2023 Approved Capital Budget
Table of Contents
Department
Budget Summaries
Mayor & Council
Community Services
Don Beer Arena 10215
Community Centres 10220
Recreation Complex-Central Core 10225
Recreation Complex-Pool 10230
Recreation Complex-Arenas 10235
Civic Complex 10240
Museum 10250
Operations
Public Works Admin 10300
Property Maintenance 10305
Fleet Services 10310
Roads Equipment 10315
Parks 10320
Operations Admin 10325
Corporate Services
Information Technology 10405
Engineering Services
Water Resources & Development Services 10510
Sidewalks 10515
Streetlights & Signalization 10520
Stormwater Management 10525
Roads Projects 10570
Development Projects -(DC Funded) 10575
Finance
Finance 10600
Fire Services
Fire Protection 10700
Libraries
Library 10900
Page
1
8
13
14
16
21
23
25
29
34
38
39
43
45
55
59
88
90
91
95
96
98
101
107
111
136
146
147
149
150
155
156
Common Budget Terms
Assessment Growth
The additional taxation revenue the City receives from new homes and businesses that
are built each year. This revenue is used to cover the cost of providing services to the
new residents/businesses and for long term financial planning.
Budget Levy
Sometimes referred to as the "Tax Levy", the budget levy is the total of all expenditures
funded by property taxes.
Capital Budget
One time expenditures for major projects ( often referred to as "infrastructure") such as
roads, vehicles/equipment, parks, sidewalks, trails, streetlights, storm sewers,
playgrounds and buildings. It includes both the development of new, and the
maintenance/rehabilitation of existing infrastructure.
Current Budget
The expenditures (e.g., wages/benefits, supplies, contracted services, utilities, etc.)
required to deliver the day to day City services. It also includes the revenues that the
City receives (e.g., user fees, interest income, building permit fees, etc.).
Debt
A type of long term loan used as partial financing for major capital projects. The debt,
including interest, is repayable over 5 to 25 years. Debenture debt spreads the project
cost and related tax rate increase over a number of years and ensures that future
taxpayers pay their fair share of capital projects being completed today.
Development Charges
A charge paid by developers to partially pay for the cost of new capital projects required
as a result of growth (e.g., new roads, parks, trails, community centres, fire stations,
etc.). Development charges do not cover the entire cost of a capital project, as
legislation requires municipalities to fund a portion of most projects. In addition, certain
expenditures are exempt from development charges and must be paid entirely by the
municipality.
Common Budget Terms
Reserves/Reserve Funds
Dollars set aside for specific purposes, both current and capital budget items. There
are two main types of reserves/reserve funds:
Statutory/Obligatory -municipalities are required by legislation to establish certain
reserve funds (e.g., Development Charges, Parkland)
Discretionary -can be established by Council for specific purpose (e.g., Vehicle
Replacement, Rate Stabilization)
City of Pickering
2023 Approved Capital Budget
Reconciliation
Draft Capital Budget as Submitted to
Executive Committee on April 13, 2023
Report to Council Budget Changes:
Add:
-Gwendolyn St. Resurfacing -Rouge
Valley Dr. to Fawndale Rd.
-Fuschia Lane Asphalt Resurfacing -
Grenoble Blvd. to Modlin Rd.
-Petunia Place Asphalt Resurfacing -
Gwendolyn St. to North Terminus
-Falconcrest Dr. Asphalt Resurfacing -
10570.2319
10570.2320
10570.2321
Dunbarton Rd. to Rambleberry Ave. 10570.2322
2023 Approved Capital Budget
1
$270,000
$115,000
$105,000
$255,000
$58,899,668
$745,000
$59,644,668
City of Pickering
2023
Project Classification Approved
Budget
Infrastructure Renewal $30,920,800
Growth 28,723,868
$59,644,668
2023
Financing Summary Approved
Budget
Capital Paid from Property Taxes $668,000
Donations 27,500
Federal Grants 12,542,000
Provincial Grants 500,000
Debt 352,324
Development Charges - Debt 1,235,000
Rate Stabilization Reserve 5,317,000
Third Party Contributions 200,000
Parkland Reserve Fund 718,000
Federal Gas Tax Reserve Fund 7,409,000
Development Charges - Reserve Fund 8,211,364
Casino Reserve 4,533,700
Other Discretionary Reserves & Reserve Funds 17,930,780
Total $59,644,668
2023 Approved Capital Budget Overview
Total
City of Pickering
Infrastructure Renewal
2023 Approved Capital Budget Overview
2023
Infrastructure Renewal by Program Approved
Budget
11000 Mayor $15,000
11005 Councillors 90,000
10215 Don Beer Arena 461,000
10220 Community Centres 1,664,000
10225 Rec. Complex -Central Core 308,000
10230 Rec. Complex -Pool 598,000
10235 Rec. Complex -Arenas 587,000
10240 Civic Complex 2,089,200
10245 Sr. Citizens Centre 263,000
10250 Museum 325,000
10300 Public Works Admin. 68,000
10305 Property Maintenance · 320,000 ·
10310 Fleet Services 3,797,700
10315 Roads Equipment 1,345,000
10320 Parks 4,004,000
10405 Information Technology 2,142,000
10520 Streetlights & Signalization 689,000
10525 Stormwater Management 1,400,000
10570 Roads Projects 5,421,900
10700 Fire Protection 4,730,000
10900 Library 603,000
' Total $30,920,800
3
City of Pickering
Annual Debt Charges for 2023 Approved Capital Projects
2023
Project# Description Annual Project Debt
Charges Amount
Property Tax Debt
Debt -10 Year
C 10700.2305 Fire Station #5 Land Purchase $75,000 $526,700
$75,000 $526,700
Debt -15 Year
C 10700.2307 Fire Pumper Rescue Replacement $225,000 $2,000,000
Total Cost of Debt -5 Year $225,000 $2,000,000
Internal Loan -5 Year
C10700.2303 Fire Portable Radio Replacement 121,000 500,000
C10700.2306 Fire Dispatch CAD Replacement 85,000 350,000
$206,000 $850,000
Total Cost of Property Tax Funded Debt $506,000 $3,376,700
DC Debt
DC Debt -5 Year
C10305.2305 Sidewalk Plow with Attachments $42,000 $175,000
C10315.2303 4 Ton Dump Truck with Snow Plow, Wing & Brine Tank 101,000 420,000
C 10315.2306 1 Ton Truck with Aluminum Dump Body & Tailgate Lift 27,000 110,000
C10315.2311 4 Ton Dump Truck with Snow Plow & Wing 101,000 420,000
C10315 .2312 1 Ton Dump Truck with Tailgate Lift 27,000 110,000
Total Cost of DC Debt -5 Year $298,000 $1,235,000
Total Cost of DC Funded Debt $298,000 $1,235,000
Grand Total $804,000 $4,611,700
5
Project Description
City of Pickering
Accessibility Capital Projects
2023 Approved Capital Budget
10225.2302 Chestnut Hill Developments Recreation Centre -
Elevator Retrofit
Upgrade finishes and accessibility features in the existing lobby elevator to comply with
current standards. Total project cost is $165,000.
10230.2303 Chestnut Hill Developments Recreation Centre -
Pool Chair Lift Replacement
Lifecycle replacement of chair lift required to provide accessibility entry and exit.
10320.2301 Dunmoore Park Pathway Construction
Construction of asphalt path from Dunmoore parking lot to Engel Court and Atwood
Crescent. Will include removing stairs at Engel Court for improved accessibility.
10320.2302 J. McPherson Park -Accessible Pathway Construction
New accessibility pathway at J. McPherson Park from parking lot to baseball diamond and
to the walkway at Pebble Court.
10320.2315 Martin's Tot Lot -Playground Replacement of Tot Unit
Replacement of tot aged playground only in Martin's Tot Lot.
10320.2327 Pathway Reconstruction (Accessibility to Parks)
Phase 1 -Design and reconstruction of existing pathways and associated infrastructure.
Locations for 2023 include Valleyview Park (15,000sf) and Douglas Park (930sf).
10320.2330 Chickadee Park -Playground Replacement
Replacement of playground in Chickadee Park with accessibility options added. Total
project cost is $120,000.
10515.2302 Finch Avenue -New Concrete Sidewalk
New Concrete Sidewalk -Finch Avenue, south side from Altona Road to Shadow Place.
10520.2105 Accessible Pedestrian Signals - 4 locations
Equipping existing traffic signals with accessible pedestrian signals in accordance with
Accessibility for Ontarians with Disabilities Act, 2005.
7
Accessibility
Component of
Project Cost
$ 33,000
65,000
220,000
300,000
40,000
330,000
60,000
140,000
400,000
$ 1,588,000
C ity of P ickering
2023
Approved Capital Budget Summary
Mayor, Council & Council Support
Expenditures
502730 HardwareReplacements
Total Expenditures
Financing
408900 Property Tax Funded
Total Financing
8
Run Date: Aug 9 , 2023
2022 2023
Approved Approved
Budget Budget
-105,000
-105,000
-(105,000)
-(105,000)
City of Pickering
2023 Approved Capital Budget
Project Listing
Project Name
11000 Mayor
C11000.2301 Computer Equipment Mayor
Total 11000 Mayor
11005 Councillors
C11005.2301 Computer Equip Reg. Coun. Ward 1
C11005.2302 Computer Equip Reg. Coun. Ward 2
C11005.2303 Computer Equip Reg. Coun. Ward 3
C11005.2304 Computer Equip City Coun. Ward 1
C11005.2305 Computer Equip City Coun. Ward 2
C11005.2306 Computer Equip City Coun. Ward 3
Total 11005 Councillors
9
Run Date: Aug 9, 2023
2023
Project
Budget
15,000
15,000
15,000
15,000
15,000
15,000
15,000
15,000
90,000
11000 Mayor
City of Pickering
2023
Approved Capital Budget
C11000.2301 Computer Equipment Mayor
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Policy, these funds can
only be spent during the first 40 months of office .
80 Funding
408900 Property Tax Funded
Total C11000.2301 Computer Equipment Mayor
Total 11000 Mayor
10
Run Date: Aug 9, 2023
Funding Expense
15,000
(15,000)
(15,000) 15,000
(15,000) 15,000
City of Pickering
2023
Approved Capital Budget
11005 Councillors
C 11 005 .2301 Computer Equip Reg . Coun . Ward 1
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Policy , these funds can
only be spent during the first 40 months of office .
80 Funding .
408900 Property Tax Funded
Total C11005.2301 Computer Equip Reg. Coun. Ward 1
C 11 005 .2302 Computer Equip Reg. Co un . Ward 2
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Policy, these funds can
only be spent during the first 40 months of office.
80 Funding
408900 Property Tax Funded
Total C11005.2302 Computer Equip Reg. Coun. Ward 2
C11005 .2303 Computer Equip Reg . Coun . Ward 3
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Policy, these funds can
only be spent during the first 40 months of office .
80 Funding
408900 Property Tax Funded
Total C11005.2303 Computer Equip Reg. Coun. Ward 3
C11005.2304 Computer Equip City Coun. Ward 1
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Policy, these funds can
only be spent during the first 40 months of office .
80 Funding
408900 Property Tax Funded
Total C11005.2304 Computer Equip City Coun. Ward 1
C11005.2305 Computer Equip City Coun. Ward 2
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Poli cy, these funds can
only be spent d uring the first 40 months of office.
80 Funding
11
Run Date: Aug 9, 2023
Funding E~pense
15,000
(15,000)
(15,000) 15,000
15,000
(15,000)
(15,000) 15,000
15,000
(15,000)
(15,000) 15,000
15,000
(15,000)
(15,000) 15,000
15,000
11005 Councillors
408900 Property Tax Funded
City of P ic ke ring
2023
Approved Capital Budget
Total C11005.2305 Computer Equip City Coun. Ward 2
C11005.2306 Computer Equip City Coun. Ward 3
90 Expense
502730 HardwareReplacements
As per the Council Compensation & Communication Policy, these funds can
only be spent during the first 40 months of office .
80 Funding
408900 Property Tax Funded
Total C11005.2306 Compute'r Equip City Coun. Ward 3
Total 11005 Councillors
1 2
Run Date: Aug 9, 2023
Funding Expense
(15,000)
(15,000) 15,000
15,000
(15 ,000)
(15,000) 15,000
(90,000) 90,000
City of Pickering
2023
Approved Capital Budget Summary
Community Services Dept
Expenditures
502340 Building Rpr & Mntc
504001 Capital Consulting
504100 Capital Buildings
504200 Capital Machinery & Equipment
504300 Capital Vehicles
504950 Cap Furniture&Fix
Total Expenditures
,
Financing
402500 Federal Grants
402510 Ontario Grants
406704 OebtFinancing-20Year
408001 Trf fr Rplc-Cpa Res
408007 Trf fr RateStblz Res
408011 Trf fr Ounbrt Pl Res .
408012 Trf fr DonBeer A Res
408013 Trf fr PRC Core Res
408015 Trf fr PRC Arena Res
408016 Trf fr VhcleRplc Res
408026 Trf fr FacilitiesRes
408Ci29 Trf fr MinorBldg Res
408032 Trf fr Major Equip R
408037 Trf fr Casino Res
408502 Trf fr FGT Oblg RF
408505 Trf fr CBC Oblig RF
408606 Trf fr DC-P&R OB RF
408607 Trf fr OC-Libr OB RF
408700 Trf fr Comm Fae RF
408701 Trf fr Cap Works RF
408900 Property Tax Funded
Total Financing
13
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
239,000 518,000
30,000 918,200
3,365 ,000 15,374,500
200,000 -
32,000 -
25,000 720,000
3,891,000 17,530,700
(570,000) (12,500,000)
(426,000) -
-3,024,376
-(55,000)
(2,103,000) (2,754,000)
(20,000) -
-(120,000)
-(60,000)
(114,000) -
(22,000) -
-(160,000)
-(290 ,000)
-(157,000)
-(2,070,700)
(570,000) (1,447,000)
-(489,026)
-(4,422,248)
-4,577,898
-(366,000)
-(187,000)
(66,000) (55,000)
(3,891,000) (17,530,700)
Don Beer Arena
Expenditures
504100 Capital Buildings
Total Expenditures
Financing
408001 Trf fr Rplc-Cpa Res
408012 Trffr DonBeer A Res
408502 Trf fr FGT Oblg RF
408700 Trf fr Comm Fae RF
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
14
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-461,000
-461,000
-(55,000)
-(120,000)
-(143 ,000)
-(143,000)
-(461,000)
City of Pickering
2023
Approved Capital Budget
10215 Don Beer Arena
C10215 .2103 Rink 1 & 2 Refrigerati on Plant
01 Capital
504100 Capital Buildings
Construction costs for replacement of existing compressors . Existing
equipment was installed over various years , but is collectively nearing end of
life.
80 Funding
408502 Trf fr FGT Oblg RF
Total C10215.2103 Rink 1 & 2 Refrigeration Plant
C 10215 .2104 Security Camera Program
01 Capital
504100 Capital Buildings
Replace obsolete analog secu rity camera system components with modern
equipment. The analog equipment is at end of life .
80 Funding
408001 Trf fr Rplc-Cpa Res
Total C10215.2104 Security Camera Program
C10215 .2302 Rink 1 Skate Tile Replacement
01 Capital
504100 Capital Buildings
Lifecycle replacement of existing rubber flooring in and adjoining Rink #1 .
The existing flooring was installed in 2009 .
80 Funding
408700 Trf fr Comm Fae RF
Total C10215 .2302 Rink 1 Skate Tile Replacement
C10215.230 3 Rink 3 Structural Repairs
01 Capital
504100 Capital Buildings
Repairs to structural steel based on 2022 engineering review . Existing
splice bolts are corroded and need to be replaced with galvanized fasteners
in accordance structural engineering recomm endations.
