April 16, 1990.
Friends and Neighbours,
Hi! I wanted to take this opportunity to welcome our new
neighbours who have recently moved to our Lakeside community
Staxton Glen.
In a constant effort to create a more attractive and
improving the equity in our investments, I have investigated
an important avenue that needs immediate attention.
Currently, this subdivision is considered still under
construction and officially has not been assumed by the Town
of Pickering. This i.s important in that we can add further
improvements without major applications, permits and red
tape.
ENTRE3I�TC'E G.r3 2-'E—'7
Originally, Shipstate the developer, had planned to build
entrance gates on each side of the road beside Mr. & Mrs.
Meyer's and Mr. & Mrs. Pong's homes. Due to some financial
factors this was not done and cancelled.
I believe that these gates should be completed and I have
begun to orchestrate the financial plan and seek your
support.
Page 2
In discussing this with Rick Rondeau, he has worked out an
agreement with Braidstone Company, who would build these gate
posts and put a cap on the edge with a granite plaque with
6taxton Glen engraved into it. The price is $13,000,
excluding the base preparation which is difficult to
estimate, however, Tom Forsythe is probably the most
reasonable for base preparation as we've all found.
With an estimated cost of $jt0,000 + or - I have talked with
Bill Brown of Shipstate, our developer, who is determining
if he will support the project by assisting us financially.
Initially, he mentioned $3,000., however, apparently he has
$8,000. plus of tree planting expense planned for the
boulevards and other commitments lie hasn't completed. I
believe that this could be used towards the construction of
the gatepost.
As these negotiations begin, I believe that we should start
this construction immediately, prior to the road being
assumed by the Town.
Each home would contribute $665. towards the construction for
a total of $19,977.60. If Bill Brown comes through,
proportionate refunds will be split and returned to you,
along with any savings attributed during construction.
To start the ball rolling, we require a cheque for $665. made
out to: "IN TRUST STAXTON GLEN HOMEOWNERS ASSOCIATION."
This cheque will not be cashed until the funds are requited
to pay for the construction sometime in May or June. Please
send this cheque to: M.J. Bryant
3290 Greenburn Place
Locust Hill, Ontario.
LOH 1J0
or drop it by. If you have any concerns, please give me a
call at home at 427-2095 or at the office at 686-1261.
I require your cheque by 444W 30, 1990.
M.J. Bryant
1
91,
Jar 4-100
17-11
co
co L i
aton
-103.87
I IN
Lo
------� o ELocK�oz
RESERVE 0.3mELOCP
- .14 720 5, �-� q � +- r"!.R`��\ . l 7�'0 45 E 7REcERG'E C
L .. r- r" C" _r % a C Jam— '1 1 I 1 1 A,
ENTRANCE /
GATE
14180
42�4
106-22
Ln
CD
N
141.50
14127 < 41 Oc
114075)
-1'9 , 7,?
L071
I C3.87
5c 5*
05C
LO
140.2C
141,00 L
C�
N 17
6�, 7480
%0 4r" E' 720 45 ql� 4i 0V8
%
X!39 91 f r ,:L
C E
x _lCj(D
x 139. tc x :39.5c
439 5
NOTE
FENCING IN ACCORDANCE WITH SUBDIVISION AGRE:ZMENT
.X TON GLEN DEVELOPMENTS LTD.
322, R.R.#1 Locust Hill, Ontario LOH 1JO
_)ne (416) 427-0390
April 17, 1990
Staxton Glen Association
c/o Mr. Michael Bryant
3290 Greenburn Place
R. R. #1
Locust Hill, Ontario
LOH 1JO
Gentlemen: RE: Staxton Glen Entry Gates
The following is a quotation for two (2) piers 16 to 20 feet
long by 2 feet wide, capped with stone sills with "Staxton
Glen" embossed in each pier. Very similar to gates at "Deer
Creek" Subdivision.
Product
Excavating & Backfill
Foundation
Masonary Labour
$ 6,177.60
1,200.00
3,000.00
4,200.00
Approximate Total Cost
$17,577.60
The price for
the foundation
is based on
4 foot depth. Any
depth beyond 4
feet would be
additional,
e.g.,
2 pillars @ 6
feet deep
2 pillars
x additional 2
feet deep x
$300.00/foot,
add - $1,200.00.
2 pillars @ 8
feet deep
2 pillars
x additional 4
feet deep x
$300.00/foot,
add - $2,400.00.
The above quotation does not include any mark-up for supervision,
or office administration. All surveys, stake -outs, telephone
and hydro locations would have to be done by the Association.
Yours very truly
STAXTOONN 10 DEVELOPMENTS LTD.
R. Rondeau
RR/gb
BRADSTONE
'
I
'i,�Ay. c,
7�' - drs-ACARC
A STANDARD INDUSTRIES COMPANY
DIVISION OF CANADA CEMENT LAFARGE LTD.
0 t J l J I A I I[IN
-
P.O. Box 1060, Slouffville, Ontario LOH 11-0
-
UMM
Tel.: (416) 640-7264 Toronto Tel.: (416) 733-4633
AXXKN0XJD5J101YMVXX
JOB NUMBER
SOLD TO
JOB LOCATION
Fourteen
LsLaLes
ENTRANCE
WALLS
R.R.#1,
Box 522
"STAXTON
GLEN"
Locust
Hill, Ont.
LOH 1JO 5TH CONC.
E. off WESTNEY
CONTRACT NUMBER
SALESMAN T i m
R u f
DATE §000=
CUST. ORDER NO.
SHIP VIA
F.O.B.
TERMS
MAR. 01/90
ORADSION[
JUB SITE
NET/30
DATE REQUIRED
FED. SALES TAX
PROV. SALES TAX
INCL. + 1°0
TO ADVISE
FED. ADJ.
I-X I I?A
COLOUR WLAIHLRLD
YORK
PLLASE ACCEPT THE FOLLOWING QUOFA110N
FOR THE SUPPLY OF THE BRADSTONE "1"
BLOCK WALLING MATERIAL AND PRE-CASI
COPING, PIER CAPS, AND SIGNS.
-v 800 F112 1 'IT" BLOCK WALLING STONE
4 FA
PIER
CAPS 31
1/2
x 31 1/2 x 911
411 l/ft
WAI I
COPING
10"
x 4"
2 EA. I I SIGN PLAQUES ENGRAVED "STAXTON GLEN"
PRE -CAST SIII'PI if I) IN NATURAL GREY
ACID ETCHED
TOTAL
PLEASE ADVISE IMMEDIATELY OF ANY ERRORS, CHANGES, OR OMISSIONS TO THE ORDER AS SHOWN ABOVE.
REMARKS (FOR INTERNAL USE ONLY)
3.65 E�2
1 50.00 1 A. has (-Ie
1`). 0 0 1,
f t. a c cr..z,
4
800.00 1
A. / C ,
Bradslone is a registered trade mark or
Bradstone International Lid., Swindon,
England and all products are manulac-
iured and sold under licence train
Bradslone international in Canada by
Standard Industries Company