 Central Library Shelving Replacement 100,000 C10900.2601 Collection Materials 332,000 C10900.2602 GAL Computers Replacement 25,000 C10900.2603 Library IT Infrastructure Upgrades 28,500 C10900.2604 PHCC -Collection Materials 100,000 C10900.2605 RFID detection system upgrades (Central and George Ashe) 30,000 C10900.2606 Lobby & Washrooms Retrofit 80,000 C10900.2607 Self Checkout workstation upgrades (all locations) 30,000 C10900.2608 Return Materials Sorter for Central Library 200,000 C10900.2701 Collection Materials 342,000 C10900.2702 PCL Computers Replacement 30,000 C10900.2706 Main Library Interior Renovations 100,000 5,640,000 C10900.2802 Library Collection materials C10900.2803 Central Library FF&E C 10900.2901 Library Collection materials C10900.2902 Central Library Computer & Technology Replacement Total 1105 500 8 082 000 364 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 2,830,000 25,000 28,500 2,000,000 342,000 350,000 592,000 30,000 5 575 500 622 000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10900 Library C10900.2507 Lobby & Washrooms Retrofit 01 Capital 504100 Capital Buildings Replacing aging fixtures, partitions, counters and finishes in the second floor washrooms at the Central Library. A majority of these components are original from 1990. 80 Funding 408037 Trf fr Casino Res Total C10900.2507 Lobby & Washrooms Retrofit C10900.2511 Central Library Shelving Replacement 01 Capital 504950 Cap Furniture&Fix Replace aging furniture and shelving at Central Library. 80 Funding 408036 Trf fr Library Bldg Res Total C10900.2511 Central Library Shelving Replacement C10900.2601 Collection Materials 01 Capital 504900 Cap Library Coll Mat Collection Materials include: Books, audio books, movies and other types of physical materials along with their processing and packaging. 80 Funding 408900 Property Tax Funded Total C10900.2601 Collection Materials C10900.2602 GAL Computers Replacement 01 Capital 504800 Cap Information Tech Replacement of public and staff computers at the George Ashe Library that are at least 5 years old. 80 Funding 408900 Property Tax Funded Total C10900.2602 GAL Computers Replacement C10900.2603 Library IT Infrastructure Upgrades 01 Capital 504800 Cap Information Tech Replacement of aging servers and IT infrastructure. 80 Funding 408900 Property Tax Funded 365 Run Date: Oct 11, 2024 Funding Expense 80,000 (80,000) (80,000) 80,000 100,000 (100,000) (100,000) 100,000 332,000 (332,000) (332,000) 332,000 25,000 (25,000) (25,000) 25,000 28,500 (28,500) City of Pickering 2026 Staff Recommended Draft Capital Forecast 10900 Library Total C10900.2603 Library IT Infrastructure Upgrades C10900.2604 PHCC -Collection Materials 01 Capital 504900 Cap Library Coll Mat Collection Materials include: Books, audio books, movies and other types of physical materials along with their processing and packaging. Create new collection for PHCC site. 80 Funding 408900 Property Tax Funded Total C10900.2604 PHCC -Collection Materials C10900.2605 RFID detection system upgrades (Central and George Ashe) 01 Capital 504200 Capital Machinery & Equipment Replacement of old technology for security of collection. 80 Funding 408900 Property Tax Funded Total C10900.2605 RFID detection system upgrades (Central and George Asl C10900.2606 Lobby & Washrooms Retrofit 01 Capital 504100 Capital Buildings Main Library Second Floor Public Washrooms Renovation. Replacing aging fixtures, partitions, counters and finishes in the second floor washrooms at the Library. A majority of these components are original from 1990. 80 Funding 408037 Trf fr Casino Res Total C10900.2606 Lobby & Washrooms Retrofit C10900.2607 Self Checkout workstation upgrades (all locations) 01 Capital 504200 Capital Machinery & Equipment Replacement of old technology for client self checkout. 80 Funding 408900 Property Tax Funded Total C10900.2607 Self Checkout workstation upgrades (all locations) C10900.2608 Return Materials Sorter for Central Library 01 Capital 504200 Capital Machinery & Equipment Return Materials Sorter for Central Library. 366 Run Date: Oct 11, 2024 Funding Expense (28,500) 28,500 100,000 (100,000) (100,000) 100,000 30,000 (30,000) (30,000) 30,000 80,000 (80,000) (80,000) 80,000 30,000 (30,000) (30,000) 30,000 200,000 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10900 Library 80 Funding 408900 Property Tax Funded Total C10900.2608 Return Materials Sorter for Central Library C10900.2706 Main Library Interior Renovations 01 Capital 504950 Cap Furniture&Fix Furniture, fixtures and equipment needed for the main library. Replacement of outdated library shelving with modern, adaptable, and Accessibility for Ontarians with Disabilities Act (AODA) compliant units. Also Includes furniture, security, IT hardware, cabling, AN, appliances, program and facility equipment, fixtures and artwork, signage, wayfinding, moving, installation and related costs. 