HomeMy WebLinkAboutENG 12-20 Report to
Executive Committee
Report Number: ENG 12-20
Date: November 2, 2020
From: Richard Holborn
Director, Engineering Services
Subject: Beachfront Park Rehabilitation & Needs Assessment
- Work Plan Status Report
- File: A-1440
Recommendation:
1. That Report ENG 12-20 regarding a Work Plan Status Report for Beachfront Park, as a
follow-up to Report ENG 13-19 and in response to Resolutions #196/19 & 197/19, be
received for information; and,
2. That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this report.
Executive Summary: The City of Pickering has retained The MBTW Group and Shoreplan
Engineering to complete the Beachfront Park Rehabilitation & Needs Assessment Study. The
study will consider the future population growth and pressures for increased use and programming
of waterfront parkland, keeping in mind increased lake water levels and wave action that has
caused significant damage to the waterfront area. Concept plans are being developed in
consultation with City and Toronto and Region Conservation Authority (TRCA) staff. Refined
concept plans will be available for public engagement and comment upon completion of this study.
Financial Implications: Funds for the preparation of a Waterfront Park Needs Assessment
were approved by Council as part of the Engineering Services 2019 Current Budget. Funds to
complete the public engagement process will be requested in the 2021 Current Budget. Funds for
the preparation of detailed design drawings and construction will be included in the 2022 and
future years Capital Budgets for Council consideration.
Discussion: With the projected population growth of Pickering, through downtown
intensification and the development of Seaton, there will be more pressure for public access to the
Pickering waterfront. As such, the requirement for a Waterfront Park Needs Assessment was
identified in the 2017 Development Charges Study.
With the extremely high lake water levels and wave action of 2017 and 2019, much of Pickering’s
waterfront sustained significant damage. The boardwalk in Beachfront Park, which formed part of
the Waterfront Trail, was damaged beyond repair and was removed by City Public Works staff in
spring 2020.
-C~()f-
p](KERJNG
ENG 12-20 November 2, 2020
Subject: Beachfront Park Rehabilitation & Needs Assessment
Work Plan Status Report Page 2
The MBTW Group in association with Shoreplan Engineering were retained in late 2019 to
complete a Beachfront Park Rehabilitation & Needs Assessment Study. The study area extends
from the west end of Alex Robertson Park to the Frenchman’s Bay harbour entrance. An updated
bathymetry survey was completed for the beach area, near shore and mid-shore area, to inform a
wave up-rush analysis. Wave modelling and up-rush calculations were completed along the
shoreline, to determine the maximum height and effects of the wave action, considering the higher
water levels that were experienced in 2017 and 2019.
Initial discussions regarding existing and projected park uses with Community Services, City
Development and Engineering Services staff led to the development of several concept plans.
Both passive and more active waterfront park features are currently being considered. The
reconstruction of the boardwalk to re-establish the Waterfront Trail connection through Beachfront
Park is one of the key elements for all concept plans. Consideration is also being made for the
relocation and enhancement of the washroom facilities to service this section of the Pickering
waterfront.
TRCA attended a site meeting to view the study area’s existing conditions and to provide
preliminary comments on the concept plans. The consulting team and City staff are currently
working with TRCA to develop plans that will be functional, environmentally sensitive to the
beachfront area the adjacent Provincially Significant Wetlands of Frenchman’s Bay and the Hydro
Marsh, as well as, be resilient to future high water levels, erosion and wave action. The intent is
that the refined concept plans will receive acceptance in principle from TRCA staff as the approval
agency and landowners of the east spit. Being that Ontario Power Generation (OPG) are the
landowners for Beachfront Park (east of Liverpool Road), staff will be consulting with them as well,
to obtain their endorsement.
The deliverables for this Beachfront Park Rehabilitation & Needs Assessment will include concept
plans for both the passive and more active options. Upon completion of these plans, staff will
review the plans with Council and organize a public consultation process. Funds to undertake this
public engagement/consultation will be requested in the 2021 Current Budget.
Funds required for the preparation of detailed designs, cost estimates and other studies that may
be required to obtain approval from TRCA, the Ministry of Natural Resources and Forestry
(MNRF) and other approval agencies will be considered for the 2022 Capital Budget. The first
phase of construction could proceed as early as fall 2022, pending approval of funding through the
budget process.