80 Funding
408012 Trf fr Don Beer A Res
Total C10215.2303 Rink 3 Structural Repairs
Total 10215 Don Beer Arena
15
Run Date: Aug 9, 2023
Funding Expense
143,000
(143,000)
(143,000) 143 ,000
55 ,000
(55,000)
(55,000) 55,000
143,000
(143,000)
(143,000) 143 ,000
120,000
(120,000)
(120,000) 120,000
(461 ,000) 461,000
Community Centres
Expenditures
502340 Building Rpr & Mntc
504001 Capital Consulting
504100 Capital Buildings
Total Expenditures
Financing
402500 Federal Grants
406704 DebtFinancing-20Year
408007 Trf fr RateStblz Res
408029 Trf fr MinorBldg Res
408037 Trf fr Casino Res
408502 Trf fr FGT Oblg RF
408505 Trf fr CBC Oblig RF
408606 Trf fr DC-P&R OB RF
408607 Trf fr DC-Libr OB RF
408700 Trf fr Comm Fae RF
408900 Property Tax Funded
Total Financing
Abbreviations
City of Pickering
2023
Approved Capital Budget Summary
PHCC
GALCC
TCC
Pickering Heritage & Community Centre
George Ashe Library and Community Centre
Dr. Nelson F. Tomlinson Community Centre
16
Run Date: Aug 25, 2023
2022 2023
Approved Approved
Budget Budget
-138,000
30,000 420,000
222,000 11,178,000
252,000 11,736,000
-(12,500,000)
-3,024,376
(151,000) (902,000)
-(130,000)
-(330,000)
(60,000) (507,000)
-(489,026)
-(4,422,248)
-4,577,898
-(58,000)
(41,000) -
(252,000) (11,736,000)
City of Pickering
2023 Approved Capital Budget
Project Listing
10220 Community Centres
Project Name
10220 Community Centres
C10220.2011 PHCC -Construction
C10220 .2203 GALCC RTU 2 & C1 Replacement
C10220 .2214 Soccer Dome Upgrades
C10220.2301 GALCC Renovation
C10220 .2302 Northern Facilities -Drinking Water System Replacement
C10220.2303 TCC Septic System Upgrades
C10220 .2304 Greenwood Library Restoration
C10220 .2305 AHU #1 AC & RTU 2 Replacement
C 10220.2306 Roof Repairs
C10220 .2307 RTU 1 Replacement
Total 10220 Community Centres
17
Run Date: Aug 25, 2023
2023
Project
Budget
9,809,000
190,000
902,000
330,000
11,2,000
50,000
80,000
165,000
58,000
40,000
11,736,000
City of Pickering
2023
Approved Capital Budget
10220 Community Centres
C10220.2011 PHCC -Constru cti o n
01 Capital
504100 Capital Buildings
Additional project funding and change in financing to reflect increased
senior government grant funding fo r the construction of Pickering Heritage &
Community Centre (PHCC). The total PHCC project budget is $40 million.
80 Funding
402500 Federal Grants
406704 DebtFinancing-20Year
408505 Trf fr CBC Oblig RF
408606 Trf fr DC-P&R OB RF
408607 Trf fr DC-Libr OB RF
Total C10220.2011 PHCC -Construction
C 10220.2203 GALCC RTU 2 & C 1 Replacement
01 Capital
504100 Capital Buildings
Construction costs for lifecycle replacement of seniors room air conditioning
un it and controls at the George Ashe Library and Community Centre. The
equipment is original , installed in 2000 .
80 Fund ing
408502 Trf fr FGT Oblg RF
Total C10220 .2203 GALCC RTU 2 & C1 Replacement
C 10220 .221 4 Soccer Dome Upgrades
01 Capital
504100 Capital Buildings
Upgrades (construction of four pickle ball courts and minor facility
improvements) to indoor soccer dome (Council Resolution #972/22).
80 Funding
408007 Trf fr RateStblz Res
Total C10220.2214 Soccer Dome Upgrades
C10220 .2301 GALCC Renovation
01 Capital
504001 Capital Consulting
Design and related costs for renovations to Geo rge Ashe Library &
Community Centre (GALCC), including parking lot resurfacing, converting
indoor and outdoor lighting to LED, driveway alterat ions to Highway 2
entrance to address road widening by Durham Region and various
age-related interior retrofits . GALCC originally opened in 2001 . Library
share of project costs and funding is listed separately in cost centre 10900.
18
Run Date: Aug 25, 2023
Funding Expense
9,809,000
(12,500,000)
3,024,376
(489,026)
(4,422,248)
4,577,898
(9,809,000) 9,809 ,000
190,000
(190,000)
(190,000) 190,000
902,000
(902,000)
(902,000) 902,000
330,000
City of Pickering
2023
Approved Capital Budget
10220 Community Centres
80 Funding
408037 Trf fr Casino Res
Total C10220.2301 GALCC Renovation
C10220.2302 Northern Facilitie s -Drinking Water System Replacement
01 Capital
504100 Capital Buildings
Lifecycle replacement of drinking water treatment systems at northern
community centres , including : Brougham Hall CC, Whitevale CC , Nelson F.
Tomlinson CC, Whitevale Arts and Culture Centre, Mt. Zion CC , Greenwood
CC and Greenwood Library .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10220.2302 Northern Facilities -Drinking Water System Replacemen1
C10220.2 303 TCC Septic System Upgrades
01 Capital
504001 Capital Consulting
Investigation and design to upgrade existing septic system at Tomlinson
Community Centre and Fire Station #4 . The existing system is original ,
installed in 1997 .
80 Funding
408029 Trf fr MinorBldg Res
Total C10220.2303 TCC Septic System Upgrades
C10220.2304 Greenwood Library Restoration
90 Expense
502340 Building Rpr & Mntc
Localized repairs and restoration to the overall building .
80 Funding
408029 Trf fr MinorBldg Res
Total C10220.2304 Greenwood Library Restoration
C10220.2305 AHU #1 AC & RTU 2 Repla cement
01 Capital
504100 Capital Buildings
Lifecycle replacement of the AHU-1 (Air handling unit) condenser, serving
the seniors room and HVAC (Heating , ventilation and air conditioning) unit
RTU-2 (Roof top unit) serving the Millennium room. The existing AHU -1
condenser was installed in 2013 , and RTU-2 was installed in 1998 .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10220 .2305 AHU #1 AC & RTU 2 Replacement
19
Run Date: Aug 25, 2023
Funding Expense
(330,000)
(330,000) 330,000
112,000
(112,000)
(112,000) 112,000
50,000
(50,000)
(50,000) 50,000
80,000
(80,000)
(80,000) 80,000
165,000
(165 ,000)
(165,000) 165,000
10220 Community Centres
C10220.2306 Roof Repairs
90 Expense
502340 Building Rpr & Mntc
City of P icke ring
2023
Approved Capital Budget
Immed iate re pai rs and design for lifecycle re placement of existing flat roofs
over the main mechani cal room (roof 5) and adjacent storage areas (roof 6).
The existing roofs were installed in 1997 and 1999 .
80 Funding
408700 Trf fr Comm Fae RF
Total C10220.2306 Roof Repairs
C1 0220 .2 307 RT U 1 Re placem ent
01 Capital
504001 Capita l Consulting
Lifecycle replacement of HVAC (Heating , ventilation and air conditioning)
unit RTU -1 (Rooftop unit) serving the Lawn Bowling Shed. The existing unit
was installed in 2004. Design and related costs only .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10220.2307 RTU 1 Replacement
Total 10220 C ommunity Centres
20
Run Date: Aug 25, 2023
Funding Expense
58,000
(58,000)
(58,000) 58,000
40,000
(40,000)
(40,000) 40,000
(11 ,736 ,000) 11 ,736 ,000
City of Pickering
2023
Approved Capital Budget Summary
Rec. Complex -Central Core
Expenditures
504001 Capital Consulting
504100 Capital Buildings
504200 Capital Machinery & Equipment
Total Expenditures
Financing
402510 Ontario Grants
408007 Trf fr RateStblz Res
408013 Trf fr PRC Core Res
408037 Trf fr Casino Res
408502 Trf fr FGT Oblg RF
408700 Trf fr Comm Fae RF
Total Financing
21
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-110,000
576,000 198,000
200,000 -
776,000 308,000
(188 ,000) -
(438,000) -
-(60,000)
-(83,000)
(150,000) -
-(165,000)
(776,000) (308,000)
C ity of P ic ker ing
2023
Approved Capital Budget
10225 Rec. Complex -Central Core
C10225 .21 04 Secu r it y Ca mera Pro gram
01 Capital
504100 Capital Buildings
Installation of new security cameras in the Banquet Hall and along the east
side of the fa ci lity to supplement existing cov erage .
80 Funding
4Q8037 Trf fr Casino Res
Total C10225.2104 Security Camera Program
C 10225 .230 2 El evato r Retrofit
01 Capital
504100 Capital Buildings
Upgrade finishes and accessibility features in the existing lobby elevator to
comply with current standards . $33 ,000 relates to Accessib ility .
80 Funding
408700 Trf fr Comm Fae RF
Total C10225.2302 Elevator Retrofit
C10225 .2304 Family Change Room Ren ovation
01 Capital
504001 Capital Consulting
Design for renovation of existing family change room to match the newly
renovated change rooms .
80 Funding
408013 Trf fr PRC Core Res
Total C10225.2304 Family Cha,nge Room Renovation
C10225 .2307 Life Safety Upgrades
Of Capital
504001 Capital Consulting
Various life safety upgrades , including sprinklers , fire separations , fi re alarm
and related building system and component upgrades . Design and related
costs only.
80 Funding
408037 Trf fr Casino Res
Total C10225.2307 Life Safety Upgrades
Total 10225 Rec . Complex -Central Core
22
Run Date: Aug 9, 2023
Funding Expense
33 ,000
(33,000)
(33,000) 33,000
165,000
(165 ,000)
(165,000) 165,000
60,000
(60,000)
(60,000) 60,000
50,000
(50,000)
(50 ,000) 50,000
(30 8,000) 30 8 ,000
Rec. Complex -Pool
Expenditures
504100 Capital Bu ildings
Total Expenditures
Financing
40251 O Ontario Grants
408007 Trf fr RateStblz Res
408032 Trf fr Major Equip R
408502 Trf fr FGT Oblg RF
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
-
23
Run Dat e: Aug 9 , 202 3
2022 2023
Approved Approved
Budget Budget
77 ,000 598 ,000
77,000 598,000
(52 ,000) -
(25 ,000) -
-(65,000)
-(533,000)
(77,000) (598,000)
10230 Rec. Complex -Pool
City of Pickering
2023
Approved Capital Budget
C10230.2001 Pool Dehumidification Upgrades
01 Capital
504100 Capital Buildings
Additional funds to upgrade existing HVAC piping, heating and cooling
capacity to increase dehumidification capacity required for climate resiliency
and occupant comfort .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10230.2001 Pool Dehumidification Upgrades
C10230.2301 Family Change Room RTU Replacement
01 Capital
504100 Capital Buildings
Lifecycle replacement of existing roof top unit serving family change rooms .
The unit was installed in 2002 .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10230.2301 Family Change Room RTU Replacement
C10230.2303 Pool Chair Lift Replacement
01 Capital
504100 Capital Buildings
Lifecycle replacement of chair lift required to provide accessibility entry and
exit.
80 Funding
408032 Trf fr Major Equip R
Total C10230.2303 Pool Chair Lift Replacement
Total 10230 Rec. Complex -Pool
24
Run Date: Aug 9, 2023
Funding Expense
450,000
(450,000)
(450,000) 450,000
83,000
(83,000)
(83,000) 83,000
65,000
(65,000)
(65,000) 65,000
(598,000) 598,000
Rec Complex -Arenas
Expenditures
502340 Building Rpr & Mntc
504100 Capital Buildings
Total Expenditures
Financing
402510 Ontario Grants
408007 Trf fr RateStblz Res
408015 Trf fr PRC Arena Res
408026 Trf fr FacilitiesRes
408037 Trf fr Casino Res
408502 Trf fr FGT Oblg RF
408900 Property Ta x Funded
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
25
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-55,000
320,000 532 ,000
320,000 587,000
(146,000) -
-(250,000)
(114,000) -
-(160,000)
-(122,000)
(60,000) -
-(55,000)
(320,000) (587,000)
Project Name
10235 Rec Complex -Arenas
City of Pickering
2023 Approved Capital Budget
Project Listing
C10235.2004 Sealant and Mortar Replacement
C10235.2301 Arena Desiccant Dehumidifier Replacement
C10235.2303 O'Brien Gutter Replacement
C10235.2304 Condenser Pad and Tank Replacement
C10235.2306 Gas Monitor Sensor System Replacement
Total 10235 Rec Complex -Arenas
26
Run Date: Aug 9, 2023
2023
Project
1;3udget
55,000
250,000
160,000
88,000
34,000
587,000
10235 Rec Complex -Arenas
City of Pickering
2023
Approved Capital Budget
C10235.2004 Sealant and Mortar Replacement
90 Expense
502340 Building Rpr & Mntc
Next phase of sealant and mortar replacement around CHDRC arenas.
Remaining sealants and mortar to be replaced are original, installed in
1992 .
80 Funding
408900 Property Tax Funded
Total C10235.2004 Sealant and fVlortar Replacement
C10235.2301 Arena Desiccant Dehumidifier Replacement
01 Capital
504100 Capital Buildings
Replacement of critical components for the desiccant systems connected to
the Delaney and O'Brien arenas. The system is essential to maintaining
humidity control in both arenas and it failed in late 2022 . Repairs need to be
completed immediately in order to avoid possible loss of ice when outdoor
temperatures begin to rise.
80 Funding
408007 Trf fr RateStblz Res
Total C10235.2301 Arena Desiccant Dehumidifier Replacement
C10235.2303 O'Brien Gutter Replacement
01 Capital
504100 Capital Buildings
Replacement of existing roof gutters on the north and south side of O'Brien
arena, including tie-in to surrounding walls and roofs . This work is required
to extend the overall life of the roof, originally installed in 1992 .
80 Funding
408026 Trf fr FacilitiesRes
Total C10235.2303 O'Brien Gutter Replacement
C10235.2304 Condenser Pad and Tank Replacement
01 Capital
504100 Capital Buildings
Lifecycle replacement of the existing condenser tank and supporting
concrete pad. The existing equipment is original, installed in 1983 .
80 Funding
408037 Trf fr Casino Res
Total C10235.2304 Condenser Pad and Tank Replacement
C10235.2306 Gas Monitor Sensor System Replacement
01 Capital
27
Run Date: Aug 9, 2023
Funding Expense
55,000
(55,000)
(55,000) 55,000
250,000
(250,000)
(250,000) 250,000
160,000
(160,000)
(160,000) 160,000
88,000
(88,000)
(88,000) 88,000
10235 Rec Complex -Arenas
504100 Capital Buildings
City of Pickering
2023
Approved Capital Budget
Lifecycle replacement of existing gas monitoring sensors . This is essential
life safety equipment.
80 Funding
408037 Trf fr Casino Res
Total C10235.2306 Gas Monitor Sensor System Replacement
Total 10235 Rec Complex -Arenas
28
Run Date: Aug 9, 2023
Funding Expense
34,000
(34,000)
(34,000) 34,000
(587 ,000 ) 587 ,000
Civic Complex
Expenditures
504001 Capital Consulting
504100 Capital Buildings
504950 Cap Furniture&Fix
Total Expenditures
Financing
408007 Trf fr RateStblz Res
408032 Trf fr Major Equip R
408037 Trf fr Cas ino Res
408502 Trf fr FGT Oblg RF
408701 Trf fr Cap Works RF
408900 Property Tax Funded
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
29
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-388,200
1,300,000 2,081,000
25,000 720,000
1,325,000 3,189,200
(1 ,000,000) (1,437,000)
-(92,000)
-(1,473,200)
(300,000) -
-(187,000)
(25,000) -
(1,325,000) (3,189,200)
City of Pickering
2023 Approved Capital Budget
Project Listing
Project Name
10240 Civic Complex
C 10240.1901 Generator Replacement
C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retrofits
C10240.2301 Audio-Visual, Sound System, Security, and Privacy Upgrade
C10240.2302 Council Chamber Renovation
C10240.2303 Low Pressure Steam Boilers Replacement
C10240.2304 Server Room A/C Upgrades
C10240.2305 Parking Garage Sprinkler System Replacement
C10240.2306 Server Room FM200 System Replacement
C10240.2307 Satellite Office Leasehold Improvements
C10240.2308 Mechanical Heating Pumps Replacement
Total 10240 Civic Complex
30
Run Date: Aug 9, 2023
2023
Project
Budget
92,000
720,000
365,000
250,000
187,000
187,000
46,200
77,000
1,100,000
165,000
3,189,200
City of Pickering
2023
Approved Capital Budget
10240 Civic Complex
C10240.1901 Generator Replacement
01 Capital
504001 Capital Consulting
Additional funding for design and planning work for the replacement of the
existing backup power generator and related systems. Includes increasing
the capacity of the existing equipment and expand ing backup power
coverage throughout the Civic Complex. This project updates and
supplements project C10240 .1901 .