80 Funding 408900 Property Tax Funded Total C10900.2706 Main Library Interior Renovations Total 10900 Library 367 Run Date: Oct 11, 2024 Funding Expense (200,000) {200,000) 200,000 100,000 (100,000) (100,000} 100,000 (1,105,500) 1,105,500 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10900 Library C10900.2303 GAL Renovation 01 Capital 504100 Capital Buildings Construction costs for renovations to George Ashe Library, including circulation counter modifications, replacement of book stacks, modifications to quiet room and children's areas. GAL originally opened in 2001. Community Centre share of project costs and funding is listed separately in the 10220 cost centre. 504950 Cap Furniture&Fix 80 Funding 408037 Trf fr Casino Res Total C10900.2303 GAL Renovation C10900.2701 Collection Materials 01 Capital 504900 Cap Library Coll Mat Collection Materials include: Books, audio books, movies and other types of physical materials along with their processing and packaging. Addition of funds for PHCC collection maintenance. 80 Funding 408900 Property Tax Funded Total C10900.2701 Collection Materials C10900.2702 PCL Computers Replacement 01 Capital 504800 Cap Information Tech Replacement of public and staff computers at the Pickering Central Library that are at least 5 years old. 80 Funding 408900 Property Tax Funded Total C10900.2702 PCL Computers Replacement C10900.2706 Main Library Interior Renovations 01 Capital 504001 Capital Consulting 504100 Capital Buildings Construction costs for renovation of interior spaces throughout the main branch library, expected to proceed in phases. 504950 Cap Furniture&Fix 80 Funding 499999 Unfunded Capital Projects Total C10900.2706 Main Library Interior Renovations 368 Run Date: Oct 11, 2024 Funding Expense 1,650,000 420,000 (2,070,000) (2,070,000) 2,070,000 342,000 (342,000) (342,000) 342,000 30,000 (30,000) (30,000) 30,000 530,000 4,910,000 200,000 (5,640,000) (5,640,000) 5,640,000 10900 Library Total 10900 Library City of Pickering 2027 Staff Recommended Draft Capital Forecast 369 Run Date: Oct 11, 2024 Funding Expense (8,082,000) 8,082,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10900 Library C10900.2505 Building Envelope Retrofit -Central Library 01 Capital 504100 Capital Buildings Construction costs for lifecycle replacement to the existing building envelope including glazing systems, skylights, metal roofs, flat roof repairs and localized brick repairs. All components are original from 1990. 80 Funding 406703 Debt Financing-15Year Total C10900.2505 Building Envelope Retrofit -Central Library C10900.2602 GAL Computers Replacement 01 Capital 504800 Cap Information Tech Replacement of public and staff computers at the George Ashe Library that are at least 5 years old. 80 Funding 408900 Property Tax Funded Total C10900.2602 GAL Computers Replacement C10900.2603 Library IT Infrastructure Upgrades 01 Capital 504800 Cap Information Tech Replacement of aging servers and IT infrastructure. 80 Funding 408900 Property Tax Funded Total C10900.2603 Library IT Infrastructure Upgrades C10900.2706 Main Library Interior Renovations 01 Capital 504950 Cap Furniture&Fix Furniture, fixtures and equipment for the main library. Includes furniture, security, IT hardware, cabling, AN, appliances, program and facility equipment, fixtures and artwork, signage, wayfinding, moving, installation and related costs. 80 Funding 499999 Unfunded Capital Projects Total C10900.2706 Main Library Interior Renovations C10900.2802 Library Collection materials 01 Capital 504900 Cap Library Coll Mat 370 Run Date: Oct 11, 2024 Funding Expense 2,830,000 (2,830,000) (2,830,000) 2,830,000 25,000 (25,000) (25,000) 25,000 28,500 (28,500) (28,500) 28,500 2,000,000 (2,000,000) (2,000,000) 2,000,000 342,000 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10900 Library Collection Materials include: Books, audio books, movies and other types of physical materials along with their processing and packaging. Addition of funds for PHCC collection maintenance. 80 Funding 408900 Property Tax Funded Total C10900.2802 Library Collection materials C10900.2803 Central Library FF&E 01 Capital 504950 Cap Furniture&Fix Replace collection shelving. 