HomeMy WebLinkAboutOctober 14, 2020Present
Tom Copeland -Vice-Chair
David Johnson -Chair
Eric Newton
Denise Rundle
Sean Wiley
Also Present
Deborah Wylie, Secretary-Treasurer
Lesley Dunne, Assistant Secretary-Treasurer
Isabel Lima, Planner I
1. Disclosure of Interest
No disclosures of interest were noted.
2. Adoption of Agenda
Moved by Eric Newton
Seconded by Denise Rundle
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
That the agenda for the Wednesday, October 14, 2020 meeting be adopted.
3. Adoption of Minutes
Moved by Eric Newton
Seconded by Denise Rundle
Carried Unanimously
That the minutes of the 7th meeting of the Committee of Adjustment held Wednesday,
September 9, 2020 be adopted.
Carried Unanimously
Page 1 of 8
-C1°f-
p](KER]NG
4. Reports
4.1 PICA 57 /20
J P & R 10 Development Inc.
1604 Sandhurst Crescent
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
The applicant requests relief from Zoning By-law 3036, as amended by By-law 4058/92,
to permit a minimum north side yard width of 1.1 metres, whereas the By-law requires a
minimum side yard width of 1.2 metres.
The applicant requests approval of this variance in order to recognize a deficient side
yard width.
The Secretary-Treasurer outlined the staff recommendation from the City Development
Department recommending approval subject to a condition.
Written comments were received from the City's Building Services Section expressing
no concerns with the application.
Written comments were received from the City's Engineering Services Department
expressing no comments on the application.
Written comments were received from the Toronto and Region Conservation Authority
(TRCA) expressing TRCA staff have reviewed the requested variances and can confirm
they have no impact on TRCA's policies and programs. As such, they have no
objections to the approval. TRCA also expressed that TRCA staff previously issued a
permit for the construction of a two-storey dwelling with minor grading to the rear on
October 18, 2018. The drawings circulated to TRCA as part of this minor variance
application are not consistent with the plans approved with the TRCA permit application
(CFN 60300). It is our understanding the revised plans include a reduced north side
yard setback to 1.1 metres. TRCA has reviewed the revised plans and have no
objections to the proposal in principle. TRCA will not require a permit revision for the
reduced side yard setback as these changes are minor in nature.
Elena Latcheva, agent, was present to represent the application. Robin Thompson of
1594 Sandhurst Crescent was present in objection to the application.
Elena Latcheva outlined an error was made during the construction of the foundation. In
response to a question from a Committee Member, Elena Latcheva indicated the homes
are still under construction and that they are owned by the developer.
Robin Thompson expressed concerns with the variance infringes on her rights and
TRCA lands, the homes are close together and on an angle; loss of privacy and
explained the history of the subject property. In response to questions from Committee
Members, Robin Thompson indicated she lives 3 houses south from the subject
property and commented that even though the variance request is small they are still
requesting more space.
Page 2 of 8
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
After hearing the neighbour's concerns, considers the proposed side yard width is minor
in nature, and recognizing there are no objections from TRCA, Sean Wiley moved the
following motion:
Moved by Sean Wiley
Seconded by Tom Copeland
That application PICA 57120 by J P & R 10 Development Inc., be Approved on the
grounds that the requested variance is minor in nature, desirable for the appropriate
development of the land, and in keeping with the general intent and purpose of the
Official Plan and the Zoning By-law, subject to the following condition:
1. That this variance apply only to the existing dwelling on the subject site, as generally
sited and outlined on the applicant's submitted plan (refer to Exhibit 2 contained in
the staff report to the Committee of Adjustment, dated October 14, 2020).
4.2 PICA 58120
C. Fiorino-Vieira
301 Fiddlers Court
Carried Unanimously
The applicant requests relief from Zoning By-law 3036, as amended, to permit an
uncovered platform (deck) not exceeding 1.1 metres in height above grade, whereas
the By-law requires uncovered steps and platforms not exceeding 1.0 metre in height
above grade and to not project more than 1.5 metres into any required front or rear yard
and not more than 0.5 metres into any required side yard.
The applicant requests approval of this variance in order to recognize an existing
uncovered deck. ·
The Secretary-Treasurer outlined the staff recommendation from the City Development
Department recommending approval subject to a condition.
Written comments were received from the City's Building Services Section expressing
no concerns with the application.
Written comments were received from the City's Engineering Services Department
expressing no comments on the application.
Carmela Fiorino-Vieira, applicant, was present to represent the application. No further
representation was present in favour of or in objection to the application.
Page 3 of 8
Pl
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
In response to a question from a Committee Member, Carmela Fiorino-Vieira indicated
they are the original purchaser and she also indicated this should have been addressed
by the builder.