80 Funding
408032 Trf fr Major Equip R
Total C10240.1901 Generator Replacement
C10240.2006 Workstations, Partitions, Tables, Shelving, Space Use Retrofits
01 Capital
504950 Cap Furniture&Fix
Replacement of original and worn furniture , some over 25 years old . Spare
parts are no longer available as original furniture manufacturer is no longer
in business. Includes replacement of existing furniture in poor repair and
other space-use related costs . Also includes furniture, fixture and equipment
costs for satellite office spaces .
80 Funding
408007 Trf fr RateStblz Res
Total C10240.2006 Workstations, Partitions, Tables, Shelving , Space Use Re ·
C10240 .2301 Audio-Visual, Sound System, Security, and Privacy Upgrade
01 Capital
504100 Capital Buildings
Audio-Visual, sound system , security, and privacy upgrades for Council
meeting spaces which includes Council Chambers and Main Committee
Room .
80 Funding
408007 Trf fr RateStblz Res
Total C10240.2301 Audio-Visual, Sound System, Security, and Privacy Upgra
C10240.2302 Council Chamber Renovation
01 Capital
504001 Capital Consulting
Interior renovations to the Council Chamber, including accessibility,
audio-visual systems and finish improvements , plus building in allowance for
the future expansion of the size of Council. Design and related costs only.
80 Funding
408037 Trf fr Casino Res
31
Run Date: Aug 9, 2023
Funding Expense
92,000
(92,000)
(92,000) 92,000
720 ,000
(720,000)
(720,000) · 720,000
365,000
(365,000)
(365,000) 365,000
250,000
(250,000)
10240 Civic Complex
C i ty of Pickering
2023
Approved Capital Budget
Total C10240.2302 Council Chamber Renovation
C10 240.230 3 Low Pres sure Steam B oi lers Rep lac ement
01 Capital
504100 Capital Buildings
Lifecycle replacement of ex isting steam boilers installed in 2009 .
80 Funding
408701 Trf fr Cap Works RF
Total C10240.2303 Low Pressure Steam Boilers Replacement
C10240.230 4 Server Ro o m A/C Upgrades
01 Capital
504100 Capital Buildings
Lifecycle replacement of existing rooftop air conditioning units, access
flooring distribution plenum and other related systems .
80 Funding
408007 Trf fr RateStblz Res
Total C10240.2304 Server Room A/C Upgrades
C 10240.2305 Parking Garage Sprinkler Sys tem Replacement
01 Capital
504001 Capital Consulting
Lifecycle replacement of sprinkler system components in the underground
parking garage. The existing system is original and was installed in 1990 .
Design and related costs only .
80 Funding
408037 Trf fr Casino Res
Total C10240.2305 Parking Garage Sprinkler System Replacement
C10240 .2306 Server Room FM200 System Re p lacement
01 Capital
504100 Capital Buildings
Lifecycle replacement of the existing main server room fire suppression
systems and related controls .
80 Funding
408037 Trf fr Casino Res
Total C10240.2306 Server Room FM200 System Replacement
C10240 .2307 Satellite Office Leasehold Improvements
01 Capital
504100 Capital Buildings
32
Run Date : Aug 9, 2023
Funding Expense
(250,000) 250,000
187,000
(187,000)
(187 ,000) 187,000
187,000
(187 ,000)
(187,000) 187,000
46,200
(46,200)
(46,200) 46,200
77,000
(77,000)
(77,000) 77,000
1,100,000
10240 Civic Complex
City of Pickering
2023
Approved Capital Budget
Pre-occupancy renovations and leasehold improvements for a location to be
determ ined as a future satellite facility to address the ongoing staff office
space constraints at City Hall.
80 Funding
408037 Trf fr Casino Res
Total C10240.2307 Satellite Office Leasehold Improvements
C10240.2 308 Me ch an ic al Heating Pumps Replacement
01 Capital
504100 Capital Buildings
Lifecycle replacements of four existing mechanical heating pumps originally
installed in 1990.
80 Funding
408007 Trf fr RateStblz Res
Total C10240.2308 Mechanical Heating Pumps Replacement
Total 10240 Civic Complex
33
Run Date : Aug 9, 2023
Funding Expense
(1,100,000)
(1,100,000) 1,100,000
165,000
(165,000)
(165,000) 165,000
(3,189,200) 3,1 89,200
Museum
Expenditures
502340 Building Rpr & Mntc
504100 Capital Buildings
504300 Capital Vehicles
Total Expenditures
Financing
402500 Federal Grants
402510 Ontario Grants
408007 Trf fr RateStblz Res
408016 Trf fr VhcleRplc Res
408029 Trf fr MinorBldg Res
408037 Trf fr Casino Res
408502 Trf fr FGT Oblg RF
Total Financing
City of P ickering
2023
Approved Capital Budget Summary
34
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
239,000 325,000
700,000 326,500
32,000 -
971,000 651,500
(570,000) -
(40,000) -
(339,000) (165,000)
(22,000) -
-(160 ,000)
-(62 ,500)
-(264,000)
(971,000) (651,500)
City of Pickering
2023 Approved Capital Budget
Project Listing
Run Date: Aug 9, 2023
Project Name
10250 Museum
C10250.1701
C10250.2205
C10250.2301
C10250.2303
C10250.2304
New Security Cameras
Log Barn & House Restoration
Brougham Temperance House Restoration
Rooftop Solar Panel System (Conservation Building) -Design & Construction
Miller Cole House Restoration
Total 10250 Museum
35
2023
Project
Budget
62,500
165,000
80,000
264,000
80,000
651,500
City of Pickering
2023
Approved Capital Budget
10250 Museum
C10250.1701 New Security Cameras
01 Capital
504100 Capital Buildings
Additional funds to expand security camera coverage to include upper site
storage shed used for heritage artifact storage and Combination barn on the
lowe r site . Includes cabling and related equipment costs.
80 Funding
408037 Trf fr Casino Res
Total C10250.1701 New Security Cameras
C 10250.2205 Log Barn & House Rest orati on
90 Expense
502340 Building Rpr & Mntc
Addit ional funding required to address special ized structural repairs to
heritage log bu ildings. The total project cost is $339,000 .
80 Funding
408007 Trf fr RateStblz Res
Total C10250.2205 Log Barn & House Restoration
C10250 .2301 Brougham Temperance Hou se Re storation
90 Expense
502340 Building Rpr & Mntc
Design costs for various restoration work including: structural, ramp and
porch repairs, roofing and cladding replacement, interior framing and finish
work at the Brougham Tempe rance House (buill-1835), including
restoration of existing wood frame window and doors.
80 Funding
408029 Trf fr MinorBldg Res
Total C10250.2301 Brougham Temperance House Restoration
C10250 .2303 Rooftop Solar Panel System (Conservation Building) -Design & C
01 Capital
504100 Capital Buildings
Design and construction costs for the installation of rooftop photovoltaic
panels (PV). Provision for future installation of PV was incorporated into the
recent retrofit of the Conservation Building .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10250.2303 Rooftop Solar Panel System (Conservation Building) -De!
C10250.2304 Miller Cole House Restoration
90 Expense
502340 Building Rpr & Mntc
36
Run Date : Aug 9, 2023
Funding Expense
62,500
(62 ,500)
(62,500) 62,500
165,000
(165,000)
(165,000) 165,000
80,000
(80,000)
(80,000) 80,000
264,000
(264,000)
(264,000) 264,000
80,000
10250 Museum
City of Pickering
2023
Approved Capital Budget
Design only -Full cladding; trim and roof replacement ; repairs to structural
framing; interior restoration; painting . Built in 1840 . Existing materials to be
conserved, wherever possible.
80 Funding
408029 Trf fr MinorBldg Res
Total C10250.2304 Miller Cole House Restoration
Total 10250 Museum
37
Run Date : Aug 9, 2023
Funding Expense
(80 ,000)
(80,000) 80,000
.(651,500) 651,500
City of Pickering
2023
Approved Capital Budget Summary
Operations Dept
Expenditures
502760 Other Fixed Assets
504001 Capital Consulting
504100 Capital Buildings
504200 Capital Machinery & Equipment
504300 Capital Vehicles
504700 Capital Parks
Total Expenditures
Financing
402500 Federal Grants
406500 Donations
406703 DebtFinancing-15Year
4067 41 DC -DebtFinancing-5YR
408007 Trffr RateStblz Res
408008 Trf fr DC City's Res
408016 Trf fr VhcleRplc Res
408024 Trffr Sustnlntli Res
408028 Trf fr Fence Res
408031 Trf fr Tennis Res
408032 Trf fr Major Equip R
408037 Trf fr Casino Res
408040 Trf fr Cherrywood Res
408501 Trf fr PrklndOblg RF
408502 Trf fr FGT Oblg RF
408603 Trf fr DC-0th Hwy ORF
408606 Trf fr DC -P&R OB RF
408705 Trf fr OPs Cntr RF
408710 Trf fr Seaton FIA RF
408900 Property Tax Funded
Total Financing
38
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
180,000 200,000
-163,000
-2 ,516,500
1,247,000 2,655,000
3,456,500 5,396 ,300
6,037,764 7,552,568
10,921,264 18,483,368
(90,500) (42,000)
(27,500) (27,500)
(1,200,000) (2,000,000)
-(1 ,235,000)
(1 ,140,322) -
(425,000) (354,175)
(1,269,000) (1,727,700)
-(119,000)
(180,000) (200 ,000)
(135,000) (588,500)
(687,000) (2,000,000)
-(1,752,000)
-(45,000)
(1,907,942) (718,000)
(150,000) (1,403,000)
(1,340 ,000) (256,100)
(2,222,900) (3,800 ,939)
-(2,408,500)
(46 ,100) 194,046
(100,000) -
(10,921,264) (18,483,368)
Public Works Admin.
Expenditures
504001 Capital Consulting
504100 Capital Buildings
Total Expenditures
Financing
408024 Trf fr Sustnlntv Res
408705 Trf fr OPs Cntr RF
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
39
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-38,000
-2,432,500
-2,470,500
-(77,000)
-(2,393,500)
-· (2,470,500)
Project Name
10300 Public Works Admin.
C10300.1801 New Security Cameras
C10300.2302 EV Charging Stations
City of Pickering
2023 Approved Capital Budget
Project Listing
C10300.2305 Overhead Door Upgrades
C10300.2306 Rooftop Solar Panel System
C10300.2307 Vehicle Storage Shed
Total 10300 Public Works Admin.
40
Run Date: Aug 9, 2023
2023
Project
Budget
27,500
77,000
68,000
38,000
2,260,000
2,470,500
City of Pickering
2023
Approved Capital Budget
10300 Public Works Admin.
C10300.1801 New Security Cameras
01 Capital
504100 Capital Buildings
Additional cameras in vehicle storage bay .
80 Funding
408705 Trf fr OPs Cntr RF
Total C10300.1801 New Security Cameras
C10300.2302 EV Charging Stations
01 Capital
504100 Capital Buildings
Installation of EV Charg ing Stations at the Operations Centre to
accommodate electric fleet vehicles . Provision for the future equipment was
included in the original construction of the facility .
80 Funding
408024 Trf fr Sustnlntv Res
Total C10300.2302 EV Charging Stations
C10300.2305 Overhead Door Upgrades
01 Capital
504100 Capital Buildings
Replace door sensor and chains on 17 stacking overhead doors .
80 Funding
408705 Trf fr OPs Cntr RF
Total C10300 .2305 Overhead Door Upgrades
C10300.2306 Rooftop Solar Panel System
01 Capital
504001 Capital Consulting
Design and relat ed costs for the installation of rooftop photovoltaic panels .
Provision for future installation of solar panels was incorporated into the
original design of the Operations Centre.
80 Funding
408705 Trf fr OPs Cntr RF
Total C10300 .2306 Rooftop Solar Panel System
C10300 .2307 Vehicle Storage Shed
01 Capital
504100 Capital Buildings
Design and construction of a new vehicle storage bay to include 4 heated
bays and 6 partially enclosed bays . Required to accommod ate growth and
maintain levels of serv ice in the Seaton Community.
80 Funding
41
Run Date : Aug 9, 2023
Funding Expense
27,500
(27,500)
(27,500) 27,500
77,000
(77,000)
(77,000) 77,000
68,000
(68,000)
(68,000) 68,000
38,000
(38 ,000)
(38,000) 38,000
2,260,000
City of Pickering
2023
Approved Capital Budget Summary
Property Maintenance
Expenditures
502760 Other Fixed Assets
504200 Capital Machinery & Equipment
504700 Capital Parks
Total Expenditures
Financing
4067 41 DC -DebtFinancing-5YR
408028 Trf fr Fence Res
408032 Trf fr Major Equip R
40850 1 Trf fr PrklndOblg RF
408606 Trf fr DC -P&R OB RF
Total Financing
43
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
120,000 200,000
410 ,000 435 ,000
50 ,000 -
580,000 635,000
-(175,000)
(120,000) (200,000)
(410 ,000) (120,000)
(50 ,000) -
-(140 ,000)
(580,000) (635,000)
City of Pickering
2023
Approved Capital Budget
10305 Property Maintenance
C10305.1505 Property Line Fence Replacement
90 Expense
502760 Other Fixed Assets
Replacement of property line fences along City road allowances at various
locations.
80 Funding
408028 Trf fr Fence Res
Total C10305.1505 Property Line Fence Replacement
C10305.2305 Sidewalk Plow with Attachments• New
01 Capital
504200 Capital Machinery & Equipment
Sidewalk Plow with attachments -New
80 Funding
406741 DC-DebtFinancing-5YR
Total C10305.2305 Sidewalk Plow with Attachments -New
C10305.2306 Wide Area Mower -New
01 Capital
504200 Capital Machinery & Equipment
Wide Area Mower -New
80 Funding
408606 Trf fr DC-P&R OB RF
Total C10305.2306 Wide Area Mower -New
C10305.2307 Zero Turn Mower Replacement (4)
01 Capital
504200 Capital Machinery & Equipment
Gas , Electric, or Hybrid Zero Turn Mowers -replacement units #S512 ,
#S513, #S514, and #S515 (2017).
80 Funding
408032 Trf fr Major Equip R
Total C10305.2307 Zero Turn Mower Replacement (4)
Total 10305 Property Maintenance
44
Run Date: Aug 9, 2023
Funding Expense
200,000
(200,000)
(200,000) 200,000
175,000
(175,000)
(175,000) 175,000
140,000
(140,000)
(140,000) 140,000
120,000
(120,000)
(120,000) 120,000
(635,000) 635,000
City of Pickering
2023
Approved Capital Budget Summary
Fleet Services
Expenditures
504200 Capital Machinery & Equipment
504300 Capital Vehicles
Total Expenditures
Financing
406500 Donations
406703 DebtFinancing -15Year
4067 41 DC-DebtFinancing -5YR
408016 T rf fr VhcleRplc Res
408032 Trf fr Major Equip R
408040 Trf fr Cherrywood Res
408603 Trf fr DC-0th Hwy ORF
408606 Trf fr DC-P&R OB RF
408705 Trf fr OPs Cntr RF
408710 Trf fr Seaton FIA RF
Total Financing
45
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
246 ,000 300 ,000
3,456,500 . 5,396 ,300
3,702,500 5,696,300
(27,500) (27 ,500)
(1 ,200,000) (2,000,000)
-(1,060,000)
(1 ,135,000) (1 ,727,700)
-(35,000)
-(45,000)
(1 ,340 ,000) (256,100)
-(460,000)
-(15,000)
-(70 ,000)
(3,702 ,500) (5,696,300)
.,1:::,, ......