80 Funding 408007 Trf fr Rate Stabilization Res Total C10900.2803 Central Library FF&E Total 10900 Library 371 Run Date: Oct 11, 2024 Funding Expense (342,000) (342,000) 342,000 350,000 (350,000) (350,000) 350,000 (5,575,500) 5,575,500 City of Pickering 2029 Staff Recommended Draft Capital Forecast 10900 Library C10900.2901 Library Collection materials 01 Capital 504900 Cap Library Coll Mat Library Collection materials. Increased to reflect addition of Seaton library. 80 Funding 408900 Property Tax Funded Total C10900.2901 Library Collection materials C10900.2902 Central Library Computer & Technology Replacement 01 Capital 504800 Cap Information Tech Replacement of public and staff computers at the Central Library that are at least 5 years old. 80 Funding 408900 Property Tax Funded Total C10900.2902 Central Library Computer & Technology Replacement Total 10900 Library 372 Run Date: Oct 11, 2024 Funding Expense 592,000 (592,000) (592,000) 592,000 30,000 (30,000) (30,000) 30,000 (622,000) 622,000 City of Pickering 2026 -2029 Staff Recommended Draft Multi-Year Capital Forecast Seaton Library Run Date: Oct 11, 2024 2026 2027 2028 2029 Draft Draft Draft Draft Forecast Forecast Forecast Forecast Expenditures 504100 Capital Buildings 35,800,000 -- 504800 Cap Information Tech --425,000 504900 Cap Library Coll Mat -2,008,500 2,008,500 504950 Cap Furniture&Fix -1,050,000 1,150,000 Total Expenditures 35,800,000 3,058,500 3,583,500 Financing 406744 DC-DebtFinancng-20YR (34,905,000) -- 408607 Trf fr DC-Library OB RF -(2,982,000) (3,493,900) 408710 Trf fr Seaton FIA RF (895,000) (76,500) (89,600) Total Financing (35,800,000) (3,058,500) (3,583,500) 373 - - - - - - - - - 10905 Seaton Library Project Name C10905.2101 Seaton Library City of Pickering 2026 -2029 Staff Recommended Draft Mulit-Year Capital Forecast Project Listing 2026 2027 Draft Draft Forecast Forecast 35,800,000 1,050,000 C10905.2701 Seaton Library Collection 2,008,500 Total 35 800 000 3 058 500 374 Run Date: Oct 11, 2024 2028 2029 Draft Draft Forecast Forecast 1,575,000 2,008,500 3 583 500 City of Pickering 2026 Staff Recommended Draft Capital Forecast 10905 Seaton Library C10905.2101 Seaton Library 01 Capital 504100 Capital Buildings Construction costs for the Seaton Library. Additional funding for the Seaton Recreation Complex is shown in the 10260 cost centre. 80 Funding 406744 DC-DebtFinancng-20YR 408710 Trf fr Seaton FIA RF Total C10905.2101 Seaton Library Total 10905 Seaton Library 375 Run Date: Oct 11, 2024 Funding Expense 35,800,000 (34,905,000) (895,000) (35,800,000) 35,800,000 (35,800,000) 35,800,000 City of Pickering 2027 Staff Recommended Draft Capital Forecast 10905 Seaton Library C10905.2101 Seaton Library 01 Capital 504950 Cap Furniture&Fix Furniture and fixtures for the new Seaton Library (phase 1 of 2). FF&E costs spread over 3 years to allow for early purchase of long lead items without adding full budget pressure in a single year. Additional costs for Seaton Recreation Complex can be found in the 10260 cost centre. 80 Funding 408607 Trf fr DC-Library OB RF 408710 Trf fr Seaton FIA RF Total C10905.2101 Seaton Library C10905.2701 Seaton Library Collection 01 Capital 504900 Cap Library Coll Mat Collection Materials. Library materials include: Books, movies, music and other types of materials along with their processing and packaging. New collection Year 1 of 2. 80 Funding 408607 Trf fr DC-Library OB RF 408710 Trf fr Seaton FIA RF Total C10905.2701 Seaton Library Collection Total 10905 Seaton Library 376 Run Date: Oct 11, 2024 Funding Expense 1,050,000 (1,023,700) (26,300) (1,050,000) 1,050,000 2,008,500 (1,958,300) (50,200) (2,008,500) 2,008,500 (3,058,500) 3,058,500 City of Pickering 2028 Staff Recommended Draft Capital Forecast 10905 Seaton Library C10905.2101 Seaton Library 01 Capital 504800 Cap Information Tech 504950 Cap Furniture&Fix Furniture and fixtures for the new Seaton Library (phase 2 of 2). FF&E costs spread over 3 years to allow for early purchase of long lead items without adding full budget pressure in a single year. Additional costs for the Seaton Recreation Complex can be found in the 10260 cost centre. 80 Funding 408607 Trf fr DC-Library OB RF 408710 Trf fr Seaton FIA RF Total C10905.2101 Seaton Library C10905.2701 Seaton Library Collection 01 Capital 504900 Cap Library Coll Mat Collection Materials. Library materials include: Books, movies, music and other types of materials along with their processing and packaging. New collection Year 2 of 2. 80 Funding 408607 Trf fr DC-Library OB RF 408710 Trf fr Seaton FIA RF Total C10905.2701 Seaton Library Collection Total 10905 Seaton Library 377 Run Date: Oct 11, 2024 Funding Expense 425,000 1,150,000 (1,535,600) (39,400) (1,575,000) 1,575,000 2,008,500 (1,958,300) (50,200) (2,008,500) 2,008,500 (3,583,500) 3,583,500