After considering the City Development's report and that the application appears to
meet the four tests of the Planning Act, Tom Copeland moved the following motion:
Moved by Tom Copeland
Seconded by Eric Newton
That application PICA 58120 by C. Fiorino-Vieira, be Approved on the grounds that the
requested variance is minor in nature, desirable for the appropriate development of the
land, and in keeping with the general intent and purpose of the Official Plan and the
Zoning By-law, subject to the following condition:
1. That this variance apply only to the existing uncovered deck, as generally sited and
outlined on the applicant's submitted plan (refer to Exhibit 2 contained in the staff
report to the Committee of Adjustment, dated October 14, 2020).
Carried Unanimously
4.3 PICA 59120
A. Turney
660 Pleasant Street
The applicant requests relief from Zoning By-law 2511, as amended by By-law 7610118,
to permit:
• a minimum front yard setback of 4.0 metres, whereas the By-law requires a
minimum front yard setback of 7.5 metres;
• a minimum rear yard setback of 0.9 metres, whereas the By-law requires a minimum
rear yard setback of 7.5 metres;
• a minimum north side yard setback of 1.4 metres, whereas the By-law requires a
minimum side yard setback of 1.5 metres;
• a maximum lot coverage of 38.1 percent, whereas the By-law permits a maximum lot
coverage of 33 percent;
• a covered platform (proposed front porch) not projecting more than 4.9 metres into
the required front yard, whereas the By-law permits uncovered steps or platforms
not exceeding 1.0 metre in height above grade and not projecting more than
1.5 metres into any required front yard, not 1.0 metre into any required side yard;
Page 4 of 8
-C~of-
p](KER]NG
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
• a covered platform (existing rear second-storey deck) not exceeding 3.6 metres in
height above grade, whereas the By-law permits uncovered steps or platforms not
exceeding 1.0 metre in height above grade and not projecting more than 1.5 metres
into any required front yard, not 1.0 metre into any required side yard;
• an existing accessory structure (shed) greater than 10 square metres in area to be
setback a minimum of 0.6 metres from the rear lot line, whereas the By-law permits
accessory structures greater than 10 square metres in area to be setback a
minimum of 1.0 metres from all lot lines.
The applicant requests approval of these variances in order to recognize an existing
two-storey dwelling, an existing attached garage, an existing rear ground floor covered
deck, an existing rear second-storey covered deck, and an existing shed; and to obtain
a building permit for a two-storey addition to a dwelling and front covered porch.
The Secretary-Treasurer outlined the staff recommendation from the City Development
Department recommending approval subject to a condition.
Written comments were received from the City's Building Services Section expressing
no concerns with the application.
Written comments were received from the City's Engineering Services Department
expressing the shed to be relocated to a minimum of 0.6 metres from all lot lines. The
roof area is being increased substantially therefore creating additional volume of
precipitation drainage. Applicant is to propose Low Impact Development Features with
the building permit application in order to reduce runoff volume. Rain Gardens or Rain
Barrels and Soakaway Pits are options to consider. Applicant is to provide a grading
plan with the building permit which shows the existing drainage patterns on the property
so that Development Services can assess the potential impact to surrounding properties
due to the increased lot coverage and increased roof area. Also, the discharge locations
of all rainwater leaders are to be shown on the grading plan. Existing Armourstone
driveway edging is to be removed from within the City's boulevard. As per the Boulevard
Maintenance By-law 6831/08, no rocks, bricks, concrete slabs or anything protruding,
sharp or dangerous is permitted on a boulevard.
Peter Barton, Avtech Designs, agent, was present to represent the application. No
further representation was present in favour of or in objection to the application.
Peter Barton explained 5 of the 7 variances being requested are existing conditions that
need to be brought into conformity. Peter Barton outlined the proposed two-storey will
be built up and will not affect the front and side lot lines. In response to questions from
Committee Members, Peter Barton indicated no problems with relocating the shed to a
0.6 of a metre setback and that they are aware of the Engineering Services comments
and will comply.
Page 5 of 8
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
Given the applicant has agreed to comply with the Engineering Services comments as
outlined the City Development department's staff report and that the application appears
to meet the four tests of the Planning Act, Denise Rundle moved the following motion:
Moved by Denise Rundle
Seconded by Tom Copeland
That application PICA 59120 by A. Turney, be Approved on the grounds that the
requested variances are minor in nature, desirable for the appropriate development of
the land, and in keeping with the general intent and purpose of the Official Plan and the
Zoning By-law, subject to the following conditions:
1. That these variances apply only to the proposed two-storey detached dwelling and
accessory structure (shed), as generally sited and outlined on the applicant's
submitted plans (refer to Exhibits 2, 3, 4, 5, 6 & 7 contained in the staff report to
the Committee of Adjustment, dated October 14, 2020).