New or
Replacement
Replacement
Replacement
Replacemeht
Replacement
Replacement
Replacement
Replacement
Replacement
Replacement
Replacement
Replacement
Replacement
New
New
New
New
New
New
New
New
New
New
New
New
Total
2023 Approved Vehicle Acquisition List (New & Replacement)
Description of Plans for Vehicle Expected Vehicle Vehicle Requested Existing Vehicle: Costs Primary User being Replacement
Year, Make, Unit# Replaced Reserve
4 Ton Dump Truck with Snow Plow and Winq 2013 International , #41 $420 ,000 Roads Equipment Sale $420,000
Garbaqe Packer with . Crane 2017 Ford, #733 330,000 Parks Sale 330,000
1/2 Ton Pickup Truck 2016 Dodge, #720 65,000 Parks Sale 65,000
Carqo Van 2016 Ford, #735 65,000 Parks Sale 65,000
1 Ton Dump Truck with Tailqate Lift 2016 Dodqe Ram, #747 110,000 Parks Sale 110,000
2016 Jeep Patriots , #418 &
Midsize SUV (2) #419 100 ,000 By-Law Sale 100,000
1/2 Ton Pickup Truck 2017 Dodge Ram, #420 65,000 By-Law Sale 65,000
1/2 Ton Pickup Truck 2016 Dodqe, #644 70,000 Engineering -Adm in Sale 70,000
Midsize SUV (2) 2017 Jeeps, #647 & 2015 90,000 Water Resources & Sale 90,000
Chevrolet, #643 Development Services
Pumper Rescue 2011 Smeal, #542 2,000,000 Fire Services Sale
Midsize SUV (5) 2016 Jeep Patriots, #578, 225,000 Fire Services Sale 225,000
579,580,581 ,582
1/2 Ton Pickup Truck (2) 2015 GMC, #583 & #584 130,000 Fire Services Sale 130,000
Electric Vehicle N/A 70 ,000 Build ing Services
Mid Size SUV N/A 45,000 Cherrywood Development
Small Electric or Gas Powered Utility Vehicle N/A 35 ,000 Museum
4 Ton Dump Truck with Snow Plow and Wing
and Brine Tank N/A 420,000 Roads Equipment
1 Ton Truck with Aluminum Dump Body & N/A 110 ,000 Roads Equipment
Tailqate Lift
1/2 Ton Pickup Truck N/A 27,500 Roads Equipment
4 Ton Dump Truck with Snow Plow and Wing N/A 420 ,000 Roads Equipment
1 Ton Dump Truck with Tailgate Lift N/A 110,000 Roads Equipment
1/2 Ton Pick-up Truck N/A 65,000 Parks
3/4 Ton Pickup Truck with Slide-in Salter and N/A 100,000 Parks
Plow
3/4 Ton Pick-up Truck N/A 75 ,000 Parks
1 Ton Dump Truck with Tailgate Lift (2) N/A 220,000 Parks
32 $5,367,500 $1,670,000
other
Funding
Source
$0
0
0
0
0
0
0
0
0
2,000 ,000
0
0
70,000
45,000
35,000
420 ,000
110,000
27,500
420,000
110,000
65,000
100,000
75,000
220,000
$3,697,500
City of Pickering
2023
Approved Capital Budget
10310 Fleet Services
C10110.2301 Electric Vehicle -New
01 Capital
504300 Capital Vehicles
Electric Vehicle New (Building Services).
80 Funding
408710 Trf fr Seaton FIA RF
Total C10110.2301 Electric Vehicle -New
C10 250.2306 Small Electric or Gas Powered Utility Vehicle -New
01 Capital
504300 Capital Vehicles
Small Electric or Gas Powered Utility Vehicle -New (Museum).
80 Funding
408032 Trf fr Major Equip R
Total C10250.2306 Small Electric or Gas Powered Utility Vehicle -New
C10300.2308 Vehicle Hoist -New
01 Capital
504300 Capital Vehicles
Hoist for the Municipal Garage -New (Public Works Admin).
80 Funding
408705 Trf fr OPs Cntr RF
Total C10300.2308 Vehicle Hoist -New
C10315.2205 4 Ton Dump Truck with Snow Plow & Wing -New
01 Capital
504300 Capital Vehicles
Additional funding to purchase one 4 Ton Dump Truck with Snow Plow &
Wing -New (Roads Equipment).
80 Funding
408603 Trf fr DC-0th Hwy ORF
Total C10315.2205 4 Ton Dump Truck with Snow Plow & Wing -New
C10315.2206 1/2 Ton Pickup Truck -New
01 Capital
504300 Capital Vehicles
1/2 Ton Pickup Truck for new Utility Cut Inspe ctor (funded by Third Party -
year 2 of 2) -New (Roads Equipment).
80 Funding
406500 Donations
Total C10315.2206 1/2 Ton Pickup Truck -New
C10315 .2220 4 To n Dump Truck with Snow Pl ow & Wing -Replacement
49
Run Date: Aug 30, 2023
Funding Expense
70,000
(70,000)
(70,000) 70,000
35,000
(35,000)
(35,000) 35,000
15,000
(15,000)
(15,000) 15,000
57,700
(57,700)
(57,700) 57,700
27,500
(27,500)
(27,500) 27,500
10310 Fleet Services
01 Capital
504300 Capital Vehicles
C ity of P ic kering
2023
Approved Capital Budget
Additional funding to purchase one 4 Ton Dump Truck with Snow Plow-
replace unit #042 (2013 International) (Roads Equipment).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10315.2220 4 Ton Dump Truck with Snow Plow & Wing -Replacemen
C10315.2222 5 Ton Dump Truck with Snow Plow & Wing -New
01 Capital
504300 Capital Vehicles
Additional funding to purchase one 5 Ton Dump Truck with Snow Plow &
Wing -New (Roads Equipment).
80 Funding
408603 Trf fr DC-othHwy ORF
Total C10315 .2222 5 Ton Dump Truck with Snow Plow & Wing -New
C10315 .2223 4 Ton Dump Truck with Snow Plow , Wing & Brine Tank -New (2 )
01 Capital
504300 Capital Vehicles
Additional funding to purchase two 4 Ton Dump Truck with Snow Plow, Wing
& Brine Tank -New (2) (Roads Equipment).
80 Funding
408603 Trf fr DC-othHwy ORF
Total C10315.2223 4 Ton Dump Truck with Snow Plow, Wing & Brine Tank - I
C10315 .2302 4 Ton Dump Truck with Snow Plow a nd Wing -Replacement
01 Capital
504300 Capital Vehicles
4 Ton Dump Truck with Snow Plow and Wing -replace unit #41 (2014
International) (Roads Equipment).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10315.2302 4 Ton Dump Truck with Snow Plow and Wing -Replacem1
C10315 .2303 4 Ton Dump Truck with Snow Plow and Wing a nd Brine Tank -N1
01 Capital
504300 Capital Vehicles
4 Ton Dump Truck with Snow Plow and Wing and Brine Tank-New (Roads
Equipment)
80 Funding
406741 DC-DebtFinancing-5YR
50
Run Date : Aug 30, 2023
Funding Expense
57,700
(57,700)
(57,700) 57,700
54,000
(54,000)
(54,000) 54,000
144,400
(144,400)
(144,400) 144,400
420,000
(420 ,000)
(420,000) 420,000
420,000
(420,000)
10310 Fleet Services
C ity of P ic ke r ing
2023
Approved Capital Budget
Total C10315.2303 4 Ton Dump Truck with Snow Plow and Wing and Brine T
C10315.2306 1 Ton Truck with Aluminum Dump Body & Tailgate Lift-New
01 Capital
504300 Capital Vehicles
1 Ton Truck with Aluminum Dump Body & Tailgate Lift -New (Roads
Equipment).
80 Funding
406741 DC-DebtFinancing-5YR
Total C10315.2306 1 Ton Truck with Aluminum Dump Body & Tailgate Lift -fl
C10315.2311 4 Ton Dump Truck with Snow Plow and Wing -New
01 Capital
504300 Capital Vehicles
4 Ton Dump Truck with Snow Plow and Wing -New (Roads Equipment).
80 Funding
406741 DC-DebtFinancing-5YR
Total C10315.2311 4 Ton Dump Truck with Snow Plow and Wing -New
C10315.2312 1 Ton Dump Truck with Tailgate Lift -New
01 Capital
504300 Capital Vehicles
1 Ton Dump Truck with Tailgate Lift -New (Roads Equipment).
80 Funding
406741 DC -DebtFinancing-5YR
Total C10315.2312 1 Ton Dump Truck with Tailgate Lift -New
C10320.2307 Garbage Packer with Crane -Replacement
01 Capital
504300 Capital Vehicles
Garbage Packer with Crane -replace unit #733 (2017 Ford) (Parks).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10320.2307 Garbage Packer with Crane -Replacement
C 10320.2308 1/2 Ton Pickup Truck -Replacement
01 Capital
504300 Capital Vehicles
1/2 Ton Pickup Truck-replace unit #720 (201 6 Dodg e) (Parks).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10320.2308 1/2 Ton Pickup Truck -Replacement
C10320 .2309 Cargo Van -Replacemen t
51
Run Date: Aug 30, 2023
Funding Expense
(420,000) 420,000
110,000
(110,000)
(110 ,000) 110,000
420,000
(420,000)
(420,000) 420,000
110,000
(110,000)
(110,000) 110,000
330,000
(330,000)
(330,000) 330,000
65 ,000
(65,000)
(65,000) 65,000
City of Pickering
2023
Approved Capital Budget
10310 Fleet Services
01 Capital
504300 Capital Vehicles
Cargo Van -replace unit #735 (2016 Ford F550) (Parks).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10320.2309 Cargo Van -Replacement
C10320.2316 1/2 Ton Pi c kup Truck-New
01 Capital
504300 Capital Vehicles
1/2 Ton Pickup Truck -New (Parks)
80 Funding
408606 Trf fr DC-P&R OB RF
Total C10320.2316 1/2 Ton Pickup Truck -New
C10320:2317 1 Ton Dump Truck with Tailgate Lift -Replacement
01 Capital
504300 Capital Vehicles
1 Ton Dump Truck -replace unit #747 (2016 Dodge Ram) (Parks).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10320.2317 1 Ton Dump Truck with Tailgate Lift -Replacement
C1032 0.2321 3/4 Ton Pi c kup Truck with Slide-in Salter and Plow -New
01 Capital
504300 Capital Vehicles
3/4 Ton Pickup Truck with Slide-in Salter and Plow -New (Parks).
80 Funding
408606 Trf fr DC-P&R OB RF
Total C10320.2321 3/4 Ton Pickup Truck with Slide-in Salter and Plow -New
C10320.2322 3/4 Ton Pickup Truck -New
01 Capital
504300 Capital Vehicles
3/4 Ton Pick-up Truck -New (Parks).
80 Funding
408606 Trf fr DC-P&R OB RF
Total C10320 .2322 3/4 Ton Pickup Truck -New
C10320.2323 (2) 1 Ton Dump Truck with Tailgate Lift -New
01 Capital
504300 Capital Vehicles
52
Run Date: Aug 30, 2023
Funding Expense
65,000
(65,000)
(65,000) 65,000
65,000
(65,000)
(65,000) 65,000
110,000
(110 ,000)
(110,000) 110,000
100,000
(100,000)
(100,000) 100,000
75,000
(75,000)
(75,000) 75,000
220,000
C i t y of Pickeri ng
2023
Approved Capital Budget
10310 Fleet Services
(2) 1 Ton Dump Truck -New (Parks).
80 Funding
408606 Trf fr DC-P&R 08 RF
Total C10320.2323 (2) 1 Ton Dump Truck with Tailgate Lift -New
C10425 .2301 Midsize SUV -Rep l acement (2)
01 Capital
504300 Capital Vehicles
Two midsize gas, hybrid or electric SUV -replace units #418 and #419 (2016
Jeep Patriots) (By-Law).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10425.2301 Midsize SUV -Replacement (2)
C10425.2302 1/2 Ton Pickup Truck -Replacement
01 Capital
504300 Capital Vehicles
1/2 Ton Pickup Truck -replace unit #420 (2017 Dodge Ram) (By-Law)
80 Funding
408016 Trf fr VhcleRplc Res
Total C10425.2302 1/2 Ton Pickup Truck -Replacement
C10500.2301 1/2 Ton Pickup Truck -Replacement
01 Capital
504300 Capital Vehicles
1/2 Ton Pickup Truck -replace unit #644 (2016 Dodge). (Enginee ring
Services -Admin)
80 Funding
408016 Trf fr VhcleRplc Res
Total C10500.2301 1/2 Ton Pickup Truck -Replacement
C10510.2301 Mid Si ze SUV New (Che r rywood)
01 Capital
504300 Capital Vehicles
New mid -size SUV for Cherrywood Development team
80 Funding
408040 Trf fr Cherrywood Res
Total C10510 .2301 Mid Size SUV New (Cherrywood)
C10510.2302 Midsize SUV -Replacem e nt (2)
01 Capital
504300 Capital Vehicles
53
Run Date: Aug 30, 2023
Funding Expense
(220,000)
(220,000) 220,000
100,000
(100,000)
(100,000) 100,000
65,000
(65,000)
(65,000) 65,000
70,000
(70,000)
(70,000) 70,000
45,000
(45,000)
(45,000) 45,000
90,000
C it y of Pi ckeri ng
2023
Approved Capital Budget
10310 Fleet Services
Midsize SUV -replace units #647 (2017 Jeeps) #643 (2015 Chevrolet
Equinox) (Wate r Re sou rces & Development Services).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10510 .2302 Midsize SUV -Replacement (2)
C10700.2307 Fire Pumpe r Rescue -Replacement
01 Capital
504200 Capital Machinery & Equipment
504300 Capital Vehicles
Fire Pumper Rescue -replace unit #542 (2011 Smeal) (Fire Services).
80 Funding
406703 DebtFinancing-15Year
Total C10700.2307 Fire Pumper Rescue -Replacement
C10700.2311 Midsize SUV -Replacement (5)
01 Capital
504300 Capital Vehicles
Five Mid Size SUVs -replace un its #578 (20 16 Jeep Patriot), #579 (2016
Jeep Patriot), #581 (2016 Jeep Patriot), #582 (2016 Jeep Patriot), and #580
(2016 Jeep Patriot) (Fire Services).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10700.2311 Midsize ·SUV -Replacement (5)
C10700 .2312 1/2 To n Pickup Truck -Replacement (2)
01 Capital
504300 Capital Vehicles
1/2 Ton Pickup Truck -replace unit #583 , #584 (2015 GMC) (Fire Services).
80 Funding
408016 Trf fr VhcleRplc Res
Total C10700.2312 1/2 Ton Pickup Truck -Replacement (2)
Total 10310 Fleet Services
54
Run Date: Aug 30, 2023
Funding Expense
(90,000)
(90,000) 90,000
300,000
1,700,000
(2,000,000)
(2,000,000) 2,000,000
225,000
(225,000)
(225,000) 225,000
130,000
(130,000)
(130,000) 130,000
(5,696,300) 5,696 ,300
Roads Equipment
Expenditures
City of Pickering
2023
Approved Capital Budget Summary
504200 Capital Mach inery & Equipment
Total Expenditures
Financing
408016 Trf fr VhcleRplc Res
408032 Trf fr Major Equip R
408037 Trf fr Casino Res
Total Financing
55
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
120,000 1,620,000
120,000 1,620,000
(70 ,000) -
(50 ,000) (1,565 ,000)
-(55,000)
(120,000) (1,620,000)
City of Pickering
2023 Approved Capital Budget
Project Listing
Project Name
10315 Roads Equipment
C10315.2301 Road Grader with Automatic Grade Control -Replacement
C10315.2304 Hydroscopic Excavator with Attachments -Replacement
C10315.2307 Brush Trimming Head -New
C10315.2308 Road Widener-New
C10315.2309 Line Painter -Replacement
C10315.2313 Asphalt Hotbox -New (2)
Total 10315 Roads Equipment
56
Run Date: Aug 9, 2023
2023
Project
Budget
550,000
770,000
55,000
115,000
25,000
105,000
1,620,000
City of Pickering
2023
Approved Capital Budget
10315 Roads Equipment
C10315.2301 Road Grader with Automati c Grade Control -Replacement
01 Capital
504200 Capital Machinery & Equipment
Road Grader -replace unit #110 (2013).