Attachments:
1. Report to Council, ENG 13-19 dated December 16, 2019
2. Council Resolutions # 196/19 & 197/19
3. Location map
ENG 12-20 Subject: Beachfront Park Rehabilitation & Needs Assessment November 2, 2020 Page 3 Prepared By: Arnold Mostert, OALA Senior Coordinator, Landscape & Parks Development AM:mjh Recommended for the consideration of Pickering City Council Marisa Carpino, M.A. Interim Chief Administrative Officer Approved/Endorsed By: ~~~ Richard Holborn, P.Eng. Director, Engineering Services
C�{)/PJ(KERJNG
From:
Subject:
Richard Holborn
Director, Engineering Services
Beachfront Park Work Plan
-File: A-1440
Recommendation:
Report to
Council
Report Number: ENG 13-19
Date: December 16, 2019
1.That Report ENG 13-19 regarding an update on the proposed work plan for the re-creation
of Beachfront Park in response to Resolution #99/19 (Notice of Motion from May 27, 2019),
be received for information;
2.That the appropriate officials of the City of Pickering be authorized to take the necessary
actions as indicated in this report.
Executive Summary:
requesting staff to:
On May 27, 2019, Pickering City Council passed Resolution #99/19
•Report back to Council prior to the December 16, 2019 Council meeting on a work plan that
will include:
o a process to engage subject experts, residents, and community partners to begin
discussions in 2020 on the re-creation of a new park plan; and
o possible sources of funding including gas tax revenues, grants associated with the carbon
tax and other environmental incentives offered by the Federal and or Provincial
Government, a funding formula that could draw from a dedicated casino revenue account,
development charges, and other sources that may exist.
•Incorporate funds in the 2020 current budget to hire required resources to assist in the
planning for the Beachfront Park Plan.
To that end, staff have commissioned a Beachfront Park Rehabilitation and Needs Assessment
Study and hired the consulting firm of MBTW Group to address the requirements contained within
Resolution #99/19 which is anticipated to be complete by June 2020, using funds that were
approved in the 2019 Current Budget. Staff have also reviewed the existing conditions of
Beachfront Park and have recommended the removal of built features, including the boardwalk
that are located along the barrier beach, due to their unsafe conditions and have suggested a
temporary re-routing of the Waterfront Trail.
Attachment #1 to Report #ENG 12-20
ENG 13-19
Subject: Beachfront Park Work Plan
December 16, 2019
Page 2
Financial Implications: A budget of $100,000 was approved in the 2019 Current Budget, for
the preparation of a Waterfront Park Needs Assessment study. Staff have recently retained the
consulting firm of MBTW Group with the assistance of Shoreplan Engineering to prepare this
study, including looking at requirements for park rehabilitation due to the shoreline damage
experienced from the high water levels and high wind and wave action. The Beachfront Park
Rehabilitation & Needs Assessment Study will include the preparation of cost estimates for the
proposed works, for Council consideration in future years budgets.
Discussion: On May 27, 2019, Pickering City Council passed Resolution #99/19
(Attachment 1) for staff to prepare a work plan, to engage subject experts, residents and
community partners to begin discussions on the re-creation of a new plan for Beachfront Park and
to investigate funding sources to implement the project.
As outlined in Memo CAO 55-19 (Attachment 2), due to the high water levels experienced in 2017
and 2019, compounded by high winds and waves, Beachfront Park has sustained substantial
damage. The type of damage sustained is common to municipalities along the Lake Ontario
shoreline. The playground structure, swings and volleyball courts were removed earlier this year
due to their unsafe conditions. Staff have recommended the removal of the boardwalk, from east
of the splash pad to Alex Robertson Park as it is in a state of disrepair and is unsafe for public
use. The area has been fenced off from public access and Public Works staff intend on performing
the removals over the winter months as the time and resources permit between winter control
events. The Waterfront Trail will be temporarily re-routed and signed (from the east) through Alex
Robertson Park, north on Sandy Beach Road, west on Parkham Crescent and Colmar Avenue,
through the midblock walkway to Annland Street, south and west on Annland Streets to Liverpool
Road, as shown in Attachment 2.
Engineering Services have also retained a consulting team to prepare the Beachfront Park
Rehabilitation & Needs Assessment Study. The MBTW Group and Shoreplan Engineering, who
were the consultants for the Rotary Frenchman's Bay West Park Master Plan update and first
phase of construction, will be working with City of Pickering and Toronto and Region Conservation
Authority (TRCA) staff to determine the best approach for park repairs and rehabilitation with
consideration for the potential of increased public use of the park due to population growth.
The park's existing conditions will be reviewed and a land survey and bathymetric survey of near
shore and mid shore in-water soundings will be taken, to provide accurate and current data of the
beach conditions. This data will provide the basis for the modelling of nearshore wave
transformations and wave run up analysis at the presently designated datum high water level and
projected "overload" level for the increased water levels that we experienced in 2017 and 2019.
Options for the reconstruction and/or re-routing of the Waterfront Trail will be investigated. Design
solutions for other park amenities will be recommended to address the anticipated shift in the
intensity of park use in response to population growth. The design will need to address both
current and future park level of service expectations as well as provisions for inclusive and barrier
free design.