4.4 PICA 60120
B. & K. Ragoo
958 Mink Street
Carried Unanimously
The applicant requests relief from Zoning By-law 2520, as amended, to permit:
• a minimum rear yard of 5.2 metres, whereas the By-law requires a minimum rear
yard of 7.5 metres;
• a maximum lot coverage of 40 percent, whereas the By-law permits a maximum lot
coverage of 33 percent;
• an uncovered platform (rear ground floor deck) not exceeding 1.25 metres in height
above grade, whereas the By-law permits uncovered steps or platforms not
exceeding 1.0 metre in height above grade and not projecting more than 1.5 metres
into any required front yard, nor 1.0 metre into any required side yard;
• a covered platform (front second-storey balcony) not exceeding 4.3 metres in height
above grade and not projecting more than 2.2 metres into the required front yard,
whereas the By-law permits uncovered steps or platforms not exceeding 1.0 metre
in height above grade and not projecting more than 1.5 metres into any required
front yard, nor 1.0 metre into any required side yard;
• a covered platform (front ground floor porch) not projecting more than 2.9 metres
into the required front yard, whereas the By-law permits uncovered steps or platforms
not exceeding 1.0 metre in height above grade and not projecting more than
1.5 metres into any required front yard, nor 1.0 metre into any required side yard.
Page 6 of 8
-C~6f-
p](KER1NG
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
The applicant requests approval of these variances in order to obtain a building permit
for a second-storey addition to a detached dwelling with an additional dwelling unit in
the basement, including the addition of an attached private garage, basement walkout,
rear ground floor uncovered deck, front second-storey covered balcony and front
ground floor covered porch.
The Secretary-Treasurer outlined the staff recommendation from the City Development
Department recommending approval subject to a condition.
Written comments were received from the City's Building Services Section expressing
no concerns with the application.
Written comments were received from the City's Engineering Services Department
expressing the roof area is being increased substantially, therefore creating additional
volume of precipitation drainage. Applicant is to propose Low Impact Development
Features with the building permit application in order to reduce runoff volume. Rain
Gardens or Rain Barrels and Soakaway Pits are options to consider. Applicant is to
provide a grading plan with the building permit which shows the existing drainage
patterns on the property so that Development Services can assess the potential impact
to surrounding properties due to the increased lot coverage and increased roof area.
Also, the discharge locations of all rainwater leaders are to be shown on the grading
plan.
Written comments were received in objection to the application expressing several
concerns that outlined the proposed plan does not align with the character of the
surrounding neighbourhood; will be monstrous and provide shadows on the street and
surrounding bungalows. Comments also questioned whether the recently passed infill
and replacement guidelines were reviewed; the height of the proposed construction and
will the accessory dwelling unit be made into a legal rental unit.
Written comments were received from the owners of 960 Mink Street in support of the
application.
Glenn Rubinoff, agent, was present to represent the application. No further representation
was present in favour of or in objection to the application.
Glen Rubinoff outlined that the attached garage will provide additional living space, the
front porch is in keeping with the character of the surrounding neighbourhood, that he
and his client are aware of the comments received in support and in objection to the
application; and that the variances are minor. In response to questions from Committee
Members, Glen Rubinoff is aware of the comments received from the City's Engineering
Services.
Page 7 of 8
-C~6f-
p](KER]NG
Committee of Adjustment
Meeting Minutes
Wednesday, October 14, 2020
7:00 pm
Electrontic Meeting
After considering the City Development Department's report, noting that the applicant is
providing the required number of parking spaces, and that the application appears to
meet the four tests of the Planning Act, Denise Rundle moved the following motion:
Moved by Denise Rundle
Seconded by Sean Wiley
That application PICA 60/20 by B. & K. Ragoo, be Approved on the grounds that the
requested variances are minor in nature, desirable for the appropriate development of
the land, and in keeping with the general intent and purpose of the Official Plan and the
Zoning By-law, subject to the following conditions:
1. That these variances apply only to the proposed two-storey detached dwelling, as
generally sited and outlined on the applicant's submitted plans (refer to Exhibits 2,
3, 4, 5 & 6 contained in the staff report to the Committee of Adjustment, dated
October 14, 2020).
Carried Unanimously
5. Adjournment
Moved by Eric Newton
Seconded by Sean Wiley
That the 8th meeting of the 2020 Committee of Adjustment be adjourned at 7:33 pm
and the next meeting of the Committee of Adjustment be held on Wednesday,
November 11, 2020.
Carried Unanimously
November 11 , 2020
Date
Chair
Assistant Secretary-Treasurer
Page 8 of 8