80 Funding
408032 Trf fr Major Equip R
Total C10315.2301 Road Grader with Automatic Grade Control -Replacemer
C 10315.2304 Hydr osco pic Excavator with Attachments -Repla cement
01 Capital
504200 Capital Machinery & Equipment
Hydroscopic Excavator with Attachments -replace unit #114 (2005).
Pre-Budget Approval received (Council Resolution #31/22).
80 Funding
408032 Trf fr Major Equip R
Total C10315.2304 Hydroscopic Excavator with Attachments -Replacement
C10315.2307 Brush Trimming Head -New
01 Capital
504200 Capital Machinery & Equipment
Brush trimming head .
80 Funding
408037 Trf fr Casino Res
Total C10315.2307 Brush Trimming Head -New
C10315 .2308 Road Widener -New
01 Capital
504200 Capital Machinery & Equipment
Road Widener.
80 Funding
408032 Trf fr Major Equip R
Total C10315.2308 Road Widener -New
C10315.2309 Line Painter -Replacement
01 Capital
504200 Capital Machinery & Equipment
Line Painter .
80 Funding
408032 Trf fr Major Equip R
Total C10315.2309 Line Painter -Replacement
C10315.2313 Asphalt Hotbox -New (2) .
01 Capital
57
Run Date: Aug 9, 2023
Funding Expense
550,000
(550,000)
(550,000) 550,000
770,000
(770,000)
(770,000) 770,000
55,000
(55,000)
(55,000) 55,000
115,000
(115,000)
(115,000) 115,000
25,000
(25,000)
(25,000) 25 ,000
10315 Roads Equipment
City of Pickering
2023
Approved Capital Budget
504200 Capital Machinery & Equipment
Asphalt Hotbox -New (2)
80 Funding
408032 Trf fr Major Equip R
Total C10315.2313 Asphalt Hotbox -New (2)
Tot al 10315 Roads Equipment
58
Run D ate : Aug 9, 2023
Funding Expense
105,000
(105,000)
(105,000) 105,000
(1,620,0 00) 1,620 ,000
Parks
Expenditures
502760 other Fixed Assets
504001 Capital Consulting
City of Pickering
2023
Approved Capital Budget Summary
504200 Capital Machinery & Equipment
504700 Capital Parks
Total Expenditures
Financing
402500 Federal Grants
408007 Trf fr RateStblz Res
408008 Trf fr DC City's Res
408016 Trf fr VhcleRplc Res
408028 Trf fr Fence Res
408031 Trf fr Tennis Res
408032 Trf fr Major Equip R
408037 Trf fr Casino Res
408501 Trf fr PrklndOblg RF
408502 Trf fr FGT Oblg RF
408606 Trf fr DC-P&R OB RF
408710 Trf fr Seaton FIA RF
408900 Property Tax Funded
Total Financing
Abbreviations
BRC
RHM
Brock Ridge Community Park
Rick Hull Memorial Park
59
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
60,000 -
-125,000
391,000 300,000
5 ,987 ,764 7 ,552,568
6,438,764 7,977,568
(90 ,500) -
(1,060,322) -
(425,000) (354 ,175)
(64,000) -
(60,000) -
(135,000) (588,500)
(227,000) (280 ,000)
-(1 ,697,000)
(1,857,942) (718,000)
(150,000) (1,403 ,000)
(2,222 ,900) (3,200,939)
(46,100) 264 ,046
(100,000) -
(6,438,764) (7,977,568)
City of Pickering
2023 Approved Capital Budget
Project Listing
Run Date: Aug 9, 2023
Project Name
10320 Parks
C10320.1808
C10320.2019
C10320.2023
C10320.2024
C10320.2025
C10320.2118
C10320.2119
C10320.2205
C10320.2208
C10320.2224
C10320.2301
C10320.2302
C10320.2303
C10320.2304
C10320.2305
C10320.2306
C10320.2310
C10320.2313
C10320.2314
C10320.2315
C10320.2318
C10320.2319
C10320.2320
C10320.2326
C10320.2327
C10320.2328
C10320.2329
Neighbourhood Park -Dersan St.ffillings Rd.
Dunmoore Park Tennis Courts Reconstruction
Community Park -Seaton P-123
Village Green -Seaton P-112
Village Green -Seaton P-113
Village Green -Seaton P-126
Village Green -Seaton P-127
Village Green -Seaton P-121
Valleyview Park -Playground Reconstruction
RHM Park -Playground Replacement
Dunmoore Park Pathway Construction
J. McPherson Park -Accessible Pathway Construction
Creekside Park -Expansion
Tractor Replacement
Village Green -Four Seasons Lane
Enclosed Trailer Replacement
Solar Lighting Dunmoore Park Off-Leash -New
Enclosed Trailer Seaton -New
BRK Park Soccer Artificial Turf Replacement
Martin's Tot Lot -Playground Replacement of Tot Unit
Additional Tennis/Pickleball Court -Amberlea Tennis Club -Shadybrook Park
Outdoor Rink Lighting
Rick Hull Memorial Park -Tennis Court Lighting Replacement -Design
Amberlea Park Hard Ball Diamond -Outfield Fence & Regrading Design
Pathway Reconstruction (Accessibility to Parks)
Claremont Memorial Park Upgrades
BRK Park -Artificial Soccer Field Lighting
C10320.2330 Chickadee Park-Playground Replacement
C10320.2331 Remote Controlled Flail Mower -New
C10320.2332 Park Block at Old Operations Centre Site
C10320.2333 Beverley Morgan Park Track Replacement
C10320.2334 Dunmoore Park -Parking Lot Reconstruction & Lighting -Design
Total 10320 Parks
60
2023
Project
Budget
95;000
550,000
983,915
192,458
46,995
35,000
165,000
232,700
60,000
25,000
220,000
300,000
110,000
110,000
960,000
20,000
132,500
20,000
770,000
80,000
400,000
82,000
38,500
33,000
330,000
100,000
720,500
120,000
150,000
50,000
770,000
75,000
7,977,568
City of Pickering
2023 ·
Approved Capital Budget
10320 Parks
C1 0320.1808 Ne ighbourhoo d Park -Dersan St./Tilling s Rd.
01 Capital
504700 Capital Parks
Neighbourhood Park -Dersan Street/fillings Road -Additional Funds for
project approved in 2018 for construction and 10 licence fees.
80 Funding
408008 Trf fr DC City's Res
408606 Trf fr DC-P&R OB RF
Total C10320.1808 Neighbourhood Park -Dersan St./Tillings Rd .
C 1032 0 .2 019 Dunm oore Park Tennis Co urts Re co nstru ction
01 Capital
504700 Capital Parks
Additional construction funding for project approved in 2022 for tennis courts
reconstruction and related drainage improvements required by TRCA.
Includes reconstruction of retaining wall adjacent to tennis courts and other
related earth works .
80 Funding
408031 Trf fr Tennis Res
Total C10320.2019 Dunmoore Park Tennis Courts Reconstruction
C 10320.2023 Community Park -Seato n P-123
01 Capital
504700 Capital Parks
Community Park Seaton P-123 (97.5/2.5) Additional funds required for
project approved in 2020. Total project cost $3,755,000.
80 Funding
408606 Trf fr DC-P&R 08 RF
408710 Trf fr Seaton FIA RF
Total C10320.2023 Community Park -Seaton P-123
C1 0320 .2024 Village Green -Seato n P-112
01 Capital
504700 Capital Parks
Village Green (Seaton) P-112 (97 .5/2 .5) Additional funds required for project
approved in 2020. Total project cost is $475,000 .
80 Funding
408606 Trf fr DC -P&R 08 RF
408710 Trf fr Seaton FIA RF
Total C10320.2024 Village Green -Seaton P-112
C10320 .2025 Village Green -Seaton P-113
61
Run Date: Aug 9, 2023
Funding Expense
95,000
(2,375)
(92,625)
(95,000) 95,000
550,000
(550,000)
(550,000) 550,000
983,915
(1,222,545)
238,630
(983,915) 983,915
192,458
(214,463)
22,005
(192,458) 192,458
City of Pickering
2023
Approved Capital Budget
10320 Parks
01 Capital
50~700 Capital Parks
Village Green (Seaton) P-113 (97 .5/2 .5) Additional funds required for project
approved in 2020 . Total project cost is $210 ,000.
80 Funding
408606 Trf fr DC -P&R OB RF
408710 Trf fr Seaton FIA RF
Total C10320.2025 Village Green -Seaton P-113
C10320.2118 Village Green -Seaton P-126
01 Capital
504700 Capital Parks
Village Green Seaton P-126 (97 .5/2 .5). Additional funds for project approved
in 2021 . Total project cost is $295 ,000.
80 Funding
408606 Trf fr DC-P&R 08 RF
408710 Trf fr Seaton FIA RF
Total C10320.2 118 Village Green -Seaton P-126
C10320.2119 Village Green -Seaton P-127
01 Capital
504700 Capital Parks
Village Green Seaton P-127 (97 .5/2 .5). Additional funds for project approved
in 2021 . Total project cost is $395,000.
80 Funding
408606 Trf fr DC-P&R OB RF
408710 Trf fr Seaton FIA RF
Total C10320.2119 Village Green -Seaton P-127
C10320.2205 Village Green -Seaton P-121
01 Capital
504700 Capital Parks
V illage Green Seaton P-121 (97.5/2 .5). Additional funds for project approved
in 2021. Total project cost is $685,000.
80 Funding
408606 Trf fr DC -P&R 08 RF
408710 Trf fr Seaton FIA RF
Total C10320.2205 Village Green -Seaton P-121
C10320 .2208 Valleyview Park -Playground Reconstruction
01 Capital
504700 Capital Parks
62
Run Date : Aug 9, 2023
Funding Expense
46,995
(61,256)
14,261
(46,995) 46,995
35,000
(34,100)
(900)
(35,000) 35,000
165,000
(160 ,850)
(4,150)
(165,000) 165,000
232 ,700
(226 ,900)
(5,800)
(232,700) 232,700
60,000
City of Pickering
2023
Approved Capital Budget
10320 Parks
Additional funds required for project approved in 2022 for playground
equipment.
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2208 Valleyview Park -Playground Reconstruction
C10320.2224 RHM Park -Playground Replacement
01 Capital
504700 Capital Parks
Additional funds required for proj ect approved in 2022 for playground
equipment.
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2224 RHM Park -Playground Replacement
C10320.2301 Dunmoore Park Pathway Constructi o n
01 Capital
504700 Capital Parks
Construction of asphalt path from Dunmoore parking lot to Engel Court and
Atwood Cres . Will include removing stairs at Engel Court for accessibility.
80 Funding
408502 Trf fr FGT Oblg RF
Total C10320.2301 Dunmoore Park Pathway Construction
C10320 .2302 J . McPhers o n Park -Accessible Pathway Con struction
01 Capital
504700 Capital Parks
New Accessibility Pathway at J . McPherson Park . From Parking lot to
Baseball diamond and to the walkway at Pebble Court.
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2302 J. McPherson Park -Accessible Pathway Construction
C 10320 .2303 Creekside Park -Expans ion
01 Capital
504700 C~pital Parks
Creekside Park -Expansion -pa rkette adjacent to Tr illium Hom es (William
Jackson Drive).
80 Funding
408008 Trf fr DC City's Res
408606 Trf fr DC-P&R OB RF
Total C10320.2303 Creekside Park-Expansion
63
Run Date: Aug 9, 2023
Funding Expense
(60,000)
(60,000) 60,000
25 ,000
(25,000)
(25,000) 25,000
220,000
(220,000)
(220,000) 220,000
300,000
(300,000)
(300,000) 300,000
110,000
(2,800)
(107,200)
(110,000) 110,000
City of Pickering
2023
Approved Capital Budget
10320 Parks
C10320 .23 04 Tractor Replacement
01 Capital
504200 Capital Machinery & Equipment
Tractor -replace unit #124 (2009).
80 Funding
408032 Trf fr Major Equip R
Total C10320.2304 Tractor Replacement
C 1032 0.23 05 V illage G reen -Four S easons Lane
01 Capital
504700 Capital Parks
Village Green -on Four Seasons Lane .
80 Funding
408008 Trf fr DC City's Res
408606 Trf fr DC -P&R OB RF
Total C10320.2305 Village Green -Four Seasons Lane
C10320 .23 06 Enclosed Trailer Replacement
01 Capital
504200 Capital Machinery & Equipment
Enclosed Trailer -replace unit #781 (2018).
80 Funding
408032 Trf fr Major Equip R
Total C10320.2306 Enclosed Trailer Replacement
C 10 320 .2310 Solar Lighting Dunm oore Park Off-Leash -New
01 Capital
504700 Capital Parks
New solar lighting for lighting at the off-leash dog pa rk for safety .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10320 .2310 Solar Lighting Dunmoore Park Off-Leash -New
C10320 .2313 Enclosed Trailer Seaton -New
01 Capital
504200 Capital Machinery & Equipment
Enclosed Trailer Seaton -New.
80 Funding
408606 Trf fr DC-P&R OB RF
Total C10320.2313 Enclosed Trailer Seaton -New
C10320.2314 BRK Park Soccer Artificial Turf Replacement
64
Run Date : Aug 9, 2023
Funding Expense
110,000
(110,000)
(110,000) 110,000
960,000
(24,000)
(936,000)
(960,000) 960,000
20 ,000
(20,000)
(20,000) 20,000
132,500
(132,500)
(132,500) 132,500
20,000
(20,000)
(20 ,000) 20,000
City of P ickering
2023
Approved Capital Budget
10320 Parks
01 Capital
504700 Capital Parks
Replacement of artificial turf surface at Bay Ridges Kinsmen Park Soccer
Field .
80 Funding
408037 Trf fr Casino Res
Total C10320.2314 BRK Park Soccer Artificial Turf Replacement
C 1032 0.2315 Martin's Tot Lot -Play grou nd Replacement of Tot Unit
01 Capital
504700 Capital Parks
Replacement of tot aged playground only in Martin's Tot Lot. $40,000
relates to Accessibility .
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2315 Martin's Tot Lot -Playground Replacement of Tot Unit
C10320 .2318 Additi o nal Tenn is/Pick leball Court -Amberlea Tennis Club -Shae
01 Capital
504700 Capital Parks
Construction of a new Tennis/Pickleball Court at Shadybrook Park
(Resolution #935/22 -Report CS 11-22).
80 Funding
408008 Trf fr DC City's Res
408606 Trf fr DC-P&R OB RF
Total C10320.2318 Additional Tennis/Pickleball Court -Amberlea Tennis Clul
C10320.2319 Outd oor Rink Lighting
01 Capital
504700 Capital Parks
Outdoor rink lighting at Rick Hull Memorial Park, Centennial Park Picnic
Shelter, and Frenchman's Bay Ratepayers Memorial Park.
80 Funding
408037 Trf fr Casino Res
Total C10320.2319 Outdoor Rink Lighting
C10320 .2320 Ri c k Hull Memorial Park -Tennis Court Lighting Replacement -D
01 Capital
504700 Capital Parks
Replacement of tennis court lighting to LED, wiring & poles at Rick Hull
Memorial Park -design .
80 Funding
65
Run Date: Aug 9, 2023
Funding Expense
770,000
(770,000)
(770,000) 770,000
80,000
(80,000)
(80,000) 80,000
400,000
(300,000)
(100,000)
(400,000) 400,000
82,000
(82,000)
(82,000) 82,000
38,500
10320 Parks
408031 Trf fr Tennis Res
City of Pickering
2023
Approved Capital Budget
Total C10320.2320 Rick Hull Memorial Park -Tennis Court Lighting Replacen
C10320.2326 Amberlea Park Hard Ball Diamond -Outfield Fence & Regrading I
01 Capital
504700 Capital Parks
Amberlea Hard Ball Diamond -Outfield Fence Replacement (6 Foot Fence,
O-pipe Cap , Earthworks & Regrading) -Design .