ENG 13-19
Subject: Beachfront Park Work Plan
December 16, 2019
Page 3
Stakeholder consultation meetings will be held with City staff from the Engineering Services
Department and Community Services Department ,as well as TRCA and Ontario Power
Generation (OPG) as landowners and approval agencies. Based on input from the stakeholder
groups, a preferred solution will be prepared along with associated costing. The material prepared
will be suitable to engage residents and community partners for review and input and will form a
good basis to take this project into detailed design and consideration for future year budgeting
purposes.
Attachments.
1.Council Resolution #99/19
2.CAO 55-19 Memorandum dated November 26, 2019
3.Location Map
Prepared By: Approved/Endorsed By:
Arnold Mostert
Sr. Coordinator, Landscape & Parks Development
Sco"?i��i�
Manager, Capital Projects & Infrastructure
AM:mjh
Recommended for the considerati on
of Pickering C�
'f2a., l°i U>F/
Tony Prevedel, P.Eng.
Chief Administrative Officer
May 30, 2019
To:
From:
Subject:
Legislative Services Division
Clerk's Office
Directive Memorandum
Richard Holborn
Director, Engineering Services
Susan Cassel
City Clerk
Attachment #1 to Report # ENG 13-19
Direction as per Minutes of the Meeting of City Council
held on May 27, 2019
Notice of Motion
Re-Creation of the Beachfront Park
Council Decision Resolution #99/19
Whereas in 1997, the City of Pickering adopted the Waterfront 2001 Interim Task Force
report;
Whereas the Task Force report was the foundation leading to the construction of the
Beachfront Park to serve as a link to the Great Lakes Waterfront Trail, a Nautical Village
and marine destination, a tourist destination, and a place for families to enjoy one of
Pickering's jewels -"Lake Ontario and Frenchman's Bay";
Whereas for two decades, the Frenchman's Bay east waterfront has grown in popularity
as not only a recreational place, but a place to appreciate Pickering's rich history and
the importance of environmental stewardship;
Whereas in spite of all efforts to maintain our Beachfront Park, the impact of global
warming and climate change has resulted in water levels increasing to record levels,
causing severe flooding and damage to properties across the entire Lake Ontario
shoreline;
Whereas the frequency of storms and winds off the lake has become the norm resulting
in many of the amenities that were built on the shoreline of Lake Ontario, including the
Beachfront Park to be damaged to the point that many can no longer be restored;
And whereas the Council for the Corporation of the City of Pickering and its residents
deem the re-creation of a new Beachfront Park as a priority;
Now therefore be it resolved that staff be directed through the direction of the CAO to:
1.Report back to Council prior to the December 16, 2019 Council meeting on a
work plan that will include:
a)A process to engage subject experts, residents, and community partners to
begin discussions in 2020 on the re-creation of a new park plan; and,
b)Possible sources of funding including gas tax revenues, grants associated
with the carbon tax and other environmental incentives offered by the Federal
and or Provincial Government, a funding formula that could draw from a
dedicated casino revenue account, development charges, and other sources
that may exist.
2.Incorporate funds in the 2020 current budget to hire required resources to assist
in the planning for the Beachfront Park Plan.
Please take any action deemed necessary.
Susan Cassel
Copy: Chief Administrative Officer
Director, Community Services
Director, Finance & Treasurer
Cd/l of-p](KER]NG
To:
From:
Copy:
Tony Prevedel
Chief Administrative Officer/)
Marisa Carpino (jJ.
Director, Community Services
Richard Holborn
Director, Engineering Services
Division Head, Operations
Manager, Public Works
Supervisor, Parks Operations
Subject: Beachfront Park
Attachment #2 to Report# ENG 13-19
CAO 55-19 Memo
Office of the CAO No', ember 26, 2019
Received NOV 2 6 2019
File#
Follow Up ' ✓ Mayor City Development ✓Council Corporate Services ✓Directors Clerk
Community Services Legal & LS
Eng. Services Finance
Fire Services Human Resources
Customer Care Economi c Dev.
CAO Mgt Team Public Affairs & Comm.
Damages to the Boardwalk & Rerouting of the Waterfront Trail
File: 0-8110-001-19
As you are aware, Beachfront Park has lost significant shoreline to high water levels, wave energy
and storm erosion over the last five years. The recent high water levels in Lake Ontario, coupled
with more frequent storm events, has severely compromised the City's ability to maintain many of
the amenities alon·g the barr ier beach at Beachfront Park. Already, damage caused by high water
levels and continuing erosion has led to the removal of the beach volleyball courts and the
playground structure. On October 30, 2019, an overnight storm with high winds and significant
storm surge caused significant damage to the boardwalk at Beachfront Park (see Attachment 1)
which must be addressed.
