Loading...
HomeMy WebLinkAboutBy-law 4517/94 THE CORPORATION OF THE TOWN OF pICKERING BY-LAW NO. 4517/94 Being a by-law to amend By-law 1562/82 temporarily closing roads for construction purposes (Glendale Drive, Sheppard Avenue and Fairport Road). WHEREAS, pursuant to the provisions of the predecessor of section 208.43 of the Municipal Act, R.S.O. 1990, chapter M.45, the Council of The Corporation of the Town of Picketing enacted By-law 1562/82, providing for the temporary closing of roads under the jurisdiction of the Town for construction purposes, and it is necessary to amend that By-law in certain respects; NOW THEREFORE, the Council of the Corporation of the Town of Picketing HEREBY ENACTS AS FOLLOWS: 1. Schedule A to By-law 1562/82 is hereby amended by adding thereto Items 172 to 174 both inclusive, set out in Schedule I to this by-law. BY-LAW read a first, second and third time and finally passed this 17th day of October, 1994. ~/l~ruce Taylor, Clerk Lt::G ~L DEPT. Temporary Closure for Construction - Clem,:,le Drive PUBLIC WORKS DEPARTMENT LOCATION MAP TEMPORARY ROAD CLOSURE: Glendale Drive - from Kingston Road, Glenarma Road Road closed from .lune 2'/,'1994 to October 3 I, 1994. CONSTRUCTION DURATION: Approximately 12 weeks· CONSTRUCTION INCLUDES: Installation of Stonm Sewer · On Glendale Drive, belween Kingston Road and Glcnanna Road to facilitate road drainage, servicing to existing homes and fuaue ser.'icing for homes further norlh along the streel lnstallalion of Storm Sewer · On Bronte Square, from Glendale Drive v.'estedy 70 metres, to facilitate road drainat~e and serve as an outfall for Olendale Drive Complete Road Reconstruclion & Widening (excavalion, granular base, asphalt, and cmb/g'atter) · On Glendale Drive between Kingslon Road and Glenarma Road to urbanize the street, and future wideningnorth along the street Road Resloration (excavation, granular base, asphalt, ~d cusblguller) ,, On Bronte Square from Glendale Drive westerly 70 metres, to restore the road over the sewer Installation of Sidewalk · between Kingston Road and Olenanna Road · to be Iocaled on the east boulevard of Glendale Drive Complete Landscape Restoration (grading, sodding, and fencing where required) · to all areas affecled The Town of Pickering ] i~c~as Temporary Closings for Oonstruction Purposes LEGAL SERVICES DEPARTMENT File W2303 Temporary Road Closure for Construction - Faiport Road PUBLIC WORKS DEPARTMENT LOCATION MAP TEMPORARY ROAD CLOSURE: Falrport Road - from Kingston Road to Dunbarton Road Road closed from June 27, 1994 Io Oclober 31, 1994. CONSTRUCTION DURATION: Approximately 12 weeks. CONSTRUCTION INCLUDES: Installation of Storm & Sanitary Sewers · On Falrport Road, belwccn Kingslon Road and the C.N.R. Train Trestle to facilitate road drainage and future servicing for homes further north along the street Installation of Sanitary Sewers · On Sheppatd Avenue, between Fairport Road and Spruce Hill Drive to provide se~'icing for homes Complete Road Reconstruction, Realigmnent & Widening (excavation, granula' base, asphalt, and curb/gu,er) · On Fairport Road belween Kingslon Road and the C.N.R. Train Trestle to accomodate new intersection at Highway No. 2, and future widening n~.rlh along thc street Road Reconstruction (granular base, asphalt, and curb/gutter) · On Sheppard Avenue between Falrporl Road and Spcucc Hill Road to meet with previous road improvements Inslallation of Sidewalk · between Kingston Road and Sheppard Avenue * to be located on thc west boulevard of Fairport Road Complete Landscape Restoration (grading, sodding, and fencing where required) · to all m'cas affected ., The Town of Pickering ] ~oa~s T~'~orary Closings for Constructions LEGAL SERVICES DEPARTMENTI File ~303 Temporary Road Closure for Construction Sheppard Avenue PUBLIC WORKS DEPARTMENT LOCATION MAP TEMPORARY ROAD CLOSURE: Sheppa.rd Avenue- from Fairport Road to Whites Road Road closed from June 27, 1994 to October 3 I, 1994. CONSTRUCTION DURATION: Approximately 4 weeks. CONSTRUCTION INCLUDES: Installation of Storm & Sanitary Sewers · On Fairpoa Road, between Kingston Road and fhe C.N.R. Train Trestle to facililale road drainage and future servicing for homes fudher north along the street Installation of Sanitary Sewer · On Sheppard Avenue, between Fairport Road and Spruce Hill Drive to provide sen'icing for homes Complele Road Reconstruclion, Realignment & Widening (excavation, granular base, asphalt, and curb/guUer) · On Fairporl Road between Kingston Road and the C.N.R. Train Trestle to accomodate new intersection at Highway No. 2, and future widening north along the street Road Reconstruction (granular base, asphalt, and curb/gutte0 · On Sheppard Avenue between Fairpon Road and Spruce Hill Road to meet with previous road improvements Installation of Sidewalk · between Kingston Road and Sheppa.rd Avenue · to be located on the west boulevard of Fairporl Road Complete Landscape Restoration (grading, sodding, and fencing where required) · to all areas affected The Town of .,o er,ns T~','~or~ Closings for Construction PurFoses LEGAL SERVICES DEPARTMENT File W2303