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2326 Amberlea Park Hard Ball Diamond -Outfield Fence & Reg
C 10320.232 7 Pathway Re c on struction (Acces si bility to Parks)
01 Capital
504700 Capital Parks
Phase 1 -Des ign and reconstruction of existing pathways and associated
infrastructure . Locations for 2023 include Valleyvi ew Park (15000sf) and
Douglas Park (930sf).
80 Funding
408502 Trf fr FGT Oblg RF
Total C10320.2327 Pathway Reconstruction (Accessibility to Parks)
C10 32 0 .2328 Claremont Memorial Park Upgrades
01 Capital
504700 Capital Parks
Claremont Memorial Park Upgrades (geotech, conceptual design , cost
estimate , phasing).
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2328 Claremont Memorial Park Upgrades
C10320.2329 BRK Park -Artificial Soccer Field Lighting
01 Capital
504700 Capital Parks
Bay Ridges Kinsmen Park -Artificial So ccer Field Lighting Replacement
(L.E.D).
80 Funding
408502 Trf fr FGT Oblg RF
Total C10320.2329 BRK Park -Artificial Soccer Field Lighting
C10320 .2330 Chickadee Park -Playground Replacement
01 Capital
504700 Capital Parks
66
Run Date: Aug 9, 2023
Funding Expense
(38,500)
(38,500) 38,500
33,000
(33 ,000)
(33,000) 33,000
330,000
(330,000)
(330,000) 330,000
100,000
(100,000)
(100,000) 100,000
720,500
(720,500)
(720 ,500) 720,500
120,000
City of Pickering
2023
Approved Capital Budget
10320 Parks
Replacement of playground in Chickadee Park with accessibility options
added. $60 ,000 relates to Accessibility .
80 Funding
408501 Trf fr PrklndOblg RF
Total C10320.2330 Chickadee Park -Playground Replacement
C10320.2331 Remote Controlled Flail Mower -New
01 Capital
504200 Capital Machinery & Equipment
Remote Controlled Flail Mower For Phragmites Control -New
80 Funding
408032 Trf fr Major Equip R
Total C10320.2331 Remote Controlled Flail Mower -New
C 10320.23 32 Park Block at Ol d Operations Centre Site
01 Capital
504001 Capital Consulting
Design and preliminary investigations of new park adjacent to Creekwood
School site in Duffin Heights. Park block at Old Operations Centre site.
80 Funding
408008 Trf fr DC City's Res
408606 Trf fr DC-P&R OB RF
Total C10320.2332 Park Block at Old Operations Centre Site
C10320 .2333 Beverley Morgan Park Track Replacement
01 Capital
504700 Capital Parks
Beverley Morgan Park Track Replacement.
80 Funding
408037 Trf fr Casino Res
Total C10320.2333 Beverley Morgan Park Track Replacement
C10320 .2334 Dunmoore Park-Parki ng Lot Reconstruction & Lighting -Design
01 Capital ·
504001 Capital Consulting
Dunmoore Park -Parking Lot Reconstruction and Lighting -Design .
80 Funding
408037 Trf fr Casino Res
Total C10320.2334 Dunmoore Park -Parking Lot Reconstruction & Lighting -
Total 10320 Parks
67
Run D ate: Aug 9, 2023
Funding Expense
(120,000)
(120,000) 120,000
150,000
(150 ,000)
(150,000) 150,000
50,000
(25,000)
(25,000)
(50,000) 50,000
770,000
(770,000)
(770,000) 770,000
75,000
(75,000)
(75,000) 75,000
(7,977,568) 7,977,568
\ \
\ \
\ \
\ \
\ \
\ I
I I
I I
I I
I I
J Lr------------~---------~---------__
FifthConcession.8.oad, ................................................................ .
)
11
-----~--------~---, /1 L-----..___ .-----~' I ! \ r----, \ i I\.____ \; I \ i 11 1•11 •11•11 •u
~I ~
I ,-----1 I j (I) I I I I C
I I I I ·-I L ____ J I ____ i
I 1--------1 ,,,---1· (/)
r------J
I ,-----,, I
I I I I
I I I I
I ~----) I
City of Pickering Engineering Services Department
2023 Approved Budget
Budget Amount:
C10320 .2119 Village Green -Seaton P-127
Financing Sources:
408606 Trf fr DC-P&R OB RF
408710 Trf fr Seaton FIA RF
Location and Proposed Construction:
Village Green Seaton P-127 (97.5/2.5) Additional funds required for
C10320.2119.
--
$165,000
$160,850
4,150
$165,000
Ops. -Adm in.
Expenditures
504100 Capital Buildings
City of Pickering
2023
Approved Capital Budget Summary
504200 Capital Machinery & Equ ipment
Total Expenditures
Financing
402500 Federal Grants
408007 Trf fr RateStblz Res
408024 Trf fr Sustnlntv Res
Total Financing
88
Run Date : Aug 9 , 2023
2022 2023
Approved Approved
Budget Budget
-84,000
80,000 -
80,000 84,000
-(42 ,000)
(80 ,000) -
-(42,000)
(80,000) (84,000)
10325 Ops. -Adm in.
C10325.2 301 EV Charging Stati o ns
01 Capital
504100 Capital Buildings
City of Pickering
2023
Approved Capital Budget
EV Charging Stations pilot project (1x dual level 2 charging station).
Potential locations include George Ashe Library and Community Centre or
Dr . Nelson F. Tomlinson Community Centre . Subject to receiving senior
government funding .
80 Funding
402500 Federal Grants
408024 Trf fr Sustnlntv Res
Total C10325.2301 EV Charging Stations
Total 10325 Ops. -Admin .
89
Run Date: Aug 9, 2023
Funding Expense
84,000
(42,000)
(42,000)
(84,000) 84,000
(84,000) 84 ,000
City of Pickering
2023
Approved Capital Budget Summary
Corporate Services Dept
Expenditures
502720 System &Sftwr Upgrade
504100 Capital Buildings
504800 Cap Information Tech
Total Expenditures
Financing
402510 Ontario Grants
4067 4 3 DC-DebtFinancng -15YR
40 8001 Trf fr Rplc-Cpa Res
408007 Trf fr RateStblz Res
408008 Trf fr DC City's Res
408703 Trf fr Animal Sit RF
Total Financing
90
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-1,500,000
8,830 ,000 -
654,000 642,000
9,484,000 2,142,000
(48,000) -
(6 ,004,000) -
(331,000) (364,000)
(275 ,000) (1,778,000)
(1 ,626 ,000) -
(1,200,000) -
(9,484,000) (2,142,000)
Information Technology
Expenditures
C ity of P icker ing
2023
Approved Capital Budget Summary
502720 System&Sftwr Upgrade
504800 Cap Information Tech
Total Expenditures
Financing
402510 Ontario Grants
408001 Trf fr Rplc-Cpa Res
408007 Trf fr RateStblz Res
Total Financing
91
Run Date : Aug 9 , 2023
2022 2023
Approved Approved
Budget Budget
-1,500,000
579,000 642,000
579,000 2,142,000
(48,000) -
(331,000) (364,000)
(200,000) (1,778 ,000)
(579,000) (2,142,000)
Project Name
10405 Information Technology
City of Pickering
2023 Approved Capital Budget
Project Listing
C10405.2302 Storage Area Network Upgrades
C10405.2303 Virtual Desktop Infrastructure
C10405.2304 5 Yrs. PC Upgrades
C10405.2305 Website Replacement and Customized Integrations Project
C10405.2306 Disaster Recovery Infrastructure
C10405.2307 Hybrid .AV Requirements for Meeting Rooms
Total 10405 Information Technology
92
Run Date: Aug 9, 2023
2023
Project
Budget
278,000
122,000
68,000
1,500,000
78,000
96,000
2,142,000
City of Pickering
2023
Approved Capital Budget
10405 Information Technology
C10405.2302 Storage Area Network Upgrades
01 Capital
504800 Cap Information Tech
The City's Storage Area Network (SAN) is at end of service and needs to be
replaced. The SAN provides the storage infrastructure for all City data . This
project includes both SAN storage and SAN network infrastructure.
80 Funding
408007 Trf fr RateStblz Res
Total C10405.2302 Storage Area Network Upgrades
C10405.2303 Virtual Deskt?P Infrastructure
01 Capital
504800 Cap Information Tech
New server infrastructure is required to upgrade the City's virtual desktop
infrastructure environment used by staff to connect to applications and
systems . This upgrade is required for improved audio/video transmission ,
reduced IT support requirements and to provide a better online collaboration
experience .
80 Funding
408001 Trf fr Rplc-Cpa Res
Total C10405.2303 Virtual Desktop Infrastructure
C10405.2304 5 Yrs. PC Upgrades
01 Capital
504800 Cap Information Tech
Replacement of End User Computing Devices
80 Funding
408001 Trf fr Rplc-Cpa Res
Total C10405.2304 5 Yrs. PC Upgrades
C10405 .2305 Website Replacement and Customized Integrations Project
90 Expense
502720 System&Sftwr Upgrade
The City is developing a multi-year strategy to assess the needs and
potential associated with using technology to modernize service delivery and
enhance the resident experience.
Phase 1 recommendations are related to technology architecture,
technology solutions , digital governance, and technology investment that will
enable the City to achieve its business objective of becoming a leader in
citizen-centred digital services .
80 Funding
408007 Trf fr RateStblz Res
93
Run Date : Aug 9, 2023
Funding Expense
278,000
(278,000)
(278,000) 278,000
122,000
(122,000)
(122,000) 122,000
68,000
(68,000)
(68 ,000) 68,000
1,500,000
(1,500,000)
10405 Information Technology
City of Pickering
2023
Approved Capital Budget
Total C10405.2305 Website Replacement and Customized Integrations Proje
C10405 .2306 Disaster Recovery Infrastructure
01 Capital
504800 Cap Information Tech
The City requires an improved disaster recovery environment to allow for
expedited recovery in the event of a disaster or cyber event. This
environment will include network equipment, servers and storage to recover
. City applications arid data.
80 Funding
408001 Trf fr Rplc -Cpa Res
Total C10405.2306 Disaster Recovery Infrastructure
C10405.2307 Hybrid AV Requirements for Meeting Rooms
01 Capital
504800 Cap Information Tech
City staff are currently operating in a hybrid working environment and
existing meeting room technology needs to be updated to support hybrid
work environment and provide IT staff with the ability to remotely support staff
virtually regardless of the facility .
80 Funding
408001 Trf fr Rplc-Cpa Res
Total C10405.2307 Hybrid AV Requirements for Meeting Rooms
Total 10405 Information Technology
94
Run Date : Aug 9, 2023
Funding Expense
(1,500,000) 1,500,000
78,000
(78,000)
(78,000) 78,000
96 ,000
(96,000)
(96,000) 96,000
(2,142,000) 2,142,000
City of Pickering
2023
Approved Capital Budget Summary
Water Resources & Dev. Services
Expenditures
504500 Capital Construction
504520 Capital Development Construction
Total Expenditures
Financing
408200 Trf fr 3rdPtyOblg RF
Total Financing
96
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
200,000 -
-200,000
200,000 200,000
(200,000) (200,000)
(200,000) (200,000)
City of Pickering
2023
Approved Capital Budget
10510 Water Resources & Dev. Services
C10510.2303 Various Construction Projects
01 Capital
504520 Capital Development Construction
Various Construction Projects Related to Development (funded from Third
Party Contributions).
· 80 Funding
408200 Trf fr 3rdPtyOblg RF
Total C10510.2303 Various Construction Projects
Total 10510 Water Resources & Dev. Services
97
Run Date: Aug 9, 2023
Funding Expense
200,000
(200,000)
(200,000) 200,000
(200,000) 200,000
Sidewalks
Expenditures
504600 Capital Sidewalks
Total Expenditures
Financing
408502 Trffr FGT Oblg-RF
Total Financing
City of P ickering
2023
Approved Capital Budget Summary
98
Run Date : Aug 9 , 2023
2022 2023
Approved Approved
Budget Budget
500,000 140,000
500,000 140,000
(500 ,000) (140 ,000)
(500,000) (140,000)
10515 Sidewalks
City of Pickering
2023
Approved Capital Budget
C10515.2302 Finch Avenue -New Co ncrete Sidewalk
01 Capital
504600 Capital Sidewalks
New Concrete Sidewalk -Finch Avenue, south side from Altona Road to
Shadow Place
80 Funding
408502 Trf fr FGT Oblg RF
Total C10515.2302 Finch Avenue -New Concrete Sidewalk
Total 10515 S i dewalks
99
Run Date : Aug 9, 2023
Funding Expense
140,000
(140,000)
(140,000) 140,000
(140,0 00 ) 140,000
City of Pickering
2023
Approved Capital Budget Summary
Streetlights & Signalization
Expenditures
504300 Capital Vehicles
504450 Cap Traffic Signals
504620 Capital Streetlights
Total Expenditures
Financing
408007 Trf fr RateStblz Res
408008 Trf fr DC City's Res
408016 Trf fr VhcleRplc Res
408037 Trf fr Casino Res
408502 Trf fr FGT Oblg RF
408602 Trffr DC-TrnsprtORF
408900 Property Tax Funded
Total Financing
101
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
45,000 -
58,000 989,000
-20,000
103,000 1,009,000
-(200,000)
-(30,000)
(45,000) -
-(490,000)
(12,000) (19,000)
-(270,000)
(46,000) -
(103,000) (1,009,000)
City of Pickering
2023 Approved Capital Budget
Project Listing
Project Name
10520 Streetlights & Signalization
C10520.2003 Pedestrian Countdown Signals -5 locations
C10520.2102 LED Signal Head Replacement Program
C10520.2105 Accessible Pedestrian Signals -4 locations
C10520.2106 Uninterruptible Power Supply-5 locations
C10520.2301 Traffic Signals/Controllers Replacement
C10520.2302 A-9 Pedestrian Signalization
C10520.2303 BR-16 Pedestrian Signalization
C10520.2305 TC-4 Traffic Signals: Pickering Parkway at Glenanna
C10520.2306 Rodd Avenue New Streetlights
Total 10520 Streetlights & Signalization
102
Run Date: Aug 9, 2023
2023
Project
Budget
45,000
19,000
400,000
200,000
25,000
125,000
125,000
50,000
20,000
1,009,000
City of Pickering
2023
Approved Capital Budget
10520 Streetlights & Signalization
C10520 .2003 Pedestrian Countdown Signals -5 locations
01 Capital
504450 Cap Traffic Signals
Retrofit existing traffic signals with pedestrian countdown signals for
increased crossing safety . Year 3 of 3 year program .
80 Funding
408037 Trf fr Casino Res
Total C10520.2003 Pedestrian Countdown Signals -5 locations
C10520 .2102 LED Si gna l He ad Replacement Pro gram
01 Capital
5_04450 Cap Traffic Signals
Replacement of LED signal heads.
80 Funding
408502 Trf fr FGT Oblg RF
Total C10520.2102 LED Signal Head Replacement Program
C10520.2105 Access i ble Pedestrian Signals -4 locati o ns
01 Capital
504450 Cap Traffic Signals
Equipping existing traffic signals with accessible pedestrian signals . In
accordance with Accessibility for Ontarians with Disabilities Act , 2005 (AODA
2005). Year 2 of 5 year program .
80 Funding
408037 Trf fr Casino Res
Total C10520.2105 Accessible Pedestrian Signals -4 locations
C10520.2106 Uninterruptible Power Supply -5 locations
01 Capital
504450 Cap Traffic Signals
Installation of uninterruptible power supply battery backup system that
operates signals in the event of a power outage . Year 2 of 5 year program.