In December 2017, Council received report CS 30-17 Lake Front Water Damage which detailed
the damage and service interruptions at Beachfront Park and Rotary Frenchman's Bay West Park.
As reflected in that report, the water level of Lake Ontario in 2017 was the highest ever recorded.
It was not anticipated that within two years these levels would be surpassed. ·
. In light of the persistent nature of these weather events, and persistent high water levels, it is clear
to staff that the boardwalk cannot be reinstated or maintained in a manner that will withstand
these elements. The barrier beach is regulated by TRCA and designated as a dynamic beach
which precludes more substantial structures that would be needed for a storm-resistant boardwalk
replacement.
As a result, staff are recommending removal of the boardwalk at Beachfront Park (from the east
limit of the splash pad to the connection to A lex Robertson Park). The removal will be completed
over the winter months to allow for regrading and updated signage will be installed well before
spring/summer use in 2020. Since the boardwalk. is part of the Waterfront Trail, staff will establish
an alternate route prior to its removal (see Attachment 2). Signage will be installed to direct
Waterfront Trail users along the new route, and public notifications will be made on the
appropriate web and social media channels.
The 2017 DC Background Study includes a Waterfront Park Needs Assessment study. As such, a
budget of $100,000 (97.5% DC funded) was approved in the 2019 Current Budget. This study will
be commissioned by the Engineering Services Department in late 2019 and will be completed
later in 2020, and will include a full assessment of existing conditions and a review of storm
resilient design for all existing and proposed infrastructure.
Although the 2021-2024 Capital Budget forecast will include the life-cycle replacement of the
Beachfront Park boardwalk as part of the multi-year Beachfront Park Master Plan Implementation,
the Waterfront Park Needs Assessment will determine if this is practical or if an alternate solution
should be developed, which may include a permanent re-routing of the Waterfront Trail
connection. The Waterfront Park Needs Assessment will also determine sustainable and resilient
amenities and infrastructure that can be located at Beachfront Park, moving forward.
�.
ard Holborn, P. Eng.
ctor, Engineering Services
:me
Attachments Photographs of the damaged Beachfront Park Boardwalk
Waterfront Trail Re-route Map
November 26 1 2019
Subject: Beachfront Park
Page 2 of 2
unity Services
Damages to Beachfront Park Boardwalk, October 2019
z 0 .....I
ROAD
COMMERCE
0 !/) 3 w l•I STREET
N w w z Q:'. 0 > u <( .------, •• ��=����.:....:�==---=---=--:::'..----,I�(/) \ ====B=R=O==A=D=V ;'= EW===;.
::: S REET
D
-
STREET
STREET
.....I
0 0 Q_ n::: w > ::J
I u <( w (D
MONTGOMERY
I
� T
-ot,o/Pl(KERING
WATERFRO T
TRAIL SYSTEM
CLOSURE
MAP LEGEND
_ Existing Trail
• __ ■, Trail Closure
W'aterfront
·--• Detour
z
<{
(/}
<(
w
_J
I
:::,
w z
_J
rn
::J
_J
)--
0 z
<{
(/)
0
(Y
0 >-
Engineering Services Department
Frenchman's Bay East - Beachfront Park
L4KE
Attachment #3 to Report# ENG 13-19
ONTARIO
Location Map
-040/-
PJ(KERJNG
Legislative Services Division
Clerk’s Office
Directive Memorandum
December 23, 2019
To: Richard Holborn
Director, Engineering Services
From: Susan Cassel
City Clerk
Subject: Direction as per Minutes of the Meeting of City Council held on
December 16, 2019
Director, Engineering Services, Report ENG 13-19
Beachfront Park Work Plan
Council Decision Resolution #196/19 & 197/19
1.That Report ENG 13-19 regarding an update on the proposed work plan for the
re-creation of Beachfront Park in response to Resolution #99/19 (Notice of
Motion from May 27, 2019), be received for information;
2.That the appropriate officials of the City of Pickering be authorized to take the
necessary actions as indicated in this report; and,
3.That Staff be directed to provide an update, through a report back to Council, on
the status of the Beachfront Park Work Plan, by the end of 2nd Quarter 2020.
Please take any action deemed necessary.
Susan Cassel
Copy: Chief Administrative Officer
Attachment #2 to Report #ENG 12-20
LIVERPOOL ROADANNLAND STREET
WHARF STREET
1:5,000
SCALE:
Engineering Services
Department Beachfront ParkLocation MapOct. 13, 2020 DATE:
q
Frenchman'sBay
Lake Ontario
Attachment #3 to Report #ENG 12-20
-C4,;/-
P1CKER1NG