80 Funding
408007 Trf fr RateStblz Res
Total C10520.2106 Uninterruptible Power Supply -5 locations
C10520.2301 Traffic Signals /Controllers Replacement
01 Capital
504450 Cap Traffic Signals
Traffic Signals/Controllers Replacement-Altona Road @ Valley Gate (last
replacement 2010).
80 Funding
103
Run Date : Aug 9, 2023
Funding Expense
45,000
(45,000)
(45,000) 45,000
19,000
(19,000)
(19,000) 19,000
400,000
(400,000)
(400,000) 400,000
200,000
(200,000)
(200,000) 200,000
25,000
City of Pickering
2023
Approved Capital Budget
10520 Streetlights & Signalization
408037 Trf fr Casino Res
Total C10520.2301 Traffic Signals/Controllers Replacement
C10520.2302 A-9 Pedestrian Signalization
01 Capital
504450 Cap Traffic Signals
Pedestrian Cross Over. A-9 Pedestrian Signalization -Rosebank Road at
Charnwood/Woodsmere .
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10520.2302 A-9 Pedestrian Signalization
C 10 52 0.2303 BR-1 6 Pedestrian Si gnal izati o n
01 Capital
504450 Cap Traffic Signals
Pedestrian Cross Over. BR-16 Pedestrian Signalization -Major Oaks Road
at Wildwood Crescent.
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10520.2303 BR-16 Pedestrian Signalization
C 10520.2305 TC-4 Traffic Signals : Pickering Parkway at Glenanna
01 Capital
504450 Cap Traffic Signals
New traffic signals and intersection improvements -Pickering Parkway at
Glenanna Road (90/10) -Design .
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10520.2305 TC-4 Traffic Signals: Pickering Parkway at Glenanna
C10520 .2306 Rodd Avenue New Streetlights
01 Capital
504620 Capital Streetlights
Rodd Avenue new streetlights from CN Rail crossing east to Bella Vista
Drive .
80 Funding
408037 Trf fr Casino Res
Total C10520.2306 Rodd Avenue New Streetlights
Total 10520 Streetlights & Signalization
104
Run Date : Aug 9, 2023
Funding Expense
(25,000)
(25,000) 25,000
125,000
(12,500)
(112,500)
(125,000) 125,000
125,000
(12,500)
(112,500)
(125,000) 125,000
50,000
(5,000)
(45,000)
(50,000) 50,000
20 ,000
(20,000)
(20,000) 20,000
(1,009,000) 1,009,000
Stormwater Management
Expenditures
504100 Capital Build ings
504550 Capital Storm System
Total Expenditures
Financing
408707 Trf fr SWM RF
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
107
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
310,000 -
860 ,000 1,400,000
1,170,000 1,400,000
(1,170,000) (1,400,000)
(1,170,000) (1,400,000)
City of Pickering
2023
Approved Capital Budget
10525 Storm water Management
C10525.2203 Lisg oold SWM Pon d (C 2-08 -GC) Retrofit
01 Capital
504550 Capital Storm System
Lisgoold SWM Pond on Meriadoc Dr . north of Dellbrook Ave -SWM Pond
retrofit as per SWM Facility Asset Management Plan.
Additional funds required for construction and con.tract
administration/inspection for project approved in 2022 .
80 Funding
408707 Trf fr SWM RF
Total C10525.2203 Lisgoold SWM Pond (C2-08-GC) Retrofit
C 10525.2301 Rouge SWM Pond (C1-01 -ER) Cle anout
01 Capital
504550 Capital Storm System
Rouge SWM Pond on Valley Ridge Crescent west of Pine Grove Avenue -
SWM Pond Cleanout as per SWM Facility Asset Management Plan.
80 Funding
408707 Trf fr SWM RF
Total C10525.2301 Rouge SWM Pond (C1-01-ER) Cleanout
Total 10525 Stormwater Management
108
Run Date: Aug 9, 2023
Funding Expense
150,000
(150,000)
(150,000) 150,000
1,250,000
(1,250,000)
(1,250,000) 1,250,000
(1,400,000) 1,400,000
Roads Projects
Expenditures
504001 Capital Consulting
504400 Capital Roads
Total Expenditures
Financing
402510 Ontario Grants
408008 Trf fr DC City's Res
408200 Trf fr 3rdPtyOblg RF
408502 Trf fr FGT Oblg RF
408602 Trf fr DC-TrnsprtORF
408706 Trf fr Rds&Bridgs RF
408708 Trf fr OCIF Grant
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
1 1 1
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
200,000 521,900
4,265,300 4 ,900,000
4,465,300 5,421,900
(124,895) -
(305,150) (52,200)
(197,500) -
(3,228 ,995) (4,400,000)
(502,650) (469,700)
(106,110) -
-(500,000)
(4,465 ,300) (5,421,900)
City of Pickering
2023 Approved Capital Budget
Project Listing
Project Name
10570 Roads Projects
C10570.2301 Alder Crt. -Asphalt Resurfacing
C10570.2302 Chapleau Dr. -Asphalt Resurfacing
C10570.2304 Vistula Dr. -Asphalt Resurfacing
C10570.2306 DH-14 William Jackson Dr. -Culvert Replacement
C10570.2308 Chiron Crescent -Asphalt Resurfacing
C10570.2309 Dellbrook Avenue -Asphalt Resurfacing
C10570.2310 St. Martins Drive -Asphalt Resurfacing
C10570.2311 Linwood Street -Asphalt Resurfacing
C10570.2312 Eyer Dr. -Asphalt Resurfacing
C10570.2313 Heathside Gres. -Asphalt Resurfacing
C10570.2314 Victoria St. -Asphalt Resurfacing
C10570.2315 Listowell Gres. -Asphalt Resurfacing
C10570.2316 Jomar Ave. -Asphalt Resurfacing
C10570.2317 Stonehurst Road -Asphalt Resurfacing
C10570.2318 Joseph Street Road Reconstruction and Drainage Improvements
C10570.2319 Gwendolyn Street -Asphalt Resurfacing
C10570.2320 Fuschia Lane -Asphalt Resurfacing
C10570.2321 Petunia Place -Asphalt Resurfacing
C10570.2322 Falconcrest Drive -Asphalt Resurfacing
Total 10570 Roads Projects
11 2
Run Date: Aug 9, 2023
2023
Project
Budget
115,000
330,000
440,000
521,900
390,000
590,000
230,000
265,000
305,000
330,000
80,000
390,000
105,000
85,000
500,000
270,000
115,000
105,000
255,000
5,421,900
10570 Roads Projects
City of Pickering
2023
Approved Capital Budget
C10570 .2301 Alder Crt. -Asphalt Resurfacin g
01 Capital
504400 Capital Roads
Alder Court -Asphalt Resurfacing -Strouds Lane to South Terminus
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2301 Alder Crt. -Asphalt Resurfacing
C10570 .2302 Ch apleau Dr. -As phalt Resurfac ing
01 Capital
504400 Capital Roads
Chapleau Drive -Asphalt Resurfacing -Haller Avenue to Douglas Avenue
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570 .2302 Chapleau Dr. -Asphalt Resurfacing
C10570.2304 Vistula Dr. -Asphalt Resurfacing
01 Capital
504400 Capital Roads
Vistula Drive -Asphalt Resurfacing -West Shore Boulevard to 500m east of
West Shore Boulevard
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2304 Vistula Dr. -Asphalt Resurfacing
C10570 .2306 DH-14 William Jackson Dr. -Culvert Replacement
01 Capital
504001 Capital Consulting
William Jackson Drive -Urfe Creek Culvert Structure Replacement -
Design/approvals
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC -TrnsprtORF
Total C10570.2306 DH-14 William Jackson Dr. -Culvert Replacement
C10570.2308 Chiron Crescent -Asphalt Resurfac i ng
01 Capital
504400 Capital Roads
Chiron Crescent -Asphalt Resurfacing -Amberlea Rd to Amberlea Rd .
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570 .2308 Chiron Crescent -Asphalt Resurfacing
113
Run Date: Aug 9, 2023
Funding Expense
115,000
(115,000}
(115,000} 115,000
330,000
(330,000}
(330 ,000} 330,000
440,000
(440,000}
(440,000} 440,000
521,900
(52 ,200)
(469,700}
(521,900) 521,900
390,000
(390,000}
(390,000} 390,000
10570 Roads Projects
C it y of Pic kerin g
2023
Approved Capital Budget
C10570.2309 Dell broo k A ven ue -Asphal t Resu rfacing
01 Capital
504400 Capital Roads
Dellbrook Avenue -Asphalt Resurfacing -Meriadoc Drive to Brock Road
(RR#1)
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2309 Dellbrook Avenue -Asphalt Resurfacing
C 10570.23 10 St. Martins Drive -Asphalt Resurfacing
01 Capital
504400 Capital Roads
St. Martins Drive -Asphalt Resurfacing -Radom Street to Bayly Street
(RR#22)
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2310 St. Martins Drive -Asphalt Resurfacing
C10570.2311 Lin w ood Stree t -Asphalt Resurfacing
01 Capital
504400 Capital Roads
Linwood Street -Asphalt Resurfacing -Liverpool Road to Bridle Path
Crescent (west end)
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2311 Linwood Street -Asphalt Resurfacing
C10 570.2312 Eyer Dr. -Asp hal t Resu rfacing
01 Capital
504400 Capital Roads
Eyer Drive -Asphalt Resurfacing -70m south of Edge Lane to Hillcrest Road
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2312 Eyer Dr. -Asphalt Resurfacing
C1 0570.2313 Heat hs ide Gres . -Asp ha lt Resu rfa cin g
01 Capital
504400 Capital Roads
Heathside Crescent -Asphalt Resurfacing -Longbow Drive (east end) to
320m south of Longbow Drive
80 Funding
114
Run Date: Aug 9, 2023
Funding Expense
590,000
(590,000)
(590,000) 590,000
230,000
(230,000)
(230,000) 230,000
265,000
(265,000)
(265,000) 265,000
305,000
(305,000)
(305,000) 305,000
330,000
10570 Roads Projects
408502 Trf fr FGT Oblg RF
City of Pickering
2023
Approved Capital Budget
Total C10570.2313 Heathside Cres. -Asphalt Resurfacing
C10570 .2314 Victoria St. -Asphalt Resurfacing
01 Capital
504400 Capital Roads
Victoria Street -Asphalt Resurfacing -Central Street to Wellington Street
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2314 Victoria St. -Asphalt Resurfacing
C 10570.2315 Listowell C re s . -As phalt Resurfac in g
01 Capital
504400 Capital Roads
Listowell Crescent -Asphalt Resurfacing -Storrington Street to Glenanna
Road
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2315 Listowell Cres. -Asphalt Resurfacing
C 10570.23 16 Ja mar Ave . -Asphalt Re s urfa cing
01 Capital
504400 Capital Roads
Jamar Avenue -Asphalt Resurfacing -west terminus to east terminus
80 Funding
408502 Trf .fr FGT Oblg RF
Total C10570.2316 Jamar Ave. -Asphalt Resurfacing
C10570 .2317 Stonehurst Road -Asph alt Resurfacing
01 Capital
504400 Capital Roads
Stonehurst Road -Asphalt Resurfacing -Jamar Avenue to Third Concession
Road
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570 .2317 Stonehurst Road -Asphalt Resurfacing
C10570.2318 Joseph Street Road Reconstruction and Drainage Improvements
01 Capital
504400 Capital Roads
Joseph Street from Franklin Street to Old Brock Road -road reconstruction
and drainage improvements
80 Funding
115
Run Date: Aug 9, 2023
Funding Expense
(330,000)
(330,000) 330,000
80,000
(80,000)
(80,000) 80,000
390,000
(390,000)
(390,000) 390,000
105,000
(105,000)
(105,000) 105,000
85,000
(85,000)
(85,000) 85,000
500,000
10570 Roads Projects
408708 Trf fr OCIF Grant
City of Pi ckeri ng
2023
Approved Capital Budget
Total C10570.2318 Joseph Street Road Reconstruction and Drainage Im prov
C1057 0.2319 Gwendolyn Street -Asphalt Resurfacing
01 Capital
504400 Capital Roads
Gwendolyn Street -Asphalt Resurfacing -Rouge Valley Drive to Fawndale
Road
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2319 Gwendolyn Street -Asphalt Resurfacing
C1057 0.23 20 Fu sch i a Lane -Asphalt Resurfa c ing
01 Capital
504400 Capital Roads
Asphalt Resurfacing -Grenoble Boul eva rd to Modlin Road
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2320 Fuschia Lane -Asphalt Resurfacing
C10570 .2321 Petunia Place -Asphalt Resurfacing
01 Capital
504400 Capital Roads
Petunia Place -Asphalt Resurfacing -Gwendolyn Street to North Terminus
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570 .2321 Petunia Place -Asphalt Resurfacing
C10570 .2322 Falc o ncrest Drive -Asphalt Resurfacing
01 Capital
504400 Capital Roads
Falconcrest Drive -Asph alt Resurfacing -Dunbarton Road to Ramblebe rry
Avenue
80 Funding
408502 Trf fr FGT Oblg RF
Total C10570.2322 Falconcrest Drive -Asphalt Resurfacing
total 10570 Roads Projects
116
Run Date: Aug 9, 2023
Funding Expense
(500,000)
(500,000) 500 ,000
270,000
(270,000)
(270,000) 270,000
115,000
(115,000)
(115,000) 115,000
105,000
(105,000) '
(105,000) 105,000
255,000
(255,000)
(255,000) 255,000
(5,421 ,900) 5,421,900
I
Third _C.oncessionBoad j I
(l) -0
C CO
.8 &. .
Cl)
liiPJomar/8 venue~
LJ
-0 cu
0 er:,
t:'. g_
!...
cu
LL'
City of Pickering Engineering Services Department
2023 Approved Budget
Budget Amount:
C10570.2316 Jomar Ave. -Asphalt Resurfacing $105,000
Financing Sources:
408502 Trf fr FGT Oblg RF $105 ,000
Location and Proposed Construction:
Jamar Avenue -Asphalt Resurfacing -west terminus to east term inus
City of Pickering
2023
Approved Capital Budget Summary
Development Projects (DC Funded)
Expenditures
504001 Capital Consulting
504400 Capital Roads
504550 Capital Storm System
504600 Capital Sidewalks
504620 Capital Streetlights
Total Expenditures
Financing
408008 Tri fr DC City's Res
408602 Tri fr DC-TrnsprtORF
408604 Tri fr DC-SWM OB RF
Total Financing
136
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
655,030 204,970
11,240,270 2,704 ,730
1,199,000 -
-2,118,000
477 ,300 858 ,000
13 ,571,600 5,885,700
(5,436 ,225) (2,315,425)
(7,823 ,875) (3,570,275)
(311,500) -
(13,571,600) (5,885,700)
Project Name
City of Pickering
2023 Approved Capital Budget
Project Listing
10575 Development Projects (DC Funded)
C10575.1801 Walnut Lane Extension -Design & Construction
C10575.2206 New East/West Local Road -Delta Boulevard
C10575.2301 BRT-5a/5b/5c Kingston Road (Dixie Rd. to Bainbridge Dr.)
C10575.2302 RP-4b Finch Avenue -Road Reconstruction
C10575.2303 DH-24 Brock Rd. -Sidewalks & Streetlights
C10575.2307 BRT-3a/b Kingston Road (Steeple Hill to Merritton Rd.)
Total 10575 Development Projects (DC Funded)
137
Run Date: Aug 9, 2023
2023
Project
Budget
2,009,700
400,000
2,059,000
500,000
96,000
821,000
5,885,700
City of Pickering
2023
Approved Capital Budget
10575 Development Projects (DC Funded)
C10575 .1801 Walnut Lane Extension -De s ign & Co nstruction
01 Capital
504001 Capital Consulting
504400 Capital Roads
Additional Funding for Walnut Lane Extension from Liverpool Road to
Kingston Road for increased construction costs and contract administration
for project approved in 2020 . The total project cost is $8,560,000.
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10575.1801 Walnut Lane Extension -Design & Construction
C 10575 .2206 New East/West Lo cal Road -Delta Boulevard
01 Capital
504400 Capital Roads
Additional funding for project approved in 2022 to construct a 25m long,
engineered, precast retaining wall, required to support the road . Additional
funding is necessary to complete this project also due to rising costs for road
building materials and labour.
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10575.2206 New East/West Local Road -Delta Boulevard
C10575.2301 BRT -5a /5b /5c Kingston Road (Dixie Rd . to Bainbridge Dr.)
01 Capital
504600 Capital Sidewalks
504620 Capital Streetlights
BRT-5a/5b/5c -Kingston Road -Dixie Road to Bainbridge Drive . New
Sidewalk, Cycle Track and Streetlight Installation . Durham Stage 1 (both
sides) 2022-2025 .
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10575 .2301 BRT-5a/5b/5c Kingston Road (Dixie Rd. to Bainbridge Dr.)
C10575.2302 RP-4b Finch Avenue -Road Reconstruction
01 Capital
504400 Capital Roads
138
Run Date : Aug 9, 2023
Funding Expense
204,970
1,804,730
(502,425)
(1,507,275)
(2,009,700) 2,009,700
400,000
(200,000)
(200,000)
(400,000) 400,000
1,444,000
615,000
(1,029,500)
(1,029,500)
(2,059,000) 2,059,000
500,000
City of Pickering
2023
Approved Capital Budget
10575 Development Projects (DC Funded)
RP-4b Finch Avenue -Road Reconstruction -North side of Finch Ave from
Nature Haven Crescent to approximately 120m to the east (3 lane Road
Reconstruction , Urbanization, incl. storm and sidewalk).
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10575.2302 RP-4b Finch Avenue -Road Reconstruction
C10575.2303 DH,24 Brock Rd. -Sidewalks & Streetlights
01 Capital
504600 Capital Sidewalks
504620 Capital Streetlights
DH-24 Sidewalks & Streetlights -Brock Road(both sides Forbrock St to
Taunton Rd .)
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10575.2303 DH-24 Brock Rd. -Sidewalks & Streetlights
C10575.2307 BRT-3a/b Kingston Road (Steeple Hill to Merritton Rd.)
01 Capital
504600 Capital Sidewalks
BRT-3a/b Kingston Road (Steeple Hill to Merriton Rd.) New Sidewalk, Cycle
Track and Streetlight Installation . Durham Stage 1 (both sides) 2022-2025
504620 Capital Streetlights
80 Funding
408008 Trf fr DC City's Res
408602 Trf fr DC-TrnsprtORF
Total C10575.2307 BRT-3a/b Kingston Road (Steeple Hill to Merritton Rd.)
Total 10575 Development Projects (DC Funded)
139
Run Date : Aug 9, 2023
Funding Expense
(125,000)
(375,000)
(500,000) 500,000
48,000
48,000
(48,000)
(48,000)
(96,000) 96,000
626,000
195,000
(410,500)
(410,500)
(821,000) 821,000
(5,885,700) 5,885,700
Finance Dept
Expenditures
City of P ickering
2023
Approved Capital Budget Summary
502720 System&Sftwr Upgrade
Total Expenditures
Financing
408007 Trf fr RateStblz Res
408900 Property Tax Funded
Total Financing
146
Run Date : Aug !;J, 2023
2022 2023
Approved Approved
Budget Budget
-550,000
-550,000
-(475 ,000)
-(75,000)
-(550,000)
Finance
Expenditures
C ity of P icke rin g
2023
Approved Capital Budget Summary
502720 System&Sftwr Upgrade
Total Expenditures
Financing
408007 Trf fr RateStblz Res
408900 Property Tax Funded
Total Financing
147
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-550,000
-550,000
-(475,000)
-(75,000)
-(550,000)
10600 Finance
City of Pickering
2023
Approved Capital Budget
C10600.2301 SAP Fleet Management
90 Expense
502720 System&Sftwr Upgrade
Fleet Management: Development in SAP system to manage the City's fleet
operations and to be able to report on overall total cost of ownership for all
City vehicles . SAP to collect costs from work orders and consider the
overhead, labour and spare parts to arrive at the total vehicle ownership
costs . SAP to also consider the depreciation and useful life of vehicles to
obtain relevant KPls to help determine the optimal time to replace vehicles.
80 Funding
408007 Trf fr RateStblz Res
Total C10600.2301 SAP Fleet Management
C10600.2302 Budgeting & Forecasting Software Enhancements
90 Expense
502720 System&Sftwr Upgrade
To investigate and implement budget software reporting add-ons or
enhancements to improve the presentation of the City's annual current and
capital budgets. Also, to investigate and implement forecasting software to
support the City's budget decision making.
80 Funding
408900 Property Tax Funded
Total C10600.2302 Budgeting & Forecasting Software Enhancements
Total 10600 Finance
148
Run Date: Aug 9, 2023
Funding Expense
475 ,000
(475,000)
(475,000) 475,000
75,000
(75,000)
(75,000) 75,000
(550,000) 550,000
Fire Services Dept
Expenditures
504000 Capital Land
504001 Capital Consulting
504100 Capital Buildings
City of Pickering
2023
Approved Capital Budget Summary
504200 Capital Machinery & Equipment
504300 Capital Vehicles
504550 Capital Storm System
504800 Cap Information Tech
504950 Cap Furniture&Fix
Total Expenditures
Financing
406601 Misc. Sale of Land
406701 DebtFinancing-5-Year
406702 DebtFinancing-1 0Year
406713 Internal Loan -5Year
408007 Trf fr RateStblz Res
408008 Trf fr DC City's Res
408016 Trf fr VhcleRplc Res
408032 Trf fr Major Equip R
408037 Trf fr Casino Res
408038 Trf fr Public ArtRes
408601 Trf fr DC-ProtectORF
408705 Trf fr OPs Cntr RF
408900 Property Tax Funded
Total Financing
149
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-4,850 ,000
-30 ,000
628 ,500 394,000
334,000 900,000
200,000 -
636 ,290 -
30,000 -
42,500 -
1,871,290 6,174,000
-(3,500,000)
(371,000) -
-(526,700)
-(850 ,000)
(370,000) -
(190 ,887) -
(200,000) -
-(203,000)
-(221,000)
(95,000) -
(614,403) -
-(823,300)
(30,000) (50,000)
(1,871,290) (6,174,000)
Fire Protection
Expenditures
504000 Capital Land
504001 Capital Consulting
504100 Capital Buildings
City of Pickering
2023
Approved Capital Budget Summary
504200 Capital Machinery & Equipment
504300 Capital Vehicles
504550 Capital Storm System
504800 Cap Information Tech
504950 Cap Furniture&Fix
Total Expenditures
Financing
406601 Misc. Sale of Land
406701 DebtFinancing-5-Year
406702 DebtFinancing-1 0Year
406713 Internal Loan-5Year
408007 Trf fr RateStblz Res
408008 Trf fr DC City's Res
408016 Trf fr VhcleRplc Res
408032 Trf fr Major Equip R
408037 Trf fr Casino Res
408038 Trf fr Public ArtRes
408601 Trf fr DC-ProtectORF
408705 Trf fr OPs Cntr RF
408900 Property Tax Funded
Total Financing
Abbreviations
Run Date: Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-4,850,000
-30,000
628,500 394,000
334,000 900,000
200,000 -
636,290 -
30,000 -
42,500 -
1,871,290 6,174,000
-(3,500,000)
(371,000) -
-(526,700)
-(850,000)
(370,000) -
(190,887) -
(200,000) -
-(203,000)
-(221,000)
(95,000) -
(614,403) -
-(823,300)
(30,000) (50,000)
(1,871,290) (6,174,000)
FS#1
FS#2
FS#5
FS#6
Fire Station #1, New Fire Station & HQ (Seaton) 1700 Zents Drive
Fire Station #2, 553 Kingston Road
Fire Station #5, 1616 Bayly Street
Fire Station #6, 1115 Finch Avenue
150
City of Pickering
2023 Approved Capital Budget
Project Listing
Project Name
10700 Fire Protection
C10700.1809 FS #2 Renovation
C10700.2109 FS #6 Generator Replacement
C10700.2301 FS #2 Lower Roof Replacement
C10700.2302 FS #5 Exterior Security Camera System
C10700.2303 Portable Radio Replacement
C10700.2304 FS #1 Fitness Equipment
C10700.2305 Seaton Fire Station B Land Purchase
C10700.2306 Dispatch CAD Replacement
C10700.2308 FS #5 Land Purchase
C10700.2310 FS #6 Kitchen Retrofit
C10700.2313 FS #2 Exterior Security Camera System
C10700.2314 FS #6 Exterior Security Camera System
Total 10700 Fire Protection
151
Run Date: Aug 9, 2023
2023
Project
Budget
25,000
203,000
30,000
22,000
500,000
50,000
1,350,000
350,000
3,500,000
100,000
22,000
22,000
6,174,000
City of Pickering
2023
Approved Capital Budget
10700 Fire Protection
C10700 .1809 FS #2 Renovation
01 Capital
504100 Capital Buildings
Additional funds for Hope's Cradle Safe Infant Surrender Syste m installation
and associated costs at Fire Hall No . 2 . Initi ative to support mothers in c ris is
and save infants from unsafe abandonment.
80 Funding
408037 Trf fr Casino Res
Total C10700.1809 FS #2 Renovation
C 10700.210 9 FS #6 Generato r Repla cem e nt
01 Capital
504100 Capital Buildings
Lifecycle re placement of existing generator. Original unit install ed in 1993.
80 Funding
408032 Trf fr Major Equip R
Total C10700 .2109 FS #6 Generator Replacement
C10700 .2301 FS #2 Lower Roof Replacement
01 Capital
504001 Capital Consulting
Investigation and des ign costs to determine options to extend the life of the
existing lowe r roof, or if it requires complete replacement.
80 Funding
408037 Trf fr Casino Res
Total C10700.2301 FS #2 Lower Roof Replacement
C10700 .2302 FS #5 Exterior Security Camera System
01 Capital
504100 Capital Buildings
New camera systems to allow for video monitoring of building exterior.
80 Funding
408037 Trf fr Casino Res
Total C10700.2302 FS #5 Exterior Security Camera System
C10700.2303 Portable Radio Replacement
01 Capital
504200 Capital Machinery & Equipment
Lifecycle replacement of portable radios . Replacement includes portabl e
radios , batte ries, lapel mies, vehi c le chargers , de sktop charg e rs (pre-budget
approval, Resolution #51/2 3).
80 Funding
152
Run Date: Aug 9, 2023
Funding Expense
25,000
(25,000)
(25,000) 25,000
203,000
(203,000)
(203,000) 203,000
30 ,000
(30,000)
(30,000) 30,000
22,000
(22 ,000)
(22,000) 22,000
500,000
City o f P i ckering
2023
Approved Capital Budget
10700 Fire Protection
406713 Internal Loan-5Year
Total C10700.2303 Portable Radio Replacement
C10700 .2304 FS #1 Fitness Equipment
01 Capital
504200 Capital Machinery & Equipment
Fitness equipment for new fire station #1 (Zents).
80 Funding
408900 Property Tax Funded
Total C10700.2304 FS #1 Fitness Equipment
C 10700.23 05 Seaton Fire St ation B Land Purc ha se
01 Capital
504000 Capital Land
Seaton Fire Station B and Northern Satellite Operations facility land
purchase.
80 Funding
406702 DebtFinancing -1 0Year
408705 Trf fr OPs Cntr RF
Total C10700.2305 Seaton Fire Station 8 Land Purchase
C10700 .2306 Di s patc h CAD Re pla cement
01 Capital
504200 Capital Machinery & Equipment
Dispatch CAD Replacement.
80 Funding
406713 Internal Loan-5Year
Total C10700.2306 Dispatch CAD Replacement
C10700.230 8 FS #5 Land Purchase
01 Capital
504000 Capital Land
Land purchase for the relocation of Fire Station #5 .
80 Funding
406601 Misc. Sale of Land
Total C10700.2308 FS #5 Land Purchase
C10700 .2310 FS #6 Kitchen Retrofit
01 Capital
504100 Capital Buildings
Construction costs for lifecycle replacement of the existing kitchen at Fire
Station #6 . The existing millwork is original , installed in 1993 .
80 Funding
153
Run Date: Aug 9, 2023
Funding Expense
(500,000)
(500 ,000) 500,000
50,000
(50,000)
(50,000) 50,000
1,350,000
(526,700)
(823,300)
(1,350 ,000) 1,350,000
350,000
(350 ,000)
(350,000) 350,000
3,500 ,000
(3,500,000)
(3,500,000) 3,500,000
100,000
10700 Fire Protection
408037 Trf fr Casino Res
City of Pickering
2023
Approved Capital Budget
Total C10700.2310 FS #6 Kitchen Retrofit
C10700 .2313 FS #2 Exterior Security Camera System
01 Capital
504100 Capital Buildings
New camera systems to allow for video monitoring of building exterior.
80 Funding
408037 Trf fr Casino Res
Total C10700.2313 FS #2 Exterior Security Camera System
C 10700 .2314 FS #6 Exterior Se c urity Cam era System
01 Capital
504100 Capital Buildings
New camera systems to allow for video monitoring of building exterior.
80 Funding
408037 Trf fr Casino Res
Total C10700.2314 FS #6 Exterior Security Camera System
Total 10700 Fire Protection
154
Run Date : Aug 9, 2023
Funding Expense
(100,000)
(100,000) 100,000
22,000
(22,000)
(22 ,000) 22,000
22,000
(22,000)
(22,000) 22,000
(6 ,174,000) 6,174,000
Library
Expenditures
504001 Capital Consulting
504100 Capital Buildings
504800 Cap Information Tech
504900 Cap Library Coll Mat
504950 Cap Furniture&Fix
Total Expenditures
Financing
402510 Ontario Grants
408007 Trf fr RateStblz Res
408036 Trf fr Libr Bldg Res
408900 Property Tax Funded
Total Financing
City of Pickering
2023
Approved Capital Budget Summary
155
Run Date : Aug 9, 2023
2022 2023
Approved Approved
Budget Budget
-110,000
90,000 133,000
37,000 20,000
295,000 290,000
35,000 50,000
457,000 603,000
(60 ,000) -
-(110 ,000)
-(110,000)
(397,000) (383,000)
(457,000) (603,000)
Project Name
10900 Library
City of Pickering
2023 Approved Capital Budget
Project Listing
C10900.2205 Improvements to Claremont Library Public Service Space
C10900.2209 Create Virtual Programming space at Central Library
C10900.2301 Collection Materials
C10900.2302 PCL Computers Replacement
C10900.2303 GAL Renovation
C 10900.2305 Central Library Lobby Retrofit
C10900.2307 Public Telework at the Library spaces -George Ashe
Total 10900 Library
156
Run Date: Aug 9, 2023
2023
Project
Budget
20,000
23,000
290,000
20,000
110,000
110,000
30,000
603,000
City of Pickering
2023
Approved Capital Budget
10900 Library
Design and related costs for renovations to George Ashe Library, including
circulation counter modifications, replacement of book stacks, modifications
to quiet room and children's areas. GAL originally opened in 2001.
Community Centre share of project costs and funding is listed separately in
cost centre 10220.
80 Funding
408036 Trf fr Libr Bldg Res
Total C10900.2303 GAL Renovation
C10900.2305 Central Library Lobby Retrofit
01 Capital
504100 Capital Buildings
Renovation of the main lobby area at the Central Library to reconfigure and
remove existing service counter and install flexible service point. Also
improve traffic flow through the space . Includes furniture, fixture and
equipment costs .
80 Funding
408007 Trf fr RateStblz Res
Total C10900.2305 Central Library Lobby Retrofit
C10900.2307 Public Telework at the Library spaces -George As he
01 Capital
504950 Cap Furniture&Fix
Work pods for clients to .use for online meetings . Soundproof, with
connectivity/power -includes furniture.
80 Funding
408900 Property Tax Funded
Total C10900.2307 Public Telework at the Library spaces -George Ashe
Tot al 10900 Library
158
Run Date : Aug 9, 2023
Funding Expense
(110,000)
(110,000) 110,000
110,000
(110,000)
(110,000) 110,000
30,000
(30,000)
(30,000) 30,000
(603,000) 603,000